CONTENTS ASSIGNMENT 03 WORKING DRAWINGS & SYSTEM INTEGRATION

ASSIGNMENT 02 PRECEDENT STUDIES - A BUREAU

ASSIGNMENT 01 WORK FROM HOME: DOORS AND WINDOWS


ASSIGNMENT 03 WORKING DRAWINGS & SYSTEM INTEGRATION In this assignment, we are required to produce a series of working drawings. The objective is to enable students to produce documents with an integration of the building services components by working together in the design process and identify solutions to design needs with interior design proposal of appropriate building scale. Also to introduce and expose students to the production of working drawings documentation and format and to demonstrate skills and ability to produce working drawings and detailing commensurate with the industry standard practice.

TAN XIAO HUI 0335215


IDS60804 DETAILING AND WORKING DRAWINGS ASSIGNMENT 03: WORKING DRAWINGS + SYSTEM INTERGRATION

NAME : TAN XIAO HUI STUDENT ID : 0335215 PROGRAMME: BACHELOR OF ARTS (HONOURS) INTERIOR ARCHITECTURE BATCH: AUGUST 2021 LECTURER : MS NORJI, MS AZIAH


HENRY GOH & CO SDN BHD PROPOSED INTERIOR DRAWING NO.

DRAWING SHEET NAME

REV

DATE

DESCRIPTION

ISSUED

NOTES FOR REMARKS

1 DWG_DWD_TXH_DL_01

DRAWING LIST

1

26 OCT 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_SOA_02

SCHEDULE OF ACCOMODATION

2

02 NOV 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_SOP_03

SETTING OUT PLAN

1

02 NOV 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_FLP_04

FURNITURE LAYOUT PLAN

1

02 NOV 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_FFP_05

FLOOR FINISHES PLAN

1

02 NOV 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_SOF_06a

SCHEDULE OF FURNITURE, FIXTURES & EQUIPMENT

1

02 NOV 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_SOF_06b

SCHEDULE OF FURNITURE, FIXTURES & EQUIPMENT

1

02 NOV 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_RCP_07

REFLECTED CEILING PLAN

1

02 NOV 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_LEP_08

LIGHTING AND ELECTRICAL PLAN

1

02 NOV 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_SC_09

SECTION A-A

1

23 NOV 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_BS_10a

BESPOKE FURNITURE PLAN AND ELEVATION

0

23 NOV 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_BS_10b

BESPOKE FURNITURE SECTION DETAIL

0

23 NOV 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_BOQ_11a

BILL OF QUANTITIES

1

02 DEC 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_BOQ_11b

BILL OF QUANTITIES

1

02 DEC 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_BOQ_11c

BILL OF QUANTITIES

1

02 DEC 2021

FOR CONSTRUCTION

NO

DWG_DWD_TXH_BOQ_11c

BILL OF QUANTITIES

1

02 DEC 2021

FOR CONSTRUCTION

NO

2

3

4

5

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

DRAWING TITLE:

DRAWING LIST SCALE: N/A

DATE: 26 OCTOBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_DL_01

REV. NO:

01


SCHEDULE OF ACCOMODATION (TOWER A - GROUND FLOOR & LEVEL 5) NO. OF PERSONS

NO. OF ROOMS

AREA FOR 1 ROOM (m2)

TOTAL AREA (m2)

A8 A9 A10 A11 A12

RECEPTION SHARE IT ONE DERFUL TINKER MAKER NEW BORN LIFT LOBBY EMERGENCY STAIRS 1 EMERGENCY STAIRS 2 TOILET TNB ROOM SECURITY ROOM REFUSE ROOM

20 18 6 6 6 6 6 6 6 6 6 6

1 1 1 1 1 1 1 1 2 1 1 1

47.60 22.60 28.60 38.70 71.20 33.30 12.70 13.80 9.70 14.70 14.50 11.18 SUBTOTAL

47.60 22.60 28.60 38.70 71.20 33.30 12.70 13.80 19.40 14.70 14.50 11.18 328.28

B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16

LEVEL 5 RECEPTION WAITING AREA RESOURCES ROOM TEST LAB FIXING ROOM BROWSING AREA SERVICE POD CUSTOMIZING AREA LIFT LOBBY TOILET EMERGENCY STAIRS 1 EMERGENCY STAIRS 2 MEETING ROOM WORKING SPACE STAFF ROOM / PANTRY BREAKOUT ZONE

6 4 5 5 5 5 6 7 15 3 50 40 8 8 5 5

1 1 1 1 1 1 2 1 1 2 1 1 1 1 1 1

5.40 7.90 10.70 24.90 10.90 8.64 15.70 20.40 33.30 9.70 12.70 13.80 22.60 24.10 8.84 11.10 SUBTOTAL TOTAL

5.40 7.90 10.70 24.90 10.90 8.64 31.40 20.40 33.30 19.4 12.70 13.80 22.60 24.10 8.84 11.10 266.18

A A1 A2 A3 A4 A5 A6 A7

SPACES GROUND FLOOR

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

594.46 DRAWING TITLE:

SCHEDULE OF ACCOMODATION SCALE: N/A

DATE: 2 NOVEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_SOA_02

REV. NO:

02


1

2

4

3 29400

9110

11330

W1

A

9110

W1

W2

W2

W1

STAFF ROOM/ PANTRY CONCRETE 8.84m2

5340

D2

WORKING AREA EPOXY 24.10m2

EMERGENCY STAIRS 1

12 83

CERAMIC TILE 12.70m2

CONCRETE 198.50m2

1300

RECEPTION KIOSK

1704

3450

8260

D1

1325 LIFT LOBBY MARBLE TILE 33.30m2

1 29

D3

D1

3300

D4 D3

3

SYM

CERAMIC TILE 13.80m2

D2

TOILET

TOILET

CERAMIC TILE 9.70m2

CERAMIC TILE 9.70m2

225MM EXISTING BRICK WALL

EPOXY 11.10m2

200MM EXISTING CONCRETE WALL

820

D5

D5

14100

DESCRIPTION

BREAKOUT ZONE

EMERGENCY STAIRS 2

100MM PROPOSED CONCRETE WALL

835 50MM PROPOSED PARTITION WALL

RESOURCES AREA

D6

EPOXY 10.70m2

B

BROWSING AREA CARPET TILE 8.64m2

WINDOW LEGEND

SYM

170

MEETING ROOM

19

36

12

EPOXY 22.60m2

94

1730

4

3340

129

0

DESCRIPTION

W1

600MM(L) X 3100MM(H) TEMPERED GLASS FIXED WINDOW WITH ALUMINIUM FRAME

W2

1160MM(L) X 3100MM(H) ALUMINIUM FRAME FIXED WINDOW C/W DOUBLE TEMPERED GLASS

2633 D7

3748

W1

3948

206 0

2275

5990

DOOR LEGEND

TEST LAB EPOXY 24.90m2

6256

2217

3662

SC A

19

83

70 17

93 31

990

STAINLESS TEEL 15.70m2

4292

SERVICE POD

SC A

4188

2697

1984

CUSTOMIZING AREA

3190

STAINLESS STEEL 15.70m2

FIXING ROOM CONCRETE 10.90m2

C

W2

SLP L5

W2

D2

800MM(L) X 2100MM(H) EMERGENCY EXIT DOOR IN EPOXY POLYESTER POWDER COATED FINISH

D3

700MM(L) X 2100MM(H) ALUMINIUM SINGLE FLUSH DOOR IN WHITE GLOSSY FINISH

D4

900MM(L) X 2100M(H) ALUMINIUM SLIDING DOOR C/W 50MM THK ALUMINIUM FRAME IN POLISHED FINISH

D5

700MM(L) X 2100MM(H) ALUMINIUM SINGLE FLUSH DOOR IN BLACK GLOSSY FINISH

D6

AUTOMATICAL TEMPERED GLASS SLIDING DOOR C/W 50MM THK ALUMINIUM DOOR FRAME IN POLISHED FINISH

D7

700MM(L) X 2100MM(H) SLIDING DOOR C/W 50MM THK ALUMINIUM FRAME WITH TEMPERED GLASS

W2

SCALE 1:100

CLIENT:

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

Date

1600MM(L) X 2100MM(H) TEMPERED GLASS DOUBLE FLUSH DOOR C/W 50MM THK ALUMINIUM DOOR FRAME

SETTING LAYOUT PLAN

NOTE :

No.

DESCRIPTION

D1

W1

CARPET TILE 20.40m2

SERVICE POD

SYM

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

DRAWING TITLE:

SETTING OUT PLAN SCALE: 1:100

DATE: 2 NOVEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_SOP_03

REV. NO:

01


1

2

4

3 29400 11330

9110

9110

A LF12

LF11

BF1

LEGEND

STAFF ROOM/ PANTRY

SYM

DESCRIPTION

NOS

LF1

WHITE FABRIC CURVED SOFA WITH ALUMINIUM BASE IN POLISHED FINISH

1

LF2

WHITE POLYURETHANE BAR STOOL WITH BRUSHED STEEL FRAME LEG

3

LF3

MATTE WHITE POLYPROPYLENE CHAIR WITH SWIVEL ALUMINIUM BASE

3

LF4

WHITE LEATHER SWIVEL CHAIR IN FIBERGLASS SHELL WITH STEEL LEG IN POLISHED FINISH

8

LF5

ORGANIC SHAPED DESK WITH 22MM THK MDF LIGHT GREY CPL LAMINATE C/W CONICAL STEEL LEGS

1

MATTE WHITE POLYPROPYLENE CLASSIC CHAIR

6

WHITE POLYURETHANE BAR STOOL WITH BRUSHED STEEL FRAME LEG

3

420MM DIAMETER ROUND CERAMIC SIDE TABLE

2

CONCRETE 8.84m2

LF1

LF6

EMERGENCY STAIRS 1

8260

CERAMIC TILE 12.70m2

LF5

RECEPTION KIOSK

LIFT LOBBY MARBLE TILE 33.30m2

CONCRETE 198.50m2

LF6

WORKING AREA EPOXY 24.10m2

EMERGENCY STAIRS 2 CONCRETE 13.80m2

TOILET

TOILET

CERAMIC TILE 9.70m2

CERAMIC TILE 9.70m2

LF7

LF9

LF8

LF10

BF3

14100

BF2

LF9

BREAKOUT ZONE EPOXY 11.10m2

LF2

LF8

LF11

BF1

B

4

550MM DIAMETER ROUND WHITE COTTON POUFES

5

MATTE WHITE ABS SEAT SWIVEL BAR STOOL WITH STEEL FRAME LEG IN POLISHED CHROME FINISH

2

BAR TABLE IN MDF BOARD WITH BLACK LAMINATE IN MATTE FINISH

1

LF10

RESOURCES AREA EPOXY 10.70m2

POLYETHYLENE GUMBALL ARMCHAIR IN MATTE FINISH

LF12 198

0

BROWSING AREA

LEGEND

CARPET TILE 8.64m2

SYM

BF6

DESCRIPTION

NOS

BF1

RECPTION SELF SERVICE COUNTER KIOSK

1

BF2

DOUBLE TEMPERED GLASS DISPLAY RACK

1

BF3

CUSTOMIZED MARBLE TOP BUILT IN TABLE

1

BF4

CUSTOMIZED ORGANIC SHAPE DESK IN MDF BOARD WITH WHITE LAMINATE IN GLOSS FINISH

1

BF5

CURVED SHAPE CONCRETE SEATING IN POLISHED FINISH

4

BF6

BUILT IN FIBERGLASS ROUND TABLE

2

BF7

ORGANIC SHAPE MEETING TABLE WITH RESIN COATED BASE AND GLASS TABLE TOP

1

BF8

ORGANIC SHAPE TABLE WITH RESIN COATED IN GLOSS FINISH

1

BF9

STAINLESS STEEL BUILT IN DISPLAY RACK

1

MEETING ROOM EPOXY 22.60m2

SERVICE POD STAINLESS TEEL 15.70m2

SC A

BF5

5990

TEST LAB

LF4

EPOXY 24.90m2

BF7

BF9

CUSTOMIZING AREA

SC A

CARPET TILE 20.40m2

19 80

3370

FIXING ROOM CONCRETE 10.90m2

BF6

LF7

SERVICE POD

LF3 BF5

BF4

STAINLESS STEEL 15.70m2

BF8

3370

C

FLP L5

FURNITURE LAYOUT PLAN SCALE 1:100

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

DRAWING TITLE:

FURNITURE LAYOUT PLAN SCALE: 1:100

DATE: 2 NOVEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_FLP_04

REV. NO:

01


1

2

4

3 29400

9110

11330

9110

A STAFF ROOM/ PANTRY CONCRETE 8.84m2 FF2

EMERGENCY STAIRS 1

RECEPTION KIOSK

CERAMIC TILE 12.70m2

CONCRETE 198.50m2

WORKING AREA EPOXY 24.10m2

FF2

8260

FF4

LIFT LOBBY MARBLE TILE 33.30m2 FF1

BREAKOUT ZONE

EMERGENCY STAIRS 2 CERAMIC TILE 13.80m2

TOILET

TOILET

CERAMIC TILE 9.70m2

CERAMIC TILE 9.70m2

FF7

FF6

FF6

14100

GRANITE FLOOR 11.10m2

BROWSING AREA CARPET TILE 8.64m2

RESOURCES AREA

FF3

EPOXY 10.70m2

B

FF4

LEGEND

MEETING ROOM EPOXY 22.60m2

SERVICE POD STAINLESS TEEL 15.70m2

SC A

5990

DESCRIPTION

AREA / m2

FF1

HEXAGON MARBLE TILES IN GLOSSY FINISH

33.30

FF2

CONCRETE FLOORING IN POLISHED FINISH

198.50

FF3

ORIGINAL LIGHT GREY COLOR CARPET TILE

8.64

FF4

EPOXY FLOORING IN WHITE GLOSS FINISH

82.30

FF5

LIGHT GREY CARPET TILE

20.40

FF6

STAINLESS STEEL FLOORING IN POLISHED FINISH

19.40

FF7

GRANITE FLOORING IN GREY GLOSSY FINISH

11.10

SYM

HATCHING

FF4

SC A

FF6

TEST LAB

CUSTOMIZING AREA

EPOXY 24.90m2

CARPET TILE 20.40m2

FF4

FF5

SERVICE POD

FIXING ROOM

STAINLESS STEEL 15.70m2

CONCRETE 10.90m2

FF6

FF2

C

FFP L5

FLOOR FINISHES PLAN SCALE 1:100

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

DRAWING TITLE:

FLOOR FINISHES PLAN SCALE: 1:100

DATE: 2 NOVEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_FFP_05

REV. NO:

01


SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT QUANTITY

BRAND

1600MM(D) X 2500MM(W) X 420MM(H)

1

SECOLO

LED TOUCHSCREEN MONITOR WITH ADJUSTABLE DISPLAY ANGLE

735MM(W) X 70MM(D) X 500MM(H)

6

ACER

WHITE POLYURETHANE BAR STOOL WITH BRUSHED STEEL FRAME LEG

375MM(L) X 700MM(H)

3

ATLANTIC

MATTE WHITE POLYPROPYLENE CHAIR WITH SWIVEL ALUMINIUM BASE

615MM(D) X570MM(W) X635MM(H)

3

INFINITI

C4

WHITE LEATHER SWIVEL CHAIR IN FIBERGLASS SHELL WITH STEEL LEG IN POLISHED FINISH

660MM(D) X 900MM(W) X 1220MM(H)

8

ZANOTTA

M2

75-INCH 4K LED FLAT PANEL 4K INTERACTIVE TOUCH MONITOR

1735MM(W) X 791MM(D) X 1000MM(H)

1

DELL

C10

MATTE WHITE ABS SEAT SWIVEL BAR STOOL WITH STEEL FRAME LEG IN POLISHED CHROME FINISH

400MM(W) X 700MM(H)

3

ATLANTIC

T3

BAR TABLE IN MDF BOARD WITH BLACK LAMINATE IN MATTE FINISH

500MM(W) X 1500MM(D) X 1080MM(H)

2

BIG BROTHERS

C7

POLYETHYLENE GUMBALL ARMCHAIR IN MATTE FINISH

700MM(W) X 640MM(D) X 490MM(H)

2

PLUST

T2

420MM DIAMETER ROUND CERAMIC SIDE TABLE

360MM(W) X 390MM(H)

1

PULPO

CODE

DESCRIPTION

SIZE

C1

WHITE FABRIC CURVED SOFA WITH ALUMINIUM BASE IN POLISHED FINISH

M1

IMAGE

WAITING AREA

BROWSING AREA

C2

FIXING ROOM

C3

MEETING ROOM

STAFF/PANTRY AREA

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

PROJECT NAME:

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

DRAWING TITLE:

SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT SCALE: N/A

DATE: 2 NOVEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_SOF_06a

REV. NO:

01


SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT QUANTITY

BRAND

500MM(W) X 610MM(D) X 860MM(H)

6

VITRA

ORGANIC SHAPED DESK WITH 22MM THK MDF LIGHT GREY CPL LAMINATE C/W CONICAL STEEL LEGS

2290MM(L) X 1140MM(W) X 750MM(H)

1

LAURITZ

P1

COLOR LASER JET PRO PRINTER WITH DUPLEX WIRELESS

426MM(W) X 652MM(D) X 414MM(H)

1

HP

M3

27-INCH HEIGHT ADJUSTABLE DISPLAY MONITOR

614MM(W) X 54MM(D) X 211MM(H)

3

HP

C6

WHITE POLYURETHANE BAR STOOL WITH BRUSHED STEEL FRAME LEG

460MM(W) X 450MM(D) X 660MM(H)

3

COM.P.AR

C7

POLYETHYLENE GUMBALL ARMCHAIR IN MATTE FINISH

700MM(W) X 640MM(D) X 490MM(H)

2

PLUST

T2

420MM DIAMETER ROUND CERAMIC SIDE TABLE

360MM(W) X 390MM(H)

1

PULPO

C8

EGG POD CHAIR IN FABRIC SEAT WITH FIBERGLASS SHELL

736MM(W) X 1016MM(D) X 1219MM(H)

2

JASMETO

C9

WHITE COTTON POUFES

900MM(W) X 450MM(H)

3

MAISON DE VACANCES

L1

LED FLOOR LAMP IN MATTE BLACK ALUMINIUM

200MM(D) X 1250MM(H)

1

MEINE LAMPE

CODE

DESCRIPTION

SIZE

C5

MATTE WHITE POLYPROPYLENE CLASSIC CHAIR

T1

IMAGE

WORKING AREA

CUSTOMIZING AREA

BREAKOUT ZONE

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

DRAWING TITLE:

SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT SCALE: N/A

DATE: 2 NOVEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_SOF_06b

REV. NO:

01


1

2

4

3 29400

9110

11330

9110

A DL DL

DL

CT-1

CH=+3380

STAFF ROOM/ PANTRY

DL

DL

8.84m2

DL

DL

CT-2

DL

DL

CH=+3350

DL

DL

DL

EMERGENCY STAIRS 1 CERAMIC TILE 12.70m2

DL

DL

DL

CT-3

CH=+3340

DL

DL

8260

WORKING AREA 2 DL

DL

DL

DL

DL

DL

24.10m

DL

DL

DL

DL

CT-1

DL

DL

CH=+3380

DL

DL

CT-1

LIFT LOBBY

CH=+3380

DL

MARBLE TILE 33.30m2

DL

RECEPTION KIOSK 198.50m2

DL

CH=+3000

BREAKOUT ZONE

DL

CONCRETE 13.80m2

11.10m2

DL

DL

DL

TOILET DL

14100

CT-1

DL

EMERGENCY STAIRS 2

CERAMIC TILE 9.70m2

DL

DL

TOILET CERAMIC TILE 9.70m2

DL

DL

DL

DL

DL

LIGHTING AND ELECTRICAL LEGEND DL DL

DL

DL

DL

DL

DL

DL DL

CT-2 DL

DL

DL

DESCRIPTION YELLOW COLOR DOWNLIGHT

8.64m2

CH=+3380

B

SYM

BROWSING AREA

CT-1

RESOURCES AREA

DL

DL

DL

DL

CH=+3350

DL

ROUNDED LED DOWNLIGHT

DL

DL

2

10.70m

DL

DL

DL

WARM WHITE COLOR LED DOWNLIGHT

CT-1 DL

DL

CH=+3330

DL

DL

MEETING ROOM

DL

CT-4

DL

DL

DL

DL

ROUNDED LED DOWNLIGHT

22.60m2

DL

CH=+3070

SERVICE POD

DL

DL

DL

EMERGENCY LIGHT

15.70m2

SC A

DL

DL DL

DL

DL

DL

5990

DL

DL

DL

SC A

AIR CONDITIONER

A/C

DL

DL

CEILING FINISHES LEGEND

DL

DL

CT-1

CH=+3380

CT-1

DL

DL

DL

TEST LAB

DL

DL

2

24.90m

CT-3

10.90m2

SERVICE POD

DL

15.70m2

DL

DL

SYM

DL

CARPET TILE 20.40m2

CH=+3070

FIXING ROOM DL

CH=+3350

DL

DL

DL DL

DESCRIPTION

CUSTOMIZING AREA

CT-4

CH=+3340

DL

DL

DL

DL

DL

CTX

EXISTING EXPOSED CEILING TO BE REMAIN

CT-2

TO INSTALL 15MM THK PLASTERBOARD CEILING

DL

DL

DL

DL

DL

CT-3

TO INSTALL 15MM THK PLASTERBOARD CEILING

CT-4

TO INSTALL 15MM STEEL CEILING WITH POLISHED FINISH

DL

C

RCP L5

REFLECTED CEILING PLAN SCALE 1:100

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

DRAWING TITLE:

REFLECTED CEILING PLAN SCALE: 1:100

DATE: 23 NOVEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_RCP_07

REV. NO:

01


1

2

4

3 29400

9110

11330

9110

A DL DL

DL

CT-1

CH=+3380

STAFF ROOM/ PANTRY

DL

DL

8.84m2

DL

DL

CT-2

DL

DL

CH=+3350

DL

DL

DL

EMERGENCY STAIRS 1 CERAMIC TILE 12.70m2

DL

DL

DL

CT-3

CH=+3340

DL

DL

8260

WORKING AREA 2 DL

DL

DL

DL

DL

DL

24.10m

DL

DL

DL

DL

DL

DL

CT-1 DL

CH=+3380

DL

LIFT LOBBY

CT-1

DL

MARBLE TILE 33.30m2

DL

CH=+3380

RECEPTION KIOSK

DL

BREAKOUT ZONE

DL

CONCRETE 13.80m2

DL

DL

14100

DL

CT-1

CH=+3000

198.50m2

EMERGENCY STAIRS 2

DL

DL

DL

11.10m2

DL

TOILET

TOILET

CERAMIC TILE 9.70m2

CERAMIC TILE 9.70m2

LIGHTING AND ELECTRICAL LEGEND DL

DL

SYM

DESCRIPTION

DL

DL

YELLOW COLOR DOWNLIGHT

DL

DL DL

DL

DL

DL

DL

DL

DL

CT-2

DL

DL

ROUNDED LED DOWNLIGHT

DL

DL

DL

DL

CH=+3350

DL

BROWSING AREA

WARM WHITE COLOR LED DOWNLIGHT

8.64m2

CT-1

CH=+3380

B

RESOURCES AREA

DL

DL

ROUNDED LED DOWNLIGHT

DL

DL

10.70m2 DL

DL

DL

EMERGENCY LIGHT

CT-1

DL

DL

CH=+3330

DL

DL

MEETING ROOM

DL

CT-4

DL

DL

DL

DL

AIR CONDITIONER

A/C

22.60m2

DL

CH=+3070

SERVICE POD

DL

ONE WAY SWITCH

DL

DL

15.70m2

SC A

DL

DL DL

DL

DL

DL

5990

DL

DL

DL

SC A

WIRE

DL

DL

CEILING FINISHES LEGEND

DL

DL

CT-1

CH=+3380

CT-1

DL

DL

DL

TEST LAB

DL

DL

24.90m2

CT-3

10.90m2

SERVICE POD

DL

15.70m2

DL

DL

DL

CARPET TILE 20.40m2

CH=+3070

FIXING ROOM DL

CH=+3350

DL

DL

DL DL

SYM

DESCRIPTION

CT-1

EXISTING EXPOSED CEILING TO BE REMAIN

CT-2

TO INSTALL 15MM THK PLASTERBOARD CEILING

CT-3

TO INSTALL 15MM THK PLASTERBOARD CEILING

CT-4

TO INSTALL 15MM STEEL CEILING WITH POLISHED FINISH

CUSTOMIZING AREA

CT-4

CH=+3340

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

C

LEP L5

LIGHTING AND ELECTRICAL PLAN SCALE 1:100

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

DRAWING TITLE:

LIGHTING AND ELECTRICAL PLAN SCALE: 1:100

DATE: 23 NOVEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_LEP_08

REV. NO:

01


1

2

4

3

5

7

6

29400 5454

3655

4863

4573

6476

4525

CT2

ROOF LEVEL 24000

15MM GYPSUM BOARD PLASTER CEILING IN WHITE PAINT FINISH

SGAG FASGA

FASGASGAG

FASGASGAG

agagag a

agagaga

agagaga

8260

BF9 5000MM(W) X 250MM(D) X 2580MM(H) STAINLESS STEEL DISPLAY SHELVES

FF3 5.5MM THK ORIGINAL LIGHT GREY COLOR CARPET TILE

LEVEL 4 20000

FF2

14100

CONCRETE FLOORING IN POLISHED FINISH

W3 NEW PEAR SERIES PORCELAIN WALL IN HIGH GLOSS FINISH

LEVEL 3 16000

FF6 STAINLESS STEEL FLOORING IN POLISHED FINISH

D1 ALUMINIUM DOUBLE SLIDING DOOR IN GLOSSY REFLECTIVE FINISH C/W ELECTRIC MOTOR AND SENSOR LEVEL 2 12000

LF9 POLYETHYLENE GUMBALL ARMCHAIR IN MATTE FINISH

BW4 BRICK WALL IN WHITE PAINT FINISH

W1

LEVEL 1 8000

ALUMINIUM FRAME FIXED WINDOW C/W DOUBLE TEMPERED GLASS

RC1 REINFORCED CEMENT CONCRETE COLUMN IN GREY PLASTER FINISH

FE1 EPOXY FLOOR IN POLISHED FINISH

GROUND FLOOR 0

SC L5

SECTION A-A SCALE 1:75 CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

DRAWING TITLE:

SECTION A-A SCALE: 1:75

DATE: 23 NOVEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_SC_09

REV. NO:

00


2220

3750

PB1 15MM THK PLASTER BOARD IN WHITE COLOR PAINT FINISH

3750

1910

950

TG1 7MM THK DOUBLE TEMPERED DISPLAY GLASS

3750

2220

3750

950

LT1 FOLKSTONE CELESTA FORMICA LAMINATE TABLETOP IN MATTE FINISH

LP

BESPOKE PLAN

BS1

SCALE 1:20

CLIENT:

NOTE :

WL1 WOODEN LOUVERS IN BLACK PAINT FINISH

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

EL

BESPOKE ELEVATION

BS1

SCALE 1:20

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

DRAWING TITLE:

BESPOKE PLAN AND ELEVATION SCALE: 1:20

DATE: 23 NOVEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_BS_10a

REV. NO:

00


90 65

2220

65

65

STAINLESS STEEL PIPE TUBE IN POLISHED FINISH 10

PB1

WOOD SCREWS

10

15MM THK PLASTER BOARD IN WHITE COLOR PAINT FINISH

10

ANGLE BRACKETS DETAIL 1 ST1

3750

40MM THK STAINLESS METAL TUBE IN POLISHED FINISH

DT

DETAIL 2

BS1

SCALE 1:5

TG1

7MM THK DOUBLE TEMPERED DISPLAY GLASS

20

WL1

WOOD LOUVERS IN BLACK PAINT FINISH

WOOD LOUVERS IN BLACK PAINT FINISH

DETAIL 2 10

WOOD SCREWS

SC

BESPOKE SECTION

BS1

SCALE 1:25

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

DT

DETAIL 2

BS1

SCALE 1:5

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

MDF SILVER PANEL IN GLOSS FINISH

DRAWING TITLE:

BESPOKE SECTION SCALE: 1:25

DATE: 23 NOVEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_BS_10b

REV. NO:

00


C1 C2

WT1 WT2

W1 W1

W2

D1 BF2 LF1

FF2


GYPSUM BOARD IN NIPPON GREY PAINT FINISH

GLASS REFLECTIVE MIRROR WALL PANEL DOUBLE SWING DOOW C/W 15MM THK TEMPERED GLASS

ALUMINIUM FRAME DOUBLE CASEMENT WINDOW C/W TEMPERED GLASS FIXED DISPLAY SHELF WITH DOUBLE TEMPERED GLASS

CONCRETE FLOORING IN POLISHED FINISH


BILL OF QUANTITIES

TERMS & CONDITION QUOTATION

1

Validity : 14 days

DATE: 02 DECEMBER 2021

2

Period of completed : 60 days (refer of down payment upon confirmation of order)

QUOTE NO:

3

All Dimension subject to final site measurement

TERMS: C.O.D.

4

4 Variation Order : Any alternation not specified in the quotation will be issued under variation order follow with an invoice

HENRY GOH & CO SDN BHD OFFICE JALAN TAYLORS, 47500 SUBANG JAYA, MALAYSIA

ATTENTION

Variation order (VO).

RE: RENOVATION WORKS FOR HENRY GOH & CO OFFICE, TOWER A LEVEL 4

5 UNIT

NO DESCRIPTION

QTY

RATE(RM)

TOTAL(RM)

WALL

WT1 To supply material and labour to INSTALL GLASS REFLECTIVE MIRROR

2

m

15

2500

37500

WALL PANEL @ waiting area

WT2 To supply material and labour to install WALL MOUNT LIGHT WITH CLEAR

N/A

5

115

575

Payment Terms : - THE CONTRACT SUM RM

Percentage

Stage I Upon confirmation of project/service

50% = RM

Stage II Progress Claim (Installation of fixtures & fittings)

50% = RM

Stage III Progress Claim (Completion of fixtures & fittings)

50% = RM

Stage IV Final Payment (Full completion of all works)

50% = RM

LED LIGHT @ waiting area CEILING

- Services / works shall commence upon receipt of payment of each phase except for final phase. Time frame of work that has been agreed by both

C1 To supply material and labour to LAY 9MM GYPSUM BOARD IN NIPPON

N/A

5

80

400

parties are subjects to the receipt of payments.

GREY PAINT FINISH

- All outstanding amounts must be paid within ten (10) working days after handover of site (exclude V.O. period). Shall there be any delay of the handover

C2 To supply material and labour to WHITE HEXAGON LED PANEL LIGHT

N/A

6

95

570

of site, payment must still be made within ten (10) working days of the originally contemplated date confirmed by the Client & DMZ Consultancy Sdn Bhd

FLOOR

- DMZ Consultancy Sdn Bhd do not hold any responsibilities in delay of work from the agreed Time frame that is resulted by payment issues mentioned.

FF2 To supply material and labour SELECTED CONCRETE GRADE FOR

3

m

5

237

1185

- Cheque should be crossed *A/C Payee* & Made Payable to DMZ Consultancy Sdn Bhd.

FLOORING IN NATURAL TEXTURE

- DMZ Consultancy Sdn Bhd shall not in any circumstances or for any reason whatsoever be liable for any losses, damages cost, expenses, including

Area: Reception Area

without limitation direct, indirect, special or consequential damages or economic losses arising from any such failure to perform.

6

DOOR AND WINDOW

D1 To supply material WHITE PVC DOUBLE SWING WINDOW c/w 12mm THK

N/A

1

285

- DMZ Consultancy Sdn Bhd cannot be held responsible for design/works/service that may later be undesirable or cause inconvenience. The Client

285

TEMPERED GLASS DOOR LEAF 2100MM(H) X 1800MM(W) X 40MM (THK)

W1 To supply material and labour to ALUMINIUM FRAME DOUBLE CASEMENT

understands that all designer/contractor interprets the Client's requirement and wishes. However any design/works that are not done according to agreed N/A

2

270

as per quoted shall be rectified accordingly by DMZ Consultancy Sdn Bhd.

540

WINDOW C/W TEMPERED GLASS 1800MM(H) X 1000MM(W) X 40MM(THK)

W2 To supply material and labour to ALUMINIUM FRAME SINGLE FIXED

7 N/A

2

195

Project Access - Client will provide DMZ Consultancy Sdn Bhd with access to the project and all information that may be required to complete the project. Failure to do so

390

WINDOW C/W TEMPERED GLASS 1800MM(H) X 600MM(W) X 40MM(THK)

by the Client provides DMZ Consultancy Sdn Bhd the right to terminate service (with a written notice) and collecting outstanding balances

OTHER EQUIPMENTS

8

LF1 1600MM(D) X 2500MM(W) X 420MM(H) WHITE FABRIC CURVED SOFA WITH

Design/Works/Service Disclaimer

N/A

1

185

Termination of Service - DMZ Consultancy Sdn Bhd has the right to terminate or suspend All works/Services, upon written notice, if the Client fails to make payments/ default in

185

ALUMINIUM BASE IN POLISHED FINISH @ waiting area

accordance with the mentioned terms and conditions herein.

BF2 To supply and install FIXED DISPLAY SHELF WITH DOUBLE TEMPERED

N/A

- Termination shall be without prejudice to any and all other rights and remedies of DMZ Consultancy Sdn Bhd and Client shall remain liable for all

1

outstanding obligations owed.

GLASS @ reception area

- Within five (5) working days of termination of our service for any reason, DMZ Consultancy Sdn Bhd shall submit to Client an itemized invoice for any fees or expenses under this quotation. The Client, upon payment of accrued amounts so invoiced, shall thereafter have no further liability or obligations to DMZ Consultancy Sdn Bhd for any further fees or expenses arising hereunder.

9

Project Time Frame & Fees for extra services - Reasonable time frame for drawings to be discussed & agreed by both party DMZ Consultancy Sdn Bhd . - Estimated time frame for entire project's time frame inclusive of revision period will be a maximum of TWO (2) Months starts from date of appointment. If project exceed the estimated time frame, an additional minimum fee of RM150 per month will be charged, as consultation fees only. excluded reimbursement claim & site visit charges. Subject to the Project & remaining job scope.

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.

DRAWING TITLE:

BILL OF QUANTITIES SCALE: N/A

DATE: 02 DECEMBER 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

DWG_DWD_TXH_BQ_11c

REV. NO:

01


REFLECTION

03

However, there is still room for me to learn and improve in this module. Nonetheless, this module has definitely taught me to work in a proper and neater way.

T

The final assignment was related to our office design from IAD IV. From here, I have learned the type of drawings that needed to produced, such as the the quality of line weights, sizing of dimension and text, specification, and etc. In the design, I have referred to the UBBL to design my office such as UBBLBY-LAW 172, Emergency Exit Signs and UBBL-BY-LAW 227, Portable Extinguishers.

ASSI GN ME N


ASSIGNMENT 02 PRECEDENT STUDIES – A BUREAU

TAN XIAO HUI | 0335215

In this assignment, we are required to Students required to research on a precedent study that relates to a working space that relates to their concept design in Design 4. This assignment will also expose the students to the relevance and significance of drawing convention and detailing. The objective of this assignment is for students to develop the knowledge and understanding related to the production of working drawings for construction.


IDS60804 DETAILING AND WORKING DRAWINGS ASSIGNMENT 02: PRECEDENT STUDIES – A BUREAU NAME : TAN XIAO HUI STUDENT ID : 0335215 PROGRAMME: BACHELOR OF ARTS (HONOURS) INTERIOR ARCHITECTURE BATCH: AUGUST 2021 LECTURER : MS NORJI, MS AZIAH


TABLE ON CONTENT 1) PRECEDENT STUDIES (INDIVIDUAL) 2) PRECEDENT STUDIES (CHOSEN) 3) LAYOUT PLAN 4) SCHEDULE OF ACCOMODATION 5) LONG SECTION 6) BESPOKE DETAIL 7) DOORS AND WINDOW SCHEDULE 8) SCHEDULE OF FINISHES 9) UBBL DIAGRAM 10) ANALYSIS


precedent studies 07

Second Home London Office by Selgascano 04

Area: 2400 sq meter

07

Located in the East End of the city of London. It is a concept of shared workspace (co-working space) that hosts some 30 companies that are as alternative as the neighborhood, small scale, and quite related to technology.

09 07 09 05

06

03

absorbent carpets and ceilings

08 07

09

09 02

01

09 07

open discussion room ideation room

U-shaped meeting table that can be winched up towards the ceiling when not in use

a continuous curved shape that scatters around the building

01 ENTRANCE 02 RECEPTION / WAITING AREA 03 PANTRY AREA 04 TOILET 05 OPEN WORK AREA

transparent glass panel

open work area

work area

translucent wall panel pantry area

a curved bank of seating, painted with glossy orange paint.

06 OPEN DISCUSSION AREA 07 MEETING ROOM 08 IDEATION ROOM 09 PRIVATE WORK AREA


PRECEDENT STUDIES PROJECT:

CATEGORY: Office Design --------------------------------------LOCATION: Nisshin Aoyama Building 5F, 3-4 Kita Aoyama, Minato-ku, Tokyo, Japan

PRODUCE: PRISM DESIGN --------------------------------------SPECIFICATIONS: Area: 431㎡ Ceiling Height: 2900mm --------------------------------------DATE: DEC 2019

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------1. Lift Lobby 2. Toilet 3. Emergency Stairs 1 4. Office Entrance 5. Foyer Closet 6. Waiting Area 7. Staff Room/ Pantry 8. Meeting Room

DESIGN CONCEPT:

The tagline and motto of the company

-------------------------------------------------

KEYWORDS:

9. Conference Room 10. Emergency Stairs 2 11. Working Space 12. Online Conference Working Space 13. Chat Room 1 & 2 14. Discussion Room 15. Manager Room

1

2

3 13

15

SPACE PROGRAMMING

14

4 5

1. Fusion of analog and digital 2. Fusion of creative and engineering 3. Work while playing 4. Collaboration among employees --------------------------------------------------

MATERIALS

7

CONCRETE

6

12

8

STEEL

9 CORK BOARD

11

TIMBER

10 CARPET TILE

PUBLIC

SEMI PUBLIC

SEMI PUBLIC/ SEMI PRIVATE

CORIAN

SEMI PRIVATE

PRIVATE

GLASS


INTERIOR PERSPECTIVES Various spreadsheet matrices to extract the root of the design. Fusing the past and the present to find out what the future should be. Both conventional and latest are needed, Hybridize them to create a new standard.

DISSCUSSION POD

Timeless Spacecraft

WAITING AREA

Exposed ceiling of fittings and ducting in the center symbolized the fusion of old and new.

ENTRANCE

Entering the magnificient entrance with pendant installation art, there is a stair-shaped bench and display, and a space for casual communication with people outside the company was created while ensuring operational security.

Connectivity Large display in the center of the wall enable active communication between the two sites online.

Landolt C's Sequence An initial “C” -shaped desk that is common to keywords such as “Creative and Collaboration” that are necessary for a new office environment.

WORKING SPACE

MEETING ROOM

DISSCUSSION/ SELF-THINKING AREA

CONFERENCE ROOM

MANAGER ROOM

There are several meeting rooms, including a casual interior that encourages free thinking and a room that is ideal for chic and relaxing meetings.


1

2

4

3

5

7

6

8

10

9

31735 1250

2235

5400

5400

3900

3300

2400

3200

4650

A W5

TOILET CERAMIC TILE 38.70m2

EMERGENCY STAIRS 1 CERAMIC TILE 12.50m2

D11

D7

7000

D10

D11

LIFT LOBBY CERAMIC TILE 38.70m2

D8

500

B

BS3

ELECTRICAL ROOM 1

2840

ELECTRICAL ROOM 2

D8

CONCRETE 8.80m2

CONCRETE 17.50m2

MANAGER ROOM

C

D9

D9

CORIAN TILE 16.10m2

D5

FOYER CLOSET

SC E

W4

CONCRETE 8.65m2

D1

OFFICE ENTRANCE

D3

D1

SC E

CONCRETE 6.60m2

SERVER ROOM

D1

D

STAFF ROOM/ PANTRY

CARPET TILE 7.65m2

CONCRETE 3.35m2

DISCUSSION ROOM

CONCRETE 4.10m2

W3

D1

FC1

CHAT ROOM OSB SHEET 6.30m2

W1

CORRIDOR 1

D4

CARPET TILE 12.10m2

SC D

D1

D1

21735

SC D

250MM(L) x 250MM(W) x 5.5MM THK ORIGINAL COLOUR CARPET TILE

W4

CONFERENCE ROOM

MEETING ROOM

EPOXY 29.70m2

CONCRETE 13.30m2

FE1

EPOXY FLOORING IN POLISHED FINISH

8960

BS1

ONLINE CONFERENCE WORKING SPACE

WAITING AREA

CARPET TILE 198.50m2

CARPET TILE 41.60m2

SC C

SC C BS4

W1 BS2

D1

SC B

SC B

W3

CORRIDOR 2

D6

CARPET TILE 14.40m2

D2

E

2000

WORKING SPACE W1

CARPET TILE 12.10m2

BS5

SC A

EMERGENCY STAIRS 2

SC A

CONCRETE 11.60m2

TIMBER VINVYL D7

G

435

F

FLP L5

5TH LEVEL LAYOUT PLAN SCALE 1:125

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

PROJECT 2: PRECEDENT STUDIES - A BUREAU

Revision

Fontworks Inc Tokyo Head Office

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

PROJECT NAME:

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

DRAWING TITLE:

5TH LEVEL FURNITURE LAYOUT PLAN SCALE: 1:125

DATE: 11 OCTOBER 2021

CHECKED BY: MISS NORJI

DRAWN BY: TAN XIAO HUI

DRAWING NO:

MDT_DWD_TXH_PL_01

REV. NO:

04


1

2

4

3

5

7

6

8

9

10

31800 2340

6000

2900

3220

3200

2260

3370

2460

4450

SL

CL

2900

P1

W1

W4 BS3

D5

WP2

FFL

ARTIFICIAL LEATHER FABRIC

SC E

WOOD MELAMINE DECORATIVE BOARD SHELVE

15MM GYPSUM BOARD PLASTER CEILING IN WHITE PAINT FINISH

SCALE 1:100

CLIENT:

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

Date

CONCRETE FLOORING IN POLISHED FINISH

SECTION E-E

NOTE :

No.

18MM THK OSB PATTERN ORIGINAL LAMINATED SHEETS

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

PROJECT 2: PRECEDENT STUDIES - A BUREAU

Revision

Fontworks Inc Tokyo Head Office

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

PROJECT NAME:

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

DRAWING TITLE:

SECTION E-E SCALE: 1:100

DATE: 11 OCTOBER 2021

CHECKED BY: MISS NORJI

DRAWN BY: TAN XIAO HUI

DRAWING NO:

MDT_DWD_TXH_SC_03

REV. NO:

04


3920

10

600

10

P1

15MM GYPSUM BOARD PLASTER CEILING IN WHITE PAINT FINISH

2830

2900

DETAIL 1

FL1

ARTIFICIAL LEATHER FABRIC

CT1

CORIAN FLOOR TILES IN MATTE FINISH

EL FRONT ELEVATION BS3 SCALE 1:25

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

PROJECT 2: PRECEDENT STUDIES - A BUREAU

Revision

Fontworks Inc Tokyo Head Office

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

PROJECT NAME:

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

DRAWING TITLE:

BESPOKE FRONT ELEVATION SCALE: 1:25

DATE: 11 OCTOBER 2021

CHECKED BY: MISS NORJI

DRAWN BY: TAN XIAO HUI

DRAWING NO:

PS_DWD_TXH_EL_04a

REV. NO:

04


10

4400

10

WP1

630

920

PLASTERED BRICK WALL IN COTTON WHITE FINISH

FL1

ARTIFICIAL LEATHER FABRIC

LP

LAYOUT PLAN

BS3

SCALE 1:25

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

PROJECT 2: PRECEDENT STUDIES - A BUREAU

Revision

Fontworks Inc Tokyo Head Office

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

PROJECT NAME:

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

DRAWING TITLE:

BESPOKE LAYOUT PLAN SCALE: 1:25

DATE: 11 OCTOBER 2021

CHECKED BY: MISS NORJI

DRAWN BY: TAN XIAO HUI

DRAWING NO:

PS_DWD_TXH_PL_04b

REV. NO:

04


3288 20

WOOD LOUVERS IN POLISHED FINISH

600

WOOD SCREWS

10

WOOD LOUVERS IN POLISHED FINISH

DT 1

DETAIL 1 SCALE 1:5

1570

ARTIFICIAL LEATHER FABRIC 40

30

ARTIFICIAL LEATHER FABRIC

50

60

700

DETAIL 2

WOOD FRAMING

SC H

SECTION H-H

DT

SCALE 1:20

2

CLIENT:

NOTE :

ARCHITECT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

SCALE 1:5

PROJECT NAME: PROJECT 2: PRECEDENT STUDIES - A BUREAU

Revision

Fontworks Inc Tokyo Head Office

DETAIL 2

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

DRAWING TITLE:

BESPOKE SECTION & DETAIL SCALE:

DATE: 11 OCTOBER 2021

CHECKED BY: MISS NORJI

DRAWN BY: TAN XIAO HUI

DRAWING NO:

PS_DWD_TXH_SC_04c

REV. NO:

04


UBBL CONSTRUCTIONAL & FIRE REQUIREMENTS: STAIRCASES, HANDRAILS AND BEAM OR COLUMN STAIRCASES

*Applied UBBL Requirements

According to UBBL BY-LAW 107: Dimensions of Staircases

Staircases/ Handrails

(1) In any staircase, the rise of any staircase shall be not more than 180mm and the tread shall not less than 255mm and the dimensions of the rise and the tread of the staircase so chosen shall be uniform and consistent throughout.

RC Columns

(2) The widths of staircases shall be in accordance with ByLaw 168. Figure 1.1 Dimensions of Emergency Stairs 1

(3) The depths of landings shall be not less than the width of the staircases.

HANDRAILS

*Applied UBBL Requirements

According to UBBL BY-LAW 107: Handrails (1) Except for staircases of less than 4 risers, all staircases shall be provided with at least one handrail.

Figure 1.2 Dimensions of Emergency Stairs 2

COLUMN

STAIRCASES

According to UBBL BY-LAW 143: Beam or Column

According to UBBL BY-LAW 168: Staircases

Any beam or column forming part of, and any structure carrying, and external wall which is required to be constructed of non-combustible materials shall comply with the provisions of paragraph (3) of UBBL By-Law 142 as to non-combustibility.

The required width of a staircase shall be the clear width between walls but handrails may be permitted to encroach on this width to a maximum of 75mm.

*Applied UBBL Requirements

Figure 1.3 The RC Column.

(2) In building other than residential buildings, a handrail shall be provided on each side of the staircase when the width of the staircase is 1100mm or more.

*Applied UBBL Requirements

Figure 1.3 Dimensions of Emergency Stairs 1 &2


UBBL FIRE REQUIREMENTS: EMERGENCY EXIT SIGNS, DOOR CLOSERS FOR FIRE DOORS, MEASUREMENT OF TRAVEL DISTANCES TO EXITS. ESCAPE SIGNS

*Not Applied UBBL Requirements

Travel Distances to Exit

The Emergency Exit Sign only has the icon representation but lack of the sign reading "KELUAR".

Emergency Exit Signs & Fire Doors

According to UBBL BY-LAW 172: Emergency Exit Signs (1) A sign reading "KELUAR" with an arrow indicating the direction shall be placed in every location where the direction of travel to reach the nearest exit is not immediately apparent. (2) All exit signs should be illuminated continuously during periods of occupancy. Figure 1.5 Emergency Exit Signs

DOOR CLOSERS

*Not Applied UBBL Requirements The automatic Door Closer is not equipped in the fire exits for a swing door.

According to UBBL BY-LAW 165: Door Closers for Fire Doors Figure 1.6 Door Closers for Fire Doors

TRAVEL DISTANCE TO EXITS *Applied UBBL Requirements

According to UBBL BY-LAW 165: Measurement of Travel DIstance to Exits

(2) Double doors with rabbeted meeting stiles shall be provided with co-ordinating device to ensure that leafs close in the proper sequence.

(1) The travel distance to an exit shall be measured on the floor or other walking surface along the centre line of the natural path of travel, starting 0.300m from the most remote point of occupancy, curving around any corners or obstructions with 0.300m clearance therefrom and ending at the storey exit. Where measurement includes stairs, it shall be taken in the plane of the trend noising. (2) In the case of open areas the distance to exists shall be measured from the most remote point of occupancy provided that the direct distance shall not exceed two-thirds the permitted travel distance. (3) In the case of individual rooms which are subject to occupancy of not more than six persons, the travel distance shall be measured from the doors of such rooms: Provided that the travel distance from any point in the room to the room door does not exceed 15m.

(1) All fire doors shall be fitted with automatic door closers of the hydraulically spring-operated type in the case of swing doors and of wire rope and weight type in the case of sliding doors.

(3) Fire doors may be held open provided the hold open device incorporates a heat actuated device to release the door. Heat actuated devices shall not be permitted on fire doors protecting openings to protected corridors or protected staircases. Figure 1.7 Travel Distances to Exits.


UBBL FIRE REQUIREMENTS: FIRE ALARMS, SMOKE DETECTOR AND FIRE PRECAUTIONS IN AIR CONDITIONING SYSTEMS FIRE ALARMS *Applied UBBL Requirements

Fire Alarms

According to UBBL BY-LAW 237: Fire Alarms

Sprinkler Valves

(1) Fire alarms shall be provided in accordance with the Tenth Schedule to these By-laws. (2) All premises and buildings with gross floor area excluding car park and storage areas exceeding 9290sqm or exceeding 30.5m in height shall be provided with a two-stage alarm system with evacuation (continuous signal) to be given immediately in the affected section of the premises while an alert (intermittent signal) be given in adjoining section.

Fire Alarms

Figure 1.8 Fire Alarms

(3) Provision shall be made for the general evacuation of the premises by action of a master control.

Figure 1.9 Smoke Detector in Manager Room (Left) & Waiting Area (Right).

AIR CONDITIONING

*Applied UBBL Requirements

According to UBBL BY-LAW 160: Fire Precautions in Air Conditioning Systems. (1) All air conditioning ducts, including framing there for, except ducts in detached and semi-detached residential buildings shall be constructed entirely of non-combustible materials and shall be adequately supported throughout their lengths.

Figure 1.10 Air Conditioning System

SMOKE DETECTOR

*Applied UBBL Requirements

According to UBBL BY-LAW 225: Detecting and extinguishing fire.

(2) No air-conditioning ducts shall pass through fire walls unless as provided for in by-laws 148 and 156.

(1) Every building shall be provided with means of detecting and extinguishing fire and with alarms together in accordance with the requirements as specified in the Tenth Schedule to these By-laws.

(3) The air intake of any air-conditioning apparatus shall be situated such that air shall not be recirculated from any space in which objectionable quantities of inflammable vapours or dust are given off and shall be so situated as to minimise the drawing in of any combustible material.

(2) Every building shall be served by at least one fire hydrant located not more than 91.5M from the nearest point of fire brigade access.


UBBL ANALYSIS PART VIII - FIRE ALARMS, FIRE DETECTION, FIRE EXTINGUISHMENT AND FIRE FIGHTING ACCESS 237. Fire Alarms. (Applied UBBL requirements)

225. Detecting and extinguishing fire. (Applied UBBL requirements)

Figure 1.8 Fire Alarms

According to UBBL 237, all premises and buildings shall be provided with at least two-stage alarm system with evacuation to be given clearly. Both emergency stairs has been thoughtfully to applied UBBL 237 requirements as for a fire alarm to be effective, it should be placed at main exits, emergencies exits or fire points. Fire alarm system should be designed to provide early detection and warning of a fire so one of the general rule of thumbs is to install these devices throughout the area and in visible locations. In both emergency exit 1 and 2 in the building, fire alarm were positioned at the right place near both emergency exits door where it is visible. For fire alarms system to be useful, detectors should also be coupled with fire alarms as it provides notice to at least the building occupants. As seen in the diagrams, the building has a smoke detectors along side with fire alarm system which is near. (161 words)

According to UBBL 225, all premises and buildings should have appropriate fire detection and warning systems installed. Every building shall be provided with means of detecting and extinguishing fire with alarms together in accordance with the requirements as specified in the Tenth Schedule to these By-laws. smoke detectors offer the earliest possible warning of fire. Detectors should be located on every level of a building. Detectors may not sense a fire developing on the other side of a closed door. In areas where doors are usually closed, detectors should be located on both sides of the door. In the building, it is seen that it applies UBBL 225 as every room including public space has placement of smoke detectors along with alarm systems. (123 words)


REFLECTION

In assignment 02, I have learned a lot about the building' s fire safety and the implementation of UBBL in a building. I' ve also learned that the material of a building is important in fire safety. This assignment is a group work and it helps me to have efficient communication with my group members and i' m happy that all members delicate our task evenly so we can keep our work going on.


ASSIGNMENT 01

ASSIGNMENT 01 WORK FROM HOME: DOORS & WINDOWS In this assignment, we are required to choose, observe and measure our own personal work space within our house, and the chosen space should have an opening either a door or a window. The objective is to enable students to observe, measure, understand and then capture the space and then capture the level of detailing, materiality used and other finishes considerations into a proper 2D drawing formats with appropriate drawing convention.

TAN XIAO HUI | 0335215


IDS60804 DETAILING AND WORKING DRAWINGS ASSIGNMENT 01: WORK FROM HOME: DOORS AND WINDOWS

NAME : TAN XIAO HUI STUDENT ID : 0335215 PROGRAMME: BACHELOR OF ARTS (HONOURS) INTERIOR ARCHITECTURE BATCH: AUGUST 2021 LECTURER : MS NORJI, MS AZIAH


4800 950

2500

1580

WP1

F1

BEDROOM

2100

4580

W1

700

TOILET

SCHEDULE OF FINISHES AREA BEDROOM

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

Date

LAYOUT PLAN

1

SCALE 1:25

CLIENT:

NOTE :

No.

LP

Revision

ARCHITECT:

TAN XIAO HUI

WINDOW

CODE: WP1

CODE: C1

CODE: W1

LAMINATED WOOD FLOORING

BRICK WALL WITH WHITE PAINT FINISH

PLASTER CEILING WITH WHITE PAINT FINISH

ALUMINIUM WINDOW WITH TEMPERED GLASS

SIZE: 8MM THICK

BRAND: NIPPON PAINT

BRAND: NIPPON PAINT

SIZE: 1400(H) x 700(L) x 12(THK) MM

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

YHDA (Yuhoe Design Architect)

CEILING

CODE: F1

PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW

016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor. 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

WALL

FLOOR

DRAWING TITLE:

LAYOUT PLAN SCALE: 1:25

DATE: 30 AUGUST 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

WS_DWD_TXH_DD_01

REV. NO:

03


4800 2500

PLASTER CEILING WITH WHITE PAINT FINISH

GLASS WINDOW C/W ALUMINIUM FRAME IN MATTE POWDERCOAT FINISH

3110

510

900

1400

400

1100

SECTION DETAIL

EXISTING BRICK WALL WITH WHITE PAINT FINISH 8MM THK LAMINATED WOOD FLOORING IN SATIN FINISH

SC 1

CLIENT:

NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

SECTION A-A SCALE 1:25

ARCHITECT:

TAN XIAO HUI 016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor.

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

DRAWING TITLE:

SECTION A-A SCALE: 1:25

DATE: 30 AUGUST 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

WS_DWD_TXH_DD_02

REV. NO:

03


2100 700

700

700

30 SIDE JAM

100

150

30

8MM THK TEMPERED GLASS FRAME JAB

DETAIL 2 700(L) x 1400(H) MM ALUMINIUM WINDOW FRAME WITH MATTE POWDERCOAT FINISH

PL 1

NOTE :

CLIENT:

THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

TAN XIAO HUI

No.

Date

Revision

OPENING DETAIL PLAN SCALE 1:10

ARCHITECT:

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW

DRAWING TITLE:

OPENING DETAIL PLAN SCALE: 1:10

DATE: 30 AUGUST 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

WS_DWD_TXH_DD_03

REV. NO:

03


100 50

80

EXISTING BRICK WALL WITH WHITE PAINT FINISH

1240

1400

8MM THICK TEMPERED GLASS

1200(H) x 700(L) x 12THK MM ALUMINIUM FRAME IN MATTE POWDERCOAT FINISH INSIDE

OUTSIDE

80

DETAIL 1

SC 1 CLIENT:

NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

ARCHITECT:

TAN XIAO HUI 016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor.

OPENING DETAIL SECTION SCALE 1:10

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

DRAWING TITLE:

OPENING DETAIL SECTION SCALE: 1:10

DATE: 30 AUGUST 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

WS_DWD_TXH_DD_04

REV. NO:

03


25 8

8

8MM TEMPERED GLASS

75 26.5

SASH FRAME HEAD

85

48 5 20

ALUMINIUM WINDOW FRAME WINDOW HANDLE BACKSET WINDOW HANDLE

D 1

DETAIL 1 SCALE 1:5

CLIENT:

NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

D 1

ARCHITECT:

TAN XIAO HUI 016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor.

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

DETAIL 2 SCALE 1:5

PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW

YHDA (Yuhoe Design Architect)

DMZ Consultancy Sdn Bhd

016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

DRAWING TITLE:

DETAIL 1 & DETAIL 2 SCALE: 1:5

DATE: 30 AUGUST 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

WS_DWD_TXH_DD_05

REV. NO:

03


WINDOW SCHEDULE 2100 700

700

1400

700

WINDOW NO.

W1

LOCATION

BEDROOM TYPE

CASEMENT WINDOW

FRAME

700(L) x 1400(H) x 40(W) MM ALUMINIUM WINDOW FRAME

WINDOW LEAF

8MM THK TEMPERED GLASS

HINGES

STEEL

LOCK/BOLTS

ALUMINIUM

STOP/PULL

ALUMINIUM

DESCRIPTION

IRONMONGERY

CLIENT:

NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.

No.

Date

Revision

ARCHITECT:

TAN XIAO HUI 016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor.

YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor

INTERIOR DESIGN CONSULTANT:

QUANTITY SURVEYOR:

PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW

DMZ Consultancy Sdn Bhd

JUBM Sdn Bhd

012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur

03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.

DRAWING TITLE:

WINDOW SCHEDULE SCALE:

DATE: 30 AUGUST 2021

CHECKED BY: MISS AZIAH

DRAWN BY: TAN XIAO HUI

DRAWING NO:

WS_DWD_TXH_DD_06

REV. NO:

03


REFLECTION In this assignment 01, I' ve learned to properly draw 2d drawing more detail and observe more detail. This assignment help me to improve my observation and understanding the mechanism of window. I was also able to know more about the materials of window. This assignment is a great chance for me to learn and observe things around me.