Glue pads + glue Rev 3 Eng

Page 1


Glue Pads + Glue

Installation guidelines

Please read these instructions carefully before starting installation. Failure to follow these instructions may result in damage to the product or property.

Please check all parts and tools are included before installation. Ensure the parts and tools are suitable for the product’s weight and size. Ensure the mounting surface is suitable for the product’s weight and size.

Installation should be carried out by quali ed personnel only. If you are not con dent with any part of the installation process, please contact a professional installer for assistance.

The manufacturer is not responsible for any damage caused by incorrect installation or misuse of the product.

Required Tools

• Masking Tape

• Bubble Level

Always use appropriate safety equipment and take necessary precautions when working with tools and electricity.

These instructions are provided as a guide only. Actual installation may vary depending on speci c circumstances and site conditions.

• Cleaning Solution

• Pressure Roller (Optional)

• Clean Cloth

E-mail: support@signage-group.com

Phone: +49 (0)30 863280590

Opening hours: Mon. - Fri., 9:00 - 17:00 Uhr

O ce address:Bogen 45, Holzmarktstr. 15-18 10179 Berlin Germany

Step 7

Step 8

Repeat the process for the remaining letters. Leave letters over night in template allowing the glue to fully cure. Next day carefully remove the mounting template, making sure not to pull o any letters.

Step 9

Once glue fully cured, remove the protective lm from the front of the letters if present.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.