Laindon Newsletter | Summer 2021

Page 1

LAINDON NEWSLETTER

Summer 2021 www.laindonfutures.co.uk

NEXT STEPS TO A NEW LAINDON At the beginning of June Swan Housing Association sent local residents a letter outlining the plans to pause work on the Laindon Place regeneration whilst we obtain an updated planning permission. As set out in that letter, we would like to reassure the local community that Swan remains committed to delivering a new high street and moving their staff from Billericay to our new Laindon office which is the building on the corner at the Laindon Link end of the site. The updated planning permission will reflect changes to the highways required by Essex

County Council; the change to steel-framed modular construction (to address changes to regulations since the original planning consent was granted) and a number of design efficiencies (because of the change to steel framed modular construction) which may allow us to include additional homes. Swan is committed to making the plans for Laindon Place work harder and for example, we hope that we can now replace a number of the smaller studio flats with one-bedroom flats. After all, lockdown has reminded everyone how important it is to have a bit of extra space in our homes. Please do be assured, Swan has no plans to put a tower block on the site!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Laindon Newsletter | Summer 2021 by Swan Housing Association - Issuu