Installation guidelines
Please read these instructions carefully before starting installation. Failure to follow these instructions may result in damage to the product or property.
Installation should be carried out by qualified personnel only. If you are not confident with any part of the installation process, please contact a professional installer for assistance.
The manufacturer is not responsible for any damage caused by incorrect installation or misuse of the product.
Please check all parts and tools are included before installation. Ensure the parts and tools are suitable for the product’s weight and size. Ensure the mounting surface is suitable for the product’s weight and size.
Always use appropriate safety equipment and take necessary precautions when working with tools and electricity.
These instructions are provided as a guide only. Actual installation may vary depending on specific circumstances and site conditions.
Required Tools
• Drill With Drill Bit
• Wall Plugs With Matching Screws
• Bubble Level
• Screwdriver Drill
• Pencil
• Hammer
• Masking Tape
• Mounting Glue (Optional)
E-mail: support@signage-group.com
Phone: +49 (0)30 863280590
Opening hours: Mon. - Fri., 9:00 - 17:00 Uhr
Office address:Bogen 45, Holzmarktstr. 15-18 10179 Berlin Germany


Step 1
If the mounting template is included, skip to step 5. Lay the paper mounting template flat on a soft surface or mat. Secure the corners with masking tape to prevent curling.
Step 2
Each distance holder consists of two parts: a small base attached to the product, and a removable plastic coupler. If the plastic couplers are attached, remove them.
Step 3
Place the letters on the template in their designated positions. Press each letter firmly so the sharp tip of the base pierces through the paper template. Repeat for all letters.
Step 4
Mark the pierced holes with a pencil for clarity.



Step 5
Attach the template to the wall using masking tape and align it with a bubble level.






Step 6
Drill holes at the marked positions on the template.




Step 7
Step 8






Remove the template and insert wall plugs using a hammer. Insert a screw into each plastic coupler and fasten them into the wall plugs using a screwdriver drill.


Step 9
If the product is mounted outdoors, it is recommended to apply glue inside the plastic couplers before installation. Align letter’s plastic bases with the mounted plastic couplers and press firmly until it clicks into place. Repeat the process for all letters.