LivRed Investor Update | Q4 2020

Michael Sather, CFO – Tailwind Group, Inc.


Executive Summary Tailwind Group and Campion Devco have broken ground on LivRed – a new student housing development located adjacent to the University of Nebraska’s main campus in Lincoln. LivRed is a $50 Million luxury student housing project that will boast 154 Units & 595 Beds. Located near the University of Nebraska-Lincoln and near the historic “Haymarket Square” and West Campus, the location will provide walkability to most major academic and entertainment areas on campus.


Property Summary Address

322 9th Street

City, State

Lincoln, Nebraska

Universiry

University of Nebraska - Lincoln

Delivery Year

2022

Units

154

Beds

575

Unit Mix

1x1, 2x2, 3x3, 4x4

Distance to Central Campus

.7 Miles

Residential Square Feet

257,857

Parking Square Feet

72,544

Average Rent/Bed

$682


Project Summary General Partner

Tailwind Group (Mankato, MN)

General Partner

Campion Devco (New Orleans, LA)

General Contractor

Sampson Construction (Lincoln, NE)

Architect

Grace Herbert Curtis Architects (Baton Rouge, LA)

Structural Engineer

Fox-Nesbit Engineering (Baton Rouge, LA)

Mechanical & Electrical Engineer

Engineering Technologies (Lincoln, NE)

Civil Engineer

Rega Engineering Group (Lincoln, NE)

Project Details •

6-story stick frame over concrete podium • Amenity Package: • Covered Garage Parking (153 Spaces). • 24-hr Fitness Center • Study Area • Spa – Massage, Tan, Sauna • Pool & Hot Tub • Dog Yard • Bike Racks


Construction Summary General Contractor: Sampson Construction

Link to Construction Live Stream

Projected Costs

Expenses to Date

Remaining

Construction Costs

$37,500,000

$1,200,000

$36,300,000

Soft Costs

$8,200,000

$3,300,000

$4,900,000

Total Construction Costs

$45,700,000

$4,500,000

$41,200,000

December 21, 2020

January 21, 2021

March 3, 2021


Project Costs / Funding Sources Project Cost

Amount

Expenses to Date

Remaining

Construction Loan

$30,000,000

$0

$30,000,000

TIF

$5,500,000

$0

$5,500,000

Equity

$15,050,000

$8,870,000

$6,180,000

Total Project Costs

$50,550,000

$8,870,000

$41,680,000


Construction Timeline General Contractor: Sampson Construction

Date

Start Date

Nov-20

Expected Completion Date

Jul-22

Current Status 10 Days Behind Schedule


Bridgewater Bank – Construction Loan Summary

Construction Loan Amount: $30,000,000 Interest Rate: 4.20% Interest Only Period: 36 Months Loan Amortization Date: 12/1/2023 Amount Utilized to Date: $0.00 Remaining Amount: $30,000,000


Enrollment Trend

30,000

Per the University Data Index, a total of 25,560 students were enrolled for the Fall

25,000

Semester, a 1.3% decline YOY, driven largely

20,000

by a decline of 18.4% in international

15,000

students to due the coronavirus pandemic.

10,000 The University saw increases, however, in

5,000

these key areas:

0

•

2017

2018 2019 Total Enrollment

*F is for Forecast *Information from AxioMetrics

2020 2021F 2022F Undergraduate Graduate

2023F

•

Underrepresented Minorities 5.6% Increase First-generation students increase of 3.2%


Market Occupancy and Pre-Lease Summary

*Information from College House as of 02/26/2021


Comparable Property Summary

*Information from College House as of 02/26/2021


Michael Sather, CFO Tailwind Group msather@thetailwindgroup.com investors@thetailwindgroup.com