Installation guidelines
Please read these instructions carefully before starting installation. Failure to follow these instructions may result in damage to the product or property.
Installation should be carried out by qualified personnel only. If you are not confident with any part of the installation process, please contact a professional installer for assistance.
The manufacturer is not responsible for any damage caused by incorrect installation or misuse of the product.
Please check all parts and tools are included before installation. Ensure the parts and tools are suitable for the product’s weight and size. Ensure the mounting surface is suitable for the product’s weight and size.
Always use appropriate safety equipment and take necessary precautions when working with tools and electricity.
These instructions are provided as a guide only. Actual installation may vary depending on specific circumstances and site conditions.
Required Tools
• Drill With Drill Bit
• Wall Plugs With Matching Screws
• Bubble Level
• Screwdriver Drill
• Pencil
• Hammer
• Masking Tape
E-mail: support@signage-group.com
Phone: +49 (0)30 863280590
Opening hours: Mon. - Fri., 9:00 - 17:00 Uhr
Office address:Bogen 45, Holzmarktstr. 15-18 10179 Berlin Germany


Step 1
Attach the mounting template to the wall using masking tape. Use a bubble level to make sure it is properly aligned.
Step 2
Step 4
Place the product on the wall and align the mounting ears with the plugs.








Drill holes at the marked positions.

Step 3
Remove the mounting template and Insert wall plugs into the holes using a hammer.
Step 5






Screw through the mounting ears into the wall plugs using a screwdriver drill.