PVC Base [Standing] Rev 3 Eng

Page 1


PVC Base [Standing]

Installation guidelines

Please read these instructions carefully before starting installation. Failure to follow these instructions may result in damage to the product or property.

Please check all parts and tools are included before installation. Ensure the parts and tools are suitable for the product’s weight and size. Ensure the mounting surface is suitable for the product’s weight and size.

Installation should be carried out by quali ed personnel only. If you are not con dent with any part of the installation process, please contact a professional installer for assistance.

The manufacturer is not responsible for any damage caused by incorrect installation or misuse of the product.

Required Tools

• Screwdriver Drill

• Screws

Always use appropriate safety equipment and take necessary precautions when working with tools and electricity.

These instructions are provided as a guide only. Actual installation may vary depending on speci c circumstances and site conditions.

E-mail: support@signage-group.com

Phone: +49 (0)30 863280590

Opening hours: Mon. - Fri., 9:00 - 17:00 Uhr

O ce address:Bogen 45, Holzmarktstr. 15-18 10179 Berlin Germany

Step 1

Step 4

Place the letters on an elevated surface for easier installation. Locate the mounted pegs on the bottom of the letter.

Step 2

Align monted pegs with the holes in the base plate.

Step 3

Place the product on the oor, making sure it stands on a at surface and in a location protected from the wind.

Attach the base plate using screws and a screwdriver drill. Make sure the letter is tightly xed to the base.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
PVC Base [Standing] Rev 3 Eng by ONE TEAM Signage Group - Issuu