Architecture Portfolio II

Page 1

Family Name:

Sarkissian

Forename: Tamar

UCL Student ID number:

Application Number: 24196095

Programme applied for: MArch Architecture [TMHARCSING09] (ARB/RIBA PT2)

Any other programmes you have applied for at UCL:

N/A

Qualification, Subject, Grade (e.g. Bachelor degree in Architecture 2:1) :

Bachelor Degree in Architecture 2:1

Have you completed work experience (taken after your degree)?

I am currently working and will complete it by the end of September.

If an English Language certificate is required please let us know if you have one or will be taking a test?

N/A

Link to your online portfolio (Preferably on ISSUU):

https://issuu.com/tamar.sark/docs/architecture_portfolio_II

Classification - Public THE BARTLETT, FACULTY OF THE BUILT ENVIRONMENT
Education & Student Experience Team, Bartlett Faculty Office, University College London, Gower Street, London WC1E 6BT 1
TAMAR SARKISSIAN +44 7471 326 441 tamar.sark@gmail.com @tamar.sark_architecture linkedin.com/in/tamar-sarkissian/ T.SARKISSIAN ARCHITECTURE PORTFOLIO

TABLE OF CONTENTS

ACADEMIC WORK

TECHNICAL STUDIES

PRACTICE EXPERIENCE

PERSONAL PROJECT

p. 3-8, 10-15 p. 9 p. 16-19
2
p. 20

RUMINATION GALLERY & RETREAT

SITUATED WITHIN MERCHISTON PARK ALONG EDINBURGH’S UNION CANAL, MY PROJECT IS A COMBINATION OF AN ART GALLERY [LVL -2], AND A RETREAT SPACE, WITH PRIVATE ROOMS FOR OVERNIGHT STAYS [LVL -1] AND MEDITATION ROOMS [LVLS -3 & -4].

THE COMPLEX IS MEANT TO SERVE AS A SPACE OF TRANQUILLITY AWAY FROM THE BUSY URBAN HUB SURROUNDING—A REFUGE FOR PEOPLE TO SELFREFLECT, TO RUMINATE VIA ART, VIA SOCIAL, OR INDIVIDUAL ACTIVITY.

TO EMBODY THIS SACRED TRANQUILLITY I LOOK TOWARDS THE NATURAL—PARTICULARLY TOWARDS LIGHT AND WATER. NOT WANTING TO DISTURB THE SERENE PARK, I DECIDED TO BUILD UNDERGROUND. WATER HAS ALWAYS BEEN A SACRED ELEMENT, A TRANSITIONAL THRESHOLD, AND SO I PULLED THE CANAL INTO THE PARK, CREATING A GLAZED WATERCHANNEL SKYLIGHT ABOVE MY CIRCULATION, BOTH WATERWAY AND PATHWAY SPIRALLING DOWN AROUND THE CENTRAL COURTYARD.

EACH LEVEL IS DIVIDED INTO 4 ZONES OF OCTAGONAL ROOMS. IN THE GALLERY [-2], EACH ZONE IS DEDICATED TO EXPERIENCING THE ARTWORK THROUGH ONE OF 4 CORE BODILY MOVEMENTS: WALKING, STANDING, SITTING DOWN, AND LYING DOWN. IN THE RETREAT [-3&-4], EACH ZONE IS DEDICATED TO ONE OF 4 CONTRASTING SENSORY THEMES: LIGHT VS DARK, AND SOUND VS SILENCE.

[ YEAR 3 FINAL DESIGN PROJECT ]
LEVEL 0 3
05101520m

KEY SECTION AA

[KEY SECTION CUTTING THROUGH THE UNDERGROUND RETREAT AND GALLERY ENTRANCES]

5101520 m [ YEAR 3 FINAL DESIGN PROJECT ] 4
SECTIONAL PERSPECTIVE RETREAT ZONE 4, WATER FALLING IN SILENCE ROOM GALLERY ZONE 3, SITTING DOWN IN NICHES TO VIEW ART RETREAT ZONE 1, BATHING IN DARKNESS 5
SECTIONAL PERSPECTIVE CUTTING THROUGH ZONE 1, CENTRAL COURTYARD & ZONE 3

STAGE 3 FINAL DESIGN PROJECT ]

GALLERY ENTRANCE HALL

&
[
PATHWAY
GALLERY PATHWAY
ENTRANCE HALL BRIDGE OVERLOOKING GALLERY PATHWAY GALLERY ENTRANCE HALL [VIDEO OF MODEL DEMONSTRATING THE WATER CAUSTICS LIGHTING EFFECT OF THE SKYLIGHT WITHIN THE GALLERY PATHWAY]
6
SCAN FOR VIDEO

8 10

17

9 11

7 16

5 6

15 17

05101520m 1 2 3 4

LEVEL -1 RETREAT ROOMS - 800

12 13

14

- 1600 - 2400 - 3200 +

1. ENTRANCE

2. ENTRANCE LOBBY

3. ADMINISTRATION ROOMS

4. INFIRMARY

5. PRIVATE RETREAT ROOMS

6. PRIVATE RETREAT ROOM COURTYARDS

7. CENTRAL COURTYARD CIRCULATION

8. RETREAT PRESENTATION ROOM

9. STAFF ROOM

10. CHANGING ROOMS

11. VENTILATION ROOM

12. PRIVATE ROOM STAIRWELLS TO REACH THE MEDITATION ROOMS IN LVL -3

13. BRIDGE

14. VOID AROUND CENTRAL COURTYARD FOR LVL -2

DOUBLE VOLUME

15. EARTH

16. CENTRAL COURTYARD VOID

17. LIGHT WELL VOIDS REACHING DOWN TO LEVEL -3

[PROGRAMME] + 3200

LEVEL -2 GALLERY

[PROGRAMME]

1. ENTRANCE TO GALLERY

2. ENTRANCE LOBBY

3. CLOAKROOM

4. WATER TANK AND FILTRATION ROOM

5. VIEWPOINT DOWN TO ZONE 4 LYING DOWN GALLERY

6. GIFT STORE AND LIBRARY

7. RAMP CIRCULATION BEGINNING

8. ZONE 1 WALKING GALLERY

9. SUN TUNNEL LIGHT WELL, THE SHAFT IS COVERED IN REFLECTIVE MATERIAL TO SHINE LIGHT ONTO THE ARTWORK DISPLAY WITHIN IT

10. FIRE ESCAPE CORRIDOR

11. ADMINISTRATION ROOMS

12. PRIVATE ROOM STAIRWELLS TO REACH THE MEDITATION ROOMS IN LVL -3, WITH SEATED VIEWING PORTS LOOKING INTO THE GALLERIES, HIDDEN BEHIND A TWO-WAY WINDOW

13. ZONE 2 STANDING GALLERY

14. PRESENTATION ROOMS

15. ZONE 3 SITTING DOWN GALLERY

16. CENTRAL COURTYARD

17. LIGHT WELL VOIDS REACHING DOWN TO LEVEL -3

18. ZONE 4 LYING DOWN GALLERY

19. WATER BASIN WHERE RAIN CHAIN FROM CANTILEVERS ON LEVEL 0 DRIP WATER, WHICH THEN FALLS DOWN AGAIN THROUGH THE BASIN VOID TO -4

20. ART DISPLAY, CHANGES WITH EVERY NEW EXHIBITION

21. BRIDGE FROM ZONE 1 ONTO AND OVER ZONE 4, LOOKING ONTO LYING DOWN GALLERY

22. EARTH

- 800 - 1600 - 2400 - 3200 0---- 3200+ 0 - 800 - 2400 05101520m 1 2 3 4 5 6 12 13 14 15 17 18 21 22 7 16 19 20 8 10 9 11 17
7

LEVEL -3 RETREAT MEDITATION ROOMS

1. ENTRANCE FROM COURTYARD CIRCULATION

2. WATER TANK, FILTER AND PUMP ROOM FOR THE WATER BASIN OF LEVEL -4

3. ZONE 1 BATHING IN THE DARK ROOMS

4. ZONE 2 SITTING IN THE LIGHT ROOMS

5. ZONE 3 GROUP ACTIVITY ROOM, WITH STAIRWELL PASSAGE TO NOISE ROOM ON LEVEL -4

6. ZONE 4 GROUP ACTIVITY ROOMS WITH PASSAGE TO 7

7. ZONE 4 SILENCE ROOM, WELL LIT FROM THE WINDOWS AT THE CENTRE, WATCHING THERE THE WATER FALL FROM ABOVE IN SILENCE

8. STAIRWELLS FROM PRIVATE RETREAT ROOMS ON LEVEL -1

9. LIGHT-WELLS ABOVE

10. EARTH

- 4000 - 4900 - 5800 - 6700- 4300 - 4600-- 6700 -- 6700 05101520m 1 2 3 4 7 5 6 8 10
[PROGRAMME]
9
AUDITORIUM BUILDING ALONG CANAL AUDITORIUM ENTRANCE TO RETREAT, LVL -1
8
GALLERY ZONE 4, LYING DOWN IN NICHES TO VIEW ART
400 mm CONTIGUOUS PILING WALL 70 mm SHOTCRETE WATERPROOF TANKING MEMBRANE DRAINAGE PROTECTIVE BOARD TO WATERPROOFING 200 mm REINFORCED CONCRETE WALL 150 mm RIGID FOAM INSULATION 200 mm FAIR-FACED REINFORCED CONCRETE WALL 50 mm PRE-CAST CONCRETE PANEL 100 mm INSULATION 200 mm REINFORCED CONCRETE SLAB 50 mm SCREED WITH UNDERFLOOR HEATING PIPES CONTIGUOUS PILING WALL CAP 400 mm CONTIGUOUS PILING WALL CONTINUES INTO THE GROUND ANOTHER 2-3 METERS WATERSTOP 100 mm CONCRETE BLINDING WATERPROOF TANKING MEMBRANE 200 mm CONCRETE SLAB FOUNDATION 100 mm INSULATION VCL 75 mm CONCRETE SCREED WITH UNDERFLOOR HEATING PIPES 200 mm REINFORCED CONCRETE SLAB 100 mm CONCRETE SCREED WITH UNDERFLOOR HEATING PIPES 200 mm REINFORCED CONCRETE SLAB VCL 100 mm INSULATION WATERPROOF MEMBRANE DRAINAGE PROTECTIVE BOARD TO WATERPROOFING 50 mm CONCRETE SCREED 50 mm GRAVEL 2 mm ALUMINIUM PLATE FILTER FABRIC GRILL POLYURETHANE PUTTY TO FILL THE GAP BETWEEN THE ALUMINIUM PLATES ROOF LIGHT, TEMPERED TRIPLE LAMINATED GLASS. THE GLASS IS COVERED IN SHALLOW WATER, BROUGHT BY THE RAIN CHAIN. ROOF LIGHT, TEMPERED TRIPLE LAMINATED GLASS. THE GLASS IS COVERED IN SHALLOW WATER. Ø 50 mm DRAINAGE PIPE RAIN CHAIN, HOOKED ONTO THE SCREED BELOW THE GRAVEL. POLYURETHANE PUTTY FILLS THE GAP WITH THE ALUMINIUM PLATE WHERE THE HOOK IS EMBEDDED. ‘L’ ALUMINIUM FLASHING ALUMINIUM PLATE DOUBLE LAMTIMBRE SILL 1:20 SECTION TECHNICAL DETAILING [ YEAR 3 FINAL DESIGN PROJECT ] 013m 2 50 mm SCREED WITH UNDERFLOOR HEATING PIPES 100 mm CONCRETE BLINDING WATERPROOF TANKING MEMBRANE DRAINAGE PROTECTIVE BOARD TO WATERPROOFING 300 mm CONCRETE SLAB FOUNDATION 150 mm CONCRETE SCREED 200 mm REINFORCED CONCRETE SLAB 2 mm ALUMINIUM PLATE FILTER FABRIC GRILL POLYURETHANE PUTTY TO FILL THE GAP BETWEEN THE ALUMINIUM PLATES ROOF LIGHT, TEMPERED TRIPLE LAMINATED GLASS. THE GLASS IS COVERED IN SHALLOW WATER, BROUGHT BY THE RAIN CHAIN. ROOF LIGHT, TEMPERED TRIPLE LAMINATED GLASS. THE GLASS IS COVERED IN SHALLOW WATER. 50 mm OVERFLOW PIPE ALUMINIUM PLATE Ø100 mm DRAINAGE PIPE FOR WATER BASIN WATERPROOF MEMBRANE 150 mm SCREED WATERPROOFING PAINT 20 mm FIBER CEMENT BOARD 50 mm INSULATION WATERPROOF MEMBRANE 20 mm FIBER CEMENT BOARD ALUMINIUM CHANNEL TO FIX THE FIBER CEMENT LAYERS ONTO THE CONCRETE WALL AND BEAM 4 mm ACP (ALUMINIUM COMPOSITE PANEL) 70 mm INSULATION WATERPROOF MEMBRANE CONCRETE BEAM ALUMINIUM CHANNEL TO FIX THE ACP & INSULATION LAYER TRIPLE GLAZED FIXED WINDOW WITH 52 mm ALUMINIUM FRAME 50 mm PRE-CAST CONCRETE PANEL 100 mm INSULATION VAPOUR CONTROL LAYER (VCL) 230 mm REINFORCED CONCRETE SLAB 40 mm SCREED TO FALLS VCL 100 mm RIGID INSULATION WATERPROOF MEMBRANE DRAINAGE GEODRAIN ROOT BARRIER FILTER FABRIC 100 mm EXTENSIVE SUBSTRATE 300 mm GRAVEL RETENTION TRIM 8 mm BRONZE PLATE RAIN CHAIN V-HOOK BRONZE PLATE CONTINUES, BECOMING 3 mm WATERPROOFING MEMBRANE OVERFLOW DRAIN 40mm DRAINAGE PIPE GUTTER 50 mm CONCRETE SCREED 50 mm PRE-CAST CONCRETE PANEL WATERPROOFING L-SHAPED STEEL FLASHING 200 mm TIMBRE SILL 70 mm PRE-CAST CONCRETE PANEL 150 mm INSULATION PRE-CAST WATER RESISTANT CONCRETE BASIN BRONZE RAIN CHAINS, HOOKED ONTO THE CONCRETE BASIN. POLYURETHANE PUTTY FILLS THE GAP WHERE THE HOOKS ARE EMBEDDED. RAIN CHAIN, HOOKED ONTO THE SCREED BELOW THE GRAVEL. POLYURETHANE PUTTY FILLS THE GAP WITH THE ALUMINIUM PLATE WHERE THE HOOK IS EMBEDDED. ‘L’ ALUMINIUM FLASHING ALUMINIUM PLATE STONE DOOR SILL DOUBLE LAMINATED GLASS RAIL EMBEDDED TIMBRE SILL DOUBLE LAMINATED GLASS RAIL 1:20 SECTION 1:20 300 mm GRAVEL RETENTION TRIM L-SHAPED STEEL FLASHING PRE-CAST WATER RESISTANT CONCRETE BASIN BRONZE RAIN CHAINS, HOOKED ONTO THE CONCRETE BASIN. POLYURETHANE PUTTY FILLS THE GAP WHERE THE HOOKS ARE EMBEDDED. PLAN LEVEL -2 SECTION LINE ELEVATION LINE 1:20 TECHNICAL SECTION TECHNICAL SECTION ZONE
013m 2 100 mm CONCRETE BLINDING WATERPROOF TANKING MEMBRANE DRAINAGE PROTECTIVE BOARD TO WATERPROOFING 300 mm CONCRETE SLAB FOUNDATION 150 mm CONCRETE SCREED Ø100 mm DRAINAGE PIPE FOR WATER BASIN WATERPROOF MEMBRANE 150 mm SCREED WATERPROOFING PAINT 20 mm FIBER CEMENT BOARD 50 mm INSULATION WATERPROOF MEMBRANE 20 mm FIBER CEMENT BOARD ALUMINIUM CHANNEL TO FIX THE FIBER CEMENT LAYERS ONTO THE CONCRETE WALL AND BEAM 4 mm ACP (ALUMINIUM COMPOSITE PANEL) 70 mm INSULATION WATERPROOF MEMBRANE CONCRETE BEAM ALUMINIUM CHANNEL TO FIX THE ACP & INSULATION LAYER TRIPLE GLAZED FIXED WINDOW WITH 52 mm ALUMINIUM FRAME 50 mm PRE-CAST CONCRETE PANEL 100 mm INSULATION VAPOUR CONTROL LAYER (VCL) 230 mm REINFORCED CONCRETE SLAB 40 mm SCREED TO FALLS VCL 100 mm RIGID INSULATION WATERPROOF MEMBRANE DRAINAGE GEODRAIN ROOT BARRIER FILTER FABRIC 100 mm EXTENSIVE SUBSTRATE 300 mm GRAVEL RETENTION TRIM 8 mm BRONZE PLATE RAIN CHAIN V-HOOK BRONZE PLATE CONTINUES, BECOMING 3 mm WATERPROOFING MEMBRANE OVERFLOW DRAIN 40mm DRAINAGE PIPE mm PRE-CAST CONCRETE WATERPROOFING L-SHAPED STEEL FLASHING 200 mm TIMBRE SILL 70 mm PRE-CAST CONCRETE PANEL 150 mm INSULATION PRE-CAST WATER RESISTANT CONCRETE BASIN BRONZE RAIN CHAINS, HOOKED ONTO THE CONCRETE BASIN. POLYURETHANE PUTTY FILLS THE GAP WHERE THE HOOKS ARE EMBEDDED. PERIMETER INSULATION DOUBLE LAMINATED GLASS RAIL THE CENTRAL COURTYARD, FROM ABOVE LOOKING UP AT THE RAIN CHAIN CANTILEVERS WITHIN THE CENTRAL COURTYARD 9

SHIELDFIELD HOUSING

CREATING A PSEUDO-STREET: A LONG CORRIDOR OF ALTERNATING BARREL VAULTED SPACES & LIGHT WELLS. A SAFE COMMUNAL CORRIDOR FOR ELDER RESIDENTS TO RELAX IN & YOUNGER RESIDENTS TO PLAY IN, WHILE THEIR CARERS OVERLOOK FROM VIEWS WITHIN THE HOUSING UNITS.

[YEAR 2 DESIGN PROJECT]
‘PSEUDO-STREET’ COMMUNAL CORRIDOR
BACK VIEW
BALCONY IN BETWEEN HOUSING UNITS, WITH VIEW DOWN INTO THE COMMUNAL CORRIDOR 10
FRONT VIEW

SHIELDFIELD HOUSING

INTERNAL VIEWS INTO THE COMMUNAL CORRIDOR ARE FOUND THROUGHOUT THE HOUSING UNITS.

GROUND FLOOR SECTIONAL PERSPECTIVE

PLAN FLOOR_0
PLAN
FLOOR_1
PLAN FLOOR_2 SECTIONAL PERSPECTIVE 11
KEY

MARITIME GALLERY

INSPIRED BY THE SITE’S PROXIMITY TO THE SEA, AND THE EFFECTS OF SAID PROXIMITY, I AIMED TO EXPERIMENT WITH THE CONCEPT OF WEATHERING.

ALONGSIDE BEING HOSTS TO A LOCAL MARKET, MY STRUCTURES PRIMARILY FUNCTION AS ART EXHIBITS, WITH ADVENTUROUS ROUTES, AND ARTWORK DISPLAYED BOTH INDOORS AND OUT. THOSE OUTDOORS WILL BE ENCASED WITHIN BLOCKS OF MATERIAL THAT, COMPLETELY EXPOSED TO THE NATURAL ELEMENTS, WEATHER AWAY TO SLOWLY EXPOSE THE ARTWORK EMBEDDED WITHIN.

WITH THIS, NATURE TAKES ON THE ROLE OF SCULPTOR ALONGSIDE THE EXHIBITION’S HUMAN ARTISTRY.

[YEAR 2 DESIGN PROJECT]
12

INVITING THE SEA INSIDE

[ALLOWING THE TIDE TO CHANGE THE SPACE AT VARYING TIMES OF DAY]

AT HIGH TIDE THE PYTHAGORAS CUP MECHANISM BRINGS SEA WATER INTO THE DISPLAY, ALLOWING IT TO SLOWLY CORRODE THE BLOCKS OF ENTOMBED ARTWORK.

PYTHAGORAS CUP MECHANISM SECTION
KEY SECTION [THROUGH THE CIRCULAR VIEWING BAY] 13

ARCHITECTONIC MORPHOGENESIS

RESIDENCE OF INDULGENCE — STALAGMITES, JANUS, AND A CUPPED HAND

[YEAR 1 DESIGN PROJECT]
14

MODEL-MAKING

HAND-DRAWING 15

PART 1 ARCHITECTURAL ASSISTANT - MACE

PHOENIX ACADEMY — FEASIBILITY STUDIES

FORMERLY AN OFFICE FACILITY, THE EXISTING BUILDING HAS BEEN REFURBISHED INTO AN AP (ALTERNATE PROVISION) SCHOOL. IN PHASE 2, WE TACKLE THE FIRST FLOOR AND THE EXTERNAL AREAS, AIMING TO INCREASE THE PAN FROM 30 TO 64 PUPILS.

PARTICIPATION

PARTICIPATED IN DESIGN & STAKEHOLDER MEETINGS, AND ATTENDED A SITE VISIT WITH THE PROJECT TEAM.

EXTERNALS

WORKED ON THE EXTERNAL AREAS PLAN, AND DEVELOPED THE EXTERNAL PLAY AREAS.

CREATED A CONCEPT OF GREENING THE FENCES WITH COMMON IVY, TO COMBAT THE PRISONLIKE FEEL OF THE EXCESSIVE FENCING NECESSARY IN AP SCHOOLS.

[WORK EXPERIENCE]

16

GT 2 KS3 29

45

Science Lab 17 17 57 10 MI 22

Head Office 45

Main Recep

Maintenance store 8 Interview room 28

4 Lift 11

11 Staff Toilets

16.5

7.3 7.7 Str

ICT Car Park

Food Tech 78

78

Prep. Prep. Changing 3 Changing 1 15 Changing 2 Dining halls 163

AC WC

Str 8.3 8.33

Meeting Room Food Str

Group Room Therapy Room 15

Classroom 1 Lobby

22 11

7 Central Stairway 47

Recep Circ. Food Str

3.3 8 Lobby Staff Toilets

1.7 Cleaners store Pupils Toilets

15 2

Student Recep Sick Bay

5

127 17 13

Main Entrance Pupil Entrance

Activity Studio Str 28

Stairwell 2

28

Classroom 52.27 20.44 Therapy Room Str 9.24 8.95

Group Room Classroom 45.06

Office Classroom 44.66 5.55 Group Room

Staff work room 19.01 Group Room 5.83 Art Str 73.09

Classroom 45.25 8.27 Office

Str 5.12 Str 5.12 Classroom 44.27

ICT Classroom 9.8

Therapy Room 31.9 13.63 47.96

Hygiene Room

Basic Teaching Halls and Dining Learning Resources Non-Net Staff and Admin Storage

9.96 1.73

Str 5.06 Str 5.03

Central Stairway 16.2

Str

3.7 Lift 3

12

9.57 2.74 StrToilet Str Str AC WC 2.65

Toilet 9.97

Deputy Head Office Str 6.73 8.45 Not in use Area

Group Room Not in use Area

Staff room

Art room 21.96

Art Str

4 Kiln 3.51

Stairwell 2 12.15 Server 13 2 4.75

28

Stairwell 1 Ground Floor First Floor

DATE

KEY Non-Net Parking/ Vehicle Access Building Area Building Main Entrance Building Pupil Entrance ByRev Description 155 Moorgate, London, EC2M 6XB www.macegroup.com PROJECT DRAWING TITLE DRAWN BY CHECKED SCALE

1:200@A3

INTERNALS DIAGRAMS DATA MANAGEMENT Stairwell 1

SH A - MACXXXX D2005 FS0633 -

WORKED ON THE SOA (SCHEDULE OF ACCOMMODATION). CREATED ADJACENCY DIAGRAMS.

Spatial PROJECT No. Form Originator Disc. Functional Number

DateCHK'D FILED ON AUTOCAD AS:C:\Users\tamar.sarkissian\OneDrive Mace\Desktop\Aspire Liverpool_Nelson\Week 6_6-11-23\adj (003)_first floor adjacencies_10-11-2023.dwg

P01 VORTEX HOUSE, WAVERTREE TECHNOLOGY PARK, ENTERPRISE WAY, LIVERPOOL, L13 1FB FEASIBILITY INTERNAL ADJACENCIES - PHASE 1 DRAFTASSET_NO

03/04/23 16

N Basic Teaching Halls and Dining Learning Resources Non-Net Staff and Admin Storage KEY Proposed Partition Wall Proposed Door Existing Door Removed Door Removed Partition Wall Replaced Door Window blocked internallyProposed Window blocked internallyExisting 10m 0 4m2m6m8m Internal Layout (PHASE 2 - SEPT 2024) 64 pupils Deputy Head Office 16.23 Corridor 2 22.68sq.m Female Pupil WC 9.57sq.m Lift 3.7sq.m Duct 0.58sq.m Void (Not Surveyed) 2.47sq.m Void (Not Surveyed) 2.65sq.m Classroom 3 45.06 Classroom 4 44.66 Classroom 7 45.25 Classroom 5 44.27 Therapy Room 2 31.9 FIRST FLOOR Staff Room 21.96 Server 12.15 Staff Workroom 19.01 Hygiene Room 12 Classroom 6 52.27 ART 73.09 Group Room 3 9.8 ICT ROOM CLASSROOM 47.96 Store 6 Store 3 Group Room 4 13.63 Therapy Room 1 20.44 Store 1 9.24 Group Room 1 8.95 Group Room 2 5.55 Store 2 5.03 Store 7 8.45 Store 8 6.73 Corridor 6 46.47sq.m Office 1 8.33 Store 4 Office 2 8.27 8.3 ART Store 2 Kiln 4 ART Store 1 3.51 F a Store 5 5.12 5.06 5.83 5.12 Staircase 1 28.5 Staircase 2 28.9 Corridor 45.48 sq.m Corridor 21.93sq.m Corridor 32.18sq.m Corridor 7 39.6 sq.m Excess Space 1 Excess Space 2 Excess Space 3 Store 10 2.74sq.m Cleaner's Store 2.65 sq.m Toilet 3.01sq.m Male Pupil WC 9.97sq.m Proposed Layouts Level 01 ByRev Description 155 Moorgate, London, EC2M 6XB PROJECT DRAWING TITLE DRAWN BY CHECKED DateCHK'D PROJECT No. Originator P01 GST KINGS LEADERSHIP PHOENIX ACADEMYPHASE 2 WAVERTREE TECHNOLOGY PARK, ENTERPRISE WAY, LIVERPOOL, L13 1FB - - FS0633 4231D MAC 0101 ATS ASSET_NO NH
WORKED ON THE INTERNAL LAYOUT OF THE FIRST FLOOR. 28

PART 1 ARCHITECTURAL ASSISTANT - MACE

CENTRAL BEDFORDSHIRE — VIABILITY STUDIES

APPRAISALS FOR BATCHES OF 26 SCHOOLS IN TOTAL. STUDIES OF WHETHER THESE EXISTING SCHOOLS ARE VIABLE FOR EXPANSION OR NOT, AND IF THEY ARE, PRODUCING PROPOSALS. SITE VISITS ARE CONDUCTED & VIABILITY REPORTS ARE PRODUCED.

DATA MANAGEMENT PARTICIPATION

- COLLATED INFORMATION INTO DOCUMENTS AND EXCEL SPREADSHEETS (REGISTER OF INFORMATION).

EXCEL SPREADSHEETS (REGISTER OF INFORMATION).

- SET UP SHEETS, VIEWS AND SCHEDULES ON REVIT.

PARTICIPATED IN DESIGN & STAKEHOLDER MEETINGS, AND ATTENDED SITE VISITS WITH THE PROJECT TEAM.

[WORK EXPERIENCE]
School Existing External Areas Plan on Revit [by myself] Document of school batches, locations, NORs, contact details, I created on InDesign Register of Information, created on Excel Schedule of Existing BB103 External Areas, set up on Revit

H-HLNet

H-HLNon

(Building)636

H-HLNon net area Building-Ex_TA Brief - CanopyMarginal areas (Building)46

H-HLNon net area MAC_En_32_35_36_Hard marginal areas_Footpaths Marginal areas (footpaths)443 m²

H-HLNon net area MAC_En_32_35_36_Non-Net Parking Marginal areas (Car Park)408 m²

H-HLNon net area MAC_En_32_35_80_Marginal areas-soft Marginal areas (soft)1181 m²

Non net area:

SPACE TYPE LEGEND AND DEFINITIONS

HARD

SOFT INFORMAL AND SOCIAL AREA INFORMAL SOCIAL AREAS TO SUIT LUNCH BREAKS AND FORMAL OUTDOOR LEARNING, SUCH AS GRASS, SAND OR BARK MULCH, GRASSED BANKS, SHRUBS, PLANTED AREAS, MEADOWLAND AND WOODLANDS WHICH ARE SPACE FOR GATHERING.

HARD INFORMAL AND SOCIAL AREA

THESE COMPLEMENT SOFT INFORMAL AREAS

SUCH AS PLAYGROUNDS WHICH ENCOURAGE HEALTHY ACTIVE OUTDOOR PAY DURING LUNCH BREAKS AND FORMAL LEARNING.

HABITAT AREAS AREAS CAN INCLUDE OUTDOOR CLASSROOMS SPACES SUCH AS MEADOWLAND, WILDLIFE HABITATS (PONDS), GARDENS AND OUTDOOR SCIENCE AREAS

NON-NET SITE AREAS

SOFT OUTDOOR PE SUMMER AND WINTER PITCHES FOR TEAM GAMES SUCH AS FOOTBALL, RUGBY, HOCKEY AND CRICKET, ALSO INCLUDES ALL WEATHER PITCHES. BUILDINGS

DRAWINGS REPORTS

- TRACED THE SCHOOLS’ EXTERNAL AREAS ON REVIT.

- PRODUCED SITE CONSTRAINT PLANS ON REVIT.

- PRODUCED PROPOSALS FOR THE SCHOOLS VIABLE

FOR EXPANSION.

PRODUCED VIABILITY REPORTS, STUDYING THE SITE’S SURROUNDINGS, CONSTRAINTS, INTERNALS, EXTERNALS, COMPARING THE EXISTING TO BB103 RECOMMENDED GUIDELINES AND DESIGNING PROPOSAL EXPANSIONS WHEN VIABLE.

APPLICATION BOUNDARY
OUTDOOR PE HARD SURFACE SUCH AS POROUS MACDAM AREAS TYPICAL MUGAS FOR TEAM GAMES SUCH AS NETBALL, TENNIS AND BASKETBALL.
N.B: AREAS SHOWN ARE TAKEN FROM INFORMATION RECEIVED FROM CBC. SOME DRAWING INFORMATION HAS HAD TO BE SCALED FROM PDF DRAWINGS SO AREAS GIVEN ARE APPROXIMATIONS VEHICLE ACCESS POINTS PEDESTRIAN ACCESS POINTS BUILDING ENTRANCE POINTS OTHER ENTRY POINTS EXISTING TREE WITHIN SITE BROOK DRAWING TITLE PROJECT Name Site CLIENT KEY PLAN PROJECT STATUS 155 Moorgate, London, EC2M 6XB www.macegroup.com DRAFT Hockliffe Lower School - Existing External Areas L&L Viability Assessments Central Bedfordshire Council FEASIBILITY STUDY REVDATE DESCRIPTION Existing BB103 External areas - Hockliffe Lower School Mark Area Category Type BB103_Area typeAreaComments H-HLNet areaMAC_En_32_35_36_Hard informal and social areas Hard informal and social areas 882 m² H-HLNet areaMAC_En_32_35_36_Hard outdoor PE Hard outdoor PE106 m² H-HLNet areaMAC_En_32_35_80_Habitat_Bodies of water Habitat areas 306 m²abnormal
areaMAC_En_32_35_80_Soft informal and social areas Soft informal and social areas 2482 m² Net area: 4 3776 m²
net area Building
Marginal areas
footprint
12
6489 m² 0 @1:500 10 5
2714 m²
55 Year 55 Year Toilet Toilet Indicative plant room space 11.6 9.6 55 Year 55 Year 55 Year 5.5 55.3 Reception 55 Year 43.6 studio block out door Storage toilet toilet Staff Toilet Cleaner's Str Outdoor Space for Nursery Outdoor Space for Nursery Canopy? Canopy Draft School Viability Report [by myself with guidance from the Project Architect] WIP - Expansion Proposal for a viable school, drafted in AutoCAD & Revit [by myself, checked by the Project Architect]
17

MENTORSHIP & INTERNSHIP - A.D. & D.

AIN MREISSI 125 — ENTRANCE DESIGN

A 32-FLOOR TWO-BLOCK RESIDENTIAL TOWER. IT IS QUITE A LUXURIOUS BUILDING, AND THE ENTRANCE WITH ITS VAST DOUBLE VOLUME HEIGHT REFLECTS THE SCALE OF THE PROJECT.

I VISITED THE SITE DURING VARIOUS STAGES OF CONSTRUCTION, FROM THE CONCRETE WORKS AND HARDSCAPING TO THE FINAL LANDSCAPING.

GF Plan by A.D.&D.

I PARTICIPATED IN DESIGN MEETINGS FOR THE TOWER’S ENTRANCE, CONTRIBUTED TO THE DISCUSSIONS AND IDEAS, AND WORKED ON THE DESIGN PROCESS.

[WORK EXPERIENCE]

ENTRANCE DESIGN

THERE IS A CONTINUOUS MOTIF OF STRIPED GEOMETRY LEADING BOTH THE LINE OF SIGHT AND THE MOVEMENT OF THE RESIDENTS TOWARDS AND WITHIN THE ENTRANCES.

THIS STARTS WITH THE PERGOLA OUTSIDE, AND CONTINUES INTO THE ENTRANCE WITH HORIZONTAL STRIPS OF WOOD ON ITS CEILING,— THEN, EVOLVING INTO VERTICAL STRIPS OF MARBLE, ALMOST LIKE STALACTITES. THEY ARE LIT UP, BECOMING A SCULPTURAL CHANDELIER.

EACH STRIP VARIES IN LENGTH, CREATING AN ALGORITHMIC WAVE THAT INTERACTS WITH THE VIEWER’S MOVEMENT, OFFERING DIFFERENT VIEWS ALONG DIFFERENT ANGLES OF SIGHT.

THE CHANDELIERS CONTINUE ACROSS THE CEILING AND THEN CLIMB DOWN THE WALL OVERHEAD, TURNING HORIZONTAL, STARING DIRECTLY BACK TOWARDS THE CENTRAL DOORS.

THE FLOOR SUPPORTS THE MOMENTUM OF THIS GEOMETRIC MOTIF, WITH MARBLE SQUARES DOTTING ITS PLANE WHEREVER A CHANDELIER DROPS DOWN FROM ABOVE, DIRECTLY REFLECTING IT, AS IF ITS SHADOW.

DESIGN
18
Render by A.D.&D.

MENTORSHIP & INTERNSHIP - A.D. & D.

BLISS 319 — ENTRANCE DESIGN

A 14-FLOOR LUXURIOUS RESIDENTIAL BUILDING. IT IS QUITE THE IDEAL LOCATION, WITH GREAT VIEWS TOWARDS THE GREEN AUB CAMPUS AND THE VAST MEDITERRANEAN SEA.

I PARTICIPATED IN DESIGN MEETINGS FOR THE BUILDING’S ENTRANCE AND LANDSCAPING, CONTRIBUTED TO THE DISCUSSIONS AND IDEAS, AND WORKED ON THE DESIGN PROCESS. I VISITED THE SITE DURING VARIOUS STAGES OF CONSTRUCTION, FROM THE CONCRETE WORKS AND HARDSCAPING TO ITS FINAL STAGES.

[WORK EXPERIENCE]
GF Plan by A.D.&D.

ENTRANCE DESIGN

THE CEILING’S FLOWING DESIGN LEADS THE VISITOR’S LINE OF SITE TOWARDS THE OLIVE TREE FRAMED WITHIN THE BACK GARDEN, HONOURING THE TREE’S ELEGANCE AND BEAUTY.

IT IS FORMED OF A SOFTLY UNDULATING WAVE, AN ORGANIC FEATURE TO CONTRAST THE SHARP GEOMETRIES OF THE ENTRANCE’S STRUCTURE.

THE SCULPTED ROOF LEADING ACROSS THE ENTRANCE CREATES A CLEAR PATHWAY, PAVING THE WAY FOR THE NATURE AT THE BUILDING’S FRONT TO COME, SWEEP IN—CONNECTING THE FRONT AND BACK GARDENS WITH AN ORGANIC TUNNEL.

VERTICAL STRIPS OF WOOD HANG DOWN, LIT UP. WITH THE DIRECTIONALITY UNDULATING SEQUENCE, THEY, TOO, HELP DIRECT THE LINE OF SIGHT TOWARDS THE OLIVE TREE.

Render by A.D.&D.
19
Render by A.D.&D.

HOPE(LESS)(FUL)(NESS)

A WORK IN PROGRESS

A PROJECT INSPIRED BY THE DICHOTOMY BETWEEN THE STATE OF HOPELESSNESS & THE STATE OF HOPEFULNESS, AND THE PROCESSION FROM ONE TOWARDS THE OTHER.

We are set on a path, a strip of shore with sea further we go, the closer the waves encroach our feet—until we are standing at the mouth

A jagged cavern slopes down into the sea’s depths. a small stream of light beckons us forth. We central path—although there are others, winding side of us. These other paths quickly find their exits through gaps in the walls. Our central path, however, any exit’s reach, and continues to wind and wind The ceiling slopes and slopes and the space gets we are bent over crouching. Finally we’ve reach the only to find no exit in sight. The stream of light beckoning disappeared. We are surrounded by water and Turn and go back? Or—

[PERSONAL PROJECT]

sea on either side. The encroach until they lap at mouth of a great hall.

depths. At its very end, are set on a single, winding around on either exits out of the cavern however, remains far from wind down its course. darker and darker until the end of the passage— beckoning us forth has wall and nothing else.

Jump despite the lack of space to move, take a leap of faith, dive into the waters, and suddenly— A whole new, endless path is revealed. The water was, is, in itself a path, with endless opportunity and endless possibility. Swim any which way in any dimension, explore and yes find light and then the exit, An exit— swim up, upwards, up into the light and surface into its brilliance. We are met with a chamber of sunshine streaming from above, above against a high, high wall. Close ahead steps beckon us forth—swim to them, lift yourself up, climb them, one step another, and we are at a height now where we can see: there’s a vast expanse, an open sky and an open sea. One step down and we’re on a boat, its sails set and blowing— Off we go.

20

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.