
2 minute read
New Orleans Landmass Projects
LAKE CAMPUS
1. Student Housing
Advertisement
2. Mille M. Charles School of Social Work
3. College of Arts & Sciences
4. College of Business and Public Administration
5. College of Education and Human Development
6. Information Technology Center
7. Cafeteria
PARK CAMPUS

8. University Center
9. Knight’s Dining Hall
10. Maintenance Building
11. Central Plant
12. Tennis Courts
13. Leonard S. Washington Memorial Library
14. Arts, Humanities and Social Sciences Building
15. Emmett W. Bashful Administration Building
16. Science Buidling
17. Natural Sciences Building
18. Conference Center
19. Health & Physical Education Building
CAFETERIA - VIEW FROM NORTH

Project Summary
PROJECT SUMMARY - CAFETERIA
BUILDING DATA
BUILDING DATA
Building Area 24,650 SQ FT
The proposed new cafeteria facility will be located on the Lake Pontchartrain (northern) side of the campus on a vacant lot adjacent to student housing and the FBI Building. Students at Southern University New Orleans campus will soon have a modern, new dining option near student housing. The new building will be a contemporary one-story facility with seating for more than 150 and a private dining seating for 60.

The proposed new cafeteria facility will be located on the Lake Ponchartrain (northern) side of the campus on a vacant lot adjacent to student housing and the FBI Building. Students at Southern University New Orleans campus will soon have a modern, new dining option near student housing. The new building will be a contemporary one-story facility with seating for more than 150 and a private dining seating for 60. The HUB facility will have five food selections/vendors, like Starbucks, Subway, Flip Kitchen, Bento Sushi, and Chick-Fil-A, and a salad bar with fresh food.
The HUB facility will have ve food selections/vendors, like Starbucks, Subway, Flip Kitchen, Bento Sushi, and Chick-Fil-A, and a salad bar with fresh food.
CAFETERIA - PROJECT SUMMARY
Number of Stories 1
Number of Stories 1
Building Height25’
Building Height 25’
Building Area 24,650 SQ FT

COST ESTIMATE
Building Estimate $

COST ESTIMATE
FF&E $
Site / Landscaping $

10,800,000
185,000 70,000
Budget 10.8 M
Soft Cost $
TOTAL PROJECT COST $
660,000 11,715,000

Degree Programs
• UNDERGRADUATE-- NURSING
PROJECT SUMMARY
The Nursing Program is currently housed in the Natural Sciences Building and partially occupies the second floor with the capacity to enroll 30 plus students but envisions expanding its capacity to increase enrollment by constructing a facility that will accommodate up to 100 pre-nursing and nursing students each year.
The proposed new facility will be located on a vacant parcel which exists between the Natural Sciences Building and the Administration Building. The facility will include programmed spaces such as, administration, lecture hall, library, clinical/ medical/simulation lab spaces, student study rooms, student lounge, and a computer testing lab. The project phase one will start in 2023, with the construction phase commencing in 2024, with an estimated completion in time for the opening of the Fall Semester 2026. Phase Two will accommodate planned growth of the Nursing program to graduate 100 nursing students.
Building
