IDS 60804
DETAILING AND WORKING DRAWINGS E-PORTFOLOIO
TAN XIAO HUI | 0335215 SEMESTER 4 - AUG 2021 BACHELOR OF ARTS (HONS) IN INTERIOR ARCHITECTURE
CONTENTS ASSIGNMENT 03 WORKING DRAWINGS & SYSTEM INTEGRATION
ASSIGNMENT 02 PRECEDENT STUDIES - A BUREAU
ASSIGNMENT 01 WORK FROM HOME: DOORS AND WINDOWS
ASSIGNMENT 03 WORKING DRAWINGS & SYSTEM INTEGRATION In this assignment, we are required to produce a series of working drawings. The objective is to enable students to produce documents with an integration of the building services components by working together in the design process and identify solutions to design needs with interior design proposal of appropriate building scale. Also to introduce and expose students to the production of working drawings documentation and format and to demonstrate skills and ability to produce working drawings and detailing commensurate with the industry standard practice.
TAN XIAO HUI 0335215
IDS60804 DETAILING AND WORKING DRAWINGS ASSIGNMENT 03: WORKING DRAWINGS + SYSTEM INTERGRATION
NAME : TAN XIAO HUI STUDENT ID : 0335215 PROGRAMME: BACHELOR OF ARTS (HONOURS) INTERIOR ARCHITECTURE BATCH: AUGUST 2021 LECTURER : MS NORJI, MS AZIAH
HENRY GOH & CO SDN BHD PROPOSED INTERIOR DRAWING NO.
DRAWING SHEET NAME
REV
DATE
DESCRIPTION
ISSUED
NOTES FOR REMARKS
1 DWG_DWD_TXH_DL_01
DRAWING LIST
1
26 OCT 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_SOA_02
SCHEDULE OF ACCOMODATION
2
02 NOV 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_SOP_03
SETTING OUT PLAN
1
02 NOV 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_FLP_04
FURNITURE LAYOUT PLAN
1
02 NOV 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_FFP_05
FLOOR FINISHES PLAN
1
02 NOV 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_SOF_06a
SCHEDULE OF FURNITURE, FIXTURES & EQUIPMENT
1
02 NOV 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_SOF_06b
SCHEDULE OF FURNITURE, FIXTURES & EQUIPMENT
1
02 NOV 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_RCP_07
REFLECTED CEILING PLAN
1
02 NOV 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_LEP_08
LIGHTING AND ELECTRICAL PLAN
1
02 NOV 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_SC_09
SECTION A-A
1
23 NOV 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_BS_10a
BESPOKE FURNITURE PLAN AND ELEVATION
0
23 NOV 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_BS_10b
BESPOKE FURNITURE SECTION DETAIL
0
23 NOV 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_BOQ_11a
BILL OF QUANTITIES
1
02 DEC 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_BOQ_11b
BILL OF QUANTITIES
1
02 DEC 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_BOQ_11c
BILL OF QUANTITIES
1
02 DEC 2021
FOR CONSTRUCTION
NO
DWG_DWD_TXH_BOQ_11c
BILL OF QUANTITIES
1
02 DEC 2021
FOR CONSTRUCTION
NO
2
3
4
5
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
DRAWING TITLE:
DRAWING LIST SCALE: N/A
DATE: 26 OCTOBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_DL_01
REV. NO:
01
SCHEDULE OF ACCOMODATION (TOWER A - GROUND FLOOR & LEVEL 5) NO. OF PERSONS
NO. OF ROOMS
AREA FOR 1 ROOM (m2)
TOTAL AREA (m2)
A8 A9 A10 A11 A12
RECEPTION SHARE IT ONE DERFUL TINKER MAKER NEW BORN LIFT LOBBY EMERGENCY STAIRS 1 EMERGENCY STAIRS 2 TOILET TNB ROOM SECURITY ROOM REFUSE ROOM
20 18 6 6 6 6 6 6 6 6 6 6
1 1 1 1 1 1 1 1 2 1 1 1
47.60 22.60 28.60 38.70 71.20 33.30 12.70 13.80 9.70 14.70 14.50 11.18 SUBTOTAL
47.60 22.60 28.60 38.70 71.20 33.30 12.70 13.80 19.40 14.70 14.50 11.18 328.28
B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16
LEVEL 5 RECEPTION WAITING AREA RESOURCES ROOM TEST LAB FIXING ROOM BROWSING AREA SERVICE POD CUSTOMIZING AREA LIFT LOBBY TOILET EMERGENCY STAIRS 1 EMERGENCY STAIRS 2 MEETING ROOM WORKING SPACE STAFF ROOM / PANTRY BREAKOUT ZONE
6 4 5 5 5 5 6 7 15 3 50 40 8 8 5 5
1 1 1 1 1 1 2 1 1 2 1 1 1 1 1 1
5.40 7.90 10.70 24.90 10.90 8.64 15.70 20.40 33.30 9.70 12.70 13.80 22.60 24.10 8.84 11.10 SUBTOTAL TOTAL
5.40 7.90 10.70 24.90 10.90 8.64 31.40 20.40 33.30 19.4 12.70 13.80 22.60 24.10 8.84 11.10 266.18
A A1 A2 A3 A4 A5 A6 A7
SPACES GROUND FLOOR
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
594.46 DRAWING TITLE:
SCHEDULE OF ACCOMODATION SCALE: N/A
DATE: 2 NOVEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_SOA_02
REV. NO:
02
1
2
4
3 29400
9110
11330
W1
A
9110
W1
W2
W2
W1
STAFF ROOM/ PANTRY CONCRETE 8.84m2
5340
D2
WORKING AREA EPOXY 24.10m2
EMERGENCY STAIRS 1
12 83
CERAMIC TILE 12.70m2
CONCRETE 198.50m2
1300
RECEPTION KIOSK
1704
3450
8260
D1
1325 LIFT LOBBY MARBLE TILE 33.30m2
1 29
D3
D1
3300
D4 D3
3
SYM
CERAMIC TILE 13.80m2
D2
TOILET
TOILET
CERAMIC TILE 9.70m2
CERAMIC TILE 9.70m2
225MM EXISTING BRICK WALL
EPOXY 11.10m2
200MM EXISTING CONCRETE WALL
820
D5
D5
14100
DESCRIPTION
BREAKOUT ZONE
EMERGENCY STAIRS 2
100MM PROPOSED CONCRETE WALL
835 50MM PROPOSED PARTITION WALL
RESOURCES AREA
D6
EPOXY 10.70m2
B
BROWSING AREA CARPET TILE 8.64m2
WINDOW LEGEND
SYM
170
MEETING ROOM
19
36
12
EPOXY 22.60m2
94
1730
4
3340
129
0
DESCRIPTION
W1
600MM(L) X 3100MM(H) TEMPERED GLASS FIXED WINDOW WITH ALUMINIUM FRAME
W2
1160MM(L) X 3100MM(H) ALUMINIUM FRAME FIXED WINDOW C/W DOUBLE TEMPERED GLASS
2633 D7
3748
W1
3948
206 0
2275
5990
DOOR LEGEND
TEST LAB EPOXY 24.90m2
6256
2217
3662
SC A
19
83
70 17
93 31
990
STAINLESS TEEL 15.70m2
4292
SERVICE POD
SC A
4188
2697
1984
CUSTOMIZING AREA
3190
STAINLESS STEEL 15.70m2
FIXING ROOM CONCRETE 10.90m2
C
W2
SLP L5
W2
D2
800MM(L) X 2100MM(H) EMERGENCY EXIT DOOR IN EPOXY POLYESTER POWDER COATED FINISH
D3
700MM(L) X 2100MM(H) ALUMINIUM SINGLE FLUSH DOOR IN WHITE GLOSSY FINISH
D4
900MM(L) X 2100M(H) ALUMINIUM SLIDING DOOR C/W 50MM THK ALUMINIUM FRAME IN POLISHED FINISH
D5
700MM(L) X 2100MM(H) ALUMINIUM SINGLE FLUSH DOOR IN BLACK GLOSSY FINISH
D6
AUTOMATICAL TEMPERED GLASS SLIDING DOOR C/W 50MM THK ALUMINIUM DOOR FRAME IN POLISHED FINISH
D7
700MM(L) X 2100MM(H) SLIDING DOOR C/W 50MM THK ALUMINIUM FRAME WITH TEMPERED GLASS
W2
SCALE 1:100
CLIENT:
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
Date
1600MM(L) X 2100MM(H) TEMPERED GLASS DOUBLE FLUSH DOOR C/W 50MM THK ALUMINIUM DOOR FRAME
SETTING LAYOUT PLAN
NOTE :
No.
DESCRIPTION
D1
W1
CARPET TILE 20.40m2
SERVICE POD
SYM
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
DRAWING TITLE:
SETTING OUT PLAN SCALE: 1:100
DATE: 2 NOVEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_SOP_03
REV. NO:
01
1
2
4
3 29400 11330
9110
9110
A LF12
LF11
BF1
LEGEND
STAFF ROOM/ PANTRY
SYM
DESCRIPTION
NOS
LF1
WHITE FABRIC CURVED SOFA WITH ALUMINIUM BASE IN POLISHED FINISH
1
LF2
WHITE POLYURETHANE BAR STOOL WITH BRUSHED STEEL FRAME LEG
3
LF3
MATTE WHITE POLYPROPYLENE CHAIR WITH SWIVEL ALUMINIUM BASE
3
LF4
WHITE LEATHER SWIVEL CHAIR IN FIBERGLASS SHELL WITH STEEL LEG IN POLISHED FINISH
8
LF5
ORGANIC SHAPED DESK WITH 22MM THK MDF LIGHT GREY CPL LAMINATE C/W CONICAL STEEL LEGS
1
MATTE WHITE POLYPROPYLENE CLASSIC CHAIR
6
WHITE POLYURETHANE BAR STOOL WITH BRUSHED STEEL FRAME LEG
3
420MM DIAMETER ROUND CERAMIC SIDE TABLE
2
CONCRETE 8.84m2
LF1
LF6
EMERGENCY STAIRS 1
8260
CERAMIC TILE 12.70m2
LF5
RECEPTION KIOSK
LIFT LOBBY MARBLE TILE 33.30m2
CONCRETE 198.50m2
LF6
WORKING AREA EPOXY 24.10m2
EMERGENCY STAIRS 2 CONCRETE 13.80m2
TOILET
TOILET
CERAMIC TILE 9.70m2
CERAMIC TILE 9.70m2
LF7
LF9
LF8
LF10
BF3
14100
BF2
LF9
BREAKOUT ZONE EPOXY 11.10m2
LF2
LF8
LF11
BF1
B
4
550MM DIAMETER ROUND WHITE COTTON POUFES
5
MATTE WHITE ABS SEAT SWIVEL BAR STOOL WITH STEEL FRAME LEG IN POLISHED CHROME FINISH
2
BAR TABLE IN MDF BOARD WITH BLACK LAMINATE IN MATTE FINISH
1
LF10
RESOURCES AREA EPOXY 10.70m2
POLYETHYLENE GUMBALL ARMCHAIR IN MATTE FINISH
LF12 198
0
BROWSING AREA
LEGEND
CARPET TILE 8.64m2
SYM
BF6
DESCRIPTION
NOS
BF1
RECPTION SELF SERVICE COUNTER KIOSK
1
BF2
DOUBLE TEMPERED GLASS DISPLAY RACK
1
BF3
CUSTOMIZED MARBLE TOP BUILT IN TABLE
1
BF4
CUSTOMIZED ORGANIC SHAPE DESK IN MDF BOARD WITH WHITE LAMINATE IN GLOSS FINISH
1
BF5
CURVED SHAPE CONCRETE SEATING IN POLISHED FINISH
4
BF6
BUILT IN FIBERGLASS ROUND TABLE
2
BF7
ORGANIC SHAPE MEETING TABLE WITH RESIN COATED BASE AND GLASS TABLE TOP
1
BF8
ORGANIC SHAPE TABLE WITH RESIN COATED IN GLOSS FINISH
1
BF9
STAINLESS STEEL BUILT IN DISPLAY RACK
1
MEETING ROOM EPOXY 22.60m2
SERVICE POD STAINLESS TEEL 15.70m2
SC A
BF5
5990
TEST LAB
LF4
EPOXY 24.90m2
BF7
BF9
CUSTOMIZING AREA
SC A
CARPET TILE 20.40m2
19 80
3370
FIXING ROOM CONCRETE 10.90m2
BF6
LF7
SERVICE POD
LF3 BF5
BF4
STAINLESS STEEL 15.70m2
BF8
3370
C
FLP L5
FURNITURE LAYOUT PLAN SCALE 1:100
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
DRAWING TITLE:
FURNITURE LAYOUT PLAN SCALE: 1:100
DATE: 2 NOVEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_FLP_04
REV. NO:
01
1
2
4
3 29400
9110
11330
9110
A STAFF ROOM/ PANTRY CONCRETE 8.84m2 FF2
EMERGENCY STAIRS 1
RECEPTION KIOSK
CERAMIC TILE 12.70m2
CONCRETE 198.50m2
WORKING AREA EPOXY 24.10m2
FF2
8260
FF4
LIFT LOBBY MARBLE TILE 33.30m2 FF1
BREAKOUT ZONE
EMERGENCY STAIRS 2 CERAMIC TILE 13.80m2
TOILET
TOILET
CERAMIC TILE 9.70m2
CERAMIC TILE 9.70m2
FF7
FF6
FF6
14100
GRANITE FLOOR 11.10m2
BROWSING AREA CARPET TILE 8.64m2
RESOURCES AREA
FF3
EPOXY 10.70m2
B
FF4
LEGEND
MEETING ROOM EPOXY 22.60m2
SERVICE POD STAINLESS TEEL 15.70m2
SC A
5990
DESCRIPTION
AREA / m2
FF1
HEXAGON MARBLE TILES IN GLOSSY FINISH
33.30
FF2
CONCRETE FLOORING IN POLISHED FINISH
198.50
FF3
ORIGINAL LIGHT GREY COLOR CARPET TILE
8.64
FF4
EPOXY FLOORING IN WHITE GLOSS FINISH
82.30
FF5
LIGHT GREY CARPET TILE
20.40
FF6
STAINLESS STEEL FLOORING IN POLISHED FINISH
19.40
FF7
GRANITE FLOORING IN GREY GLOSSY FINISH
11.10
SYM
HATCHING
FF4
SC A
FF6
TEST LAB
CUSTOMIZING AREA
EPOXY 24.90m2
CARPET TILE 20.40m2
FF4
FF5
SERVICE POD
FIXING ROOM
STAINLESS STEEL 15.70m2
CONCRETE 10.90m2
FF6
FF2
C
FFP L5
FLOOR FINISHES PLAN SCALE 1:100
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
DRAWING TITLE:
FLOOR FINISHES PLAN SCALE: 1:100
DATE: 2 NOVEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_FFP_05
REV. NO:
01
SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT QUANTITY
BRAND
1600MM(D) X 2500MM(W) X 420MM(H)
1
SECOLO
LED TOUCHSCREEN MONITOR WITH ADJUSTABLE DISPLAY ANGLE
735MM(W) X 70MM(D) X 500MM(H)
6
ACER
WHITE POLYURETHANE BAR STOOL WITH BRUSHED STEEL FRAME LEG
375MM(L) X 700MM(H)
3
ATLANTIC
MATTE WHITE POLYPROPYLENE CHAIR WITH SWIVEL ALUMINIUM BASE
615MM(D) X570MM(W) X635MM(H)
3
INFINITI
C4
WHITE LEATHER SWIVEL CHAIR IN FIBERGLASS SHELL WITH STEEL LEG IN POLISHED FINISH
660MM(D) X 900MM(W) X 1220MM(H)
8
ZANOTTA
M2
75-INCH 4K LED FLAT PANEL 4K INTERACTIVE TOUCH MONITOR
1735MM(W) X 791MM(D) X 1000MM(H)
1
DELL
C10
MATTE WHITE ABS SEAT SWIVEL BAR STOOL WITH STEEL FRAME LEG IN POLISHED CHROME FINISH
400MM(W) X 700MM(H)
3
ATLANTIC
T3
BAR TABLE IN MDF BOARD WITH BLACK LAMINATE IN MATTE FINISH
500MM(W) X 1500MM(D) X 1080MM(H)
2
BIG BROTHERS
C7
POLYETHYLENE GUMBALL ARMCHAIR IN MATTE FINISH
700MM(W) X 640MM(D) X 490MM(H)
2
PLUST
T2
420MM DIAMETER ROUND CERAMIC SIDE TABLE
360MM(W) X 390MM(H)
1
PULPO
CODE
DESCRIPTION
SIZE
C1
WHITE FABRIC CURVED SOFA WITH ALUMINIUM BASE IN POLISHED FINISH
M1
IMAGE
WAITING AREA
BROWSING AREA
C2
FIXING ROOM
C3
MEETING ROOM
STAFF/PANTRY AREA
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
PROJECT NAME:
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
DRAWING TITLE:
SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT SCALE: N/A
DATE: 2 NOVEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_SOF_06a
REV. NO:
01
SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT QUANTITY
BRAND
500MM(W) X 610MM(D) X 860MM(H)
6
VITRA
ORGANIC SHAPED DESK WITH 22MM THK MDF LIGHT GREY CPL LAMINATE C/W CONICAL STEEL LEGS
2290MM(L) X 1140MM(W) X 750MM(H)
1
LAURITZ
P1
COLOR LASER JET PRO PRINTER WITH DUPLEX WIRELESS
426MM(W) X 652MM(D) X 414MM(H)
1
HP
M3
27-INCH HEIGHT ADJUSTABLE DISPLAY MONITOR
614MM(W) X 54MM(D) X 211MM(H)
3
HP
C6
WHITE POLYURETHANE BAR STOOL WITH BRUSHED STEEL FRAME LEG
460MM(W) X 450MM(D) X 660MM(H)
3
COM.P.AR
C7
POLYETHYLENE GUMBALL ARMCHAIR IN MATTE FINISH
700MM(W) X 640MM(D) X 490MM(H)
2
PLUST
T2
420MM DIAMETER ROUND CERAMIC SIDE TABLE
360MM(W) X 390MM(H)
1
PULPO
C8
EGG POD CHAIR IN FABRIC SEAT WITH FIBERGLASS SHELL
736MM(W) X 1016MM(D) X 1219MM(H)
2
JASMETO
C9
WHITE COTTON POUFES
900MM(W) X 450MM(H)
3
MAISON DE VACANCES
L1
LED FLOOR LAMP IN MATTE BLACK ALUMINIUM
200MM(D) X 1250MM(H)
1
MEINE LAMPE
CODE
DESCRIPTION
SIZE
C5
MATTE WHITE POLYPROPYLENE CLASSIC CHAIR
T1
IMAGE
WORKING AREA
CUSTOMIZING AREA
BREAKOUT ZONE
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
DRAWING TITLE:
SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT SCALE: N/A
DATE: 2 NOVEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_SOF_06b
REV. NO:
01
1
2
4
3 29400
9110
11330
9110
A DL DL
DL
CT-1
CH=+3380
STAFF ROOM/ PANTRY
DL
DL
8.84m2
DL
DL
CT-2
DL
DL
CH=+3350
DL
DL
DL
EMERGENCY STAIRS 1 CERAMIC TILE 12.70m2
DL
DL
DL
CT-3
CH=+3340
DL
DL
8260
WORKING AREA 2 DL
DL
DL
DL
DL
DL
24.10m
DL
DL
DL
DL
CT-1
DL
DL
CH=+3380
DL
DL
CT-1
LIFT LOBBY
CH=+3380
DL
MARBLE TILE 33.30m2
DL
RECEPTION KIOSK 198.50m2
DL
CH=+3000
BREAKOUT ZONE
DL
CONCRETE 13.80m2
11.10m2
DL
DL
DL
TOILET DL
14100
CT-1
DL
EMERGENCY STAIRS 2
CERAMIC TILE 9.70m2
DL
DL
TOILET CERAMIC TILE 9.70m2
DL
DL
DL
DL
DL
LIGHTING AND ELECTRICAL LEGEND DL DL
DL
DL
DL
DL
DL
DL DL
CT-2 DL
DL
DL
DESCRIPTION YELLOW COLOR DOWNLIGHT
8.64m2
CH=+3380
B
SYM
BROWSING AREA
CT-1
RESOURCES AREA
DL
DL
DL
DL
CH=+3350
DL
ROUNDED LED DOWNLIGHT
DL
DL
2
10.70m
DL
DL
DL
WARM WHITE COLOR LED DOWNLIGHT
CT-1 DL
DL
CH=+3330
DL
DL
MEETING ROOM
DL
CT-4
DL
DL
DL
DL
ROUNDED LED DOWNLIGHT
22.60m2
DL
CH=+3070
SERVICE POD
DL
DL
DL
EMERGENCY LIGHT
15.70m2
SC A
DL
DL DL
DL
DL
DL
5990
DL
DL
DL
SC A
AIR CONDITIONER
A/C
DL
DL
CEILING FINISHES LEGEND
DL
DL
CT-1
CH=+3380
CT-1
DL
DL
DL
TEST LAB
DL
DL
2
24.90m
CT-3
10.90m2
SERVICE POD
DL
15.70m2
DL
DL
SYM
DL
CARPET TILE 20.40m2
CH=+3070
FIXING ROOM DL
CH=+3350
DL
DL
DL DL
DESCRIPTION
CUSTOMIZING AREA
CT-4
CH=+3340
DL
DL
DL
DL
DL
CTX
EXISTING EXPOSED CEILING TO BE REMAIN
CT-2
TO INSTALL 15MM THK PLASTERBOARD CEILING
DL
DL
DL
DL
DL
CT-3
TO INSTALL 15MM THK PLASTERBOARD CEILING
CT-4
TO INSTALL 15MM STEEL CEILING WITH POLISHED FINISH
DL
C
RCP L5
REFLECTED CEILING PLAN SCALE 1:100
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
DRAWING TITLE:
REFLECTED CEILING PLAN SCALE: 1:100
DATE: 23 NOVEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_RCP_07
REV. NO:
01
1
2
4
3 29400
9110
11330
9110
A DL DL
DL
CT-1
CH=+3380
STAFF ROOM/ PANTRY
DL
DL
8.84m2
DL
DL
CT-2
DL
DL
CH=+3350
DL
DL
DL
EMERGENCY STAIRS 1 CERAMIC TILE 12.70m2
DL
DL
DL
CT-3
CH=+3340
DL
DL
8260
WORKING AREA 2 DL
DL
DL
DL
DL
DL
24.10m
DL
DL
DL
DL
DL
DL
CT-1 DL
CH=+3380
DL
LIFT LOBBY
CT-1
DL
MARBLE TILE 33.30m2
DL
CH=+3380
RECEPTION KIOSK
DL
BREAKOUT ZONE
DL
CONCRETE 13.80m2
DL
DL
14100
DL
CT-1
CH=+3000
198.50m2
EMERGENCY STAIRS 2
DL
DL
DL
11.10m2
DL
TOILET
TOILET
CERAMIC TILE 9.70m2
CERAMIC TILE 9.70m2
LIGHTING AND ELECTRICAL LEGEND DL
DL
SYM
DESCRIPTION
DL
DL
YELLOW COLOR DOWNLIGHT
DL
DL DL
DL
DL
DL
DL
DL
DL
CT-2
DL
DL
ROUNDED LED DOWNLIGHT
DL
DL
DL
DL
CH=+3350
DL
BROWSING AREA
WARM WHITE COLOR LED DOWNLIGHT
8.64m2
CT-1
CH=+3380
B
RESOURCES AREA
DL
DL
ROUNDED LED DOWNLIGHT
DL
DL
10.70m2 DL
DL
DL
EMERGENCY LIGHT
CT-1
DL
DL
CH=+3330
DL
DL
MEETING ROOM
DL
CT-4
DL
DL
DL
DL
AIR CONDITIONER
A/C
22.60m2
DL
CH=+3070
SERVICE POD
DL
ONE WAY SWITCH
DL
DL
15.70m2
SC A
DL
DL DL
DL
DL
DL
5990
DL
DL
DL
SC A
WIRE
DL
DL
CEILING FINISHES LEGEND
DL
DL
CT-1
CH=+3380
CT-1
DL
DL
DL
TEST LAB
DL
DL
24.90m2
CT-3
10.90m2
SERVICE POD
DL
15.70m2
DL
DL
DL
CARPET TILE 20.40m2
CH=+3070
FIXING ROOM DL
CH=+3350
DL
DL
DL DL
SYM
DESCRIPTION
CT-1
EXISTING EXPOSED CEILING TO BE REMAIN
CT-2
TO INSTALL 15MM THK PLASTERBOARD CEILING
CT-3
TO INSTALL 15MM THK PLASTERBOARD CEILING
CT-4
TO INSTALL 15MM STEEL CEILING WITH POLISHED FINISH
CUSTOMIZING AREA
CT-4
CH=+3340
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
C
LEP L5
LIGHTING AND ELECTRICAL PLAN SCALE 1:100
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
DRAWING TITLE:
LIGHTING AND ELECTRICAL PLAN SCALE: 1:100
DATE: 23 NOVEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_LEP_08
REV. NO:
01
1
2
4
3
5
7
6
29400 5454
3655
4863
4573
6476
4525
CT2
ROOF LEVEL 24000
15MM GYPSUM BOARD PLASTER CEILING IN WHITE PAINT FINISH
SGAG FASGA
FASGASGAG
FASGASGAG
agagag a
agagaga
agagaga
8260
BF9 5000MM(W) X 250MM(D) X 2580MM(H) STAINLESS STEEL DISPLAY SHELVES
FF3 5.5MM THK ORIGINAL LIGHT GREY COLOR CARPET TILE
LEVEL 4 20000
FF2
14100
CONCRETE FLOORING IN POLISHED FINISH
W3 NEW PEAR SERIES PORCELAIN WALL IN HIGH GLOSS FINISH
LEVEL 3 16000
FF6 STAINLESS STEEL FLOORING IN POLISHED FINISH
D1 ALUMINIUM DOUBLE SLIDING DOOR IN GLOSSY REFLECTIVE FINISH C/W ELECTRIC MOTOR AND SENSOR LEVEL 2 12000
LF9 POLYETHYLENE GUMBALL ARMCHAIR IN MATTE FINISH
BW4 BRICK WALL IN WHITE PAINT FINISH
W1
LEVEL 1 8000
ALUMINIUM FRAME FIXED WINDOW C/W DOUBLE TEMPERED GLASS
RC1 REINFORCED CEMENT CONCRETE COLUMN IN GREY PLASTER FINISH
FE1 EPOXY FLOOR IN POLISHED FINISH
GROUND FLOOR 0
SC L5
SECTION A-A SCALE 1:75 CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
DRAWING TITLE:
SECTION A-A SCALE: 1:75
DATE: 23 NOVEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_SC_09
REV. NO:
00
2220
3750
PB1 15MM THK PLASTER BOARD IN WHITE COLOR PAINT FINISH
3750
1910
950
TG1 7MM THK DOUBLE TEMPERED DISPLAY GLASS
3750
2220
3750
950
LT1 FOLKSTONE CELESTA FORMICA LAMINATE TABLETOP IN MATTE FINISH
LP
BESPOKE PLAN
BS1
SCALE 1:20
CLIENT:
NOTE :
WL1 WOODEN LOUVERS IN BLACK PAINT FINISH
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
EL
BESPOKE ELEVATION
BS1
SCALE 1:20
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
DRAWING TITLE:
BESPOKE PLAN AND ELEVATION SCALE: 1:20
DATE: 23 NOVEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_BS_10a
REV. NO:
00
90 65
2220
65
65
STAINLESS STEEL PIPE TUBE IN POLISHED FINISH 10
PB1
WOOD SCREWS
10
15MM THK PLASTER BOARD IN WHITE COLOR PAINT FINISH
10
ANGLE BRACKETS DETAIL 1 ST1
3750
40MM THK STAINLESS METAL TUBE IN POLISHED FINISH
DT
DETAIL 2
BS1
SCALE 1:5
TG1
7MM THK DOUBLE TEMPERED DISPLAY GLASS
20
WL1
WOOD LOUVERS IN BLACK PAINT FINISH
WOOD LOUVERS IN BLACK PAINT FINISH
DETAIL 2 10
WOOD SCREWS
SC
BESPOKE SECTION
BS1
SCALE 1:25
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
DT
DETAIL 2
BS1
SCALE 1:5
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
MDF SILVER PANEL IN GLOSS FINISH
DRAWING TITLE:
BESPOKE SECTION SCALE: 1:25
DATE: 23 NOVEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_BS_10b
REV. NO:
00
C1 C2
WT1 WT2
W1 W1
W2
D1 BF2 LF1
FF2
GYPSUM BOARD IN NIPPON GREY PAINT FINISH
GLASS REFLECTIVE MIRROR WALL PANEL DOUBLE SWING DOOW C/W 15MM THK TEMPERED GLASS
ALUMINIUM FRAME DOUBLE CASEMENT WINDOW C/W TEMPERED GLASS FIXED DISPLAY SHELF WITH DOUBLE TEMPERED GLASS
CONCRETE FLOORING IN POLISHED FINISH
BILL OF QUANTITIES
TERMS & CONDITION QUOTATION
1
Validity : 14 days
DATE: 02 DECEMBER 2021
2
Period of completed : 60 days (refer of down payment upon confirmation of order)
QUOTE NO:
3
All Dimension subject to final site measurement
TERMS: C.O.D.
4
4 Variation Order : Any alternation not specified in the quotation will be issued under variation order follow with an invoice
HENRY GOH & CO SDN BHD OFFICE JALAN TAYLORS, 47500 SUBANG JAYA, MALAYSIA
ATTENTION
Variation order (VO).
RE: RENOVATION WORKS FOR HENRY GOH & CO OFFICE, TOWER A LEVEL 4
5 UNIT
NO DESCRIPTION
QTY
RATE(RM)
TOTAL(RM)
WALL
WT1 To supply material and labour to INSTALL GLASS REFLECTIVE MIRROR
2
m
15
2500
37500
WALL PANEL @ waiting area
WT2 To supply material and labour to install WALL MOUNT LIGHT WITH CLEAR
N/A
5
115
575
Payment Terms : - THE CONTRACT SUM RM
Percentage
Stage I Upon confirmation of project/service
50% = RM
Stage II Progress Claim (Installation of fixtures & fittings)
50% = RM
Stage III Progress Claim (Completion of fixtures & fittings)
50% = RM
Stage IV Final Payment (Full completion of all works)
50% = RM
LED LIGHT @ waiting area CEILING
- Services / works shall commence upon receipt of payment of each phase except for final phase. Time frame of work that has been agreed by both
C1 To supply material and labour to LAY 9MM GYPSUM BOARD IN NIPPON
N/A
5
80
400
parties are subjects to the receipt of payments.
GREY PAINT FINISH
- All outstanding amounts must be paid within ten (10) working days after handover of site (exclude V.O. period). Shall there be any delay of the handover
C2 To supply material and labour to WHITE HEXAGON LED PANEL LIGHT
N/A
6
95
570
of site, payment must still be made within ten (10) working days of the originally contemplated date confirmed by the Client & DMZ Consultancy Sdn Bhd
FLOOR
- DMZ Consultancy Sdn Bhd do not hold any responsibilities in delay of work from the agreed Time frame that is resulted by payment issues mentioned.
FF2 To supply material and labour SELECTED CONCRETE GRADE FOR
3
m
5
237
1185
- Cheque should be crossed *A/C Payee* & Made Payable to DMZ Consultancy Sdn Bhd.
FLOORING IN NATURAL TEXTURE
- DMZ Consultancy Sdn Bhd shall not in any circumstances or for any reason whatsoever be liable for any losses, damages cost, expenses, including
Area: Reception Area
without limitation direct, indirect, special or consequential damages or economic losses arising from any such failure to perform.
6
DOOR AND WINDOW
D1 To supply material WHITE PVC DOUBLE SWING WINDOW c/w 12mm THK
N/A
1
285
- DMZ Consultancy Sdn Bhd cannot be held responsible for design/works/service that may later be undesirable or cause inconvenience. The Client
285
TEMPERED GLASS DOOR LEAF 2100MM(H) X 1800MM(W) X 40MM (THK)
W1 To supply material and labour to ALUMINIUM FRAME DOUBLE CASEMENT
understands that all designer/contractor interprets the Client's requirement and wishes. However any design/works that are not done according to agreed N/A
2
270
as per quoted shall be rectified accordingly by DMZ Consultancy Sdn Bhd.
540
WINDOW C/W TEMPERED GLASS 1800MM(H) X 1000MM(W) X 40MM(THK)
W2 To supply material and labour to ALUMINIUM FRAME SINGLE FIXED
7 N/A
2
195
Project Access - Client will provide DMZ Consultancy Sdn Bhd with access to the project and all information that may be required to complete the project. Failure to do so
390
WINDOW C/W TEMPERED GLASS 1800MM(H) X 600MM(W) X 40MM(THK)
by the Client provides DMZ Consultancy Sdn Bhd the right to terminate service (with a written notice) and collecting outstanding balances
OTHER EQUIPMENTS
8
LF1 1600MM(D) X 2500MM(W) X 420MM(H) WHITE FABRIC CURVED SOFA WITH
Design/Works/Service Disclaimer
N/A
1
185
Termination of Service - DMZ Consultancy Sdn Bhd has the right to terminate or suspend All works/Services, upon written notice, if the Client fails to make payments/ default in
185
ALUMINIUM BASE IN POLISHED FINISH @ waiting area
accordance with the mentioned terms and conditions herein.
BF2 To supply and install FIXED DISPLAY SHELF WITH DOUBLE TEMPERED
N/A
- Termination shall be without prejudice to any and all other rights and remedies of DMZ Consultancy Sdn Bhd and Client shall remain liable for all
1
outstanding obligations owed.
GLASS @ reception area
- Within five (5) working days of termination of our service for any reason, DMZ Consultancy Sdn Bhd shall submit to Client an itemized invoice for any fees or expenses under this quotation. The Client, upon payment of accrued amounts so invoiced, shall thereafter have no further liability or obligations to DMZ Consultancy Sdn Bhd for any further fees or expenses arising hereunder.
9
Project Time Frame & Fees for extra services - Reasonable time frame for drawings to be discussed & agreed by both party DMZ Consultancy Sdn Bhd . - Estimated time frame for entire project's time frame inclusive of revision period will be a maximum of TWO (2) Months starts from date of appointment. If project exceed the estimated time frame, an additional minimum fee of RM150 per month will be charged, as consultation fees only. excluded reimbursement claim & site visit charges. Subject to the Project & remaining job scope.
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
Henry Goh & Co Sdn Bhd 018-288 7886 V02-10-06 Lingkaran SV, Sunway Velocity, Jalan Peel, 55100, Kuala Lumpur Malaysia.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
PROJECT NAME: PROPOSED OFFICE INTERIOR DESIGN FOR HENRY GOH & CO AT SUNWAY VELOCITY SALES GALLERY, V02-10-06 LINGKARAN SV, JALAN PEEL, 55100 KUALA LUMPUR.
DRAWING TITLE:
BILL OF QUANTITIES SCALE: N/A
DATE: 02 DECEMBER 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
DWG_DWD_TXH_BQ_11c
REV. NO:
01
REFLECTION
03
However, there is still room for me to learn and improve in this module. Nonetheless, this module has definitely taught me to work in a proper and neater way.
T
The final assignment was related to our office design from IAD IV. From here, I have learned the type of drawings that needed to produced, such as the the quality of line weights, sizing of dimension and text, specification, and etc. In the design, I have referred to the UBBL to design my office such as UBBLBY-LAW 172, Emergency Exit Signs and UBBL-BY-LAW 227, Portable Extinguishers.
ASSI GN ME N
ASSIGNMENT 02 PRECEDENT STUDIES – A BUREAU
TAN XIAO HUI | 0335215
In this assignment, we are required to Students required to research on a precedent study that relates to a working space that relates to their concept design in Design 4. This assignment will also expose the students to the relevance and significance of drawing convention and detailing. The objective of this assignment is for students to develop the knowledge and understanding related to the production of working drawings for construction.
IDS60804 DETAILING AND WORKING DRAWINGS ASSIGNMENT 02: PRECEDENT STUDIES – A BUREAU NAME : TAN XIAO HUI STUDENT ID : 0335215 PROGRAMME: BACHELOR OF ARTS (HONOURS) INTERIOR ARCHITECTURE BATCH: AUGUST 2021 LECTURER : MS NORJI, MS AZIAH
TABLE ON CONTENT 1) PRECEDENT STUDIES (INDIVIDUAL) 2) PRECEDENT STUDIES (CHOSEN) 3) LAYOUT PLAN 4) SCHEDULE OF ACCOMODATION 5) LONG SECTION 6) BESPOKE DETAIL 7) DOORS AND WINDOW SCHEDULE 8) SCHEDULE OF FINISHES 9) UBBL DIAGRAM 10) ANALYSIS
precedent studies 07
Second Home London Office by Selgascano 04
Area: 2400 sq meter
07
Located in the East End of the city of London. It is a concept of shared workspace (co-working space) that hosts some 30 companies that are as alternative as the neighborhood, small scale, and quite related to technology.
09 07 09 05
06
03
absorbent carpets and ceilings
08 07
09
09 02
01
09 07
open discussion room ideation room
U-shaped meeting table that can be winched up towards the ceiling when not in use
a continuous curved shape that scatters around the building
01 ENTRANCE 02 RECEPTION / WAITING AREA 03 PANTRY AREA 04 TOILET 05 OPEN WORK AREA
transparent glass panel
open work area
work area
translucent wall panel pantry area
a curved bank of seating, painted with glossy orange paint.
06 OPEN DISCUSSION AREA 07 MEETING ROOM 08 IDEATION ROOM 09 PRIVATE WORK AREA
PRECEDENT STUDIES PROJECT:
CATEGORY: Office Design --------------------------------------LOCATION: Nisshin Aoyama Building 5F, 3-4 Kita Aoyama, Minato-ku, Tokyo, Japan
PRODUCE: PRISM DESIGN --------------------------------------SPECIFICATIONS: Area: 431㎡ Ceiling Height: 2900mm --------------------------------------DATE: DEC 2019
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------1. Lift Lobby 2. Toilet 3. Emergency Stairs 1 4. Office Entrance 5. Foyer Closet 6. Waiting Area 7. Staff Room/ Pantry 8. Meeting Room
DESIGN CONCEPT:
The tagline and motto of the company
-------------------------------------------------
KEYWORDS:
9. Conference Room 10. Emergency Stairs 2 11. Working Space 12. Online Conference Working Space 13. Chat Room 1 & 2 14. Discussion Room 15. Manager Room
1
2
3 13
15
SPACE PROGRAMMING
14
4 5
1. Fusion of analog and digital 2. Fusion of creative and engineering 3. Work while playing 4. Collaboration among employees --------------------------------------------------
MATERIALS
7
CONCRETE
6
12
8
STEEL
9 CORK BOARD
11
TIMBER
10 CARPET TILE
PUBLIC
SEMI PUBLIC
SEMI PUBLIC/ SEMI PRIVATE
CORIAN
SEMI PRIVATE
PRIVATE
GLASS
INTERIOR PERSPECTIVES Various spreadsheet matrices to extract the root of the design. Fusing the past and the present to find out what the future should be. Both conventional and latest are needed, Hybridize them to create a new standard.
DISSCUSSION POD
Timeless Spacecraft
WAITING AREA
Exposed ceiling of fittings and ducting in the center symbolized the fusion of old and new.
ENTRANCE
Entering the magnificient entrance with pendant installation art, there is a stair-shaped bench and display, and a space for casual communication with people outside the company was created while ensuring operational security.
Connectivity Large display in the center of the wall enable active communication between the two sites online.
Landolt C's Sequence An initial “C” -shaped desk that is common to keywords such as “Creative and Collaboration” that are necessary for a new office environment.
WORKING SPACE
MEETING ROOM
DISSCUSSION/ SELF-THINKING AREA
CONFERENCE ROOM
MANAGER ROOM
There are several meeting rooms, including a casual interior that encourages free thinking and a room that is ideal for chic and relaxing meetings.
1
2
4
3
5
7
6
8
10
9
31735 1250
2235
5400
5400
3900
3300
2400
3200
4650
A W5
TOILET CERAMIC TILE 38.70m2
EMERGENCY STAIRS 1 CERAMIC TILE 12.50m2
D11
D7
7000
D10
D11
LIFT LOBBY CERAMIC TILE 38.70m2
D8
500
B
BS3
ELECTRICAL ROOM 1
2840
ELECTRICAL ROOM 2
D8
CONCRETE 8.80m2
CONCRETE 17.50m2
MANAGER ROOM
C
D9
D9
CORIAN TILE 16.10m2
D5
FOYER CLOSET
SC E
W4
CONCRETE 8.65m2
D1
OFFICE ENTRANCE
D3
D1
SC E
CONCRETE 6.60m2
SERVER ROOM
D1
D
STAFF ROOM/ PANTRY
CARPET TILE 7.65m2
CONCRETE 3.35m2
DISCUSSION ROOM
CONCRETE 4.10m2
W3
D1
FC1
CHAT ROOM OSB SHEET 6.30m2
W1
CORRIDOR 1
D4
CARPET TILE 12.10m2
SC D
D1
D1
21735
SC D
250MM(L) x 250MM(W) x 5.5MM THK ORIGINAL COLOUR CARPET TILE
W4
CONFERENCE ROOM
MEETING ROOM
EPOXY 29.70m2
CONCRETE 13.30m2
FE1
EPOXY FLOORING IN POLISHED FINISH
8960
BS1
ONLINE CONFERENCE WORKING SPACE
WAITING AREA
CARPET TILE 198.50m2
CARPET TILE 41.60m2
SC C
SC C BS4
W1 BS2
D1
SC B
SC B
W3
CORRIDOR 2
D6
CARPET TILE 14.40m2
D2
E
2000
WORKING SPACE W1
CARPET TILE 12.10m2
BS5
SC A
EMERGENCY STAIRS 2
SC A
CONCRETE 11.60m2
TIMBER VINVYL D7
G
435
F
FLP L5
5TH LEVEL LAYOUT PLAN SCALE 1:125
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
PROJECT 2: PRECEDENT STUDIES - A BUREAU
Revision
Fontworks Inc Tokyo Head Office
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
PROJECT NAME:
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
DRAWING TITLE:
5TH LEVEL FURNITURE LAYOUT PLAN SCALE: 1:125
DATE: 11 OCTOBER 2021
CHECKED BY: MISS NORJI
DRAWN BY: TAN XIAO HUI
DRAWING NO:
MDT_DWD_TXH_PL_01
REV. NO:
04
1
2
4
3
5
7
6
8
9
10
31800 2340
6000
2900
3220
3200
2260
3370
2460
4450
SL
CL
2900
P1
W1
W4 BS3
D5
WP2
FFL
ARTIFICIAL LEATHER FABRIC
SC E
WOOD MELAMINE DECORATIVE BOARD SHELVE
15MM GYPSUM BOARD PLASTER CEILING IN WHITE PAINT FINISH
SCALE 1:100
CLIENT:
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
Date
CONCRETE FLOORING IN POLISHED FINISH
SECTION E-E
NOTE :
No.
18MM THK OSB PATTERN ORIGINAL LAMINATED SHEETS
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
PROJECT 2: PRECEDENT STUDIES - A BUREAU
Revision
Fontworks Inc Tokyo Head Office
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
PROJECT NAME:
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
DRAWING TITLE:
SECTION E-E SCALE: 1:100
DATE: 11 OCTOBER 2021
CHECKED BY: MISS NORJI
DRAWN BY: TAN XIAO HUI
DRAWING NO:
MDT_DWD_TXH_SC_03
REV. NO:
04
3920
10
600
10
P1
15MM GYPSUM BOARD PLASTER CEILING IN WHITE PAINT FINISH
2830
2900
DETAIL 1
FL1
ARTIFICIAL LEATHER FABRIC
CT1
CORIAN FLOOR TILES IN MATTE FINISH
EL FRONT ELEVATION BS3 SCALE 1:25
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
PROJECT 2: PRECEDENT STUDIES - A BUREAU
Revision
Fontworks Inc Tokyo Head Office
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
PROJECT NAME:
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
DRAWING TITLE:
BESPOKE FRONT ELEVATION SCALE: 1:25
DATE: 11 OCTOBER 2021
CHECKED BY: MISS NORJI
DRAWN BY: TAN XIAO HUI
DRAWING NO:
PS_DWD_TXH_EL_04a
REV. NO:
04
10
4400
10
WP1
630
920
PLASTERED BRICK WALL IN COTTON WHITE FINISH
FL1
ARTIFICIAL LEATHER FABRIC
LP
LAYOUT PLAN
BS3
SCALE 1:25
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
PROJECT 2: PRECEDENT STUDIES - A BUREAU
Revision
Fontworks Inc Tokyo Head Office
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
PROJECT NAME:
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
DRAWING TITLE:
BESPOKE LAYOUT PLAN SCALE: 1:25
DATE: 11 OCTOBER 2021
CHECKED BY: MISS NORJI
DRAWN BY: TAN XIAO HUI
DRAWING NO:
PS_DWD_TXH_PL_04b
REV. NO:
04
3288 20
WOOD LOUVERS IN POLISHED FINISH
600
WOOD SCREWS
10
WOOD LOUVERS IN POLISHED FINISH
DT 1
DETAIL 1 SCALE 1:5
1570
ARTIFICIAL LEATHER FABRIC 40
30
ARTIFICIAL LEATHER FABRIC
50
60
700
DETAIL 2
WOOD FRAMING
SC H
SECTION H-H
DT
SCALE 1:20
2
CLIENT:
NOTE :
ARCHITECT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
SCALE 1:5
PROJECT NAME: PROJECT 2: PRECEDENT STUDIES - A BUREAU
Revision
Fontworks Inc Tokyo Head Office
DETAIL 2
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
DRAWING TITLE:
BESPOKE SECTION & DETAIL SCALE:
DATE: 11 OCTOBER 2021
CHECKED BY: MISS NORJI
DRAWN BY: TAN XIAO HUI
DRAWING NO:
PS_DWD_TXH_SC_04c
REV. NO:
04
UBBL CONSTRUCTIONAL & FIRE REQUIREMENTS: STAIRCASES, HANDRAILS AND BEAM OR COLUMN STAIRCASES
*Applied UBBL Requirements
According to UBBL BY-LAW 107: Dimensions of Staircases
Staircases/ Handrails
(1) In any staircase, the rise of any staircase shall be not more than 180mm and the tread shall not less than 255mm and the dimensions of the rise and the tread of the staircase so chosen shall be uniform and consistent throughout.
RC Columns
(2) The widths of staircases shall be in accordance with ByLaw 168. Figure 1.1 Dimensions of Emergency Stairs 1
(3) The depths of landings shall be not less than the width of the staircases.
HANDRAILS
*Applied UBBL Requirements
According to UBBL BY-LAW 107: Handrails (1) Except for staircases of less than 4 risers, all staircases shall be provided with at least one handrail.
Figure 1.2 Dimensions of Emergency Stairs 2
COLUMN
STAIRCASES
According to UBBL BY-LAW 143: Beam or Column
According to UBBL BY-LAW 168: Staircases
Any beam or column forming part of, and any structure carrying, and external wall which is required to be constructed of non-combustible materials shall comply with the provisions of paragraph (3) of UBBL By-Law 142 as to non-combustibility.
The required width of a staircase shall be the clear width between walls but handrails may be permitted to encroach on this width to a maximum of 75mm.
*Applied UBBL Requirements
Figure 1.3 The RC Column.
(2) In building other than residential buildings, a handrail shall be provided on each side of the staircase when the width of the staircase is 1100mm or more.
*Applied UBBL Requirements
Figure 1.3 Dimensions of Emergency Stairs 1 &2
UBBL FIRE REQUIREMENTS: EMERGENCY EXIT SIGNS, DOOR CLOSERS FOR FIRE DOORS, MEASUREMENT OF TRAVEL DISTANCES TO EXITS. ESCAPE SIGNS
*Not Applied UBBL Requirements
Travel Distances to Exit
The Emergency Exit Sign only has the icon representation but lack of the sign reading "KELUAR".
Emergency Exit Signs & Fire Doors
According to UBBL BY-LAW 172: Emergency Exit Signs (1) A sign reading "KELUAR" with an arrow indicating the direction shall be placed in every location where the direction of travel to reach the nearest exit is not immediately apparent. (2) All exit signs should be illuminated continuously during periods of occupancy. Figure 1.5 Emergency Exit Signs
DOOR CLOSERS
*Not Applied UBBL Requirements The automatic Door Closer is not equipped in the fire exits for a swing door.
According to UBBL BY-LAW 165: Door Closers for Fire Doors Figure 1.6 Door Closers for Fire Doors
TRAVEL DISTANCE TO EXITS *Applied UBBL Requirements
According to UBBL BY-LAW 165: Measurement of Travel DIstance to Exits
(2) Double doors with rabbeted meeting stiles shall be provided with co-ordinating device to ensure that leafs close in the proper sequence.
(1) The travel distance to an exit shall be measured on the floor or other walking surface along the centre line of the natural path of travel, starting 0.300m from the most remote point of occupancy, curving around any corners or obstructions with 0.300m clearance therefrom and ending at the storey exit. Where measurement includes stairs, it shall be taken in the plane of the trend noising. (2) In the case of open areas the distance to exists shall be measured from the most remote point of occupancy provided that the direct distance shall not exceed two-thirds the permitted travel distance. (3) In the case of individual rooms which are subject to occupancy of not more than six persons, the travel distance shall be measured from the doors of such rooms: Provided that the travel distance from any point in the room to the room door does not exceed 15m.
(1) All fire doors shall be fitted with automatic door closers of the hydraulically spring-operated type in the case of swing doors and of wire rope and weight type in the case of sliding doors.
(3) Fire doors may be held open provided the hold open device incorporates a heat actuated device to release the door. Heat actuated devices shall not be permitted on fire doors protecting openings to protected corridors or protected staircases. Figure 1.7 Travel Distances to Exits.
UBBL FIRE REQUIREMENTS: FIRE ALARMS, SMOKE DETECTOR AND FIRE PRECAUTIONS IN AIR CONDITIONING SYSTEMS FIRE ALARMS *Applied UBBL Requirements
Fire Alarms
According to UBBL BY-LAW 237: Fire Alarms
Sprinkler Valves
(1) Fire alarms shall be provided in accordance with the Tenth Schedule to these By-laws. (2) All premises and buildings with gross floor area excluding car park and storage areas exceeding 9290sqm or exceeding 30.5m in height shall be provided with a two-stage alarm system with evacuation (continuous signal) to be given immediately in the affected section of the premises while an alert (intermittent signal) be given in adjoining section.
Fire Alarms
Figure 1.8 Fire Alarms
(3) Provision shall be made for the general evacuation of the premises by action of a master control.
Figure 1.9 Smoke Detector in Manager Room (Left) & Waiting Area (Right).
AIR CONDITIONING
*Applied UBBL Requirements
According to UBBL BY-LAW 160: Fire Precautions in Air Conditioning Systems. (1) All air conditioning ducts, including framing there for, except ducts in detached and semi-detached residential buildings shall be constructed entirely of non-combustible materials and shall be adequately supported throughout their lengths.
Figure 1.10 Air Conditioning System
SMOKE DETECTOR
*Applied UBBL Requirements
According to UBBL BY-LAW 225: Detecting and extinguishing fire.
(2) No air-conditioning ducts shall pass through fire walls unless as provided for in by-laws 148 and 156.
(1) Every building shall be provided with means of detecting and extinguishing fire and with alarms together in accordance with the requirements as specified in the Tenth Schedule to these By-laws.
(3) The air intake of any air-conditioning apparatus shall be situated such that air shall not be recirculated from any space in which objectionable quantities of inflammable vapours or dust are given off and shall be so situated as to minimise the drawing in of any combustible material.
(2) Every building shall be served by at least one fire hydrant located not more than 91.5M from the nearest point of fire brigade access.
UBBL ANALYSIS PART VIII - FIRE ALARMS, FIRE DETECTION, FIRE EXTINGUISHMENT AND FIRE FIGHTING ACCESS 237. Fire Alarms. (Applied UBBL requirements)
225. Detecting and extinguishing fire. (Applied UBBL requirements)
Figure 1.8 Fire Alarms
According to UBBL 237, all premises and buildings shall be provided with at least two-stage alarm system with evacuation to be given clearly. Both emergency stairs has been thoughtfully to applied UBBL 237 requirements as for a fire alarm to be effective, it should be placed at main exits, emergencies exits or fire points. Fire alarm system should be designed to provide early detection and warning of a fire so one of the general rule of thumbs is to install these devices throughout the area and in visible locations. In both emergency exit 1 and 2 in the building, fire alarm were positioned at the right place near both emergency exits door where it is visible. For fire alarms system to be useful, detectors should also be coupled with fire alarms as it provides notice to at least the building occupants. As seen in the diagrams, the building has a smoke detectors along side with fire alarm system which is near. (161 words)
According to UBBL 225, all premises and buildings should have appropriate fire detection and warning systems installed. Every building shall be provided with means of detecting and extinguishing fire with alarms together in accordance with the requirements as specified in the Tenth Schedule to these By-laws. smoke detectors offer the earliest possible warning of fire. Detectors should be located on every level of a building. Detectors may not sense a fire developing on the other side of a closed door. In areas where doors are usually closed, detectors should be located on both sides of the door. In the building, it is seen that it applies UBBL 225 as every room including public space has placement of smoke detectors along with alarm systems. (123 words)
REFLECTION
In assignment 02, I have learned a lot about the building' s fire safety and the implementation of UBBL in a building. I' ve also learned that the material of a building is important in fire safety. This assignment is a group work and it helps me to have efficient communication with my group members and i' m happy that all members delicate our task evenly so we can keep our work going on.
ASSIGNMENT 01
ASSIGNMENT 01 WORK FROM HOME: DOORS & WINDOWS In this assignment, we are required to choose, observe and measure our own personal work space within our house, and the chosen space should have an opening either a door or a window. The objective is to enable students to observe, measure, understand and then capture the space and then capture the level of detailing, materiality used and other finishes considerations into a proper 2D drawing formats with appropriate drawing convention.
TAN XIAO HUI | 0335215
IDS60804 DETAILING AND WORKING DRAWINGS ASSIGNMENT 01: WORK FROM HOME: DOORS AND WINDOWS
NAME : TAN XIAO HUI STUDENT ID : 0335215 PROGRAMME: BACHELOR OF ARTS (HONOURS) INTERIOR ARCHITECTURE BATCH: AUGUST 2021 LECTURER : MS NORJI, MS AZIAH
4800 950
2500
1580
WP1
F1
BEDROOM
2100
4580
W1
700
TOILET
SCHEDULE OF FINISHES AREA BEDROOM
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
Date
LAYOUT PLAN
1
SCALE 1:25
CLIENT:
NOTE :
No.
LP
Revision
ARCHITECT:
TAN XIAO HUI
WINDOW
CODE: WP1
CODE: C1
CODE: W1
LAMINATED WOOD FLOORING
BRICK WALL WITH WHITE PAINT FINISH
PLASTER CEILING WITH WHITE PAINT FINISH
ALUMINIUM WINDOW WITH TEMPERED GLASS
SIZE: 8MM THICK
BRAND: NIPPON PAINT
BRAND: NIPPON PAINT
SIZE: 1400(H) x 700(L) x 12(THK) MM
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
YHDA (Yuhoe Design Architect)
CEILING
CODE: F1
PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW
016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor. 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
WALL
FLOOR
DRAWING TITLE:
LAYOUT PLAN SCALE: 1:25
DATE: 30 AUGUST 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
WS_DWD_TXH_DD_01
REV. NO:
03
4800 2500
PLASTER CEILING WITH WHITE PAINT FINISH
GLASS WINDOW C/W ALUMINIUM FRAME IN MATTE POWDERCOAT FINISH
3110
510
900
1400
400
1100
SECTION DETAIL
EXISTING BRICK WALL WITH WHITE PAINT FINISH 8MM THK LAMINATED WOOD FLOORING IN SATIN FINISH
SC 1
CLIENT:
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
SECTION A-A SCALE 1:25
ARCHITECT:
TAN XIAO HUI 016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor.
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
DRAWING TITLE:
SECTION A-A SCALE: 1:25
DATE: 30 AUGUST 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
WS_DWD_TXH_DD_02
REV. NO:
03
2100 700
700
700
30 SIDE JAM
100
150
30
8MM THK TEMPERED GLASS FRAME JAB
DETAIL 2 700(L) x 1400(H) MM ALUMINIUM WINDOW FRAME WITH MATTE POWDERCOAT FINISH
PL 1
NOTE :
CLIENT:
THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
TAN XIAO HUI
No.
Date
Revision
OPENING DETAIL PLAN SCALE 1:10
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW
DRAWING TITLE:
OPENING DETAIL PLAN SCALE: 1:10
DATE: 30 AUGUST 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
WS_DWD_TXH_DD_03
REV. NO:
03
100 50
80
EXISTING BRICK WALL WITH WHITE PAINT FINISH
1240
1400
8MM THICK TEMPERED GLASS
1200(H) x 700(L) x 12THK MM ALUMINIUM FRAME IN MATTE POWDERCOAT FINISH INSIDE
OUTSIDE
80
DETAIL 1
SC 1 CLIENT:
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
ARCHITECT:
TAN XIAO HUI 016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor.
OPENING DETAIL SECTION SCALE 1:10
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
DRAWING TITLE:
OPENING DETAIL SECTION SCALE: 1:10
DATE: 30 AUGUST 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
WS_DWD_TXH_DD_04
REV. NO:
03
25 8
8
8MM TEMPERED GLASS
75 26.5
SASH FRAME HEAD
85
48 5 20
ALUMINIUM WINDOW FRAME WINDOW HANDLE BACKSET WINDOW HANDLE
D 1
DETAIL 1 SCALE 1:5
CLIENT:
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
D 1
ARCHITECT:
TAN XIAO HUI 016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor.
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
DETAIL 2 SCALE 1:5
PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW
YHDA (Yuhoe Design Architect)
DMZ Consultancy Sdn Bhd
016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
DRAWING TITLE:
DETAIL 1 & DETAIL 2 SCALE: 1:5
DATE: 30 AUGUST 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
WS_DWD_TXH_DD_05
REV. NO:
03
WINDOW SCHEDULE 2100 700
700
1400
700
WINDOW NO.
W1
LOCATION
BEDROOM TYPE
CASEMENT WINDOW
FRAME
700(L) x 1400(H) x 40(W) MM ALUMINIUM WINDOW FRAME
WINDOW LEAF
8MM THK TEMPERED GLASS
HINGES
STEEL
LOCK/BOLTS
ALUMINIUM
STOP/PULL
ALUMINIUM
DESCRIPTION
IRONMONGERY
CLIENT:
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORISED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURE DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING.
No.
Date
Revision
ARCHITECT:
TAN XIAO HUI 016-328 4332 28, Jalan Sungai Merbau 79A, Seksyen 32, 40460 Shah Alam, Selangor.
YHDA (Yuhoe Design Architect) 016-503 4305 02-17, The Square @, Jalan USJ 25/1C, One City, 47650 Subang Jaya, Selangor
INTERIOR DESIGN CONSULTANT:
QUANTITY SURVEYOR:
PROJECT NAME: PROJECT 1: WORK FROM HOME + WINDOW
DMZ Consultancy Sdn Bhd
JUBM Sdn Bhd
012-335 3180 8, Jalan Sungai Buaya, Taman Desa, 58100 Kuala Lumpur
03-2106 8000 Menara TSR, Level 5, 12, Jalan PJU 7/3, Mutiara Damansara, 47810 Petaling Jaya.
DRAWING TITLE:
WINDOW SCHEDULE SCALE:
DATE: 30 AUGUST 2021
CHECKED BY: MISS AZIAH
DRAWN BY: TAN XIAO HUI
DRAWING NO:
WS_DWD_TXH_DD_06
REV. NO:
03
REFLECTION In this assignment 01, I' ve learned to properly draw 2d drawing more detail and observe more detail. This assignment help me to improve my observation and understanding the mechanism of window. I was also able to know more about the materials of window. This assignment is a great chance for me to learn and observe things around me.