Skip to main content

Teerawat Sativawong Portfolio for Architecture Technologist

Page 1

ARCHITECTURE TECHNOLOGY

PORTFOLIO

NAME:

TEERAWAT SATIVAWONG (TEE)


2-1

1

Contents

T.O ROOF 15 136

B

PA

B.O ROOF 14 536

CEILING FIFTH FLOOR 14 336

B.O COMMERCIAL FLOOR 0

W2B

T.O PARKADE -200

W1

D6 2%

About Me ............................................ 1 Contact ........................................ 1

D6

Working Drawing ................................. 2-7

6 1

Pearlstone Building ...................... 2-3 Semester 2 Building ..................... 4-5 Semester 3 Building ..................... 6-7 EW2

W2 EW2 W2

0


Teerawat Sativawong Architecture Technologist I am a new SAIT Architecture Technology graduate. I am very excited to start a long career in a field I love. I am passionate about exploring our world and making an impact in my community. I enjoy anything that allows me to understand something new and unique.

Calgary, Alberta

403.383.5546 jiwkung1@gmail.com

1


Parlstone Building Mix Used(MU-2) f5.0 h26 Location : 3720 17 Ave SW, Calgary, AB Parlstone Building :

Commercial and Retail Residential Condo Renting

About Pearlstone Building : Our client is focused on an individual or a company that is looking to develop a mix-used building that consists of rent able residential units and least able commercial units. Our building is located in the neighborhood of Rosscarrock on 17th avenue, SW.

3


Parlstone Building Working Drawing 1

4

CD3-03

3

CD3-06

CD0-09 4

2-1

CD3-06

P5

P6

P7

P8

9 773

8 200

7 293

7 996

7 796

8 237

8 815

3 000

2

3

4

5

2 600

2 600

2 800

2 800

6

7

8

9

10

11

2 600

2 600

2 800

2 600

2 600

2 600

500

W2B

2 600

W2B

D5

300

W2B

W1

W2B

W1

2-9

6 478

W1

W2B

6 374

D4

W2B

W1

D4

6 100

W1

D4

P3

P3

P3

D1

1 bedroom

SPECIAL UNIT

209 52.4 m²

207 50.6 m²

205 56.3 m²

15

16

1 500

2 331

519

800

Room 202

D3

740

P4

18.6 m²

D7

D7

D7

D7

800 D7

630 P1

2 240

17

向向

30 000

7 177

P4

W2

D3

1 500

14

2 CD3-06

519

6 045

5 408

8 786

D3

2 554

W3

D5

1 bedroom

211 52.4 m²

411

2 800

2 800

7 177

28

D5

1 bedroom

214 52.6 m²

UNDERNEATH RAMP

7 200 5 777

D5

D5

6 045

1 bedroom

216 50.5 m²

2

300

2 600

29

13

D5

2 800 7 200

30 4 536

2 600

2 CD4-02

P4 1 bedroom

218 45.0 m²

D5

500

14 138

D5

2 600

D5

CD4-02

2 bedroom

2-C

5 389

12

D5 P2

W2B

2 800

D5

W2B

CD3-06

2 800

D5

3

D5

4 064

D5

2-B CD3-02 CD0-09

16 196

2 600

1 CD3-02

CD1-11

D5

P1

D5

1 873

---

W2

13

1 2

300

-

W2B

D5

P3

P3

D1

PC

7 465

W2B

W2B

D4

P3

P4

31

2-8

6 478

W2

P1

P1

500

6 478

12 578

W2B

W1

W2B D4

P1

33 000

2-7

2 516

W1

1 973 3 273

PRESSURIZED STORM WATER TANK

PB

PD

6 478

2 516

D4

BIKE STORAGE

5 820

1

2 600

2-6

2-A

P1

AIR EXHAUST LOUVE

5 006

32

6 478

3 915 W1

2 800

2-5

2-10

6 478

1

PA

W1

2-4

CD3-03

4 180

W1

P1

2-3

60 000

60 000 5 001

2-2

3 CD3-06

P9

D4

P4

4 496

P3

1 800

P2

D5

3 CD3-06

P1

D3

D3

D3

P2

P2

D3

P2

D3

P2

P2

P2

P2

P2

D3

D3

D3

D3

D3

1

P2 D3

D3

CD3-05

D3

No slope

10.1 m²

D5

D5 1 Bedroom 210

4

1 Bedroom

CD4-02

1 Bedroom

206 50.6 m²

203 43.5 m²

D5 D5

-

1 Bedroom

208 50.5 m²

36.4 m² 213 8.4 m²

D5

P3

52.4 m²

Storage. Room

D5

26

1 Bedroom 215

217 50.7 m²

219 45.1 m²

CD3-06

D5

No slope

P3

P2

D5

6 045

7 261

7 200

No slope

15%

1 Bedroom

2 bedroom

1

15%

2 800

8 600

27

2 600

W1

1

P1 P3

P3

D2

CD3-06

D7

P1 Mech room 212

2-D P1

D7

D7

D7

760

D5

STORAGE

780

D5

PEDESTRIAN WALWAY

PE

700

1 500

300

1 369

7 646

D7

D1

7 200

1 CD3-05

--D5

D5

D5

D5

D5

2-E D2

D1

P1

D3

P1

2 800

300

D5

P1

2 600

2 800

2 800

D2

2 600

P4

W2B

PF

D4

21

20

19

18 2 800

2 651

4 600

ELECTRICAL ROOM

D2

D2

P1

6 793

P4

D5 D4

W2

6 435

W2B P1

P1

1 812

P4

UP

P4

D4

190

WATER METER ROOM P4

P4

2 105

D3

P4

P1

UP

W2B

1

P4

D4

Room 201 18.6 m²

950

D4

D4

W2

1 500

22

6 045

23

D4

5 017

6 247

1 100

24

5 417

1 500

D2 1 281

25 AIR INTAKE

1 W2B

W2B

W2B

W2B

CD3-01

W2B

CD0-09 CD3-01

2-F

PG P4

W1

P4

3 000

W1

W1

W2B

W1

W1

W1

W1

W2B

W3

6 478

W1

W2B

1 660

1

1

CD3-04

CD3-04

Residential Floor

Underground Parking Floor

FULLY-ADHERED WATER CONTROL MEMBRANE CONTINUE AROUND WALL AND PARAPET

EXTERIOR

W2B

INTERIOR

T.O ROOF 15 136 1

2

1

3

4

5

6

7

8

CD3-03

OZARK MIN METAL PANEL CLADDING

60 000 4

9 220 1 084

2 020

588 582

8 060

1 949

532

868

3 500

568 601

1 930

7 800 532

1 068

3 500

600 570

7 800

1 930

500

896

3 500

600 570

13 269

1 930

500

2 033

CD3-06

5 880

8 000

2 468

601

1 930

500

10 958

449

A

3 301

2%

15.9 mm (5/8") BURDOCK CEMENT BOARD OR DOUGLASS

3

2 LAYER OF 15.9 mm (5/8") DUROCK CEMENT BOARD OR DENSGLASS

13 mm HATS BOARD

BACKER ROD FILL GAP

INSULATION SLOPE 2% TO DRAIN WITH GRAVEL PROTECTION ON TOP

4%

CD3-06

6

B

150 MM RIGID INSULATION CONTINUE THE WALL

9 CD1-10

CD1-10

1 756

METAL FLASHING WITH CLADDING

45 mm RIGID INSULATION BEHIND PARAPET

7 972

2 500

D1

90 X 57 X 190 mm SMOOTH TEXTURED BRICK

2 1

FULLY-ADHERED WATER CONTROL MEMBRANE CONTINUE

B.O SECOND FLOOR 3 980

C

D1

D1

D1

500

3

7 500

500

800

CD1-10

CD1-10

7 700

D1

500

4 067

BRICK TIE

D1

3 429

468

7 335

500

7 730

500

-

4 847

---

CD1-10

MOZAIK VMZINC METAL PANEL CLADDING

AIR BARRIER TRANSITION MEMBRANE

P4

INSULATION SLOPE 2% TO DRAIN 1 2

COMMERCIAL UNIT 2 120 211.591m2

COMMERCIAL UNIT 3 130 190.212m2

COMMERCIAL UNIT 4 140 194.449m2

CONCRETE SLAB 200 MM

AIR BARRIER TRANSITION MEMBRANE

NORTH STAIR 2

102 18.6 m²

BALCONY DOOR WITH SILL 100 MM FROM THE SLAB

CD3-06

P1

MOZAIK VMZINC METAL PANEL CLADDING

P4

1 CD4-01

150 MM RIGID INSULATION CONTINUE THE WALL

2 581

500

2

152 MM METAL STUD WALL

150 MM RIGID INSULATION CONTINUE THE WALL

METAL ANGLE TO SUPPORT PARAPET STRUCTURE

FLASHING CUT ACROSS INSULATION AND GO THRU BRICK

CEILING FIFTH FLOOR 14 336

BACKER ROD FILL GAP

CEILING COMMERCIAL FLOOR 3 580

D3

CD4-03

7 301

1 CD1-11

260

3 CD4-03

2 140

1 860

15.9 mm (5/8") TYPE X GYPSUM BOARD

W3

D3

D3

15.9 mm (5/8") DUROCK CEMENT BOARD OR DENSGLAS

7

METAL AZ-GRIT

METAL ANGLE TO SUPPORT BRICKS

5 000

5 000

CD3-05

161 16.0 m²

D4

2 580

800

MAIL ROOM

E

W2B

1

1 560

D3

D3

CD1-10 D3

1 680 D3

D3

500

1 440

1 560 D3

D3

5 777 30 000

800

800

400

4 CD1-10

5 789

P4 P1

D

B.O ROOF 14 536

PARAPET STRUCTURE

COMMERCIAL UNIT 5 150 381.493m2

D3

COMMERCIAL UNIT 1 110 145.258m2

P3

P3

15%

P3

P3

2 615

10 852

8 600

CD3-02 CD0-09

P3

200 MM CONCRETE SLAB 190 mm CONCRETE CMU BLOCK

3 490

1 000

500

15.9 mm (5/8") BURDOCK CEMENT BOARD OR DOUGLASS

15.9 mm (5/8") TYPE X GYPSUM BOARD

15.9 mm (5/8") TYPE X GYPSUM BOARD

W2B

[No Slope]

P1

5 420

11 309

8 600

P2 1 CD3-06

7 639

SMOOTH TEXTURED BRICK

13 419

LOBBY 160 110.215m 2

SLOPE DOWN FROM THE DOOR STEP

P1

781

P3

1 386

1 145

6 855

3 639

3 525

D2

5 177

800

3 055

1 680

15 873

1 669

P2

0. B.O PARKADE -3 180

162

50 mm RIGID INSULATION CONTINUE WITH FOUNDATION WALL

1 212

8 5

D2

EAST STAIR

CD1-10

CD1-10 D1

D3

5 268

8.2 m²

SPRINKLED CONTROL ROOM 111 24.88m2

101

P1 8

1 500

CD4-01 D1

D12

15.9 mm (5/8") TYPE X GYPSUM BOARD

D2

1 930 600 1 930

8 564

W2A

1 930

7 229

1 017

3 586

3 000

12 533

W2A

3 000

5 647

2 500

2 040

190_350_500-STANDARD ENTRACES KAWNEER

1 CD3-04

150 MM RIGID INSULATION CONTINUE THE WALL FULLY-ADHERED WATER CONTROL MEMBRANE CONTINUE

Commercial Floor

2 LAYER OF 15.9 mm (5/8") DUROCK CEMENT BOARD OR DENSGLASS 2 LAYER OF 15.9 mm (5/8") TYPE X GYPSUM BOARD

T.O FOUNDATION -3 530

WEEP HOLES SELVES @ 3m OCD

STOREFRONT WINDOW FLASHING

SIDEWALK

90 X 57 X 190 mm SMOOTH TEXTURED BRICK

CD0-09 CD3-01

D3

UP

D1

G

4 854

COMMERCIAL UNIT

1

P4 D1

STOREFRONT WINDOW KAWNEER

D1

18.2 m² 10 CD1-11 D1

SLOPE 2%

500

JANITOR ROOM

4 468

1 500

5 370

PA 15.9 mm (5/8") DUROCK CEMENT BOARD OR DENSGLAS

200 mm CONCRETE SLAB

800

1 900

F

B

PAKADE FULLY-ADHERED WATER CONTROL MEMBRANE CONTINUE AROUND WALL AND PARAPET

150 MM RIGID INSULATION CONTINUE THE WALL RIGID INSULATION SLOPE 2%

FULLY-ADHERED WATER CONTROL MEMBRANE CONTINUE

6 MM PROTECTION BOARD

50 MM OF CONCRETE SIDEWALK

B.O COMMERCIAL FLOOR 0

180mm OF COMPACTED 30mm CLEAR CRUSHED GRAVEL ENVELOPED I MOISTURE BARRIER CONSULT NW/ GEOTECHNICAL ON INSTALLATION FOR CONFIRMATION OF RC/O

WEEPING TILE, CONSULT NW/ GE TECH ON INSTALLATION FOR CONFIRMATION OF REQ'D

200 mm CONCRETE FOOTING

PARKADE

METAL ANGLE TO SUPPORT BRICKS WITH CONCRETE

50 MM RIGID INSULATION CONTINUE THE WALL

100 MM OF CONCRETE SLAB

T.O PARKADE -200

2 LAYER OF 2 MM ROOFING MEMBRANE

4


Semester 2 Building Commercial - Neighborhood 1 District (C-N1) Location : 824 Edmonton TR NE Semester 2 Building :

Commercial Retail Unit Residential Penthouse

About Semester 2 Building : My primary focus for this project centers on the exterior design of a building that will seamlessly integrate with the surrounding community. The overarching concept revolves around maximizing natural sunlight throughout the entire structure. In addition, the residential section of the building has been meticulously planned to meet all relevant building codes while incorporating a penthouse design to elevate the overall luxury experience. This building is situated within the vibrant Renfrew community.

5


Semester 2 Building Working Drawing 13

EXISTING SIDE WALK

Block A

1 A0-301

MUSTER POINT

2%

FENCES FALL GRAY BIRCH

HANGER GALVINIZED CARRIAGE ROLT PER ENGINEER SPECIFICATION. 14' - 1 7/8"

Plan 4031N

12

1.5%

1'-11 1/2"

2%

11 RISER

PLYWOOD - 2x10 DECK STRUCTURE

1 11 RISER

STORAGE ROOM BIKE STORAGE

SPRAY FOAM INSULATION

1 3'-6"

A0-302

2

22'-10 1/2"

19'-1"

16'-9 1/2"

9'-3"

PLYWOOD 2x12 DECK LEDGE

MECHANIC ROOM

FLASHING RIGID INSULATION WEATHER MEMBRAIN

3 12'-4 1/2"

2 PLY LVL DROP BEAM

2'-2 1/2"

15'-1"

7'-7 1/2"

VAPOUR BARIRER

27'-11 1/2"

8'-6 1/2"

7'-0"

3'-1 1/2"

4'-6"

14'-9"

1/2 BATHROOM

3 3'-10"

A0-301

BALCONY DETAIL

9'-7"

10.14

5'-4 1/2"

1/2 BATHROOM

4

5' - 5 7/8"

8' - 0 3/8"

ALLEY WAY

EDMONTON TRAIL

W10

33' - 9 5/8"

72' - 3 1/8"

PARKING LOT

COMMERCIAL FLOOR

FILTER FRABIC GRAVEL

72' - 4 5/8"

2% RIGID INSULATION ROOF MEMBRAIN

1 A0-301 14' - 5 7/8"

17' - 11 3/8"

17' - 11 1/8"

DRAINAGE BOARD LVL LUMBER

0'-7"

21' - 9 7/8"

SPARY FOAM INSULATION DW 1' - 9 1/8"

33' - 2 1/4"

5' - 2"

2' - 0"

5' - 0"

2.1/2" RIGID INSULATION COUNTER FLASING SIGA STICK AND PEEL

5' - 10 1/2"

KITCHEN

METAL DRIP CAP

REF.

12' - 1 7/8"

VAPOUR BARRIAR

3' - 9 1/2"

1/2 BATHROOM

UP

LAUNDRY ROOM

AIR AND WATER MEMBRANE

UP

UP

2' - 0"

5' - 0"

3' - 1 7/8"

2' - 8 5/8"

7' - 6 1/4"

4' - 7"

DENSGLASS

VAPUR BARIAR 5/8" GYMSUM

SRB SOUND MAT

SIGA STICK AND PEEL DENSGLASS

4' - 2 3/4"

3' - 7 1/2"

1' - 2 1/2"

3 A0-301

MASTER BEDROOM

6' - 8 1/4"

7' - 8"

36' - 10 5/8"

3' - 0 1/4"

18' - 1 1/4"

11' - 1 1/4"

FIBERGLASS INSULATION

8' - 8 1/8"

12' - 11 7/8"

7' - 5 1/8"

8' - 4 1/8"

BEDROOM

4' - 7"

18' - 1 7/8"

3' - 7 1/2"

1' - 10"

3' - 4 5/8" 11' - 4 1/4"

4' - 10 7/8"

5' - 7 7/8"

A0-302

LIVING ROOM AREA

4' - 2"

1

19' - 3 5/8"

MEC.

6' - 0"

EXTRA ROOM

PARAPET DETAIL 6' - 7 3/4"

9' - 3 1/2"

11' - 8 3/4"

WINDOW DETAIL

13' - 6 1/4"

47' - 2 1/4"

RESIDENTIAL FLOOR

6


Semester 3 Building Commercial - Commercial – Corridor 2 (C-COR2) Location : 15-4th St NE Semester 3 Building :

Commercial Retail Unit Office

About Semester 3 Building : The main emphasis of this project revolves around designing an interior layout that accommodates the necessary office space and meets the commercial retail requirements of the area. The incorporation of green spaces within the project aims to provide a designated area for office occupants to relax and smoke. The architectural design of the building complements the surrounding community, as the project is integrated within the Bridgeland-Riverside neighborhood.

7


30 MM THICKNESS, 1180 PER PANEL ALUCOBOND GRAY CLADDING

Semester 2 Building Working Drawing 1

2

3

7 000

4

7 000

5

7 000

7 000

BACKER ROD FILL GAP 150 MM LENGHT CASCADIA CLIP THERMAL BREAK LINE UP TO METAL STRUCTURE

6

1 800

100 MM FLOOR CONCRETE SLAB

30 483 7 972

6 000

4 453

4 418

2 916

2 327

2 396

75 MM RIGID INSULATION CONTINUE THE WALL 1 A-A203

EW1

CW1

30 MM THICKNESS, 1180 PER PANEL ALUCOBOND WHITE CLADDING

EW1 D5

7

FULLY-ADHERED WATER CONTROL MEMBRANE IN FRONT OF THE DENSGLASS TO WATER PROOF AND AIR BARRIAR THE STRUCTER

7

2 390.2

1 477 3 A-A403 W2

VOID FOR MECH. 2 2.3 m²

W3

4 666

A-A403

MALE WASHROOM 27

1 418

2

523.5

D1

W2

CW1

W3

D4

1 A-A403

W3

W3

EW1 FD COMMERCIAL AREA

ELEVATOR LOBBY 21 26.3 m²

5 825

FD

8 531

W2

VOID SPACE FOR PLUMING 35

5 783.9

7 000

FD

1 A-A202

2 OF 13 MM DENSGLASS

4 A-A403

1 240.7 m²

WOMEN WASHROOM 28

Room 33

1 220

ISPAN STEEL TRUSS

8 D2

9 A-A403

D7

W3

1

1

A-A201

A-A305

8 402.6

FD D3

2 000

STORAGE ROOM 3 8.3 m²

90 MM BATT FIBERGLASS BATT INSULATION

2 A-A501

D1

W4

8

2 OF 5/8"(15.8755 MM) GYPSUM BOARD TYPE X

20 182

11

20 366.4

11 4 A-A507 W3

2 957.8

13 987.3

6 221.4

W1 7 D6

2 590.5

3

5 328

D6

D6

1 6 A-A403

BLACK PAINT AROUND STRUCTURE TO FIRE CODE

W1

A-A507

W4

A-A403

EW2

D6

5 000

6 319

3 890

W1

A-A507

W2

W4 2

UP

152 mm stud steel structral

A-A507 5

2 222.6

2 212.8

D1

A-A403

9

699

9

LOBBY

2 222.6

CLADDING CHANGE DETAIL

37 JANITOR ROOM

STAIRWELL

5 14.1 m²

4 788

7 032.5

5 500

FD

5 684

5 500

W3

7 113.8

34

8

STAIR 22 27.1 m²

A-A403

30 MM THICKNESS, 1180 EW2 PER PANEL ALUCOBOND GRAY CLADDING

10 A-A403

10

4 389

6 658

4 576

3 395

3 406

2 000

10

FULLY-ADHERED WATER CONTROL MEMBRANE CONTINUE AROUND WALL AND PARAPET

6 058

30 483

6

1 A-A304

1

2

3

4

5

1

6

ALUCABOND PARAPET FLASHING CONTINUE FROM CLADDING

W2

150 MM LENGHT CASCADIA CLIP THERMAL BREAK LINE UP TO METAL STRUCTURE PEEL AND STICK AIR AND VAPOUR BARRIER

2 OF 13 MM DENSGLASS AIR BARRIER TRANSITION MEMBRANE

COMMERCIAL FLOOR

75 MM RIGID INSULATION CONTINUE THE WALL 1

2

3

4

5

6

1

7 971.5

6 000

0

4 332.2

CW1

EW2

4 600

EW2

2 855.5

30 MM THICKNESS, 1180 PER PANEL ALUCOBOND CLADDING

4 723.1

CW1

D1

W2

1 200

600

7 VOID W3

9 2.7 m²

COFFEE BAR

4 666

W3

CW1

MEC. W3

215 X 102 SOLDIER BRICK WITH CONCAVE FINISH

6.4 m²

90 MM BATT FIBERGLASS BATT INSULATION

STEEL BEAM (INVISACOUSTICS BLACK PAINT)

FD

METAL ANGLE TO SUPPORT PARAPET STRUCTURE

1 A-A202

D1

W2

215 X 102 BRICK WITH RUNNING BOND LINE UP AND CONCAVE FINISH

784

8

2 000

10 616.3

WATER, AIR AND VAPOR CONTROL MEMBRANE PREFEABLY FULLY- ADHERED

5 5.3 m²

2 770.2

JANITOR

FD

W1

D1

709.2

D1

2 566.2

FD

WOMEN WASROOM 24 21.1 m²

8

3 362.9

5 340

3 633.1

150 MM LENGHT CASCADIA CLIP THERMAL BREAK LINE UP TO METAL STRUCTURE

BRICK TIE TO THE MAIN STRUCTER BEHIDE(150 MM)

1 A-A201

14 881

1 157

2 744

4 435.2

D2

W4

W1

11

20 181.5

901

4 588

6 412

W4

4 432.4

3 705

2 000

20 366.4

11

2 OF 13 MM DENSGLASS

BLACK PAINT AROUND STRUCTURE TO FIRE CODE

5 000

W1 OFFICE AREA

W4

BACKER ROD FILL GAP

25

OFFICE SPACE 1 7 33.7 m²

D6

BUG SCREEN

DRAINAGE MAT

2 900

1 225

10

5 631.4

8 317.4

7 000

FD

75 MM RIGID INSULATION

MEMBRANE OVER TRAINION OR CAN BE PEEL AND STICK MEMBRANE

6 13.5 m²

FD

2 OF 13 MM DENSGLASS

CW1

7

MEN WASHROOM 23 18.6 m²

BATT 90 MM FIBERGLASS INSULATION

5/8"(15.8MM) GYPSUM BOARD

30 482.2

A-A203

45 MM RIGID INSULATION EXTRDED POLYSTYRENE INSULATION

337.1 m²

D6

5/8" GYMSUM BOARD

EW2

W1

11 A-A403

EW1

W2

9

10 049

9

W2

2 OF 5/8"(15.8755 MM) GYPSUM BOARD TYPE X

W5

4 953

978

PARAPET DETAIL

5 500

5 692

5 500

8 312.9

675

CW1

EW2 W1 12 EW2

A-A403

W2

10

10

4 388.2

6 606.1

2 778.5

10 000

6 594.5

TRANSFER CLADDING DETAIL

1 A-A304

7 000

1

7 000

2

7 000

3

7 000

4

1 800

5

6

OFFICE FLOOR

8


Turn static files into dynamic content formats.

Create a flipbook