NEWSFLASH
Spring / Summer 2015
Newsticker +++ Interview with Mr. Gabriel +++ FlapSign +++ Interschutz 2015 +++ Interview with Mr. Gabriel +++ FlapSign +++ Interschutz 2015
CONTENT
Nissen LED
Page 2 aTalking to Mr. Hans-Adolf Gabriel
Page 3 aThe new folding traffic sign FlapSign aOpening of Zeppelin Rental BVS in Berlin
Page 4 aIt is that time again: Interschutz 2015 in Hanover aNewcomer in the consulting team: Rudolf Striepen
In a recent pilot project, our LED technology successfully demonstrated how its freely programmable and intelligent control system is able to meet the complex demands of any traffic and roadwork situation. This pilot project implemented 5+0W alternating one-way traffic control on the A 95 MunichGarmisch-Partenkirchen motorway in the course of restoration works. This complex traffic control, among others, was only possible by the high flexibility of dynamic LED alternating traffic signs. The results of this project were positive all around and exceeded all expectations. There was no traffic congestion during peak traffic, and at least 200 000 congestion hours could
technology helps in avoiding 200 000 hours of traffic congestion
be avoided. ABD Southern Bavaria offers further information under the following link https://vimeo.com/12165284. This project is also discussed in the current Straßen- und Verkehrstechnik, Edition 04/2015. (Source: SVT April 2015). According to the Federal Ministry of Transport and Digital Infrastructure (BMVI) forecast for 2025 traffic, passenger and goods traffic are set to increase significantly. This means that every responsible person will now and in the future be facing enormous challenges, demanding maximum flexibility of traffic planning. Since the perfect condition of infrastructure is significant in this respect and whereas this cannot be guaranteed without the necessary restorati-
on, planners will time and again be facing new challenges of maintaining traffic flow despite road works. This is where Nissen’s LED technology will assist with active light. This project therefore represents a milestone for future traffic control at long duration road works and is set to serve as an example for further construction projects.
NEWSFLASH 01/2015 | www.nissen.de
1