DIA20003-2021-s2-Parolmar

Page 1

Final Submission Portfolio \ DIA20003 Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021


TASK 1 Drawings 04 \ Replicate Drawings of Precedent

TASK 2 Progress 10 \ Digital Sketches of Abstract Forms 41 \ Abstract Model on Site & Shadow Diagram 50 \ Model Progress for Community Building

TASK 2 Drawings 52 \ Original Submissions 60 \ 2D Drawings Extracted from 3D Model 67 \ Interior & Exterior Renders

TASK 3 Drawings 72 \ Original Submissions 68 \ Textured Site Plan & Elevation 70 \ Textured Section & Exploded Axonometric 72 \ Diagram & Sectional Prespective

Contents


Drawing No.

Drawing Title

Scale

A101

Site Plan 01

1 : 2500

A201

Floor Plan 01

1 : 200

A301

West Elevation

1 : 100

A401

Section 01

1 : 100

Replicate Drawings of Precedent Final Submissin Portfolio Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021

TASK 1


N

0 10

50

100 M

Notes

Task 1 - REPLICATE DRAWINGS OF PRECEDENT Unit & Tutorial Time DIA20003 - DIGITAL DOCUMENTATION 1 TUESDAY 2.30PM Tutor PANTEA ALAMBEIGI

Building DØNNING COMMUNITY BUILDING Location 8313 KLEPPSTAD, NORWAY Architect JARMUND / VIGSNÆS AS ARCHITECTS MNAL

Drawn by RHIANA PAROLMA Student No. 103475203 Date 21 / 08 / 2020 Revision No. 1.0

Scale 1 : 2500 @ A3 Drawing Title SITE PLAN 01 Drawing No.

SP01 A101

SITE PLAN 01 SCALE 1:2500 @ A3

A101


31700 5430

1. Entrance / Hallway

20680

5590

2. WC Disabled 3. WC Women 4. WC Gentlemen 5. Storage 6. Wardrobe 8. Meeting Room 9. Kitchen

2

3

4 5

10. Communal Hall / Cafe

2500

107 60

7. Stage

6

20300

7

9020

10

S01 A401

2920

2 72 90

1

8 9

8550 13070

21620

E01 A301

FP01 A201

FLOOR PLAN 01 SCALE 1:200 @ A3

N

0

1

2

5M

Task

Building

Drawn by

Scale

1 - REPLICATE DRAWINGS OF PRECEDENT

DØNNING COMMUNITY BUILDING

RHIANA PAROLMA

1 : 200 @ A3

FLOOR PLAN 01

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

8313 KLEPPSTAD, NORWAY

103475203

1.0

Architect

Date

JARMUND / VIGSNÆS AS ARCHITECTS MNAL

21/08/2021

A201

Tutor PANTEA ALAMBEIGI

Notes

Drawing Title


1680

RL + 7745 AFFL

3450 2100

7830

520

RL + 6062 AFFL

FFL + 87 GL + 0.0

8700

12840

8570

1580

31680

E01 A301

WEST ELEVATION SCALE 1:100 @ A3

0

1

2

5M

Task

Building

Drawn by

Scale

1 - REPLICATE DRAWINGS OF PRECEDENT

DØNNING COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

WEST ELEVATION

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

8313 KLEPPSTAD, NORWAY

103475203

1.0

Architect

Date

JARMUND / VIGSNÆS AS ARCHITECTS MNAL

21/08/2021

A301

Tutor PANTEA ALAMBEIGI

Notes

Drawing Title


31680 18180

6110

7400

FCL + 7550 AFFL

RL + 6062 AFFL

FCL + 4822 AFFL

FFL + 87 GL + 0.0

5190

7140

2000

1080

2000

5480

1210

4350

3180

31640

S01 A401

SECTION 01 SCALE 1:100 @ A3

0

1

2

5M

Task

Building

Drawn by

Scale

1 - REPLICATE DRAWINGS OF PRECEDENT

DØNNING COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

SECTION 01

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

8313 KLEPPSTAD, NORWAY

103475203

1.0

Architect

Date

JARMUND / VIGSNÆS AS ARCHITECTS MNAL

21/08/2021

A401

Tutor PANTEA ALAMBEIGI

Notes

Drawing Title


379 \ Floor Bud From Siteless: 100

Selected Abstract Form

09


Digital Sketches of Abstract Forms Progress Final Submissin Portfolio Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021

379 \ Floorbud

263 \ Circumventing Towers

77 \ Pillar Crown

TASK 2


11


13


15


17


19


21


23


25


27


29


31


33


35


37


39


Digital Sketches of Abstract Model on Site & Shadow Diagram Progress Final Submissin Portfolio Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021

TASK 2

41


Original submission had minimal details of site as well as abstract for m being elongated to fill the site space. Shadow diagram of Spring Equinox - September 23 2021 below.

Original Submission


Abstract Model on Site

Improved

43


Task 2 Progress Final Submissin Portfolio Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021

Abstract Model on Site

Improved


9am


Spring Equinox \ September 23 2021

Shadow Diagrams Improved

12pm

47


3pm


Model Progress for Community Building Final Submissin Portfolio Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021

TASK 2

49


It took a very long time to kind of get this shape above. On the left is a screenshot of one of (very) many files of experimenting.

1. On my first progress upload - I was just thinking inside the box - I’ve literally turned my abstract form into a box. I was attempting to optimise footprint. 2. For my second type of shape, I thought to be more abstract and place broken ‘petals’ around yet agian another box. It’s still lost all its charm. 3. Back to being more true to the form I started elongating & playing with heights of the original form. After some excellent feedback, I started to attempt to apply the same design language on the exterior & interior building. I have modified and tweaked my model consistently - up to the days leading to this submission.

3


1

2


Original Submissions Final Submissin Portfolio Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021

TASK 2


N SP01 A101

SITE PLAN 01 SCALE 1:500 @ A3 0

2

5M

Task

Building

Drawn by

Scale

2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL

FLOOR BUD COMMUNITY BUILDING

RHIANA PAROLMA

1 : 500 @ A3

SITE PLAN 01

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

132 - 138 CORRS LANE, MELBOURNE

103475203

1.0

A101

Tutor PANTEA ALAMBEIGI

Form No.

Date

379 - FLOOR BUD

10/10/2021

Notes

1

Drawing Title


S02 A402

S01 A401

E01 A301

FP01 A201

FLOOR PLAN 01 SCALE 1:100 @ A3 0

2

5M

Task

Building

Drawn by

Scale

2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL

FLOOR BUD COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

FLOOR PLAN 01

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

132 - 138 CORRS LANE, MELBOURNE

103475203

1.0

A201

Tutor PANTEA ALAMBEIGI

Form No.

Date

379 - FLOOR BUD

10/10/2021

Notes

1

Drawing Title


FP02 A202

FLOOR PLAN 02 - MEZZANINE LVL. 02 SCALE 1:100 @ A3 0

Notes

1

2

Task

Building

Drawn by

Scale

2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL

FLOOR BUD COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

FLOOR PLAN 02 MEZZANINE LVL. 02

5M

Drawing Title

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

132 - 138 CORRS LANE, MELBOURNE

103475203

1.0

A202

Tutor PANTEA ALAMBEIGI

Form No.

Date

379 - FLOOR BUD

10/10/2021


E01 A301

WEST ELEVATION SCALE 1:100 @ A3 0

Notes

1

2

Task

Building

Drawn by

Scale

2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL

FLOOR BUD COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

WEST ELEVATION

5M

Drawing Title

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

132 - 138 CORRS LANE, MELBOURNE

103475203

1.0

Form No.

Date

379 - FLOOR BUD

10/10/2021

A301

Tutor PANTEA ALAMBEIGI


S01 A401

SECTION 01 SCALE 1:100 @ A3 0

2

5M

Task

Building

Drawn by

Scale

2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL

FLOOR BUD COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

SECTION 01

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

132 - 138 CORRS LANE, MELBOURNE

103475203

1.0

Form No.

Date

379 - FLOOR BUD

10/10/2021

A401

Tutor PANTEA ALAMBEIGI

Notes

1

Drawing Title


S02 A402

SECTION 02 SCALE 1:100 @ A3 0

2

5M

Task

Building

Drawn by

Scale

2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL

FLOOR BUD COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

SECTION 02

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

132 - 138 CORRS LANE, MELBOURNE

103475203

1.0

Form No.

Date

379 - FLOOR BUD

10/10/2021

A402

Tutor PANTEA ALAMBEIGI

Notes

1

Drawing Title


Drawing No.

Drawing Title

Scale

A101

Site Plan 01

1 : 500

A201

Floor Plan 01

1 : 100

A202

Floor Plan 02 Mezzanine Lvl 02

1 : 100

A301

West Elevation

1 : 100

A401

Section 01

1 : 100

A402

Section 02

1 : 100

Improved 2D Drawings Extracted from 3D Model Final Submissin Portfolio Rhiana Parolma \ 103475203 I found my original submissions very confusing with

Pantea Alambeigi \ Tutor

many missing items. Feedback was very useful, not only

18 \ 11 \ 2021

for this task but for editing drawings for task 3 aswell. I attempted to use what I learned from the precedent building for this re-do.

TASK 2


N

0

2

1

Notes

4M

Task 2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL Unit & Tutorial Time DIA20003 - DIGITAL DOCUMENTATION 1 TUESDAY 2.30PM Tutor PANTEA ALAMBEIGI

Building BUD COMMUNITY BUILDING Location 132 - 138 CORRS LANE, MELBOURNE Form No. 379 - FLOOR BUD

Drawn by RHIANA PAROLMA Student No. 103475203 Date 18 / 11 / 2021 Revision No. 2.0

Scale 1 : 500 @ A3 Drawing Title SITE PLAN 01 Drawing No.

SP01 A101

SITE PLAN 01 SCALE 1:500 @ A3

A101


26490 16530

5490

2340

2140

S02 A402

3

7

7360

6

10670 2

4

S01 A401

14520

14810

5

3840

7440

1

1. Entrance 2. Cafe & Urban Farm Shop 3. Kitchen 4. Hydraulic Elevator 5. WC Men \ Ambulant Cubicle 6. WC Women \ Enlarged Baby Change Cubicle

E01 A301

7. Herb Garden

FP01 A201

FLOOR PLAN 01 SCALE 1:100 @ A3

N 0

2

5M

Task

Building

Drawn by

Scale

2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL

BUD COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

FLOOR PLAN 01

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

132 - 138 CORRS LANE, MELBOURNE

103475203

2.0

Form No.

Date

379 - FLOOR BUD

18/11/2021

A201

Tutor PANTEA ALAMBEIGI

Notes

1

Drawing Title


25100 16560

8530

8180

8380

7210

8130

1.

4

8 7

3350

14770

9

14690

12530

930

5

6

4790

7600

3

6670

7480

2 1. Mezzanine 01 Stairs to Community Hall Lvl 02 2. Community Hall - Multi-purpose 3. Hydraulic Elevator

2280

4. Mezzanine 02 Landing 5. Office 6. Workshop \ Meeting Room 7. Storage 8. WC - Unisex 9. WC - Unisex Enlarged 6680

17130

FP02 A202

3940

FLOOR PLAN 02 - MEZZANINE 02 SCALE 1:100 @ A3

N 0

Notes

1

2

Task

Building

Drawn by

Scale

2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL

BUD COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

FLOOR PLAN 02 MEZZANINE 02

5M

Drawing Title

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

132 - 138 CORRS LANE, MELBOURNE

103475203

2.0

A202

Tutor PANTEA ALAMBEIGI

Form No.

Date

379 - FLOOR BUD

18/11/2021


1050 1170

RL 14070

RL 11960

12910

15130

RL 10380

510

GL + 0.0

E01 A301

WEST ELEVATION SCALE 1:100 @ A3 0

2

5M

Task

Building

Drawn by

Scale

2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL

BUD COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

WEST ELEVATION

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

132 - 138 CORRS LANE, MELBOURNE

103475203

2.0

Form No.

Date

379 - FLOOR BUD

18/11/2021

A301

Tutor PANTEA ALAMBEIGI

Notes

1

Drawing Title


2260

3430

1170

RL + 3430 AFFL

15130

5450

FCL + 5150 AFFL

6250

11700

FCL + 5650 AFFL

FFL + 300

S01 A401

GL + 0.0

SECTION 01 SCALE 1:100 @ A3 0

2

5M

Task

Building

Drawn by

Scale

2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL

BUD COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

SECTION 01

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

132 - 138 CORRS LANE, MELBOURNE

103475203

2.0

Form No.

Date

379 - FLOOR BUD

18/11/2021

A401

Tutor PANTEA ALAMBEIGI

Notes

1

Drawing Title


1170 930

FCL + 3500 AFFL

12730

15130

FCL + 3500 AFFL

FCL + 3500 AFFL

FFL + 300

S02 A402

GL + 0.0

SECTION 02 SCALE 1:100 @ A3 0

2

5M

Task

Building

Drawn by

Scale

2B - RENDERINGS AND TECHNICAL DRAWINGS EXTRACTED FROM 3D MODEL

BUD COMMUNITY BUILDING

RHIANA PAROLMA

1 : 100 @ A3

SECTION 02

Unit & Tutorial Time

Location

Student No.

Revision No.

Drawing No.

DIA20003 - DIGITAL DOCUMENTATION 1 SEM 2, 2021 - TUESDAY 2.30PM

132 - 138 CORRS LANE, MELBOURNE

103475203

2.0

Form No.

Date

379 - FLOOR BUD

18/11/2021

A402

Tutor PANTEA ALAMBEIGI

Notes

1

Drawing Title


Renders Final Submissin Portfolio Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021

TASK 2


Interior Render Final Submissin Portfolio Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021

TASK 2


Exterior Render Final Submissin Portfolio Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021

TASK 2


Original Submissions Final Submissin Portfolio Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021

TASK 3


TASK 3 \ Textured Elevation - West 0

1

2

5M

Scale 1 : 100 @ A3


La cey

nd

Pla

Pe

ce

er Pla ce

Co rrs La ne

o B le t t Li

u

S e rk

e tre

t

N

0

5

10

25 M TASK 3 \ Site Plan Scale 1 : 250 @ A3


Roof Top Farm & Garden

Community Hall

Offices & Workshop Area

Offices & Workshop Area

Cafe

Kitchen

TASK 3 \ Textured Section 0

1

2

5M

Scale 1 : 100 @ A3


MEZZANINE FLOOR WALLS & ROOF

TASK 3 \ Exploded Axonometric


\ Improved Textured Site Plan & Elevation \Improved Textured Section & Exploded Axonometric \ Diagram & Sectional Prespective

Final Submission Portfolio \ DIA20003 Rhiana Parolma \ 103475203 Pantea Alambeigi \ Tutor 18 \ 11 \ 2021

TASK 3

77


La

Lc ae cy

Pcl ae ePrl a

ace

aPcl e

ne dr Pn ed

ePyl

Pe

ce

r r rss CCoo r n ee LLaa n

B oo B e tlle t t t i LLi

tt e e e e r S tt r

S e e k u rr k

u

N

0

5

10

25 M TASK 3 \ Site Plan Scale 1 : 250 @ A3


TASK 3 \ Textured Elevation 0

1

2

5M

Scale 1 : 100 @ A3


TASK 3 \ Textured Section 0

1

2

5M

Scale 1 : 100 @ A3


MEZZANINE FLOOR WALLS & ROOF

TASK 3 \ Exploded Axonometric


Abstract Form on Site

Scale

Stretch

Increase Footprint

Add

TASK 3 \ Form Diagram


TASK 3 \ Sectional Perspective


Turn static files into dynamic content formats.

Create a flipbook
DIA20003-2021-s2-Parolmar by SwinArchitecture - Issuu