
1 minute read
Building Block
Construction Manager At-Risk VS Design-Build
Submitted by Will Black, Business Development Manager, Performance Services
Arkansas schools have design and construction procurement options. These delivery methods range from low bid (Design-Bid-Build or Plan/Spec) to best value (Design-Build) or fall somewhere in between (Construction Manager At-Risk).
Evaluate these three important considerations before selecting a method for your next building project:
• Budget Constraints
• Fixed Move-in Schedules
• Owner Risk Tolerance
