Skip to main content

Terri Leung | Architecture Portfolio

Page 1

Architecture Portfolio|Vol.3

Master of Architecture 2021 University of Minnesota, School of Architecture

Extrastatecraft | Selby Ave. | Juxtaposition | Live-Work|Rule-Set Eatery | Public Squares in Zanzibar | Malaika Childcare Village

TERRI LEUNG


2

Contents


CONTENTS STUDIO WORK

04

Extrastatecraft - Urban Factory

30

Selby Ave. Filling the Commercial Gaps

42

Live-Work

Master Final Project 2021 Professor Jennifer Yoos

Graduate Studio III Professor Gabriel Cuellar

Graduate Studio II Professor Cynthia Jara

WORK SAMPLE

CLICK NUMBERS TO EXPLORE

Contents

Position: Architectural Intern Engineering Ministry International (EMI)

3

54

Malaika Childcare Village, Voi, Kenya


ARCHITECTURE PORTFOLIO | STUDIO WORK

Extrastatecraft - Urban Factory

4

Urban Factory

Master Final Project 2021 Professor Jennifer Yoos

“What if the main ports in the world lost its resources, could developing city pick up the manufacture technology and speed to provide the city’s need? “


UNIVERSITY OF MINNESOTA | 2021

This project is looking at the city Hong Kong and make change on this bleeding pattern of infrastructures. Ongoing trade war, Umbrella

What if one day trade war become more serious, could people in Hong Kong still survive without the imported food? What if one day another wave of pandemic comes, China or other countries are not capable to transport goods, would economy of Hong Kong die? What if the main ports in the world lost its resources, could developing city pick up the manufacture technology and speed to provide the city’s need?

Urban Factory

One of the infrastructures, the free zone was described by Keller Easterling as EXTRASTATECRAFT. The zone is developed drastically from a out-of-way area for manufacturing custom-free goods as a postwar surviving method to a model for thriving city like Hong Kong, Singapore, and Dubai. Easterling did not make a clear statement on whether it is bad or good; rather, describe how this phenomenon evolve overtime.

Revolution in 2014, Extradition Law in 2019 and the pandemic this year has evoked us the problem of over-reliance from the thriving cities to the manufactory in the developing countries (urban-space-to-be).

5

Urban space has become an instrument that contain mobile and monetized technology. The globalizing world are being displayed through spatial information of infrastructure, architecture, and urbanism with an underlay of some patterns of trading instead of the language of law and diplomacy.


6

Urban Factory

ARCHITECTURE PORTFOLIO | STUDIO WORK


UNIVERSITY OF MINNESOTA | 2021

1966

1988

1996

Commercial

Agriculture Residential

Urban Factory

Governmental

7

2019

Industrial


ARCHITECTURE PORTFOLIO | STUDIO WORK 1950

San Po Kong Tai Kuk Tsui Industrial Area Wong Chuk Hang Industrial Area Kennedy Town Industrial Area Cheung Sha Wan Industrial Area Hung Hom Industrial Area Quarry Bay Industrial Area Chai Wan Industrial Area Shau Kei Wan Industrial Area Yau Tong Industrial Area Kwun Tong Industrial Area To Kwa Wan Industrial Area Kwai Chung Estate Tsuen Wan District Industrial Area

Where people resident T_POP / Area ≤0.009325 ≤0.02438 ≤0.04907 ≤0.08957 ≤0.1560

1970

Sha Tin District Industrial Area 1980-1990 Tseung Kwan O Industrail Estate, 1995 Yuen Long District Industrial Area 1983 Tai Po District Industrial Area 1978 Tuen Mun District Industrial Area 1972 (first factory estate in hk)

Where people resident T_POP / Area ≤0.009325 ≤0.02438 ≤0.04907 ≤0.08957 ≤0.1560

1990

Cyberport 2019 Hong Kong Science and Technology Parks Corporation 2001

Where people resident T_POP / Area ≤0.009325 ≤0.02438 ≤0.04907 ≤0.08957

8

Urban Factory

≤0.1560


UNIVERSITY OF MINNESOTA | 2021

Chai Wan Resettlement Estate, 1963

Chai Wan Resettlement Estate, 1963

Wah Ha Factory Building, 1972

Kwai Bo Industrial Building,1977

Yue Fung Industrial Building, 1972

E. Tat Factory Building Wong Chuk Hang 1974

Sai Wan Industrial Building, 1981 Derrick Industrial Building, 1982

Urban Factory

Chai Wan Industrial City Phase II, 1989

9

Shing Yip Industrial Building, 1987


ARCHITECTURE PORTFOLIO | STUDIO WORK

Trade in the past Design/Investment

Design/Investment

Manufacture

Finance (Stock Market) Wholesaler

Wholesaler

Retailer

Retailer

Tourist

Consumer

Tourist

Consumer

Other Developed Countries

Hong Kong

Trad Nowadays Design Company/Investment

Design/Investment

Design Company/Investment

Manufacture

Finance (Stock Market)

Finance (Stock Market) Wholesaler

Consumer

Urban Factory

Mainland China/ Developing Countries

10

Wholesaler

Retailer

Retailer

Tourist

Wholesaler

Tourist

Retailer

Consumer

Hong Kong

Tourist

Consumer

Other Developed Countries


UNIVERSITY OF MINNESOTA | 2021

Trade (proposed)

Design Company/Investment

Design Company/Investment

Self sustaining Manufacture

Self sustaining Manufacture

Design/Investment

Manufacture

Tourist

Tourist

Consumer

Consumer

Wholesaler

Finance (Stock Market)

Finance (Stock Market)

Retailer

Consumer Retailer

Mainland China/ Developing Countries

Wholesaler

Hong Kong Hong Kong

Other Developed Countries

Urban Factory

Wholesaler

Retailer

11

Tourist


ARCHITECTURE PORTFOLIO | STUDIO WORK

12

Urban Factory

Self-Sustain Factory Customer • Having entirely different shopping experience than being in a conventional mall by going through workshop, and buying partially tailer-made products. • Opportunity to be contributor to the designs for potential mass production.

Manufactory • Having multiple resource-related factory located in the same building allow sharing recourses, recycle waste from one-another, which reduces cost. • Its developed sustainable facility attract different existing cooperate brand to vest authority in manufactory in this building.

Product Investor • The transperancy of the manufactoring process attract more business and build up good reputation. • As envrionmental protection requiremnets getting more strict in the future, self-sustain manufactory community would be a go-toplace for investors to locate their factory.

Worker • By increasing its community space for workers only allow them to have closer working relationship, as well as increase their productivity • Having office and labotary close to the manufactory also allow faster and more convinient communication from design to manufacture.


UNIVERSITY OF MINNESOTA | 2021

c fi f ra T in

a M

e g rid

b t o

o F d

n a d

a o r ss

ly n O

o r C

s g in

ly n O

ld i u B

B y a

, y a

w e us

g n o K g

n o H

13

Urban Factory

Ca


ARCHITECTURE PORTFOLIO | STUDIO WORK

14

Urban Factory

This study is to find out which part of the building get the most attention from moving transportation, pedestrian by setting points where most people stops and walks. It turns out that the the intersection between Yi-Wo street and SOGO are being seen the most.Paterson Street is also an essential part of the building as many street performance being held there. It is also a popular pathway for pedestrian to shop. These points are selected because of its threshold change, desnsity of pedestrain or car. Examples are exit of metro station, shopping street, footbridge, tram, etc.


15

Urban Factory

UNIVERSITY OF MINNESOTA | 2021


16

Urban Factory

ARCHITECTURE PORTFOLIO | STUDIO WORK


UNIVERSITY OF MINNESOTA | 2021

17

Urban Factory

This façade study opening are showing how each opening are telling a story of making, the building itself as a machine that constantly moving, as well as the manufacturing machine. It reveals the circulation of people, waste transporting, goods, product process line track, etc.


ARCHITECTURE PORTFOLIO | STUDIO WORK

Worker Space Loading Area Tailor experience/Workshop Commercial-Eatery/Retail Outdoor Green Space Customer Walkway Customer Circulation

18

Urban Factory

Office/Lab Manufactory


19

Urban Factory

UNIVERSITY OF MINNESOTA | 2021


20

Urban Factory

ARCHITECTURE PORTFOLIO | STUDIO WORK


21

Urban Factory

UNIVERSITY OF MINNESOTA | 2021


22

Urban Factory

ARCHITECTURE PORTFOLIO | STUDIO WORK


23

Urban Factory

UNIVERSITY OF MINNESOTA | 2021


ARCHITECTURE PORTFOLIO | STUDIO WORK

Pedestrian Experience Vegetable Factory and Pathway to Metro

24

Urban Factory

As many are going to Metro station and SOGO department store on ground, this basement tunnel allows pedestrians to avoid the crowd on ground. And be able to see the process of growing vegetable through LED light.


25

Urban Factory

UNIVERSITY OF MINNESOTA | 2021


26

Urban Factory

ARCHITECTURE PORTFOLIO | STUDIO WORK


27

Urban Factory

UNIVERSITY OF MINNESOTA | 2021


28

Urban Factory

ARCHITECTURE PORTFOLIO | STUDIO WORK


UNIVERSITY OF MINNESOTA | 2021

Working environments are essential for workers. Factory in Hong Kong in the past are way too efficiency oriented and neglecting worker’s wellbeing by not providing open area, green space and enough day lighting.

29

Urban Factory

This model of urban factory is allowing manufacturing, shopping, office space and workshop combine together. Our products in our hands no longer from another country, but by our own people, our own hand. Even if the communist party are blocking all imported resource, we are strong to survive.


ARCHITECTURE PORTFOLIO | STUDIO WORK

Selby Ave. Filling the Commercial Gaps

30

Selby Ave.

Graduate Studio III Professor Gabriel Cuellar

“The ground graffiti connect the whole street visually and also enable a strong identity for Selby Ave.“


UNIVERSITY OF MINNESOTA | 2020

Along Selby Avenue from Lexington Parkway to Dale Street, there are various local-owned businesses such as Café, barbershops, boutiques, and fitness that contribute to the Selby Avenue community. Although Selby Avenue is filled with local businesses, each store is separated by some residential buildings in between, which are commercial gaps that interrupts the continuity of shopping experience and takes away the visual identity of this neighborhood. To offer a safe, lively, and promotable trading experience for the neighborhood and the merchants, the proposal is to add graffiti on the ground as an agency to bring visual unification to the street.

There are few businesses played important role to encourage social engagement in the neighborhood. They can occupy further to the north, where the metro station located to attract more people to come. The ground graffiti connect the whole street visually and also enable a strong identity for Selby Ave.

31

Selby Ave.

This is a collective graffiti proposal, inviting all merchants on Selby avenue to design the portion in front of their shops. Some newer businesses indicated in orange can also occupy space further to fill in the commercial gaps on Selby.


32

Selby Ave.

ARCHITECTURE PORTFOLIO | STUDIO WORK


Ped Bike System Trail Bike Lane Bike Route Striped Shoulder

Crosswalk or Connecto Sidewalk Footpath

Railroad Abandoned Rail Heavy Rail Light Rail rondo20200810

sale after 2006

Trail Bike Lane

≤141.2

Striped Shoulder Crosswalk or Connector Sidewalk Footpath

Railroad

≤112.8

≤106.1 ≤118.9

≤158.2 ≤164.5 ≤171.3 ≤178.4 ≤186.2 ≤194.1

Heavy Rail

≤211.6

Light Rail

≤221.4 ≤231.8 ≤242.6 ≤255.4

≤61.34

≤272.4

≤77.62

≤298.0

≤88.79

≤344.4

≤97.88

≤422.1

≤106.1

≤579.4

≤112.8

≤906.6

≤118.9

≤1589

≤124.8

rondo20200810

≤130.4

≤88.79

≤152.5

≤202.4

EMVTotal / LivingAreaSquareFeet

≤77.62 ≤97.88

Abandoned Rail

Attributed Parcel

≤61.34

≤146.8

Esri Community Maps Contributors, County of Ramsey, Metropolitan Council, MetroGIS, Esri, HERE, Garmin, SafeGraph, INCREMENT P, METI/NASA, USGS, EPA, NPS, US Census Bureau, USDA

Bike Route

EMVTotal / LivingAre

Selby Ave.

Ped Bike System

≤135.8

33

MENT P, METI/NASA, USGS, EPA, NPS, US Census Bureau, USDA

UNIVERSITY OF MINNESOTA | 2020


ARCHITECTURE PORTFOLIO | STUDIO WORK

Natural Sound Studio (2000)

Natural Sound Studio (2000)

Northwest Architectural Salvage (2000)

Golden Thyme Cafe (2001)

Sense of Style Hair Salon (1990)

Key Business After 2007 Business Before 2007

Key

34

Selby Ave.

Business After 2007 Business Before 2007

Bouquests by Carolyn Florist (1990)

Northwest Architectural Salvage (2000


35

Selby Ave.

UNIVERSITY OF MINNESOTA | 2020


36

Selby Ave.

ARCHITECTURE PORTFOLIO | STUDIO WORK


37

Selby Ave.

UNIVERSITY OF MINNESOTA | 2020


38

Selby Ave.

ARCHITECTURE PORTFOLIO | STUDIO WORK


UNIVERSITY OF MINNESOTA | 2020

The graffiti is filled with shops’ names so that people know where they are heading to. It helps businesses to promote themselves, as well as to gain a sense of belonging to this neighborhood.

Selby Ave.

At where most people stopped by for a cup of coffee and even for music Festival, Jazz fest. The graffiti could bring the atmosphere to the next level.

When a commercial Gap like this filled with colorful graffiti, it connects the previous business area to the next one. Pedestrians are drawn to walk further.

39

To unify the graphic in different portions of the ground, there should be a color scheme collectively agree on. Name of their shops are encouraged to paint on the ground for advertisement. Merchants could also change the graffiti every 5-10 years to update the new businesses.


40

Selby Ave.

ARCHITECTURE PORTFOLIO | STUDIO WORK


UNIVERSITY OF MINNESOTA | 2020

To watch the video about this proposal , scan the QR code

41

Selby Ave.

or Click Here


ARCHITECTURE PORTFOLIO | STUDIO WORK

Live-Work

42

Live-Work

Graduate Studio II Professor Cynthia Jara

“There are two parts to live/work – living and working. Traditionally, live/work dictated that both activities take place in the same building or unit within a larger structure; however, contemporary interpretations allow for a degree of travel between living and working “


UNIVERSITY OF MINNESOTA | 2018

The client has expressed an interest in a design that encourages a sense of community. This adds a few considerations. One is whether to identify a type of work that will focus the community. Another would be whether to allow non-workers, or non-working families, to live in the community. You must determine types of housing – one, two, or threebedroom apartments, maisonettes, townhomes, lofts, studios – and the mix of each type in the development. Finally, a community may require services such as recreation – workout rooms, swimming pools, etc. - and services such as child care.

Live-Work

There are two parts to live/work – living and working. Traditionally, live/work dictated that both activities take place in the same building or unit within a larger structure; however, contemporary interpretations allow for a degree of travel between living and working – via an

elevator, walkway, or short walk from one building to another. In addition, work may (or not) be separated into two parts – doing the work and engaging with people who buy the work or service.

43

Whatever the back-story up to this point, we are assuming that a nonprofit developer – may be male, female, or a group – has taken up the challenge of providing a design for the site to the north and west of the Art and Architecture Building extending to the boundary of the Tierney parking lot. The non-profit goal is to balance the desire of the city of Minneapolis for maximum density with neighborhood concerns relating to over-building. The neighborhood group has indicated they may be willing to accept a maximum height of seven storeys on the site. The non-profit developer is proposing the foundation of a live-work community that might, in future, continue its extension along University Avenue, between Clarence and Bedford Avenues.


44

Live-Work

ARCHITECTURE PORTFOLIO | STUDIO WORK


45

Live-Work

UNIVERSITY OF MINNESOTA | 2018


46

Live-Work

ARCHITECTURE PORTFOLIO | STUDIO WORK


47

Live-Work

UNIVERSITY OF MINNESOTA | 2018


Beam Girder

Column

Full-Floor-height Truss

48

Live-Work

Foundation


R

Concrete Un-vegated barrier rounded shingle

nel

Extensitve Subtrate

Girder Filter Fleece Layer

Ground Level

3” Concrete Retaining Concrete Wall 3” Metal Deck

Grout Steel Beam Ground Level

Point load

Concrete Column

Earth

Girder

Detail 2: Transition from Steel Column to Concrete Column

Detail 3: Wood Flooring

WBP plywood Cavity Closer

Un-vegated barrier rounded shingle Upstand

4

5

Roof Level

6

7

8

Waterprofing Thermal Barrier

9

10

11

12

13

14

15

Filter Fleece Layer

16 Ground Level

3” Concrete Retaining Concrete Wall Steel Beam

Reaction from Earth

3” Metal Deck

Column: 16"X16" Glulam Column

Grout

Spider Bracket movement connection between two buildings

Wall wood panel

Concrete Column

Detail 1: Green roof section

Detail 2: Transition from Steel Column

7

C

Wood Base Light Furring

Concrete

F

3” Metal Deck 3/8” Wood floor

Girder

1

2

3

4

5

6

7

8

9

Radiant Warmboard Rigid Insulation Same as floor, Green roof Girder: W21X50 Beam: W16X24

3” concrete Metal Deck

Column: W14X120 Steel Beam

A

Ground B LevelC

D

E

F

G

H

Girder

Column:W14X145

Section 1

Roof top 105' - 0" Girder: W21X50 Beam: W16X24

Detail 3: Wood Flooring on Steel Structure Column: W14X145

Live-Work

3

Steel Column

Extensitve Subtrate

Roof 90' - 0"

Level 6 75' - 0"

49

ll

3” Metal Deck

Steel Column

Column:W14X159 Level 5 60' - 0"

Full height 15' truss for 20' cantiliver


ARCHITECTURE PORTFOLIO | STUDIO WORK

Library 1068 SF

Startup Companies 2539 SF

Level 6

Retail A

4000lb. load elevator

550 SF

4100 SF

Retail B 624 SF

Coffee Shop

Retail C 666 SF

3685 SF

Retail Space 1

50

Live-Work

589 SF

Level 1

Retail Space 2 488 SF

Retail Space 3 625 SF


UNIVERSITY OF MINNESOTA | 2018

External Enterprises

This Single building (Live-Work Community)

Neighborhood

Unemployed populatio in Prospect Park Neighborhood

Residential Office Retail Stores Workshop

Residential Office

Freelance worker in the Neighborhood

Co-working Space

Create Job opportunities for the neighborhood

Profit of the companies/Retails

Profit reached what a mature company got needs to leave and allow new companies to join

10% of the profit to support the unemployed

Green roof provide new habitats for the n hood and increase biodiversity

To Stormwater

Live-Work

startup companies to grow

Increase information Exchange between companies and diciplines

51

Affordable rental office allow


hood Unemployed population in Prospect Park Neighborhood

WBP plywood Cavity Closer

Un-vegated barrier rounded shingle

ker in the d

Upstand Roof Level Waterprofing Thermal Barrier

Filter Fleece Layer 3” Concrete

portunities borhood

0% of the profit o support the nemployed

Extensitve Subtrate

Steel Beam

3” Metal Deck

Spider Bracket Wall wood panel

Green Roof lower the temperature of the surroundings Detail 1: Green roof section

WC

of provide new habitats for the neighbornd increase biodiversity

WC Drip Irrigation WC

Rainwater Collector

Pump

Rainwater Harvesting through Green roof

Filter


f

Glazing

Outside Air is hearted passing through absorber Solar Wall Collector

1

2

3 Air Space Under Negative Pressure

Air Gap

Summer/Winter Bypass Damper

Existing HVAC System


ARCHITECTURE PORTFOLIO | WORK SAMPLE

Malaika Childcare Village, Voi, Kenya

54

Malaika Childcare Village

Position: Architectural Intern Engineering Ministry International (EMI) • Presented final design for the local women, orphans, and ministries directors at Voi, Kenya. • Developed construction drawings and conceptual renderings for future funding.


This is a beautiful, secluded 93-hectare (230-acre) site in the mountains a half an hour from the pollution and congestion of Monterrey. The site is nestled in a valley surrounded awe-inspiring mountains that turn one’s heart and mind to their Creator. This site is intended to become a multipurpose center to be used for prayer and fasting, discipleship, training, retreats, children’s recreation area, and orphanage home.

EMI provides Long-term Master Planning of the Site, Existing Survey, Site Architectural Master-Plan, Water Distribution & Wastewater Collection Assessment. For the Detailed Design of Phase I, we offered Architectural Site Plan, Building Layouts for primary school (including Kindergarten), Watoto village homes,Agricultural Assessment and Electrical Assessment.

55

Engineering Ministries International (EMI) is an international Christian non-profit organization whose vision is to mobilize design professionals to provide design assistance to ministries in developing nations who are helping the poor and proclaiming the gospel of Christ.

Malaika Childcare Village

ENGINEERING MINISTRY INTERNATIONAL| 2017


56

Malaika Childcare Village

ARCHITECTURE PORTFOLIO | WORK SAMPLE


57

Malaika Childcare Village

ENGINEERING MINISTRY INTERNATIONAL | 2018


58

Malaika Childcare Village

ARCHITECTURE PORTFOLIO | WORK SAMPLE


ENGINEERING MINISTRY INTERNATIONAL | 2018

• The proposed church will be located centrally on the site, at the end of the proposed Entrance Drive. Village Clinical and Administration Offices will be located along the Entrance Drive and will be available for use by the public and the residents of the Children’s Village. The Athletic Facilities will be located near the main entrance so the children and public will have easy access to them. • The Children’s Homes will be clustered into 9 individual homes per village. Each home will house 8 children and 1 house mother, for a total of 72 children and nine 9 staff per village. The Master Plan provides for sixteen of these villages, with 4 villages clustered around 1 education classroom pod. The Baby House could easily be accommodated in one 1 or 2 of the individual Children’s Homes located in a Village.

• A masonry wall, entrance gate, and guard house will secure the south perimeter of the property. The east and west perimeters will be secured with electric elephant fencing. The north perimeter will also be secured with elephant fencing but will also include a secondary access point for emergency and maintenance access. • The existing Village Road bisects the site and will be maintained as a private maintenance road from the church to the northern secondary access point. An existing public right-of-way, located to the west of the site, will be used to access the village to the north.

Malaika Childcare Village

• The access to the site will be located approximately midway along the existing public road, in the general vicinity of the existing Village Road. An arrival point / gate will be incorporated into the Entrance Drive, as well as a masonry perimeter wall to the south.

• The agricultural area is proposed on the northeast side of the site. The site naturally slopes in this direction and can serve as a storm water collection point to facilitate water capture and reuse for agricultural irrigation. The agriculture area will include housing for the Agricultural Specialist, green houses, maintenance buildings, sheds, barns, chicken houses, etc.

59

• The public road to the south is expected to be improved at some point in the future. As such, a 60 meter wide Commercial Area along the road has been reserved for future development. A 2 meter high masonry wall is proposed to the north of the Commercial Area to separate the Village area from the Commercial area.


60

Malaika Childcare Village

ARCHITECTURE PORTFOLIO | WORK SAMPLE


ENGINEERING MINISTRY INTERNATIONAL | 2018

CISTERN

3000

8500

LAUNDRY SINK 1

2

HIDDEN CLOSET

KEY NOTES: 1. GATE WITH LOCK 2. METAL DOORS WITH LOCKS AND SCREEN DOOR 3. FURNITURE LAYOUT

VB

1.0m x 2.0m  105

VB

102  3.0m x 3.0m

6000

2800

VB

3700

3

104  3.0m x 3.5m 10000

2

100  2.7m x 3.0m

1

4000

HALF WALL

106  4.0m x 3.0m

101  4.5m x 6.0m

103  3.0m x 3.5m

SLIDING DOOR

COLUMN

CISTERN

Children’s Home Design   The approximately 115 sq.WIDE m.BLOCK floorplan of a typical MCV home EXTERIOR WALL WITH 300MM 1 INTERIOR WALL WITH 170MM WIDE BLOCK 1:100 includes: LOW / PARTIAL HEIGHT WALL 0 1M VB VENT BLOCK • 2 bedrooms (for 8 children), each room with 2 sets of bunk 1:100 beds • 1 bedroom for the house mother • Outdoor covered kitchen • Open plan dining and lounge area • Bathroom • Clothes hanging area • Rain water catchment • Electricity and running water 

5M

Malaika Childcare Village

Phase 1 of the Master Plan includes 9 units of the children’s home. After the construction of the first cluster of homes, it would be good to re-visit the design to evaluate how well it meets the needs of the community.

SQUARE METE

61

MCV’s vision is to raise up leaders, ensuring that children are exposed to a better way of life. Therefore, it is important to improve the quality of the environment that these children are raised in so that they will flourish and become responsible adults. The MCV village concept is adequate, meets African standards, and is not over-ambitious.


ARCHITECTURE PORTFOLIO | WORK SAMPLE

Primary School Classroom Design Rationale Academic education is a key factor in child development. As the saying goes, “knowledge is power.” One of the most important ways to empower children is to educate them, thereby helping them realize their full potential.

62

Malaika Childcare Village

The specific goals of the MCV School Program building include: • To equip students with a basic education, computer skills, and language skills (to include Swahili, English, and possibly Norwegian). Education will be Christcentered and based on Christian values. • To give daily devotions for the training of a generation with spiritual and ethical values. • To motivate children and young people to reach their goals. • To assist children and young people in their homework. • To offer tutorial services in different subjects in order to obtain a better academic efficiency.

While in Kenya, the EMI team visited a unique school concept designed and built through coordination with the Oslo School of Architecture and Design (https://aho.no/en/news/built-kenya-classroom-five-weeks). This recently-completed school project inspired both MCV and the EMI design team. EMI sought to incorporate the curved front wall with light boxes, the open truss roof system, and the creative feel of this new school concept, while also expanding the school building to accommodate more children. In addition to the larger space, EMI sought to make modifications to the Oslo classroom design so as to accommodate simpler construction methods, and create a more cost effective building that would require less maintenance.


ENGINEERING MINISTRY INTERNATIONAL | 2018

METAL ROOF(TYPICAL) TOP OF ROOF 4100 TOP OF WALL 3500

TRUSS MEMBERS (TYPICAL)

TOP OF WALL 2500

CREATIVE APERTURE V.I.F WATER TANK CAPACITY: 16,000L CURVED WALL

CONCRETE FOUNDATION

METAL DOOR

 1:100

MALAIKA CHILDCARE VILLAGE

1

TOP OF ROOF 4100 TOP OF WALL 3500

METAL ROOF(TYPICAL)

TOP OF WALL 2500

TRUSS MEMBERS (TYPICAL)

SCHOOL CLASSROOM

300

VOI, KENYA

GROUND FLOOR

SACSO

   

GROUND FLOOR

WATER TANK CAPACITY: 16,000L

CURVED WALL METAL DOOR

PROJECT

CONCRETE FOUNDATION

#5695

DATE ISSUE

AUG 2017

REVISIONS

 1:100

0

1M

5M 1:100

SHEET NUMB



Malaika Childcare Village

2

63

300

CREATIVE APERTURE V.I.F


THE END


Turn static files into dynamic content formats.

Create a flipbook
Terri Leung | Architecture Portfolio by Terri Leung - Issuu