Case Study
Fountain View
When: Jan 2019 - Jan 2020
on. This alleviated ground forces allowing Byrne to deploy double deck mast climbers as and when required, with scope to deploy a triple application if needed for the project.
Where: Dubai, UAE Site: High rise residential site Client Brief: The client required mast climbers, along with a solution for on the ground and multiple level access to carry out façade works on this private, high rise residential unit. Equipment Supplied: Double deck mast climbers, MC450, along with the 490kn support wall chair system.
Result: Byrne Equipment Rental provided a unique solution, enabling the client to achieve multiple level access to the site as well as on the ground. This solution gave the client reassurance when using new machines at heights of 300m, with a unique wall chair loading capability.
Solution: The first of its kind in the region, Byrne Equipment Rental designed and supplied a 490kn wall chair, which the mast climbers were positioned
Enabling operational efficiency through equipment rental and lease solutions
UAE
KSA
Kuwait
Oman
Bahrain