2 minute read

New Orleans Landmass Projects

LAKE CAMPUS

1. Student Housing

Advertisement

2. Mille M. Charles School of Social Work

3. College of Arts & Sciences

4. College of Business and Public Administration

5. College of Education and Human Development

6. Information Technology Center

7. Cafeteria

PARK CAMPUS

8. University Center

9. Knight’s Dining Hall

10. Maintenance Building

11. Central Plant

12. Tennis Courts

13. Leonard S. Washington Memorial Library

14. Arts, Humanities and Social Sciences Building

15. Emmett W. Bashful Administration Building

16. Science Buidling

17. Natural Sciences Building

18. Conference Center

19. Health & Physical Education Building

CAFETERIA - VIEW FROM NORTH

Project Summary

PROJECT SUMMARY - CAFETERIA

BUILDING DATA

BUILDING DATA

Building Area 24,650 SQ FT

The proposed new cafeteria facility will be located on the Lake Pontchartrain (northern) side of the campus on a vacant lot adjacent to student housing and the FBI Building. Students at Southern University New Orleans campus will soon have a modern, new dining option near student housing. The new building will be a contemporary one-story facility with seating for more than 150 and a private dining seating for 60.

The proposed new cafeteria facility will be located on the Lake Ponchartrain (northern) side of the campus on a vacant lot adjacent to student housing and the FBI Building. Students at Southern University New Orleans campus will soon have a modern, new dining option near student housing. The new building will be a contemporary one-story facility with seating for more than 150 and a private dining seating for 60. The HUB facility will have five food selections/vendors, like Starbucks, Subway, Flip Kitchen, Bento Sushi, and Chick-Fil-A, and a salad bar with fresh food.

The HUB facility will have ve food selections/vendors, like Starbucks, Subway, Flip Kitchen, Bento Sushi, and Chick-Fil-A, and a salad bar with fresh food.

CAFETERIA - PROJECT SUMMARY

Number of Stories 1

Number of Stories 1

Building Height25’

Building Height 25’

Building Area 24,650 SQ FT

COST ESTIMATE

Building Estimate $

COST ESTIMATE

FF&E $

Site / Landscaping $

10,800,000

185,000 70,000

Budget 10.8 M

Soft Cost $

TOTAL PROJECT COST $

660,000 11,715,000

Degree Programs

• UNDERGRADUATE-- NURSING

PROJECT SUMMARY

The Nursing Program is currently housed in the Natural Sciences Building and partially occupies the second floor with the capacity to enroll 30 plus students but envisions expanding its capacity to increase enrollment by constructing a facility that will accommodate up to 100 pre-nursing and nursing students each year.

The proposed new facility will be located on a vacant parcel which exists between the Natural Sciences Building and the Administration Building. The facility will include programmed spaces such as, administration, lecture hall, library, clinical/ medical/simulation lab spaces, student study rooms, student lounge, and a computer testing lab. The project phase one will start in 2023, with the construction phase commencing in 2024, with an estimated completion in time for the opening of the Fall Semester 2026. Phase Two will accommodate planned growth of the Nursing program to graduate 100 nursing students.

Building

This article is from: