1 minute read

INSTALLATION GUIDELINES

Earlier, when the system was new, awareness on how to install was low. If the installation is not done properly, there is a chance of squeezing or blocking of pipes

Installation is very easy! Just remember::

Advertisement

1. The pipes should not be in direct touch with wet cement. Install it on sand and cover it with sand

2. Do not bend it at sharp corners. Install it with a slight curve or use jointers and ties

3. Install junction boxes at required intervals (we suggest 1 junction box at every 25mtrs )

4. View installation videos on our website, social media handles or YouTube channel https://www.youtube.com/watch?v=iakUX_rRfp4&t=1s

5. TermiPore also offers technical guidance and training for installation of TermiPore Reticulation Pipes

This article is from: