Skip to main content

Mindanao Daily Set B (April 20, 2017)

Page 1

THE

FOUR-WAY

TEST

of the things we think, say or do 1. Is it the TRUTH? 2. Is it FAIR to all concerned? 3. Will it build GOODWILL and BETTER FRIENDSHIP? 4. Will it be BENEFICIAL to all concerned?

A message of concern by Dir. Dante Sudaria, RCCDO

vertical home builders enterprises

FOR QUALITY TARPS Contact:

MDN

TARPAULIN PRINTING Tel. #s: 881-0100 / 0935-1613398 mdntarps@gmail.com Abellanosa St., Consolacion, CDO

Patag Highway, Cagayan de Oro City

Tel. No. 858-5789 / Fax No. 850-5020; Cel. Nos. 0919-655-3754, 0923-304-2676 Email: verticalhomebuilders@yahoo.com

Dealer of hardware and construction materials: Product Lines: Angle Bars; Gl Pipes; C-Purlins; Holow Blocks; Coco Lumber; Carrying Channel; Double Furring Channel; Single Furring ; Acoustic Board; Polycarbonate; Power Tools; Good Lumber S4S; Panel Doors; PVC Laminated Panel; PVC Vertical Blinds; Roller Blinds ; Wooden Blinds; Armstrong Vinyl Tiles; Kent Vinyl Tiles; Parquet Tiles - Apo Vinyl Tiles.

“YOU NAME IT, WE HAVE IT.”

Distributor & Dealer of: Steel Bars; Holcim Cement; Davis Paint; Sand & Gravel; Plywood; INdustrial Supplies; Finishing Supplies; Electrical Supplies; Power Tools; Air Compressors

MINDANAO DAILY www.mindanaodailynews.com

A ‘modern’ port city to rise within Davao City EDITOR: Cris diaz

DAVAO CITY, Philippines The preliminary technical studies for the reclamation, construction and development of a modern port city in this urban center’s foreshore area are now complete. Project proponent and developer Mega Harbour Port and Development Inc. has completed all the geotechnical , parcellary, bathymetric , baseline traffic, socioeconomic, environmental and coastal engineering surveys of the areas in and around the prospective 200-hectare site where the port city will be built. Except for the securing of the environmental compliance certificate (ECC), which is now being processed by the Department of Environment and Natural Resources (DENR) and its Environment Management Bureau, all the preliminary studies are now completed, less than a year since the signing of the agreement on the Davao Coastline and Port Development Project on June 21, 2016 by then Mayor Rodrigo R. Duterte and Mega Harbour chairman Reghis M. Romero II. “The issuance of the ECC by the DENR-EMB will serve as the greenlight for the start of Mega Harbour’s formulation and design of the integrated and detailed engineering masterplan, where the results of all the preliminary studies shall be factored in,” Romero said. The latest to be completed, according to Romero, were the coastal engineering survey and the environmental study. “The coastal engineering survey involved nearshore oceanography, marine geology, behavioral assessment of waves and measurements See port, page A2

Thursday

April 20, 2017

Vice Governor Benglen Ecleo and Senior Board Member NIlo Demerey, Jr. turned over a provincial support fund worth Php 439,000.00 to Brgy, Justiniana Edera, San Jose for their road concreting project. The said assistance from the provincial government of Dinagat islands is a counterpart to the DSWD Kalahi Project to the said barangay. Brgy. Captain, Hon. Aurora Tismo and other Brgy. Officials accepted the check with the presence of Mam Virginia Cedro Salar and Mam Ferelyn C. Lavisto-Jumanguin of PSWDO. ~APE

A1 Presidential son lauds result of ‘TIME 100’ poll Presidential son Vi c e Mayor Pa ol o Duterte has lauded the outcome of the “100 Most Influential Persons in the World” survey conducted by TIME Magazine, which was topped by President Rodrigo Duterte. “The result showed an affirmation of how the world views President Rodrigo Duterte as a leader worthy of respect not just by the Filipino people but by all other peoples from other nations,” the vice mayor said Monday night. He added the result was also an indication that the President “has the trademark of a good leader that citizens from other countries desperately look for.” “We Filipinos should be proud that we have a president who is admired by other nations,” the younger Duterte said, as he called on Filipinos to support the programs and services of the Duterte administration. “We must rally See lauds, page A2

WB, donors eye fresh funds for peace efforts in M’danao

BANGKO SENTRAL NG PILIPINAS (BSP) CHAIRS THE 13th ASEAN CENTRAL BANK GOVERNORS’ MEETING IN CEBU. Bangko Sentral ng Pilipinas (BSP) Governor Amando M. Tetangco, Jr. (6th from left) chaired the 13th ASEAN Central Bank Governors’ Meeting (ACGM) on 7 April 2017 held at Shangri-la Mactan, Cebu. ASEAN central banks affirmed the critical role of Qualified ASEAN Banks in facilitating intra-ASEAN trade and investment; acknowledged the significance of ASEAN payment and settlement systems that are safe, cost-efficient and more connected; reiterated the importance of capital market settlement and policy harmonization and standardization; and emphasized financial inclusion initiatives to deliver financial products and services to a wider, under-served community. Joining Governor Tetangco are central bank governors and heads of delegations: (left to right) Managing Director Yusof Abdul Rahman, Autoriti Monetari Brunei Darussalam; Governor Chea Chanto, National Bank of Cambodia; Governor Agus D.W. Martowardojo, Bank Indonesia; Governor Somphao Phaysith, Bank of Lao PDR; Governor Muhammad Bin Ibrahim, Bank Negara Malaysia; Governor Kyaw Kyaw Maung, Central Bank of Myanmar; Deputy Managing Director Jacqueline Loh, Monetary Authority of Singapore; Governor Veerathai Santiprabhob, Bank of Thailand; and Deputy Governor Nguyen Thi Hong, State Bank of Vietnam. photo supplied

DAVAO CITY -- The World Bank (WB) and other foreign donors are open to pour fresh funds to further support the government’s peace and development efforts in Mindanao. “We are planning new World Bank-supported programs for Mindanao to sustain efforts toward attaining peace and development (in the island),” said World Bank Country Director Mara Warwick during the closing of the 11-year-old Mindanao Trust Fund-Reconstruction and Development Project (MTF-RDP) held at the SM Convention Center on Tuesday.

The MTF is a multi-donor grant facility established to consolidate international development assistance for the socioeconomic recovery of conflict-affected communities in Mindanao. It partners with the Bangsamoro Development Agency (BDA), the development arm of the Moro Islamic Liberation Front, with technical support from Community and Family Services International and Mindanao Land Foundation, Incorporated. Warwick said a similar program is being finalized by the government that would also cover the See funds, page A3

Editorial: e-mail: mindanaodailynews@gmail.com • Advertising: e-mail: mindanaodaily.ads@gmail.com Contact: 0917-7121424, 0947-8935776


A2

FOR ADS PLACEMENT CALL OR TEXT: 0917-712-1424 • 0947-893-5776 E-mail: mindanaodaily.ads@gmail.com

Thursday, April 20, 2017

Catching up on climate change By MARILOU A. RABAGO Lala National High School

The Mindanao Daily is pubished by MINDANAO DAILY NEWS PUBLISHING CORPORATION. It is Registered with the Securities and Exchange Commission (SEC) with Reg. No. CS201531735. With Business Plate No. 201703518, Under Business License Certificate No. 2017-02949, BIR-TIN No. 464682-324-000. Main Business address at Tanleh Building, Abellanosa St., Brgy. Consolacion, Cagayan de Oro City. Tel. Nos: (088) 856-3344, 0917-7121424, 09478935776 E-mails: Advertising:mindanaodaily.ads@gmail.com, Editorial: mindanaodailynews@gmail.com DANTE M. SUDARIA Publisher and President

A new study looks at changes in solar activity and carbon dioxide levels over the past 420 million years. The authors found that on our current path, by mid-century humans will be causing the fastest climate change in approximately 50

Port...

from page A1

of the pressure of flashing, or the impact of water current when it hits the shore,” TERESA ZAFRA PELONE Romero pointed out. Comptroller “On the other hand, the melanie rivera felix santillan environmental study takes SAIRA E. GUMISING ZHELONIE SUDARIA into account the results of Advertising Layout Artist all the technical studies put together,” Romero added. Rolando sudaria WEMALYN GARCIA He said the results of Marketing Production all the various preliminary manila marketing office studies were encouraging. 9th Flr, Unit 918, CityLand Herrera VA Rufino cor. Valero St. “Nothing goes adversely Salcedo Village, Makati City beyond the norm, except for TEL. #: 5555392, Cell No.: 0977-152-8860 the abrupt steepening of the slope of the sea bed, which lani vallido MIJIE JUAT can raise the cost of reclama Marketing and Sales MAY IGLECIAS tion significantly because of Manager Account Executives the length of concrete piles that it entails and various DAVAO booking OFFICE Door 223, Doña Segunda Bldg., CM Recto Ave., Davao City other structural requireOffice in Charge : SARA CASTOR, 0926-398-8293 ments. There are Circulation : JOHN PAUL AQUINO, 0907-331-5640 also sea grass and corrals in the area near the Sta. Ana ILIGAN OFFICE G/F IBJT North Terminal, Tambo, Hinaplanon, Iligan City wharf, which we will have to Office in Charge: SONNY SUDARIA, 0916-349-7422 avoid by moving the project site further southward,” Romero explained. EDITORIAL He attributed the generally positive results of the ALLAN M. MEDIANTE Editor-in-Chief studies to the nature of the project site, being shielded ruel pelone CRIS DIAZ by the Samal Island from Managing Editor Executive Editor strong ocean currents that MARK FRANCISCO get through the Davao Gulf. Lifestyle Editor “The eastern flank of Davao del Sur and the west GILBERT Y. CHAO gerry lee gorit ern side of Davao Oriental Motoring Editor Photo Journalist surrounding the gulf also PAT SAMONTE CHRIS PANGANIBAN generate a moderating effect Regional Editor Caraga Regional Editor-Davao on ocean waves,” Romero Rene Michael BaÑos uRIEL C. QUILINGUING said. Regional Editor Northmin Contributing Editor “As such, Davao del Sur, AL JACINTO Regional Editor-WestMin

RODRIGO B. SEVILLA Regional Editor-Davao

JOE FELICILDA Editorial Consultant JOE PALABAO Feature Editor

ATTY. MARIO T. JUNI

NOTARY PUBLIC- JUNI LAW OFFICE CELL NO: 09352379999/ (088) 8573595 CRUZ TAAL ST., CAG. DE ORO CITY Legal Counsel ---------------------------------------------------------------

bureau and mktg staff candy macabale - 09161326483 RIZA O. ARES - 0915-9753-277/0926-2242-653 MISOR - LOLONG NABONG - 0906-875-8650 GINGOOG CITY-MANNY ANSIHAGAN-0936-287-7788 North Buk. - DAHLIA S. BENEMERITO-0955-150-6602 VALENCIA CITY - PHILIP PHIL CALUMBA-0905-652-5407 MARAMAG - roFINA CUALES - 0926-336-1585 quezon, buk. - ROSE GENON Iligan City - JEFFREY OPONDA-0936-1174378 tangub city - bobby mag usara OROQUIETA CITY - PJ TREMEDAL-0919-3452375 ARMM - Sony Sudaria-0947-4810371 cotabato - ANALISA ESPAÑOLA-0916-9351714 davao - tom a. caballero-09756023684 davao - tomas canoy avancena jr.-09177017010 davao del norte - sarah castor - 09263988293 digos city, dvo sur & kidapawan - romeo d. sanchez davao city - rene s. arias (Photo Journalist,) butuan - PAT SAMONTE-0912-8091093 san frans - CRIS PANGANIBAN-09277974193 San Francisco - deding PANGANBAN-0927-7974193 Pagadian City - GRACE FRANCISCO -0912-8484037 ZAMBOANGA - AL JACINTO -09177103642 Member: ORO CHAMBER Philippine Press Institute

million years and if we burn all available fossil fuels, we’ll cause the fastest change in the entire 420-million year record. The study relates to a scientific conundrum known as the faint young sun paradox – that early in Earth’s history, solar output was 70 percent less intense than it

is today and yet the planet was warm enough to have a liquid ocean. A stronger greenhouse effect due to higher carbon dioxide levels in the atmosphere may be one explanation. Over time, solar output has grown stronger and atmospheric carbon dioxide levels have fallen due to an

effect known as weathering of rocks and an increase in plant life. The authors of this study found that over the past 420 million years, the slow heating of the sun and slow decline of the greenhouse effect have roughly offset each other, leading to a fairly stable long-term global climate.

Davao Oriental and Davao del Norte, will immediately benefit from the project because of their natural geographic access to this emerging world-class port, both by land and by sea,” Romero pointed out. He described the Davao Gulf as a natural harbor and sanctuary even for large inter-ocean vessels because of its wide mouth but long cylindrical shape resembling a womb. The (Davao) gulf is actually much bigger than the Manila Bay, yet having an almost the same characteristics but with a lot less pollution and vulnerability to storms. “Another blessing is the coastal highway project of the DPWH (Department of Public Works and Highways) to which the port city shall be linked by three bridges. Running parallel to the highway, the port city itself will have to be divided into three ‘islands’ to provide an opening from the coast to the sea. The three reclaimed islands will connect to each other also by bridges,” Romero said, stressing the importance of the preliminary studies. “All (the results of the studies) will be factored in during the formulation and design of the integrated and detailed engineering masterplan ,” Romero added. Aside from reclaiming and constructing the port

city, Mega Harbour will also implement an onsite infrastructure development in the coastal communities of Poblacion and Agdao districts up to Barangay Bukana, which lie parallel to the project across the sea. This social component of the project will not entail relocation since it does not involve the construction of housing facilities. To be undertaken are improvements of infrastructure facilities for power and water supply connections, flood control system, pockets of recreational and commercial zones, sanitation centers, obstruction-free main roads, and other calamitymitigating measures. Mega Harbour is the country’s only port city developer, whose mother firm is the industry’s sole member with a track record in port reclamation, development and operations. HELLY SARA CASTOR

is the least we can do for all the sacrifices that he is doing now,” he said. In a post on its website on Monday, TIME Magazine said President Duterte won the 2017 TIME 100 poll after consistently leading the survey. “Duterte received five percent of the total yes votes in the poll, which closed Sunday night,” the magazine said, explaining that the poll asked readers who should be included in this year’s TIME 100, an annual list of the world’s most influential people. Following President Duterte in the poll were Canadian Prime Minister Justin Trudeau, Pope Francis, Microsoft founder Bill Gates and Facebook’s Mark Zuckerberg. The Duterte family is also hoping that all the sacrifices of the President will be appreciated by all Filipinos, not just the 16 million who voted for him last year, the vice mayor said. He said he told his father to “keep up the good work” and prayed that God will give the President more strength to continue serving the Filipino people. (PNA)

Lauds... from page A1

behind President Duterte and continue to support him for his mission to make the country more progressive and at par with more developed countries. That

READ MINDANAO DAILY NEWS through THE WORLD WIDE WEB http://www.mindanaodailynews.com

BUSINESS LOAN!!! 100K - 10M No Collateral No Co-Maker

Existing Business Owners 5 Banking Days Processing

0906-671-2560 0917-555-5662

TEXT LOAN TO:

KIMBERLITE PAWNSHOP MALAYBALAY BRANCH

Kagay-an Festival 1st Oro Lechoneros Encuentro Champion

for Orders, Contact Yoyong:

09354145759 09169249371

Kimberlite Pawnshop will be having an AUCTION SALE on all items that expired on February 2017: AUCTION DATE: April 18, 2017 Estrada Bldg., Fortich-Don Carlos Sts., Malaybalay City, Bukidnon


FOR ADS PLACEMENT CALL OR TEXT: 0917-712-1424 • 0947-893-5776 E-mail: mindanaodaily.ads@gmail.com

Thursday, April 20, 2017

Be positive in times of your emotional struggles The Gospel of Jesus Christ (April 20, 2017-Thursday)Luke 24:35-48” Then He opened their minds to understand the Scriptures, and He said to them, “Thus it is written, that the Christ would suffer and rise again from the dead the third day, and that repentance for forgiveness of sins would be proclaimed in His

name to all the nations, beginning from Jerusalem. You are witnesses of these things: This is natural for us human beings to find a dwelling place for us to have comforts and relaxation from the troubles and sufferings we have experienced. But the worst of the two disciples, they forgot the words

of promises of Jesus for them. They never believed that Jesus resurrected after three days. They made Jesus a liar in that way, but anyway, they were very emotional at the time and needed to be understood. This means that in time of troubles and doubts recall and remember the miraculous works of God in your life in

the previous events of your journey for you to be fueled by the passion to move forward. This was the mistakes of these two men because they focused on the death of Jesus but never to his promised resurrection. They were very emotional at the time and made them coward to face the truth of Jesus fortune in Israel. Re-

Funds...

Alsons restocks Sarangani Bay with milkfish hatchlings. Alsons Power Group subsidiary Sarangani Energy Corporation (SEC), together with the Conrado and Ladislawa Alcantara Foundation Inc. and Alsons Aquaculture Corporation led volunteers in releasing at least 105,000 bangus (milkfish) hatchlings into Sarangani Bay. The activity is part of the power firm’s commitment in improving the quality of life for residents in the communities where it operates. Alsons Power Corporate Affairs and Community Relations head Ruben Tungpalan disclosed that the Alcantara Foundation – the corporate social responsibility arm of the Alcantara Group – has been spearheading fish seeding activities since 2012 in partnership with Alsons Aquaculture Corporation, SEC and the Department of Environment and Natural Resources.

Tungpalan says the fish seeding is done twice a year to help ensure an abundant population of milkfish fry in Sarangani Bay. Alsons Aquaculture Corporation is the country’s largest fully-integrated producer and processor of milkfish under the Sarangani Bay trademark- providing more than half the national requirement for prime milkfish. The 105,000 milkfish fry were released from the SEC jetty site, underscoring the power company’s commitment to uphold environmentally-sound practices in the conduct of its operations with its 210-megawatt baseload plant located in Maasim, Sarangani. The fish seeding was only one of several activities that marked the ceremonial switch-on for the first 105-megawatt section of the baseload plant hat started operating in April last year, and the

Lot For Sale

start of civil works for the second 105-megawatt section of the plant. As the country’s first and most experienced independent power producer in Mindanao, the Alsons Power Group has been steadfast in its commitment to help Mindanao grow its economy by providing a reliable and stable supply of electricity that helped end the power crisis, helping fuel the region’s dynamic growth through SEC and the other power subsidiaries, namely the Southern Philippines Power Corporation, Western Mindanao Power Corporation and the Mapalad Power Corporation.

from page A1 communist revolutionaries. Since 2006, the MTF completed 573 community-driven projects benefitting 650,000 people in 315 conflict-affected communities. The European Union is the biggest contributor to the MTF, providing PHP1.17 billion to the PHP1.4 billion total trust fund. During the press conference, Ambassador Franz Jessen, Head of Delegation of the European Union, said they are closely monitoring the peace process, which they regard as the “most promising area” of President Rodrigo Duterte’s administration. Jessen cited the President’s tremendous efforts to bring peace in Mindanao, particularly in Bangsamoro areas, as well as

A3 Biblical reflection

minder: Be positive in times of your emotional struggles because it is wrong to make a decision. Almost emotional people went wrong when they made a decision in life: Printing paid by: Edith Ranoa - Jordan and Crespina Ranoa - Bobong Balino– Cagayan De Oro: # 09187148435: Listen to me via Thunder Radio 97.9

FM- Cagayan De Oro City- 1:00 PM- Sunday: God loves you!

his stance to forge an agreement with the Communist Party of the Philippines – New People’s Army- National Democratic Front (CPP-NPA-NDF). Jessen said the EU is willing to provide fresh funds to support peace initiatives in the country. “The European Union will continue to support programs such as these (provided by MTF) to help bring lasting

peace and development in Mindanao,” he said. Canadian Ambassador to the Philippines John Holmes said they are satisfied with the work of the MTF and looks forward to work closely again with the Philippine government. Holmes said they are now in the process of reviewing international assistance with special focus on Mindanao. (PNA)

Bro. Edcel L. Closas

OROFIESTA TRADING SERVICES, INC. TEL. #S: 0998-991-3742 - Smart / 0917-720-3742 - Globe

PURCHASING OFFICER

APPARTELLE IN MACTAN CEBU, NEAR AIRPORT 1,541 SQM 12 ROOMS W/ INCOME, ASKING PRICE 28M NEG.

• LOT FOR SALE AT PUEBLO HILLSBOROUGH POINTE, 395 SQM 500/Sqm NO FLOOD @ 7K/SQM NEG. • LOT FOR SALE LUMBIA KIAM-IS 18,903 SQM 500/SQM NEG. • Residential warehouse 5.5M 200 sqm located at Serina St., Carmen.

TEXT: 09178535958/850-13-24

Mindanao Daily

TARPS-STICKERS-NEWS

tarpaulin sticker billboards backlitfilm panaflex photopaper 881-0100

0935-1613398 mdntarps@gmail.com


A4

FOR ADS PLACEMENT CALL OR TEXT: 0917-712-1424 • 0947-893-5776 E-mail: mindanaodaily.ads@gmail.com

Thursday, April 20, 2017

Teleperformance wins PEZA Outstanding Employer and Community Project of the Year awards Teleperformance, the worldwide leader in outsourced omnichannel customer experience management, brought home two major trophies from the 2017 Philippine Economic Zone Authority (PEZA) Awards – one for Outstanding Employer of the Year and another for Outstanding Community Project of the Year. The awards were conferred to Teleperformance by Department of Trade and Industry (DTI) Secretary Ramon M. Lopez and PEZA Director-General Charito B. Plaza during the PEZA Investors’ Recognition Night held on April 4 at the World Trade Center in Pasay City. This marks the third trophy for Outstanding Community Project of the Year, and the first for Outstanding Employer of the Year. Teleperformance Philippines was recognized for building thousands of career opportunities implementing strong employee development programs, providing a safe and convenient work environment, and for its sound

business performance. The year 2016 marked a great milestone in the company’s growth in the country. Established in the Philippines in 1996 with 100 employees, Teleperformance expanded to 40,000 team members twenty years later. Moreover, Teleperformance has actively implemented its advocacy programs through its corporate social responsibility arm, Citizen of the World, with primary focus on helping the sick, children, the elderly, and those affected by natural disasters. Travis Coates, Teleperformance Philippines Managing Director, accepted the recognition on behalf of the company. “Being acknowledged as Outstanding Employer and Outstanding Community Project of the Year is a great honor for the men and women of Teleperformance Philippines. As a people-focused organization, we make the conscious decision to let our core values guide us in realizing programs that support our people’s professional

development and inspire us to better serve the community.” Jeffrey Johnson, Senior Vice President for Human Capital Resource Management, added, “We are truly proud of our team at Teleperformance Philippines. This recognition reinforces our people’s talent, resilience, and active contribution to the leadership position of Teleperformance and the positive impact the company makes to the industry and society. Our employee-volunteers have selflessly devoted their time, talent, and other resources so they can help uplift the lives of people in need.” Vice President for Human Resources Rachel Cacabelos also noted, “Receiving these accolades from esteemed people managers and business leaders will continuously motivate us to deliver bestin-class services for Teleperformance employees. Our people are always inspired to share their time with the less fortunate, and this recognition will truly create a stronger affinity with their adopted communities.”

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

DELFIN R. BALACUIT CASE NO. 2017-10-680 (2012-10-839)

RICHARD S. AKUT

In 2016, Teleperformance has raised more than seven million pesos to support its chosen beneficiaries such as the Philippine Red Cross, Gawad Kalinga, Kythe Foundation, White Cross Orphanage, and Mary Mother of Mercy

Home for the Elderly and the Abandoned. The various CSR programs garnered a total of 11,900 employee volunteer hours, with a total of 320 trees planted, 100 homes built, 38 classrooms renovated, and 2,800 lives saved from

employee blood donations. Earlier in 2013 and 2014, Teleperformance was also presented the PEZA Outstanding Community Project Awards for the company’s unrelenting support for the nation.

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

MANSUETO I. SAJULGA CASE NO. 2017-10-676 (2012-10-531)

LANTRANSCO CASE NO. 2017-10-672 (2012-10-017) NOTICE OF HEARING

LAWRENCE C. HOFER

NOTICE OF HEARING

NOTICE OF HEARING

NOTICE OF HEARING

NARCISO TAMPOS CASE NO. 2016-10-1947 (2011-10-1250) NOTICE OF HEARING

APPLICANT(s) PETITIONER(s) request/s authority for approval of EXTENSION OF VALIDITY of Certificate of public Convenience to operate PUJ service along the line CAGAYAN DE ORO TO LUGAIT and vice versa with the use of ONE (1) unit/s . This Application/petition shall be considered by this Board on April 27, 2017 at 10:00 A.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least FIVE (5) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). N.B FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. Issued this 17th day of April 2017 at Cagayan de Oro City, Philippines.

APPLICANT(s) PETITIONER(s) request/s authority for approval of EXTENSION OF VALIDITY of certificate of public convenience to operate PUJ service along line: COGON MARKET TO XAVIER HEIGHTS and vice versa with the use of ONE (1) unit/s . This Application/petition shall be considered by this Board on April 27, 2017 at 10:00 A.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least FIVE (5) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). N.B FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. Issued this 17th day of April 2017 at Cagayan de Oro City, Philippines.

APPLICANT(s) PETITIONER(s) request/s authority for approval of EXTENSION OF VALIDITY of certificate of public convenience to operate PUJ service along line: COGON MARKET BALULANG and vice versa with the use of ONE (1) unit/s . This Application/petition shall be considered by this Board on April 27, 2017 at 10:00 A.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least FIVE (5) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). N.B FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. Issued this 17th day of April 2017 at Cagayan de Oro City, Philippines.

APPLICANT(s) PETITIONER(s) request/s authority to Extend the Validity of a Certificate of Public Convenience to operate PUJ service on the line: ROUTE 1 LOOP SERVICE (ALL IN CAGAYAN DE ORO CITY) with the use of ONE (1) unit/s. This Application/petition shall be considered by this Board on April 25, 2017 at 11:00 A.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least FIVE (5) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/ PETITION. Issued this 18th day of April 2017 at Cagayan de Oro City, Philippines.

APPLICANT(s) PETITIONER(s) request/s authority to Extend the Validity of a Certificate of Public Convenience to operate PUJ service on the line: ILIGAN CITY PROPER TO ISABEL VILLAGE-PALAO and vice versa with the use of NINETEEN (19) unit/s. This Application/petition shall be considered by this Board on April 26, 2017 at 02:00 P.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least FIVE (5) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/ PETITION. Issued this 19th day of April 2017 at Cagayan de Oro City, Philippines.

(Sgd.) AMINODEN D. GURO Regional Director

(Sgd.) AMINODEN D. GURO Regional Director

(Sgd.) AMINODEN D. GURO Regional Director

(Sgd.) AMINODEN D. GURO Regional Director

(Sgd.) AMINODEN D. GURO Regional Director

MDN: Apr 20, 2017

CASE NO. 2017-10-674 (2007-10-945)

Teleperformance Philippines Managing Director Travis Coates receives from PEZA Director-General Charito B. Plaza and Department of Trade and Industry Secretary Ramon M. Lopez the Outstanding Employer of the Year Award (left) and Outstanding Community Project of the Year Award (right) from the Philippine Economic Zone Authority (PEZA) during the Investors’ Recognition Night held at the World Trade Center in Pasay City.

CASE NO. 2017-10-679

NOTICE OF HEARING APPLICANT(s) PETITIONER(s) request/s authority for the Issuance of a Certificate of public Convenience to operate TH FREIGHT service on the line: WITHIN CAGAYAN DE ORO CITY AND FROM SAID PLACE TO ANY POINT IN THE ISLAND OF MINDANAO ACCESSIBLE TO MOTOR VEHICLE TRAFFIC and vice versa with the use of ONE (1) unit/s . This Application/petition shall be considered by this Board on May 03, 2017 at 10:00 A.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least TEN (10) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). N.B FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. Issued this 18th day of April 2017 at Cagayan de Oro City, Philippines. . (Sgd.) AMINODEN D. GURO Regional Director

MDN: Apr 20, 2017

MDN: Apr 20, 2017

MDN: Apr 20, 2017

MDN: Apr 20, 2017

MDN: Apr 20, 2017

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANSCHISING & REGULATORY BOARD Regional Office No. 10, Apovel, Bulua, Cagayan de Oro City

GENENIEVE HOJAS CALUGAY CASE NO. 2017-10-681

LANTRANSCO

MICHAEL ANDRE S. EPONDOL CASENO.2017-10-691 (2013-10-399)

ELENA DAILO CASE NO. 2017-10-678 (2012-10-670) NOTICE OF HEARING

WILFREDO SEGARA CASE NO. 2017-10-668 (2007-10-642) NOTICE OF HEARING

JOEL B. MARIÑO CASE NO. 2017-10-684 (2012-10-1006) NOTICE OF HEARING

APPLICANT(s) PETITIONER(s) request/s authority to Extend the Validity of a Certificate of Public Convenience to operate PUJ service on the line: PUERTO TO BALINGOAN and vice versa with the use of ONE (1) unit/s. This Application/petition shall be considered by this Board on April 25, 2017 at 11:00 A.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least FIVE (5) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/ PETITION. Issued this 17th day of April 2017 at Cagayan de Oro City, Philippines.

APPLICANT(s) PETITIONER(s) request/s authority to Extend the Validity of a Certificate of Public Convenience with change mode of service to operate from TTS to UV EXPRESS on the line: GAISANO TO KISANLU and vice versa with the use of ONE (1) unit/s . This Application/petition shall be considered by this Board on April 25, 2017 at 02:00 P.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least FIVE (5) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/ PETITION. Issued this 17th day of April 2017 at Cagayan de Oro City, Philippines.

APPLICANT(s) PETITIONER(s) request/s authority to Extend the Validity of a Certificate of Public Convenience to operate PUJ/FILCAB service on the line: WEST BOUND TERMINAL TO AGORA TERMINAL and vice versa with the use of ONE (1) unit/s . This Application/petition shall be considered by this Board on April 27, 2017 at 03:00 P.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least FIVE (5) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/ PETITION. Issued this 18th day of April 2017 at Cagayan de Oro City, Philippines.

NOTICE OF HEARING

APPLICANT(s) PETITIONER(s) request/s authority for the Issuance of a Certificate of public Convenience to operate TH FREIGHT service on the line: WITHIN CAGAYAN DE ORO CITY AND FROM SAID PLACE TO ANY POINT IN THE ISLAND OF MINDANAO ACCESSIBLE TO MOTOR VEHICLE TRAFFIC and vice versa with the use of TWO (2) unit/s . This Application/petition shall be considered by this Board on May 03, 2017 at 10:00 A.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least TEN (10) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). N.B FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/PETITION. Issued this 18th day of April 2017 at Cagayan de Oro City, Philippines. (Sgd.) AMINODEN D. GURO Regional Director

MDN: Apr 20, 2017

CASE NO. 2017-10-692 (2002-10-1088A)

NOTICE OF HEARING APPLICANT(s) PETITIONER(s) request/s authority to Extend the Validity of a Certificate of Public Convenience to operate PUJ service on the line: ILIGAN CITY PROPER TO BURU-UN and vice versa with the use of ONE (1) unit/s. This Application/petition shall be considered by this Board on April 26, 2017 at 02:00 P.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least FIVE (5) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/ PETITION. Issued this 19th day of April 2017 at Cagayan de Oro City, Philippines.

(Sgd.) AMINODEN D. GURO Regional Director

MDN: Apr 20, 2017

NOTICE OF HEARING

APPLICANT(s) PETITIONER(s) request/s authority to Extend the Validity of a Certificate of Public Convenience with amendment of route to operate AIRCON TAXI service on the line: WITHIN ILIGAN CITY TO ANY POINT IN REGION X and vice versa with the use of ONE (1) unit/s. This Application/petition shall be considered by this Board on May 04, 2017 at 10:30 P.M. at this Board on which date Applicants(s) Petitioner(s) shall formally submit his/her/its evidence. The Applicant(s)/ Petitioner(s) shall publish said notice at least FIVE (5) DAYS prior to the date of hearing in a daily newspaper of general circulation in Mindanao. Party(s) opposed to the approval/granting of the application/petition must file his/her/it’s written opposition with supporting documents, unless this Board deems it necessary to require additional documentary evidence and/or his/her/ its oral testimony(s). FAILURE TO APPEAR AT THE SCHEDULED DATE AND TIME OF HEARING SHALL MEAN THE DISMISSAL OF THE APPLICATION/ PETITION. Issued this 19th day of April 2017 at Cagayan de Oro City, Philippines. (Sgd.) AMINODEN D. GURO Regional Director

MDN: Apr 20, 2017

(Sgd.) AMINODEN D. GURO Regional Director

MDN: Apr 20, 2017

(Sgd.) AMINODEN D. GURO Regional Director

MDN: Apr 20, 2017

(Sgd.) AMINODEN D. GURO Regional Director

MDN: Apr 20, 2017


Turn static files into dynamic content formats.

Create a flipbook
Mindanao Daily Set B (April 20, 2017) by Mindanao Daily News - Issuu