Case Study
Bubble Laundry
When: June 2021 - Ongoing Where: UAE Site: Abu Dhabi Client Brief: The client required a temporary chilled water-cooling system to improve the working environment for employees at the plant.
Result: Byrne was able to reduce the water network temperate which improved the performance of the air handling units, in turn providing better air conditioning and improving the working environment conditions.
Equipment Supplied: 2 x 100kW Chillers. Solution: Byrne assessed the location and requirements and provided the necessary equipment based on this, providing a HVAC designed solution with heat load and fabricated bespoke water network as per site conditions.