Swarangi Bhaire
2021
SELECTED WORKS FROM 2018 - 2021
Personal Information Institute: Rizvi College of Architecture, Mumbai Residential Address: A-703, Snehadeep Building, Goregaon (W), Mumbai Languages Known: English, Marathi, Hindi, Sanskrit & Spanish Date of Birth: 10th June 2000 Contact Number: +91 8424992203/ 8169798719 Email ID: swara.bhaire@gmail.com
hi, hello
I’m Swarangi Bhaire I believe I have a lot to contribute to your team! Call +91 8424992203 Write swara.bhaire@gmail.com
Education 10th
(SSC) 2016 St. Thomas Academy, Goregaon (W)
12th
(HSC) 2018 S. S. & L. S. Patkar College of Arts and Science, Goregaon (W) Course: Science
B.Arch
Rizvi College of Architecture, Bandra (W) Currently appearing 7th Semester Mumbai University, Average CGPI of all semesters 8.3
Work Experience Internship 2021
01
Documentation & Survey Project Mumbai, Andheri (W) 2 Months, March - April 2021
Achivemements & Co - curricular
Soft Skills
Bamboo Workshop 2018 @Rizvi College of Architecture
Vastu Shastra Foundation & Advance Course 2019 Member of Student Council 2019 - 2020 @Rizvi College of Architecture
The Secret Passages, 2019 @Rizvi College of Architecture
Active helper & participant of college events - Archfest & APIC 2020 Member of Student Council 2020 - 2021
• • • •
Responsible Time Management Communication Teamwork
• Creative Thinking • Leadership • Conflict Awareness
Hobbies & Interests
@Rizvi College of Architecture
Software Skills Reading
Music
Travel
Drama Art 02
Learning about human psychology, their cultures & differences, it’s a never ending topic of fascination. It is very exciting to learn how people interact with architecture & how it has a massive impact on lives of others. Designing is all about making decisions. A human’s passion for space and environment, just like we have for each other. Mostly architecture gives us an impeccable experience of memories of many significant places. The process involved in designing, ends up with lot of new learning experiences. Constantly going back and forth between thinking, what else can be improved? Architecture is a vast subject where you can observe and notice each and every small detail around you. That, is what literally enthralls ME!
03
CONTENTS
09
17
YOUTH CENTRE
TINY HOUSE
SEM 05
05
KHAR MARKET SEM 06
25
COMPETITIONS
SEM 02
15
BELLE VIE CAFE SEM 04
21
WEEKEND HOME SEM 06
27
OTHER SKILLS
SELECTED WORKS FROM 2018 TO 2021 04
Existing Site
01
Khar Market
Site Area: 6839 sqm Site: Khar (West) Brief: Redevelopment of Khar Municipal Market, the New Market will play a key function in the strategic transformation of the place. It will not be conceived as just another commercial building but rather as a hub of services and activities and as a neighbourhood booster. The New Market will be designed to have a deep impact on the social fabric of the locality. In this new context, new and alternative urban strategies and policies must be considered, namely in the area of urban regeneration. Subject: Architectural Design Semester: 06
I N F E R E N C E 05
On this edge a more interactive space can be created.
A fruits and vegetable market lane can set up along the 2nd road, resulting more profits for the shops.
The main entrance can be kept the same.
Since the hawkers have setup their stalls along the periphery of the existing market, pockets of open spaces can be created inside the market for them, providing an informal setup of their stalls.
About the Site Name: Khar Municipal Market Accessibilty: Madhu Park, Kabootar Khana, Hanuman Temple, Arjun Circle. Neighbourhood: Residential, Institutional, Commercial Major Transport: S.V. road & Khar station road.
Concept
Zoning
Program
Flexible Spaces
Creating pockets of open spaces More than just a Market
the
s
ces
Multiple entry & exit points
Clo
Offi
Formal and informal set - ups
Upgrade existing Shops
First Floor Plan
Modules
Wet Market
Ge
ne
rt
C I R C U L A T I O N
ou dC
o Fo
In between spaces which can cater to the informal activities which can co-exist with the formal market
ral
Vegetable Fruits
&
Ground Floor Plan
Area of Market Existing Area 2373.44 Sq.m. Proposed Area 2667 Sq.m.
Open seatings
06
Understanding of Design
B
First Floor Plan
A
A’
B’ 07
Ground Floor Plan
Detail
Such type of food stalls can be provided, ie. they will have a permanent roof as well as the stalls set up could keep on changing.
Roof Level +8400 First Floor Level +4800 Ground Level 0.0
Section AA’
Roof Level +5250 Ground Level 0.0
Masterplan R O O F D E S I G N
Section BB’ 08
The Art of Expression...
02
Learning Spaces Interaction & Communication NEED OF THE YOUTH
Youth Centre
Empowerment
Site Area: 4280 sqm Site: Bandra (West)
Drug/ alcohol abuse
Personality Development
Brief: Design is to be a breathing and breeding arena of urban youths who can channelize their extremely eager passion and energy on the variety of fruitful activities that this place is going to offer them. This place would be an amalgamation of fun and productive events for the urban youth to enjoy their time and nourish their growing mind.
Stress & management
Employment Creativity
Materialism
SOLUTIONS Tagline: Fusion of Cultures, bringing harmony How does it CONNECT to YOUTH? Dance is considered as a medium to convey stories & emotions. With the change in generation, dance forms have also changed. For instance the traditional dance forms are mixed with western dance to bring a new form of expression - Dance Fusion.
09
Economic issues
PROBLEMS
Subject: Architectural Design Semester: 05
Co working spaces job startup
DRAMA • Builds confidence • Develops body language • Improves vocabulary • Improves memory • Develops imagination
DANCE • Dance movement theraphy • Aerobic fitness • Reduces mental stress • Boosts cognitive performance • Better co ordination & flexibilty
10
11
First Floor Plan
Second Floor Plan C O R E
A
B
B’
A’
Ground Floor Plan
Program Area
P R O G R A M A U X I L I A R Y 12
Section AA’
Front Elevation 13
View B: Pockets of informal spaces View A: Courtyard & cafeteria
Masterplan
View C: Interactive Staircase
View D: Informal performing or gathering space
Section BB’
14
03 Belle Vie Cafe Area: 247 sqm Site: Bandra (West) Brief: Design interior layout and the exterior plan for a cafe, with the provided layout. The cafe shares a wall with the structure beside it.
M O O D B O A R D
Subject: Allied Design( Interior Design) Semester: 04
15
Front Facade
A
Section AA’
B
B’ Section BB’
A
Plan
A’
View A 16
04 Tiny House Plot: 10 x 10 mts Site: Bandra (West) Brief: Design a tiny house, considering a user of your choice which can be a student or a family. The maximum built volume should not be more than 150 cu.m. Subject: Architectural Design Semester: 02
North side view 17
User
Concept Private
Regular Job Extro vert
PLOT ed terest Not in g n cooki
Young
Materials
• Wood
in
Creative
Public
The plot selected, has a Pride of India tree, which blossoms in the month of winter, and becomes a focal point. Design in alignment with the Pride of India tree
STUDENT
• Division of Public and Private spaces
• Glass
Form Evolution
Basic Square Shape
Fluidity and Square
Triangle
2 Triangles intersection
Intersection with shape changed 18
First Floor Plan
Ground Floor Plan 19
Exploded view
Front Elevation
R.H.S. Elevation
South side view L.H.S. Elevation
Rear Elevation 20
NOTES :1. THIS IS AN ACADEMIC EXERCISE. 2. DRAWINGS SHOULD NOT BE MEASURED. 3. DATA'S ARE ASSUMED WHEREVER REQUIRED. 4. R.C.C FRAMED STRUCTURE. 5. REFER SEPARATE NOTES FOR MINIMUM
05
DEPTH,THICKNESS,PROJECT SPECIFICATIONS FOR STRUCTURAL MEMBERS. 6. WALLS ARE AND 230 AND 150 MM. THK.
412
WRITING.
1220
7780
960
5447
63 09
4034
198 900
2250
2650
402
1650 RAMP
1700
3025
1800 818
1064
7522
DWG. NO. : 01
1541
C1W5 F1 -
RAMP (6000 X 1200)
W2
5047
9M WIDE MAIN ROAD
1281
+600 LVL
+600 LVL
MANHOLE
PERMANENT BENCHMARK
230
PARKING (6000 X 6000) 36 Sqm
4
9000
2700
3
3000
COLLEGE STAMP & GUIDE'S SIGN.
1040
1200
ENTRANCE PORCH (2700 X 2500) 6.75 Sqm
2
C1W5 F1 -
460
1
10
1700
9
8633
8
10 00 0
7
TITLE 1800 : SETTING OUT 920 PLAN.
DECK (7520 X 1700) 6.75 Sqm
6
11
W1
4802
5
12
1500
4
13
-150 LVL
+600 LVL
1500
950
SCALE : 1:100
11036
2470
NAME : SWARANGI S. BHAIRE
230
6000
1500
ROLL NO. : 1805 EXAM. SEAT NO. : 3477
Setting out Plan
Subject: Working Drawing
Ground Floor Plan YEAR : 3RD YEAR
RIZVI COLLEGE OF ARCHITECTURE
DOOR SCHEDULE
TYPE
LINTEL
NOs
T.W. FRENCH DOOR
2100
1
NOTES :-
900 X 2100
T.W. FLUSH DOOR
2100
4
1. THIS IS AN ACADEMIC EXERCISE.
750 X 2100
T.W. FLUSH DOOR
2100
3
2. DRAWINGS SHOULD NOT BE MEASURED.
DOOR
SIZE
D1
1200 X 2100
D2 D3
CEILING FINISH SCHEDULE
TYPE
1.
C1
2.
C2
REMARK
SR NO.
TYPE
C17 +19569
C4, C12 +19602
C3, C11 +13604
C16 +13569
C2, C7 +10904
C1, C10, C15 +7649
C6, C14 +3545
C9 +3496
C8 +194
Y
5. REFER SEPARATE NOTES FOR MINIMUM
S. NO
TYPE
DESCRIPTION
DEPTH,THICKNESS,PROJECT
SPECIFICATIONS
12 MM THICK PLASTER,12MM THICK 150x1200 MM FORS1 STRUCTURAL MEMBERS. POLISHED VITRIFIED TILE 12MM THICK THICK 150x1200 POLISHED 230 ANDPLASTER,12MM 150 MM. THK. S2 ARE AND 2.6. WALLS VITRIFIED TILES OF APPROVED SHADE
Y'
ALL ROOMS EXCEPT TOILET AND KITCHEN
1. 2.
1.
3.
F3
38MM THICK CEMENT SCREEDING,12MM THICK 600X1200 POLISHED VITRIFIED TILES OF APPROVED SHADE WITH WHITE CEMENT GROUT
4.
F4
38MM THICK CEMENT SCREEDING,10MM THICK 600X600 ANTI-SKID VITRIFIED TILES OF BARCELONA MAFFIL FINISH
TOILET,POWDER ROOM
5.
F5
CHINA MOSAIC TILES
TERRACE
KITCHEN, STORAGE
RESPECTIVELY.
x'
PB38
PB37
PB39
133
PB36
SIZE
A
C13
C14
300 x 230
C15
F2
350 x 230
F1
C16
F2
350 x 230
350 x 230
W1
1800 X 1400
W2
900 X 550
W3
1000 X 1400
C17 F2
F1
PB33
TYPE x'
8. MORTARS SHOULD NOT EXCEED 18 MM IN
SILL\ LINTEL NOs
SLIDING WINDOW
SILL - 700 LINTEL - 2100
4
AWNING WINDOW
SILL - 1600 LINTEL - 2750
3
T.W. PANEL WINDOW
SILL - 700 LINTEL - 2100
2
C13, C14, C15, C16, C17 +12386
PROOFING ADMIXTURES. 10.DRIP MOULD TO BE PROVIDED TO ANY
6043
PLINTH BEAM PB1
PB28
PB2
PB27
F4
PB3
12147
12518
PB21
PB20
C8 +6283 C8
D
350 x 230
C9
C10
C11
230 x 450
230 x 450
230 x 450
C12
C9, C10, C11 +6173
230 x 350
4340
F4
C7
F1
PB8
1505
F4
350 x 230
300 x 230
F2
F2
PB1 PB3
23986
PB2 F4
C1
x 3302
50
C3
C2
230 x 450
25
+1833
3050
PRIMARY
3254
2665
+226
x
230 x 350
230 x 450
4100
+325
C1, C2
5962
36
600 600
PARAPET LEVEL 15.VOIDS
3820
SECONDARY
5425
PRIMARY
+10800 LVL
600
3480
600
2470
TERTIARY
C3 - C11
600
5450
PRIMARY
PRIMARY
PB12
C4 - C12
600
5670
PRIMARY
PB13
C8 - C5
600
4220
PRIMARY
PB13 - PB15
600
3130
C6 - C9
600
4000
PB8 - C7
600
3025
SECONDARY
600
2470
SECONDARY
600
1595
TERTIARY
2300
SECONDARY
C7 - PB11
PB18
PB19 - PB23
PB19
PB18 - C8
600
PB20
C8 - C9
600
3010
PRIMARY
PB21
C9 - C10
600
3925
PRIMARY
C11 - C12 PB18 - PB24
600 600
5770 2518
PB24
C8 - C13
600
5875
PB25
PB24 - PB31
600
3130
PB31 - PB32 PB25 - PB37 C12 - C17
600 600 600
3925
TERTIARY PRIMARY
3270
TERTIARY
600
2560
TERTIARY
C9 - C14
600
5870
PRIMARY
C10 - C15
600 600
5870 1730
PB27 - PB28
600
1065
TERTIARY
PB39 - PB34
600
1730
TERTIARY
C13 - C14
600
3050
PRIMARY
PB37
C14 - C15
600
3755
PRIMARY
PB38
C15 - C16
600
5570
PRIMARY
PB39
C16 - C17
600
5675
PRIMARY
THE GROUND FLOOR LEVEL.
LINE, EXCEPTION FOR CASE SPECIFIC.
15.VOIDS TO BE MARKED WITH DIAGONAL L
16.DRAWINGS TO BE CHECKED THOROUGHL
W1 W1
THE SITE ENGINEER BEFORE THE EXECUT OF WORK.
+2000 +3000
+2600
+3600 LVL
17.ANY AMBIGUITY TO BE CLARIFIED BY THE ARCHITECT WITH IMMEDIATE EFFECT IN WRITING.
W1
W1
LEGEND.
+0.0
F - FOOTING X- TYPE
FIRST FLOOR LEVEL FX
FOR STRUCTURAL MEMBERS.
CHAJJA,CANOPIES TO BE SHOWN IN DOT
PB - PLINTH BEAM X- NUMBER
PB X
PRIMARY TERTIARY
PB34 PB35 PB36
DEPTH,THICKNESS,PROJECT SPECIFICATIO
UNFINISHED FACE.
C - R.C.C COLUMN X- NUMBER
CX
4. R.C.C FRAMED STRUCTURE.
5. REFER SEPARATE NOTES FOR MINIMUM
14.ARCHITECTURAL PROJECTIONS SUCH AS
COLUMN CENTERLINE
TERTIARY
3885
PB24 - PB30 PB29 - PB36
PB34 - PB39
600
5750
PB29 PB30
2. DRAWINGS SHOULD NOT BE MEASURED
EN 18MM THICK PLASTER,WALL3.SURFACE FINISHED DATA'S ARE ASSUMED WHEREVER REQUI EX WITH SAND ROUGH PLASTER
13.LEVELS ARE MENTION WITH REFERENCE T +2600
+6600 LVL
PB31
W5
12.ALL DIMENSIONS ARE FROM UNFINISHED
TO BE MARKED WITH DIAGONAL LINES.
R.C.C COLUMN
SECOND FLOOR LEVEL
TERTIARY
5.
NOTES :-
12MM THICK PLASTER,10MM THICK 600X1200 VITRIFIED TILE (BARCELONE MAFFIL AND ANGORA FINISH )EXERCISE. 1. THISCOFFEE IS AN ACADEMIC UPTO 2.5 M HEIGHT
PROJECTIONS.
WRITING.
TERTIARY
W4
18 MM EXTERNALLY.
LEGEND.
PRIMARY
PRIMARY
4.
ALL E EXCEPT
11.PLASTER THICKNESS 12 MM INTERNALLY
ARCHITECT WITH IMMEDIATE EFFECT IN
PRIMARY
12MM THICK PLASTER,10MM THICK 300X450 MM VITRIFIED TILES OF TWO FINISH (SEASON LIGHT AND SEASON DARK) UPTO 2.4M HEIGHT
10.DRIP MOULD TO BE PROVIDED TO ANY
AS
17.ANY AMBIGUITY TO BE CLARIFIED BY THE
TERTIARY
PB15 PB16
18MM THICK PLASTER,WALL SURFACE FINISHED WITH 2 COATS OF SATIN FINISH PAINT OF APPROVED SHADE
THICKNESS.
OF WORK.
+9600 LVL
W2
W3
PROOFING ADMIXTURES.
THE SITE ENGINEER BEFORE THE EXECUTION
TERRACE LEVEL
2.
3.
9. FIRST COAT TO BE MADE WITH WATER
16.DRAWINGS TO BE CHECKED THOROUGHLY BY
C2 - C7 PB9 - PB11
PB11
R
ALL EXCE
RESPECTIVELY.
LINE, EXCEPTION FOR CASE SPECIFIC.
PB9
PB33
C3, C4
C6 - PB8 C1 - C10
SUCH
DESCRIPTION
W1
12MM THICK PLASTER,1 COAT OF PUTTY,2 COATS OF PRIMER,2 COATS OF PLASTIC EMULSION PAINT OF APPROVED SHADE AND ONE HIGHLIGHTER WALL WITH EGGSHELL FINISH
8. MORTARS SHOULD NOT EXCEED 18 MM I
CHAJJA,CANOPIES TO BE SHOWN IN DOTTED
PB10
PB32
C4 230 x 350
PB4
F
169
600
PB28
C5, C6
G
C5 - C6
PROJECTIONS
1.
TYPE
7. BRICKS TO BE LAID WITH FROGS UPWARD
THE GROUND FLOOR LEVEL. 14.ARCHITECTURAL
PRIMARY
PB6
PB27
PB10
PB7
C6
C5
SECONDARY
PRIMARY
PB26
F2 PB6
E
SECONDARY
7285 3025
TERTIARY
PB23
PB12
PB11 PB9
TYPE
1470
5770
PB22
230 x 450
PB5
SPAN
1430
PB14
PB17
PB16
PB15
PB14
600 600 600 600
PB17
PB13
DEPT
600
PB8
C12 +6343
PB22
C5 - PB2 C1 - PB1 C1 - C2 C3 - C4 PB13 - PB6
PB7
F2
F4
F4
F2 PB19
ANCHORED TO
PB4 PB5
SR NO.
6. WALLS ARE AND 230 AND 150 MM. THK.
UNFINISHED FACE.
PB26
PB25
PB18
KITCHEN, STORAGE
13.LEVELS ARE MENTION WITH REFERENCE TO
PLINTH BEAM SCHEDULE
PB24
C
LIVING ROOM , DINING ROOM AND BEDROOM
12.ALL DIMENSIONS ARE FROM UNFINISHED TO PB32
B
ENTRANCE PORCH, DECK & PORCH
18 MM EXTERNALLY.
PB31
PB23
38MM THICK CEMENT SCREEDING,18MM THICK 200X914MM MOCHA WOOD LOOK FLOOR TILE 38MM THICK CEMENT SCREEDING,12MM THICK 900X900 MM ONSITE CUT, POLISHED MARBLE WITH CEMENT GROUT
11.PLASTER THICKNESS 12 MM INTERNALLY AND
PB34
PB29
F1 F2
PROJECTIONS.
PB35 PB30
TOILET
REMARK
THICKNESS. 9. FIRST COAT TO BE MADE WITH WATER
300 x 230
REMARK ALL CEILINGS EXCEPT TIOLET,POWDER ROOM
DESCRIPTION
7. BRICKS TO BE LAID WITH FROGS UPWARDS.
WINDOW SCHEDULE WINDOW
DESCRIPTION
12MM THICK PLASTER,1 COAT OF PUTTY,2 COATS OF PRIMER, 2 COATS OF WHITE PAINT 12MM THICK SAND PLASTER FINISHED WITH 2 COATS OF WHITE PAINT
FLOORING FINISH SCHEDULE
SKIRTING SCHEDULE
4. R.C.C FRAMED STRUCTURE.
WALL FINISH SCHEDULE
SR NO.
WORKING DRAWING
3. DATA'S ARE ASSUMED WHEREVER REQUIRED. C5, C13 +169
12000
3
3900
24350
1.5M WIDE FOOTPATH
2
*ALL DIMENSIONS ARE IN MM
14
2400
1600
15
4000
BRICK WALL
16
4000
17
4000
LEVEL MARKER
D1
18
4000
238
TOILET (2200 X 1500) 4.44 Sqm +600 LVL
W2
2700
1
0 00 R6
4000
C1 W1 F2 S1
750
1212
+/-0.00 LVL
2500
+600 LVL
5850
UP
19
C1 W1 F2 S1
3184
+600 LVL
350 x 320 MM R.C.C. PIER
D3
TEMPORARY BENCHMARK
FOYER (5600 X 2200)
DINING AREA (3900 X 4450) PAVED FOOTPATH 23.478 Sqm
+600 LVL
2212
D2
ARCHITECT WITH IMMEDIATE EFFECT IN
LEGEND.
79
Total builtup area: 6000-8000 sqft
1224
D2
SERVANT ROOM (3400 X 2650) 9 Sqm
1000
4000
1575
W3
13736
W1
C1 W1 F2 S1
OF WORK.
690
2500
ad (25420,5447)
L
A
GUEST ROOM (5850 X 3900) 22.82 Sqm +600 LVL
LINES.
17.ANY AMBIGUITY TO BE CLARIFIED BY THE
3200
aa (3184, 5447)
600
7200
6150
6145
2062
600
THE SITE ENGINEER BEFORE THE EXECUTION
PASSAGE (3200 X 1500) 4.8 Sqm +600 LVL
C1W5 F1 -
1062DIAGONAL WITH
450
4000
24998
D2
+600 LVL
4000
4000
450 x 450 PRECAST GUTTER WITH C.I. GRATING
PORCH (2700 X 2500) 6.75 Sqm
6000
900
J
K
325
B
2500
2076
4000
C
TO
BE976 MARKED
16.DRAWINGS TO BE CHECKED THOROUGHLY BY
5317
275
8
51
462
CHAJJA,CANOPIES TO BE SHOWN IN DOTTED
6082
25
+600 LVL
C1 W1 F2 S1
LINE, EXCEPTION FOR CASE SPECIFIC. 195515.VOIDS
D3
750
1800
1641
1200 4000
2076
19061
1200
6369
4000
D2
3200
1149
4500
2549
539 300 300 300 300
3097
6082
215 SQ.M.
4
FOOTPRINT AREA
4350
E
MENTION WITH REFERENCE TO
THE GROUND FLOOR LEVEL.
2500 TOILET (2500 X 1800) C2 W4 4.5 Sqm F4 +600 LVL
W2
C2 W4 F4 -
LIVING ROOM (5700 X 5850) 33.06 Sqm
14.ARCHITECTURAL PROJECTIONS SUCH AS
3
1300
C1W3 13.LEVELS ARE F3 S2
+600 LVL
2
F D
+600 LVLFACE. UNFINISHED
C1W3 F3 S2
1000
1
G
12.ALL ARE FROM UNFINISHED TO 16.8DIMENSIONS Sqm
900
6
1200
1200
KITCHEN
18 MM X4200) EXTERNALLY. (3990
STORE ROOM (2200 X 4200) 12 Sqm
W2
2450
79
I ac (25420,17965)
4000
10
H
ab (3184,17965)
D3
3161
4
3020
1800
2500
73
1030
POWDER ROOM (1800 X 1800) 3.24 Sqm +600 LVL
11.PLASTER THICKNESS 12 MM INTERNALLY AND
2687
4101
19737
10
5700
PROJECTIONS.
1609
4000
2
PROOFING ADMIXTURES. 10.DRIP MOULD TO BE PROVIDED TO ANY
50
2559
2711
1450
991
9. FIRST COAT TO BE MADE WITH WATER
1270
WASH AREA
588
2200
3130
W3
1337
2300
300 300 300 300 300 300 300 300 300
4000
1200
4350
1000
300 300 300 300
4000
450 X 450 PRECAST GUTTER WITH C.I. GRATING
80
W1
W3
300 300 300 300 300 300 300 300 300
4000
4000
4200
4000
1800
80
684
W1
THICKNESS.
4450
4000
900
4000
1000
8. MORTARS SHOULD NOT EXCEED 18 MM IN
W3
85
Semester: 06
7. BRICKS TO BE LAID WITH FROGS1901 UPWARDS. 1800
1895
751
1000
34999
Weekend Home Brief: Design is required for a weekend home with Ground +2 storey height with full or part terrace, The criteria for design are 1. Footprint area of the structure is expected to be in range of 1800 - 2500 sqft 2. Provide all the drawings with necessary details
3960
RESPECTIVELY. 2000
+2000
+2000
SUNK SLAB
132
TITLE : FOUNDATION PLAN.
19411 19736
COLLEGE STAMP & GUIDE'S SIGN.
W1
PLINTH LEVEL +600 LVL
Y
1
2
3
4
5
6
7
8
9
10 Y'
GROUND FLOOR LEVEL
+1700
0.00 LVL
DWG. NO. : 03
TITLE : SECTION
SCALE : 1:50
COLLEGE STAMP & GUIDE'S SI
NAME : SWARANGI S. BHAIRE F1 (1010 x 800)
F2 (1160 x 800)
1310
1460
1010 300
1160
800
230
1100
800
230 ISOLATED ISOLATED
1760 1460 450
230
ISOLATED
800
C1, C2, C7, C9, C10, C11
DOOR & WINDOW SCHEDULE
1100
C3, C4, C6, C8, C12, C14, C15, C16
230
F4 (1460 x 800)
YEAR : 3RD YEAR F4 (1460 x 800)
F3 (1310 x 800) 1610 1310 400
1100
F3 (1310 x 800)
Front Elevation
EXAM. SEAT NO. : 3477
TYPE ISOLATED
800
F2 (1160 x 800)
COLUMN NUMBER C5, C13, C17
1100
FOUNDATION SCHEDULE FOUNDATION F1 (1010 x 800)
WEST ELEVATION
ROLL NO. : 1805
350
Foundation Plan
RIZVI COLLEGE OF ARCHITECTURE
WORKING DRAWING DOOR SCHEDULE
DOOR
SIZE
TYPE
LINTEL
D1
1200 X 2100
NOs
SIZE 1800 X 1400
TYPE
SCALE : 1:50
NAME : SWARANGI S. BHAIRE ROLL NO. : 1805 EXAM. SEAT NO. : 3477
WINDOW SCHEDULE
WINDOW
DWG. NO. : 15
SILL\ LINTEL NOs
T.W. FRENCH DOOR
2100
1
W1
SLIDING WINDOW
SILL - 700 LINTEL - 2100
4
D2
900 X 2100
T.W. FLUSH DOOR
2100
4
W2
900 X 550
AWNING WINDOW
SILL - 1600 LINTEL - 2750
3
D3
750 X 2100
T.W. FLUSH DOOR
2100
3
W3
1000 X 1400
T.W. PANEL WINDOW
SILL - 700 LINTEL - 2100
2
YEAR : 3RD YEAR
RIZVI COLLEGE OF ARCHITECT
WORKING DRAWIN
21
1. THIS IS AN ACADEMIC EXERCISE.
NOTES :-
2. DRAWINGS SHOULD NOT BE MEASURED.
1. THIS IS AN ACADEMIC EXERCISE.
3. DATA'S ARE ASSUMED WHEREVER REQUIRED.
2. DRAWINGS SHOULD NOT BE MEASURED.
4. R.C.C FRAMED STRUCTURE.
3. DATA'S ARE ASSUMED WHEREVER REQUIRED.
5. REFER SEPARATE NOTES FOR MINIMUM DEPTH,THICKNESS,PROJECT
4. R.C.C FRAMED STRUCTURE.
SPECIFICATIONS
5. REFER SEPARATE NOTES FOR MINIMUM
FOR STRUCTURAL MEMBERS.
6148
6. WALLS ARE AND 230 AND 150 MM. THK.
DEPTH,THICKNESS,PROJECT
RESPECTIVELY.
485
5221
OF WORK.
1260
1370
2853
1744 1800
1960
5085
440
5039
3036
860
2700
1470
R.C.C COLUMN BRICK WALL TILE
+5100 LVL
4160
6000
LEGEND.
STAIRCASE (3000 X3900)
F5 -
+6600 LVL
3930
3514
WRITING.
2700
4150
1433
1690 1700
7.1 Sqm
ARCHITECT WITH IMMEDIATE EFFECT IN
300 300 300 300 300 300 300 300 300
6000
300 300 300 300 300 300 300 300 300
3056
1800
1800
290 300 300 300 300 300 300 300 300 300
2140
300 300 300 300 300 300 300 300 300
900
1000
2250
1200
(4160 X 1700) - W2 LEVEL MARKER
R.C.C 4082
OF WORK.
10
BALCONY
+5100 LVL
9
11
W1
8
12
TILE DROP
7
934
6
1800
13
1180
5
TILE
14
- W2 F5 -
4
BRICK WALL
10
STAIRCASE (3000 X3900)
16.DRAWINGS TO BE CHECKED THOROUGHLY BY
17.ANY AMBIGUITY TO BE CLARIFIED BY THE
3
C1 W1 F2 S1
+3400 LVL
DOUBLE HEIGHT
(3900 X4300)
16.77 Sqm R.C.C COLUMN +6600 LVL
TILE DROP
3514
Servants Room Design Plan
TITLE : FIRST FLOOR PLAN.
LEVEL MARKER
COLLEGE STAMP & GUIDE'S SIGN. WALL FINISH SCHEDULE
CEILING FINISH SCHEDULE
LINTEL
First Floor Plan SR NO.
NOs
H DOOR
2100
0
DOOR
2100
5
DOOR
2100
3
TYPE
1.
C1
2.
C2
TYPE
1.
S1
2.
S2
TYPE
DESCRIPTION
REMARK
12 MM THICK PLASTER,12MM THICK 150x1200 MM POLISHED VITRIFIED TILE 12MM THICK PLASTER,12MM THICK 150x1200 POLISHED VITRIFIED TILES OF APPROVED SHADE
ALL ROOMS EXCEPT TOILET AND KITCHEN
1.
F1
38MM THICK CEMENT SCREEDING,18MM THICK 200X914MM MOCHA WOOD LOOK FLOOR TILE
ENTRANCE PORCH, DECK & PORCH
2.
F2
38MM THICK CEMENT SCREEDING,12MM THICK 900X900 MM ONSITE CUT, POLISHED MARBLE WITH CEMENT GROUT
LIVING ROOM , DINING ROOM AND BEDROOM
KITCHEN, STORAGE
3.
F3
38MM THICK CEMENT SCREEDING,12MM THICK 600X1200 POLISHED VITRIFIED TILES OF APPROVED SHADE WITH WHITE CEMENT GROUT
1.
W1
12MM THICK PLASTER,1 COAT OF PUTTY,2 COATS OF PRIMER,2 COATS OF PLASTIC EMULSION PAINT OF APPROVED SHADE AND ONE HIGHLIGHTER WALL WITH EGGSHELL FINISH
2.
W2
18MM THICK PLASTER,WALL SURFACE FINISHED WITH 2 COATS OF SATIN FINISH PAINT OF APPROVED SHADE
3.
W3
4.
W4
5.
W5
ALL INTERNALS WALLS EXCEPT KITCHEN,TOILET
4.
F4
38MM THICK CEMENT SCREEDING,10MM THICK 600X600 ANTI-SKID VITRIFIED TILES OF BARCELONA MAFFIL FINISH
5.
F5
CHINA MOSAIC TILES
D1
1200 X 2100 TERRACE 900 X 2100
D3
750 X 2100
TOILET
18MM THICK PLASTER,WALL SURFACE FINISHED WITH SAND ROUGH PLASTER
ENTRANCE PORCH EXTERNAL WALL
LINTEL
3. DATA'S ARE ASSUMED WHEREVER REQUIRED.
ROLL NO. : 1805 EXAM. SEAT NO. : 3477
NOs
2100
0
T.W. FLUSH DOOR
2100
3
T.W. FLUSH DOOR
2100
1
T.W. FRENCH DOOR
YEAR : 3RD YEAR
S. NO
TYPE
1.
S1
2.
S2
1804 1800
SIZE
W1
1800 X 1400
DESCRIPTION
REMARK
12 MM THICK PLASTER,12MM THICK 150x1200 MM POLISHED VITRIFIED TILE 12MM THICK PLASTER,12MM THICK 150x1200 POLISHED VITRIFIED TILES OF APPROVED SHADE
ALL ROOMS EXCEPT TOILET AND KITCHEN
12MM TUFFEN GLASS FIXED WITH BRACKETS
SILL\ LINTEL NOs
SLIDING WINDOW
SILL - 700 LINTEL - 2100
4
W2
900 X 550
AWNING WINDOW
SILL - 1600 LINTEL - 2750
1
W3
1000 X 1400
T.W. PANEL WINDOW
SILL - 700 LINTEL - 2100
0
8. MORTARSSRSHOULD NOT EXCEED 18 MM IN
WALL FINISH SCHEDULE REMARK ALL CEILINGS EXCEPT TIOLET,POWDER ROOM TOILET
TYPE
DESCRIPTION
REMARK
F1
38MM THICK CEMENT SCREEDING,18MM THICK 200X914MM
ENTRANCE PORCH, DECK & PORCH
2.
F2
38MM THICK CEMENT SCREEDING,12MM THICK 900X900 MM ONSITE CUT, POLISHED MARBLE WITH CEMENT GROUT
LIVING ROOM , DINING ROOM AND BEDROOM
3.
F3
NO.
THICKNESS. 1.
KITCHEN, STORAGE
MOCHA WOOD LOOK FLOOR TILE 9. FIRST COAT TO BE MADE WITH WATER
38MM THICK CEMENT SCREEDING,12MM THICK 600X1200 POLISHED VITRIFIED TILES OF APPROVED SHADE WITH WHITE CEMENT GROUT
18 MM EXTERNALLY. 5. F5
CHINA MOSAIC TILES
KITCHEN, STORAGE
1200
SR NO.
TYPE
DESCRIPTION
1.
W1
12MM THICK PLASTER,1 COAT OF PUTTY,2 COATS OF PRIMER,2 COATS OF PLASTIC EMULSION PAINT OF APPROVED SHADE AND ONE HIGHLIGHTER WALL WITH EGGSHELL FINISH
TERRACE
UNFINISHED FACE. 13.LEVELS ARE MENTION WITH REFERENCE TO THE GROUND FLOOR LEVEL.
40 MM THK CEMENT SCREEDING
14.ARCHITECTURAL PROJECTIONS SUCH AS
100 MM THK BB COBA
CHAJJA,CANOPIES TO BE SHOWN IN DOTTED
1500
REMARK
DWG. NO. : 07
SCALE : 1:50
ALL INTERNALS WALLS EXCEPT KITCHEN,TOILET ALL EXTERNAL WALLS EXCEPT ENTRANCE PORCH
2.
W2
18MM THICK PLASTER,WALL SURFACE FINISHED WITH 2 COATS OF SATIN FINISH PAINT OF APPROVED SHADE
3.
W3
12MM THICK PLASTER,10MM THICK 300X450 MM VITRIFIED TILES OF TWO FINISH (SEASON LIGHT AND SEASON DARK) UPTO 2.4M HEIGHT
4.
W4
12MM THICK PLASTER,10MM THICK 600X1200 VITRIFIED TILE (BARCELONE MAFFIL AND ANGORA COFFEE FINISH ) UPTO 2.5 M HEIGHT
TOILET
5.
W5
18MM THICK PLASTER,WALL SURFACE FINISHED WITH SAND ROUGH PLASTER
ENTRANCE PORCH EXTERNAL WALL
KITCHEN
NAME : SWARANGI S. BHAIRE ROLL NO. : 1805 EXAM. SEAT NO. : 3477
YEAR : 3RD YEAR
TOILET,POWDER ROOM
12.ALL DIMENSIONS ARE FROM UNFINISHED TO 10 MM THK VITRIFIED TILE FLOOR FINISH
+9600 LVL
RIZVI COLLEGE OF ARCHITECTURE
WORKING DRAWING
LINE, EXCEPTION FOR CASE SPECIFIC.
3000
+8100 LVL
2 COATS OF WHITE PAINT
RESPECTIVELY.
38MM THICK CEMENT SCREEDING,10MM THICK 600X600 4. F4 11.PLASTER THICKNESS 12 ANTI-SKID MM INTERNALLY AND VITRIFIED TILES OF BARCELONA MAFFIL FINISH
TERRACE LEVEL
SECOND FLOOR MIDLANDING LEVEL
THICK SAND PLASTER FINISHED WITH 6. WALLS ARE2. ANDC2230 AND 15012MM MM. THK.
PROJECTIONS.
D2
+10800 LVL
NO.
12MM THICK PLASTER,1 COAT OF PUTTY,2 COATS OF PRIMER, FOR STRUCTURAL MEMBERS. C1 1.
WORKING PROOFING ADMIXTURES. 10.DRIP MOULD TO BE PROVIDED TO ANY DRAWING
100X100 MM M.S STEEL BOX SETION
TYPE
DEPTH,THICKNESS,PROJECT SPECIFICATIONS SR TYPE DESCRIPTION
7. BRICKS TO BE LAID WITH FROGS FLOORING UPWARDS. FINISH SCHEDULE
SKIRTING SCHEDULE
WINDOW SCHEDULE WINDOW
4. R.C.C FRAMED STRUCTURE. 5. REFER SEPARATE NOTES FOR MINIMUM
2 COATS OF WHITE PAINT
MUMPTY LEVEL +12600 LVL
COLLEGE STAMP & GUIDE'S SIGN.
1. THIS IS AN ACADEMIC EXERCISE.
NAME : SWARANGI S. BHAIRE 2. DRAWINGS SHOULD NOT BE MEASURED.
CEILING FINISH SCHEDULE
TYPE
SIZE
D2
TITLE : SECOND FLOOR PLAN.
SCALE NOTES : 1:50 :-
KITCHEN
12MM THICK PLASTER,10MM THICK 600X1200 VITRIFIED TILE (BARCELONE MAFFIL AND ANGORA COFFEE FINISH ) UPTO 2.5 M HEIGHT
DOOR SCHEDULE
TOILET,POWDER ROOM
DOOR
OHT SHEAR WALL AS PER STRUCTURAL DRAWING
+14400 LVL
PARAPET LEVEL
DWG. NO. : 05
ALL EXTERNAL WALLS EXCEPT ENTRANCE PORCH
12MM THICK PLASTER,10MM THICK 300X450 MM VITRIFIED TILES OF TWO FINISH (SEASON LIGHT AND SEASON DARK) UPTO 2.4M HEIGHT
R.C.C
Second Floor Plan
REMARK
KITCHEN, STORAGE
R.C.C COPING
OVER HEAD TANK LEVEL
15.VOIDS TO BE MARKED WITH DIAGONAL LINES.
BEDROOM 4
LIBRARY
W1
16.DRAWINGS TO BE CHECKED THOROUGHLY BY
D2
D2
1500
THE SITE ENGINEER BEFORE THE EXECUTION OF WORK.
SECOND FLOOR LEVEL
17.ANY AMBIGUITY TO BE CLARIFIED BY THE
+6600 LVL
1500
ARCHITECT WITH IMMEDIATE EFFECT IN FIRST FLOOR MIDLANDING LEVEL +5100 LVL
3000
2
DESCRIPTION
WRITING. BEDROOM 2
BEDROOM 3
PASSAGE
LEGEND.
W1
1500
3
SILL - 700 LINTEL - 2100
TYPE
EARTH PACKING
BALCONY
FIRST FLOOR LEVEL +3600 LVL
BRICK WALL 1500
SILL - 1600 LINTEL - 2750
TOILET
SR NO.
MIDLANDING LEVEL +2100 LVL
3000
NDOW
WINDOW
SR NO.
R.C.C DINING AREA
LIVING ROOM
PASSAGE
SCREEDING
W1
1500
4
ALL CEILINGS EXCEPT TIOLET,POWDER ROOM
REMARK
SILL\ LINTEL NOs SILL - 700 LINTEL - 2100
12MM THICK PLASTER,1 COAT OF PUTTY,2 COATS OF PRIMER, 2 COATS OF WHITE PAINT 12MM THICK SAND PLASTER FINISHED WITH 2 COATS OF WHITE PAINT
DESCRIPTION
E
NDOW
REMARK
FLOORING FINISH SCHEDULE
SKIRTING SCHEDULE S. NO
DESCRIPTION
AS
THE SITE ENGINEER BEFORE THE EXECUTION
2
BALCONY (6000 X 6000) 36 Sqm
W1
SUCH
15.VOIDS TO BE MARKED WITH DIAGONAL LINES. 2000
2700
LEGEND. LIBRARY
PROJECTIONS
CHAJJA,CANOPIES TO BE SHOWN IN DOTTED
888
1067
1120
THE GROUND FLOOR LEVEL.
W3
15
9
11
- W2 F5 -
+3400 LVL
D2
16
8
12
1700
13.LEVELS ARE MENTION WITH REFERENCE TO
LINE, EXCEPTION FOR CASE SPECIFIC.
1
196
UNFINISHED FACE.
+6600 LVL
14.ARCHITECTURAL
ARCHITECT WITH IMMEDIATE EFFECT IN
17
7
13
414
18 MM EXTERNALLY. 12.ALL DIMENSIONS ARE FROM UNFINISHED TO
3900
18
6
1650
BALCONY (2000 X 5085) 10 Sqm
THE SITE ENGINEER BEFORE THE EXECUTION
19
5
14
W1
BALCONY (4000 X 1700) 9.35 Sqm
3440
4
15
920
3
16
1800
2
17
1180
PROJECTIONS.
- W2 F5 -
15.VOIDS TO BE MARKED WITH DIAGONAL LINES.
WRITING.
1
18
C2 W4 F4 -
4533
CHAJJA,CANOPIES TO BE SHOWN IN DOTTED
W1
19
C1 W1 F2 S1 TOILET (2200 X 1500) 3.3 Sqm +3600 LVL
W2
W1
C1 W1 F2 S1
LINE, EXCEPTION FOR CASE SPECIFIC.
2700
+3600 LVL
D3
AS
3900 TO BE CLARIFIED BY THE 17.ANY AMBIGUITY
BEDROOM 2 (3900X 4300) 16.77 Sqm
238
+6600 LVL
SUCH
10.DRIP MOULD TO BE PROVIDED TO ANY 11.PLASTER THICKNESS 12 MM INTERNALLY AND
GYM (5700 X 2500) 20.09 Sqm
+6600 LVL
THE GROUND FLOOR LEVEL. C1 W1
F2 S1PROJECTIONS 14.ARCHITECTURAL
THICKNESS. 9. FIRST COAT TO BE MADE WITH WATER PROOFING ADMIXTURES.
3300
1000
1800
462
4300
1640
2161
D2
750
876
2849
UNFINISHED(3990 FACE.X 5850)
D2
8. MORTARS SHOULD NOT EXCEED 18 MM IN 2000
Sqm WITH REFERENCE TO 13.LEVELS ARE 23.4 MENTION
D2
2212
920
12.ALL DIMENSIONS ARE FROM UNFINISHED TO
597
3362
3050
2562
WALK IN WARDROBE (3200X 1640) C1 W1 5.248 Sqm +3600 LVL F2 S1
3960
16.DRAWINGS TO BE CHECKED THOROUGHLY BY
+3600 LVL
3362
820
BEDROOM 3
750
WALK IN WARDROBE (3200X 1640) 5.248 Sqm C1 W1 +6600 LVL F2 S1
C1 W1 F2 S1
PASSAGE (4150 X 1500) 6.9 Sqm
1500
W1
D2
18 MM EXTERNALLY.
2606
200 1000
1862 2160
+3600 LVL
D2
W3
3028
1950
BEDROOM 1 (5850 X 3900) 22.8 Sqm
C1 W1 F2 S1
530
920
11.PLASTER THICKNESS 12 MM INTERNALLY AND
D3
600 820
460
4351 900
1800
PROJECTIONS. C2 W4 F4 -
1541
2562
C2 W4 F4 -
D3
2700
+3600 LVL
900
D2
+3600 LVL
FAMILY ROOM (5700 X 5850) 33.06 Sqm
C1 W1 F2 S1
600
WALK IN WARDROBE (3200X 1640) C1 W1 5.248 Sqm +3600 LVL F2 S1
1640
TOILET (2500 X 1800) 4.5 Sqm
1800
2815
2300
+3600 LVL
W2
1280
192 900
2565
1273
PROOFING ADMIXTURES.
RESPECTIVELY.
10.DRIP MOULD TO BE PROVIDED TO ANY
TOILET (2200 X 2300) 5.06 Sqm +6600 LVL
6. WALLS ARE AND 230 AND 150 MM. THK. 7. BRICKS TO BE LAID WITH FROGS UPWARDS.
9. FIRST COAT TO BE MADE WITH WATER
5700
932
BEDROOM 3 (3990 X4200) 16.8 Sqm
C2 W4 F4 -
750
2161
3020
W4
W1
D2
D3
3362
1030
919
1000
W2
TOILET (2200 X 2300) 5.06 Sqm +3600 LVL
W2
1800
1270
1981 80
900
W4
W1
2200
+3400 LVL 1800
80
1180 W4
W1
2101
1000
1635
809
W4
W1
THICKNESS.
2565
863
3960
8. MORTARS SHOULD NOT EXCEED 18 MM IN
1800
1800
1770
2000
4894
1800 1900 7. BRICKS TO BE LAID WITH FROGS UPWARDS.
4895
5688
BALCONY (6000 X 2000) 12 Sqm
SPECIFICATIONS
FOR STRUCTURAL MEMBERS.
BB COBA
PLINTH PROTECTION
PLINTH LEVEL +600 LVL
*ALL DIMENSIONS ARE IN MM
GROUND FLOOR LEVEL 0.00 LVL
230 MM DRY RANDOM RUBBLE
Servants Room Plan TITLE : SECTION
EARTH PACKING
COLLEGE STAMP & GUIDE'S SIGN.
SECTION AA'
Section AA’
DWG. NO. : 11 KEY PLANS
DOOR & WINDOW SCHEDULE
NAME : SWARANGI S. BHAIRE
A W3
A W1
W3
W1
BALCONY (6000 X 2000) 12 Sqm
W3
D3
STORE ROOM (2200 X 4200) 12 Sqm +600 LVL
C1W3
KITCHEN (3990 X4200) 16.8 Sqm +600 LVL
C1W3 F3 S2
POWDER ROOM (1800 X 1800) 3.24 Sqm +600 LVL C2 W4 F4 -
W2
W2
+600 LVL
W4
W1
W4
W2
W2
TOILET (2200 X 2300) 5.06 Sqm +3600 LVL
D2
D3
TOILET (2500 X 1800) 4.5 Sqm +3600 LVL
C2 W4 F4 -
BEDROOM 3 (3990 X4200) 16.8 Sqm
FAMILY ROOM
W4
W1
TOILET (2500 X 1800) C2 W4 4.5 Sqm F4 +600 LVL
D3
LIVING ROOM (5700 X 5850) 33.06 Sqm
A
+3400 LVL
W1
WASH AREA
SCALE : 1:50
C2 W4 F4 W2
TOILET (2200 X 2300) 5.06 Sqm +6600 LVL
D2
C2 W4 F4 D3
BEDROOM 3
W1
W4
ROLL NO. : 1805
Servants Room Sections
22
Compound Details Sheet
NOTES :1. THIS IS AN ACADEMIC
2. DRAWINGS SHOULD N
4. R.C.C FRAMED STRUCT
2400
5. REFER SEPARATE NOTE
1800
2500
3. DATA'S ARE ASSUMED
DEPTH,THICKNESS,PRO
FOR STRUCTURAL MEM
6. WALLS ARE AND 230 AN FRONT ELEVATION
RESPECTIVELY.
@SCALE 1:50
7. BRICKS TO BE LAID WIT
8. MORTARS SHOULD NO THICKNESS. A
9. FIRST COAT TO BE MAD
B
PROOFING ADMIXTURE
10.DRIP MOULD TO BE PR PROJECTIONS. 350 X 350 MM RCC PIER
11.PLASTER THICKNESS 12 18 MM EXTERNALLY.
12.ALL DIMENSIONS ARE F UNFINISHED FACE. I
I'
MUFASA 6W UP - DOWN WATERPROOF LED WARM LIGHT
13.LEVELS ARE MENTION W
THE GROUND FLOOR L
14.ARCHITECTURAL PROJE 16 THK M.S. SHEET WELDED AS PER SPECIFICATION WITH ONE COAT OF ANTI-RUST PAINT 40X40 MM M.S. BOX SECTION WELDED AS PER SPECIFICATION WITH ONE COAT OF ANTI-RUST PAINT
CHAJJA,CANOPIES TO B
LINE, EXCEPTION FOR C 15.VOIDS TO BE MARKED
16.DRAWINGS TO BE CHEC
THE SITE ENGINEER BE
COMPOUND WALL ELEVATION
OF WORK. A'
B'
17.ANY AMBIGUITY TO BE
ARCHITECT WITH IMM WRITING.
40X40 MM M.S. BOX SECTION WELDED AS PER SPECIFICATION WITH ONE COAT OF ANTI-RUST PAINT
SECURITY CABIN
70
350
230
350 X 350 MM RCC PIER
6400 350
9600
4000
2500
11036
PLAN @ I-I'
350 X 350 MM RCC PIER
40 70 40 100
40 100
40 100
40 100
40
100
40 100
40
SECURITY CABIN
40 70 40 70 40 100
40 100
40 100
40 100
40 100
40 100
40 100
40 100 40 100 40 100 40 70 40 70 40 40 70 40 70 40 100
40 100
40 100
40 100
40 100
40 100
40 100
230 MM THK BRICK WALL WITH 18MM PLASTER
40 100 40 100 40 100 40 70 40 70 40
TITLE : COMPOUN
COLLEGE STAMP PLAN @ I-I'
350 X 350 MM RCC PIER
18 MM CRYSTALLO 300 X 600 MM RUSTIC TILE 10 MM CEMENT BACKING 18 MM CRYSTALLO 300 X 600 MM RUSTIC TILE
350 X 350 MM RCC PIER
10 MM CEMENT BACKING
NAME : SWARANG
50 MM THK R.C.C PRECAST PLANTER
18MM EXTERNAL PLASTER
FOOTPRINT AREA 215 sqm
CORBELLING
ROLL NO. : 1805
PAVER BLOCKS
PAVER BLOCKS
EXAM. SEAT NO. :
KERB STONE
KERB STONE C.I. GRATING ROAD LEVEL
C.I. GRATING
ROAD LEVEL
P.C.C BENCHING BRICK FOOTING
BRICK FOOTING
SECTION A A'
YEAR : 3RD YEAR
450 X 450 R.C.C GUTTER LAID TO SLOPE
450 X 450 R.C.C GUTTER LAID TO SLOPE P.C.C BENCHING
23
DWG. NO. : 20
18MM EXTERNAL PLASTER
KEY PLAN
SECTION B B'
WORKING D
Kitchen Details Sheet
Details
24
Competitions & Experience A.N.D.C Entry 2019 @ National Association of students of Architecture (N.A.S.A)
A.N.D.C Entry 2020 @ National Association of students of Architecture (N.A.S.A)
P O S T E R PANVEL BUS TERMINUS
25
S.S.A.388
ANDC 2020-21
Laurie Baker Trophy Entry 2019 @ National Association of students of Architecture (N.A.S.A)
Intach Heritage Awards Entry 2019 Documentation of Jhuntamara village, Orissa Won - Award of Excellence ( National Level) U N C H A R T E D H A M L E T O F J H U N TA M A R A , O D I S H A , I N D I A - Retracing the Abodes of the ‘Forgotten Tribe’- Jani Heritage as defined by UNESCO is “a legacy that we received from the past that we experience in the present and that w e w i l l p a s s o n t o f u t u r e g e n e r a t i o n”
Such villages like Jhuntamara, might lack in character regarding their built form, but through the years they have adapted, and are now are very familiar with the material and their building methods. It is important that we take into consideration that the area along the coastline of Bay of Bengal is frequently affected by cyclones and heavy rainfall, which has a negative impact on their homes and daily routines.
Fo r g e n e r a t i o n s p e o p l e a r e s t r i v i n g t o p r e s e r v e t h e i r h e r i t a g e w h i l e a d a p t i n g t o c h a n g e s i n s o c i e t y w h i c h l e a d s t o t h e question, “Is heritage always supposed to be monumental?”. A place, before it is considered monumental holds engaging and functional attributes, by repetition, by the people, which is later defined as a “heritage site.”
H e n c e , u s a g e o f l i g h t e r m a t e r i a l s a n d e a s y- t o - m a i n t a i n h o m e s i s plausible and justified. During such heavy rainfalls, the pond also acts as a storage unit while it actively recharges the groundwater level, and also makes the soil very fertile which is ideal for the type of plantations set up.
S u c h s i t e s a r e p r e d o m i n a n t l y m a d e b y a c e r t a i n c o m m u n i t y, t o p r a c t i c e t h e i r r i t u a l s o r d a i l y p r a c t i c e s , w h i c h o f t e n c e l e brates their cultural and traditional upbringing which has been passed down to them by their ancestors. On the banks of the Mahanadi river there is an arrangement of settlements of various tribes strongly arranged with “ h i e r a r c h y o f t h e c a s t e s y s t e m” , w h i c h d i c t a t e s t h e a r e a f o r t h e i r d w e l l i n g s . M o v i n g a w a y f r o m t h e m a i n r i v e r, t h e r e i s a noticeable shift in the, “social status” of these occupants. The ones who are considered to belong from a higher sect of s o c i e t y m a i n l y r e s i d e n e a r t h e r i v e r b a n k s , w h i l e t h o s e w h o d o n’ t , o c c u p y t h e l a n d s f u r t h e r a w a y f r o m i t .
The people in Jhuntamara had a physical connect with their homes. As the walls were made of mud, it required day to day maintenance. So they would make a conc o c t i o n o f c l a y, c o w dung and water once a week and applied this layer over the walls and the floor of the house and its plinth.
Alpona was frequently painted on the walls a n d t h e e n t r a n c e o f t h e i r h o m e s t o h o n o r, a n d welcome their deities. The paste used for it w a s m a d e u s i n g r i c e f l o u r a n d w a t e r. T h e abundance of water allowed the cultivation of rice, which is now a part of their culture.
T h e a r e a o f t h i s p a r t i c u l a r s t u d y, J h u n t a m a r a , h o l d s a s a n e x a m p l e t o s u c h c o m m u n i t i e s , w h i c h d e s p i t e b e i n g d e prived of the are wholly self-sufficient and are thriving on their own, irrespective of their place in the traditional c o n c e p t o f s o c i e t y. Wa t e r a s h a r e d r e s o u r c e a m o n g t h e p e o p l e b i n d s t h e c o m m u n i t y t o w a r d s i t s u s e f r o m c o m m o n s o u r c e s . S u c h c o m m u n i t i e s , t h a t a r e a w a y f r o m t h e r i v e r, a n d a r e a t a d i s a d v a n t a g e o v e r c a m e t h i s p r o b l e m b y taking initiative and building artificial ponds around their settlements. The water from these ponds is used for their daily activities which was dug by their ancestors and is considered a part of their heritage. They identify the pond as a part of their routine which, if taken away will cause major distress in their lives.
The tribe had a set routine for their daily affair and it majorly revolved around water:The pond, which was an important space for village, mainly contained graywater which was used for bathing and various purposes. The men and women went in groups to take a bath in the pond at different set timings.
Po s t l u n c h w o m e n u s u a l l y g o n e a r t h e h a n d p u m p to refill drinking water while they have a short conversation as they wait for their turn with their pots and pails. After having a bath the women walk back to their homes and they pour water on the sacred t u l s i p l a n t t h a t s t o o d a t t h e c e n t r e o f t h e i r c o u r ty a r d . T h e y b e l i e v e t h a t a h e a l t h y, g r e e n p l a n t , signifies prosperity and the gods blessing over t h e f a m i l y.
During the afternoon, the women would go to the well which is adjacent to the pond and fetch water for their house work. Even though it was situated in the backyard of a house, it was free for use for the entire village. They were no said-unsaid boundaries, which strengthened the community spirit of Jhuntamara.
P OND
After they completed most of their chores the began to prepare lunch in their kitchens that were supposed to be sacred and they kept it out of bounds from the outsiders.
C LU S T E R 3
Water and Jh un tamara are i ntricately w oven tog ether, as th ei r lif e wh olly d epen ds on i t in f orm of Pon d, Han dp ump s an d A qu edu cts. D urin g the 2012 f ires of Jhu n tamara, the pon d s aved th e li ves of the enti re vill ag e b ecau se of its close p rox imity, an d th e vi llage would bu rn down to the g rou n d if i t was n’t f or th is p ond , water is ess enti al for su rvival b ut h ow its ab ud ance h as created thi s b eau tif ul cultu re arou nd h ere from the food th ey eat to th e h ouse ive in the ous e they th ey llive i n..
Rice paddies are worked by men and women alike as they drench their feet in the muddy waters to plant the rice saplings. Rice requires large amounts of water which is provided by the pond
Fe e d e r s w e r e t h e n f i l l e d w i t h w a t e r, f o r t h e c o w s a n d t h e g o a t s before they are left to graze. B e c a u s e t h e w i l d b o a r c o u l d n’ t b e s e t f r e e , a s m a l l c o n t a i n e r was filled with water for them, which was chained to the pole a n d r e f i l l e d p e r i o d i c a l l y.
La t e r i n t h e a f t e r n o o n , t h e s e f i e l d w o r k e r s t a k e a short nap along the side of the pond under the shade of the trees. A cooler environment is gained due to evaporative cooling along the sides of the pond, making it an ideal pause point after their crusade in the fields.
Internship 2021
26
Other Skills
Painting on Canvas
ARD - Semester 03
Humanities- Semester 01
Bamboo Workshop
EVS Semester 02
27
New material: Clay
TENT- Semester 01 AD
Model Making
28
+91 8424992203 swara.bhaire@gmail.com