PORTFOLIO Landscape Architecture I Selected works 2023-2026 Sylvie Zhang 0424298306 I sylvieyuxin@gmail.com
AFL TASMANIA HIGH PERFORMANCE TRAINING FACILITY, KINGSTON, TASMANIA Project Type : Sport Infrastructure Contexts The Tasmanian Devil AFL Training Facility in Kingston was designed to respond to environmental conditions and the sports precinct’s needs, and create a memorable, hands-on experience that strengthened the site’s connection to place. Challenge One challenge was balancing budget constraints with a thoughtful planting design. The client proposed using mostly grasses instead of shrubs to save costs—an approach that can work at first but often leads to more maintenance later. Approach Rather than making short-term cost-saving choices, I help to develop a planting strategy based on the site’s microclimate, including shade analysis. For example, one planting zone drew inspiration from Tasmania’s Grassy Woodland, increasing habitat value by introducing a wider mix of native species that require little maintenance and are well adapted to local conditions. Responses The final design supports AFL training while also encouraging ongoing community use and creating a more engaging experience for everyone.
Landscape batter treatment options
Surface and material treaments
Skillsets Vectorworks • Producing technical drawings Photoshops • Producing landscape diagrams and sections Microsoft Excel •
Creating interactive Tasmanian plant database Treatment 1 : Cut Batter (Geogrid installnation)
Treatment 2 : Fill Batter (Jute Mat installnation)
Treatment 3 : Hydroseeding
Treatment 4: Instant Turf and Garden bed 2
Shadow analysis
Initial planting plan
Soft Landscape Plan
3
85
2
2
642
523
2
644
2
272
2 717
2 598 2 601 2 650 622
593
696
2
2
2
604
592
2
2
097
1 2 133 990
2 554
2
2 449
603
626
2
2
617
2
2 619
749
2 601
2 499
2 429
462
2 485
2 679
2 465
2 160
2 2 196 073 2
566
2 561
2
505
271
2
2 260
2
466 2
NO. 202
2 2 128 086
2
422
2
485
608
2 581
255 148
2
215
2
243
2
2 270 2
2
2
2 290 2 142 295 2 2 143 204 2 206
408
2
570
2 2 2 451 427 441
LIGHTPOLE LIGHT POLE
2 194 222 113 116 099
2
2
2
529
2
449
450
2 655
2 455
2
4
550
79
2 532
2
2
2 628
529
2
513
2 460 2 455 447 2 427 2 462
11
67
2.6
1.
1.
2
61
2
2
1.
2.6
2 415
2 657
12
1.
487
50 0
1. 57 5
1.
02
1
2.6
79
2 567
2
2
429
706
2
594
64 6
1. 68 0
1.
2
701
386 2 2332
2
2
2
558
71
62 1
1.
79
0
1. 1.60 1.6012 59 1. 2 61 4 1. 62 1. 2 62 8
2
2
705
653
270
2
1
1.
64
53 1.7
2
1.
480
59 6
672
2 573
2
2
651 2 679
723
1.
1. 72 52 3 2
2
2 634
756
1
6
79
71
1.
1.
1.
63
2
1.
2
65 6 1.
52
98
8
1.
1.
825
0
589
72
9
2
2
2.
467 2 328 2
2
7
9
83
71
1.
1.
354
795
976
0
501
03
2
1.
1.
474
5
2
77
76
651
2 727
2
4
123
2
1.
78
7
9
1.
8
2
1.
347
08 7
2.
2.
4
2.
6
5
8
5
620
81
2
1.
98
07
1.
04
2 761
1. 74 9
1. 64
5
1.
79
9
1.
1.
1
1.
77
6
1.
2
87
691
1.
4
80
65
67
728
4 1.
2
1. 1. 9 70 64 0
63
56
00 821. 1 476 1. 11.1. 1. 57 7981 74 0 1. 3 1. 6 996 1.1.69 73 1. 58 1. 8 1.1.6117 54 8 561. 63 60 6 1 7 83 1. 63 7 1.
1.
9 1.82
2.
75
548
76
78
1.
252
1.
2
3
1.
7
1.
3
1.
1
67
1.
65
5
63 1. 8 69
2
68 1.5 1. 66 66 4 5
58
765 3
1.
1.
9
2
802
2
75
532 2 388 2 446
2
1.
715
1
1.
0
74
3
66
1.
96
1.
1.
1
NG
2
98
66
ROCK EDGI
2. 1. 08 76 6 1. 1. 64 41. 55 4 79 2 1. 3 81 5
6
541. 1. 1. 49 1. 657459 68 1. 55 9 1. 0 73 1. 4 1.1. 3 1.76 85 1. 3 5757 49 92 1 8 76 1. 01. 1. 0 2 1. 50 54 1.69 571 807 90 1. 8 4 9 1. 0 51 89 1. 71. 1.80 52 55 4 4 2. 1.71. 2 02 5254 1. 1 2 4 77 4
1.
1.
1.
1. 1. 55 53 2 5
56 9
1.
1 1 2 903 050
256
1.
2
73
1
67 18
1.
65 3
9
2
4
377
2
475
79
1. 74 1
2 024
1 2 971 130
349
5
70
191
2
453 454
454
22
424
2 460
2 2 451 468
1. 82
81
1
1. 8
9
674
68
2
1. 56 8
1 1 61 622 02 2
2
598 2 431 2 471
627
625
2
1 73
672
8
1. 68
8
4
67
72
1.
1.
1. 1. 76 77 76 1.31. 1.1 1. 8 78 7777 85 7 5 7 1. 0 1. 1.90 89 1. 76 1 21.88 4 776 1
1.
2
2
GATE
85
1.
7
20 638
67
656
1.
2
1.
1.
2
1. 58 9 1.1.1 1. 616058 1 59 5968 6 73 1. 1 51 1 50 64 6 1 1 27 1. 53 65 53 1 1.1.52 11 6 69 1. 1 5552 11812166 1 58 1. 52 2 5276790 1.1 3 64 62 9 66 499 1.159 59 1 78 55 2 2 723
66 1. 4 2 651 64 71 63
58
1.
1.
2
1.1.71 81 60
1.
71
454
5
2
2
9
1
1. 66 0
2
1
2
82
00 9
600
1. 79 4
81
1
1
67 6
1 1 73 58 4 2
11 8593 75 1
1
1.
1.
52 1 6 63
6
0
1
2
3
92
96
1 91 94 7 1 1
0
2
2
2
2
095
529
344
2 2 040 209
2
546
8
1.
85
686
1.
71
7
528
87
2 2
79
2
6
2
0
1.
647
78
2
1
2
1.
2
77 1
82 7
527 2 416 2 426
2 716
1
2
93
546
1 4 2
1
1.
732
4
647
1
2
84
1
2 08
2
84
1
2
2
07
6
71
1.
2
90 2
2
1 10 9
09
2
5
08
2
1
2
1 90
1 95
0
2
8
0
656
72
2
2
748
77
159 73 4
4
1
76
1.
701
1
7
2
1 88 3
1
74
9
2
1 72
2
5
711
FENC FENCE E
291
1
2
95
808
1.
0
1 1 79 64 7 3
2
89
514
7
6
2
E
1 70 118 6765 04 1 1 1 60856 75 4 0
22 639 2 633 6572 2 654 2 643 646
1.
74
8 509 2 417 2 432
7
93
2
86
1
1
1 62 162 1 1 754 74 9 3
MESH MESH
62 09 9 12 9 2 2 09 08 2 8
2
1
434
09
0 1
8
89
84
08
4
9
709
85
2
2
GRASS GRAS S CHAIN CHAIN
1.
628
309
K. K. & & BLUE BLUEST. ST. CH. CH.
1. 1. 75 75 7 1. 4 77 6
519
494
2
CONC CONCRETE RETE
70
76
94
1
1
693
1
5
2
59
3
431
82
6
1.
543
1.
2
2
1 86 91 91
5
G
1 97
1 77 2
1
CH C
20
8
5
G
90 2
H..
402
2
E E
TT..
LT AALT PPHH AASS
2
EE
503
NCC N
2
FFEE
C C ENN E
ESS
TC
H SSH MEE M
1.
C
487
FH
T
IN IN
HAA
CH C
2
SS
AASS
487
GGRR
2
D
418
D
LT AALT PPHH AASS
2
D
2
.
56
D
HH.
. CC
D
1.
E
CC.
D
328
458
E
330
2
D
ONN
2 416 325
E
2
D
CCO
2
E
2
D
480
133
124
2
E
. &&
2
2
D
KK.
T
322
281
E
T
2
2
D
E
090
E
2
D
121
E
E ONN TTO
1 1 811 963
D
2
E
ESS
240
D
UUE
2
E
BBLL
D
216
E
2
D
GRASS GRAS S
E
FENC FENCE E
D
029
E
2
D
MESH MESH
E
T
107
D
T
2
E
T
181
D
T
CHAIN CHAIN
E
T
2
D
T
216
E
T
2
D
T
124
E
T
2
D
T
289
E
T
2
D
AD
G
E
887
G
D
1
G
E
T
1 1 762 910
G
D
T
BENCHM BENCH
UUE
G G
E
T
Y) NL O
016
G
G
D
T
2
G
G
E
T
972
G
G
E
D
E
T
1
G
E
T
T
ARY RO
BBLL
2 2 16 11 5 7
G
517
E
1 72 1 1 4 66 66 2 5
1 1 98 99 9 2
G
2
714
2
2
383 398 2 379
2
2
2
2
E
535
E
1 98
G
2
2
17 8
6
608
7
E
630
634
2
19 2 16
2
6
16
4
18
17
2 1 2
2
9
E
2
2
2
1 78 3
2 05 4
72
E
8
1
91
8
2 593
3
E
508 2 426 2
98
6
0
19
17
2
1 1 83 68 9 8
1
2
693
1 1 61 750 6 1
2
2
651
569 581 2 572
665
651
2 2 650 686
22
427
2
20 19 90
E
2
635
604
2
2
2
2
21 6
E
569
653
598
551
2
2
585
E
2 269
2 2 180 318
2
1
647
542
432
2
2
2
E
87
AASS
E
2 623
645
3
1
21
4
2
19
4
2
598
674
2
544
2
2
SS
DATE 83 3
E
2 7
E
06
1 1 90 74 4 0
E
2 610
G
REVISION
E
2
1
13
E
11 9
E
481 2 411 2 427
2
9
6
97
2
2 224 2 231 2 2 220 348 2 406
E E
2
2
E E
2
509
14
2
9 E
1
2
1
2
26
5
E
2 422
438
2
462
461
2
2 2 308 2 280 444
2
2
444 2
2 27 6
430
03
E
9
2
2 493 459
2 2 307 472
463 2
2
2 512
493
2
10
9
483
37 9
1 92 5
2
28
1 1 95 80 6 9
6
2
2 15 9
2
22
0
2
42
9
2 67 9
1
2 14
98
6
4
2 1 01 86 5 6
2 16 0
2 31
2 15 6
K. K. & & BLU BLUEST EST..
2 2 362 374
2 2 2 2 526374 421 2 2 766 2526 349 527 2 395
2 2 2 375 372 352 390 2 520 2 2 380 5302 2 2390 5242394 402
FEN FENCE CE
GRASS GRA SS
MES MESH H
2
2
2
448 2 371 2 382
CON CONCRE CRETE TE
2
516 2 496
488
471
2
2
1 167 839 7
80
501
470
2
2 2 242 414
CHA CHAIN IN
E
2
2 2 509505 2 2513 2 520 2 505 515
2372 2224 382
2 226 378
4
2
0
1
35
37
2
2
30
7
4
2 23
2
43
7
4
2
70
1
2 23 5
2 2 22 22 6 1
1 98 2 0 18 1
1 1682 83 5
79
GATE 22 23 26 50
CH. CH. 1
05
3
4
1
54
16
2
2
2
1 2 08 93 5 2
2
64
2
2
52
3
2
2
2
4
2
64
32
27
2
2 08 0
2 48 0
2
71
2
7
41 8
2
59 2 8 60
2
1
3
2
65 62
3
6
59
69
2
2
50
02 2
2
2
60
59
BY
A RA GR G
KK..
2
4
SSSS
&&
M
G G G G
G
G G G G
G G G G G G G
G G
G G
NO.
7
1 2 13 99 3 0
TT.. ESS UUE BBLL 09
2 28 9
2
1 80
2
61
2
2
55
97
4
1
12
2
44
3
6
60
62
2
2
7
8
4
1 1 72 877 7
2
9
2
61
9
74
9
2 33 0
2
60
1
2
48
7
49
9
2
42
9
IN AIN A 2
2 01 6
2
46
2
2
48
2
67
5
9
2
46
5
H H EESS
DATE
16
0
C C ENN FFE 2
ISSUE
2
6
2
56
40
2
E E 2 2 19 07 6 3
56
1
BENCHM BENCH 2
2
27
2
1
50
5
2
2
6
0
21
26
2
46
6
1
20
2
7
2
42
2
2
5
8
48
32
2
2
2 2 12 08 8 6
2 19 4 222 11 11 09 2 936
2
18
83 8
1 1 76 91 2 0
1
10
60
8
2
2
48
CHA CHAIN IN
2
2
7
BOUND
58
1
2
25 14 5 8
2
5
2
3
21
24
2
27 20
29 2
02 9
2
57
2
0
6
014 22 20 20
29 2
4
2
40
8
2
2 44 2 2 2 45 42 9 44 1 7 1
514 23
2
2
52
9
45
0
2
65
5
2
45
5
2
FEN FENCE CE
GRASS GRA SS
2
53
2
55
0
2
2
2
52
45
7
7
0
51
46 44
2
42
2 52
2
3
62
9
2
2
8
6
46
21
2.
61 1
2
2
24
2
0
2.
61
41
5
2
65
7
2
2
2 41 32 6 5
2
88
1
7
12
48
2
2.
7 1 1 81 96 1 3
1
60
2
2
56
7
2
2
6
9
59
42
70
2
4
2
70
2 3 27
1
38 2 6 23
2
2
55
8
2
09
2
0
2
70
5
ARY RO
MES MESH H
LIGHTPOLE LIGHT POLE TT AALL PPHH AASS
G
A
E
T
X. RO PP (A
FF G
M
TC
G
E
T
H SSH MEE M
VRR
FH
G
CCV
R GR G
EE
G
E
D
T
T. T. G
O
E
D
T
ESS G
E
D
T
UUE
BBLL
IN AIN A G
E
D
T
&&
KK.. && G
E
R
E
D
T
SS G
G
E
T
CHH C G
G
TTEE RREE NNCC CCOO G
TTEE GGAA
NCC N
G
BENCH BENCH FFEE
G
CHH C
C
G
H SSH MEE M
G
M T
IN IN
G
HAA
G
TTEE RREE NNCC CCOO
CH C
G
65
3
0
2
67
2
45
57
2
2
3
8
2
48
2
65
2
1
0
67
3
2
72
9
2
2
2
63
1
4
13
12
2
4
57
1
6
2
28
75
2
3
2
82
5
AD
.
G
E
HH.
G
R ST
. CC
SS
G
AASS
G
IE
SEAT SEAT
CC.
G
ONN
G
GGRR
G
LIGHTPOLE LIGHT POLE
TT AALL PPHH AASS
G
GRASS GRASS
CCO
G
C RA
. &&
G
S
KK.
G
SAS
SEAT SEAT
2
5
28 35
79
732
2
46 2
9
2
58
E
G
LIGHTPOLE LIGHT POLE
4
E ONN TTO
G
1
2
50
1
97 1 2 90 05 3 0
2
65
ESS
G
1
UUE
G
ASR G
6
2
72
7
BBLL
G
G
Y
E
T
838
2
47
4
2
76
1
2
12
3
2
2
8
2
54
25
2
62
0
2
34
7
2
69
1
2
72
8
2
80
2
5
6
2
76
53 22 382 844
2
2
71
5
2
25
6
2
LIGHTPOLE LIGHT POLE
45
D
G
GRASS GRASS
4
2
2
65
1
2
2
3
65
7
72
5
37
47
2
6
2
A
G
BENCH BENCH
2
02
4
2
9
63
34
8
1 2 97 131 0
2
19
1
22
2
4
2
45
2
4
45 45 34
42
4
2
62
2
0
67
46
5
2
2 62 7 592 843 2 147
1
2
2 2 45 46 1 8
GATE
67
2
O
G
LIGHT POLE LIGHT POLE
R
G
G
E
T
AASS
E E
LIGHTPOLE LIGHT POLE
2
60
0
Y
G
RESERVE
2
54
3
2
43
1
2
69
3
2
52
8
2
2
54
2
09
52
4
2
34
6
2
2 2 04 20 0 9
9
5
2
4
51
49
2
68
6
2
64
7
2
9
CON CONCRE CRETE TE
LA
G
GR
522 7412 642
U
G
2
6
2
71
6
2
30
62
9
8
2
54
6
2
2
73
2
2
64
9
7
70
2
CHA CHAIN IN
43
4
65
2
8
2
6
74
2
70
1
MES MESH H
GRASS GRA SS
K. K. & & BLU BLUEST EST..
A
G
SEAT SEAT
SS
G
AASS
G
GGRR
G
IN AIN A
C
GRASS GRASS TT AALL PPHH AASS
G
CHH C
A
GRASS GRASS
H SSH MEE T C M E E
.
C C ENN FFE
HH.
G
G
E
T
EE EETT CCRR OONN KK..
SEAT SEAT
LIGHTPOLE LIGHT POLE
. CC
GRAVEL GRAVEL
29
2
71 1
2
50 2
80
8
9412 743
2
2
FEN FENCE CE
1
CH. CH.
2
M
M
CC.
ONN
CCO
G
. &&
G
EE
G
G
LA
E
T
CC R GR G
C LAY T O N
KK.
G
G
E
T
1
E
QUIET DOG AREA
NCC N
G
G
E
T
SEAT SEAT
FFEE
G
E ONN TTO
CONFIDENTDOG AREA
ESS
G
G
E
T
GRASS GRASS
RESERVE
UUE
G
M
22 2 6363 6532 92 65 27 64 4 64 3 6
2
51
BBLL
G
G
E
SS
AASS
T
LIGHTPOLE LIGHT POLE
M SEAT SEAT
H SSH MEE M
G
E
GGRR
.
T
SUB-CONSULTANTS G
E
U
E
H
T
GRASS GRASS SEAT SEAT G
E
Y) NL O
LT AALT PPHH AASS
TOP PIT RL. 1.552 PIT INVERT 0.942
C C ENN FFE G
E
A
E
C
T
LIGHTPOLE LIGHT POLE
IN AIN A H SSH MEE M G
C
E
T.
O TTO CHH C G
E
ES
ESS E AT
E
U
G
T
UE U
A
E
X. O PR HP.. CCH . (A
CC.
BL
IN
T
BENCH BENCH
BBLL NEE N DF
LL G
E
ONN
G
T
M
M
E
CCO
SEAT SEAT
G
E
&
T
M E
T
BENCH BENCH
. &&
T
RESERVE
NEE KK.
T
ED LIGHTPOLE LIGHT POLE
EE AAVV GGRR G
E
CK
T
ON TTO GRASS GRASS G
E
T
GRAVEL GRAVEL
PICNIC TABLE
LIGHTPOLE LIGHT POLE IN IN
G
G
D
G
E
K.
RO
T
LIGHTPOLE LIGHT POLE
E
T
ESS E
T
CLIENT UE U E ONN TTO
T
BBLL E
T
Y) NL O
CONFIDENTDOG AREA
MULCH ESS
GRASS GRASS UUE
T
MULCH MULCH D
E
T
C LAY T O N D
EE
T
LIGHTPOLE LIGHT POLE D
BBLL
LIGHTPOLE LIGHT POLE D
G
D
G
D
G
D
G
HAA
G
LIGHT POLE
CH C
G
E AT
M
GRASS GRASS
4
2
9
71
2
3
38
39 8 2 37
2
4
2
51
7
2
2
2
53
5
2
0
4
63
63
TT AALL PPHH AASS
G
EE QUU AAQ
CLAYTON
SS
G
NCC N
T
NEE D
G
ET
T
X. RO PP (A
RESERVE D
G
R
T
ON O SSTT UEE U D
FFEE
T
808
60
8 2
2
2
5
1
2
65
2
2 2 65 68 0 6
56 58 2 1957
66
1
2
65
69
2
59
3
502 842 2 6 42
3 2
E TTE GGAA
AASS
G
D
C
M SEAT SEAT D
N
T
NOTE D
O C EESSHH M M
T
CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU GRASS GRASS D
IN IN
T
BBLL D
HAA
T
CLAYTON D
CH C
T
W: WWW.URBANINITIATIVES.COM.AU 1 1 727 877
L
GGRR
G
TE GA
D
G
D
LT AALT PPHH AASS
T
Existing Opportunities Analysis
M D
SS
T
GROUND FLOOR 143 FRANKLIN STREET, MELBOURNE VIC 3000 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU D
TOP PIT RL. 1.650 PIT BLOCKED
AASS
D
TC
D
GGRR
D
EE QUU AAQ
T
TAS OFFICE D
G
L
PPLL
D
G
M
7
2
2
5
4
63
60
2
2
8
2
65
59
56
3
9
2
2
2
1
2
26
7
9
64
2
2
54
2
2 2 18 31 0 8
43
5
55
58
2
4
2
59
4
67
2
54
2
2
62
5
2
64
8
3
M
TC
PPLL
NNTT
E TTE GGAA LT AALT PPHH AASS
EE M M
080
SEAT SEAT
2
61
0
2
2
22
4
2
23 1 2 2 22 34 0 2 8 40 6
48 2 1 41 21 42
7
TT AALL PPHH AASS
U U
D
G
2
2 222 637
2
50
9
2 2 50 50 2 9 5 2513 2 522 50 051 5 5
23 2 7 22238 4 2 8
2
47
2
2 2 24 412 4
50
0
1
2
42
2
47
1
2
43
48 2 8 2 51 49 6 6
2
2
8
2
2
1
46
46
2
2 2 30 2 28 8 440 4
2
2
44
442
4
0 138
43 8372
2
2
2
VR
TC
N N
D
M
TC
O O
SEAT SEAT
NNTT
M M
GRASS GRASS
EE M M
VR
TC
Skillsets FH
Responses The design makes the park easier to use, safer, and more enjoyable for everyone. U U
Approach I created a sensory buffer to control the dogs’ behaviour and boost their engagement, using plants such as rosemary and native fuchsia to provide a rich sensory experience through scent and texture. I also used sensory landscape mounds as a ‘Space Breaker’ to draw the dogs’ attention away from chasing; this feature consists of a rock scramble 600mm high with rocks and plants that promote climbing and interaction N N
Challenge I designed a garden to help dogs manage their behaviour, as they had been digging and collecting items along the fence line, creating safety risks near Macaulay Road. 2
2 49 45 3 9
2 2 30 47 7 2
46
3
T
O O
VR
TC
MELB OFFICE TC
Photoshop • Community Engagement Concept TC
THIS WORK IS NOT TO BE COPIED ORLIGHT POLE REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR. 2
Contexts The project renewed Melbourne’s oldest off-leash dog park. The main aim is to improve safety, increase accessibility, and create a friendly atmosphere for all park users. M M
Rhino 3D & Nano Banana • Initial Concept drawings (including plan and design iterations) T
FH
BOUND
2
51
3
2
49
2 2
48
3
2
2 2 362 37 4
2 2 2 37 3537 5 39 2 52 2 22 0 0 2 53380 2 022392 52 3940 4 04 2 2 2 2 2 5237 6 42 2 2 76 41 252 34 5262 6 9 7 39 5
Project Type : Park
TC
Vectorworks • Drafting technical drawing
TC
1
CLAYTON RESERVE DOG PARK UPGRADE , NORTH MELBOURNE, VICTORIA VR
Main Interest Areas
GRASS GRASS
M
Buffer Zone Iteration 1 : Physical barrier
Buffer Zone Iteration 2 : Planting buffer
ET Main Interest Areas
Add 3m wide 1.2m high black chain mesh gate for vechicle access
Pedestrians & Dogs Circulation
Buffer Zone Iteration 3 : Sensory landscape buffer 25036
Vechicle access
CH C H..
Existing Picnic Table
BY
DRAWN BY
SZ
CHECKED BY
TH
PLOT DATE
18/6/2026
CAD FILE NAME 260617_25036 Clayton Dog Park_Plan_ACTIVE v2026.vwx
NORTH
1:350 1:
SCALE
Minor Interest Areas
Rock Mound and Nature Play Zone
Sand Pit Play Zone
Dog Run Zone Existing Grass
Existing Granite Gravel (top up)
Proposed Granite Gravel Possible New 1.2m high fence
New 3x3m New Airlock Gate
Include tapered corners along fence
Add 3m wide 1.2m high black chain mesh gate for vechicle access Pedestrians & Dogs Circulation
M M
H..
CH C
Vechicle access
Existing Picnic Table
Existing seats to be relocated and refurbished Existing Light Pole
Minor Interest Areas
G
Rock Mound and Nature Play Zone
Sand Pit Play Zone
G G G G
Dog Run Zone
G
G G G G G G
Existing Grass
G G
Existing Granite Gravel (top up)
Proposed Granite Gravel Possible New 1.2m high fence
New 3x3m New Airlock Gate
Include tapered corners along fence
PROJECT
Clayton Dog Park
@A1 ADDRESS @A3 201-241 Macaulay Rd, North Melbourne VIC 3051
DRAWING NO.
SK02
DRAWING NAME
REV #
DRAFT
SITE OPPORTUNITIES PLAN
1
CLAYTON RESERVE DOG PARK
REFER TO SHELTER MANUFACTURER DETAILS FOR SHELTER'S COLUMN, BEAM AND ROOF DETAILS.
FENCED OFF-LEASH DOG AREA
4020 SHELTER
CONFIDENT DOG AREA
SHELTER
2420
BE
EXISTING GRASS AREA
RUBBISH RUBBISH BIN BIN
1 1
7 7
1000
1100
3920
1000
MAKE GOOD GRASS
GARDEN BED
CONCRETE SLAB
MAKE GOOD GRASS
LG1.1 Quite Dog Area and Confident dog area Shelter Section 2
NEW NEW 1.2M 1.2M HIGH HIGH FENCE FENCE TO TO PREVENT DOGS PREVENT DOGS JUMPING JUMPING OVER OVER
EXISTING GRASS AREA
20
PL1.2
00
BE
PL1.3 RB1.1
BB OO UU NN DD AA RRYY RR OO AA DD
2000
RB1.1
300 MIN.
3000
200
6 6
PV2.1
NC
0
SZ
CHECKED BY
TH
PLOT DATE
17/6/2026
NORTH
DRAWING NO.
PROJECT
LA400
25036 Clayton Dog Park
SCALE
2000
DRAWN BY
260202_25036 Clayton Dog Park_Plan_ACTIVE v2024 v2026.vwx
REV #
RUBBISH RUBBISH BIN BIN
SHELTER SECTION
NO.
DATE
ISSUE
100 400-500
300 MIN.
Final Design Drawing for DEECA Grant Milestone
CHECKED BY
TH
PLOT DATE
17/6/2026
CAD FILE NAME
260202_25036 Clayton Dog Park_Plan_ACTIVE v2024 v2026.vwx
200
NORTH
SCALE
1:100
DRAWING NO.
PROJECT
LA410
25036 Clayton Dog Park @A1 ADDRESS 201-241 Macaulay Rd, North Melbourne VIC 3051
300MM MIN. SAND OVER 1: GEOTEXTILE FABRIC@A3
DRAWING NAME
CONFIDENT CONFIDENT DOG AREA AREA DOG 5 5
3 3
REV #
MAINTENANCE MAINTENANCE ACCESS ACCESS GATE GATE
11
ENTRY ENTRY GATES GATES WITH WITH SIGNAGE SIGNAGE
QUIET QUIET DOG DOG AREA AREA
6 6
7 7
8 8
7 7
5 5
11
MOUND 1 - CONFIDENT DOG AREA
SANDPIT WITH DIFFERENT SIZE BOULDER EDGING DRINKING RUBBISH BIN DRINKING RUBBISH BIN FOUNTAIN FOUNTAIN
300 MIN.
PLACEPLACE ROCKROCK ON ON AL CONSOLIDATED CONSOLIDATED GROUND GROUND (TO (TO BY APPROVAL) APPROVAL)
11/12/2025
SZ
6 6
2 2
4 4
DRAWING NAME
DEECA GRANT MILESTONE - DEC 2025 DRAWN BY
-
9 9
DEECA GRANT MILESTONE - DEC 2025
6 6
3 3
4 4
1400
H
20
00
7 7
AGRICULTURAL AGRICULTURAL DRAINDRAIN CENTRALLY CENTRALLY LOCATED LOCATED CONNECTED CONNECTED TO CLOSEST TO CLOSEST DRAINAGE DRAINAGE PIT PIT
Typical Sand Pit Detail
Typical Sand Pit Detail
Scale: 1:25
MINIMUM OF 300MM TOPSOIL AND CAPPING IS REQUIRED FOR ALL EXCAVATED FOOTING MATERIALS AND FILLED MOUND AREAS AS PER BEVERIDGE WILLIAMS CONTAMINATION ASSESSMENT. ALL SOILS EXCAVATED ON SITE MUST BE TESTED AND WRAPPED IN GEOTEXTILE PRIOR TO TOPSOIL COVER. PLEASE REFER TO BEVERIDGE WILLIAMS CONTAMINATION ASSESSMENT FOR FURTHER INFORMATION.
ENTRY ENTRY GATES GATES WITH WITH SIGNAGE SIGNAGE
9 9
GRACIE GRACIE STREET STREET
NORTH NORTH
Existing Existing Tree Tree
Grass Grass
Shelter Shelter
Bike Bike rack rack
Rock Rock
Agility Agility -- Bridge Bridge
Proposed Proposed Tree Tree
Granite Granite Gravel Gravel
Seating Seating
Mounds Mounds
Log Log
Agility Agility -- Weaver Weaver Pole Pole
Garden Garden Beds Beds
Concrete/asphalt Concrete/asphalt path path
Picnic Picnic table table
Sand Sand Pit Pit
Lights Lights
Agility Agility -- Tunnel Tunnel
MULCH INSTEAD OF GRASS AS A COST SAVING FOR NATURE PLAY ELEMENTS
SANDPIT WITH DIFFERENT SIZE BOULDER EDGING
DEECA GRANT MILESTONE - DEC 2025 MELB OFFICE
CLIENT
SUB-CONSULTANTS
8 8
RUBBISH RUBBISH BIN BIN
LEGEND LEGEND GEOTEXTILE FABRIC LAYER AS PER DASHED BLUE LINE. GEOTEXTILE FABRIC TO WRAPPED TO UNDER BOTTOM OF ROCK AND LOG.
5 5
PV3.1
0
1:100 @A1 ADDRESS Typical Mound Detail 201-241 Macaulay Rd, North Melbourne CAD FILE 11/12/2025 Final Design Drawing for DEECA Grant Milestone AL Logs and boulders build up mounds for sensory 1: & nature @A3 play Scale: 1:50 NAME VIC 3051 NO. DATE ISSUE BY
1
3 3
PL1.1
TIMBER LOG 450-550MM DIA., ENSURE CAN'T BE 2000 ROCKED
200
1
AD ROAD LAYYRO AULA ACAU MMAC
LOGS AND BOULDERS BUILD UP MOUNDS FOR SENSORY & NATURE PLAY
MINIMUM OF 300MM TOPSOIL AND CAPPING IS REQUIRED FOR ALL FILLED MOUND AREAS AS PER BEVERIDGE WILLIAMS CONTAMINATION ASSESSMENT.
4 4
LG1.1
Scale: 1:25
PV3.1
S S 5 5 a a rr g g
3 3
ENTRY ENTRY GATES GATES WITH SIGNAGE SIGNAGE WITH
PL1.3
NC H
CONCRETE PAD FOR SHELTER AS PER HATCHING
2 2
DRINKING DRINKING FOUNTAIN FOUNTAIN
1200
A
D D 11 p p e e ss
SHELTER ROOF OVERHANG 100MM OVER GARDEN BED TO HELP MAXIMUM STORMWATER RUNOFF INTO GARDEN BED
SHELTER ROOF LINE AS PER DOTTED LINE
QUIET DOG AREA
11
DRAWN BY
SZ
NORTH
PROJECT
DRAWING NO.
REV #
2
D D L L a a p p p p
C C O O u u tt m m rr e e
D D O O d d u u D D d d a a
T T T T d d tt m m ss u u tt
L L B B tt e e rr tt
A A E E o o e e tt ss
D D P P ii
SUNSHINE SECONDARY COLLEGE, SUNSHINE, VICTORIA KEY
Existing trees retained (with tree TPZ)
Proposed Tree
EXISTING BUILDING
Proposed Native Shurbs and G roundcovers
Project Type : Education
Proposed G rass
Proposed G ravel Pavem ent (cem ent stabilised)
Contexts This project collaborates with architects in order to design an inviting outdoor area for students and improve the campus environment.
Proposed Concrete Pavem ent Proposed Exposed Aggregate Concrete Pavem ent Proposed Rock Lined Swale
Proposed Large Com m unal Tables & Chairs Proposed Bench Seat Proposed Stone Seats
Challenge The goal was to strengthen students’ connection to the Indigenous culture of the area as part of their everyday experience on campus.
NOTES
1 2 3
Approach To strengthen the connection to Wurundjeri culture, I helped design a yarning circle on the north side of the art building using large basalt rocks from the site for seating. Around the circle, I planted native species like kangaroo grass and chocolate lily in groupings that reflect the seven Wurundjeri seasons. Different sections change throughout the year. The space is positioned for morning sun and easy access, supporting gatherings, storytelling, and cultural learning. Responses The result is a school atmosphere that is more inclusive and welcoming while also promoting cultural learning and interaction.
4
5 6
PEDESTRIAN ACCESS School entry point and arrival area for pedestrians from Northum berland Rd. M O UNDED PLANTING Raised garden beds with colourful native plants along eastern edge of building to create variation in the ground plane. YARNING CIRCLE Cultural gathering space / yarning circle with rock seating - subject to further discussion with W urundjeri W oi W urrung Cultural Heritage Aboriginal Corporation. CO VERED O UTDO O R LEARNING AREA New covered outdoor learning area with seating and BBQ s, and clim bers growing on pergola structure. CO URTYARD SPACE A welcom ing gathering space with seating and planting to create a sense of enclosure and provide shade. SCREEN TREES New trees planted to screen existing building and provide shade and habitat.
7
EPHEM ERAL PO ND Shallow ephem eral pond fed by rock lined swale with overflow pit in case of flood events.
8
ACCESSIBLE DECKED BRIDG E New tim ber bridge at grade over swale to provide DDA access.
Initial Concept Sketch: Proposed a yarning circle as a welcoming gathering space at the site entrance.
L-C01 Landscape Sketch Design Plan
Yarning Circle Moodboard
24041 P R O J E C T N O . SUNSHINE COLLEGE NORTH CAMPUS P R O J E C T 1:200@ A3 S C A L E IS S U E D F O R
29/11/2024 D A T E IS S U E D
Skillsets Vectorworks • Producing technical drawing including setout, planting and grading plans Procreate and Photoshop • Producing concept diagrams and illustrations Canva • Creating visual contents for presentations
Kangaroo Apple
Poa labillardierei
Kangaroo grass, Wallaby grass, Spear grass, and Tussock grasses
Mentha australis Myrnong (Yam Daisy) & Dianella (Flax Lily)
Rock correa, Grevillea rosmarinifolia Orchids
Yarning Circle planting diagram
Concept Design: Refined the yarning circle into an integrated arrival space that strengthens wayfinding, gathering, and cultural connection. 3
NOTES A
B
C
PEDESTRIAN ACCESS F G J K School entry pointH and arrival area for pedestrians from Northumberland Rd.
1E
D
L
M
9
9
2 SUNSHINE SECONDARY COLLEGE, SUNSHINE, VIC R 2000
SR
SR
SR
SR
1
SR
2000
R 2000 SR
SR
SR
SR
SR
SR
SR
R 800
2
R 7420
N: 5817043
NEW BUILDING
R 940
E: 309859 N: 5817066
E: 309853
#01 N: 5817037
R 1095
1500
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
DP-** X 2 NO
SR
SF
SR
SF
SF
SF
SF
SF
3 x Cor gla PROPOSED LOCATION OF UNDERGROUND RAIN TANKS
31 x Atr sem
NEW COVERED OUTDOOR LEARNING AREA
6
4 x Dis cra 4 x Cal cit 4 x Ery ovi
SF
SF
CLIENT
SUB-CONSULTANTS
BM
DRAWN BY
Planting Plan TAS OFFICE
CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU W: WWW.URBANINITIATIVES.COM.AU
NOTE
THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.
NO.
DATE
REVISION
BY
SR
T1
04/9/2025
TENDER ISSUE
BM
NO.
DATE
ISSUE
BY
NORTH
CHECKED BY
BM
PLOT DATE
24/6/2026
CAD FILE NAME
250721_Sunshine Secondary College_Tender Plan_v2024 ACTIVE v2025.vwx
24041 SUNSHINE COLLEGE NORTH CAMPUS
1:100 @ A1
8 SF
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SF SR SF
5
NEW BUILDING
NEW BUILDING 1
NEW BUILDING
EXISTING BUILDING
NEW COVERED OUTDOOR LEARNING AREA
Kangaroo Apple
7
4
#03 SR
SF
SR
SF
Planting Plan
SF
EXISTING BUILDING
1000
SF
SR
SF
SR
SR
SR
SR
SR
SF SF
SF
TAP
SF
SF
SF
SF
SF
Awards: Awards here
TAP
CLIENT
SUB-CONSULTANTS
TAS OFFICE
CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU W: WWW.URBANINITIATIVES.COM.AU
DRAWN BY
BM
CHECKED BY
BM
PLOT DATE
24/6/2026
CAD FILE NAME
250721_Sunshine Secondary College_Tender Plan_v2024 ACTIVE v2025.vwx
NOTE
THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.
NO.
DATE
REVISION
BY
T1
04/9/2025
TENDER ISSUE
BM
NO.
DATE
ISSUE
BY
NORTH
SCALE
1:100 @ A1
MELB OFFICE
PROJECT
Yarning Circle
6
Screen Trees
A
4
DRAWING NO.
LD4.3
24041 SUITECOLLEGE 3, 25-31NORTH ARGYLE STREET, SUNSHINE FiTZROY VIC 3065 AUSTRALIA CAMPUS
ADDRESST: (03) 9329 6844 Irrigation Plan NORTHUMBERLAND RD, SUNSHINE E: OFFICE@URBANINITIATIVES.COM.AU DRAWING NAME
TAS OFFICE
7
Buffer Planting
Covered Outdoor Learning Area Covered Outdoor Learning Courtyard Space Area NO.
DATE
EXISTING SERVICES REMOVED
8
REVISION
SZ
04/9/2025
NO.
DATE
ISSUE
BM BY
8
Courtyard Space
LD2.1
24041 SUNSHINE COLLEGE NORTH CAMPUS NEW BUILDING
BM
PLOT DATE
21/4/2026
CAD FILE NAME
PROPOSED LOCATION OF 250721_Sunshine Secondary UNDERGROUND RAIN College_Tender Plan_v2024-Project TANKS Sheets.vwx
SCALE
REV #
DRAWING NO.
PROJECT
SR
SR
SR
SR
SR
NEW BUILDING
A
NEW COVERED OUTDOOR LEARNING AREA
DRAWING NAME
ADDRESS
NORTHUMBERLAND RD, SUNSHINE
DRAWN BY
5
NEW COVERED CHECKED BY OUTDOOR LEARNING AREA
NEW BUILDING
Buffer Planting Opportunity For Aboriginal
SR
8
SF
5 NORTH
CHECKED BY
It creates an inclusive and welcoming school environment that also support 6 cultural and connection. Screenlearning Trees 7
8
4 Plan 01 Materials & Surfaces
8
SUB-CONSULTANTS
5
SF
SF
SF
BM SF
1:100 @ A1
TENDER ISSUE
Opportunity For Aboriginal 6 Artwork / Mural BY
NOTE
THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF
T1
SR
SR
SF
A
25/6/2025
EXISTING SERVICES REMOVED
PROPOSED LOCATION OF UNDERGROUND RAIN TANKS SZ
4
SF
W: WWW.URBANINITIATIVES.COM.AU
5
SF
SF
CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU
REV #
CLIENT
25/6/2025
8 SF
SF
3
Indicative location of proposed new taps
FOR TENDER
Irrigation Plan
Mounded Planting
SF
SF
W: WWW.URBANINITIATIVES.COM.AU Garden bed irrigated with dripline NOTE THIS WORK IS NOT TO BE COPIED OR Grass irrigated with spray REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF Indicative location of THE AUTHOR. irrigation conduits
IRRIGATED GRASS
2
SF
DRAWN BY
SF
Orchids SR
FOR TENDER
SUB-CONSULTANTS
CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138
E: ANDREW@URBANINITIATIVES.COM.AU KEY - IRRIGATION
Courtyard Space
SR
SR
5
SF
SF SF
Budget: $xxK or million
TAS OFFICE
5
Pedestrian Access
SF
SF
IRRIGATED GRASS
CLIENT
6
SF
MELB OFFICE SUITE 3, 25-31 ARGYLE STREET, FiTZROY VIC 3065 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU
TAP
MELB OFFICE
1
#03
Client: Client
SUITE 3, 25-31 ARGYLE STREET, FiTZROY VIC 3065 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU
5
#01
Role: Lead Consultant NEW COVERED OUTDOOR LEARNING AREA
PROPOSED LOCATION OF UNDERGROUND RAIN TANKS
Covered NEW Outdoor Learning ENTRY Area Covered Outdoor Learning SF Courtyard Space Area
SR
SF
EXISTING TREES RETAINED
SR
SF
SR
3
SF
4 NEW BUILDING
NEW BUILDING
SR
SF
#02
3
SR
SR
SF
SF
SF
Yarning Circle
SF
SF
SF
3
SF
SF SF
Mounded Planting
SF
SF
SR
#03
SF
SF
SF
SF
2
SF
SF
SF
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SF
SR
SF
SR
SR
SF
SR
8 SF
SF
SFSF
SR
SF
SR
SF
SF
SR
SR
SF
SF
SF
SR
SF
SR
SR
Rock correa, Grevillea rosmarinifolia
SR
SR
5
SR
SF SF
SR
SR
SR
TAP
SF
Pedestrian Access
SR
SR
SR
SR
SR SR
TAP
PROPOSED DRINKING FOUNTAIN REFER TO HYDRAULIC ENGINEER
1
SR
SR
SR SR
SR
SR
SR
SF
SR
SR
SR
SR
SR SF
SF
SR
SR
SF
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SF
SR
SR
SF
SR
SR
SF
SR
SR
SR
SR
SR
SR
SR
SR
SF SR
SR
Mentha australis
Myrnong (Yam Daisy) & Dianella (Flax 3 Lily) SR SR SR SF
7 SR
SR
SF
SF
PROPOSED DRINKING FOUNTAIN REFER TO HYDRAULIC ENGINEER
NEW PROPOSED LOCATION FOR ENTRY PORTABLE BBQ
SR
SF
PROPOSED LOCATION FOR PORTABLE BBQ
SR
SR
SR
Poa labillardierei
SR
Kangaroo SR grass, Wallaby grass, Spear grass, and Tussock grasses
SR
SR
SF
SR
SR
3
SR
SR
SR
SR
SR
4
DRAWING NAME
ADDRESS
NORTHUMBERLAND RD, SUNSHINE
1 #01
#01
SR
SF
SR
SR
SR
SR
2
UNDERGROUND RAIN TANKS
1000
SR
SR
1
SF
PROPOSED LOCATION OF UNDERGROUND RAIN TANKS PROPOSED LOCATION OF
Boreium rate nus, od quatem quatecu ptatatempere nusciae. Epudanda dolutas diciis sitiam, solupta ssinven iscitis audae esci aut quis et aboreperum fugitist arum
EXISTING BUILDING
SR
SF
NEW BUILDING
REV #
DRAWING NO.
PROJECT
SCALE
SR
SR
8
SR
NEW COVERED OUTDOOR LEARNING AREA
3 x Ind aus
2 x Hym den
SR
SR
8 5
1 x Cor gla
180 x Lom tan 1 x Cor gla
SR
SR
SF
1 x Aca bai
3 x Ind aus
SR
SR
8
FOR TENDER
MELB OFFICE
SF
16 x Ere gla 16 x Cal cit
100 x Kun amb pro 100 x Lon lon
SR
SF
SF
SR
#02
#03
2 x Ind aus
3 x All ver
SUITE 3, 25-31 ARGYLE STREET, FiTZROY VIC 3065 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU
SF
SF
4 x Dis cra 4 x Cal cit 4 x Ery ovi
86 x Lom tan
SR
1 x Aca bai
2 x Aph res
DP-** X 2 NO
DP-** x 2 NO
6
GARDEN BED TO BE SUPPLEMENTED WITH NEW PLANTS
#01
6 x Dia rev 6 x Sca aem
3 x Aph res
3 x Hym den
SR
SR
SF
EXISTING TREES AND GARDEN BED RETAINED.
UNDERGROUND SERVICES CULVERT
42 x Ken pro 42 x Men aus
SR
SR
3
SR
#02
4 x Dis cra 4 x Cal cit 4 x Ery ovi
4 x Wes fru 'flat n fruity' 4 x Dis cra
4 x Pan jas
3 x Gre ros
SR
1 x Aca bai
2 x Aph res
4 x Pan jas
1 x Aca pyc
SR
30 x Dia rev 30 x Con eru
NEW BUILDING
2 x Aph res
4 x Pan jas
4 x Pan jas
SR
18 x Ere gla 18 x Cal cit
1 x Gre ros
2 x Dia rev 2 x Sca aem
4 x Pan jas
SR
41 x Wes fru 'flat n fruity' 41 x Dis cra
8 x Dia rev 8 x Sca aem
NEW BUILDING
SR
SF
SF
DP-** x 2 NO
SF
SF
2 x Gre ros
SF
SF
DP-** X 2 NO
SF
SR
2 x Gre ros 'Nana' 2 x Cor gla
5 x Diu fra 5 x Pim hum
5
SF
2 x Gre ros
SR
SR
SR
SF
SF
8SF
SF
SFSF
SF
3
3 x Gre ros
SR
SF
SF
3 x Kun amb pro
SR
1 x Cor fic 'W'
16 x Atr sem
6 x Men aus
SF
SF
26 x Dia rev 26 x Dia SS
SR
SF
24 x Dia rev 24 x Dia SS
SR
SR
SR
SF
29 x Dia rev 29 x Con eru
SR
SF
3 x All ver 79 x Aus mol 79 x Poa lab 79 x Wes fru 'flat n fruity'
SF
SF
SF
SF
SF
SR
SF
SF
SR
SF
SF
1 x Euc LS
14 x Dia rev 14 x Con eru
EX 43.31
EX 43.31
SF
SR
40 x Dia rev 40 x Dia SS
SF
SR
SR
SR
SF
SF
ACCESSIBLE BUILDING ENTRY RETAINED
NEW ENTRY
Ebit lam, ex est unte niatur, quia corum 1 Pedestrian Access dolorem lantium aut et omnia dolorem erovide Mounded Planting lestem facessint quia 2alibus cor seritibus 3 Yarning nest Circle lacearum adipid ut velendam eaquiam, quunt aut lam, quid que dipid eaquia si dit 4 Covered Outdoor Learning Area es sin rature eosti aliquam utemporeheni Covered Outdoor Learningad Courtyard Space Area quaes ant id escipsa 5solluptatem fugit, nos 5 Courtyard Space elenimus nonsendae nosanihic te plabo. Nem 6 eos quidel ipsandae odi optatest, Screen Trees aditatemped maxim sed et rest, que poreped molorro ma Buffer Planting 7 poratatio qui dent laborem perferibus elitatem Opportunity For Aboriginal 8 intibus, optatem velibus rempore pratem Artwork / Mural qui alis dolorundae quae rerumquae paris LD4.1 maximus essus. SF
5
66 x Atr sem 66 x Ere gla
Wurrung Cultural Heritage Aboriginal Corporation.
40 x Dia rev 40 x Dia SS 1 x Sol avi 6 x Car ros 3 x Poa lab 3 x Wah com 2 x The tri 2 x Aua ten 2 x Aus sca 2 x Poa lab SR 6 x Dia rev
31 x Atr sem 31 x Ere gla
SF SF
8
SR
SR
SR
SR
SR
SR
SR
SF
SF
SF
SF
59 x Dia rev 59 x Con eru
SR
SR
SR
SR
SR
SR
SR
SR
7 SR
SF
1 x Euc LS
1 x Lep lan
SR
SF
43 x Lon lon
SR
SR
SR
NEW ENTRY
41 x Lom tan
SR
SR
45 x Lom tan
SR
SR
33 x Lom tan 15 x Atr sem 15 x Ere gla
SR
SR
17 x Lom tan 11 x Atr sem 11 x Ere gla
Setout Plan
SF
ADDRESS
NORTHUMBERLAND RD, SUNSHINE
SF
1:100 @ A1
SR
SF
11 x Atr sem 11 x Ere gla
DRAWING NAME
SCALE
SF
25 x Lom tan
10 x Atr sem 10 x Ere gla
24/6/2026
250721_Sunshine Secondary College_Tender Plan_v2024 ACTIVE v2025.vwx
SF
34 x Lom tan
15 x Atr sem 15 x Ere gla
PLOT DATE
CAD FILE NAME
SF
BY
SF
BM
ISSUE
SF
TENDER ISSUE
DATE
SF
EXISTING BUILDING
04/9/2025
NO.
54 x Lom tan
14 x Ban GC
86 x Lom tan
T1
SR
SF
BY
SR
SF
REVISION
SR
SR
SF
DATE
SR
SF
NO.
SR
SR
THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.
SR
SR
SR
SF
LD3.1
24041 SUNSHINE COLLEGE NORTH
BM
CHECKED BY
W: WWW.URBANINITIATIVES.COM.AU
NOTE
SR S F
SR
F SSR
REV #
Ur, conem quo odisbetween eumthesit, 7 buffer roadcon and theeatquosam new building surrounds. quia ducia volum untempo riscium volorro OPPORTUNITY FOR ABORIGINAL ARTWORK / tessitatiae pernam, 8 MURALalit debitat inullorepre Possible location for artwork such as sculpture, cusam fugitat ea volupta tusdame pro dolupta mural, sandblasted concrete. to further discussion with Wurundjeri Woi non nonse maioSubject dolorecatat.
CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU
SR
SR SR
New garden bed with trees /CAMPUS shrubs to create a
TAS OFFICE
59 x Ken pro 59 x Men aus
SF SF
SR
DRAWING NO.
PROJECT
SR
SR
NORTH
SR
SR
BM
DRAWN BY
SR
SF
SF
SUB-CONSULTANTS
SR
SR
7
M
L
K
J
H
G
SR
SR
SR
R 2490
F
E
D
C
SR
SR
R 815
E: 309856 N: 5817054
SF
CLIENT
E: 309845 N: 5817054
EXISTING BUILDING
FOR TENDER
Setout Plan MELB OFFICE
SUITE 3, 25-31 ARGYLE STREET, FiTZROY VIC 3065 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU
R 1560
R 3200
B
A
R 3460
SR
SR
6
SR
SR
7
R 1415
R 2910
R 5680
SF
R 1500
R 2395
E: 309863 N: 5817057
R 2640
SR
SF
E: 309859 N: 5817062
E: 309859 N: 5817058
R 880
R 1080
R 670
E: 309828 N: 5817056
E: 309822 N: 5817055
5
SR
SR
SR
SR
SF
R 2730
E: 309859 N: 5817054
SF
E: 309820 N: 5817057
R 3445
#03N: 5817033
R 770
SR
SR
R 3685 E: 309813 N: 5817058
6
SR
E: 309856
R 1000
R 1500
4
SR
E: 309816 N: 5817065
R 4840
5
7
R 7340
NEW COVERED OUTDOOR LEARNING AREA
4 R 3405
3
EXISTING TREES RETAINED
R 770
NEW BUILDING
85
SR
R 1150
R 530
47
SR
SF
R 2980
E: 309815 N: 5817070
SR
SF
Veraecti busandam si dit estinit est, consecae sum ab ium, sant pre simagni beaquiAREA ne lanis COVERED OUTDOOR LEARNING New covered outdoor learning area with 4 apidipsa et omnia prerore perrum re nitatur seating and BBQs, and climbers growing on pergola structure. secus et vendebis eos consequ ossitaspel COURTYARD SPACE et hic te dolendam, officiis as elis moluptate A welcoming gathering space with seating and 5 planting create aanda sense ofvollamusdant enclosure and est eumquas alicti adto eos provide shade. Opportunity for outdoor learning. volore nusdae vercid etur ad ut eum es vel ma SCREEN TREES New trees planted to screen existing building 6 ma quia veliqui del quidi culpa inciae nonest and provide shade and habitat. voluptatia volecti onesciis aut laboratus. BUFFER PLANTING R 1920
3
EXISTING BUILDING
#02E: 309859
R 1050
SF
E: 309859 N: 5817073
R 1415
R 975
SF
SR
SR
SF
800
8
SR
SR
SR
800
SF
SF
SF
E: 309832 N: 5817080
SF
SR
SR
SR
610
SF
SR
SR
7610
SR
SR
SR
SF
SR
SR
SR
SF
1575
SF
695
765
SF
1110
SF
SR
SR
SR
800
SF
E: 309820 N: 5817074
SR
SR
YARNING CIRCLE Cultural gathering space / yarning circle with rock seating - subject to further discussion with Wurundjeri Woi Wurrung Cultural Heritage Aboriginal Corporation.
3
SF
SF SF
R 2755
SR
SR
SR
2000 R 1670
SF
SF
SF
R 2055
E: 309815 N: 5817075
SR
SR
0
SF
80
E: 309835 N: 5817079
SF
SF
R 3050
SF
2
SR
SR
R 5110
SR
SF SF
SF
R 1855
SR
SR
R 4305
SR
R 1000
SF
R 1065
R 1525
2000
R 410
SR
1 00
R 1115
SR
SR
24
SR
SR
SR
SR
SR
R 3800
R 1240
SF
E: 309829 N: 5817086
R 2035
R 1300
R 1315
2025
8
MOUNDED PLANTING Raised garden beds with colourful native plants along eastern edge of building to create variation in the ground plane.
R 1875
R 2885
R 3400
E: 309859 N: 5817078
EXISTING BUILDING
T1
04/9/2025
TENDER ISSUE
BM
PLOT DATE
CAD FILE NAME
BM
NORTH
BM
1/7/2026 250721_Sunshine Secondary College_Tender
PROJECT
NEW BUILDING 24041 PROPOSED DRINKINGSUNSHINE FOUNTAIN COLLEGE NORTH REFER TO HYDRAULIC ENGINEER CAMPUS PROPOSED LOCATION FOR PORTABLE BBQ
SCALE
1:100 @ A1
ADDRESS
NORTHUMBERLAND RD, SUNSHINE
DRAWING NO.
LD2.1 1
#01
DRAWING NAME
4
Materials & Surfaces P
NORTH RICHMOND HOUSING ESTATE BASKETBALL COURT UPGRADE , NORTH RICHMOND, VIC 17
.4
3
17
.5
9 17
Project Type : Community
.6
17
7
.6
3 17
.7
0
D D
18
D
D
Contexts The project upgraded the basketball court between Buildings 108 and 110 to meet Basketball Australia guidelines and improve safety and accessibility for the local community. 0
1
6.5
3
16
16
.5
.9
18
6 17
.1
6
17
.8
.0
4
6
1
16
16
0
.5
.4
7
16
16
.4
.4
.8
4
6 16
2
16
.6 EXISTING CONCRETE 16 BASKET BALL COURT
.7
.7
8
7
16
0
.4
16
1 16
3 16
.7
.7
.7
.9
17
7
7 16
.9
3 16
.7
6 16
.9
16
9
.3
16
4 D
.3
5 16
8 16
D
.7
16
9 16
D
D
.4
16
5
16 6
9 1
6.5
.4
5 16
.6
5 16 16
1
F
.6
.8
0
16
.8
5
9
16
.6
.7
.9
.9
16
1
.9
.9
5 16
.9
8
8 17
D
16
9
.9
1
1
3
.0
5
17
.0
4 D
D
17
D
.1
8
L
.4 16
.4
L
16
F
16
0
.5
16
1 16
16
.5
.5
6 16
4
.7
2
16
.9
0
16
.8
.8
6
D
16
7
.8
5 17
.2
5
D
16
.0
.5
8
17
D
3
.2
8
The conflict with 2 metre run off zone and existing path 17
4
.1
16
6
.9
1
16
L
17
8
D
17
.1
.9
0
Day View
D
Night View
L
1
6.7
L
DRAFT MELB OFFICE
GROUND FLOOR 143 FRANKLIN STREET, MELBOURNE VIC 3000 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU
CLIENT
SUB-CONSULTANTS
DRAWN BY
DW
CHECKED BY
TH
PLOT DATE
9/9/2026
W: WWW.URBANINITIATIVES.COM.AU
CAD FILE NAME
25037_NR Basket Ball Court_Concept 3D 250925 copy v2026.vwx
NOTE
NO.
DATE
REVISION
BY
PROJECT
25037 NRHE - BASKET BALL COURT UPGRADE D
TAS OFFICE
CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU
THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.
NORTH
HOMES VICTORIA L
Approach The northeast path conflicted with the required two-metre run-off zone and was only 1.5 metres wide, below the 1.8-metre standard for wheelchair passing. The ground also sloped sharply away from the path, creating a safety risk for mobilityimpaired users. To resolve this, the concrete path was demolished and regraded, widened to 2 metres, and fitted with a handrail, stairs, and a ramp to ensure safe, accessible entry to the basketball court for everyone.
.6
D
D
D
L
.3
3
2
16
16
.2
7
2 16
L
.8
16
L
L
L
L
L
L
L
L
L
L
16
L
L
L
L
L
L
L
L
7
7
16
D
.5
.9
D
D
16
16
1
L
L
D
16
Challenge A key challenge was integrating the required two-meter run-off zone surrounding the court within the constrained existing site conditions, particularly due to the existing slope and conflicts with adjacent concrete pathways.
.6
17
.3
.1
L
L
D
L
17
17
L
L
L
L
L
L
L
L
L
L
NO.
DATE
ISSUE
BY
SCALE
1:100 1:200
@A1 ADDRESS @A3 106-112 Elizabeth Street North Richmond VIC 3121
DRAWING NO.
L100
REV #
DRAWING NAME
Existing Conditions
Responses The upgraded community facility complies with Basketball Australia’s standards and provides the local community with a safer, more functional space. Skillsets Vectorworks • Producing technical drawings including setout, planting, grading plans and material & surface plan Photoshop and Nano Banana • Producing daytime and nighttime visualisations of the basketball court for marketing purposes
Introduced a concrete terrace around the basketball court to incorporate the required 2 m run-off zone in accordance with Basketball Australia guidelines 5
NT
RR
PE
ME
COBURG HIGH SCHOOL
E
EK RE
DG
IC
RI
EVC 851 Streambank Shrubland HO268
VD BL
EVC 55 Plains Grassy Woodland EVC 68 Creekline Grassy Woodland
PROJECT SITE
OR TE
DE CHENE RESERVE
URG HALL
URQUHART
MCDONALD RESERVE
EVC 937 Swampy Woodland
ST
URQUHART STREET CARPARK DOCUMENTATION C/A , COBURG, VIC BELL ST
EVC 55 Plains Grassy Woodland
BUS STOP
Heritage Overlay
BUS STOP
Ecological Vegetation Classes Pre-1750
COBURG SPECIAL DEVELOPMENTAL SCHOOL NOT IN SCOPE
/ /
/
/
/
/
/
/
48
/
/
47
1:40
1:40
/
47
47
AD
/
/
RO
1:22
47
/
/ 2
/
/
60.
LP
RETAIN AND PROTECT EXISTING RAMP & TGSI HANDRAIL MAKE-GOOD
42.
B
46
5
61.
LP
.6
59.
G4 C
12.
13.
14.
18.
17.
16.
15.
21.
20.
19.
22.
23.
B
SSV OFFICE
24.
(PREVIOUSLY REFERRED TO AS BLOCK 'A')
MRV
STANDARDS 2018 (AU) G2 B
/ /
/
/
/
EX SP EE D HU MP
45.70
45.75
/
7
/
//
/ /
/
(c) 2026 Transoft Solutions, Inc. All rights reserved.
EXISTING GATE & FOOTPATH
41.
39.
38.
36.
37.
35.
32.
33.
34.
28.
29.
30.
31.
27.
25.
26.
/
40.
45.97
/
/
/
SUB-CONSULTANTS
//
CLIENT
/
SUITE 3, 25-31 ARGYLE STREET, FITZROY, VICTORIA 3064 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU
WKT / SZ
CHECKED BY
TH
PLOT DATE
20/9/2026
CAD FILE NAME
26028 Urquhart Street Carpark Design Development 06 v2026.vwx
NORTH
CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: OFFICE@URBANINITIATIVES.COM.AU W: WWW.URBANINITIATIVES.COM.AU
NOTE
THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.
A
28/8/2026
UPDATE TO MATCH ARCHITECT'S DRAWINGS
WKT
1
21/8/2026
PRELIMINARY D&C TENDER ISSUE
WKT
NO.
DATE
REVISION
BY
NO.
DATE
ISSUE
BY
/
/
PROJECT
26028 Urquhart Street Carpark 1 & 2 Landscape
Department of Education
HOBART OFFICE
/
/
DRAWN BY
/
Material and Surface Plan MELBOURNE OFFICE
SCALE
@A1 ADDRESS @A3 2/189 Urquhart St, Coburg VIC 3058
1:125 1: 1:250
PRELIMINARY - SUBJECT TO DOCUMENTATION
/
DRAWING NO.
LD200
/
/
REV #
A
DRAWING NAME
Material & Surface Plan
KICKRAIL TBC
FINISH LEVEL TO BE BELOW THE MOSITURE BARRIER OF THE BUILDING
EXISTING LEVELS AS PER PINK LINE
TGSI INDICATORS (AS1428.1)
HANDRAIL (AS1428.1)
STAIR NOSING (AS1428.1)
EDGE THICKENING TO ENGINEER'S SPEC.
Special Building Overlay
PRELIMINARY
L01
47.40 47.20 47.00 46.80
REV #
DRAWING NAME
Site Context
PRELIMINARY 1
DRAWING NO.
25030 Urquhart Street Coburg Feasibility Study
45.98
45
62.
PL05
PL02
46
Ecological Vegetation Classes Pre-1750
PROJECT NAME
+45.80
1:42
+46.41
/
/ 46
/
LB
CL
LP
43.
58.
/
HANDRAIL TBC
LB
/
46.44
BL01
BL01
3 3
1:56
46
BL01
LB
PD02 A-401
/
BL01
10.
GATE
DRAWING NO.
REV #
L01
EXISTING LEVELS
46.60 46.40 46.20 46.00
2
+46.49
3
1:5000 45.60@A3
E AT W R K N TA
19/9/2026
/
PLOT DATE
PROJECT NO.
+46.49
LB
+46.55
46.47 +46.54
HANDRAIL MAKE-GOOD
4
1750
Heritage Overlay
/
6
9.
PL02-D
EVC 937 Swampy Woodland
EVC 55 Plains Grassy Woodland
STEPS +46.61 0 146.50 2
3
EXISTING LEVELS
LB+47.30 +47.31 47.28
+47.29
5
CHECKED BY
NORTH
44.
SEAT
3
/
EDGE THICKENING TO ENGINEER'S SPEC.
Ecological Vegetation Classes Pre-1750 Ecological Vegetation Class Pre
DRAWING NAME
SCALE
57.
2
DE/VCAA BUILDING (PREVIOUSLY REFERRED TO AS BLOCK 'J') TWO WATER TANKS TO BE REMOVED (TBC)
PROTECT & RETAIN DISCONTINUED NATURAL GAS PIPE & THE SURROUNDING ROCK WORKS
8
SCALE BAR
45.
RETAIN EXISTING CONCRETE LANDING
47.28
7.
46.67 46.4 4 8. 46.4 46.61 4 46.5 5 8 46.5146.37
5
56.
LP
5
DRAWN BY
46.
FL.47 EXISTING DOORWAY .31
2
2
HOBART OFFICE City Mill, Level 3, 11 Morrison Street Hobart TAS 7000 T: (03) 6223 3138 E: andrew@urbaninitiatives.com.au
55.
+47.30 +FL 47.31
PL04
46.80
46.53
6
EVC 55 Plains Grassy Woodland
/
MELBOURNE OFFICE Suite 3, 25-31 Argyle Street Fitzroy VIC 3065 T: (03) 9329 6844 E: office@urbaninitiatives.com.au
47.
EXISTING DOORWAY
47.28 LB
47
16
Skillsets
PROJECT NAME
(AU)
73.
EVC 937 Swampy Woodland
54.
RAMP 47.04 47.01
6.
11.
72.
ocal bluestone construction of Pentridge The Special is also within anused AreainoftheAboriginal Cultural HeritagePrison. Sensitivity. at part of the project site has historically been, and may still be, low-lying and 47.40 s a heritage-listed former quarry (HO268), which supplied the local bluestone used in the construction of Pentridge Prison. The Special y and the Ecological Vegetation Classes Pre-1750 suggest that part of the project site has 47.20 historically been, and may still be, low-lying and Special47.00 Building Overlay ng.
PROJECT NO.
S 2018
71.
+47.12
PD01 A-401
5. 8 46.80 47.0 46.8746.70
48.
6
65. EXCAVATION IN THE NRZ AND SRZ MUST BE DONE UNDER THE PROJECT ARBORIST SUPERVISION, 64. BY HAND DIGGING OR WITH LINEA CURVED SEAT NDD-EXCAVATION TECHNIQUES. AND BENCH COMBO ( EVC 851 Streambank Shrubland 63. SURFACE MOUNTED)
EVC 68 Creekline Grassy Woodland
y. use, enhance landscape character and protect areas of aboriginal and natural hertiage. ion
NORTH
DARD
LP PL01
LP
53.
5
5
6
EVC 55 Plains Grassy Woodland
TRAM 1 STOP
SCALE
48
reserved.
70.
BUS STOP
SCALE BAR
N
rights
46
Scale: 1:20
Vectorworks 46.80 • Producing technical drawings 46.60 including 46.40 landscape sections, details and material & 46.20 46.00 1:5000 @A3surface plan 25030 Urquhart Street Coburg Feasibility Study Site Context 45.80
1
47.12
47.26 46.98
4.
LP
46
BUS STOP
Indicative Section CC
3.
49.
PL01
5
1
BUS STOP
/
Inc. All
VD BL
TRAM 1 STOP
I TA
Solutions,
E
Responses The landscape design transforms the site into a space that supports staff wellbeing, delivers educational institutions sincecompliant 1959. It is in close proximity the Merri Creek access and manages andtoinclusive mental otes: Significance Overlay. This signifies that the Merri Creek and Environs tives of the ESO are to restore natural systems, provide waterway function,institutions sustainably using car is located in Coburg. Its landstormwater use has been predominantly for educational since the 1959. Itexisting is in close proximity to the Merri Creek original and natural ch Merri-bek Councilhertiage. has designated the area with an Environmental Significance Overlay. This signifies that the Merri Creek and Environs park landscape. ous environmental, heritage, and recreation corridor. The objectives of the ESO are to restore natural systems, provide waterway function, BUS STOP
Areas of Cultural Heritage Sensitivity 69.
HO268
EK RE
DG
IC
RI
BUS STOP
UN
Transoft
NT
RR
EK RE
ME
IC
RR
ME
PE
BELL ST
51.
PL02
RELOCATED SIGNAGE 3 66.
68.
5
EX SP EVC 851 EE Streambank Shrubland D LINEA CURVED SEAT HU AND BENCH COMBO MP ( EVC 68 Creekline Grassy Woodland SURFACE MOUNTED)
EVC 55 Plains Grassy Woodland
2.
50.
67.
ACCESS TO SUBFLOOR ACCESS HATCH
HO268
52.
REV #
L01
Environmental Significant overlay Environmental Significance Overlay LEVEL TO ALLOW
OR ITE
BUS STOP
PRELIMINARY DRAWING NO.
Areas of Cultural Heritage Sensitivity
47.52
47.51 47
DRAWING NAME
BUS STOP
48
4
2
LB
1
47.14
19/9/2026
Approach COBURGVegetation Class (EVC) I used an Ecological HIGH Pre-1750 overlaySCHOOL to prioritise indigenous and native species over a purely low-maintenance PROJECT SITE palette and drew on the character 47.40 of the 47.20 adjacent Merri CreekPROJECT corridor to ground the SITE 47.00 CHENE 46.80 design in itsDERESERVE local surroundings. 46.60 I worked with the project engineer to resolve DE CHENE 46.40 URQUHART ST RESERVE 46.20 the DDA access issue, thickening the path 46.00 URG URQUHART ST 45.80 HALL MCDONALD edge and elevating the surface to achieve RESERVE a compliant 1:40 grade under AS 1428. Heritage Overlay
FO
(c) 2026
PROJECT NAME
Environmental Significance Overlay
COBURG HIGH SCHOOL
3
G1 A
CHECKED BY PLOT DATE
48
47.34 47.14
47.37 47.2
BL02
4
PROJECT NO.
6
/ /
47.37
HU MP
NORTH
LB
47.39
BL02
1.
EX SP EE D
DGE NG E& RISON
SCALE
G3 C
48
Challenge Special Building Overlay Special Building Overlay • The plants MURRAY RD in the understory near the NW Region building were senescent, in poor health, and largely non-indigenous. 1:5000 @A3 Urquhart Street Coburg Feasibility Study Site Context • The DDA access was non-compliant —25030 the northeast asphalt path was narrow, steep, and failed to meet AS 1428. SCALE BAR
MRV
LB
s a heritage-listed former quarry (HO268), which supplied the local bluestone used in the construction of Pentridge Prison. The Special y and the Ecological Vegetation Classes Pre-1750 suggest that part of the project site has historically been, and may still be, low-lying and g.
DRAWN BY
STAN
Contexts The project involves upgrading the existing car parking spaces for the Department of s also within an Area of Aboriginal Cultural Heritage Sensitivity. Education at 189 Urquhart Street, Coburg.
48
PROTECT & RETAIN EXISTING DRAINAGE PIT
PL03
/
47.70
otes: is located in Coburg. Its land use has been predominantly for educational institutions since 1959. It is in close proximity to the Merri Creek h Merri-bek Council has designated the area with an Environmental Significance Overlay. This signifies that the Merri Creek and Environs us environmental, heritage, and recreation corridor. The objectives of the ESO are to restore natural systems, provide waterway function, on use, enhance landscape character and protect areas of aboriginal and natural hertiage.
HOBART OFFICE City Mill, Level 3, 11 Morrison Street Hobart TAS 7000 T: (03) 6223 3138 E: andrew@urbaninitiatives.com.au
RELOCATED SIGNAGE 1
48
/
Project Type : Open Space
/
TRAM 1 STOP
/
BUS STOP
MELBOURNE OFFICE Suite 3, 25-31 Argyle Street Fitzroy VIC 3065 T: (03) 9329 6844 E: office@urbaninitiatives.com.au
48
ALL SIGNAGE LOCATIONS ARE TO BE REVIEWED
BUS STOP
1:40
1:9.9
Indicative Section DD Scale: 1:20
MELBOURNE OFFICE
SUITE 3, 25-31 ARGYLE STREET, FITZROY, VICTORIA 3064 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU
PRELIMINARY - SUBJECT TO DOCUMENTATION CLIENT
3
SUB-CONSULTANTS
Indicative Section BB Scale: 1:20
Department of Education
MELBOURNE OFFICE
SUITE 3, 25-31 ARGYLE STREET, FITZROY, VICTORIA 3064 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU
HOBART OFFICE
CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: OFFICE@URBANINITIATIVES.COM.AU
CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138
NOTE
THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.
CLIENT
1 NO.
DATE
REVISION
BY
NO.
21/8/2026 DATE
E: OFFICE@URBANINITIATIVES.COM.AU PRELIMINARY D&C TENDER ISSUE
ISSUE
W: WWW.URBANINITIATIVES.COM.AU
NORTH
SUB-CONSULTANTS TH
CHECKED BY
Department of Education
HOBART OFFICE
W: WWW.URBANINITIATIVES.COM.AU
WKT / SZ
DRAWN BY
WKT BY
PLOT DATE
20/9/2026
CAD FILE NAME
26028 Urquhart Street Carpark Design Development 06 v2026.vwx
SCALE
1:20 1: 1:40
PROJECT
26028 Urquhart Street Carpark 1 & 2 Landscape
@A1 ADDRESS @A3 2/189 Urquhart St, Coburg VIC 3058
DRAWING NO.
LD701 DRAWING NAME
Landscape Sections
PRELIMINARY - SUBJ DOCUMEN
REV #
DRAWN BY
WKT / SZ
CHECKED BY
TH
PLOT DATE
20/9/2026
NORTH
SCALE
PROJECT
26028 Urquhart Street Carpark 1 & 2 Landscape
DRAWING NO.
LD702
6
DRAWING NAME
REV #
THE MYCELIA PARADISE, DAREBIN PARKLAND, VICTORIA University Project
Project Type : Design Research Contexts It offers an alternative way of ecological regeneration by deconstructing the existing ecological pyramid. It considers how the human body (walking) can be used as an agent of change. Challenge Darebin Parkland is facing many contemporary landscape challenges. For example, the high salinity (Leachate treatment) within the current wetland system and irregular stormwater have significantly threatened local biodiversity. Approach It uses human walking as a tool to redesign this very human centre parkland into a habitat for mycelium (the root of mushrooms). It reshapes the walking environment to trigger the existing mycelium network through controlled foot traffic, preserving and enhancing biodiversity.
Use Human walking as a tool
Responses It explores how the landscape can be performed for other-than-human species. Ultimately, it urges us to be aware of the non-human actors within the landscape, learning and collaborating with them in order to co-exist in this age of environmental crisis. Controlling human movement through creating water catchment areas
Binding soil particles, stabilise containments, filter pollutants and form symbolic relationship with trees.
Existing brackish soil
Permeable pavement
A casual walking style that encourage roaming in summer
Moss (nature buffer for foot traffic)
A curated ritualistic style of walking experience in Autumn
Increase humidity that leads to growth of Wooddecompose fungi 7