Backplate [Drilling] Rev 4 Eng

Page 1


Backplate [Drilling]

Installation guidelines

Please read these instructions carefully before starting installation. Failure to follow these instructions may result in damage to the product or property.

Please check all parts and tools are included before installation. Ensure the parts and tools are suitable for the product’s weight and size. Ensure the mounting surface is suitable for the product’s weight and size.

Installation should be carried out by quali ed personnel only. If you are not con dent with any part of the installation process, please contact a professional installer for assistance.

The manufacturer is not responsible for any damage caused by incorrect installation or misuse of the product.

Required Tools

• Bubble Level

• Pencil

Always use appropriate safety equipment and take necessary precautions when working with tools and electricity.

These instructions are provided as a guide only. Actual installation may vary depending on speci c circumstances and site conditions.

• Drill With Drill Bit

• Wall Plugs With Matching Screws

• Screwdriver Drill

• Hammer

• Hot Glue Gun

E-mail: support@signage-group.com

Phone: +49 (0)30 863280590

Opening hours: Mon. - Fri., 9:00 - 17:00 Uhr

O ce address:Bogen 45, Holzmarktstr. 15-18 10179 Berlin Germany

Step 1

Step 4

Check if the number of moss panels is correct. If there is more than one panel, a numbered layout drawing should be included, showing the correct position of each panel, as some edges may not be fully covered.

Step 2

Remove the panel from the wall. Gently move the moss aside at the corner areas. Drill through the panel at each corner.

Step 5

Place the rst panel against the wall. Use a bubble level to align it properly.

Step 3

Place the panel back onto the wall, aligning it with the pencil marks.

Step 6

Mark the position of the panel on the wall using a pencil.

Mark the holes of the panel on the wall using a pencil.

Step 7

Step 10

Remove the panel from the wall. Drill holes in the marked spots.

Step 8

Insert wall plugs into the drilled holes using a hammer.

Step 9

Place the panel back onto the wall, aligning it with the drilled holes.

Step 11

Fasten the panel to the wall by driving screws through the panel into the wall plugs using a screwdriver drill.

If there are multiple panels, repeat the process for each one.

Step 12

After installation, use a hot glue gun and moss from the repair kit to cover the visible screw heads.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.