Type:
Solution Manual
Resource:
Engineering Statistics
Edition:
5th Edition
Author(s):
Douglas C. Montgomery George C. Runger Norma F. Hubele
Engineering Statistics 5th edition
November 01, 2010
Chapter 1 1-1
a) One choice for the outcome variable is the proportion of students that complete a degree within a specified time period, such as six years after starting the program. In addition to the number of years until the degree is completed the final grade point average could also be used as a response. b) Predictor variables can include high school grade point average, either overall or in selected courses such as math and science, and scores on standardized exams. Information about whether students were full-time or worked while in college or were involved in co-op programs could be used as candidate predictors. Similarly, information about student involvement in extracurricular activities (sports, clubs, etc) may be relevant. Academic performance in certain university level courses (such as mathematics, science and engineering science) may be useful predictors. c) The data for such a study should be available from student records, including exit interviews with graduating students. Since the data is collected on students graduating from the program this is a retrospective study.
1-5
a) Because the study results will be applied more generally to a larger population of dental patients this is a conceptual population. b) The random division is used to avoid a systematic difference between the patients in the two groups. For example, one would not want all younger patients in one group sand older patients in another because any difference in groups might be due the fluoride, but might also be due to the age difference. Consequently, the age effect would be confused (the term confounded is used) with the fluoride effect. Similarly any other pattern between the patients in the two groups would be a cause for concern of confounding. Therefore, the random assignment is used to avoid such systematic differences. c) No the study would not be valid. Patients with more concern for tooth care, who more consistently clean their teeth, may select the fluoride group. As in the previous part, then the tooth cleaning effect would be confounded with the fluoride treatment. d) It is possible that a single group generates little or no tooth decay. One would not want to attribute this result to the use of fluoride without a comparison. For example, if the control group also generated little or no tooth decay then the effects of fluoride are not demonstrated. One would need the control group to generate more tooth decay than the fluoride group to demonstrate the positive effects of fluoride on tooth decay.
1-7
The sample is not random. All the samples are selected from the same hour of the day. It is possible that production during this hour is unusual relative to the other times.
1-9
a) The number of samples of size two is 4 choose 2 = 4!/(2!2!) = 6 b) One could list all six subsets of size 2 as {a,b}, {a,c}, {a,d}, {b,c}, {b,d}, {c,d} and randomly select one of these six subsets. An alternative approach is to randomly select one member at random from {a,b,c,d} and then randomly select another member from the remaining three. Both approaches can be used to select a random sample of size two.
1-11
The conclusion is not correct. The 6% defective in the sample is based on only 50 bearings and the true proportion defective may be greater than or less than 6%. Later chapters in the book will discuss how to quantify the uncertainty in sample data.
1-13
It is not reasonable to consider these measurements a random sample of bolts because only one bolt is measured multiple times. Variations in the production of bolts are not accounted for in these measurements. If the analysis is to focus on only the single bolt then one might consider these measurements a random sample from the populations of all measurements of this single bolt.
Engineering Statistics 5th edition
September 15, 2010 Chapter 2
Section 2-1 n
12
xi
xi
673.1 x = i =1 = i =1 = = 56.09 n 12 12
2-1. Sample average:
Sample standard deviation: 12
xi = 673.10
i =1
s=
12
xi =39168 2
i =1
n xi n i =1 2 xi − i =1 n n −1
2
39168 −
=
(673.10)2
12 − 1
12
=
1412.70 = 128.43 = 11.33 11
Dot diagram: . . . : .. . . : . -------+---------+---------+---------+---------+---------suspended solids 32.0 40.0 48.0 56.0 64.0 72.0
n
19
xi
2-2.
Sample average:
xi
x = i =1 = i =1 = n 19
272.82 = 14.36 min 19
Sample standard deviation: 19
x = 272.82 i
i =1
s=
19
x =10334 2 i
i =1
n x i n i =1 x i2 − n i =1
2
n −1
10334 − =
(272.82) 2
19 19 − 1
=
6416.59 18
=
356.48 (min) 2 = 18.88 min
Dot diagram . . .:::.:. . .... . +---------+---------+---------+---------+---------+------- Breakdown time 0 15 30 45 60 75
n
2-3.
Sample average:
xi
7
xi
x = i =1 = i =1 = n 7
Sample standard deviation:
9019 = 1288.43 angstroms 7
Engineering Statistics 5th edition 7
x i = 9019
i =1
7
September 15, 2010
x i =11621835 2
i =1
n xi n i =1 2 x − i i =1 n s= n −1
2
11621835 − =
(9019)2 7
7 −1
=
1497.71 2 = 249.62 (angstroms ) = 15.80 angstroms 6
Dot diagram: . . . . .. . -+---------+---------+---------+---------+---------+----- Thickness 1264.0 1272.0 1280.0 1288.0 1296.0 1304.0
n
2-4.
Sample average:
x=
xi
i =1
n
18
xi
=
=
i =1
18
2272 = 126.22 kN 18
Sample standard deviation: 18
18
xi = 2272
xi =298392
i =1
s2 =
2
i =1
n xi n i =1 2 x − i i =1 n n −1
2
=
298392 −
(2272)2
18 − 1
18
=
11615.11 = 683.24 (kN ) 2 = 26.14 kN 17
Dot Diagram: . : :: . :: . . : . . +---------+---------+---------+---------+---------+-------yield 90 105 120 135 150 165
n
8
x x i
2-5.
Sample average:
x = i =1 n
= i =1 8
i
=
351.8 = 43.98 8
Sample standard deviation: 8
xi = 351.8
i =1
8
xi =16528.40 2
i =1
n xi n i =1 2 xi − i =1 n s= n −1
2
=
16528.04 −
(351.8)2
8 −1
8
=
1058 = 151.143 = 12.29 7
Dot diagram: . . .. . .. . +---------+---------+---------+---------+---------+------24.0 32.0 40.0 48.0 56.0 64.0
Engineering Statistics 5th edition
n
2-6.
September 15, 2010
9
xi
xi
x = i =1 = i =1 = n 9
Sample average:
19.56 = 2.173 mm 9
Sample standard deviation: 9
9
xi = 19.56
xi =45.953
i =1
s=
2
i =1
n xi n i =1 2 xi − i =1 n n −1
2
45.953 −
=
(19.56)2
9 −1
9
=
3.443 = 0.4304 = 0.6560 mm 8
Dot Diagram: . . . . . . . .. -------+---------+---------+---------+---------+--------- Crack length 1.40 1.75 2.10 2.45 2.80 3.15
2-7.
Sample average: 35
xi
x = i =1 35 Sample variance:
=
28368 = 810.514 watts / m 2 35
35
xi = 28368 i =1 35
xi2 =23552500 i =1
2
n xi n (28368)2 i =1 xi2 − 23552500 − n 35 s 2 = i =1 = n −1 35 − 1 = 16465.61 ( watts / m 2 ) 2 Sample standard deviation: s = 16465.61 = 128.32 watts / m 2
The sample standard deviation could also be found using
(xi − x ) n
s=
2
i =1
n −1
where
(xi − x ) = 559830.743 35
i =1
2
=
559830.743 34
Engineering Statistics 5th edition
September 15, 2010
Dot Diagram (rounding of the data is used to create the dot diagram)
x . . . : .: ... . . .: :. . .:. .:: ::: -----+---------+---------+---------+---------+---------+-x 500 600 700 800 900 1000 The sample mean is the point at which the data would balance if it were on a scale.
2-8.
High Dose Group: Sample average: 22
xi
x = i =1 22 Sample variance:
=
1158.2 = 52.65 22
22
xi = 1158.2 i =1 22
xi2 =92270.6 i =1
n xi n i =1 xi2 − n 2 i =1 s = n −1 = 1490.32
2
=
92270.6 −
(1158.2)2
22 − 1
22
=
31296.63 21
Sample standard deviation: s = 1490.32 = 38.60
The sample standard deviation could also be found using
(xi − x ) n
s=
2
i =1
n −1
where
(xi − x ) = 31296.6 22
2
i =1
Dotplot of High Dose
16
32
48
64 80 High Dose
96
112
128
Engineering Statistics 5th edition
September 15, 2010
Control Group: Sample average: 22
xi
x = i =1 22
=
8418.7 = 382.67 22
Sample variance: 22
xi = 8418.7 i =1 22
xi2 =6901280 i =1
n xi n i =1 xi2 − n 2 i =1 s = n −1 = 175224.35
2
=
6901280 −
(8418.7 )2
22 − 1
22
=
3679711.38 21
Sample standard deviation: s = 175224.35 = 418.60
The sample standard deviation could also be found using
(xi − x ) n
s=
2
i =1
n −1
where
(xi − x ) = 3679711.59 22
2
i =1
Dotplot of Control
0
200
400
600
800 Control
1000
1200
The control group has higher variance. 2-9. The only two data sets that may have resulted from a designed experiment is in Exercise 2-4 and 2-8. 2-10 The monthly mean pay increases by $200; the standard deviation is unchanged.
1400
Engineering Statistics 5th edition
September 15, 2010
2-11 No. Suppose that the sample observations are 1, 2, 3, 8, and 10. The sample mean is 4.8, and this is not one of the sample values. 8
x
2.12. For the original data in cm, x = i =1
8
i
=
162.7 = 20.3375 8
Sample variance 8
x = 162.7 i =1
i
8
x =3309.17 i =1
2 i
2
n xi n i =1 (162.7)2 2 xi − 3309.17 − 0.25875 n 8 s 2 = i =1 = = = 0.037 n −1 8 −1 7 Sample standard deviation:
s = 0.037 = 0.1923 The data in inches are 7.91339, 8.07087, 7.99213, 8.07087, 8.11024, 7.91339, 7.95276, and 8.03150. In inches we find that x = 8.0069 and s = 0.0757. Since the new data differ from the old data by a constant (inches = cm/2.54), x (inchs) = x (cm) / 2.54and s(inchs) = s(cm) / 2.54 , apart from rounding.
2.13. A new salary equals the old salary times 1.05. Both the mean and the standard deviation increase by 5%.
Section 2-2 2-14. The stem and leaf display for weld strength Leaf Unit = 1.0
N
= 100
1 532 9 1 533 2 534 2 4 535 47 5 536 6 9 537 5678 20 538 12345778888 26 539 016999 37 540 11166677889 46 541 123666688 (13) 542 0011222357899 41 543 01111556 33 544 00012455678 22 545 233447899 13 546 23569 8 547 357 5 548 11257 2-15.
a) Stem-and-leaf display for cycles: unit = 100 1 1 5 10 22 33
0T|3 0F| 0S|7777 0o|88899 1*|000000011111 1T|22222223333
1|2 represents 1200
Engineering Statistics 5th edition (15) 22 11 5 2
September 15, 2010
1F|444445555555555 1S|66667777777 1o|888899 2*|011 2T|22
b) No, only 5/70 survived beyond 2000 cycles. 2-16. Stem-and-leaf of Suspended solids Leaf Unit = 1.0 1 2 3 8 12 20 (13) 27 22 13 7 3 1
N = 60
2 9 3 1 3 9 4 22223 4 5689 5 01223444 5 5666777899999 6 11244 6 556677789 7 022333 7 6777 8 01 8 9
2-17. Stem-and-leaf display for yield: unit = 1 1 1 7 21 38 (11) 41 27 19 7 1 2-18.
1|2 represents 12
7o|8 8*| 8T|223333 8F|44444444555555 8S|66666666667777777 8o|88888999999 9*|00000000001111 9T|22233333 9F|444444445555 9S|666677 9o|8
Stem-and-leaf of High Dose Leaf Unit = 1.0 5 9 10 (3) 9 7 6 4 4 3 3 3 1
1 2 3 4 5 6 7 8 9 10 11 12 13
N
= 22
24566 3456 8 367 28 0 29 9 46 4
It’s not symmetric – right skewed. Stem-and-leaf of Control Leaf Unit = 100 11 0 00001111111 11 0 2233
N
= 22
Engineering Statistics 5th edition 7 3 3 3 2 1
0 0 0 1 1 1
September 15, 2010
4455 1 3 4
It’s not symmetric – right skewed. Their shapes are similar. 2-19.
Stem-and-leaf of solar intensity measurements Leaf Unit = 10 1 1 3 3 7 10 14 (4) 17 12 4
4 5 5 6 6 7 7 8 8 9 9
N
= 35
9 56 5569 003 5677 0023 56779 00113344 5556
It’s not symmetric – left skewed. 2-20. Variable Weld strength
N 100
Median 5421.5
Q1 5399.0
Q3 5445.8
5 th 5366.45
95th 5480.8
2-21.
Variable Cycles
N 70
Median 1436.5
Q1 1097.8
Q3 1735.0
5th 772.85
95th 2113.5
2-22.
Variable Solids
N 60
Median 59.45
Q1 52.03
Q3 68.35
5th 39.455
95th 79.965
2-23.
Variable Yield
N 90
Median 89.25
Q1 86.10
Q3 93.125
5th 83.055
95th 96.58
2-24 If there are an odd number of observations then the median equals the central sample data value. 2.25. For the original data the sample mean and standard deviation are 22.154 and 2.084, respectively. The median is 21.38. If the data are incorrectly recorded, the sample mean and standard deviation are now 68.1 and 104.5, respectively but the median is still 21.38.
Engineering Statistics 5th edition
September 15, 2010
Section 2-3 a) 8 bins
Frequency
30
20
10
0 5320
5345
5370
5395
5420
5445
5470
5495
5470
5495
weld strength
100
Cumulative Frequency
2-26.
50
0 5320
5345
5370
5395
5420
5445
weld strength
Engineering Statistics 5th edition
September 15, 2010
b) 16 bins
Frequency
15
10
5
0 5300
5400
5500
5400
5500
weld strength
Cumulative Frequency
100
50
0 5300
weld strength Yes, both histograms display similar information based on this dataset.
Engineering Statistics 5th edition a) 8 bins Histogram of Cycles 18 16 14
Frequency
12 10 8 6 4 2 0
500
750
1000
1250 1500 Cycles
1750
2000
2250
2000
2250
Cummulative Frequency of Cycles 70 60
Cumulative Frequency
2-27.
September 15, 2010
50 40 30 20 10 0
500
750
1000
1250 1500 Cycles
1750
Engineering Statistics 5th edition
September 15, 2010
b) 16 bins
Histogram of Cycles 14 12
Frequency
10 8 6 4 2 0
200
500
800
1100
1400 Cycles
1700
2000
2300
2000
2300
Cummulative Frequency of Cycles 70
Cumulative Frequency
60 50 40 30 20 10 0
200
500
800
1100
1400 Cycles
1700
Yes, both histograms display similar information based on this dataset.
Engineering Statistics 5th edition a) 8 bins
Histogram of Water Quality 20
Frequency
15
10
5
0
32
40
48
56 64 Water Quality
72
80
88
Cummulative Frequency of Water Quality 60 50
Cumulative Frequency
2-28.
September 15, 2010
40 30 20 10 0
32
40
48
56 64 Water Quality
72
80
88
Engineering Statistics 5th edition
September 15, 2010
b) 16 bins Histogram of Water Quality 10
Frequency
8
6
4
2
0
32
40
48
56 64 Water Quality
72
80
88
80
88
Cummulative Frequency of Water Quality 60
Cumulative Frequency
50 40 30 20 10 0
32
40
48
56 64 Water Quality
72
Yes, both histograms display similar information based on this dataset.
Engineering Statistics 5th edition a) 8 bins
Histogram of Yield 20
Frequency
15
10
5
0
78
81
84
87
90
93
96
99
96
99
Yield
Cumulative Frequency of Yield 90 80
Cumulative Frequency
2-29.
September 15, 2010
70 60 50 40 30 20 10 0
78
81
84
87
90 Yield
93
Engineering Statistics 5th edition
September 15, 2010
b) 16 bins
Histogram of Yield 14 12
Frequency
10 8 6 4 2 0
78
81
84
87
90 Yield
93
96
99
96
99
Cumulative Frequency of Yield 90
Cumulative Frequency
80 70 60 50 40 30 20 10 0
78
81
84
87
90 Yield
93
Yes, both histograms display similar information based on this dataset.
Engineering Statistics 5th edition
High Dose
Histogram of High Dose 9 8
Frequency
7 6 5 4 3 2 1 0
20
40
60
80 High Dose
100
120
140
Cummulative Frequency of High Dose 25
20 Cumulative Frequency
2-30
September 15, 2010
15
10
5
0
20
40
60
80 High Dose
100
120
140
Engineering Statistics 5th edition
September 15, 2010
Control group
Histogram of Control 9 8
Frequency
7 6 5 4 3 2 1 0
0
200
400
600 800 Control
1000
1200
1400
1200
1400
Cummulative Frequency of Control 25
Cumulative Frequency
20
15
10
5
0
0
They both look similar.
200
400
600 800 Control
1000
Engineering Statistics 5th edition 6 bins Histogram of solar intensity measurements 14 12
Frequency
10 8 6 4 2 0
500
600
700
800
900
1000
900
1000
EX2-7
Histogram of EX2-7 40
Cumulative Frequency
2-31.
September 15, 2010
30
20
10
0
500
600
700
800 EX2-7
Engineering Statistics 5th edition
September 15, 2010
2-32.
Pareto Chart for Defect 100
80 70
80 50
60
40 40
30 20
Percent
Count
60
20
10 0
Defect Count Percent Cum %
0 o out
ur nto f co
30 37.0 37.0
e und
ed mm rtr i
21 25.9 63.0
mi
ng ss i
es hol
8 9.9 72.8
ts /sl o e as s
ly mb
6 7.4 80.2
ts par
not
ate r ic lub
5 6.2 86.4
d nts
pi ts
4 4.9 91.4
4 4.9 96.3
de
O
rs the
3 3.7 100.0
Roughly 63% of defects are described by parts out of contour and parts under trimmed.
Section 2-4 a) Sample Mean: 65.86, Sample Standard Deviation: 12.16 b) Q1: 58.5, Q3: 75 c) Median: 67.5 d) Sample Mean: 66.86, Sample Standard Deviation: 10.74, Q1: 60, Q3: 75, Median: 68 The mean has increased while the sample standard deviation has decreased. The lower quartile has increased while the upper quartile has remained unchanged. The median has increased slightly due to the removal of the data point. The smallest value appears quite different than the other temperature values. e) Using the entire data set, the box plot is
90
80
Temperatur
2-33.
70
60
50
40
30
The value of 31 appears to be one possible outlier.
Engineering Statistics 5th edition 2-34.
September 15, 2010
a) Sample Mean: 4 b) Sample Variance: 0.867, Sample Standard Deviation: 0.931 c)
PMC
5
4
3
2
2-35.
a) Sample mean = 2.415, Sample standard deviation = 0.534 b)
2.0
2.5
Ignition Time
3.0
Engineering Statistics 5th edition
2-36.
September 15, 2010
a) Sample mean = 952.44, Sample standard deviation = 3.09 b) Median = 953. The largest temperature could take on any value as long as it is the larger than the current largest value. c)
948
949
950
951
952
953
954
955
956
957
temperature
2-37.
a) Sample mean: 83.11, sample variance = 50.55, sample standard deviation = 7.11 b) Q1 = 79.5, Q3 = 84.50 c)
80
count
90
100
Engineering Statistics 5th edition
September 15, 2010
d) Sample mean = 81, sample standard deviation = 3.46, Q1 = 79.25, Q3 = 83.75. The sample mean and the sample standard deviation have decreased. The lower quartile has decreased slightly while the upper quartile has decreased. 2-38.
a) Sample Mean: 48.125, Sample Median: 49 b) Sample Variance: 7.247, Sample Standard Deviation: 2.692 c) The data appear to be skewed.
52 51
temperatur
50 49 48 47 46 45 44 43
d) 5th Percentile: 43.25, 95th Percentile: 52 2-39.
a) Sample Mean: 0.04939, Sample Variance: 0.00001568 b) Q1: 0.04738, Q3: 0.0513 c) Sample Median: 0.04975 d)
Engineering Statistics 5th edition
diameter
0.055
0.050
0.045
0.040
e) 5th Percentile: 0.03974, 95th Percentile: 0.057 2-40.
a) Sample Mean: 8.059, Sample Variance: 0.661 b) Q1: 7.575, Q3: 8.535 c) Sample Median: 8.235 d)
9.5
rate
8.5
7.5
6.5
e) 5th Percentile: 6.175, 95th Percentile: 9.3315 2-41.
a) Sample Mean: 0.7481, Sample Variance: 0.00226 b) Q1: 0.7050, Q3: 0.7838 c) Sample Median: 0.742
September 15, 2010
Engineering Statistics 5th edition
September 15, 2010
d)
0.83
rate
0.78
0.73
0.68
e) 5th Percentile: 0.5025, 95th Percentile: 0.821 2-42.
a) Sample Mean: 810.5, Sample Variance: 16465.61 b) Q1: 708, Q3: 918 c) Sample Median: 835 d) Boxplot of Solar Intensity 1000
Solar intensity
900
800
700
600
500
e) 5th Percentile: 546, 95th Percentile: 957.6 2-43.
a) High Dose: Sample Mean: 52.65, Sample Variance: 1490.32 Control: Sample Mean: 382.7, Sample Variance: 175224.35 b) High Dose: Q1: 21.70, Q3:74.38 Control: Q1: 101.9, Q3: 501.1 c) High Dose: Sample Median: 45 Control: Sample Median: 215.4 d)
Engineering Statistics 5th edition
September 15, 2010
Boxplot of Control
Boxplot of High Dose 1600
140
1400
120
1200
100
Control
High Dose
1000 80 60
800 600
40
400
20
200 0
0
e) High Dose: 5th Percentile: 13.125, 95th Percentile: 133.67 Control: 5th Percentile: 17.045, 95th Percentile: 1460.23 All summary statistics are larger for the control group.
Section 2-5 2-44. 13 12 11
Times
10 9 8 7 6 5 4 2
4
6
8
10 12 Index
14
16
18
20
Computer response time appears random. No trends or patterns are obvious. 2-45.
a)
Engineering Statistics 5th edition
September 15, 2010
49
Viscosity Measurements
48 47 46 45 44 43 42 4
8
12
16
20 Index
24
28
32
36
40
Trends or patterns are obvious. Stem-and-leaf display for Problem 2-32.Viscosity: unit = 0.1 1|2 represents 1.2 2 42o|89 12 43*|0000112223 16 43o|5566 16 44*| 16 44o| 16 45*| 16 45o| 16 46*| 16 46o| 17 47*|2 (4) 47o|5999 19 48*|000001113334 7 48o|5666689 b) The plots indicate that the process is not stable and not capable of meeting the specifications. a) 260 250 240 230
Force
2-46
220 210 200 190 180 170 4
8
12
16
20 Index
24
28
32
b) Stem-and-leaf display for Problem 2-33. Force: unit = 1 1|2 represents 12 3 17|558 6 18|357 14 19|00445589
36
40