HSBC Tower - Washroom Refurbishment

Page 1

Washroom Refurbishment using Architectural Film
Ultrathin overlay Porcelain Tiles to produce new floor finish without removal of exiting floor finish. Architectural Wrapping Solid surface Wash Troughs designed and manufactured to fit existing structural steel framework Introduction of Infra-Red Xero Touch taps Introduction of matching soap dispensers Renewal of existing and introduction of new Dyson Airblade Hand dryer to eliminate paper towels, waste & collection, maintenance costs & environmental impact Works Included ––––––

Before Installation

Before Installation

Before Installation

reduced cost, compared to traditional refurbishment methods 65% Cost Savings
Significantly

Less Mess

By bonding hygienic cladding sheets to existing old tiled walls creates a solid and smooth substrate to apply the interior film. Helping reduce waste and downtime.

Using Existing Fixtures & Fittings

Most of the fixtures and fittings were in a stable condition, so our team repaired any damage and prepared the areas before applying LG interior film.

This again reduces waste and landfill…for example ripping out the cubicles and tiles would require multiple waste skips before any building work commences.

By wrapping the existing fixtures and fittings the waste is minimal and can be recycled.

During Installation
During
Installation

Completed Installation

Completed Installation
Completed Installation

Minimal O ce Disruption

install
Our
methods provide minimal disruption to the o ce environment

Before Installation

Completed Installation

Before Installation Completed Installation