Skip to main content

Mindanao Daily Set B (October 5, 2016)

Page 1

vertical home builders enterprises

For refreshments, visit:

Patag Highway, Cagayan de Oro City

Tel. No. 858-5789 / Fax No. 850-5020; Cel. Nos. 0919-655-3754, 0923-304-2676 Email: verticalhomebuilders@yahoo.com

“YOU NAME IT, WE HAVE IT.”

FOUR-WAY

GOD IS GOOD

TEST

Dealer of hardware and construction materials: Product Lines: Angle Bars; Gl Pipes; C-Purlins; Holow Blocks; Coco Lumber; Carrying Channel; Double Furring Channel; Single Furring ; Acoustic Board; Polycarbonate; Power Tools; Good Lumber S4S; Panel Doors; PVC Laminated Panel; PVC Vertical Blinds; Roller Blinds ; Wooden Blinds; Armstrong Vinyl Tiles; Kent Vinyl Tiles; Parquet Tiles - Apo Vinyl Tiles.

THE

of the things we think, say or do

GREAT FOODS AWESOME DRINKS FUN TIMES

1. Is it the TRUTH? 2. Is it FAIR to all concerned? 3. Will it build GOODWILL and BETTER FRIENDSHIP? 4. Will it be BENEFICIAL to all concerned?

PHILIPPIANS 4:13 I CAN DO ALL THIS THROUGH HIM WHO GIVES ME STRENGTH

MindanaoDAILY Distributor & Dealer of: Steel Bars; Holcim Cement; Davis Paint; Sand & Gravel; Plywood; INdustrial Supplies; Finishing Supplies; Electrical Supplies; Power Tools; Air Compressors

BUSINESS | ARTS & CULTURE | HEALTH | TRAVEL & TOURISM | PEOPLE | REALTY | EVENTS

B1

DepEd-10 celebrates World Teachers’ Day cheng ordoÑez, Section Editor

By AIRENE ORION-SUAN MT-I

CAGAYAN DE ORO CITY -- The Department of Education (DepEd) in Region 10 is holding simultaneous celebrations of the World Teacher’s Day ( WTD), today, Oct. 5, 2016, at Limketkai Atrium, Limketkai Center, here, as a regional culmination of the monthlong activities for those in the teaching profession. This is to express the education sector’s appreciation for the important role of teachers in implementing the educational reforms in the region, as pursuant to Presidential Proclamation No. 242, declaring the period from September 5 to October 5 of every year, dubbed as “National Teachers’ Month.” The celebration aims to honor those who are in

web portal: www.mindanaodailynews.com

the teaching profession; revitalize the image of and respect for teaching as a vocation by increasing public awareness on the value of teachers in the Philippine society; take the occasion as an opportunity in building the image of teaching as an attractive and fulfilling profession and generate widespread support and assistance for teachers. Regional activities highlighting the big event include awarding of winners in the Search for Outstanding Teacher (I,II, III) and Master Teacher ( I, II) for both elementary and junior high school levels, including ALS Teacher, Mobile Teacher, Multigrade Teacher, Kindrgarten, Special Education Teacher. Marking its additional difference on the DepEd

By PAT SAMONTE Caraga Regional Editor

“A bunch of intentionally and maliciously planted trees caused the tripping of the Agus 5-Aurora 138-kV line and subsequent tripping of the Baloi-Aurora 138kV line on September 15, 2016. These tripping caused the blackout of the entire Z amboanga peninsula, including areas served by distribution utilities ZAMSURECO I, ZAMSURECO II, ZAMCELCO, MOELCI I, MOELCI II, and parts of LANECO, at 11:37 am.

The lines were restored at 12:01 PM,” a press release issued by National Grid Corporation of the Philippines (NGCP) said. The grid operator said it conducted right-of-way clearing activities on both lines last February, 2016, except at the area between towers 29 and 30 of the Agus 5-Aurora 138-kV line located in the property of a landowner who refused access for maintenance activities. These uncut and untrimmed trees, apart from violating See says, page B7

October 5, 2016

(Upper Photo L to R: ECCD Engineer ROMIEL IGNO, ECCD Program Management Officer LETICIA PICHAY, Libertad Mayor LEONARDO L. UY, Vice Mayor MIGUEL JUARIO, Vice Governor JOEY G. PELAEZ. Provincial Board Member LILIAN U. GALLOGO, ERMA C. LAGARE of LGU Libertad and Child Development Teacher KAREFF MAE N. ENERIO) EQUIPPING OUR CHILD DEVELOPMENT CENTERS IN MISAMIS ORIENTAL – ECCD Designated Program Area Coordinator for Misamis Oriental VICE GOVERNOR JOEY G. PELAEZ, Early Childhood Care and Development (ECCD) Program Management Officer LETICIA PICHAY (Former DepEd Assistant Secretary) and ECCD Engineer ROMIEL IGNO inspect the National Child Development Center in Libertad, Misamis Oriental. They also donated a Computer Set thru Child Development Teacher KAREFF MAE ENERIO. This is part of the intensified efforts of Vice Governor Pelaez and the ECCD National Office to strengthen vital ECCD programs for the benefit of our children. The ECCD Program is a holistic approach focusing on child’s physical, cognitive, social and emotional development from conception to age four as mandated by RA 10410 or the Early Years Act of 2013. The LGU of Libertad headed by Mayor LEONARD L. UY and Vice Mayor MIGUEL JUARIO guaranteed their support for the success of the program. supplied photo

See celebrates, page B7

NGCP says ‘maliciously’ planted trees caused Zambo peninsula blackout

Wednesday

Republic Cement, TESDA training program produce new welders for industry The Republic Cement Group, a leading cement and building materials manufacturer and construction solutions provider, continues the success of its community development initiatives as 147 graduates of its Iligan Plant’s skills training program recently received National Certificates II (NC II) in Shielded and Arc Welding from the Technical Education and

Skills Development Authority (TESDA). “Republic Cement is firmly committed to the development of our host communities, including providing relevant skills training that can translate into employment opportunities both here and abroad,” said Renato Sunico, president of Republic Cement and Building Materials, See produce, page B7

Editorial: e-mail: mindanaodailynews@gmail.com • Advertising: e-mail: mindanaodaily.ads@gmail.com Contact: 0917-7121424, 0947-8935776


B2

FOR ADS PLACEMENT CALL OR TEXT: 0917-712-1424 • 0947-893-5776 E-Mail: mindanaodailynews@gmail.com

Wednesday, October 5, 2016

You are a looser if you have no words of wisdom The Gospel of Jesus Christ (October5, 2016- Wednesday)Luke 13:18-21- It is like a grain of mustard seed, which a man took, and cast into his garden; and it grew, and waxed a great tree; and the fowls of the air lodged in the branches of it. And again he said, whereunto shall I liken the kingdom of God? It is like leaven, which a woman took and hid in three measures

of meal, till the whole was leavened: This is referred to the words of God which grows if it is sewed in our hearts. In Matthew13- Jesus taught about the different kinds of soils which mean the different kinds of hearts: Take note, the mustard seed can grow only if it is planted in the pure heart of a person. The effects are great since it will transform and re-

new a person to become good. This is the power of the words of God if it can penetrate in the four chambers of our hearts. God sows the words consistently waiting that you will embrace his words in your life. He is not tired in sowing his words in your life until you can realize. He will not stop in sowing his favors, graces and blessings in your life until you can recognize his

big love for your life no matter what whoever you are. God is persistent to find the exact timing when your heart becomes soften by the passage of time to sow his words in your life. God sows his words not in selective way but to all kinds of people on this earth. God wants to save all people equally. 1Timothy 2:4”who desires all men to be saved and to come to the knowledge

of the truth. God expects you to soften your heart in order that he can work in your life. You are a looser if you have no words of wisdom in your life because you might be misled in your journey in life: Printing paid by: Edith Ranoa, PhD- Major Tony Jordan and Crespina Ranoa - Bobong Balino– Cagayan De Oro: # 09187148435: Please have my latest book: To

Biblical reflection

Bro. Edcel L. Closas Make Your Soul Incredible: God loves you!!!

‘The strength of a nation derives from the integrity of a home’- Confucius By Rosemarie Alfar-Jadman

After the deadly blast in Davao City, President Rodrigo R. Duterte declared a “state of lawlessness violence” in the Philippines (Bartolome,2016/GMA News). With this declaration, the strength of our country has been challenged. However, we will remain standing and suppress lawless violence if only every family constructs a building block of integrity replenished with honesty and unity. Why it is there is a need to declare state of lawlessness violence in the Philippines? Salvador Panelo, Chief Presidential Counsel, identified four reasons, mainly- drug menace, criminality, terrorism and the ASG problem (Damicog 2016/Philippine

News Agency). These are the existing problems that prompted the president to declare the Philippines under state of lawlessness violence. It is indeed the right decision to do to counter the bombing of Davao City and to keep the people safe as possible. The declaration also is constitutional because base on Article VIII Section 18 of the Constitution, as Commander in Chief, the president has an authority to declare such ‘whenever it becomes necessary to call out the Arm Forces of the Philippines to suppress lawless violence, invasion and rebellion.’ It might be that there is a rampant violence in this country and our strength as a nation must not be weakened.

Upon facing this problem, Confucius teachings are very applicable in our educative process. It can be a bedrock of once personality, that will stimulate positive behavior. His teachings are relevant in molding a society free of chaos and trouble. One of these virtues is Li, the companion virtue of jen. It is translated as ritual, propriety or etiquette. The first sense of Li is the concrete guide to human relationships, which emphasized on the way things should be done in social life (Rainey, 2010). Noticed that the three of the five relations involve family; family is the basic unit of the society. Thus, Confucius stressed that the strength of the nation comes from

the integrity of the home. It reiterates on the proper upbringing of the child at home which will help in the transformation of the society. The second sense is on the principle of social order, ritual, ordering of life and conforming to the norms of jen. Every action affects someone else. So, ones right ends when the rights of others begin. The virtue of Li is really needed in the society, especially that the country is fighting on terrorism, illegal drugs and criminality. Iron fist must be accompanied with virtuous action to emulate the importance on social order and justice for all. Furthermore, these are just few of the many teachings of Confucius. But, I believed

Manny Pacquiao’s Strength! Boxing has been part of the Filipino culture mainly because our very own Manny Pacquiao have won so many fights. Boxing is not an easy and simple sport. It requires power, stamina, endurance and energy. If it weren’t for Manny Pacquiao’s own hard work, he wouldn’t have won the fights right? Manny seriously prepares for all his fights—he has an intense training with wild work outs that a normal person would find it difficult to cope with such routines! It was said that his routines include long runs and plyometrics. For sparring days, he would run 30 minutes on flat surface while for nonsparring days, he would run an hour uphill! His typical average routine consists of running, 8 rounds of shadow boxing, 15 rounds of sparring, 10 rounds of speed bag, 10 rounds of heavy bag, jump rope, ab crunches, knee ups, bicycle work, leg crunches, side crunches, Russian twists and ladder drills. The training alone requires super strength already, what more on fight nights?

Manny Pacquiao is a professional trained boxer and he is used to endure so much pain but if you wish to be as strong as him get your extra energy with Robust Energy Capsule to sustain strength like Manny’s! Robust Energy Capsule contains the ENERBOOST formula that gives extra energy needed to cope with everyday living of different individuals with various lifestyles. The ENERBOOST formula contains properties which help boost energy, enhance endurance, improve alertness and alleviate stress without caffeine. This gives you energy boost without the “crashing effect” of caffeine namely palpitations, anxiety and lack of focus. Ilabas ang lakas! No more sleepiness on the road with Robust Energy Capsule! Robust Energy Capsule is high content 100% Pure content of Taurine, Ginseng, Sodium Ascorbate, Vitamin B1, B6 and B12 that is made more effective than powdered ingredients. It is a product of extensive research and development that guarantees top quality and excellent promising health results

which makes it absolutely different from other energy preparation. Robust Energy Capsule is developed by ATC Healthcare International Corporation known for their supplements such as Robust, Robust Extreme, FatOut, Vita-E, BitterGo, LiverMarin and a lot more that provide care to all

ties and other drug related problems. Virtues must be that these virtues are essen- reflected to each of the famtial to promote social order ily member so that it might in the society. Nowadays, help in the transformation the Filipinos face so many of values for the coming challenges in fighting against generation. Being the basic crime of the administration. unit of the society, the family But, the fight is not only for should be as strong as a stone the administration but for the that could never be broken Filipinos as well who wants and when in times of need, the family is our source of a lasting peace. To work hand in hand strength to uplift us when we with the family and make will be drowning in the well it as a strengthened nation of problems. Thus, the united is the key factor that would family is the foundation of contribute to solve criminali- a strong nation.

NATIONAL EARTHQUAKE DRILL AT SVES By DELIA B. CAÑADILLA Master Teacher-I/OIC

Sudden and continuous ringing of the bell, alarms the pupils of San Vicente Elementary School, Baungon District, as they join the National Earthquake Drill last Wednesday, September 28, 2016 at 9:00 o’clock in the morning. Unaware of the activity, the pupils hurriedly do the drop, cover and hold. After the ringing, they immediately rush outside their classrooms and proceed to the designated evacuation center of the school. This is the second earthquake drill for this school year, and so some pupils just enjoy it, but the others really take it seriously, even feel shock and tense. The different Teams led by the teachers with their members, proceed to their assigned areas and

are ready to perform their respective functions in case of need. Busy teams are the Communication Team, lead by Ms. Mylah Faye A. Diocson, Search and Rescue Team with Mr. Vincent B. Batucan, Unification Team with Ms. Angelita L. Yu, Security Team with Ms. Mary Grace V. Zamora and the Psycho-Social Team with Ms. Delia B. Cañadilla who do some stress-debriefing for those who feel so tense. Thank God that it is only a drill so, the relax team is the Medical team with Ms. Jeanne M. Caylan. To sum it all, congratulaions! Miss Sarah L. Cabug-os -DRRM School coordinator, teachers, parents, and Mr. Julito M. CañadillaSchool Principal, for the successful drill the second time around.

Filipinos. Note that, Robust Energy Capsule is not a medicinal drug and should not be used to treat the symptoms of any disease. Robust Energy Capsule is SRP P15.00 per piece, available at all Mercury Drug and other leading drugstores and supermarkets nationwide!

quality tarpaulin printing contact: mindanao daily news publishing corporation Mdntarps@gmail.com

(0935) 161 3398 look for Anabelle, (088)881-0100

Tanleh Bldg. Abellanosa St., Consolacion, Cagayan de Oro City


B3

FOR ADS PLACEMENT CALL OR TEXT: +63917-712-1424 • +63947-893-5776 E-Mail: mindanaodailynews@gmail.com

Wednesday, October 5, 2016

SP backs opening of NHS in Brgy Tuburan WITH the intention to open schools in every barangay, the Cagayan de Oro City Council headed by Vice Mayor Raineir Joaquin V. Uy during its regular session Monday adopted a resolution favorably endorsing and interposing no objection to the separation of Tagpangi National High School-Tuburan Annex from its mother school, Tagpangi National High School, to be named as Tuburan National High School. The resolution was endorsed by the committees on education and on laws and rules chaired by Councilors Suzette MagtajasDaba and Ian Mark Nacaya, respectively, in response to the resolution of the Barangay Council of Tuburan. According to the barangay, in 2003, the barangay approved a resolution requesting the city mayor to open a secondary school in Tuburan. The following year, the DepEd regional director interposed no objection to the operation of Tuburan National High School subject to some terms and conditions such as the acquisition of a school site. Barangay officials said the city government under the leadership of Mayor Oscar Moreno identified an area for the establishment of the Tuburan National High School. Tagpangi National High School has been existing for 12 years as an annex school, the barangay cited in the resolution. The barangay council also requested the city government to donate a 12,080 ERRATUM The Notice of Hearing Applicant Named GINO C. SOCIAS, with Case No. 2016-10-2109(201310-1976)The exact service UV EXPRESS not as publish. OUR APOLOGY; LTFRB-X -CDOC

The Andres P. Tamayo Foundation Incorporated Feeds Schoolchildren in CDO!

Kikang Uy

square meter lot in Tuburan in favor of Deped to be used as the site of the Tuburan National High School. ERRATUM The Notive of Hearing Applicant Named PAUL ANTHONY C. PIZARRO,with the Case No. 2016-10-2124, the exact route within Cagayan de Oro to any point in the Island of Mindanao not as publish. OUR APOLOGY; LTFRB-X –CDOC Republic of the Philippines Department of Transportation and Communication LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD Regional Office No.10, Apovel, Bulua, Cagayan de Oro City KURAIS J. USMAN (Original Grantee of Franchise) CASE NO. 2016-10-2134 AARON SHARIEF P. USMAN (Applicant/s-surviving) (2011-10-1312) Applicant/s

NOTICE OF HEARING APPLICANT(s)/PETITIONER(s) request/s authority for the Change of Grantee of Certificate of Public Convenience with extension of validity of CPC to operate AIRCON TAXI service on the line: FROM CAGAYAN DE ORO CITY AND FROM SAID PLACE TO ANY POINT REGION X and vice versa with the use of ONE (1) unit/s. This application/petition shall be considered by this Board on October 26, 2016, 02:00 P.M. at this Board on which date Applicant/(s) Petitioner(s) shall formally submit his/her/their evidence. The Applicant(s) Petitioner (s) shall publish said notice at least FIVE (5) days prior to the date of hearing in a daily newspaper of general circulation in the Mindanao Island. Party(s) opposed to the approval /granting of the application /petition must file his/her/their written opposition with supporting documents, unless this Board deems it necessary to required additional documentary evidence and /or his/ her/their oral testimony(s). N.B. FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. WITNESS, AMINODEN D. GURO, OICRegional Director, LTFRB-Region 10, this 4th day of October, 2016. SOLAYMAN B. MACATOON, JR. Hearing Officer

We are very thankful to the philanthropists people who in one way or another help the needy. People who are blessed with resources that could share to others. One of those is the ANDRES P. TAMAYO SR. FOUNDATION INC. who started in Cagayan Valley in 2010. The objective is to have at least one student per family to finish a degree. They extend help to the public schools, churches and even in the community. They provide foods to feed school children who are indigents and severely wasted. Not only Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD Regional Office No.10, Apovel, Bulua, Cagayan de Oro City NONELIA ALCANTARA CASE NO. 2016-10-2136 Applicant/s (2005-10-1465)

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD Regional Office No.10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD Regional Office No.10, Apovel, Bulua, Cagayan de Oro City

CASE NO. 2016-10-2133 (2011-10-911)

ARTHUR S. LLARENAS Applicant/s

CASE NO. 2016-10-2131 (2011-10-1556)

NOTICE OF HEARING

NOTICE OF HEARING

NOTICE OF HEARING

APPLICANT(s)/PETITIONER(s) request/s authority to Extend the validity of certificate of public convenience to operate TH FREIGHT service on the line ;Within Cagayan de Oro City and from said place to any point in Mindanao accessible to motor vehicle traffic and vice versa with the use of FIVE(5)units. This application/petition shall be considered by this Board on November 4, 2016, 4;00 P.M. at this Board on which date Applicant/ (s) Petitioner(s) shall formally submit his/her/ their evidence. The Applicant(s)Petitioner (s)shall publish said notice at least FIVE(5) days prior to the date of hearing in a daily newspaper of general circulation in the Mindanao Island. Party(ies)opposed to the approval /granting of the application /petition must file his/her/their written opposition with supporting documents, unless this Board deems it necessary to required additional documentary evidence and /or his/ her/their oral testimony(ies). N.B. FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. WITNESS, AMINODEN D. GURO,OIC –Regional Director,LTFRB-Region 10, this 3rd day of October, 2016.

APPLICANT(s)/PETITIONER(s) request/s authority To Extend the validity of certificate of public convenience to operate PUJ service on the line; Cogon Market to Opol –Molugan-Amoros (all in Misamis Oriental)and vice versa with the use of ONE(1)units. This application/petition shall be considered by this Board on November 4, 2016, 3;00 P.M. at this Board on which date Applicant/ (s) Petitioner(s) shall formally submit his/her/ their evidence. The Applicant(s)Petitioner (s)shall publish said notice at least FIVE(5) days prior to the date of hearing in a daily newspaper of general circulation in the Mindanao Island. Party(ies)opposed to the approval /granting of the application /petition must file his/her/their written opposition with supporting documents, unless this Board deems it necessary to required additional documentary evidence and /or his/ her/their oral testimony(ies). N.B. FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. WITNESS, AMINODEN D. GURO,OIC –Regional Director,LTFRB-Region 10, this 30TH day of September, 2016.

SOLAYMAN B. MACATOON, JR. Hearing Officer MDN: Oct 5, 2016

SOLAYMAN B. MACATOON, JR. Hearing Officer

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD Regional Office No.10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD Regional Office No.10, Apovel, Bulua, Cagayan de Oro City

VIRGINIA/SIMPLICIO BALABA CASE NO. 2016-10-2139 Applicant/s (2011-10-1554)

CARLOTA BUCIO CASE NO. 2016-10-2138 Applicant/s (2006-10-1835)

NOTICE OF HEARING

NOTICE OF HEARING

VIBYLON N. FABRIA CASE NO. 2016-10-2121 Applicant/s (2011-10-1594) (2011-10-1387)

APPLICANT(s)/PETITIONER(s) request/s authority to Extend the validity of certificate of public convenience to operate PUJ service on the line ;Puerto Cagayan de Oro City to Balingoan and vice versa with the use of one(1)units. This application/petition shall be considered by this Board on November 11, 2016, 2;00 P.M. at this Board on which date Applicant/ (s) Petitioner(s) shall formally submit his/her/ their evidence. The Applicant(s)Petitioner (s)shall publish said notice at least FIVE(5) days prior to the date of hearing in a daily newspaper of general circulation in the Mindanao Island. Party(ies)opposed to the approval /granting of the application /petition must file his/her/their written opposition with supporting documents, unless this Board deems it necessary to required additional documentary evidence and /or his/ her/their oral testimony(ies). N.B. FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. WITNESS, AMINODEN D. GURO,OIC –Regional Director,LTFRB-Region 10, this 4th day of October, 2016.

APPLICANT(s)/PETITIONER(s) request/s authority To Extend the validity of certificate of public convenience to operate PUJ service on the line;Cogon Market to Balulang and vice versa with the use of one(1)units. This application/petition shall be considered by this Board on November 11, 2016, 2;00 P.M. at this Board on which date Applicant/ (s) Petitioner(s) shall formally submit his/her/ their evidence. The Applicant(s)Petitioner (s)shall publish said notice at least FIVE(5) days prior to the date of hearing in a daily newspaper of general circulation in the Mindanao Island. Party(ies)opposed to the approval /granting of the application /petition must file his/her/their written opposition with supporting documents, unless this Board deems it necessary to required additional documentary evidence and /or his/ her/their oral testimony(ies). N.B. FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. WITNESS, AMINODEN D. GURO,OIC –Regional Director,LTFRB-Region 10, this 4TH day of October, 2016.

SOLAYMAN B. MACATOON, JR. Hearing Officer

SOLAYMAN B. MACATOON, JR. Hearing Officer

NOTICE OF HEARING APPLICANT(s)/PETITIONER(s) request/s authority to extend the validity of certificate of public convenience to operate PUJ service on the line;Cagayan de Oro City to Gitagum Misamis Oriental and vice versa with the use of one(1)units. This application/petition shall be considered by this Board on November 11, 2016, 2;00 P.M. at this Board on which date Applicant/ (s) Petitioner(s) shall formally submit his/her/ their evidence. The Applicant(s)Petitioner (s)shall publish said notice at least FIVE(5) days prior to the date of hearing in a daily newspaper of general circulation in the Mindanao Island. Party(ies)opposed to the approval /granting of the application /petition must file his/her/their written opposition with supporting documents, unless this Board deems it necessary to required additional documentary evidence and /or his/ her/their oral testimony(ies). N.B. FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. WITNESS, the AMINODEN D. GURO, OIC-Regional Director,LTFRB-Region 10, this 4TH day of October, 2016. SOLAYMAN B. MACATOON, JR. Hearing Officer MDN: Oct 5, 2016

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD Regional Office No.10, Apovel, Bulua, Cagayan de Oro City JOCELYN E. SALONGA Applicant/s

CASE NO. 2016-10-1973

NOTICE OF HEARING APPLICANT(s)/PETITIONER(s) request/s authority for issuance of certificate of public convenience to operate TH FREIGHT service on the line ;Within Cagayan de Oro City and from said place to any point in the Island of Mindanao accessible to motor vehicle traffic and vice versa with the use of ONE(1)units. This application/petition shall be considered by this Board on November 11, 2016, 2;00 P.M. at this Board on which date Applicant/ (s) Petitioner(s) shall formally submit his/her/ their evidence. The Applicant(s)Petitioner (s)shall publish said notice at least TEN (10) days prior to the date of hearing in a daily newspaper of general circulation in the Mindanao Island. Party(ies)opposed to the approval /granting of the application /petition must file his/her/their written opposition with supporting documents, unless this Board deems it necessary to required additional documentary evidence and /or his/ her/their oral testimony(ies). N.B. FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. WITNESS, AMINODEN D. GURO,OIC –Regional Director,LTFRB-Region 10, this 4th day of October, 2016. SOLAYMAN B. MACATOON, JR. Hearing Officer MDN: Oct 5, 2016

SOLAYMAN B. MACATOON, JR. Hearing Officer MDN: Oct 5, 2016

MDN: Oct 5, 2016

MDN: Oct 5, 2016

MDN: Oct 5, 2016

LMDC ENTERPRICES CORP. Applicant/s

APPLICANT(s)/PETITIONER(s) request/s authority To extend the validity of certificate of public convenience to operate PUJ service on the line;Cogon Market to Macanhan/Balongis and vice versa with the use of one(1)units. This application/petition shall be considered by this Board on November 3, 2016, 10;00 A.M. at this Board on which date Applicant/ (s) Petitioner(s) shall formally submit his/her/ their evidence. The Applicant(s)Petitioner (s)shall publish said notice at least FIVE(5) days prior to the date of hearing in a daily newspaper of general circulation in the Mindanao Island. Party(ies)opposed to the approval /granting of the application /petition must file his/her/their written opposition with supporting documents, unless this Board deems it necessary to required additional documentary evidence and /or his/ her/their oral testimony(ies). N.B. FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. WITNESS, the AMINODEN D. GURO, OIC-Regional Director,LTFRB-Region 10, this 4TH day of October, 2016.

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD Regional Office No.10, Apovel, Bulua, Cagayan de Oro City

MDN: Oct 5, 2016

foods they give but also school supplies that could be used by the children. They also extend livelihood to mothers of the beneficiaries to augment their daily needs. And so that feeding could extend at home. In the community, they also encourage out of school youth to enroll vocational course or TESDA accredited courses for them to be used in the future employment. Pupil in the elementary should be followed up in High school and in college until he/she finishes a course. In Cagayan de Oro, there are three schools who are beneficiaries of

the said foundation, They are Dungguan Elementary school, Fr. William Masterson Elem.School And Sacred Heart Village Elem. School. They provide educational assistance until college for those beneficiaries with good school record. Aside from those, every meeting with the parents of the beneficiaries, there is always a spiritual lecture to be done to infuse values formation and a komostahan. Miss Divine Nobis, the program Development officer in Mindanao herself conducts it. Many asked where they get the source of fund? Through Engr. Andrea Tamayo Ulep, the daughter of the late Andres Tamayo

By TESSIE BATAUSA LUMANTAO, T-III Sacred Heart Village Elementary School Carmen, Cagayan de Oro City

Sr. with the generous employees and workers of their construction company, they solicited an amount for the purpose. She initiated the program starting in Cagayan Valley and extended here in Mindanao. This school year 20162017 the said foundation will continue its commitment to our school children for better. From the Administrator, Mrs. Leonora S. Alinsub and the teaching staff of Sacred Heart Village Elem. School, Our heartfelt gratitude to ANDRES P. TAMAYO Foundation Inc. for the continuous support to our pupils. God Bless! Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD Regional Office No.10, Apovel, Bulua, Cagayan de Oro City WENDEL M. PORMINAL Applicant/s

CASE NO. 2016-10-2132 (2011-10-1571) (2006-10-1742)

NOTICE OF HEARING APPLICANT(s)/PETITIONER(s) request/s authority To extend the validity of certificate of public convenience to operate PUJ service on the line;Cagayan de Oro City to Libona-Bukidnon via Camp Philips and vice versa with the use of three(3)units. This application/petition shall be considered by this Board on November 4, 2016, 4;00 P.M. at this Board on which date Applicant/(s) Petitioner(s) shall formally submit his/her/their evidence. The Applicant(s)Petitioner (s)shall publish said notice at least FIVE(5) days prior to the date of hearing in a daily newspaper of general circulation in the Mindanao Island. Party(ies)opposed to the approval /granting of the application /petition must file his/her/their written opposition with supporting documents, unless this Board deems it necessary to required additional documentary evidence and /or his/ her/their oral testimony(ies). N.B. FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. WITNESS, the AMINODEN D. GURO, OIC-Regional Director,LTFRB-Region 10, this 30th day of September, 2016. SOLAYMAN B. MACATOON, JR. Hearing Officer MDN: Oct 5, 2016

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD Regional Office No.10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD Regional Office No.10, Apovel, Bulua, Cagayan de Oro City

VICTORIAN FREIGHT EXPRESS CORP. CASE NO. 2016-10-2128 (REP BY; MYRA JAINANI) Applicant/s

FILIMON T. PAGADUAN CASE NO. 2016-10-2135 Applicant/s (2005-10-1095)

NOTICE OF HEARING APPLICANT(s)/PETITIONER(s) request/s authority For the Issuance of certificate of public convenience to operate TH FRIEGHT service on the line;Within Cagayan de Oro City and from said place to any point in the Island of Mindanao accessible to motor vehicle traffic and vice versa with the use of one(1)units. This application/petition shall be considered by this Board on October 27, 2016, 10;00 A.M. at this Board on which date Applicant/ (s) Petitioner(s) shall formally submit his/her/ their evidence. The Applicant(s)Petitioner (s)shall publish said notice at least TEN(10) days prior to the date of hearing in a daily newspaper of general circulation in the Mindanao Island. Party(ies)opposed to the approval /granting of the application /petition must file his/her/their written opposition with supporting documents, unless this Board deems it necessary to required additional documentary evidence and /or his/ her/their oral testimony(ies). N.B. FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. WITNESS, AMINODEN D. GURO,OIC –Regional Director,LTFRB-Region 10, this 30TH day of September, 2016. SOLAYMAN B. MACATOON, JR. Hearing Officer MDN: Oct 5, 2016

NOTICE OF HEARING APPLICANT(s)/PETITIONER(s) request/s authority To extend the validity of certificate of public convenience to operate TH FREIGHT service on the line;Within Cagayan de Oro City and from said place to any point in Region X accessible to motor vehicle traffic and vice versa with the use of one(1)units. This application/petition shall be considered by this Board on October 27, 2016, 3;00 P.M. at this Board on which date Applicant/(s) Petitioner(s) shall formally submit his/her/their evidence. The Applicant(s)Petitioner (s)shall publish said notice at least FIVE(5) days prior to the date of hearing in a daily newspaper of general circulation in the Mindanao Island. Party(ies)opposed to the approval /granting of the application /petition must file his/her/their written opposition with supporting documents, unless this Board deems it necessary to required additional documentary evidence and /or his/ her/their oral testimony(ies). N.B. FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. WITNESS, the AMINODEN D. GURO, OIC-Regional Director,LTFRB-Region 10, this 4TH day of October, 2016. SOLAYMAN B. MACATOON, JR. Hearing Officer MDN: Oct 5, 2016


B4 Notice

FOR ADS PLACEMENT CALL OR TEXT: 0917-712-1424 • 0947-893-5776 E-Mail: mindanaodailynews@gmail.com

Wednesday, October 5, 2016

Republic of the Philippines City of Iligan Office of the City Treasurer First Notice of Real Property Tax Deliquency of NATIONAL STEEL CORPORATION (NSC, Iligan City) of FOUR BILLION FIVE HUNDRED FIFTY TWO MILLION, SEVEN HUNDRED THIRTY SEVEN THOUSAND NINE HUNDRED FIFTY SEVEN AND SEVENTEEN CENTAVOS (4,552,737,957.17) for the period from 4th Quarter of 1999 to 2nd Quarter of 2016 Location/ Brgy. RPU Type Tax Declaration 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189

MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA MA. CRISTINA PALA-O PALA-O PALA-O PALA-O PALA-O PALA-O PALA-O PALA-O TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER TOMINOBO PROPER STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA STA. ELENA SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ SUAREZ

Land Miscellaneous Machineries Land Land Building Building Building Building Building Miscellaneous Building Land Land Building Building Building Building Building Machineries Land Land Land Land Land Land Land Land Land Building Building Building Building Building Building Building Building Building Building Machineries Machineries Machineries Machineries Machineries Machineries Machineries Machineries Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Building Building Building Building Building Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Land Machineries Miscellaneous Land Building Building Building Building Building Building Building Building Building Machineries Machineries Machineries Machineries Machineries Machineries Machineries Machineries Machineries Machineries Machineries Machineries Miscellaneous Miscellaneous Land Building Building Building Building Building Building Building Building Building Building Machineries Machineries Machineries Machineries Land Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building

14-0023-00001 14-0023-00163 14-0023-00166 14-0023-00167 14-0023-00168 14-0023-00169 14-0023-00170 14-0023-00171 14-0023-00172 14-0023-00173 14-0023-00174 14-0023-00181 14-0023-00401 14-0023-00553 14-0023-01109 14-0023-01110 14-0023-01111 14-0023-01112 14-0023-01113 14-0023-01114 14-0024-01452 14-0024-01649 14-0024-02438 14-0024-02439 14-0024-02440 14-0024-04395 14-0024-05596 14-0024-05599 14-0027-00001 14-0027-00002 14-0027-00003 14-0027-00004 14-0027-00005 14-0027-00006 14-0027-00007 14-0027-00008 14-0027-00009 14-0027-00010 14-0027-00011 14-0027-00012 14-0027-00013 14-0027-00014 14-0027-00015 14-0027-00016 14-0027-00017 14-0027-00018 14-0027-00019 14-0027-00906 14-0027-01635 14-0027-01636 14-0027-02702 14-0027-02756 14-0027-02763 14-0027-02765 14-0027-02878 14-0027-02888 14-002702889 14-0027-02898 14-0027-02899 14-0027-02900 14-0027-02901 14-0027-02902 14-0027-02903 14-0027-02905 14-0027-02906 14-0027-02907 14-0027-02908 14-0027-02909 14-0027-02910 14-0027-02911 14-0027-02912 14-0027-02913 14-0027-02918 14-0027-03078 14-0027-03079 14-0027-03080 14-0027-03081 14-0027-03082 14-0032-00001 14-0032-00012 14-0032-00013 14-0032-00033 14-0032-00037 14-0032-00040 14-0032-00041 14-0032-00042 14-0032-00046 14-0032-00052 14-0032-00129 14-0032-00362 14-0032-00363 14-0032-00364 14-0032-00365 14-0032-00366 14-0032-00367 14-0032-00498 14-0032-00499 14-0032-00500 14-0032-00501 14-0032-00502 14-0032-00503 14-0032-00504 14-0032-00511 14-0032-00571 14-0032-00572 14-0032-00644 14-0032-00645 14-0032-00646 14-0032-00917 14-0032-00918 14-0032-00919 14-0032-00920 14-0032-00921 14-0032-00922 14-0032-00923 14-0032-00924 14-0032-00925 14-0032-00926 14-0032-00927 14-0032-00959 14-0032-00960 14-0032-01459 14-0032-01460 14-0032-01461 14-0032-01462 14-0032-01463 14-0032-01464 14-0032-01465 14-0032-01466 14-0032-01467 14-0036-00266 14-0036-00267 14-0036-00268 14-0036-00269 14-0036-00270 14-0036-00271 14-0036-00272 14-0036-00273 14-0036-00274 14-0036-00275 14-0036-00276 14-0036-00277 14-0036-00278 14-0036-00280 14-0036-00281 14-0036-00282 14-0036-00283 14-0036-00284 14-0036-00285 14-0036-00287 14-0036-00288 14-0036-00289 14-0036-00290 14-0036-00291 14-0036-00292 14-0036-00293 14-0036-00294 14-0036-00296 14-0036-00297 14-0036-00298 14-0036-00299 14-0036-00300 14-0036-00301 14-0036-00302 14-0036-00303 14-0036-00304 14-0036-00305 14-0036-00306 14-0036-00314 14-0036-00315 14-0036-00316 14-0036-00317 14-0036-00318 14-0036-00319 14-0036-00320 14-0036-00321 14-0036-00322 14-0036-00323 14-0036-00324 14-0036-00325 14-0036-00326 14-0036-00327 14-0036-00328 14-0036-00329 14-0036-00330 14-0036-00331 14-0036-00332 14-0036-00333 14-0036-00334

Assessed Area(m²) Value 18,023,630.00 9,344.00 9,903,970.00 101,328,030.00 556,610.00 2,790.00 25,870,160.00 129,675.00 35,320.00 30.00 6,970.00 16.22 149,390.00 160.00 17,610.00 13.20 200,070.00 112.50 13,005,390.00 169,250.00 237.45 925,860.00 21,279.00 491,570.00 20,064.00 90,992,350.00 667,100.00 264.00 940,590.00 222.00 10,709,480.00 3,136.00 1,972,720.00 8,053,290.00 287,530.00 2,056.00 251,180.00 1,329.00 111,700.00 591.00 111,700.00 591.00 145,340.00 769.00 97,710.00 517.00 98,280.00 520.00 378,000.00 2,000.00 31,323,890.00 157,012.00 7,426,770.00 1,470.00 2,165,600.00 1,076.00 6,757,830.00 4,214.00 4,262,600.00 1,180.00 14,908,640.00 5,785.00 413,540.00 283.46 159,190.00 477.77 1,792,250.00 5,068.00 641,090.00 913.55 87,941,550.00 14,490.00 88,450.00 88,460.00 795,440.00 2,320,330.00 2,334,460.00 1,080,810.00 4,085,480.00 361,892,870.00 133,560.00 807.00 92,570.00 464.00 86,780.00 435.00 4,350,300.00 21,806.00 19,950,000.00 100,000.00 24,937,500.00 125,000.00 8,054,610.00 40,374.00 957,740.00 12,047.00 8,561,100.00 107,561.00 1,448,090.00 18,215.00 2,265,190.00 28,493.00 1,279,870.00 16,099.00 431,610.00 5,429.00 248,040.00 3,120.00 286,120.00 3,599.00 1,972,160.00 24,807.00 1,857,840.00 23,369.00 204,790.00 2,576.00 315,460.00 3,968.00 486,480.00 4,054.00 44,440.00 559.00 120,680.00 1,518.00 2,413,780.00 30,362.00 1,902,440.00 23,930.00 8,631,320.00 108,570.00 63,360.00 797.00 40,965,100.00 19,669,700.00 913.55 7,229,560.00 1,470.00 176,979,300.00 4,697,430.00 17,752,270.00 223,299.00 6,449,200.00 81,122.00 6,260,070.00 78,743.00 2,160,170.00 27,172.00 12,719,920.00 159,999.00 1,267,710.00 15,946.00 1,878,510.00 23,629.00 10,666,280.00 134,167.00 12,308,670.00 154,826.00 2,948,970.00 37,094.00 174,270.00 1,053.00 86,630.00 5,775.00 58,700.00 3,913.00 55,200.00 3,680.00 110,750.00 7,383.00 3,390.00 226.00 14,450.00 963.00 33,200.00 2,213.00 23,190.00 1,546.00 13,780.00 551.00 14,870.00 991.00 10,530.00 702.00 2,862,650.00 17,297.00 19,177,480.00 115,876.00 32,360.00 2,157.00 33,760.00 204.00 33,760.00 204.00 19,320.00 1,288.00 10,700.00 713.00 76,620.00 5,108.00 175,930.00 1,063.00 19,070.00 1,271.00 28,310.00 1,887.00 22,370.00 1,491.00 27,650.00 1,843.00 3,420.00 228.00 6,690.00 446.00 7,400.00 493.00 35,490.00 2,366.00 9,590.00 639.00 174,480.00 11,632.00 201,410.00 1,217.00 202,410.00 1,223.00 9,060.00 604.00 4,979,730.00 30,089.00 65,930.00 4,395.00 20,480.00 1,365.00 26,930.00 1,795.00 19,590.00 1,306.00 27,650.00 1,843.00 17,210.00 1,147.00 23,660.00 1,577.00 73,564,430.00 368,744.00 48,810,230.00 12,209,040.00 46,929,580.00 235,236.00 659,380.00 361.80 38,438,430.00 25,066.80 2,080.00 11.25 3,000.00 9.59 30,520.00 57.27 14,680.00 126.81 1,600.00 6.38 116,610.00 179.20 51,350.00 55.00 278,789,000.00 19,187,620.00 17,264,330.00 2,699,260.00 1,790,720.00 21,652,930.00 127,282,030.00 70,639,910.00 114,016,240.00 152,075,420.00 1,417,670,790.00 485,364,990.00 1,791,270.00 12,425,620.00 10,390,560.00 52,083.00 1,600.00 6.38 1,600.00 6.38 1,600.00 6.38 1,600.00 6.38 1,600.00 6.38 1,600.00 6.38 1,600.00 6.38 1,600.00 6.38 1,600.00 6.38 15,600.00 14.85 13,557,730.00 16,422,540.00 9,979,420.00 12,643,780.00 169,635,650.00 850,304.00 60,400.00 140.18 60,400.00 140.18 60,400.00 140.18 41,690.00 120.00 60,400.00 140.18 60,400.00 140.18 60,400.00 140.18 60,400.00 140.18 60,400.00 140.18 60,400.00 140.18 73,870.00 159.00 4,950.00 29.54 189,790.00 368.79 1,137,680.00 424,180.00 997.64 858,190.00 1,154.97

Period of delinquency Tax Due Interest As of June 2016 2006 1999-4 1999-4 2015 2013 1994-4 1994-4 1994-4 1994-4 1994-4 1994-4 1994-4 2002-4 2002 2004 1999-4 1999-4 2002 2004 1999-4 2007 2007 2007 2007 2007 2007 2007 2007 1999-4 2004 2004 2004 1994-4 1999-4 1999-4 1999-4 1999-4 1999-4 2002 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 2002-4 2002-4 2002-4 2002-3 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002 2002-4 2002-4 2002-4 2002-4 2002-4 1999-4 1999-4 1999-4 2004 1994-4 2002 2002 2002-4 2002-4 2003 2002 2002 2002 2002-4 2002 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-4 2002-3 2002-3 2002-4 2002-4 2002-4 2002-4 2002-4 2002 1999-4 1999-4 2006 1999-4 1999-4 2004 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 2002 2005 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 1999-4 2004 1999-4 1999-4

To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To

2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2 2016-2

3,509,441.04 4,089,444.51 67,944,106.40 117,794.99 6,350,225.19 17,572.37 3,330.44 86,776.26 8,810.45 119,680.80 5,370,052.19 121,872.84 244,993.89 63,821.68 28,050,833.44 275,518.48 388,473.66 4,139,832.06 600,123.53 5,188,341.69 47,594.08 40,406.77 20,563.11 20,563.11 26,148.34 18,240.89 18,334.58 52,683.76 8,616,278.59 2,713,430.96 619,679.36 1,962,470.24 2,233,572.32 7,902,313.52 157,488.80 80,811.02 958,476.82 379,791.98 39,469,433.56 27,569.16 27,569.74 251,233.22 738,854.24 723,743.85 336,495.78 3,259,623.78 253,710,713.00 33,642.55 22,627.86 21,403.19 1,104,644.46 4,981,406.26 6,226,757.83 2,011,192.80 239,829.64 2,141,304.26 362,620.68 567,233.09 320,495.85 108,079.79 62,112.38 71,648.20 493,853.32 465,225.94 51,282.42 78,994.46 90,454.87 11,694.42 30,219.99 604,441.06 476,394.24 2,161,391.48 15,866.43 18,091,343.67 8,383,990.56 3,244,666.67 61,673,525.63 2,483,450.14 3,586,160.44 1,302,835.62 1,208,722.92 417,131.44 1,723,460.31 256,089.28 379,484.54 2,154,749.58 1,689,619.21 685,883.88 41,241.22 209,795.23 142,152.25 133,687.50 268,210.85 8,210.14 34,984.30 80,394.44 56,163.28 20,344.27 36,001.49 25,502.35 782,932.29 5,245,018.63 78,360.06 9,233.75 9,233.75 46,790.62 25,902.25 78,001.92 41,552.44 46,173.35 68,551.49 54,165.56 66,953.06 8,282.83 16,202.35 17,910.06 85,952.35 21,520.61 422,568.76 46,219.25 46,364.70 21,942.21 1,385,645.50 163,123.50 49,588.18 65,209.30 47,444.52 66,953.06 41,668.68 51,080.32 20,235,403.26 34,219,181.90 3,450,340.40 12,908,942.93 244,699.69 13,344,790.12 1,624.07 1,348.69 14,950.40 12,763.56 2,139.16 56,283.45 22,260.84 86,886,044.70 5,976,055.43 6,670,687.93 1,658,423.96 691,909.78 8,366,381.49 89,233,077.80 49,523,225.70 91,424,456.50 115,442,246.60 960,712,809.76 204,329,993.70 763,330.17 5,405,736.79 1,681,240.02 2,176.02 2,176.02 2,176.02 2,176.02 2,176.02 2,176.02 2,176.02 2,176.02 2,176.02 5,984.14 7,332,598.32 12,286,063.32 8,002,040.88 9,598,040.57 24,955,834.34 32,820.00 32,820.00 32,820.00 28,875.90 32,820.00 32,820.00 32,820.00 32,820.00 32,820.00 32,820.00 52,631.83 4,356.12 71,431.59 521,608.76 241,095.46 365,775.36

2,214,312.85 2,772,689.98 47,162,981.60 75,162.15 4,123,638.21 12,037.20 2,276.55 59,878.01 6,036.91 82,687.02 3,640,956.66 84,801.78 160,343.48 37,428.99 18,612,468.86 186,759.35 263,325.85 2,794,232.44 397,744.84 3,595,982.10 29,282.66 24,738.02 12,868.83 12,868.83 16,306.98 11,439.41 11,496.96 31,378.72 5,660,642.61 1,824,373.89 408,467.12 1,295,328.06 1,533,962.28 5,430,113.68 106,192.36 55,412.47 658,901.08 262,289.10 26,886,973.84 18,316.29 18,316.53 167,096.88 491,746.27 480,621.76 223,538.43 2,276,097.07 176,397,397.00 21,907.08 14,687.15 13,905.74 719,920.67 3,240,729.38 4,050,911.67 1,308,411.98 156,072.44 1,393,484.34 235,980.59 369,135.11 208,567.29 70,334.41 40,420.51 46,626.11 321,381.99 302,752.39 33,372.77 51,406.75 56,693.20 7,649.53 19,666.15 393,348.59 310,020.30 1,406,556.36 10,325.26 12,312,585.53 5,694,033.54 2,210,297.02 41,323,817.37 1,706,304.11 2,274,255.49 826,228.62 761,746.54 262,882.59 1,020,359.84 162,405.37 240,660.19 1,366,493.05 1,003,124.21 442,708.54 26,672.27 149,550.59 101,331.85 95,297.98 191,191.60 5,852.57 24,938.08 57,308.32 40,035.54 14,408.96 25,663.28 18,179.17 514,080.07 3,443,923.88 55,858.22 6,062.97 6,062.97 33,354.23 18,464.05 54,832.93 26,867.58 32,914.21 48,866.24 38,611.37 47,726.74 5,904.29 11,549.73 12,766.88 61,270.41 15,328.50 301,224.49 29,785.86 29,873.28 15,641.27 911,328.65 116,305.84 35,348.42 46,483.78 33,820.46 47,726.74 29,703.06 36,367.67 13,294,067.04 23,791,563.80 2,272,570.78 8,480,797.27 164,704.26 8,939,054.98 1,133.10 918.79 10,232.88 8,934.12 1,523.07 38,494.00 15,133.84 57,724,447.30 3,970,094.47 4,503,574.97 1,129,929.35 467,128.34 5,648,386.91 62,041,063.20 34,432,003.10 63,848,851.50 80,481,809.40 667,134,354.34 138,702,580.30 518,541.58 3,676,701.30 1,030,346.51 1,538.83 1,538.83 1,538.83 1,538.83 1,538.83 1,538.83 1,538.83 1,538.83 1,538.83 4,037.00 5,044,413.58 8,561,239.68 5,588,451.22 6,691,377.63 15,027,142.66 22,583.22 22,583.22 22,583.22 20,064.86 22,583.22 22,583.22 22,583.22 22,583.22 22,583.22 22,583.22 36,614.23 3,050.12 48,140.23 355,833.80 166,234.41 248,417.47

Total Delinquency 5,723,753.89 6,862,134.49 115,107,088.00 192,957.14 10,473,863.40 29,609.57 5,606.99 146,654.27 14,847.36 202,367.82 9,011,008.85 206,674.62 405,337.37 101,250.67 46,663,302.30 462,277.83 651,799.51 6,934,064.50 997,868.37 8,784,323.79 76,876.74 65,144.79 33,431.94 33,431.94 42,455.32 29,680.30 29,831.54 84,062.48 14,276,921.20 4,537,804.85 1,028,146.48 3,257,798.30 3,767,534.60 13,332,427.20 263,681.16 136,223.49 1,617,377.90 642,081.08 66,356,407.40 45,885.45 45,886.27 418,330.10 1,230,600.51 1,204,365.61 560,034.21 5,535,720.85 430,108,110.00 55,549.63 37,315.01 35,308.93 1,824,565.13 8,222,135.64 10,277,669.50 3,319,604.78 395,902.08 3,534,788.60 598,601.27 936,368.20 529,063.14 178,414.20 102,532.89 118,274.31 815,235.31 767,978.33 84,655.19 130,401.21 147,148.07 19,343.95 49,886.14 997,789.65 786,414.54 3,567,947.84 26,191.69 30,403,929.20 14,078,024.10 5,454,963.69 102,997,343.00 4,189,754.25 5,860,415.93 2,129,064.24 1,970,469.46 680,014.03 2,743,820.15 418,494.65 620,144.73 3,521,242.63 2,692,743.42 1,128,592.42 67,913.49 359,345.82 243,484.10 228,985.48 459,402.45 14,062.71 59,922.38 137,702.76 96,198.82 34,753.23 61,664.77 43,681.52 1,297,012.36 8,688,942.51 134,218.28 15,296.72 15,296.72 80,144.85 44,366.30 132,834.85 68,420.02 79,087.56 117,417.73 92,776.93 114,679.80 14,187.12 27,752.08 30,676.94 147,222.76 36,849.11 723,793.25 76,005.11 76,237.98 37,583.48 2,296,974.15 279,429.34 84,936.60 111,693.08 81,264.98 114,679.80 71,371.74 87,447.99 33,529,470.30 58,010,745.70 5,722,911.18 21,389,740.20 409,403.95 22,283,845.10 2,757.17 2,267.48 25,183.28 21,697.68 3,662.23 94,777.45 37,394.68 144,610,492.00 9,946,149.90 11,174,262.90 2,788,353.31 1,159,038.12 14,014,768.40 151,274,141.00 83,955,228.80 155,273,308.00 195,924,056.00 1,627,847,164.10 343,032,574.00 1,281,871.75 9,082,438.09 2,711,586.53 3,714.85 3,714.85 3,714.85 3,714.85 3,714.85 3,714.85 3,714.85 3,714.85 3,714.85 10,021.14 12,377,011.90 20,847,303.00 13,590,492.10 16,289,418.20 39,982,977.00 55,403.22 55,403.22 55,403.22 48,940.76 55,403.22 55,403.22 55,403.22 55,403.22 55,403.22 55,403.22 89,246.06 7,406.24 119,571.82 877,442.56 407,329.87 614,192.83

See tax, page B5


Notice

FOR ADS PLACEMENT CALL OR TEXT: +63917-712-1424 • +63947-893-5776 E-Mail: mindanaodailynews@gmail.com

Wednesday, October 5, 2016

B5

Tax...

from page B4 Location/ Brgy. RPU Type Tax Declaration Assessed Area(m²) Period of delinquency Tax Due Interest Value As of June 2016 190 SUAREZ Building 14-0036-00335 70,910.00 130.20 1999-4 To 2016-2 22,391.82 16,122.03 191 SUAREZ Building 14-0036-00336 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 192 SUAREZ Building 14-0036-00337 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 193 SUAREZ Building 14-0036-00338 60,400.00 140.18 1999-4 To 2016-2 31,490.40 21,625.92 194 SUAREZ Building 14-0036-00339 60,400.00 140.18 1999-4 To 2016-2 31,490.40 21,625.92 195 SUAREZ Building 14-0036-00340 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 196 SUAREZ Building 14-0036-00341 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 197 SUAREZ Building 14-0036-00342 73,140.00 159.00 1999-4 To 2016-2 52,588.49 36,595.68 198 SUAREZ Building 14-0036-00343 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 199 SUAREZ Building 14-0036-00344 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 200 SUAREZ Building 14-0036-00345 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 201 SUAREZ Building 14-0036-00346 44,520.00 77.42 1999-4 To 2016-2 20,281.41 13,827.58 202 SUAREZ Building 14-0036-00347 73,140.00 159.00 1999-4 To 2016-2 52,588.49 36,595.68 203 SUAREZ Building 14-0036-00348 73,140.00 159.00 1999-4 To 2016-2 52,588.49 36,595.68 204 SUAREZ Building 14-0036-00349 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 205 SUAREZ Building 14-0036-00350 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 206 SUAREZ Building 14-0036-00351 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 207 SUAREZ Building 14-0036-00352 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 208 SUAREZ Building 14-0036-00353 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 209 SUAREZ Building 14-0036-00354 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 210 SUAREZ Building 14-0036-00355 25,080.00 100.00 1999-4 To 2016-2 25,681.12 18,055.59 211 SUAREZ Machineries 14-0036-00372 1,476,600.00 1999-4 To 2016-2 459,844.21 305,487.22 212 SUAREZ Machineries 14-0036-00373 8,523,960.00 1999-4 To 2016-2 2,654,541.28 1,763,485.62 213 SUAREZ Machineries 14-0036-00374 6,031,200.00 1999-4 To 2016-2 1,879,655.76 1,248,786.19 214 SUAREZ Machineries 14-0036-00375 30,649,490.00 1999-4 To 2016-2 9,552,073.15 6,346,107.15 215 SUAREZ Machineries 14-0036-00376 657,410.00 1999-4 To 2016-2 360,782.84 248,365.71 216 SUAREZ Land 14-0036-00377 2,218,050.00 27,900.00 1999-4 To 2016-2 594,976.24 389,927.45 217 SUAREZ Land 14-0036-00378 10,976,490.00 55,020.00 2006 To 2016-2 2,137,269.12 1,348,528.86 218 SUAREZ Land 14-0036-00406 10,593,050.00 53,098.00 2002-4 To 2016-2 1,435,388.22 849,822.56 219 SUAREZ Land 14-0036-00407 10,759,040.00 53,930.00 2002-4 To 2016-2 2,686,472.68 1,747,725.46 220 SUAREZ Land 14-0036-00408 21,440.00 151.00 1999-4 To 2016-2 6,394.72 4,232.44 221 SUAREZ Building 14-0036-02316 61,378,860.00 10,335.00 2004 To 2016-2 21,195,280.99 14,192,027.01 222 SUAREZ Machineries 14-0036-02335 224,790,320.00 1999-4 To 2016-2 71,077,625.60 47,278,587.40 223 SUAREZ Building 14-0036-02336 10,049,720.00 5,880.00 1999-4 To 2016-2 4,098,535.52 2,775,985.03 224 SUAREZ Building 14-0036-02337 8,529,810.00 2004 To 2016-2 2,887,452.76 1,930,466.19 225 SUAREZ Building 14-0036-02338 7,197,130.00 1999-4 To 2016-2 3,337,419.63 2,277,643.63 226 SUAREZ Building 14-0036-02339 23,787,470.00 2004 To 2016-2 7,915,385.59 5,284,949.51 227 SUAREZ Building 14-0036-02340 1,022,960.00 1999-4 To 2016-2 512,196.41 350,972.18 228 SUAREZ Building 14-0036-02341 7,021,650.00 1999-4 To 2016-2 3,340,733.78 2,283,084.90 229 SUAREZ Building 14-0036-02342 4,950,840.00 2004 To 2016-2 1,635,622.20 1,091,456.31 230 SUAREZ Building 14-0036-02343 54,659,440.00 2004 To 2016-2 18,313,427.64 12,234,074.46 231 SUAREZ Building 14-0036-02344 67,054,540.00 1999-4 To 2016-2 30,158,253.75 20,546,556.75 232 SUAREZ Building 14-0036-02345 10,017,050.00 2004 To 2016-2 3,322,730.37 2,217,974.00 233 SUAREZ Building 14-0036-02346 6,627,910.00 2004 To 2016-2 2,342,418.25 1,571,152.46 234 SUAREZ Building 14-0036-02347 149,690.00 1,108.00 1999-4 To 2016-2 99,625.20 69,124.11 235 SUAREZ Building 14-0036-02348 9,032,360.00 2004 To 2016-2 2,898,537.91 1,937,743.05 236 SUAREZ Building 14-0036-02349 42,670.00 1999-4 To 2016-2 15,617.96 10,502.03 237 SUAREZ Building 14-0036-02350 2,969,980.00 2004 To 2016-2 863,697.38 570,156.21 238 SUAREZ Building 14-0036-02352 8,570,280.00 2004 To 2016-2 2,713,797.21 1,804,729.65 239 SUAREZ Building 14-0036-02353 64,844,160.00 1999-4 To 2016-2 29,560,791.42 20,154,865.48 240 SUAREZ Building 14-0036-02354 197,816,740.00 1999-4 To 2016-2 84,317,166.77 57,264,469.23 241 SUAREZ Building 14-0036-02355 1,891,160.00 2004 To 2016-2 644,712.04 431,268.51 242 SUAREZ Building 14-0036-02356 6,089,450.00 1999-4 To 2016-2 2,930,134.40 2,003,682.39 243 SUAREZ Building 14-0036-02357 1,703,380.00 1999-4 To 2016-2 726,047.20 493,098.92 244 SUAREZ Building 14-0036-02358 1,871,520.00 2004 To 2016-2 622,756.15 415,802.20 245 SUAREZ Building 14-0036-02360 3,222,870.00 2004 To 2016-2 880,781.01 578,053.70 246 SUAREZ Building 14-0036-02361 724,500.00 1999-4 To 2016-2 301,479.02 204,451.67 247 SUAREZ Building 14-0036-02362 2,580.00 6.66 1999-4 To 2016-2 2,436.06 1,704.34 248 SUAREZ Building 14-0036-02364 2,723,270.00 1999-4 To 2016-2 1,150,720.56 781,107.98 249 SUAREZ Building 14-0036-02367 889,920.00 2004 To 2016-2 278,120.30 184,817.58 250 SUAREZ Building 14-0036-02368 9,487,250.00 1999-4 To 2016-2 3,879,191.87 2,627,849.81 251 SUAREZ Building 14-0036-02385 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 252 SUAREZ Building 14-0036-02386 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 253 SUAREZ Building 14-0036-02387 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 254 SUAREZ Building 14-0036-02388 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 55 SUAREZ Building 14-0036-02389 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 256 SUAREZ Building 14-0036-02390 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 257 SUAREZ Building 14-0036-02391 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 258 SUAREZ Building 14-0036-02392 137,460.00 1999-4 To 2016-2 75,250.92 51,787.47 259 SUAREZ Building 14-0036-02393 709,670.00 1999-4 To 2016-2 252,561.88 169,540.65 260 SUAREZ Building 14-0036-02394 22,020.00 1999-4 To 2016-2 9,301.65 6,315.34 261 SUAREZ Building 14-0036-02400 1,467,780.00 2004 To 2016-2 484,914.04 323,584.76 262 SUAREZ Building 14-0036-02401 17,895,840.00 5,879.00 1999-4 To 2016-2 6,858,653.69 4,626,672.91 263 SUAREZ Building 14-0036-02406 44,370.00 232.26 1999-4 To 2016-2 69,398.54 49,299.83 264 TUBOD Land 14-0040-01190 103,950.00 550.00 2002-4 To 2016-2 27,290.54 17,846.95 Sub Total 2,700,836,433.90 1,851,893,028.38 Location/ Brgy. RPU Type Tax Declaration 265 TOMINOBO PROPER Land 14-0027-02690 266 TOMINOBO PROPER Land 14-0027-02841

Assessed Area(m²) Value 45,620.00 1,862.00 19,890.00 812.00

2012 2012

Period of delinquency Tax Due Interest As of June 2016 To 2016-2 3,763.96 1,919.10 To 2016-2 1,835.28 976.55

Sub Total

Grand Total

Total Delinquency 38,513.85 55,403.22 55,403.22 53,116.32 53,116.32 55,403.22 55,403.22 89,184.17 55,403.22 55,403.22 55,403.22 34,108.99 89,184.17 89,184.17 55,403.22 55,403.22 55,403.22 55,403.22 55,403.22 55,403.22 43,736.71 765,331.43 4,418,026.90 3,128,441.95 15,898,180.30 609,148.55 984,903.69 3,485,797.98 2,285,210.78 4,434,198.14 10,627.16 35,387,308.00 118,356,213.00 6,874,520.55 4,817,918.95 5,615,063.26 13,200,335.10 863,168.59 5,623,818.68 2,727,078.51 30,547,502.10 50,704,810.50 5,540,704.37 3,913,570.71 168,749.31 4,836,280.96 26,119.99 1,433,853.59 4,518,526.86 49,715,656.90 141,581,636.00 1,075,980.55 4,933,816.79 1,219,146.12 1,038,558.35 1,458,834.71 505,930.69 4,140.40 1,931,828.54 462,937.88 6,507,041.68 44,595.91 44,595.91 44,595.91 44,595.91 44,595.91 44,595.91 44,595.91 127,038.39 422,102.53 15,616.99 808,498.80 11,485,326.60 118,698.37 45,137.49 4,552,729,462.28 Total Delinquency 5,683.06 2,811.83

5,599.24

2,895.65

8,494.89

2,700,842,033.14

1,851,895,924.03

4,552,737,957.17

a nd if unpaid personal property may be distrained to effect payment. However at any time before the distraint of personal property, payment of the tax with surcharges, interest and penalties may be made in accordance with Section 255 of RA 7160, unless the taxes, surcharges and penalties are paid on or before December 31, 2014, (except when the notice of the assesment or special levy is contested administratively or judicially pursuant to the provisions of Chapter 3, Title Two, Book II of RA 7160) the deliquent real property will be sold at public auction and the title of the property will be vested in the purchaser subject, however, to the right of the deliquent owner of the property or any person having legal interest therein to redeem the property within one (1) year from the date of sale. (Section 254, RA 7160) Notice: Subject to additional charges as it falls due.

LOUELA S. MAYBITUIN City Treasurer Republic of the Philippines City of Iligan Office of the City Treasurer

Pursuant to Section 260 and 261 of Republic Act No. 7160, otherwise known as the Local Government Code of 1991, First Notice of Sale of Delinquent Real Properties of NATIONAL STEEL CORPORATION located in ILIGAN CITY is hereby advised/announced that the City Treasurer of Iligan hereby give notice to all interested parties and to the general public, that on October 19, 2016 at 8:30 A.M., at the Sangguniang Panlungsod Session Hall, Iligan City, the City Treasurer or her authorized representative will sell at public auction to the highest bidder for cash and in Philippine Currency, the hereunder enumerated real properties which are hereby certified as delinquent to satisfy tax deliquency, interest and expense of sale. Location/ Brgy. RPU Type Tax Declaration Assessed Area(m²) Period of delinquency Tax Due Interest Total Value As of June 2016 Delinquency 1 MA. CRISTINA Land 14-0023-00001 18,023,630.00 9,344.00 2006 To 2016-2 3,509,441.04 2,214,312.85 5,723,753.89 2 MA. CRISTINA Miscellaneous 14-0023-00163 9,903,970.00 1999-4 To 2016-2 4,089,444.51 2,772,689.98 6,862,134.49 3 MA. CRISTINA Machineries 14-0023-00166 101,328,030.00 1999-4 To 2016-2 67,944,106.40 47,162,981.60 115,107,088.00 4 MA. CRISTINA Land 14-0023-00167 556,610.00 2,790.00 2015 To 2016-2 117,794.99 75,162.15 192,957.14 5 MA. CRISTINA Land 14-0023-00168 25,870,160.00 129,675.00 2013 To 2016-2 6,350,225.19 4,123,638.21 10,473,863.40 6 MA. CRISTINA Building 14-0023-00169 35,320.00 30.00 1994-4 To 2016-2 17,572.37 12,037.20 29,609.57 7 MA. CRISTINA Building 14-0023-00170 6,970.00 16.22 1994-4 To 2016-2 3,330.44 2,276.55 5,606.99 8 MA. CRISTINA Building 14-0023-00171 149,390.00 160.00 1994-4 To 2016-2 86,776.26 59,878.01 146,654.27 9 MA. CRISTINA Building 14-0023-00172 17,610.00 13.20 1994-4 To 2016-2 8,810.45 6,036.91 14,847.36 10 MA. CRISTINA Building 14-0023-00173 200,070.00 112.50 1994-4 To 2016-2 119,680.80 82,687.02 202,367.82 11 MA. CRISTINA Miscellaneous 14-0023-00174 13,005,390.00 1994-4 To 2016-2 5,370,052.19 3,640,956.66 9,011,008.85 12 MA. CRISTINA Building 14-0023-00181 169,250.00 237.45 1994-4 To 2016-2 121,872.84 84,801.78 206,674.62 13 MA. CRISTINA Land 14-0023-00401 925,860.00 21,279.00 2002-4 To 2016-2 244,993.89 160,343.48 405,337.37 14 MA. CRISTINA Land 14-0023-00553 491,570.00 20,064.00 2002 To 2016-2 63,821.68 37,428.99 101,250.67 15 MA. CRISTINA Building 14-0023-01109 90,992,350.00 2004 To 2016-2 28,050,833.44 18,612,468.86 46,663,302.30 16 MA. CRISTINA Building 14-0023-01110 667,100.00 264.00 1999-4 To 2016-2 275,518.48 186,759.35 462,277.83 17 MA. CRISTINA Building 14-0023-01111 940,590.00 222.00 1999-4 To 2016-2 388,473.66 263,325.85 651,799.51 18 MA. CRISTINA Building 14-0023-01112 10,709,480.00 3,136.00 2002 To 2016-2 4,139,832.06 2,794,232.44 6,934,064.50 19 MA. CRISTINA Building 14-0023-01113 1,972,720.00 2004 To 2016-2 600,123.53 397,744.84 997,868.37 20 MA. CRISTINA Machineries 14-0023-01114 8,053,290.00 1999-4 To 2016-2 5,188,341.69 3,595,982.10 8,784,323.79 21 PALA-O Land 14-0024-01452 287,530.00 2,056.00 2007 To 2016-2 47,594.08 29,282.66 76,876.74 22 PALA-O Land 14-0024-01649 251,180.00 1,329.00 2007 To 2016-2 40,406.77 24,738.02 65,144.79 23 PALA-O Land 14-0024-02438 111,700.00 591.00 2007 To 2016-2 20,563.11 12,868.83 33,431.94 24 PALA-O Land 14-0024-02439 111,700.00 591.00 2007 To 2016-2 20,563.11 12,868.83 33,431.94 25 PALA-O Land 14-0024-02440 145,340.00 769.00 2007 To 2016-2 26,148.34 16,306.98 42,455.32 26 PALA-O Land 14-0024-04395 97,710.00 517.00 2007 To 2016-2 18,240.89 11,439.41 29,680.30 27 PALA-O Land 14-0024-05596 98,280.00 520.00 2007 To 2016-2 18,334.58 11,496.96 29,831.54 28 PALA-O Land 14-0024-05599 378,000.00 2,000.00 2007 To 2016-2 52,683.76 31,378.72 84,062.48 29 TOMINOBO PROPER Land 14-0027-00001 31,323,890.00 157,012.00 1999-4 To 2016-2 8,616,278.59 5,660,642.61 14,276,921.20 30 TOMINOBO PROPER Building 14-0027-00002 7,426,770.00 1,470.00 2004 To 2016-2 2,713,430.96 1,824,373.89 4,537,804.85 31 TOMINOBO PROPER Building 14-0027-00003 2,165,600.00 1,076.00 2004 To 2016-2 619,679.36 408,467.12 1,028,146.48 32 TOMINOBO PROPER Building 14-0027-00004 6,757,830.00 4,214.00 2004 To 2016-2 1,962,470.24 1,295,328.06 3,257,798.30 33 TOMINOBO PROPER Building 14-0027-00005 4,262,600.00 1,180.00 1994-4 To 2016-2 2,233,572.32 1,533,962.28 3,767,534.60 34 TOMINOBO PROPER Building 14-0027-00006 14,908,640.00 5,785.00 1999-4 To 2016-2 7,902,313.52 5,430,113.68 13,332,427.20 35 TOMINOBO PROPER Building 14-0027-00007 413,540.00 283.46 1999-4 To 2016-2 157,488.80 106,192.36 263,681.16 36 TOMINOBO PROPER Building 14-0027-00008 159,190.00 477.77 1999-4 To 2016-2 80,811.02 55,412.47 136,223.49 37 TOMINOBO PROPER Building 14-0027-00009 1,792,250.00 5,068.00 1999-4 To 2016-2 958,476.82 658,901.08 1,617,377.90 38 TOMINOBO PROPER Building 14-0027-00010 641,090.00 913.55 1999-4 To 2016-2 379,791.98 262,289.10 642,081.08 39 TOMINOBO PROPER Building 14-0027-00011 87,941,550.00 14,490.00 2002 To 2016-2 39,469,433.56 26,886,973.84 66,356,407.40 40 TOMINOBO PROPER Machineries 14-0027-00012 88,450.00 1999-4 To 2016-2 27,569.16 18,316.29 45,885.45 41 TOMINOBO PROPER Machineries 14-0027-00013 88,460.00 1999-4 To 2016-2 27,569.74 18,316.53 45,886.27 42 TOMINOBO PROPER Machineries 14-0027-00014 795,440.00 1999-4 To 2016-2 251,233.22 167,096.88 418,330.10 43 TOMINOBO PROPER Machineries 14-0027-00015 2,320,330.00 1999-4 To 2016-2 738,854.24 491,746.27 1,230,600.51 44 TOMINOBO PROPER Machineries 14-0027-00016 2,334,460.00 1999-4 To 2016-2 723,743.85 480,621.76 1,204,365.61 45 TOMINOBO PROPER Machineries 14-0027-00017 1,080,810.00 1999-4 To 2016-2 336,495.78 223,538.43 560,034.21 46 TOMINOBO PROPER Machineries 14-0027-00018 4,085,480.00 1999-4 To 2016-2 3,259,623.78 2,276,097.07 5,535,720.85 47 TOMINOBO PROPER Machineries 14-0027-00019 361,892,870.00 1999-4 To 2016-2 253,710,713.00 176,397,397.00 430,108,110.00 48 TOMINOBO PROPER Land 14-0027-00906 133,560.00 807.00 2002-4 To 2016-2 33,642.55 21,907.08 55,549.63 49 TOMINOBO PROPER Land 14-0027-01635 92,570.00 464.00 2002-4 To 2016-2 22,627.86 14,687.15 37,315.01 50 TOMINOBO PROPER Land 14-0027-01636 86,780.00 435.00 2002-4 To 2016-2 21,403.19 13,905.74 35,308.93 51 TOMINOBO PROPER Land 14-0027-02702 4,350,300.00 21,806.00 2002-3 To 2016-2 1,104,644.46 719,920.67 1,824,565.13 52 TOMINOBO PROPER Land 14-0027-02756 19,950,000.00 100,000.00 2002-4 To 2016-2 4,981,406.26 3,240,729.38 8,222,135.64 53 TOMINOBO PROPER Land 14-0027-02763 24,937,500.00 125,000.00 2002-4 To 2016-2 6,226,757.83 4,050,911.67 10,277,669.50 54 TOMINOBO PROPER Land 14-0027-02765 8,054,610.00 40,374.00 2002-4 To 2016-2 2,011,192.80 1,308,411.98 3,319,604.78 55 TOMINOBO PROPER Land 14-0027-02878 957,740.00 12,047.00 2002-4 To 2016-2 239,829.64 156,072.44 395,902.08 56 TOMINOBO PROPER Land 14-0027-02888 8,561,100.00 107,561.00 2002-4 To 2016-2 2,141,304.26 1,393,484.34 3,534,788.60 57 TOMINOBO PROPER Land 14-002702889 1,448,090.00 18,215.00 2002-4 To 2016-2 362,620.68 235,980.59 598,601.27 58 TOMINOBO PROPER Land 14-0027-02898 2,265,190.00 28,493.00 2002-4 To 2016-2 567,233.09 369,135.11 936,368.20 59 TOMINOBO PROPER Land 14-0027-02899 1,279,870.00 16,099.00 2002-4 To 2016-2 320,495.85 208,567.29 529,063.14 60 TOMINOBO PROPER Land 14-0027-02900 431,610.00 5,429.00 2002-4 To 2016-2 108,079.79 70,334.41 178,414.20 61 TOMINOBO PROPER Land 14-0027-02901 248,040.00 3,120.00 2002-4 To 2016-2 62,112.38 40,420.51 102,532.89 62 TOMINOBO PROPER Land 14-0027-02902 286,120.00 3,599.00 2002-4 To 2016-2 71,648.20 46,626.11 118,274.31 63 TOMINOBO PROPER Land 14-0027-02903 1,972,160.00 24,807.00 2002-4 To 2016-2 493,853.32 321,381.99 815,235.31 64 TOMINOBO PROPER Land 14-0027-02905 1,857,840.00 23,369.00 2002-4 To 2016-2 465,225.94 302,752.39 767,978.33 65 TOMINOBO PROPER Land 14-0027-02906 204,790.00 2,576.00 2002-4 To 2016-2 51,282.42 33,372.77 84,655.19 66 TOMINOBO PROPER Land 14-0027-02907 315,460.00 3,968.00 2002-4 To 2016-2 78,994.46 51,406.75 130,401.21 67 TOMINOBO PROPER Land 14-0027-02908 486,480.00 4,054.00 2002-4 To 2016-2 90,454.87 56,693.20 147,148.07 68 TOMINOBO PROPER Land 14-0027-02909 44,440.00 559.00 2002 To 2016-2 11,694.42 7,649.53 19,343.95 69 TOMINOBO PROPER Land 14-0027-02910 120,680.00 1,518.00 2002-4 To 2016-2 30,219.99 19,666.15 49,886.14 70 TOMINOBO PROPER Land 14-0027-02911 2,413,780.00 30,362.00 2002-4 To 2016-2 604,441.06 393,348.59 997,789.65 71 TOMINOBO PROPER Land 14-0027-02912 1,902,440.00 23,930.00 2002-4 To 2016-2 476,394.24 310,020.30 786,414.54 72 TOMINOBO PROPER Land 14-0027-02913 8,631,320.00 108,570.00 2002-4 To 2016-2 2,161,391.48 1,406,556.36 3,567,947.84 73 TOMINOBO PROPER Land 14-0027-02918 63,360.00 797.00 2002-4 To 2016-2 15,866.43 10,325.26 26,191.69 74 TOMINOBO PROPER Building 14-0027-03078 40,965,100.00 1999-4 To 2016-2 18,091,343.67 12,312,585.53 30,403,929.20 75 TOMINOBO PROPER Building 14-0027-03079 19,669,700.00 913.55 1999-4 To 2016-2 8,383,990.56 5,694,033.54 14,078,024.10 76 TOMINOBO PROPER Building 14-0027-03080 7,229,560.00 1,470.00 1999-4 To 2016-2 3,244,666.67 2,210,297.02 5,454,963.69 77 TOMINOBO PROPER Building 14-0027-03081 176,979,300.00 2004 To 2016-2 61,673,525.63 41,323,817.37 102,997,343.00 78 TOMINOBO PROPER Building 14-0027-03082 4,697,430.00 1994-4 To 2016-2 2,483,450.14 1,706,304.11 4,189,754.25 79 STA. ELENA Land 14-0032-00001 17,752,270.00 223,299.00 2002 To 2016-2 3,586,160.44 2,274,255.49 5,860,415.93 80 STA. ELENA Land 14-0032-00012 6,449,200.00 81,122.00 2002 To 2016-2 1,302,835.62 826,228.62 2,129,064.24 81 STA. ELENA Land 14-0032-00013 6,260,070.00 78,743.00 2002-4 To 2016-2 1,208,722.92 761,746.54 1,970,469.46 82 STA. ELENA Land 14-0032-00033 2,160,170.00 27,172.00 2002-4 To 2016-2 417,131.44 262,882.59 680,014.03 83 STA. ELENA Land 14-0032-00037 12,719,920.00 159,999.00 2003 To 2016-2 1,723,460.31 1,020,359.84 2,743,820.15 84 STA. ELENA Land 14-0032-00040 1,267,710.00 15,946.00 2002 To 2016-2 256,089.28 162,405.37 418,494.65 85 STA. ELENA Land 14-0032-00041 1,878,510.00 23,629.00 2002 To 2016-2 379,484.54 240,660.19 620,144.73 86 STA. ELENA Land 14-0032-00042 10,666,280.00 134,167.00 2002 To 2016-2 2,154,749.58 1,366,493.05 3,521,242.63

See tax, page B6


B6 Notice

FOR ADS PLACEMENT CALL OR TEXT: 0917-712-1424 • 0947-893-5776 E-Mail: mindanaodailynews@gmail.com

Wednesday, October 5, 2016

Tax...

from page B5

Location/ Brgy. RPU Type Tax Declaration Assessed Area(m²) Period of delinquency Tax Due Interest Value As of June 2016 87 STA. ELENA Land 14-0032-00046 12,308,670.00 154,826.00 2002-4 To 2016-2 1,689,619.21 1,003,124.21 88 STA. ELENA Land 14-0032-00052 2,948,970.00 37,094.00 2002 To 2016-2 685,883.88 442,708.54 89 STA. ELENA Land 14-0032-00129 174,270.00 1,053.00 2002-4 To 2016-2 41,241.22 26,672.27 90 STA. ELENA Land 14-0032-00362 86,630.00 5,775.00 2002-4 To 2016-2 209,795.23 149,550.59 91 STA. ELENA Land 14-0032-00363 58,700.00 3,913.00 2002-4 To 2016-2 142,152.25 101,331.85 92 STA. ELENA Land 14-0032-00364 55,200.00 3,680.00 2002-4 To 2016-2 133,687.50 95,297.98 93 STA. ELENA Land 14-0032-00365 110,750.00 7,383.00 2002-4 To 2016-2 268,210.85 191,191.60 94 STA. ELENA Land 14-0032-00366 3,390.00 226.00 2002-4 To 2016-2 8,210.14 5,852.57 95 STA. ELENA Land 14-0032-00367 14,450.00 963.00 2002-4 To 2016-2 34,984.30 24,938.08 96 STA. ELENA Land 14-0032-00498 33,200.00 2,213.00 2002-4 To 2016-2 80,394.44 57,308.32 97 STA. ELENA Land 14-0032-00499 23,190.00 1,546.00 2002-4 To 2016-2 56,163.28 40,035.54 98 STA. ELENA Land 14-0032-00500 13,780.00 551.00 2002-4 To 2016-2 20,344.27 14,408.96 99 STA. ELENA Land 14-0032-00501 14,870.00 991.00 2002-4 To 2016-2 36,001.49 25,663.28 100 STA. ELENA Land 14-0032-00502 10,530.00 702.00 2002-4 To 2016-2 25,502.35 18,179.17 101 STA. ELENA Land 14-0032-00503 2,862,650.00 17,297.00 2002-4 To 2016-2 782,932.29 514,080.07 102 STA. ELENA Land 14-0032-00504 19,177,480.00 115,876.00 2002-4 To 2016-2 5,245,018.63 3,443,923.88 103 STA. ELENA Land 14-0032-00511 32,360.00 2,157.00 2002-4 To 2016-2 78,360.06 55,858.22 104 STA. ELENA Land 14-0032-00571 33,760.00 204.00 2002-4 To 2016-2 9,233.75 6,062.97 105 STA. ELENA Land 14-0032-00572 33,760.00 204.00 2002-4 To 2016-2 9,233.75 6,062.97 106 STA. ELENA Land 14-0032-00644 19,320.00 1,288.00 2002-4 To 2016-2 46,790.62 33,354.23 107 STA. ELENA Land 14-0032-00645 10,700.00 713.00 2002-4 To 2016-2 25,902.25 18,464.05 08 STA. ELENA Land 14-0032-00646 76,620.00 5,108.00 2002 To 2016-2 78,001.92 54,832.93 109 STA. ELENA Land 14-0032-00917 175,930.00 1,063.00 2002-4 To 2016-2 41,552.44 26,867.58 110 STA. ELENA Land 14-0032-00918 19,070.00 1,271.00 2002-4 To 2016-2 46,173.35 32,914.21 111 STA. ELENA Land 14-0032-00919 28,310.00 1,887.00 2002-4 To 2016-2 68,551.49 48,866.24 112 STA. ELENA Land 14-0032-00920 22,370.00 1,491.00 2002-4 To 2016-2 54,165.56 38,611.37 113 STA. ELENA Land 14-0032-00921 27,650.00 1,843.00 2002-4 To 2016-2 66,953.06 47,726.74 114 STA. ELENA Land 14-0032-00922 3,420.00 228.00 2002-4 To 2016-2 8,282.83 5,904.29 115 STA. ELENA Land 14-0032-00923 6,690.00 446.00 2002-4 To 2016-2 16,202.35 11,549.73 116 STA. ELENA Land 14-0032-00924 7,400.00 493.00 2002-4 To 2016-2 17,910.06 12,766.88 117 STA. ELENA Land 14-0032-00925 35,490.00 2,366.00 2002-4 To 2016-2 85,952.35 61,270.41 118 STA. ELENA Land 14-0032-00926 9,590.00 639.00 2002-4 To 2016-2 21,520.61 15,328.50 119 STA. ELENA Land 14-0032-00927 174,480.00 11,632.00 2002-4 To 2016-2 422,568.76 301,224.49 120 STA. ELENA Land 14-0032-00959 201,410.00 1,217.00 2002-4 To 2016-2 46,219.25 29,785.86 121 STA. ELENA Land 14-0032-00960 202,410.00 1,223.00 2002-4 To 2016-2 46,364.70 29,873.28 122 STA. ELENA Land 14-0032-01459 9,060.00 604.00 2002-4 To 2016-2 21,942.21 15,641.27 123 STA. ELENA Land 14-0032-01460 4,979,730.00 30,089.00 2002-3 To 2016-2 1,385,645.50 911,328.65 124 STA. ELENA Land 14-0032-01461 65,930.00 4,395.00 2002-3 To 2016-2 163,123.50 116,305.84 125 STA. ELENA Land 14-0032-01462 20,480.00 1,365.00 2002-4 To 2016-2 49,588.18 35,348.42 126 STA. ELENA Land 14-0032-01463 26,930.00 1,795.00 2002-4 To 2016-2 65,209.30 46,483.78 127 STA. ELENA Land 14-0032-01464 19,590.00 1,306.00 2002-4 To 2016-2 47,444.52 33,820.46 128 STA. ELENA Land 14-0032-01465 27,650.00 1,843.00 2002-4 To 2016-2 66,953.06 47,726.74 129 STA. ELENA Land 14-0032-01466 17,210.00 1,147.00 2002-4 To 2016-2 41,668.68 29,703.06 130 STA. ELENA Land 14-0032-01467 23,660.00 1,577.00 2002 To 2016-2 51,080.32 36,367.67 131 SUAREZ Land 14-0036-00266 73,564,430.00 368,744.00 1999-4 To 2016-2 20,235,403.26 13,294,067.04 132 SUAREZ Machineries 14-0036-00267 48,810,230.00 1999-4 To 2016-2 34,219,181.90 23,791,563.80 133 SUAREZ Miscellaneous 14-0036-00268 12,209,040.00 2006 To 2016-2 3,450,340.40 2,272,570.78 134 SUAREZ Land 14-0036-00269 46,929,580.00 235,236.00 1999-4 To 2016-2 12,908,942.93 8,480,797.27 135 SUAREZ Building 14-0036-00270 659,380.00 361.80 1999-4 To 2016-2 244,699.69 164,704.26 136 SUAREZ Building 14-0036-00271 38,438,430.00 25,066.80 2004 To 2016-2 13,344,790.12 8,939,054.98 137 SUAREZ Building 14-0036-00272 2,080.00 11.25 1999-4 To 2016-2 1,624.07 1,133.10 138 SUAREZ Building 14-0036-00273 3,000.00 9.59 1999-4 To 2016-2 1,348.69 918.79 139 SUAREZ Building 14-0036-00274 30,520.00 57.27 1999-4 To 2016-2 14,950.40 10,232.88 140 SUAREZ Building 14-0036-00275 14,680.00 126.81 1999-4 To 2016-2 12,763.56 8,934.12 141 SUAREZ Building 14-0036-00276 1,600.00 6.38 1999-4 To 2016-2 2,139.16 1,523.07 142 SUAREZ Building 14-0036-00277 116,610.00 179.20 1999-4 To 2016-2 56,283.45 38,494.00 143 SUAREZ Building 14-0036-00278 51,350.00 55.00 1999-4 To 2016-2 22,260.84 15,133.84 144 SUAREZ Machineries 14-0036-00280 278,789,000.00 1999-4 To 2016-2 86,886,044.70 57,724,447.30 145 SUAREZ Machineries 14-0036-00281 19,187,620.00 1999-4 To 2016-2 5,976,055.43 3,970,094.47 146 SUAREZ Machineries 14-0036-00282 17,264,330.00 1999-4 To 2016-2 6,670,687.93 4,503,574.97 147 SUAREZ Machineries 14-0036-00283 2,699,260.00 1999-4 To 2016-2 1,658,423.96 1,129,929.35 148 SUAREZ Machineries 14-0036-00284 1,790,720.00 1999-4 To 2016-2 691,909.78 467,128.34 149 SUAREZ Machineries 14-0036-00285 21,652,930.00 1999-4 To 2016-2 8,366,381.49 5,648,386.91 150 SUAREZ Machineries 14-0036-00287 127,282,030.00 1999-4 To 2016-2 89,233,077.80 62,041,063.20 151 SUAREZ Machineries 14-0036-00288 70,639,910.00 1999-4 To 2016-2 49,523,225.70 34,432,003.10 152 SUAREZ Machineries 14-0036-00289 114,016,240.00 1999-4 To 2016-2 91,424,456.50 63,848,851.50 153 SUAREZ Machineries 14-0036-00290 152,075,420.00 1999-4 To 2016-2 115,442,246.60 80,481,809.40 154 SUAREZ Machineries 14-0036-00291 1,417,670,790.00 2002 To 2016-2 960,712,809.76 667,134,354.34 155 SUAREZ Machineries 14-0036-00292 485,364,990.00 2005 To 2016-2 204,329,993.70 138,702,580.30 156 SUAREZ Miscellaneous 14-0036-00293 1,791,270.00 1999-4 To 2016-2 763,330.17 518,541.58 157 SUAREZ Miscellaneous 14-0036-00294 12,425,620.00 1999-4 To 2016-2 5,405,736.79 3,676,701.30 158 SUAREZ Land 14-0036-00296 10,390,560.00 52,083.00 1999-4 To 2016-2 1,681,240.02 1,030,346.51 159 SUAREZ Building 14-0036-00297 1,600.00 6.38 1999-4 To 2016-2 2,176.02 1,538.83 160 SUAREZ Building 14-0036-00298 1,600.00 6.38 1999-4 To 2016-2 2,176.02 1,538.83 161 SUAREZ Building 14-0036-00299 1,600.00 6.38 1999-4 To 2016-2 2,176.02 1,538.83 162 SUAREZ Building 14-0036-00300 1,600.00 6.38 1999-4 To 2016-2 2,176.02 1,538.83 163 SUAREZ Building 14-0036-00301 1,600.00 6.38 1999-4 To 2016-2 2,176.02 1,538.83 164 SUAREZ Building 14-0036-00302 1,600.00 6.38 1999-4 To 2016-2 2,176.02 1,538.83 165 SUAREZ Building 14-0036-00303 1,600.00 6.38 1999-4 To 2016-2 2,176.02 1,538.83 166 SUAREZ Building 14-0036-00304 1,600.00 6.38 1999-4 To 2016-2 2,176.02 1,538.83 167 SUAREZ Building 14-0036-00305 1,600.00 6.38 1999-4 To 2016-2 2,176.02 1,538.83 168 SUAREZ Building 14-0036-00306 15,600.00 14.85 1999-4 To 2016-2 5,984.14 4,037.00 169 SUAREZ Machineries 14-0036-00314 13,557,730.00 1999-4 To 2016-2 7,332,598.32 5,044,413.58 170 SUAREZ Machineries 14-0036-00315 16,422,540.00 1999-4 To 2016-2 12,286,063.32 8,561,239.68 171 SUAREZ Machineries 14-0036-00316 9,979,420.00 1999-4 To 2016-2 8,002,040.88 5,588,451.22 172 SUAREZ Machineries 14-0036-00317 12,643,780.00 1999-4 To 2016-2 9,598,040.57 6,691,377.63 173 SUAREZ Land 14-0036-00318 169,635,650.00 850,304.00 1999-4 To 2016-2 24,955,834.34 15,027,142.66 174 SUAREZ Building 14-0036-00319 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 175 SUAREZ Building 14-0036-00320 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 176 SUAREZ Building 14-0036-00321 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 177 SUAREZ Building 14-0036-00322 41,690.00 120.00 1999-4 To 2016-2 28,875.90 20,064.86 178 SUAREZ Building 14-0036-00323 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 179 SUAREZ Building 14-0036-00324 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 180 SUAREZ Building 14-0036-00325 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 181 SUAREZ Building 14-0036-00326 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 182 SUAREZ Building 14-0036-00327 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 183 SUAREZ Building 14-0036-00328 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 184 SUAREZ Building 14-0036-00329 73,870.00 159.00 1999-4 To 2016-2 52,631.83 36,614.23 185 SUAREZ Building 14-0036-00330 4,950.00 29.54 1999-4 To 2016-2 4,356.12 3,050.12 186 SUAREZ Building 14-0036-00331 189,790.00 368.79 1999-4 To 2016-2 71,431.59 48,140.23 187 SUAREZ Building 14-0036-00332 1,137,680.00 2004 To 2016-2 521,608.76 355,833.80 188 SUAREZ Building 14-0036-00333 424,180.00 997.64 1999-4 To 2016-2 241,095.46 166,234.41 189 SUAREZ Building 14-0036-00334 858,190.00 1,154.97 1999-4 To 2016-2 365,775.36 248,417.47 190 SUAREZ Building 14-0036-00335 70,910.00 130.20 1999-4 To 2016-2 22,391.82 16,122.03 191 SUAREZ Building 14-0036-00336 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 192 SUAREZ Building 14-0036-00337 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 193 SUAREZ Building 14-0036-00338 60,400.00 140.18 1999-4 To 2016-2 31,490.40 21,625.92 194 SUAREZ Building 14-0036-00339 60,400.00 140.18 1999-4 To 2016-2 31,490.40 21,625.92 195 SUAREZ Building 14-0036-00340 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 196 SUAREZ Building 14-0036-00341 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 197 SUAREZ Building 14-0036-00342 73,140.00 159.00 1999-4 To 2016-2 52,588.49 36,595.68 198 SUAREZ Building 14-0036-00343 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 199 SUAREZ Building 14-0036-00344 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 200 SUAREZ Building 14-0036-00345 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 201 SUAREZ Building 14-0036-00346 44,520.00 77.42 1999-4 To 2016-2 20,281.41 13,827.58 202 SUAREZ Building 14-0036-00347 73,140.00 159.00 1999-4 To 2016-2 52,588.49 36,595.68 203 SUAREZ Building 14-0036-00348 73,140.00 159.00 1999-4 To 2016-2 52,588.49 36,595.68 204 SUAREZ Building 14-0036-00349 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 205 SUAREZ Building 14-0036-00350 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 206 SUAREZ Building 14-0036-00351 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 207 SUAREZ Building 14-0036-00352 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 208 SUAREZ Building 14-0036-00353 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 209 SUAREZ Building 14-0036-00354 60,400.00 140.18 1999-4 To 2016-2 32,820.00 22,583.22 210 SUAREZ Building 14-0036-00355 25,080.00 100.00 1999-4 To 2016-2 25,681.12 18,055.59 211 SUAREZ Machineries 14-0036-00372 1,476,600.00 1999-4 To 2016-2 459,844.21 305,487.22 212 SUAREZ Machineries 14-0036-00373 8,523,960.00 1999-4 To 2016-2 2,654,541.28 1,763,485.62 213 SUAREZ Machineries 14-0036-00374 6,031,200.00 1999-4 To 2016-2 1,879,655.76 1,248,786.19 214 SUAREZ Machineries 14-0036-00375 30,649,490.00 1999-4 To 2016-2 9,552,073.15 6,346,107.15 215 SUAREZ Machineries 14-0036-00376 657,410.00 1999-4 To 2016-2 360,782.84 248,365.71 216 SUAREZ Land 14-0036-00377 2,218,050.00 27,900.00 1999-4 To 2016-2 594,976.24 389,927.45 217 SUAREZ Land 14-0036-00378 10,976,490.00 55,020.00 2006 To 2016-2 2,137,269.12 1,348,528.86 218 SUAREZ Land 14-0036-00406 10,593,050.00 53,098.00 2002-4 To 2016-2 1,435,388.22 849,822.56 219 SUAREZ Land 14-0036-00407 10,759,040.00 53,930.00 2002-4 To 2016-2 2,686,472.68 1,747,725.46 220 SUAREZ Land 14-0036-00408 21,440.00 151.00 1999-4 To 2016-2 6,394.72 4,232.44 221 SUAREZ Building 14-0036-02316 61,378,860.00 10,335.00 2004 To 2016-2 21,195,280.99 14,192,027.01 222 SUAREZ Machineries 14-0036-02335 224,790,320.00 1999-4 To 2016-2 71,077,625.60 47,278,587.40 223 SUAREZ Building 14-0036-02336 10,049,720.00 5,880.00 1999-4 To 2016-2 4,098,535.52 2,775,985.03 224 SUAREZ Building 14-0036-02337 8,529,810.00 2004 To 2016-2 2,887,452.76 1,930,466.19 225 SUAREZ Building 14-0036-02338 7,197,130.00 1999-4 To 2016-2 3,337,419.63 2,277,643.63 226 SUAREZ Building 14-0036-02339 23,787,470.00 2004 To 2016-2 7,915,385.59 5,284,949.51 227 SUAREZ Building 14-0036-02340 1,022,960.00 1999-4 To 2016-2 512,196.41 350,972.18 228 SUAREZ Building 14-0036-02341 7,021,650.00 1999-4 To 2016-2 3,340,733.78 2,283,084.90 229 SUAREZ Building 14-0036-02342 4,950,840.00 2004 To 2016-2 1,635,622.20 1,091,456.31 230 SUAREZ Building 14-0036-02343 54,659,440.00 2004 To 2016-2 18,313,427.64 12,234,074.46 231 SUAREZ Building 14-0036-02344 67,054,540.00 1999-4 To 2016-2 30,158,253.75 20,546,556.75 232 SUAREZ Building 14-0036-02345 10,017,050.00 2004 To 2016-2 3,322,730.37 2,217,974.00 233 SUAREZ Building 14-0036-02346 6,627,910.00 2004 To 2016-2 2,342,418.25 1,571,152.46 234 SUAREZ Building 14-0036-02347 149,690.00 1,108.00 1999-4 To 2016-2 99,625.20 69,124.11 235 SUAREZ Building 14-0036-02348 9,032,360.00 2004 To 2016-2 2,898,537.91 1,937,743.05 236 SUAREZ Building 14-0036-02349 42,670.00 1999-4 To 2016-2 15,617.96 10,502.03 237 SUAREZ Building 14-0036-02350 2,969,980.00 2004 To 2016-2 863,697.38 570,156.21 238 SUAREZ Building 14-0036-02352 8,570,280.00 2004 To 2016-2 2,713,797.21 1,804,729.65 239 SUAREZ Building 14-0036-02353 64,844,160.00 1999-4 To 2016-2 29,560,791.42 20,154,865.48 240 SUAREZ Building 14-0036-02354 197,816,740.00 1999-4 To 2016-2 84,317,166.77 57,264,469.23 241 SUAREZ Building 14-0036-02355 1,891,160.00 2004 To 2016-2 644,712.04 431,268.51 242 SUAREZ Building 14-0036-02356 6,089,450.00 1999-4 To 2016-2 2,930,134.40 2,003,682.39 243 SUAREZ Building 14-0036-02357 1,703,380.00 1999-4 To 2016-2 726,047.20 493,098.92 244 SUAREZ Building 14-0036-02358 1,871,520.00 2004 To 2016-2 622,756.15 415,802.20 245 SUAREZ Building 14-0036-02360 3,222,870.00 2004 To 2016-2 880,781.01 578,053.70 246 SUAREZ Building 14-0036-02361 724,500.00 1999-4 To 2016-2 301,479.02 204,451.67 247 SUAREZ Building 14-0036-02362 2,580.00 6.66 1999-4 To 2016-2 2,436.06 1,704.34 248 SUAREZ Building 14-0036-02364 2,723,270.00 1999-4 To 2016-2 1,150,720.56 781,107.98 249 SUAREZ Building 14-0036-02367 889,920.00 2004 To 2016-2 278,120.30 184,817.58 250 SUAREZ Building 14-0036-02368 9,487,250.00 1999-4 To 2016-2 3,879,191.87 2,627,849.81 251 SUAREZ Building 14-0036-02385 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 252 SUAREZ Building 14-0036-02386 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 253 SUAREZ Building 14-0036-02387 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 254 SUAREZ Building 14-0036-02388 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 255 SUAREZ Building 14-0036-02389 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 256 SUAREZ Building 14-0036-02390 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 257 SUAREZ Building 14-0036-02391 25,080.00 100.00 1999-4 To 2016-2 26,180.68 18,415.23 258 SUAREZ Building 14-0036-02392 137,460.00 1999-4 To 2016-2 75,250.92 51,787.47 259 SUAREZ Building 14-0036-02393 709,670.00 1999-4 To 2016-2 252,561.88 169,540.65 260 SUAREZ Building 14-0036-02394 22,020.00 1999-4 To 2016-2 9,301.65 6,315.34 261 SUAREZ Building 14-0036-02400 1,467,780.00 2004 To 2016-2 484,914.04 323,584.76 262 SUAREZ Building 14-0036-02401 17,895,840.00 5,879.00 1999-4 To 2016-2 6,858,653.69 4,626,672.91 263 SUAREZ Building 14-0036-02406 44,370.00 232.26 1999-4 To 2016-2 69,398.54 49,299.83 264 TUBOD Land 14-0040-01190 103,950.00 550.00 2002-4 To 2016-2 27,290.54 17,846.95 Sub Total 2,700,836,433.90 1,851,893,028.38

Total Delinquency 2,692,743.42 1,128,592.42 67,913.49 359,345.82 243,484.10 228,985.48 459,402.45 14,062.71 59,922.38 137,702.76 96,198.82 34,753.23 61,664.77 43,681.52 1,297,012.36 8,688,942.51 134,218.28 15,296.72 15,296.72 80,144.85 44,366.30 132,834.85 68,420.02 79,087.56 117,417.73 92,776.93 114,679.80 14,187.12 27,752.08 30,676.94 147,222.76 36,849.11 723,793.25 76,005.11 76,237.98 37,583.48 2,296,974.15 279,429.34 84,936.60 111,693.08 81,264.98 114,679.80 71,371.74 87,447.99 33,529,470.30 58,010,745.70 5,722,911.18 21,389,740.20 409,403.95 22,283,845.10 2,757.17 2,267.48 25,183.28 21,697.68 3,662.23 94,777.45 37,394.68 144,610,492.00 9,946,149.90 11,174,262.90 2,788,353.31 1,159,038.12 14,014,768.40 151,274,141.00 83,955,228.80 155,273,308.00 195,924,056.00 1,627,847,164.10 343,032,574.00 1,281,871.75 9,082,438.09 2,711,586.53 3,714.85 3,714.85 3,714.85 3,714.85 3,714.85 3,714.85 3,714.85 3,714.85 3,714.85 10,021.14 12,377,011.90 20,847,303.00 13,590,492.10 16,289,418.20 39,982,977.00 55,403.22 55,403.22 55,403.22 48,940.76 55,403.22 55,403.22 55,403.22 55,403.22 55,403.22 55,403.22 89,246.06 7,406.24 119,571.82 877,442.56 407,329.87 614,192.83 38,513.85 55,403.22 55,403.22 53,116.32 53,116.32 55,403.22 55,403.22 89,184.17 55,403.22 55,403.22 55,403.22 34,108.99 89,184.17 89,184.17 55,403.22 55,403.22 55,403.22 55,403.22 55,403.22 55,403.22 43,736.71 765,331.43 4,418,026.90 3,128,441.95 15,898,180.30 609,148.55 984,903.69 3,485,797.98 2,285,210.78 4,434,198.14 10,627.16 35,387,308.00 118,356,213.00 6,874,520.55 4,817,918.95 5,615,063.26 13,200,335.10 863,168.59 5,623,818.68 2,727,078.51 30,547,502.10 50,704,810.50 5,540,704.37 3,913,570.71 168,749.31 4,836,280.96 26,119.99 1,433,853.59 4,518,526.86 49,715,656.90 141,581,636.00 1,075,980.55 4,933,816.79 1,219,146.12 1,038,558.35 1,458,834.71 505,930.69 4,140.40 1,931,828.54 462,937.88 6,507,041.68 44,595.91 44,595.91 44,595.91 44,595.91 44,595.91 44,595.91 44,595.91 127,038.39 422,102.53 15,616.99 808,498.80 11,485,326.60 118,698.37 45,137.49 4,552,729,462.28

Location/ Brgy. RPU Type Tax Declaration Assessed Area(m²) Period of delinquency Tax Due Interest Total Value As of June 2016 Delinquency 265 TOMINOBO PROPER Land 14-0027-02690 45,620.00 1,862.00 2012 To 2016-2 3,763.96 1,919.10 5,683.06 266 TOMINOBO PROPER Land 14-0027-02841 19,890.00 812.00 2012 To 2016-2 1,835.28 976.55 2,811.83 Sub Total 5,599.24 2,895.65 8,494.89 Grand Total 2,700,842,033.14 1,851,895,924.03 4,552,737,957.17 Iligan City, ____________________ LOUELA S. MAYBITUIN City Treasurer NOTE: The properties listed above shall be sold in one (1) lot and not individually in view of the manufacturing, processing, etc., functions of the plant and of the need for space for the integration of the iron and steel industry.

MDN: Oct 5 & 12, 2016


B7

FOR ADS PLACEMENT CALL OR TEXT: +63917-712-1424 • +63947-893-5776 E-Mail: mindanaodailynews@gmail.com

Wednesday, October 5, 2016

Celebrates... from page B1

Regional Celebrations are the dance contest (Hip Hop, Retro and Ballroom) and Grand Showdown of Street Dancing Parade and Competition by the 14 Divisions in their festival presentation, plus Electronic Raffle and giving of freebies and special prizes to honor the teachers. Education Secretary Leonor Magtolis Briones expressed her sincere gratitude for teachers’ unwavering commitment to and service in strengthening the community and building the nation by enhancing the learning capabilities and protecting the welfare of learners. “Being a teacher in itself is already a tremendous job. Teaching with unwavering commitment despite the odds is a true service to the country,” Briones said. “Ang mga programa ng DepEd ay hindi magkakaroon ng kabuluhan at hindi maisasakatuparan kung wala ang ating mga guro,” Dr. Farnazo said. “Alam natin na hindi madali ang maging isang guro. Sila ay nagpapakasakit at nagsasakripisyo upang mahubog ang kahusayan ng mga mag-aaral. Kaya itinuturing natin ang mga guro na mga buhay na bayani,” he added. The NTM celebration carries the theme, “Guro: Kabalikat sa Pagbabago,” to acknowledge and emphasize the crucial role and value of teachers in the Philippine society. Aside from being a time to pay tribute to educators, the National Teachers’ Month is also an occasion to build the image of teaching as an attractive and fulfilling profession, and to generate widespread support and assistance for teachers. These efforts are pursuant to the DepEd Memorandum No. 139, s. 2016 or the 2016 National Teachers’ Month and National Teachers’ Day/World Teachers’ Day celebrations.

Says...

from page B1

from violating right-of-way (ROW) clearances, reached a height that caused the line-to-ground fault a subsequent tripping. Traces of burned plants were found in the area owned by a certain Mr. Eliezar Olaier, it said. NGCP warned that blackouts are inevitable especially when landowners continue

to maliciously plant trees and build structures with the ROW clearances, and demand exorbitant amounts before allowing NGCP access to the property. “While NGCP is exerting all efforts to provide quality power transmission services to all its customers, these will be futile if we continue to encounter delays not just in new projects but even during regular maintenance activities,” stressed NGCP. The system operator said it continues its appeal for support from the local government units, local community leaders and the public to negotiate with difficult landowners, to prevent interruptions and ensure reliable operations. It is also pushing for the refilling of the “AntiPower Line Disturbance Act,” which was proposed in the previous Congress. “NGCP is reiterating its support for the passage of the “Act prohibiting the planting of plants and trees, and the construction of any structure under or within the right-of-way clearance of all power transmission and distribution lines and providing penalties for violation thereof ” in the current 17th Congress. We are hopeful that support in the form of legislation, through the House and Senate Committees on Energy will eliminate substantial delays in project construction and obstruction in regular maintenance works. After all, this is not only for NGCP but also for distribution utilities encountering the same difficulties,” stated the grid operation. A p r i v at e l y - o w n e d corporation, NGCP is in charge of operating, maintaining, and developing the country’s power grid. It transmits high-voltage electricity through “power superhighways” that include the interconnected system of transmission lines, towers, substations and related assets.

Produce... from page B1

Inc. (RCBM). The newly certified welders represent the second batch of trainees under the program, which has since produced over 200 graduates. The project mostly benefits indigent and unemployed members from its two neighboring communities, Barangays Kiwalan and Acmac in Iligan City. Under the program,

Bicol, Eastern Visayas showcase local products at SM Megamall Micro, small and medium enterprises (MSMEs) from the regions of Eastern Visayas and Bicol will showcase their products in the 2016 editions of the Bahandi and Orgullo Kan Bikol (OKB) Trade Fairs on October 5-9, and October 6-9, 2016 at the SM Megatrade Halls 1 and 2, SM Megamall, respectively. The Bahandi and OKB Trade Fairs are annual events facilitated by the Department to help MSMEs market their products in Metro Manila. The Bahandi Trade Fair, which will be held on October 5-9, will have a total of 115 exhibitors—46 from Leyte, 10 from Southern Leyte, 4 from Biliran, 16 from Samar, 9 from Eastern Samar, and 19 from Northern Samar. Last year, 2015 Bahandi Trade Fair was able to generate total sales of P 23,992, 331—a notable breakthrough as the region is still recovering from the economic crisis brought about by Typhoon Yolanda. The trade fair

was participated by 93 MSMEs. Products up for display at the 2016 Bahandi Trade Fair include woven mats, bamboo products, food products, souvenirs, novelty items, homestyles and wearables. The 2016 Bahandi Trade Fair is in partnership with the United States Agency for International Development (USAID), Bahandi Producers Association of Eastern Visayas, Inc., Regional Development Council Region 8 and the Department of Tourism Region 8. On the other hand, the OKB 2016, will be participated by 105 exhibitors from the region—Albay (21), Camarines Norte (11), Camarines Sur (18), Catanduanes (18), Masbate (8), and Sorsogon (23). Highlighting this year’s OKB is 29 new entrepreneurs, who will be given full marketing assistance by the DTIRegion 5 through the trade fair. Now on its 20th year, the OK Bikol will feature

which is implemented in partnership with TESDA and the Barangay Councils of Kiwalan and Acmac, scholars undergo a total of 324 hours of intensive training in order to receive a certificate. NC II is part of TESDA’s Technical Vocational Education Training (TVET) Qualification and Certification System, which validates that its program graduates are equipped with the technical aptitude in all relevant competency requirements and standards prescribed by the industry. Apart from offering livelihood opportunities, the program promotes equal opportunity and gender diversity, having trained over 20 women in the Shielded and Arc Welding course, a

traditionally male-associated profession. Sunico further notes that the partnership with TESDA is part of the company’s capability-building efforts, helping to expand the local pool of skilled workers from which it can hire contractors for its expansion requirements. He adds that most of the welding contractors currently servicing Republic Cement’s Iligan Plant are products of the skills training program. “This is one way that Republic Cement builds shared value in our host communities,” shared Sunico. “Our skills training program is one way for us to contribute to the communities’ overall well-being.”

the Best of Bicol HALAL, Wearable and Homestyle products, Shared Service Facilities (SSF) products, processed food, Cococoir, Bamboo and Ceramic products. In its 2015 edition of OKB, MSMEs were able to net P15,576,000 worth of sales. The 2016 OKB Trade

Fair is organized by the OK Bikol Association, Inc. in partnership with the Department of Trade and Industry (DTI)-Region 5 and the Department of Tourism (DOT)-Region 5. The Bahandi and OKB Trade Fairs are held annually to assist MSMEs through marketing.

Perspective Views of Progressivism By Rosemarie Alfar-Jadman

Learning by doing. Through experiencing first hand learning, hands on activity by working with each other or even through watching, pupils may learn the importance of learning. Inquisitiveness is the common attitude of most children thereby the teacher should cater this. They are also explorative, and tends to be curious in everything they do. The views of progressivism might be a great challenge in terms of classroom management. When the children were active in learning, sometimes the teacher might lost control in managing the classroom. But maintaining the classroom in an orderly manner is such very good avenue in meaningful learning. They can work together in a more disciplined environment. Furthermore, creating a positive rewards or consequences for the pupils when they show good attitude and achievement would create a positive environment and motivates the children.It is relevant to create a healthy environment that will foster learning through active involvement of the children while observing discipline in the classroom through implementing the rules that is fair and agreed by the class. Thereby, active learning is a meaningful

process while the children learn what they are doing. It also promotes discipline in another aspect wherein the children agreed the rules that they have to follow in order for them to finish the activity without any disruptions. classroom level. Indeed, the teaching methods in progressivism intensify an active involvement among children. It emphasize that children should be allowed to learn freely and they will be assisted only to discover learning. Its’ main emphasis is learning by doing. The child is the center of learning where they are exposed to active engagement and honing interactional skills. Also, in progressive form, curriculum is integrated. When it comes also to learning, progressive pupils learn by activity engagement and promotes process oriented. The concepts are presented as questions to be investigated and they need to explore it in order to find the new facts. In addition, progressivism has in-depth learning and the assessment is authentic. Thereby, applying progressivism through learning by doing among children creates a meaningful learning environment. Thus, the saying, “I hear and I forget. I see and I remember. I do and I understand.”-Confucius.


B8

FOR ADS PLACEMENT CALL OR TEXT: 0917-712-1424 • 0947-893-5776 E-Mail: mindanaodailynews@gmail.com

Wednesday, October 5, 2016


Turn static files into dynamic content formats.

Create a flipbook
Mindanao Daily Set B (October 5, 2016) by Mindanao Daily News - Issuu