Skip to main content

Terri Leung | Revit Work Sample

Page 1

5/8 Gyp. Board 5/8" Plywood Sheathing

Vapor Barrier

Weather Barrier

Batt Insulation

Face Brick

Wood Baseboard Metal Flashing with Drip 1/2 Rigid Insulation 4"Concecrete Slab on Grade CMU Bond Beam

4"

6" Min.

Grade 12" CMU

Vapor Barrier Sand Cushion 2" Rigid Insulation

www.autodesk.com/revit

Chung Wan Leung Assignment 5

Detail Project number Project Number Date Issue Date Drawn by Author Checked by Checker Scale 1 1/2" = 1'-0"

A101

3/10/2016 10:55:24 AM


Tabernacle X Modern Church Ancient architecture focuses on the meaning behind each space and ornament. Most of the time, buildings were symmetrical and straightly restricted. Meanwhile, “Form Follows Function” is a principle associated with modernist architecture and industrial design in the 20th century.

Symbolic Material Choice Meanwhile, symbolic architecture evokes people to think of the meaning of being in a certain place. The design of this modern church is to combine the idea of the tabernacle and the function of a modern church.

Glass (Blue): the color blue represents heaven, the color of the sky. Blue was always mentioned throughout the tabernacle to remind man that his destination is heaven and because of our Redeemer we are destined to be in God’s Presence. Concrete (White): Fine Linen is the original. White linen always speaks of purity and righteousness Wood: This Acacia wood undoubtedly speaks of the incorruptible humanity of Christ, for we are told that His humanity would never see corruption.

Professor Andrea J. Johnson

Plant: Spiritual growth of the Christians


Design from the Tabernacle Plan Tabernacle

Design for Modern Church

Tabernacle is a historical floor plan from the Bible. It includes how God wants to connect with people and allow them to cleanse their sins. The plan was divided by “holy place”, and “the most holy place”. While the material and space that God commands has its own purpose and symbolic meaning, it reveals the social context and needs at that time.

Return (E), Power (S), Wisdom (W), Love (N) Most Holy Place Holy Place Court: Public Space Entrance: Invitation

-Stage and auditorium -Welcome Table The exploration of material was inspired by different scriptures.

-Hallway

-Church Offices -Library

-Garden

-Prayer rooms

-Seating area

Light plays an important role in this design as well, espcially as a welcoming feature.

Entrance

The exterior of the building used different method of glazing to creat different condition of light.

Transition from the worries of the world to the peace from God.

Symbolic Sides Church Office and Library allow Christian to equip themselves by God’s words. Holy Place Having Sunday Service or hear the Words as a big group.

Public Practice community love as the fellowship in Act 2.

Most Holy Place Because of Jesus Christ, getting to close to God directly is through prayers and individual time with God.


La Grande Cour Sheet List Sheet Name Title Page Material Take off Floor Plan Upper Class Unit Plan Middle Class Unit Plan Lower Class Unit Plan Roof House Plan and Roof Plan Elevation East and West Elevation North and South 3D Views Interior Rendering Exterior Views Eploded Axon (building) Sections Site Plan Solar Analyze

Sheet Issue Date

Sheet Number

05/13/16 05/13/16 05/13/16 05/14/16 05/14/16 05/15/16 05/13/16

A001 A002 A101 A102 A103 A104 A201

05/13/16

A301

05/13/16

A302

05/13/16 05/13/16 05/13/16 05/13/16

A350 A351 A352 A360

05/13/16 05/13/16 05/13/16

A400 A500 A600

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Description

Date

Title Page Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan Leung Checker

A001 Scale

5/15/2016 1:35:18 AM

Westerdoksdijk, Amsterdam 2000 – 2008 Client City Cour Combination Programme 253 apartments (owner-occupied and rental), ca. 2,500 m² commercial space (incl. creative workspaces and restaurants), underground car park with 263 parking bays. Ca. 46,800 m² gfa In collaboration with Heren 5 architecten BV, Amsterdam and de Architekten Cie., Amsterdam Awards BNA Buidling of the year 2008 - Region Noord-West/Centrum Winner NEPROM award 2009 (for regional and urban development)


Material: Name Piastrella (4) Piastrella (4) Piastrella (4) Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in Tile, Porcelain, 4in Tile, Porcelain, 4in Structure, Wood Joist/Rafter Layer Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in Structure, Wood Joist/Rafter Layer Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in Structure, Wood Joist/Rafter Layer Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in Structure, Wood Joist/Rafter Layer Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in

Material: Cost 0.00 0.00 0.00 0.00 0.00 0.00

Floor Material Takeoff Material: Volume

22.00 CF 22.00 CF 22.00 CF 233.47 CF 20.76 CF 233.47 CF

0.00 0.00 0.00 0.00

21.20 CF 21.20 CF 21.20 CF 229.75 CF

0.00

233.47 CF

0.00 0.00

20.76 CF 233.47 CF

0.00

233.47 CF

0.00 0.00

20.76 CF 233.47 CF

0.00

233.47 CF

0.00 0.00

20.76 CF 233.47 CF

0.00

233.47 CF

0.00

20.76 CF

Material: Cost

Material: Volume

Material: Name

0.00

233.47 CF

0.00

233.47 CF

0.00 0.00

20.76 CF 233.47 CF

Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board

Material: Name Structure, Wood Joist/Rafter Layer Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in Tile, Porcelain, 4in Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in Tile, Porcelain, 4in Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in Tile, Porcelain, 4in Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in Tile, Porcelain, 4in Structure, Wood Joist/Rafter Layer Tile, Porcelain, 4in Tile, Porcelain, 4in Structure, Wood Joist/Rafter Layer

Gypsum Wall Material Take off

0.00 0.00 0.00

21.20 CF 21.20 CF 229.75 CF

0.00 0.00 0.00

21.20 CF 21.20 CF 229.75 CF

0.00 0.00 0.00

21.20 CF 21.20 CF 229.75 CF

0.00 0.00 0.00

21.20 CF 21.20 CF 229.75 CF

0.00 0.00 0.00

21.20 CF 21.20 CF 229.75 CF

Chung Wan Leung La Grand Cour, MVSA Architects

Material: Cost Material: Area

Gypsum Wall Material Take off

Material: Volume

0.00

187 SF

9.72 CF

0.00

188 SF

9.80 CF

0.00

184 SF

9.57 CF

0.00

184 SF

9.57 CF

0.00

187 SF

9.72 CF

0.00

188 SF

9.80 CF

0.00

184 SF

9.57 CF

0.00

184 SF

9.57 CF

0.00

187 SF

9.72 CF

No.

Description

Date

Material: Name Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board Gypsum Wall Board

Material: Cost Material: Area

Material: Volume

0.00

187 SF

9.72 CF

0.00

187 SF

9.72 CF

0.00

187 SF

9.72 CF

0.00

187 SF

9.72 CF

0.00

187 SF

9.72 CF

0.00

187 SF

9.72 CF

0.00

187 SF

9.72 CF

Material Take off Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A002 Scale

5/15/2016 1:35:18 AM

Floor Material Takeoff


Level 1-2 FloorPlan 1" = 40'-0"

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Description

Level 3-8 FloorPlan 1" = 100'-0"

3

Level 9-11 FloorPlan 1" = 100'-0" Date

Floor Plan Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan Leung Checker

A101 Scale As indicated

5/15/2016 1:35:31 AM

1

2


2 Upper Class Unit 1/8" = 1'-0"

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Description

Date

Upper Class Unit Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A102 Scale 1/8" = 1'-0"

5/15/2016 1:35:38 AM

1

Upper Class


MiddleClass 3/16" = 1'-0"

2

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Middle Class

Description

Date

Middle Class Unit Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A103 Scale 3/16" = 1'-0"

5/15/2016 1:35:42 AM

1


Lower Class 3/16" = 1'-0"

2

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Lower Class

Description

Date

Lower Class Unit Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A104 Scale 3/16" = 1'-0"

5/15/2016 1:35:45 AM

1


Townhouse Exit 5

Townhouse Exit 4

Townhouse Exit 3 Townhouse Exit 2

Townhouse Exit 1

Barbecue 1202

Office

DN

1201

Room Legend Barbecue Office Townhouse Exit

Roof Level FloorPlan 1" = 40'-0" 2

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Description

Roof Plan 1" = 50'-0" Date

Roof House Plan and Roof Plan Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan Leung Checker

A201 Scale As indicated

5/15/2016 1:35:48 AM

1


Upper Class

Roof 120' -12 0" Level 110' -11 0" Level 100' -10 0" Level 90' - 0" Level 9 80' - 0" Level 8 70' 0" Level 7 60' - 0" Level 6 50' 0" Level 5 40' - 0" Level 4 Level 3 30' - 0" 20' - 0" Level 2 10' 0" Level 1 0' - 0" foundation -10' - 0"

More Luxury and Spacious Space

Middle Class

Lower Class Smaller Room and Lower Price

1

East 1" = 40'-0"

Office/ Conference Room

West 1" = 40'-0"

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Description

Date

Elevation East and West Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan LeungWan Leung Checker

A301 Scale 1" = 40'-0"

5/15/2016 1:36:21 AM

2

Roof 120' -12 0" Level 110' -11 0" Level 100' -10 0" Level 90' - 0" Level 9 80' - 0" Level 8 70' 0" Level 7 60' - 0"6 Level 50' - 0" Level 5 40' - 0" Level 4 30' 0" Level 3 20' - 0" Level 2 10' 0" Level 1 0' - 0" foundation -10' - 0"


Stairs/Elevators

North 1" = 40'-0"

Glass Bedroom Community Room/Entertainment

3

South. 1" = 40'-0"

Roof 120' 0" Level-12 110' -11 0" Level 100' -10 0" Level 90' - 0" Level 9 80' 0" Level 8 70' - 0" Level 7 60' 0" Level 6 50' - 0" Level 5 40' 0" Level 4 30' - 0" Level 3 20' 0" Level 2 10' - 0" Level 1 0' 0" foundation -10' - 0"

Main Entrance

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Description

Date

Elevation North and South Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan Leung Checker

A302 Scale 1" = 40'-0"

5/15/2016 1:36:53 AM

1

Roof 120' -12 0" Level 110' -11 0" Level 100' -10 0" Level 90' - 0" Level 9 80' - 0" Level 8 70' 0" Level 7 60' - 0" Level 6 50' 0" Level 5 40' - 0" Level 4 30' 0" Level 3 20' - 0" Level 2 10' 0" Level 1 0' - 0" foundation -10' - 0"


3

Leung_3D

2

Leung_3D(3)

4

Chung Wan Leung La Grand Cour, MVSA Architects

Leung_3D(2)

Leung_3D(4)

No.

Description

Date

3D Views Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan Leung Checker

A350 Scale

5/15/2016 1:38:02 AM

1


La Grand Cour, MVSA Architects

Description

Date

Interior Rendering Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan Leung Checker

A351 Scale

5/15/2016 1:38:03 AM

Chung Wan Leung

No.


Perspective one

2

Perspective2

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Description

Date

Exterior Views Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan Leung Checker

A352 Scale

5/15/2016 1:38:17 AM

1


Entertainment Office/Admistration

Luxury Units

BuildingAxon

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Description

Date

Eploded Axon (building) Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan Leung Checker

A360 Scale

5/15/2016 1:42:55 AM

1


1

Roof 120' 0" Level-12 110' -11 0" Level 100' -10 0" Level 90' - 0" Level 9 80' 0" Level 8 70' - 0" Level 7 60' 0" Level 6 50' - 0" Level 5 40' 0" Level 4 30' - 0" Level 3 20' 0" Level 2 10' - 0" Level 1 0' 0" foundation -10' - 0"

Section 1 1" = 40'-0"

Roof 120' 0" Level-12 110' -11 0" Level 100' -10 0" Level 90' - 0" Level 9 80' 0" Level 8 70' - 0" Level 7 60' 0" Level 6 50' - 0" Level 5 40' 0" Level 4 30' - 0" Level 3 20' 0" Level 2 10' - 0" Level 1 0' 0" foundation -10' - 0" Section 2 1" = 40'-0"

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Description

Date

Sections Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan Leung Checker

A400 Scale 1" = 40'-0"

5/15/2016 1:43:10 AM

2


1

2

Site Small 1" = 60'-0"

Site1 1" = 200'-0"

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Description

Date

Site Plan Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan Leung Checker

A500 Scale As indicated

5/15/2016 1:43:16 AM

1

A301


4

5

9am,jun21 1" = 200'-0"

9am,dec21 1" = 200'-0"

3

12pm,Sep21 1" = 200'-0"

6

12pm,jun21 1" = 200'-0"

7

12pm,dec21 1" = 200'-0"

Chung Wan Leung La Grand Cour, MVSA Architects

No.

Description

1

3pm,Sep21 1" = 200'-0"

8

3pm,jun21 1" = 200'-0"

9

3pm,dec21 1" = 200'-0"

Date

Solar Analyze Project number Date Drawn by Checked by

Project Number Issue Date Chung Wan Leung Checker

A600 Scale 1" = 200'-0"

5/15/2016 1:43:45 AM

9am,Sep21 1" = 200'-0"

2


Floor Material Takeoff

Maerial Cost 2450228 2450228 2450228 2450228 2450228 24754 24754 24754 24754

Material: Volume

Material: Name Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete

Floor Material Takeoff

Material: Cost

Maerial Cost

10516.00 CF

2.33

39462 24754

10516.00 CF

2.33

39462 24754

10516.00 CF

2.33

39462 24754

10516.00 CF

2.33

39462 24754

10516.00 CF

2.33

24754 39462

106.24 CF

2.33

24754 39462

106.24 CF

2.33

39462

106.24 CF

2.33

39462

106.24 CF

2.33

Material: Name Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete Concrete - Cast-in-Place Concrete

Floor Material Takeoff Material: Volume

Material: Cost

169.36 CF 106.24

2.33

169.36 CF 106.24

2.33

169.36 CF 106.24

2.33

169.36 CF 106.24

2.33

106.24 CF 169.36

2.33

106.24 CF 169.36

2.33

169.36 CF

2.33

169.36 CF

2.33

Maerial Cost

Material: Volume

Material: Name

Material: Cost

Sheet List

A001 A101 A102 A201 A301

A302

Sheet Name Title Page Level 1 Floor Plan Level 2-5 Floor Plan Roof Plan Elevation East and West Elevation North and South

Sheet Issue Date

Drawn By

03/31/16 03/31/16

Author Author

03/31/16

Author

03/31/16 03/31/16

Author Author

03/31/16

Author

1

ApartmentComplex 12" = 1'-0" No.

Chung Wan Leung www.autodesk.com/revit

Apartment Complex

Description

Date

Title Page Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A001 Scale 12" = 1'-0"

4/7/2016 5:58:52 PM

Sheet Number


2 A400

2 A400

Reading Room

Restroom

Office

Conference Room

Cinema

Restaurant

2

3

4

5

6

7

3 A400

3 A400

Kitchen

1

8

Level 1 1" = 20'-0"

2

No.

Chung Wan Leung www.autodesk.com/revit

Apartment Complex

Description

Date

Level 1 Cinema 1/8" = 1'-0"

Level 1 Floor Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A101 Scale As indicated

4/7/2016 5:58:53 PM

1

Spa Room


Level 2 1/16" = 1'-0"

3 A400

2 A400

3 A400 3 A400

Level 2 UnitPlan1 2 1" = 10'-0"

Level 2 UnitPlan2 3 1" = 10'-0" No.

Chung Wan Leung www.autodesk.com/revit

Apartment Complex

Description

4

Date

Level 2 UnitPlan3 1" = 10'-0"

Level 2-5 Floor Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A102 Scale As indicated

4/7/2016 5:58:56 PM

1


2

4' - 1 27/32"

A400

3 A400

Roof 1/16" = 1'-0"

No.

Chung Wan Leung www.autodesk.com/revit

Apartment Complex

Description

Date

Roof Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A201 Scale 1/16" = 1'-0"

4/7/2016 5:58:58 PM

1


3 A400

Roof 55' - 0" Level 5 44' - 0" Level 4 33' - 0" Level 3 22' - 0" Level 2 11' - 0" Level 1 0' - 0" Foundation -6' - 0" 3

East 1 1" = 20'-0"

A400

Roof 55' - 0" Level 5 44' - 0" Level 4 33' - 0" Level 3 22' - 0" Level 2 11' - 0"

West 1" = 20'-0" No.

Chung Wan Leung www.autodesk.com/revit

Apartment Complex

Description

Date

Elevation East and West Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A301 Scale 1" = 20'-0"

4/7/2016 5:59:07 PM

2

Level 1 0' - 0" Foundation -6' - 0"


Roof 55' - 0" Level 5 44' - 0" Level 4 33' - 0" Level 3 22' - 0" Level 2 11' - 0"

1

Level 1 0' - 0" Foundation -6' - 0"

South 3/64" = 1'-0"

Roof 55' - 0" Level 5 44' - 0" Level 4 33' - 0" Level 3 22' - 0" Level 2 11' - 0"

North 3/64" = 1'-0"

No.

Chung Wan Leung www.autodesk.com/revit

Apartment Complex

Description

Date

Elevation North and South Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A302 Scale 3/64" = 1'-0"

4/7/2016 5:59:23 PM

2

Level 1 0' - 0" Foundation -6' - 0"


-3D-_1 12" = 1'-0"

4

-3D-_4 12" = 1'-0"

3

2 No.

Chung Wan Leung www.autodesk.com/revit

Apartment Complex

Description

Date

-3D-_3 12" = 1'-0"

-3D-_2 12" = 1'-0"

3D Axons Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A351 Scale 12" = 1'-0"

4/7/2016 5:59:23 PM

1


Roof 55' - 0" Level 5 44' - 0" Level 4 33' - 0"

Roof 55' - 0" Level 5 44' - 0" Level 4 33' - 0" Level 3 22' - 0" Level 2 11' - 0" Level 1 Foundation 0' - 0" -6' - 0" 1

Section 1 1" = 40'-0"

Level 3 22' - 0" Level 2 11' - 0" Level 1 0' - 0" 2

Section 2 1" = 20'-0"

Roof 55' - 0" Level 5 44' - 0" Level 4 33' - 0" Level 3 22' - 0" Level 2 11' - 0" Level 1 0' - 0" Section 3 3/64" = 1'-0" No.

Chung Wan Leung www.autodesk.com/revit

Apartment Complex

Description

Date

Sections Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A400 Scale As indicated

4/7/2016 5:59:32 PM

3


UP

UP UP

Parking Garage 1" = 40'-0"

No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Parking Garage Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A101 Scale 1" = 40'-0"

3/3/2016 2:46:29 PM

1


A104 1-

A103

1

2

A103 -3 A402

2 1 A104 A304 A100 A402 A204

Site 1" = 60'-0" No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Site Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A102 Scale 1" = 60'-0"

3/3/2016 2:46:31 PM

1


Roof 110' - 0"

Roof 110' - 0"

Level 10 99' - 0"

Level 10 99' - 0"

Level 9 88' - 0"

Level 9 88' - 0"

Level 8 77' - 0"

Level 8 77' - 0"

Level 7 66' - 0"

Level 7 66' - 0"

Level 6 55' - 0"

Level 6 55' - 0"

Level 5 44' - 0"

Level 5 44' - 0"

Level 4 33' - 0"

Level 4 33' - 0"

Level 3 22' - 0"

Level 3 22' - 0"

Level 2 11' - 0"

Level 2 11' - 0"

Level 1 0' - 0"

Level 1 0' - 0"

Parking Garage -10' - 0"

Parking Garage -10' - 0"

East 3/64" = 1'-0"

2

No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

West 3/64" = 1'-0"

Description

Date

Elevations (East,West) Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A103 Scale 3/64" = 1'-0"

3/3/2016 2:46:35 PM

1


Roof 110' 0" Level- 10 99' - 0"9 Level 88' - 0"8 Level 77' - 0"7 Level 66' - 0"6 Level 55' - 0"5 Level 44' - 0"4 Level 33' - 0"3 Level 22' - 0"2 Level 11' - 0"1 Level 0' - 0" Garage Parking -10' - 0"

1

North 1" = 50'-0"

Roof 110' 0" Level- 10 99' - 0"9 Level 88' - 0"8 Level 77' - 0"7 Level 66' - 0"6 Level 55' - 0"5 Level 44' - 0"4 Level 33' - 0"3 Level 22' - 0"2 Level 11' - 0"1 Level 0' - 0" Garage Parking -10' - 0" South 1" = 50'-0"

No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Elevations (South, North) Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A104 Scale 1" = 50'-0"

3/3/2016 2:46:45 PM

2


3D View

No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

3D View Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A105 Scale

3/3/2016 2:46:48 PM

1


Rendering 01 12" = 1'-0"

2

Rendering 02 12" = 1'-0" No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Rendering views Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A106 Scale 12" = 1'-0"

3/3/2016 2:46:48 PM

1


3D-leung2

1

3D-leung

No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Leung-3D Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A201 Scale 12" = 1'-0"

3/3/2016 2:46:51 PM

2


DN UP DN

1

WC

WC

201

202

Room UP DN

UP

Canteen

Room

Gallery

204

203

216

304

2

WC

301

302

215

Auditorium

Level 14 1/16" = 1'-0"

WC

Storage 303

Level 13 1/16" = 1'-0"

WC

WC

WC

WC

801

802

1001

1002

Green Garden No.2 1003

FoodCourt 803

Level 12 1/16" = 1'-0"

4

Level 11 1/16" = 1'-0"

No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Leung-Floor Plans(level2,3,8,10) Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A202 Scale 1/16" = 1'-0"

3/3/2016 2:46:54 PM

3


Roof 110' - 0"

Roof 110' - 0"

Level 10 99' - 0"

Level 10 99' - 0"

Level 9 88' - 0"

Level 9 88' - 0"

Level 8 77' - 0"

Level 8 77' - 0"

Level 7 66' - 0"

Level 7 66' - 0"

Level 6 55' - 0"

Level 6 55' - 0"

Level 5 44' - 0"

Level 5 44' - 0"

Level 4 33' - 0"

Level 4 33' - 0"

Level 3 22' - 0"

Level 3 22' - 0"

Level 2 11' - 0"

Level 2 11' - 0"

Level 1 0' - 0"

Level 1 0' - 0"

Parking Garage -10' - 0" Leung Section1 1/16" = 1'-0"

No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Leung-Sections Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A203 Scale 1/16" = 1'-0"

3/3/2016 2:46:56 PM

1

Parking Garage -10' - 0" Leung Section2 2 1/16" = 1'-0"


Roof 110' - 0"

Level 10 99' - 0"

Level 9 88' - 0"

Level 8 77' - 0"

Level 7 66' - 0"

Level 6 55' - 0"

leung south 1/16" = 1'-0"

2

Leung Elevation 1" = 10'-0" No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Leung-Elevations Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A204 Scale As indicated

3/3/2016 2:47:00 PM

1


www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Lee - 3D Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A301 Scale

3/3/2016 2:47:05 PM

No.


1

1

A303

A303

Computer Lab Studyroom 01 Group Study room 504 Studyroom 02 506

Admin Office Cafe

503

104

103

Lobby

Break Room 508

505

Teacher's Office 02 507

Technology Center

105

Study Lounge

502

510

Women's W/C

Men's W/C

Women's W/C

101

102

501

2

2

A303

A303

Level 1 Copy 1 1/16" = 1'-0"

2

Level 5 Copy 1 1/16" = 1'-0" 1

1

A303

A303

Classroom 06Classroom 07 603

604

Classroom 08 605

Studyroom

Studyroom

606

609

Women's W/C

Men's W/C

601

602

Storage

Storage

StudyroomStudyroom 608 607

905

903

Science Laboratory

Science Stacks

902

904

Public toilet

Public toilet

Public toilet

901

906

907

2

2

A303

A303

3

509

Level 6 Copy 1 1/16" = 1'-0"

4

Level 9 Copy 2 1/16" = 1'-0" No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Lee - Floor Plans (Level 1, 5, 6, 9) Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A302 Scale 1/16" = 1'-0"

3/3/2016 2:47:06 PM

1

Men's W/C


1

A303

A303

Roof 110' - 0"

Roof 110' - 0"

Level 10 99' - 0"

Level 10 99' - 0"

Level 9 88' - 0"

Level 9 88' - 0"

Level 8 77' - 0"

Level 8 77' - 0"

Level 7 66' - 0"

Level 7 66' - 0"

Level 6 55' - 0"

Level 6 55' - 0"

Level 5 44' - 0"

Level 5 44' - 0"

Level 4 33' - 0"

Level 4 33' - 0"

Level 3 22' - 0"

Level 3 22' - 0"

Level 2 11' - 0"

Level 2 11' - 0"

Level 1 0' - 0"

Level 1 0' - 0"

Parking Garage -10' - 0"

Parking Garage -10' - 0"

No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Lee - Sections Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A303 Scale 1/16" = 1'-0"

3/3/2016 2:47:08 PM

2


2 A303

Roof 110' - 0" Level 10 99' - 0" Level 9 88' - 0" Level 8 77' - 0" Level 7 66' - 0" Level 6 55' - 0" Level 5 44' - 0" Level 4 33' - 0" Level 3 22' - 0" Level 2 11' - 0"

Roof 110' - 0" Level 10 99' - 0" Level 9 88' - 0" Level 8 77' - 0" Level 7 66' - 0" Level 6 55' - 0" Level 5 44' - 0" Level 4 33' - 0" Level 3 22' - 0" Level 2 11' - 0" Level 1 0' - 0" Parking Garage -10' - 0"

Level 1 0' - 0"

No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Lee - Elevations (East, South) Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A304 Scale As indicated

3/3/2016 2:47:09 PM

Parking Garage -10' - 0"


Women W/C Men W/C 2 3 Rest Place Storage 4 6

2 A403

Convenience Store 5

103 2

Room

Room

101

102

A403

Men W/C Women W/C 48

47

Convenience Store

Rest & Through Way

11

401

Roby 100 UP

1

Women W/C Men W/C 8 9 Rest Place Storage 10 12

Room

Level 1 1/16" = 1'-0"

Room

Room

Room

104

105

106

1

Level 4 1/16" = 1'-0"

2

1 A403

A403

Storage 23 2 A403

Rest Place

Room

24

501

Meeting Room 22

2

W/C

A403

1003

Architect Office 1 25

Room 502

Chairman's Office 1000

Secret Room

VIP Room

1005

1001

Rest Place Secretary's Office 1002

1004 1

1

Level 5 1/16" = 1'-0"

A403

3

Level 10 1/16" = 1'-0" No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

A403

Description

Date

Kim - Floor Plans Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A401 Scale 1/16" = 1'-0"

3/3/2016 2:47:11 PM

4


Roof 110' - 0"

Roof 110' - 0"

Level 10 99' - 0"

Level 10 99' - 0"

Level 9 88' - 0"

Level 9 88' - 0"

Level 8 77' - 0"

Level 8 77' - 0"

Level 7 66' - 0"

Level 7 66' - 0"

Level 6 55' - 0"

Level 6 55' - 0"

Level 5 44' - 0"

Level 5 44' - 0"

Level 4 33' - 0"

Level 4 33' - 0"

Level 3 22' - 0"

Level 3 22' - 0"

Level 2 11' - 0"

Level 2 11' - 0"

Level 1 0' - 0"

Level 1 0' - 0"

Parking Garage -10' - 0"

Parking Garage -10' - 0"

East -Kim 3/64" = 1'-0"

2

No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

South Copy 3 3/64" = 1'-0" Description

Date

Kim - Elevations Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A402 Scale 3/64" = 1'-0"

3/3/2016 2:47:14 PM

3


Roof 110' - 0"

Level 10 99' - 0"

Level 10 99' - 0"

Level 9 88' - 0"

Level 9 88' - 0"

Level 8 77' - 0"

Level 8 77' - 0"

Level 7 66' - 0"

Level 7 66' - 0"

Level 6 55' - 0"

Level 6 55' - 0"

Level 5 44' - 0"

Level 5 44' - 0"

Level 4 33' - 0"

Level 4 33' - 0"

Level 3 22' - 0"

Level 3 22' - 0"

Level 2 11' - 0"

Level 2 11' - 0"

Level 1 0' - 0"

Level 1 0' - 0"

Parking Garage -10' - 0"

Parking Garage -10' - 0"

Section 2 -Kim 1" = 20'-0"

2

Section 3 - Kim 1" = 20'-0"

No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Kim - Sections Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A403 Scale 1" = 20'-0"

3/3/2016 2:47:15 PM

1

Roof 110' - 0"


3D View 1

2

3D View 2 No.

www.autodesk.com/revit

Dasom Kim, Min Ji Lee, Chung Wan Leung Planned Unit Development

Description

Date

Kim - 3D Views Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A404 Scale

3/3/2016 2:47:18 PM

1


Storage 3

9' - 0 1/16"

405 SF

Locker Room UP

1 66' - 7 17/32"

406 SF

Bathroom 2 289 SF

Break Room 4 172' - 0"

809 SF

44' - 9 1/8"

132' - 0"

Level 1 3/64" = 1'-0" No.

Chung Wan Leung www.autodesk.com/revit

Truck Station

Description

Date

A101-Level 1 Floor Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A101 Scale 3/64" = 1'-0"

2/18/2016 1:05:11 AM

1


Mezzanine space 1 6092 SF

Mezzanine 3/64" = 1'-0" No.

Chung Wan Leung www.autodesk.com/revit

Truck Station

Description

Date

A102-Mezzanine Floor Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A102 Scale 3/64" = 1'-0"

2/18/2016 1:05:11 AM

1

117' - 1 13/16"

52' - 3 5/8"


70' - 11 17/32"

76' - 0"

Lower Roof 3/64" = 1'-0" No.

Chung Wan Leung www.autodesk.com/revit

Truck Station

Description

Date

A201-Roof Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A201 Scale 3/64" = 1'-0"

2/18/2016 1:05:11 AM

1

172' - 0"

132' - 0"


Upper Roof 26' - 0" Lower Roof 12' - 0" Mezzanine 10' - 0" Level 1 0' - 0" Foundation -4' - 0"

South 1/16" = 1'-0" No.

Chung Wan Leung www.autodesk.com/revit

Truck Station

Description

Date

A301-Elevations(South) Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A301 Scale 1/16" = 1'-0"

2/18/2016 1:05:12 AM

1


Upper Roof 26' - 0" Lower Roof 12' - 0" Mezzanine 10' - 0" Level 1 0' - 0" Foundation -4' - 0"

East 1/16" = 1'-0" No.

Chung Wan Leung www.autodesk.com/revit

Truck Station

Description

Date

A302-Elevations(East) Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A302 Scale 1/16" = 1'-0"

2/18/2016 1:05:12 AM

1


Second3D

1

First3D No.

Chung Wan Leung www.autodesk.com/revit

Truck Station

Description

Date

A351-3D Views Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A351 Scale

2/18/2016 1:05:14 AM

2


Upper Roof 26' - 0" Lower Roof 12' - 0" Mezzanine 10' - 0"

Level 1 0' - 0"

Foundation -4' - 0" 1

Section 1 3/64" = 1'-0"

Upper Roof 26' - 0" Lower Roof 12' - 0" Mezzanine 10' - 0" Level 1 0' - 0" Foundation -4' - 0" Section 2 3/64" = 1'-0"

No.

Chung Wan Leung www.autodesk.com/revit

Truck Station

Description

Date

A401-Building Sections Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A352 Scale 3/64" = 1'-0"

2/18/2016 1:05:15 AM

2


Site 1" = 40'-0" No.

Chung Wan Leung www.autodesk.com/revit

Truck Station

Description

Date

A501-Site Plan Project number Date Drawn by Checked by

Project Number Issue Date Author Checker

A501 Scale 1" = 40'-0"

2/18/2016 1:05:15 AM

1


Turn static files into dynamic content formats.

Create a flipbook
Terri Leung | Revit Work Sample by Terri Leung - Issuu