Submarine Telecoms Industry Report Issue 15

Page 1

SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

IMPRESSUM STF Industry Report 2026 October 2026 A Publication of Submarine Telecoms Forum, Inc. www.subtelforum.com ISSN 1948 3031

EXECUTIVE President and Publisher Wayne Nielsen | wnielsen@subtelforum.com | +1 703 798 4630 Vice President Kristian Nielsen | knielsen@subtelforum.com | +1 703 861 3647

EDITORIAL AND ANALYTICS

PUBLISHING AND LIABILITY NOTICE Submarine Telecoms Forum Industry Report is published annually by Submarine Telecoms Forum, Inc. It is an independent commercial publication serving as a freely accessible forum for professionals engaged in submarine cable systems and global digital infrastructure. No part of this publication may be reproduced or transmitted in any form, in whole or in part, without prior written permission from the publisher.

While every effort is made to ensure accuracy, the publisher accepts no liability for errors or omissions in editorial or advertising content, or for any consequences arising therefrom. The editor reserves the right to edit all submitted material.

Analytics Kieran Clark | kclark@subtelforum.com | +1 540 533 6965

SUBSCRIPTIONS AND INQUIRIES SALES AND ADVERTISING REPRESENTATION Sales and Advertising Hannah Schiffman | HSchiffman@associationmediagroup.com | +1 804 469 0340

Submarine Telecoms Forum, Inc. | 19471 Youngs Cliff Road, Suite 100 | Sterling, Virginia 20165 USA | Phone: +1 703 790 4630 | Website: www.subtelforum.com

Advertising information: subtelforum.com/advertise-with-us

GOVERNANCE Board of Directors Wayne Nielsen, Margaret Nielsen, Kristian Nielsen and Kacy Nielsen

Copyright © 2026 Submarine Telecoms Forum, Inc.

Corporate information: www.subtelforum.com/corporateinformation

Submarine Telecoms Industry Report 2026/2027

IMPRESSUM · 3


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

TABLE OF CONTENTS EXORDIUM

10

FOREWORD

12

METHODOLOGY

14

TABLE OF ACRONYMS AND DESCRIPTIONS

16

EXECUTIVE SUMMARY 1. GLOBAL OVERVIEW

5.4 Fault History and Recovery

110

5.5 Global Maintenance Challenges and Trends

111

6. CABLE SHIPS

112

6.1 Current Cable Ships

114

6.2 Future Cable Ships

116

6.3 Shore-End Activity

119

18

6.4 Vessel Demand and Fleet Adequacy

121

20

7. HYPERSCALERS AND DATA CENTERS

124

1.1 Industry Sentiment

22

1.2 Strategic Shifts in Submarine Cable Policy

35

1.3 System Growth

38

1.4 Estimated End of Service Analysis

43

8. SPECIAL MARKETS

134

1.5 Asset Age and Renewal Planning

44

8.1 Unrepeatered Systems

136

1.6 Commercial and Survey Milestones in the Forward Pipeline

48

8.2 Offshore Energy

142

8.3 Subsea Sustainability Year in Review

145

2. CAPACITY

50

2.1 Global Capacity

52

2.2 Lit Capacity

56

7.1 Hyperscaler Analysis

125

7.2 Data Center Expansion and Strategic Growth

132

9. TECHNOLOGY

148

9.1 Petabit-Scale Multi-Core Fiber Breakthroughs

150

56

9.2 High-Capacity Transmission on Live Submarine Networks

151

2.2.1 Atlantic and Pacific activation expands 2.2.2 Asian connections grow at different speeds

57

9.3 Divergent Paths Toward Petabit-Scale Cables

152

2.2.3 Additional Context: Kenya and Bangladesh

58

9.4 System-Level Integration and Outlook

153

2.2.4 Customer commitments and the next capacity wave

60

154

2.3 Capacity Pricing: Insights from SubTel Forum Magazine

62

10. REGULATORY & BUSINESS OUTLOOK

3. OWNERSHIP FINANCING ANALYSIS

10.1 Legal & Regulatory Matters: A Year in Review with Andrés Fígoli*

156

64

10.2 The IAB on Cable Resilience

163

3.1 Historic Financing Perspective

66

10.3 Permitting Pathways

166

3.2 Regional Distribution of Financing

69

10.4 Other Legal and Regulatory Developments

167

3.3 Current Financing

73 77

10.5 Recent Mergers, Acquisitions, and Industry Activities

169

3.4 Realistic Outlook

4. SUPPLIER ANALYSIS

86

11. REGIONAL ANALYSIS 11.1 Americas Region

172 174

4.1 System Suppliers

88

4.2 Installers

92

11.1.1 Current Systems

174

4.3 Surveyors

95

11.1.2 Future Systems

176

11.1.3 Region Outlook

177

11.2 AustralAsia Region

178

5. SYSTEM MAINTENANCE

98

5.1 Publicity

100

5.2 Reporting Trends and Repair Times

103

5.3 Club and Private Maintenance Agreements

107

Submarine Telecoms Industry Report 2026/2027

11.2.1 Current Systems

178

11.2.2 Future Systems

180

TABLE OF CONTENTS · 4


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

TABLE OF CONTENTS 11.2.3 Region Outlook 11.3 EMEA Region

CONTINUED

180 181

11.3.1 Current Systems

181

11.3.2 Future Systems

183

11.3.3 Region Outlook

183

11.4 Indian Ocean Region

184

11.4.1 Current Systems

184

11.4.2 Future Systems

186

11.4.3 Region Outlook

186

11.5 Polar Region

187

11.5.1 Current Systems

187

11.5.2 Future Systems

189

11.5.3 Region Outlook

189

11.6 Transatlantic Region

190

11.6.1 Current Systems

190

11.6.2 Planned Systems

192

11.6.3 Region Outlook

192

11.7 Transpacific Region

193

11.7.1 Current Systems

193

11.7.2 Future Systems

195

11.7.3 Region Outlook

195

11.8 Regional Renewal and Forward Development Balance

196

11.9 Landing Identity Overlap and Network Expansion

198

CONCLUSION

200

12.1 Outlook and Delivery

202

12.2 Investment and Value

203

12.3 Resilience and Renewal

204

13. AFTERWORD

206

REFERENCES

210

Submarine Telecoms Industry Report 2026/2027

THANK YOU TO OUR SPONSORS

TABLE OF CONTENTS · 5


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

LIST OF FIGURES Figure 1: Industry Sentiment Q1 Overall Industry Outlook

24

Figure 22: Reported whole-system length (km) of planned systems by region for the 2027–2029 report cohorts.

40

Figure 2: Industry Sentiment Q2 Reported Market Activity

24

Figure 23: System counts by contract-in-force status for the 2027–2029 report cohorts.

41

Figure 3: Industry Sentiment Q3 Investment Assessments

25

Figure 24: Reported whole-system length (km) by region for systems with estimated EOS in 2015–2026.

43

Figure 4: Industry Sentiment Q4 Mergers and Acquisitions Outlook

25

Figure 25: Operating and service-ready cable system counts by original reported RFS cohort, including systems with unknown RFS years.

44

Figure 5: Industry Sentiment Q5 Observed Project Activity by Corridor

26

Figure 6: Industry Sentiment Q6 Predominant Project Schedule Experience

26

Figure 26: Planned-system counts by recorded contract-in-force and survey status, 2027–2030 report cohorts (65 systems).

48

Figure 7: Industry Sentiment Q7 Leading Expected Delivery Constraint

27

Figure 27: Known reported whole-project cost (USD billions) of planned systems by recorded contract-inforce and survey combination, report cohorts 2027– 2030.

49

Figure 8: Industry Sentiment Q8 Repair and Maintenance Confidence

27

Figure 9: Industry Sentiment Q9 Expected Technology Impact

28

Figure 28: Known comparable reported whole-system design capacity (Tbps) by report cohort year and region, 2022–2026.

52

Figure 10: Industry Sentiment Q10 Organizational Technology Preparedness

29

Figure 29: Known comparable reported whole-system design capacity (Tbps) by region for the 2027–2029 report cohorts.

53

Figure 11: Industry Sentiment Q11 Environmental Sustainability

29

Figure 12: Industry Sentiment Q12 Leading Regulatory Challenge

30

Figure 30: Median known reported whole-system design capacity (Tbps) across original reported RFS cohorts of operating and service-ready systems.

54

Figure 13: Industry Sentiment Q13 Skilled Labor Availability

30

Figure 31: U.S. Holder Activated Capacity and Net Capacity Held, 2022-2031 (Tbps)

56

Figure 14: Industry Sentiment Q14 Workforce Development Challenges

31

Figure 32: Hong Kong External Cable Circuits and Selected Destination Connections (Tbps)

57

Figure 15: Industry Sentiment Q15 Organization Roles

32

Figure 16: Industry Sentiment Q16 Respondent Roles

33

Figure 33: Kenya Undersea Capacity Sold and Reported Available Capacity, March–June 2026 (Gbps)

58

Figure 17: Industry Sentiment Q17 Purchasing Influence

33

Figure 34: BSCPLC Capacity-Sales and Annual Service-Revenue Growth, FY2024–25 (%)

59

Figure 18: Industry Sentiment Q18 Experience in Submarine Telecommunications

34

Figure 35: Keppel's Bifrost Pair Commitments and Technical Capacity References

60

Figure 19: Industry Sentiment Q19 Region of Residence

34

66

Figure 20: Manufactured system counts by report cohort year and region, 2022–2026; 2026 is partial.

38

Figure 36: Cumulative system counts by financing type across report cohort years 2015–2026, including preperiod history.

67

Figure 21: Selected reported whole-system length (km) by report cohort year and region, 2022–2026.

39

Figure 37: Known reported whole-project cost (USD) by financing type for report cohorts 2015–2026.

Submarine Telecoms Industry Report 2026/2027

LIST OF FIGURES · 6


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

LIST OF FIGURES

CONTINUED

Figure 38: Known reported MDB-financed wholeproject cost (USD) attributed to regions for report cohorts 2015, 2017–2019 and 2021–2026.

69

Figure 39: Known reported whole-project cost (USD) of debt- and equity-financed systems attributed to regions, report cohorts 2015–2026.

70

Figure 40: Known reported whole-project cost (USD) of self-financed systems attributed to regions, report cohorts 2015–2026.

71

Figure 41: Known reported whole-project cost (USD) by report cohort year, 2015–2026; 2026 is partial.

73

Figure 42: Reported whole-system length (km) of manufactured systems by report cohort year, 2015– 2026; 2026 is partial.

74

Figure 43: Known reported whole-project cost (USD) attributed to regions for report cohorts 2022–2026.

75

Figure 44: Eligible Listings and Central Delivery Assessment by 2030

78

Figure 45: Delivery-Weighted Route Estimates and Associated Project Value by 2030

81

Figure 46: Planned/reference versus delivery-weighted known project value (USD billions), using fixed end-2030 weights across all timing groups in the full 85-entry delivery model. Usable values cover 60 of 85 entries.

84

Figure 47: Planned/reference versus delivery-weighted known project value (USD billions), using fixed end2030 weights across all timing groups in the 49-entry model-classified other-backed cohort. Unknown backing is excluded; usable values cover 35 of 49 entries.

85

Figure 48: Manufactured system counts by recorded supplier for report cohorts 2022–2026.

88

Figure 49: Known reported whole-system length (km) by recorded supplier for report cohorts 2022–2026.

89

Figure 50: Counts of survey-completed planned systems by supplier for the 2027–2029 report cohorts.

91

Figure 51: Manufactured system counts by recorded installer for report cohorts 2022–2026.

92

Figure 52: Known reported whole-system length (km) of manufactured systems with a recorded installer, attributed by region for report cohorts 2022–2026.

93

Submarine Telecoms Industry Report 2026/2027

Figure 53: System counts by recorded surveyor for the 2022–2026 report cohorts.

95

Figure 54: Planned system counts by region and survey status for the 2027–2029 report cohorts.

96

Figure 55: Cable Disruption Coverage by Geography and Reporting Focus, January 1–October 19, 2026

100

Figure 56: Reported cable Repairs in the Public Maintenance-Provider Reporting Sample, 2016–2025 (Reported cable repairs)

104

Figure 57: Elapsed Calendar Days From Reported Disruption/Onset Date to Documented Physical Repair Completion (Calendar days)

106

Figure 58: Named Telecom-Serving Ships Across 14 Operating Rosters

114

Figure 59: Targeted Gross Telecom Newbuild Deliveries by Year and Operator

117

Figure 60: Cable–landing participations by system region for the 2022–2026 report cohorts.

119

Figure 61: Cable–landing participations by system region for the 2027–2029 report cohorts.

120

Figure 62: System counts by recorded hyperscaler involvement for the 2022–2026 report cohorts.

126

Figure 63: Cumulative system counts by recorded hyperscaler involvement at report cohort years 2022–2026, retaining preperiod history.

127

Figure 64: Planned system counts by recorded hyperscaler involvement for the 2027–2029 report cohorts.

128

Figure 65: Known reported whole-project cost (USD) by recorded hyperscaler involvement for the 2027– 2029 report cohorts.

129

Figure 66: Hyperscaler shares of planned systems, known reported length and known project cost, 2027–2030 report cohorts (percentages use separate totals for each measure).

130

Figure 67: Planned-system counts and recorded CIF/survey milestone percentages by hyperscaler involvement, 2027–2030 report cohorts.

131

Figure 68: Unrepeatered system counts by report cohort year for 2022–2026.

136

Figure 69: Unrepeatered system counts by region for the 2022–2026 report cohorts.

137

LIST OF FIGURES · 7


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

LIST OF FIGURES

CONTINUED

Figure 87: Polar cumulative systems and illustrative 2027–2029 realization scenarios

189

140

Figure 88: Cumulative Transatlantic systems by report cohort year, 2018–2026.

190 191

Figure 72: Counts of systems classified as planned and unrepeatered, by region for the 2027–2029 report cohorts.

141

Figure 89: Cumulative reported whole-system length attributed to the Transatlantic region by report cohort year, 2018–2026 (km).

192

Figure 73: Cumulative systems in the Americas by report cohort year, 2018–2026.

174

Figure 90: Transatlantic cumulative systems and illustrative 2027–2029 realization scenarios

193

Figure 74: Cumulative reported whole-system length attributed to the Americas by report cohort year, 2018–2026 (km).

175

Figure 91: Cumulative Transpacific systems by report cohort year, 2018–2026.

194

Figure 75: Americas cumulative systems and illustrative 2027–2029 realization scenarios

176

Figure 92: Cumulative reported whole-system length attributed to the Transpacific region by report cohort year, 2018–2026 (km).

195

Figure 76: Cumulative systems in AustralAsia by report cohort year, 2018–2026.

178

Figure 93: Transpacific cumulative systems and illustrative 2027–2029 realization scenarios

196

Figure 77: Cumulative reported whole-system length attributed to AustralAsia by report cohort year, 2018– 2026 (km).

179

Figure 94: Regional operating/service-ready inventory age by reported original RFS year, alongside planned systems in report cohorts 2027–2030.

198

Figure 78: AustralAsia cumulative systems and illustrative 2027–2029 realization scenarios

180

Figure 95: Planned system–landing connections by recorded identity match to the operating/service-ready network, report cohorts 2027–2030.

181

Figure 80: Cumulative reported whole-system length attributed to EMEA by report cohort year, 2018–2026 (km).

182

Figure 96: Planned systems by recorded landingidentity match mix against the operating/service-ready network, report cohorts 2027–2030, including systems with no recorded landings.

199

Figure 79: Cumulative systems in EMEA by report cohort year, 2018–2026.

Figure 81: EMEA cumulative systems and illustrative 2027–2029 realization scenarios

183

Figure 82: Cumulative systems in the Indian Ocean by report cohort year, 2018–2026.

184

Figure 83: Cumulative reported whole-system length attributed to the Indian Ocean by report cohort year, 2018–2026 (km).

185

Figure 84: Indian Ocean cumulative systems and illustrative 2027–2029 realization scenarios

186

Figure 85: Cumulative systems in the Polar region by report cohort year, 2018–2026.

187

Figure 86: Cumulative reported whole-system length attributed to the Polar region by report cohort year, 2018–2026 (km).

188

Figure 70: Known reported whole-system length (km) of unrepeatered systems by report cohort year for 2022–2026.

139

Figure 71: Known reported whole-project cost (USD) of unrepeatered systems, attributed by region for report cohorts 2022–2026.

Submarine Telecoms Industry Report 2026/2027

LIST OF FIGURES · 8


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

LIST OF TABLES Table 1: Acronyms, Abbreviations, and Units Used in the Report

16

Table 2: Central Delivery Case and Dimension Coverage

79

Table 3: Hyperscaler Systems Assessed for Delivery by 2030

80

Table 4: Later Completion Allowance and Named Sensitivities

82

Table 5: Confirmed Future Telecom Newbuilds and Fleet Implications

116

Table 6: Selected Offshore Energy Connectivity Developments in 2026

143

Submarine Telecoms Industry Report 2026/2027

LIST OF TABLES · 9


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

EXORDIUM Dear Readers, Welcome to Issue 15 of SubTel Forum’s Submarine Telecoms Industry Report, our 2026 edition. Submarine cables rarely work as standalone lines on a map. Behind every new route is a network of investors, suppliers, surveyors, installation ships, landing partners, regulators, and maintenance providers. Their combined work determines whether technical ambition becomes dependable connectivity and whether that connectivity reaches the people and businesses that need it. This year’s report brings those relationships into focus. We examine system development and regional growth alongside capacity, financing, marine resources, technology, data centers, regulation, offshore energy, and sustainability. Together, these perspectives explain how engineering decisions translate into commercial opportunities, operational responsibilities, and public-policy outcomes. As 2026 draws to a close, artificial intelligence, cloud computing, and expanding data center networks are shaping demand, while geopolitical pressures, permitting requirements, and marine resources influence where and when new systems can enter service. Looking toward 2027, the industry’s challenge is to match ambition with a credible path to delivery, from planning and financing through commissioning and long-term operation. At the October 25, 2026 snapshot, systems in the 2026 reporting cohort account for 64,106 kilometers of reported route length and $5.1945 billion in reported whole-project value. Lengths are available for 11 of 12 systems and values for all 12. The cohort reflects manufacturing readiness rather than confirmed entry into operational service; these project values are not annual spending. The forward outlook combines substantial opportunity with unfinished work. Our delivery assessment through 2030 produces a conditional central planning estimate of approximately 55.6 delivery equivalents from 85 reviewed listings. For projects with available route and value estimates, covering 60 listings for each measure, the delivery-weighted contribution is approximately 288,000 kilometers and $21.7 billion in associated project value. These conditional estimates reflect the distinction between announcing a cable and bringing its full scope into service. Financing, permissions, manufacturing, marine execution, and commissioning remain decisive.

Submarine Telecoms Industry Report 2026/2027

Hyperscalers continue to reshape this landscape. They account for 27.1 percent of planned systems in the report’s 2027–2029 cohort and approximately 61.5 percent of reported whole-project value in the 43 systems with known costs. Their influence extends across route selection, technical architecture, and delivery priorities. Independent developers, carriers, consortia, and public institutions remain essential to regional connectivity, competitive access, and geographic diversity. The commercial significance of new infrastructure depends on the networks it connects, and the services customers can obtain. Technological progress is advancing on several fronts. Trials over existing submarine infrastructure are demonstrating higher transmission rates, while multicore fiber developments and planned petabit-scale systems point toward new architectures later in the decade. These advances create opportunities both to improve existing assets and to build greater capability into future systems. Their lasting value will depend on reliable integration, repairability, and practical deployment. Resilience has moved further into public policy and operational planning. Following the Porto summit in February 2026, the International Advisory Body on Submarine Cable Resilience completed its mandate with approval of its final Working Groups Report in July. Its work provides a foundation for improving deployment and repair procedures, risk management, and geographic diversity. The next task is implementation: clearer responsibilities, coordinated permitting, and arrangements that allow vessels, personnel, and equipment to reach a fault promptly. Marine investment offers another sign of confidence. Seven purpose-built telecommunications cable ships have announced delivery targets spanning 2027–2029, combining fleet renewal with potential expansion. Their contribution will depend on commissioning, crews, operating commitments, and subsequent retirements. Sustainability similarly requires a view across the asset’s life, connecting manufacturing and landing-station resource use with vessel operations, maintenance, and eventual recovery. Our purpose throughout this report is to make the evidence accessible, explain what the patterns mean, and give readers a practical foundation for the decisions ahead. We draw on the SubTel Forum Submarine Cable Database, documented project developments, and analysis from our publications. The report complements the Submarine Cable Map, Submarine Cable Almanac, Submarine Cables of the World Interactive Map, SubTel Forum Magazine, and the Cableship Codex, launched in May 2026. Together, these resources connect the industry’s broad direction with the systems, organizations, and marine assets delivering it.

EXORDIUM · 10


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

EXORDIUM

CONTINUED

We are grateful for the expertise reflected throughout this edition, including contributions and published analysis from Andrés Fígoli, Kristian Nielsen, Dr. Bosun Tijani, Professor Sandra Maximiano, Anjali Sugadev, and Michelle Elsa George. We extend special thanks to our sponsors for their invaluable support in producing this annual edition: • ACS • APTelecom • Fígoli Consulting • Hexatronic • WFN Strategies We are honored to feature a Foreword by Doreen Bogdan-Martin, Secretary-General of the International Telecommunication Union, whose contribution emphasizes the importance of translating international cooperation into lasting improvements in connectivity and resilience. As SubTel Forum marks 25 years of publication, our mission remains to inform, connect, and challenge an industry vital to the world’s digital future. More than 175 years of submarine cable history demonstrate what this community can achieve. The next chapter will require that same ingenuity, supported by disciplined investment, practical cooperation, and sustained attention to the networks already serving the world. We thank our readers for your continued engagement with SubTel Forum’s work. As ever, we believe that an informed industry is a productive industry. Good reading and Slava Ukraini,

Wayne Nielsen Publisher & President, Submarine Telecoms Forum, Inc. Wayne Nielsen is the founder and publisher of Submarine Telecoms Forum and Managing Director of WFN Strategies. He has more than 35 years of global submarine cable experience spanning commercial, governmental, and offshore energy systems. SubTel Forum reaches more than 150,000 readers in 115 countries.

Submarine Telecoms Industry Report 2026/2027

EXORDIUM · 11


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FOREWORD

Thoughts from Doreen Bogdan-Martin, ITU Secretary-General More than 99 percent of intercontinental data traffic travels through submarine telecommunication cables.

For some countries, this will mean simplifying procedures that can delay cable deployment and emergency repairs. For others, it will mean strengthening coordination with maritime authorities, improving risk monitoring or investing in additional routes to reduce dependence on a single connection.

These vast networks, stretching across our oceans and often lying thousands of meters beneath the surface, connect economies, communities and billions of people around the world.

The need is particularly pressing for small island developing States, least developed countries and other underserved regions, where a single cable disruption can have far-reaching consequences for communities and economies.

Their importance becomes especially apparent when a cable is damaged, disrupting communications, financial transactions and essential services, sometimes across entire countries and regions.

Our approach to resilience must also extend beyond the cables themselves to include secure landing infrastructure, reliable terrestrial connections and the policies and partnerships needed to support them.

Ensuring that these networks remain reliable and resilient is therefore fundamental to our goal of universal, meaningful connectivity.

Innovation has an important role to play as well.

In last year's edition of this report, I highlighted the need for governments, industry and international partners to come together to strengthen submarine cable resilience. I am pleased to see how much progress we have made since then. In February 2026, the International Telecommunication Union (ITU) and the International Cable Protection Committee (ICPC) convened the second International Submarine Cable Resilience Summit in Porto, Portugal. The Porto Declaration reaffirmed our shared commitment to protecting this vital infrastructure and strengthening international cooperation. This momentum continued in July, when the International Advisory Body on Submarine Cable Resilience, established in 2024, concluded its work with the publication of its final report. Drawing on the contributions of more than 160 participants across three working groups, the Advisory Body developed recommendations on timely cable deployment and repair, risk identification and mitigation, and greater connectivity and geographical diversity. These recommendations represent an important achievement in bringing together technical expertise, policy perspectives and industry experience around a common set of priorities. The next step is for stakeholders to translate these recommendations into practical action.

Submarine Telecoms Industry Report 2026/2027

The Joint Task Force on SMART Cables, established by ITU, the World Meteorological Organization and UNESCO's Intergovernmental Oceanographic Commission, is helping advance submarine cable systems that combine telecommunications with ocean and climate monitoring. By integrating environmental/scientific sensors into submarine cables, SMART (Science Monitoring And Reliable Telecommunications) technology could provide valuable data for scientific research, climate monitoring, tsunami detection and disaster early warning, while maintaining vital global connectivity. At ITU, we recognize the importance of sustained international cooperation in strengthening submarine cable resilience. Through our work on international standards, telecommunication policy and digital development, we will continue to provide a platform for dialogue and collaboration among governments, industry and other stakeholders. The submarine telecommunications industry has an indispensable role in this effort. Its technical expertise, investment and innovation will help determine how effectively we can anticipate risks, respond to disruptions and strengthen the networks on which our connected world depends. The Submarine Telecoms Industry Report continues to offer valuable insights into this rapidly evolving sector. I welcome this year's edition and the contribution it makes to informed dialogue and cooperation.

FOREWORD · 12


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FOREWORD

CONTINUED

I am confident that, by building on the progress achieved together, we can make submarine cable resilience an integral part of how our world connects, today and for generations to come. Doreen Bogdan-Martin took office as Secretary-General of the International Telecommunication Union (ITU) on 1 January 2023. With over three decades of leadership experience in global telecommunications policy, Ms. Bogdan-Martin has consistently promoted digital transformation to advance economic prosperity, job creation, skills development, gender equality, and socio-economic inclusion, as well as to build circular economies, reduce climate impact, and save lives. Elected as Secretary-General by ITU Member States in September 2022, she is the first woman ever to head the organization in its more than 160-year history. Along with mobilizing innovative partnerships, she continues working to expand meaningful connectivity, intensify cooperation to connect the unconnected, and strengthen the alignment of digital technologies with inclusive sustainable development.

The next step is for stakeholders to translate these recommendations into practical action. Doreen Bogdan-Martin, ITU Secretary-General

Submarine Telecoms Industry Report 2026/2027

FOREWORD · 13


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

METHODOLOGY This report examines the submarine telecommunications industry by combining SubTel Forum’s Submarine Cable Database with documented project developments, public operating information, specialist contributions, and analysis published across SubTel Forum’s publications. It considers how system development, capacity, financing, suppliers, marine resources, regulation, and maintenance interact throughout the infrastructure lifecycle. The analysis distinguishes recorded facts, announced plans, reported operating results, and conditional forecasts.

Sources and Reporting Dates The principal database analysis uses a snapshot captured on October 25, 2026. This provides a consistent reference for the report’s core system, capacity, financing, supplier, fleet, and regional comparisons. System reporting cohorts distinguish manufacturing readiness from operational ready-for-service (RFS). Service-age analyses retain reported RFS years, while end-of-service (EOS) charts use selected estimates rather than observed retirements. These views organize records held in that snapshot; they do not reconstruct successive historical versions of the database. Selected analyses use separate evidence windows. The delivery assessment through 2030 begins with the October 19, 2026 planned-system register. Newsfeed disruption coverage extends through October 19, while the public maintenance-provider reporting supplement uses evidence reviewed through October 17. Future vessel commitments are assessed as of October 19, and the corporate activity review extends through October 18. These separately dated reviews supplement the core snapshot without implying that every database record has been updated to the same date. Supporting evidence includes cable-owner and supplier announcements, regulatory filings, government publications, international institution reports, maintenance-provider summaries, and cited SubTel Forum articles. Dated statements retain their reported scope and development stage. An announcement, contract award, landing, partial activation, and full-system commissioning represent different milestones. Where sources leave an outcome unresolved, the report preserves that uncertainty.

Scope and Units of Analysis The principal unit is the cable system recorded within the selection used for each analysis. Individual charts apply specified combinations of lifecycle status, reporting or source year, region, architecture, financing, and recorded participation. Ordinary current and planned system charts use reporting cohorts that distinguish manufacturing readiness from operational ready-forservice (RFS). For source targets in 2026 or later, supported manufacturing completion can qualify a system for the 2026 cohort. Unready active cases with a 2026 source target are assigned 2027 or later for reporting, without establishing a new service forecast or a particular development phase. Genuine older reported years are preserved, and unknown years remain unknown. Service-age views retain reported RFS years, EOS views use selected estimates, and the delivery model has its own population and weights. Chart populations consequently differ, and totals from separate charts should not be assumed to describe an identical set of assets. System counts, whole-system route kilometers, design capacity, project costs, landing participations, and vessel entries measure different aspects of the industry. Several short regional systems may create more project and landing interfaces than a single ocean crossing, while contributing less length or financial value. These measures are considered together to describe both the breadth and scale of development. The forecasting assessment separately reconciles operating entries, duplicate identities, overlapping commercial names, offshore exclusions, and projects whose physical scope remains uncertain. It evaluates the original defined system, with later optional branches treated separately. This reconciliation is specific to the forecast and should not be interpreted as a retrospective revision of every core database chart.

Classification, Attribution, and Data Coverage Financing analyses distinguish self-financed systems, debt-andequity financing, and multilateral development bank financing within their stated populations. Hyperscaler analyses use the involvement classifications recorded for the relevant selection. Supplier, installer, and surveyor charts describe separate roles; participation in one does not establish responsibility for another. Regional and company attribution can overlap. Where a system belongs to more than one category, its participation or wholesystem value may appear in multiple regional or company views. Percentages in these analyses describe the charted participations or attributed values and should not be presented as unique worldwide market shares.

Submarine Telecoms Industry Report 2026/2027

METHODOLOGY · 14


SUBTEL FORUM

METHODOLOGY

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

Contract-in-force and survey classifications identify recorded development milestones. Unknown status remains distinct from a recorded negative classification. Missing length, capacity, cost, or milestone information does not establish a zero value. Known-value analyses describe the subset for which the relevant information is available, with coverage and denominators stated where material to interpretation.

The statistical reference uses 43 usable histories in 42 project groups, comprising 20 observed completions and 23 incomplete observations. Unfinished projects remain incomplete observations rather than being classified as failures solely because reporting ends. The model uses time since the first matched archived planned observation as a proxy for project tenure, with explicit treatment of unknown tenure.

Historical Comparisons, Capacity, and Costs

Delivery weights are aggregated into a conditional planning estimate. Available route lengths and associated project values are weighted consistently; where disclosed project values are unavailable, the assessment uses an explicit reference estimate of $75,000 per route kilometer. Missing route dimensions remain unquantified. Limited validation, uncertain execution dates, and project-specific assumptions prevent the assessment from establishing guaranteed delivery totals or an overall statistical confidence interval. Detailed assumptions and sensitivities appear in the forecasting chapter.

Annual system-activity views group records by the reporting cohort specified for that analysis. Cumulative views organize eligible records in the snapshot by reporting cohort, retaining their original historical lower bounds and incorporating earlier eligible systems into the first displayed point. These approaches describe the composition of the recorded inventory rather than a complete history of construction expenditure, commercial activity, or information available at each historical date. Capacity analysis distinguishes design capability, equipped or lit capacity, sold or contracted capacity, and traffic carried. These measures are not interchangeable. National gateway statistics, company sales disclosures, and technical trials retain their original reporting boundaries and cannot be combined into a global utilization rate without compatible definitions and coverage. Financial charts report whole-system U.S. dollar values associated with their selected projects. Those values are distinct from annual cash expenditure, remaining construction spending, enterprise value, or investor returns. Corporate transactions are discussed separately from cable construction costs. Historical cost comparisons should be read as reported project values; the report does not establish a common inflation-adjusted cost series.

Delivery Assessment Through 2030 The forward assessment asks whether each eligible, unfinished physical system in the October 19 planned register will reach fullscope service by December 31, 2030. It includes overdue and undated candidates while separating later-targeted projects and unresolved scope cases. The method builds on SubTel Forum’s earlier project-success research and separates financing attrition from execution timing. Hyperscaler-funded projects receive individual delivery assessments, reflecting their funded commercial starting point. Other projects enter the committed case where evidence establishes the relevant financing or physical-execution threshold. Remaining listings are assessed using a historical residual-time model informed by reconstructed project outcomes.

Submarine Telecoms Industry Report 2026/2027

Maintenance and Marine Resources Maintenance analysis separates news coverage, reported repair workload, physical repair completion, and customer service restoration. Newsfeed articles are counted by publication date, including follow-ups, and assigned to their principal geographic focus. Article totals measure coverage rather than unique faults or global failure frequency. Public annual repair figures form a partial reporting series with gaps and potentially changing coverage. Unavailable years remain missing observations. Without consistent coverage and an appropriate exposure denominator, these totals do not establish a global fault-rate trend. Named repair intervals are calculated only where documented onset and physical completion dates permit; they are not automatically customer outage durations. Vessel registers describe recorded assets and ownership, rather than assured operational availability. Newbuild analysis distinguishes announced commitments, construction milestones, delivery targets, and explicit replacements. AIS-derived observations describe vessel positions and movements; they do not independently verify assignments, completed work, or availability.

Interpretation and Limitations Public disclosure varies across systems, companies, regions, and reporting periods. Project schedules, costs, ownership, and technical designs can change, while individual records may remain incomplete. Forecasts exclude future unannounced systems, and selected operating cases are illustrative rather than statistically representative. The report therefore presents each finding within its population, date, measurement basis, and evidence limits. Its purpose is to provide a defensible account of industry development and a practical basis for further investigation and decision-making. METHODOLOGY · 15


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

TABLE OF ACRONYMS AND DESCRIPTIONS The following table defines the acronyms, abbreviations, and units used throughout this report to support consistent interpretation of its technical, commercial, operational, and regulatory analysis. Table 1: Acronyms, Abbreviations, and Units Used in the Report Acronym / Abbreviation

Description

2OCMA

2 Oceans Cable Maintenance Agreement

ACMA

Atlantic Cable Maintenance Agreement

AI

Artificial intelligence

AIS

Automatic Identification System

APMA

Atlantic Private Maintenance Agreement

APMMSA

Asia Pacific Marine Maintenance Service Agreement

ASEAN

Association of Southeast Asian Nations

BDT

Bangladeshi taka

CIF

Contract in force

CS / C.S.

Cable ship; used as a vessel-name prefix

DAS

Distributed acoustic sensing

EEZ

Exclusive economic zone

EMEA

Europe, Middle East, and Africa

ENISA

European Union Agency for Cybersecurity

EOS

End of service

EPC

Engineering, procurement, and construction

EU

European Union

FCC

Federal Communications Commission, United States

Gbps

Gigabits per second; one billion bits per second

GW

Gigawatt; one billion watts

IAB

International Advisory Body on Submarine Cable Resilience

ICPC

International Cable Protection Committee

IHO

International Hydrographic Organization

IMO

International Maritime Organization

Submarine Telecoms Industry Report 2026/2027

TABLE OF ACRONYMS AND DESCRIPTIONS · 16


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

TABLE OF ACRONYMS AND DESCRIPTIONS

CONTINUED

Acronym / Abbreviation

Description

IP

Internet Protocol

IPLC

International private leased circuit

ISA

International Seabed Authority

IT

Information technology

ITU

International Telecommunication Union

km

Kilometer

MDB

Multilateral development bank

MECMA

Mediterranean Cable Maintenance Agreement

MEPC

Marine Environment Protection Committee of the IMO

MW

Megawatt; one million watts

NCA

National Communications Authority, Ghana

NIS2

European Union’s second Network and Information Systems Directive

NIST

National Institute of Standards and Technology, United States

PTC

Pacific Telecommunications Council

PUE

Power Usage Effectiveness; ratio of total facility energy use to IT equipment energy use

RFS

Ready for service

SCLS

Submarine cable landing station

SLTE

Submarine line terminal equipment

SMART

Science Monitoring And Reliable Telecommunications

SPMA

South Pacific Maintenance Agreement

SSN

Sustainable Subsea Networks

STCW

International Convention on Standards of Training, Certification and Watchkeeping for Seafarers

STF

Submarine Telecoms Forum

Tbps

Terabits per second; one trillion bits per second

UNCLOS

United Nations Convention on the Law of the Sea

UNESCO

United Nations Educational, Scientific and Cultural Organization

USD

United States dollars

Submarine Telecoms Industry Report 2026/2027

TABLE OF ACRONYMS AND DESCRIPTIONS · 17


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

EXECUTIVE SUMMARY The submarine telecommunications industry enters 2027 with substantial recorded development and a demanding delivery agenda. Investment, technical advances and data-center expansion create opportunities, but dependable connectivity requires financing, permissions, manufacturing, marine resources and networks at both ends of a cable. This report distinguishes project announcements and manufacturing readiness from operational service. Its central finding is practical: the opportunity is substantial, but its commercial value depends on completing infrastructure that customers can access and operators can maintain. SubTel Forum’s October 25, 2026 snapshot records 12 systems in the 2026 manufactured cohort, totaling USD 5.1945 billion in known reported whole-project value. Known route length reaches 64,106 kilometers across 11 systems. These figures describe a reporting cohort associated with manufacturing readiness, not confirmed entry into service. They are neither annual spending nor a complete full-year comparison. Changes between cohorts therefore require attention to project composition, reporting coverage and the timing of individual systems. Regional activity differs according to the measure used. EMEA leads system counts in the 2022–2026 selection, while Transpacific routes lead known length and value. Indian Ocean length is concentrated in the 2024 cohort. Looking ahead, AustralAsia and Transpacific account for 62,715 of 104,651 known kilometers, or 59.9%, in the planned 2027–2029 regionallength view. Project frequency and physical scale identify different centers of activity, making a single regional growth ranking insufficient for understanding workload or opportunity. Planned projects differ in contract status, survey progress and the evidence behind their target dates. A cumulative count or route total shows the possible scale of development; it cannot tell a customer when a usable path will be ready. Regional prospects therefore depend on where systems land, how they connect inland, and whether their commercial arrangements support access. That distinction matters especially in established gateways, where a new landing may share facilities or terrestrial exposure with existing cables. Physical independence must be established across the full service path. These interfaces help determine whether an additional route offers a customer a practical alternative.

Submarine Telecoms Industry Report 2026/2027

Financing also varies across the recorded market. In the 2015– 2026 manufactured financing selection, self-financing represents 63.1% of known attributed whole-project value, compared with 17.9% for debt and equity and 19.0% for multilateral development banks. These shares describe the reviewed projects, not annual capital flows. Debt- and equity-financed value is particularly prominent in the Transpacific and Transatlantic categories, illustrating how different financing routes support different combinations of geography, project scale and ownership. Hyperscaler participation has a substantial but uneven role. Systems with recorded hyperscaler involvement represent 16 of 59 planned systems in the 2027–2029 cohorts, or 27.1%. They account for 61.5% of known reported whole-project cost, with costs available for 43 of the 59 systems. That contrast identifies greater financial scale than project frequency alone suggests. It does not measure hyperscalers’ individual investment contributions. Independent developers, carriers, consortia and public institutions remain important to regional connectivity, wholesale access and alternative routes. Commercial milestones reinforce the distinction between a pipeline and delivered service. In a separate 64-system contractstatus selection for 2027–2029, 17 systems have contracts in force. This selection is not restricted to systems labeled Planned. The October 19 delivery model separately reviews 85 listings through the end of 2030. Among 60 costed projects, USD 27.061 billion in planned or reference value becomes USD 21.701 billion after weighting, or 80.2%. These are conditional wholeproject values, not annual spending, observed completion rates or canceled investment. In the model-classified non-hyperscaler view, USD 11.703 billion becomes USD 7.276 billion after weighting, or 62.2%, with costs available for 35 of 49 systems. The ownership picture is wider than any one class of investor. Private networks can carry large company requirements, while wholesale routes, consortia and public-backed projects can connect customers and places beyond those private programs. The reported value attached to a system is its whole-project value, regardless of how its financing is divided among participants. Contracts in force, financing agreements, surveys and service targets mark different stages. Reading them together helps identify a credible delivery sequence, while keeping unknown backing and undisclosed costs explicit prevents the known-value charts from becoming an assumed census of the entire market.

EXECUTIVE SUMMARY · 18


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

EXECUTIVE SUMMARY: DELIVERY AND OUTLOOK Data-center expansion adds a significant planning context without providing a direct cable-demand forecast. Bain’s July 2026 base case forecasts global critical IT capacity rising from 99 GW in 2026E to 262 GW in 2031E. This measures computing equipment capacity, including AI and general-purpose computing, rather than submarine bandwidth. Power availability, permits, equipment, skilled workers and customer commitments will influence where facilities become usable. Terrestrial fiber, landing access and international routes must then align with each location and construction phase.

Delivery capacity requires similarly specific assessment. ASN leads recorded supplier participation and known route length, but supplier counts alone do not establish suitability for a particular project. At sea, seven purpose-built telecommunications cable ships have target deliveries in 2027–2029, including two explicit replacements. These orders indicate renewal and potential expansion, not capacity available today. Commissioning, mission equipment, crews, location, existing commitments and oldervessel withdrawals will determine their contribution to installation and maintenance.

Technical progress can increase the usefulness of existing infrastructure and the capability of new systems. Higher-speed optical transmission, greater fiber counts and multicore designs offer different paths forward. Their commercial implications require careful interpretation: design capacity, equipped capacity, capacity sold and traffic carried are distinct measures. A successful demonstration does not by itself establish available service at particular endpoints. Owners must connect technical capability with equipment, access arrangements, customer requirements and sustainable commercial terms.

The October 2026 survey captures optimism alongside execution pressure. Among 27 respondents, 92.6% were optimistic or very optimistic and 81.5% reported more or significantly more work. Among 23 respondents for whom scheduling applied, 87.0% identified some or significant delay as their most common outcome. Vessel availability, permitting and financing were the most commonly selected expected constraints. These results describe respondents’ experiences, not delay rates across the industry’s projects.

Observed capacity indicators add a view of equipment readiness. Between 2022 and 2024, U.S.-international holders reported Atlantic activation increasing from 338.2 to 696.6 Tbps and Pacific activation from 283.5 to 335.8 Tbps. Hong Kong's customer-activated external cable circuits rose from 227.4 to 307.6 Tbps between June 2024 and June 2026. These are scoped reporting measures, not complete corridor inventories or traffic. The report's modeled continuations keep activation within the matching capacity base and distinguish prospective equipment and customer commitments. Capacity also has a business life after installation. The Kenya and Bangladesh examples in this report show why sales volume, available equipment and service revenue cannot be collapsed into one growth measure. A buyer needs capacity at useful endpoints, under terms that support the required route, resilience and price. Owners need an operating model that can sustain maintenance and upgrades after the initial build. The U.S. holder and Hong Kong activation series add evidence of equipment put to use, but their reporting bases differ and neither is a direct measure of traffic carried. The opportunity lies in converting technical headroom into dependable, commercially accessible service.

Submarine Telecoms Industry Report 2026/2027

Maintaining existing networks remains equally important. The ICPC’s 2026 summary reports 178 repairs for 2025 within its maintenance-provider sample, while 63.0% of survey respondents expressed confidence in repair and maintenance provision over the following year. Neither indicator establishes global adequacy. New cable and landing identities also do not prove independent service paths. The priorities are to advance credible projects, verify landing and terrestrial interfaces, strengthen workforce and marine capability, and sustain repair readiness. Success will be measured in accessible services and continuity throughout the infrastructure’s operating life. The next construction cycle will test institutions as well as equipment. Owners need permits and landing rights that can be understood early, suppliers need executable programs, and marine operators must balance installation with repair obligations. The survey's labor concern is a reminder that crews, engineers and local specialists cannot be added on the same timetable as a purchase order. Policy also shapes whether a route can be built and restored: security, environmental, maritime and telecommunications responsibilities meet at the shore and at sea. Better coordination can make those decisions clearer without weakening their purpose. Across these tasks, the industry's measure of progress remains the continuity and usefulness of connections delivered to customers and communities.

EXECUTIVE SUMMARY · 19


SUBTEL FORUM

CHAPTER 01

GLOBAL OVERVIEW CURRENT ACTIVITY / FORWARD COMMITMENTS

CIF status · 64 report-cohort records

In force · 17 (26.6%)

INTERPRETATION

17 in force, 41 not in force, 6 unknown. Unknown is neither no nor zero; this 64-record view differs from the 59-system core planned selection. 27 RESPONDENTS / UNWEIGHTED

Industry sentiment was broadly positive in this respondent group: 92.6% described current conditions as optimistic or very optimistic, while 81.5% reported more or significantly more work than in the preceding 12 months. Growing workloads and confidence in demand create a favorable commercial backdrop.

20

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

2026 (partial) • 11/12 known

2026 (partial) • 12/12 known

64,106

5.1945

known reported km

USD billion whole-project value

October 25, 2026 snapshot; manufacturing readiness, not operational service.

Reported whole-project value, not annual spending; October 25, 2026 snapshot.

2027–2029 · not limited to Planned

Not in force · 41 (64.1%)

Unknown · 6 (9.4%)

CIF IN FORCE / 2027–2029 / 64 RECORDS

26.6% The growth picture changes depending on whether the question concerns projects, cable length or future commercial commitments. Figures 20–23 therefore examine those dimensions together. The current charts group records into 2022–2026 reporting cohorts, with 2026 figures reflecting the October 25 snapshot.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

21


SUBTEL FORUM

1.1

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

01 / GLOBAL OVERVIEW

INDUSTRY SENTIMENT

INDUSTRY SENTIMENT / 27 RESPONDENTS

92.6%

81.5%

27

OPTIMISTIC OUTLOOK

INCREASED ACTIVITY

SURVEY RESPONDENTS

Industry sentiment was broadly positive in this respondent group: 92.6% described current conditions as optimistic or very optimistic, while 81.5% reported more or significantly more work than in the preceding 12 months. Growing workloads and confidence in demand create a favorable commercial backdrop. The delivery answers show why that confidence still depends on turning announcements and commitments into functioning connections.

No single expected delivery constraint commanded a majority. Installation-vessel availability led at 25.9%, followed by permitting and regulatory approvals at 22.2% and financing at 18.5%. Geopolitical or security issues received 14.8%, manufacturing capacity and equipment lead times 11.1%, and skilled-workforce availability 7.4%. Respondents chose only their largest expected constraint, so the ranking does not say that the other issues are absent from their projects.

Investment sentiment was less precise than the question's wording suggests: 51.9% selected Above Average, 37.0% Average and 11.1% Below Average. Those are the original offered assessment bands, not directions of change, so they cannot show that investment rose. Merger and acquisition expectations split evenly, with 44.4% expecting an increase and 44.4% expecting stability. The different answers point to an active outlook without a shared expectation of faster dealmaking.

Views on repair and maintenance were positive but not emphatic. 63.0% were somewhat or very confident that the industry could meet needs over the coming year, compared with 22.2% neutral and 14.8% somewhat or very unconfident. Most of the confident group chose somewhat rather than very confident. This is a judgment of readiness, not a measure of vessel capacity, physical repair time or service restoration.

The Transpacific was the most frequently selected corridor for observed project activity, at 29.6% of respondents. Australasia drew 18.5%, the Indian Ocean Pan-East Asian corridor another 18.5%, and the Americas 14.8%. That spread suggests respondents were seeing work in several parts of the world rather than one concentrated market. It describes where they noticed activity, not a measured count of systems, route kilometers or regional market share. Delivery experience was more strained. Among respondents for whom the project-schedule question applied, 87.0% said some or significant delay had been their most common outcome over the previous year; 47.8% chose some delay and 39.1% significant delay. The question records each person's predominant experience on projects they worked on. It does not establish the percentage of all submarine cable projects delayed, and project cancellation was a separate response.

Submarine Telecoms Industry Report 2026/2027

Next-generation optical transmission and fiber design was the leading choice for the technology expected to have the greatest impact over five years, at 44.4%. AI-driven network operations followed at 22.2%, and cable-based sensing and monitoring at 18.5%. The answers show where respondents expect influence, not which systems have already been adopted or proved effective. The range also puts operational software and sensing beside improvements in transmission capacity. Organizational preparedness was mixed. Among respondents for whom the question applied, 48.0% called their organization prepared or very prepared, 44.0% were neutral and 8.0% unprepared or very unprepared. The large neutral group makes readiness an important practical question alongside interest in new technology. The impact and preparedness questions were separate, so their aggregate results should not be used to identify which organizations are ready for a particular development.

01 / GLOBAL OVERVIEW / 1.1 · 22


SUBTEL FORUM

1.1 INDUSTRY SENTIMENT

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

On environmental sustainability, 59.3% said the industry was making progress or leading the way, while 25.9% were neutral and 14.8% saw it lagging or not prioritized. Environmental regulations were the leading single regulatory challenge at 37.0%, ahead of security compliance at 29.6% and data sovereignty at 25.9%. These are perceptions and priorities, not measures of environmental performance or the cost of compliance.

Purchasing influence and experience further shape the snapshot. 59.3% described themselves as a final purchasing decisionmaker or a recommender with high influence. A larger share, 70.4%, had at least 11 years in submarine telecommunications, and 70.4% lived in Europe or the survey's North America category, which includes Central America and the Caribbean. The concentration of seniority and residence limits how far these responses can be generalized.

Skilled labor drew a broader warning than its delivery-constraint rank alone implies. Two-thirds of respondents, 66.7%, described industry availability as insufficient or a critical shortage, while 25.9% called it sufficient or abundant. Yet only 7.4% selected workforce availability as the single biggest expected constraint on delivering projects. A respondent can see a general shortage while judging a vessel, approval or financing issue to be the immediate bottleneck.

Optional comments came from 51.9% of respondents and added more divergent views. Some linked data and AI-related demand to prospects for new capacity; others pointed to overbuilding risk, political and resilience concerns, project finance and supplier economics, or talent development. These themes are paraphrased without attribution. They are useful context for the numerical answers, not a coded survey distribution or independent verification of market conditions.

Within their own organizations, attracting talent led workforcedevelopment concerns: 33.3% of respondents for whom the question applied chose it as the biggest challenge, followed by training and development at 29.2%. Succession planning and retention also appeared in the distribution. As a single-choice question, this identifies the leading challenge each person chose; it cannot measure every workforce issue their organization faces.

The central contrast is between 92.6% optimism about current conditions and 87.0% reporting predominant delays among respondents with recent project work. These percentages have different response bases. Read together, the findings describe opportunity alongside the financing, approvals, vessel scheduling and skills needed to reach service. The report's Industry Outlook in Perspective comparison returns to these themes alongside the measured project cohorts and conditional delivery model.

The profile of respondents matters to interpretation. In the organization-role question, 40.7% selected cable system owner or operator and 29.6% consultancy or professional services. This item permitted multiple selections even though its wording refers to a primary role, so these are not exclusive shares. For individual roles, 37.0% selected senior management and 33.3% engineering or other technical duties. Perspectives from those roles may be valuable, but this mix is not evidence of the industry's overall occupational distribution.

Submarine Telecoms Industry Report 2026/2027

Methods note: The survey contains 27 unweighted responses recorded October 12–24, 2026. All respondents completed Q1–Q19; 14 answered the optional written question. Unless an applicable base is stated, percentages use all 27 respondents. The schedule, technology-preparedness and workforcedevelopment questions have applicable bases of 23, 25 and 24 after explicit Not Applicable choices. The organization-role item allowed 30 selections from 27 people, so its percentages of respondents can sum above the whole respondent base. No invitation count, response rate, sampling frame or evidence of representativeness was supplied (SubTel Forum, 2026).

01 / GLOBAL OVERVIEW / 1.1 · 23


SUBTEL FORUM

INDUSTRY SENTIMENT

1

Figure 1: Industry Sentiment Q1 Overall Industry Outlook

2

Figure 2: Industry Sentiment Q2 Reported Market Activity

Submarine Telecoms Industry Report 2026/2027

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURES 1 + 2

01 / GLOBAL OVERVIEW / 1.1 · 24


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

INDUSTRY SENTIMENT

3

Figure 3: Industry Sentiment Q3 Investment Assessments

4

Figure 4: Industry Sentiment Q4 Mergers and Acquisitions Outlook

Submarine Telecoms Industry Report 2026/2027

FIGURES 3 + 4

01 / GLOBAL OVERVIEW / 1.1 · 25


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

INDUSTRY SENTIMENT

5

Figure 5: Industry Sentiment Q5 Observed Project Activity by Corridor

6

Figure 6: Industry Sentiment Q6 Predominant Project Schedule Experience

Submarine Telecoms Industry Report 2026/2027

FIGURES 5 + 6

01 / GLOBAL OVERVIEW / 1.1 · 26


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

INDUSTRY SENTIMENT

7

Figure 7: Industry Sentiment Q7 Leading Expected Delivery Constraint

8

Figure 8: Industry Sentiment Q8 Repair and Maintenance Confidence

Submarine Telecoms Industry Report 2026/2027

FIGURES 7 + 8

01 / GLOBAL OVERVIEW / 1.1 · 27


SUBTEL FORUM

1.1 INDUSTRY SENTIMENT

9

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURE 9

Figure 9: Industry Sentiment Q9 Expected Technology Impact

Submarine Telecoms Industry Report 2026/2027

01 / GLOBAL OVERVIEW / 1.1 · 28


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

INDUSTRY SENTIMENT

10

Figure 10: Industry Sentiment Q10 Organizational Technology Preparedness

11

Figure 11: Industry Sentiment Q11 Environmental Sustainability

Submarine Telecoms Industry Report 2026/2027

FIGURES 10 + 11

01 / GLOBAL OVERVIEW / 1.1 · 29


SUBTEL FORUM

INDUSTRY SENTIMENT

12

Figure 12: Industry Sentiment Q12 Leading Regulatory Challenge

13

Figure 13: Industry Sentiment Q13 Skilled Labor Availability

Submarine Telecoms Industry Report 2026/2027

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURES 12 + 13

01 / GLOBAL OVERVIEW / 1.1 · 30


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

1.1 INDUSTRY SENTIMENT

14

FIGURE 14

Figure 14: Industry Sentiment Q14 Workforce Development Challenges

Submarine Telecoms Industry Report 2026/2027

01 / GLOBAL OVERVIEW / 1.1 · 31


SUBTEL FORUM

1.1 INDUSTRY SENTIMENT

15

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURE 15

Figure 15: Industry Sentiment Q15 Organization Roles

Submarine Telecoms Industry Report 2026/2027

01 / GLOBAL OVERVIEW / 1.1 · 32


SUBTEL FORUM

INDUSTRY SENTIMENT

16

Figure 16: Industry Sentiment Q16 Respondent Roles

17

Figure 17: Industry Sentiment Q17 Purchasing Influence

Submarine Telecoms Industry Report 2026/2027

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURES 16 + 17

01 / GLOBAL OVERVIEW / 1.1 · 33


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

INDUSTRY SENTIMENT

FIGURES 18 + 19

18

Figure 18: Industry Sentiment Q18 Experience in Submarine Telecommunications

19

Figure 19: Industry Sentiment Q19 Region of Residence

Submarine Telecoms Industry Report 2026/2027

01 / GLOBAL OVERVIEW / 1.1 · 34


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

1.2

01 / GLOBAL OVERVIEW

STRATEGIC SHIFTS IN SUBMARINE CABLE POLICY

Kristian Nielsen's Fault Lines articles in Issues 146–150 present submarine cables as infrastructure shaped by international relations as well as engineering. Across the five issues published from January through September, the discussion moves from national security and trusted vendors and routes to incident investigation, coordinated readiness, and practical recovery. Together, the articles show how public policy, sea access, and day-to-day operations shape the industry's ability to protect and restore cable networks.

Security and Trusted Supply The January and March installments frame submarine cables as strategic assets shaped by state security policy, digital sovereignty, and competition over trusted vendors and routes. That framing gives project developers an early decision problem: the same supplier, ownership structure, or landing choice can carry different regulatory and political implications across jurisdictions. Read together, the articles make route diversity a policy choice as well as an engineering goal. A second path offers limited strategic value when its landing, terrestrial continuation, supplier exposure, or operating corridor recreates the same vulnerability. The January discussion of security and trusted supply and the March discussion of European coordination connect route diversity with these wider policy choices.

European Coordination and Repair Readiness The March and May discussion connects political attention with the practical means to respond. Regulatory plans and incident inquiries matter when they lead to usable procedures: clear permit paths, protected landing access, information exchange, and repair resources available to the affected sea. For cable owners, security review is one part of risk. A system's response also depends on whether operators can coordinate with authorities, obtain vessel permissions, and mobilize crews and spares. The industry question shifts from whether cables receive more attention to whether institutions and operators can turn that

attention into coordinated preparation. The March emphasis on coordination and the May discussion of repair readiness place those requirements within the wider policy debate.

Evidence and Attribution Across the January–May accounts, Nielsen discusses Baltic cable reports alongside investigations and official statements. This separates known physical damage from suspicion about intent: allegations and inquiries can inform risk planning without proving deliberate interference. That distinction matters to customers and operators because insurance, public policy, and repair priorities depend on what can be established about a particular event. Careful attribution strengthens the security discussion by keeping attention on the evidence needed to explain a break and the steps that restore service. The series through May connects that need for evidence with practical cable protection.

Redundancy, Recovery, and Industry Outlook By May and July, Nielsen broadens the picture beyond the point of failure to insurance, maritime access, permits, ship availability, and repair logistics. September's article pushes the argument further: resilience depends on recoverability as well as route redundancy. For network planners, that means assessing alternatives by whether they preserve enough usable capacity and can be repaired through the jurisdictions and vessels actually available. For governments, it emphasizes coordination across security, marine, and telecom authorities. The practical outlook is not that risk disappears, but that clear access and a credible restoration path can shorten the distance between disruption and usable service. The July discussion of repair logistics leads into September's emphasis on recoverability.

Kristian Nielsen is Chief Revenue Officer at WFN Strategies, based in Ashburn, Virginia. He has more than 18 years of experience with submarine cable systems, including Arctic and offshore energy projects. His work spans contract administration, financial monitoring, logistics, engineering support and due diligence, with Client Representative experience in cable load-out, installation and landing stations.

Submarine Telecoms Industry Report 2026/2027

01 / GLOBAL OVERVIEW / 1.2 · 35


Cable Landing Systems Subsea landing + terrestrial connectivity Reliable, scalable infrastructure for subsea systems requiring trusted landing, transport, and long-term operational partners in the Pacific Northwest.


alaska COMMUNICATIONS.

COMPREHENSIVE SUBSEA + TERRESTRIAL SUPPORT End-to-end infrastructure capabilities Cable Landing & Beach Facilities Site selection, land acquisition, easements, and multi-system-ready facilities

Terrestrial Transport & Backhaul Monitoring, maintenance, and rapid restoration

Permitting & Coordination Support for U.S. landing permits and state coordination

Operations & Lifecycle Support Florence Cable * Landing Station

Inland routing, metro connectivity, lit and dark fiber

Beach landing

Front-haul fiber

Cable landing station

Terrestrial transport

Route diversity

Carrier & Wholesale | wholesalecarrier@acsalaska.com | 1-503-707-5376 | www.AlaskaCommunications.com 600 Telephone Avenue, Anchorage, Alaska 99503

Long-term operational support


SUBTEL FORUM

1.3

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

01 / GLOBAL OVERVIEW

SYSTEM GROWTH

The growth picture changes depending on whether the question concerns projects, cable length or future commercial commitments. Figures 20–23 therefore examine those dimensions together. The current charts group records into 2022–2026 reporting cohorts, with 2026 figures reflecting the October 25 snapshot. The planned-length and contract-status views cover the 2027–2029 report cohorts but use different populations; the contract-status view is not limited to planned systems. Their relationship is useful for identifying the kinds of work entering the industry's pipeline, rather than projecting a uniform growth rate across every region. The analysis below follows the regional pattern first, then considers what its scale and recorded milestones mean for delivery and network development, without treating those milestones as proof of operational service.

20

Figure 20: Manufactured system counts by report cohort year and region, 2022–2026; 2026 is partial.

EMEA leads the 2022–2026 system-count profile with 23 regional entries, compared with 14 for AustralAsia and eight for the Americas. The annual pattern is uneven: EMEA records nine entries in 2022, five in 2023, one in 2024, five in 2025 and three in the 2026 snapshot. AustralAsia records three in 2022, then four, one, four and two. The Americas remain between one and two per report cohort. These patterns show different concentrations of regional entries within the same five-year reporting window.

Submarine Telecoms Industry Report 2026/2027

The year-to-year pattern also differs across ocean categories. Transpacific has two entries in the 2022 report cohort, one in 2023 and three in 2025; Transatlantic has one in 2023. The Indian Ocean has a three-system cohort in 2024. A region's annual cohort can consequently be a relatively small number of projects. This makes individual project assignments to report cohorts important to the shape of the series and explains why a regional chart can change noticeably without implying that every part of the wider market moved in parallel.

01 / GLOBAL OVERVIEW / 1.3 · 38


SUBTEL FORUM

1.3 SYSTEM GROWTH For the industry, EMEA's repeated entries identify a market with multiple project engagements, landing interfaces and operating relationships. The ocean-crossing categories place more emphasis on the scale of fewer engagements. That distinction affects how buyers and delivery partners evaluate opportunity: project counts describe the breadth of activity, but they do not indicate the quantity of cable, the design-capacity addition or the financial exposure associated with a particular route.

21

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

The comparison with the other growth measures is therefore central to the conclusion. EMEA leads the aggregate recent count view, while Figure 21 shows a different distribution of reported physical scale. Figure 28 supplies a separate view of reported design capacity where values are known. The grouping of systems into reporting cohorts shapes the regional profile without establishing annual operational delivery. It also gives developers a reason to examine route-level plans when interpreting a regional peak or trough.

Figure 21: Selected reported whole-system length (km) by report cohort year and region, 2022–2026.

Reported length places long-haul projects prominently in the 2022–2026 report cohorts. Transpacific records 30,417 km in 2022 and 47,414 km in 2025, with 7,000 km in 2023. The Americas record 344 km in 2023, 16,517 km in 2024 and 10,400 km in 2025. Indian Ocean entries reach 22,900 km in 2024. These values demonstrate why a modest number of projects can account for a large reported whole-system length in a regional series.

Submarine Telecoms Industry Report 2026/2027

EMEA records 19,140 km in the 2026 reporting cohort, exceeding its 17,744 km in 2023; the 2023 value covers four of five entries with known length. Its system-count peak is nine entries in 2022. AustralAsia's 2025 value of 26,667 km is substantially larger than its 2,500 km in 2024, while the corresponding counts are four and one. Length and count together reveal a changing project mix rather than a fixed quantity of cable per system. The implications of a higher report-cohort count depend on the routes behind it.

01 / GLOBAL OVERVIEW / 1.3 · 39


SUBTEL FORUM

1.3 SYSTEM GROWTH For manufacturers and marine contractors, these distinctions give the regional pipeline a physical dimension. A long route involves extensive cable quantities and a marine program; several short routes distribute work across more individual interfaces. Neither measure alone establishes installation duration, since route conditions and engineering differ. Both are nevertheless essential to understanding why the industrial significance of a small ocean-crossing cohort can exceed its apparent importance in a count ranking.

22

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

The chart also challenges the assumption that a single recent year represents normal demand. The Americas' large 2024 cohort, Indian Ocean concentration in the same year and Transpacific's two separate high-length cohorts describe different recorded project patterns. Industry planning should follow these distinct project groups. The resulting picture is a geographically varied record in which route scale and project timing require individual assessment rather than a uniform regional growth narrative.

Figure 22: Reported whole-system length (km) of planned systems by region for the 2027–2029 report cohorts.

The planned-system length mix for the 2027–2029 report cohorts places AustralAsia at 37,535 km and Transpacific at 25,180 km. Together they represent 62,715 km, or 59.9% of the 104,651 charted regional kilometers. The Americas follow at 18,147 km, Polar at 9,850 km, EMEA at 5,589 km, the Indian Ocean at 4,250 km and Transatlantic at 4,100 km. These are reported known whole-system lengths, with some planned entries lacking length data, not a complete worldwide total or scheduled annual construction. This is a geographically broad route program with a pronounced Asia-Pacific component. Submarine Telecoms Industry Report 2026/2027

The mix differs from the recent system-count ranking. EMEA's high number of recent entries does not translate into the largest future length category, and Polar's planned length is substantial relative to its small current inventory. These contrasts identify the kinds of physical routes associated with the next project group. They also show why existing regional size and planned development scale should be assessed separately: an established market and a smaller emerging route category can create different opportunities for new infrastructure.

01 / GLOBAL OVERVIEW / 1.3 · 40


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

1.3 SYSTEM GROWTH For the supply chain, the concentration of reported planned length in AustralAsia and Transpacific makes the relationship between long routes and regional resources especially relevant. Manufacturers need to translate route designs into production programs, while marine and landing partners need projectspecific sequences. The length profile establishes the reported physical scale of that task within the 2027–2029 planned report cohort. Figure 23 separately shows the recorded contract-inforce classifications of 64 systems in the 2027–2029 report cohort. That contract-status view includes systems beyond the planned group, so it represents a different population.

23

CONTINUED

The industry's forward opportunity is consequently more specific than a general increase in announced cable kilometers. It combines large ocean programs with smaller regional projects and different commercial milestones. Customers considering future route choice should also examine the landing and terrestrial connections behind each plan. The geographic reach shown here supplies a starting point for that assessment; actual network alternatives depend on how the individual projects are delivered and integrated.

Figure 23: System counts by contract-in-force status for the 2027–2029 report cohorts.

Submarine Telecoms Industry Report 2026/2027

01 / GLOBAL OVERVIEW / 1.3 · 41


SUBTEL FORUM

1.3 SYSTEM GROWTH

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

Within the 64-record contract-status view for the 2027–2029 report cohorts, 17 records show a contract in force (26.6%), 41 show not in force (64.1%), and six are unknown (9.4%). This view is not limited to planned systems and is distinct from the 59-system core planned population. The largest recorded group is therefore marked not in force, making commercial progress an important part of the delivery outlook. Unknown status is neither not in force nor evidence of failure. These records distinguish contractual status from report-cohort assignment; neither establishes operational service, physical delivery or an assigned project phase.

The chart makes recorded commercial status visible within the 2027–2029 report cohort. A contract-in-force classification identifies a recorded commitment; service status and physical delivery describe other aspects of a system. For a capacity buyer, those aspects answer different practical questions: which contractual relationships support the project, and when its services can be used. Reading the CIF composition in this way connects the commercial record with the customer's access requirements without assigning every system the same delivery stage. Actual service availability still needs project-level verification.

These categories create different commercial questions. For the contracted systems, attention can turn to the terms, engineering responsibilities and delivery milestones attached to the commitment. For the 41 not-in-force systems, the question is whether and how development advances toward a contract. The six unknown entries require status clarification rather than an assumption about their position. Keeping that distinction visible avoids treating incomplete information as either failure to progress or proof of a firm order.

For suppliers, the contracted group identifies recorded commercial relationships that can be investigated at project level. The not-in-force group presents a different set of questions about contractual progression, while unknown entries require clarification. For investors and customers, this composition helps focus attention on recorded commitments and the obligations behind a system. The conclusion is a varied commercial record across the 2027–2029 report-cohort window, with the practical significance of each category determined by the individual system's commitments and service position.

Submarine Telecoms Industry Report 2026/2027

01 / GLOBAL OVERVIEW / 1.3 · 42


SUBTEL FORUM

1.4

24

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

01 / GLOBAL OVERVIEW

ESTIMATED END OF SERVICE ANALYSIS

Figure 24: Reported whole-system length (km) by region for systems with estimated EOS in 2015–2026.

Systems with EOS estimates in the chart's 2015–2026 selection carry substantial reported known route length. The Americas record 134,204 km, followed by Transpacific at 109,599 km, Transatlantic at 100,332 km, AustralAsia at 73,398 km and EMEA at 54,832 km. This regional profile, led by the Americas, places lifecycle decisions alongside new construction as a significant part of the industry's infrastructure agenda. An EOS estimate identifies a planning milestone. It is not a verified withdrawal of every associated route in the estimated year. Owners evaluating a system approaching that milestone have to consider the services using it, the alternatives available to customers and the economics of continued support. A long route can make those choices consequential across multiple markets. The large kilometer categories therefore indicate the scale of infrastructure attached to lifecycle review, rather than a measured reduction in current connectivity.

Submarine Telecoms Industry Report 2026/2027

The relationship with the planned-system charts is strategically useful. New routes may expand technical capability and offer additional connection choices, while existing assets require decisions about upgrades, continued operation or replacement. These are complementary tasks. A new system's announced date does not by itself establish a migration path for services on an older one; landing access, terrestrial reach and commercial arrangements determine whether customers can move between them in practice. The 58th edition of the Submarine Cable Almanac provides system-level detail on routes, ownership, technical specifications, and lifecycle status. It was announced August 31, 2026, and published September 1. It complements the aggregate EOS profile with information needed to assess individual systems.

01 / GLOBAL OVERVIEW / 1.4 · 43


SUBTEL FORUM

1.5

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

01 / GLOBAL OVERVIEW

ASSET AGE AND RENEWAL PLANNING

The current operating and service-ready inventory contains older infrastructure alongside the recent construction cycle. Of 523 systems in the October 25 snapshot, 499 have a selected reported RFS year. Within that dated inventory, 168 report RFS in 2006 or earlier, representing 33.7%. A further 180 report years from 2007 through 2016, while 151 belong to the 2017–2026 cohort. The 24 systems without a selected RFS year remain outside the age comparison. This distribution makes renewal planning relevant to a broad part of the recorded network, alongside investment in new systems.

25

The older cohort also has a material physical presence. Its 156 systems with eligible whole-system length values account for 522,562 reported km, or 33.2% of the 1,575,319 reported km across the 495 records with eligible length values in the operating and service-ready inventory. That share is close to the cohort's 33.7% proportion of dated system numbers, or 168 of 499 systems. Older assets form a considerable part of the recorded wet infrastructure that owners must continue to operate, maintain and evaluate. Figure 25 shows the inventory by reported RFS year, including the systems whose year remains unknown.

Figure 25: Operating and service-ready cable system counts by original reported RFS cohort, including systems with unknown RFS years.

Submarine Telecoms Industry Report 2026/2027

01 / GLOBAL OVERVIEW / 1.5 · 44


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

1.5 ASSET AGE AND RENEWAL PLANNING An age cohort groups systems by their reported RFS year; it does not establish their remaining useful life. Systems of a similar age may differ in physical condition, optical architecture, terminal upgrades, route purpose and continuing demand. Some older links retain a distinctive landing combination or serve markets that a larger new ocean system does not reach. The business decision is consequently broader than replacing an old cable with a newer cable of greater headline capacity. Owners need to determine which connectivity functions remain valuable and how those functions can be retained through upgrades, continued operation or new infrastructure. The geographic distribution helps focus that assessment. EMEA contains 95 systems with reported original RFS years of 2006 or earlier, 49.7% of its 191 dated entries in the operating and service-ready inventory. Transatlantic has eight such systems among 18 dated entries, while the Americas have 30 among 85. These are different starting positions for renewal planning. An older regional link and an older ocean crossing may both require long-term asset decisions, but the alternatives available to their customers depend on the actual markets and landing connections served. The cross-regional comparison later in this report places those inventories beside the recorded forward pipeline.

Submarine Telecoms Industry Report 2026/2027

CONTINUED

A cable can continue operating, receive terminal upgrades, retire, or be recovered; each is a distinct lifecycle option. A planned end-of-service date alone does not establish retirement. The age distribution should guide investigation of operating assets and continuity requirements; it cannot identify a retirement schedule or justify moving a system into an out-of-service category without evidence of that change. For suppliers and infrastructure investors, the renewal opportunity therefore includes several forms of work. New wet plant can provide fresh capacity and route options; terminal and landing development can extend the commercial utility of an existing system. Maintenance and continuity arrangements remain relevant while either path is pursued. The database establishes the scale and location of the older inventory, while project-level engineering and commercial evidence determine the appropriate intervention. This gives the industry a more useful basis for asset planning than treating all systems beyond a single age threshold as an immediate replacement market.

01 / GLOBAL OVERVIEW / 1.5 · 45


Building the Connections

That Build the Future

Digital infrastructure is more than technology. It’s the foundation for economic growth, resilience, and innovation. APTelecom delivers strategic telecom consulting that combines technical expertise with commercial insight to help clients build future-ready networks across the globe.

Public Sector Solutions | Commercial | Infrastructure Solutions | Intelligence & Analysis Delivery | Governance & Finance | Monetization | Capacity Building | Security

aptelecom.com


SUBTEL FORUM

1.6

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

01 / GLOBAL OVERVIEW

COMMERCIAL AND SURVEY MILESTONES IN THE FORWARD PIPELINE

The planned cable program becomes more informative when commercial and survey records are read together. The October 25 snapshot contains 65 systems classified as Planned in the 2027–2030 reporting cohorts. Fifteen record a contract in force and three record a completed survey; two record both, or 3.1% of the cohort. The intersection is smaller than either recorded milestone group, showing why the two flags should be examined separately rather than treated as a single progress ranking.

26

Thirteen systems combine a contract-in-force record with a survey flag of no, while one records a completed survey with the CIF flag set to no. Forty-three have both fields recorded as no, and six have at least one unknown. Figure 26 retains every combination, making the distinct recorded project positions visible without forcing a single progress ranking.

Figure 26: Planned-system counts by recorded contract-in-force and survey status, 2027–2030 report cohorts (65 systems).

Eligible whole-system costs are available for 45 of the 65 systems and total USD 21.365725 billion. One of the two systems with both milestones recorded has a known cost of USD 82.5 million, or 0.4% of that known-cost total. Figure 27 therefore links the milestone intersection to a smaller share of reported project value than of system count, while retaining costs whose payments and commitments can span several years rather than treating them as annual investment spending.

Submarine Telecoms Industry Report 2026/2027

01 / GLOBAL OVERVIEW / 1.6 · 48


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

1.6 COMMERCIAL AND SURVEY MILESTONES IN THE FORWARD PIPELINE

27

FIGURE 27

Figure 27: Known reported whole-project cost (USD billions) of planned systems by recorded contract-in-force and survey combination, report cohorts 2027–2030.

For capacity buyers, this distinction improves the questions asked of a future route. A proposed RFS year places the project on a calendar, while a contract and a completed survey provide evidence about different commercial and engineering workstreams. Neither confirms manufacturing completion, installation, commissioning or customer access. Evaluating the two together encourages buyers to examine the obligations and route information behind a stated delivery objective. The appropriate next question is which remaining milestones are supported by project evidence, rather than whether one database flag can guarantee a launch date.

The same distinction matters to manufacturers and marine contractors assessing future work. A contracted route can have engineering tasks still to complete, while survey findings can alter an earlier route concept. The proposed Tasman Ring agreement provides a concrete example: the announcement assigns supply to ASN and survey and installation to OMS, while leaving RFS unestablished in that announcement. This case shows why named responsibilities matter: a contract can be meaningful without making the entire delivery sequence complete. It is contextual evidence, not a substitute for the selected facts of this cohort. The practical industry finding is a varied forward program whose recorded commitments and engineering observations do not advance in uniform combinations. A single announced-system total conceals that variation, and a contract-only total captures only one part of it. The combined view supports more specific discussion of procurement, engineering and customer planning while preserving unknown fields. It also supplies a repeatable basis for future snapshot comparisons: changes can be measured at the same system grain without converting today's record into an unsupported probability of completion.

Submarine Telecoms Industry Report 2026/2027

01 / GLOBAL OVERVIEW / 1.6 · 49


SUBTEL FORUM

CHAPTER 02

CAPACITY TECHNICAL ENVELOPE / KNOWN-VALUE COVERAGE

Capacity describes different things

Design potential Design capacity describes potential;

Equipped / lit equipped or “lit” capacity has transmission equipment ready;

INTERPRETATION

Source-defined concepts only; design, equipped/lit, sold/contracted and traffic are not interchangeable measures.

Design capacity expresses a system's technical transmission envelope. It helps explain why one new high-capacity route may have a large industry impact even when system counts change little.

50

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

2017–2026 reported RFS · 90/151 exact

Americas · planned 2027 cohort

60

1,410

Tbps median design capacity

design Tbps

Current operating/service-ready snapshot; positive exact known whole-system design values for 90 of 151 systems. Original RFS cohort, not a report cohort or traffic measure.

Known comparable reported whole-system design capacity attributed to the Americas in the planned 2027 report cohort; unknown or absent groups are not zero.

No conversion rate implied

Sold / contracted sold or contracted capacity records a customer commitment.

Traffic Traffic is the data carried over time and answers a different question.

FROM THE CHAPTER

Coverage remains consequential to the interpretation. Positive exact design values are available for 92 of 132 systems in the 1997–2006 group, 98 of 180 in 2007–2016 and 90 of 151 in 2017–2026. The corresponding coverage rates are 69.7%, 54.4% and 59.6%. The comparison describes those known-value subsets. It does not assign a zero to the remaining systems or imply that the known systems represent every asset in their cohort.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

51


SUBTEL FORUM

2.1

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

02 / CAPACITY

GLOBAL CAPACITY

Design capacity expresses a system's technical transmission envelope. It helps explain why one new high-capacity route may have a large industry impact even when system counts change little. Figures 28 and 29 show the capacity entries in their defined regional report cohorts. Comparing them with the count and length views reveals changes in the character of the build cycle. The commercial questions then concern activation, customer commitments and network integration: the designed envelope establishes what the infrastructure is intended to support, while equipment deployment and service development determine how that potential becomes usable connectivity.

28

Figure 28: Known comparable reported whole-system design capacity (Tbps) by report cohort year and region, 2022–2026.

The 2022–2026 design-capacity series shows large known reported values concentrated in a few regional reporting cohorts. Transpacific moves from 132 design Tbps in 2022 to 240 in 2023 and 754 in 2025. The Americas record 330 in 2024 and 432 in 2025, while AustralAsia reaches 466.2 in 2025. Transatlantic contributes 352 in 2023. The technical scale of these entries is substantial even where the corresponding system count is small.

Submarine Telecoms Industry Report 2026/2027

The comparison with length adds another dimension. A system's physical extent does not specify how much design capacity it carries, just as capacity does not specify the number of markets connected. Recent high-capacity projects can enlarge a route's technical envelope without a proportional change in the count of routes. For buyers, this makes the architecture and commercial offering of an individual system important alongside the presence of another cable on the map.

02 / CAPACITY / 2.1 · 52


SUBTEL FORUM

2.1 GLOBAL CAPACITY Existing assets can also develop without a new system entry. The announced Ciena terminal upgrade for MONET and SACS includes planned 800-Gbps client-interface support on MONET. The case illustrates a service-development mechanism on existing infrastructure: improved terminal capability can change the offering made to customers even when the wet route remains in place. Interface speed and whole-system design capacity describe different parts of that proposition.

29

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

The implication is that industry growth includes both new wet infrastructure and the development of capabilities on existing routes. The chart measures its specified design-capacity entries; the upgrade case explains why commercial network evolution is broader than the cable-count series. Owners assessing competitive position consequently need to consider which capacity can be offered, at which endpoints and through which network connections, rather than assuming that a design figure alone describes today's services or traffic.

Figure 29: Known comparable reported whole-system design capacity (Tbps) by region for the 2027–2029 report cohorts.

The planned capacity view for the 2027–2029 reporting cohorts includes 588 design Tbps in AustralAsia in 2027 and 570 in 2028. The Americas record 1,410 in 2027, while Transpacific records 240 in 2027. These entries show substantial planned technical scale across several regional reporting cohorts.

Submarine Telecoms Industry Report 2026/2027

For the industry, these regional planning groups raise projectspecific questions about future commissioning. Owners and suppliers face choices about architectures, terminal equipment and the progression from design to an available service. Customers face corresponding choices about routes and landing access. A large design envelope can support future development, but its usefulness depends on the connected network and the commercial rights through which customers can obtain it.

02 / CAPACITY / 2.1 · 53


SUBTEL FORUM

2.1 GLOBAL CAPACITY The regional profile also has distinct shapes. AustralAsia's known entries stay within a comparatively narrow 570–588 designTbps band in 2027 and 2028; its 2029 capacity is unknown. The Americas have a large entry in 2027, while Transatlantic capacity is unknown for 2027 and 2029. The recorded pattern varies across the window: some categories have repeated substantial cohorts, while others concentrate their known capacity in particular reporting years. Buyers and suppliers need projectspecific delivery timing as well as their headline capacity when considering the next generation of network infrastructure. The planned 2029 Petal project assigns financing and operation to Meta, system design and construction to NEC, and two-core fiber supply to Sumitomo Electric. Its 48 core-pairs are distinct from 48 physical fiber pairs. The announcement illustrates how optical architecture and delivery responsibilities can develop together in the next generation of ocean routes.

30

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

The May issue's Global Capacity coverage examines spatial division multiplexing in power-constrained cables and network testing, adding technical context to the capacity figures. The combined conclusion from the reviewed capacity figures is that technical ambition and delivery maturity should be assessed together: the forward envelope is large, while activation, integration, and customer access determine how that potential becomes an operating network.

Design Capacity Across Service Cohorts System age and reported design capacity describe different aspects of operating and service-ready systems. Comparing both measures for the same systems reveals marked differences across reported RFS-year cohorts. Among operating or serviceready systems with positive, exact whole-system design values, median capacity is 0.49 Tbps for the 1997–2006 cohort, 4.25 Tbps for 2007–2016 and 60 Tbps for 2017–2026. The oldest cohort, with RFS years of 1996 or earlier, has a median of 0.0025 Tbps. Figure 30 shows these medians alongside the number of systems and the coverage of the design-capacity field in each group.

Figure 30: Median known reported whole-system design capacity (Tbps) across original reported RFS cohorts of operating and service-ready systems.

Submarine Telecoms Industry Report 2026/2027

02 / CAPACITY / 2.1 · 54


SUBTEL FORUM

2.1 GLOBAL CAPACITY The median for the 2017–2026 group is approximately 122 times the median for 1997–2006. That is a comparison between different groups in the operating and service-ready inventory in one current snapshot. It is not the growth rate of a representative cable, and it does not measure the historical capacity available when those systems first entered service. Nevertheless, the scale of the difference helps explain why a newer route can have substantial technical significance without creating a proportionate increase in system numbers. The count of cables and the transmission envelope of those cables are different measures of infrastructure development. Coverage remains consequential to the interpretation. Positive exact design values are available for 92 of 132 systems in the 1997–2006 group, 98 of 180 in 2007–2016 and 90 of 151 in 2017–2026. The corresponding coverage rates are 69.7%, 54.4% and 59.6%. The comparison describes those knownvalue subsets. It does not assign a zero to the remaining systems or imply that the known systems represent every asset in their cohort. Publishing the medians with their coverage makes the technical contrast useful without treating incomplete disclosure as a complete network census.

Submarine Telecoms Industry Report 2026/2027

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

The use of medians also changes the emphasis from a few very large, reported values to the center of each known-value distribution. A sum of design capacity can be strongly influenced by an unusually high-capacity regional system, while a median asks what sits halfway through the ordered set. Neither describes actual traffic. The median provides a complementary perspective on the underlying project mix, particularly when the industry includes short regional links, long ocean crossings and systems with very different fiber and optical designs. Capacity analysis should distinguish design capacity, equipped capacity, and traffic carried, while terminal development still operates within wet-plant constraints. These distinctions remain essential when comparing older systems with newer assets. An older RFS date does not mean that currently equipped terminal technology is equally old. Conversely, a large, reported design envelope on a new system does not establish immediate commercial access to that entire envelope. Capacity procurement still requires evidence about equipment, available products and the end-to-end network connection. The combined age and capacity view therefore sharpens the renewal discussion. The older inventory remains substantial in physical extent, while the known design profile of more recent cohorts is markedly larger. Owners can use that contrast to investigate where a new route changes the economics or technical options of a market. They must also consider what the older asset uniquely connects and how its existing customers are served. The defensible conclusion is a pronounced difference in reported technical scale across service cohorts, with asset-level decisions determined by architecture, operating evidence and commercial requirements.

02 / CAPACITY / 2.1 · 55


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

2.2 LIT CAPACITY

FIGURE 31

2.2.1 Atlantic and Pacific activation expands Capacity reported by U.S.-international cable holders shows a particularly strong shift in the Atlantic. Between the end of 2022 and the end of 2024, activated capacity more than doubled, from 338.2 to 696.6 Tbps, while net holdings expanded from 1,015.4 to 1,218.0 Tbps. Activation was catching up with the reported capacity base much faster than holdings were growing. The Pacific advanced more gradually. Reported holdings increased from 633.7 to 652.9 Tbps over the same period, while activation rose from 283.5 to 335.8 Tbps. The activated share of holdings moved from 44.7% to 51.4%, compared with 33.3% to 57.2% in the Atlantic. These are useful indicators of readiness within the U.S. reporting footprint. FCC activation includes internal use, restoration and immediately usable spare capacity as well as customer services.

The scenarios extend this evidence through 2031 while keeping activation within the matching holdings base. December 2026 is a modeled bridge from the last observations: the base case reaches about 1,461 Tbps held and 1,142 Tbps activated in the Atlantic footprint, and 673 Tbps held and 391 Tbps activated in the Pacific footprint. Those bridge values are estimates, rather than new FCC measurements. For 2031, the constructed U.S.-holder cases put Atlantic activation at roughly 1,950-2,589 Tbps and Pacific activation at 447-599 Tbps. The respective base cases are 2,249 and 529 Tbps. Continued rapid gains in the Atlantic activation share bring its cases close to the holdings ceiling. That near-saturation is conditional on the assumed continuation; it does not establish future customer demand or paid occupancy. The Pacific paths retain more headroom and a wider spread in activation shares.

U.S.-international capacity holders Atlantic reporting footprint

Pacific reporting footprint

Net capacity held Holder activated

2,500

Net capacity held Holder activated

700 600

2,000

1,500

Tbps

Tbps

500 400 300

1,000

200 500

0

100

2022

2024

2026

2028

2031

0

2022

2024

2026

2028

2031

Solid: reported 2022-2024. Dashed: base sensitivity. Shading: constructed low/high paths, not confidence intervals. Grey bridge region is modeled; dotted horizontal lines retain the latest observation as a no-change reference.

31

Figure 31: U.S. Holder Activated Capacity and Net Capacity Held, 2022-2031 (Tbps) U.S.-international holder activated capacity and net capacity held. Solid lines are reported 2022-2024 observations; dashed lines and shading show the base and constructed low/high sensitivities through 2031, including modeled December 2026 bridges. Ranges are not confidence intervals. Dotted horizontal references retain the latest observations. Net holdings are not whole-corridor design capacity. Source: FCC capacity returns; SubTel Forum model.

Submarine Telecoms Industry Report 2026/2027

02 / CAPACITY / 2.2.1 · 56


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

2.2 LIT CAPACITY

FIGURE 32

2.2.2 Asian connections grow at different speeds Hong Kong's external-circuit series adds a valuable Asian connection indicator. Between June 2024 and June 2026, equipped cable capacity rose from 267.7 to 374.1 Tbps, while customer-activated capacity increased from 227.4 to 307.6 Tbps. Equipment readiness expanded faster than customer activation, so the activated share eased from 85.0% to 82.2% even as the absolute customer figure grew substantially. That combination is useful for understanding a growing communications hub. A lower activation share can reflect more equipment becoming available ahead of take-up. It does not, by itself, show a shrinking market. The OFCA series covers external cable circuits, including both submarine and overland facilities, and measures customer circuits rather than packet throughput.

The destination records show how uneven that growth can be. Hong Kong-Singapore customer activation increased from 38.2 Tbps in December 2022 to 73.5 Tbps in June 2026. Japan rose from 40.9 to 62.9 Tbps over those dates. Taiwan increased from 11.1 to 14.6 Tbps. The Philippines was comparatively steady at 15.3 and 15.7 Tbps, with an intervening December 2024 reading of 16.3 Tbps. These logical destination connections provide detail that an aggregate regional curve would conceal. The modeled December 2026 base case reaches 406.7 Tbps equipped and 331.5 Tbps customer activated. This half-year bridge from June assumes no seasonality. By 2031, the three constructed cases span about 811-1,087 Tbps equipped and 548-842 Tbps customer activated, with base values of 938.7 and 683.7 Tbps. The paths illustrate how customer activation can continue expanding while new equipment creates additional headroom. They complement the Atlantic and Pacific indicators without turning Hong Kong's mixed cable footprint into a complete Intra-Asia inventory.

Hong Kong external cable connections Equipped and customer activated

Reported destination connections

Equipped cable Customer activated

1,000

Singapore

800

Tbps

Japan 600 Philippines

400 200 0

Dec 2022 Dec 2024 Jun 2026

Taiwan

Jun 2024

Jun 2026

2028

2031

0

10

20

30

40

50

60

70

Customer-activated circuits (Tbps) Cable includes submarine and overland. Destinations are logical customer connections, not complete physical routes. Left: June observations, modeled December 2026 bridge and analyst scenarios. Right: reported observations only.

32

Figure 32: Hong Kong External Cable Circuits and Selected Destination Connections (Tbps) Hong Kong external cable circuits, including submarine and overland. Left: equipped and customer-activated June observations, modeled December 2026 bridge and 2027-2031 sensitivities; shading marks constructed low/high cases, not confidence intervals. Right: observed destination connections in December 2022, December 2024 and June 2026. Destinations are logical connections, not complete physical routes. Sources: OFCA aggregate and destination tables; SubTel Forum model.

Submarine Telecoms Industry Report 2026/2027

02 / CAPACITY / 2.2.2 · 57


SUBTEL FORUM

2.2

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

02 / CAPACITY

ADDITIONAL CONTEXT 2.2.3 Additional context: Kenya and Bangladesh

Capacity has to pass through several stages before it becomes a commercial result. Design capacity describes potential; equipped or “lit” capacity has transmission equipment ready; sold or contracted capacity records a customer commitment. Traffic is the data carried over time and answers a different question. Here, commercial utilization means capacity reported sold or contracted, rather than measured traffic. A sale shows a business relationship, not cash collected or a profitable cable.

33

Figure 33: Kenya Undersea Capacity Sold and Reported Available Capacity, March–June 2026 (Gbps)

Kenya’s Q4 FY2025/26 sector report provides a rare national measure of undersea capacity sold alongside available Lit/Equip bandwidth at the gateways. In June 2026, providers reported 19.432 Tbps sold—16.078 Tbps domestically and 3.354 Tbps abroad—against 28.950 Tbps available. The same report revises March to 18.678 Tbps sold of 29.050 Tbps available. On that consistent basis, the share sold rose from 64.3% to 67.1%.

Submarine Telecoms Industry Report 2026/2027

The change reflects more than a smaller denominator. Domestic sold capacity climbed 753 Gbps over those three months, export sales stayed at 3.354 Tbps, and reported availability fell by 100 Gbps. The pattern points to stronger reported customer commitments in the domestic market while the export position held steady. Because availability also declined slightly, the 2.8-point increase combines a rising numerator with a smaller denominator. The regulator’s available measure is gatewayscoped, not each cable’s design capacity; the difference between available and sold is an arithmetic residual, not a measure of dark fiber or spare wet-plant capacity. These returns also do not show traffic, cash collection, or the economics of any individual cable.

02 / CAPACITY / 2.2.3 · 58


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

2.2.3 ADDITIONAL CONTEXT

34

FIGURE 34

Figure 34: BSCPLC Capacity-Sales and Annual Service-Revenue Growth, FY2024–25 (%)

BSCPLC’s 2024–25 annual report pairs endpoint capacity sales with annual service revenue for two products. From FY2023–24 to FY2024–25, IPLC capacity sold at June 30 grew 45.5%, while annual IPLC revenue rose 3.0%. Local IP transit capacity sold rose 81.9%, while its revenue fell 22.4%. Figure 34 compares the reported changes, but the measures have different time bases: endpoint Gbps is a June 30 snapshot, while revenue covers the full fiscal year and is reported in million BDT.

The Federal Communications Commission’s capacity-holder return offers dated physical context, not a commercial benchmark. At December 31, 2024, U.S.-international cable holders reported 1,253.127 Tbps activated out of 6,543.407 Tbps net held. The FCC filing manual defines activated capacity broadly: it includes customer service, internal use, restoration reserve, and immediately usable spare. It is not sold capacity or measured traffic, and its reporting scope cannot be combined with Kenya’s gateway figures to make a global utilization rate.

The contrast shows why more sold capacity does not translate mechanically into higher annual revenue. Product mix, contract terms, pricing, and revenue timing can affect the relationship, but these aggregate figures do not identify which factor drove either gap. At the company level, total revenue fell 0.6% and operating profit 3.1%, while net profit rose 12.5%; these results cover more than submarine services and do not establish cablelevel profitability. Capacity sold, recognized revenue, and cash collection remain separate checkpoints.

Together, the two commercial examples show different parts of the path from infrastructure to returns: how much gateway availability has found a buyer, and how service-sales growth can translate unevenly into revenue. For operators and investors, the next questions concern contract duration and pricing, collection, and the capital, operating, and repair costs required to deliver service over time. Commercial utilization is an important signal of demand, but capacity sold alone does not establish traffic or profitability.

Submarine Telecoms Industry Report 2026/2027

02 / CAPACITY / 2.2.3 · 59


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

2.2 LIT CAPACITY

FIGURE 35

2.2.4 Customer commitments and the next capacity wave Keppel's Bifrost portfolio supplies a direct commercial take-up indicator. Customer commitments covered two of its five pairs in December 2025, four by June 17, 2026, and all five by July 13. That progression shows a defined ownership portfolio finding customers during the reported period. It is separate from the whole system's technical capacity and from the equipment subsequently activated to deliver services. New capacity can become useful before every planned connection is ready. Meta's October 2025 update described Echo's GuamCalifornia capacity and Apricot's northern connections ahead of southern extensions. Those phased build-outs give customers additional options on particular paths. Equipment investment and customer commitments can therefore advance on different schedules across the same broader network plan.

Further supply is already being planned for the latter part of the decade. Petal is an announced France-U.S. system with a 1,000 Tbps design and a 2029 target. EXA Meridian has an announced design above 500 Tbps between New Jersey and the United Kingdom, targeting the fourth quarter of 2029. Candle's announced multi-country Intra-Asia design is 570 Tbps, with a 2028 target. These are prospective engineering references, not additions to the holder or equipped-circuit scenario denominators. The commercial and technical evidence therefore puts the outlook in practical terms. New projects can broaden the design envelope, while commitments indicate where customers are securing access. Equipment choices and staged service dates determine how that potential becomes usable supply. For the major markets, the useful question is how reported readiness, customer commitments and new capacity plans develop together within clearly defined footprints.

Capacity and customer commitments Keppel's Bifrost portfolio 5/5

Committed fiber pairs

5

4/5

4 3 2

2/5

1 0

Dec 2025

Jun 2026

Technical references: separate from equipping System

Tbps

Scope and date

Bifrost

>260 / >240

Whole-system lower bounds Oct 2025 / Jul 2026

Echo

260

Guam-California segment Oct 2025

Apricot

290

Later plan; partial northern service Oct 2025

ADC

>160

System design at completion Dec 2024

Jul 2026

Left: dated commitments within Keppel's five-pair portfolio, not whole-system lighting or paid-Tbps utilization. Right: published technical claims retain their bounds, segments and vintages; no equipped total or additive corridor sum.

35

Figure 35: Keppel's Bifrost Pair Commitments and Technical Capacity References Dated customer commitments within Keppel's five-pair Bifrost portfolio, alongside separate technical design references for Bifrost, Echo, Apricot and ADC. The table retains each reference's system or segment scope and publication vintage. The bars do not measure whole-system lighting or paid-Tbps utilization. Sources: Keppel annual report and company releases; Meta and NEC design announcements.

Scenario method (Figures 31-32): Each reported-stock and activation-odds driver uses its own minimum, two-year geometric and maximum observed annual rates. Their constructed combinations are analyst sensitivities, not confidence intervals or paid-demand forecasts. Activation is derived jointly within the matching stock. December 2026 values are modeled bridges; Hong Kong interpolation assumes no seasonality. Source observations remain unchanged. Evidence cutoff: October 29, 2026.

Submarine Telecoms Industry Report 2026/2027

02 / CAPACITY / 2.2.4 · 60


SUBTEL FORUM

2.3

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

02 / CAPACITY

CAPACITY PRICING: INSIGHTS FROM SUBTEL FORUM MAGAZINE

The 2026 Capacity Connection articles describe a market in which the value of submarine capacity depends increasingly on who controls supply, where routes connect and how reliably services can be maintained. Across the January, March, May and July installments, growing technical capability sits alongside concentrated purchasing power and greater attention to route diversity. For capacity buyers, these developments broaden the commercial assessment beyond bandwidth volume to include access, delivery timing and continuity. The articles provide a qualitative account of these influences on capacity economics, rather than a comparable series of wholesale rates. Their common finding is that additional infrastructure creates commercial value through the services and network choices it enables (Gupta & Manock, 2026; Maguire, 2026a, 2026b, 2026c).

Market Concentration January's discussion places hyperscaler investment at the center of the changing market. John Maguire describes how large technology companies have moved from major capacity customers to direct sponsors and owners of submarine systems. Their investment priorities influence route selection, technical specifications and delivery schedules. This concentration also changes the relationship between new infrastructure and competitive supply. A privately funded cable may provide substantial capability for its owner, while the amount offered to other customers depends on the owner's commercial strategy. Buyers therefore need to understand the availability and terms of access behind a system's headline capacity (Maguire, 2026c). The same article identifies continuing opportunities in Latin America and Africa, where connectivity needs can support new systems and upgrades. These opportunities coexist with the concentration of investment around major cloud and data center networks. The commercial question is how new routes serve the requirements of the markets they reach. Landing access, terrestrial connections and an appropriate wholesale offering determine whether investment becomes a practical option for local operators. The contrast between large private backbones and underserved markets consequently concerns access to usable services as well as the distribution of cable infrastructure (Maguire, 2026c).

Submarine Telecoms Industry Report 2026/2027

Supply Growth Higher fiber counts and space division multiplexing expand the transmission capability supported by new wet infrastructure. January also discusses open-cable architectures, which allow greater flexibility in terminal equipment and reduce dependence on a single supplier. These developments give owners more scope to develop services over the life of an asset. Their effect on capacity economics depends on equipment deployment and demand: a larger design envelope creates room for supply growth, while customer commitments and utilization influence how effectively the investment can support a commercial offering (Maguire, 2026c). July's examination of Barat-Timur Indonesia-1, or BTI-1, illustrates this relationship. At publication, the system was under development with 24 planned fiber pairs, including 16 for express connections between Batam and Manado and eight serving other major centers. The architecture combines highvolume transport between international gateways with access to domestic demand. Its planned fiber count describes technical capability rather than lit capacity or available wholesale inventory. The potential economic advantage would arise through delivery of the system and development of services that customers could obtain at the required endpoints (Maguire, 2026a).

Financing and Contracts The January article describes several approaches to financing and control, including hyperscaler-led systems, neutral wholesale infrastructure and hybrid arrangements involving carriers, technology companies and governments. These approaches create different relationships between the sponsor's own network requirements and the provision of capacity to others. Concentrated sponsorship can accelerate decisions and financing, while tying a project's direction more closely to the investment priorities of a small group of firms. For customers, ownership structure helps explain whether third-party access is central to the business model and how an offering may develop over time (Maguire, 2026c).

02 / CAPACITY / 2.3 · 62


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

2.3 CAPACITY PRICING: INSIGHTS FROM SUBTEL FORUM MAGAZINE March extends the commercial analysis into the operating life of a cable. Regional maintenance agreements provide a framework for sharing access to specialized repair resources across large geographic areas. Protection, vessel mobilization and restoration are continuing obligations with financial consequences for owners and customers. A capacity agreement therefore sits within a wider operating arrangement: the usefulness of the service depends on the infrastructure and support needed to sustain it. Procurement assessments need to connect the capacity commitment with the owner's maintenance arrangements and the practical ability to restore service (Maguire, 2026b).

Regional Pricing May's Capacity Connection article, by Anup Gupta and John Manock, examines the commercial significance of geographically independent routes. Their discussion of the Red Sea and South China Sea emphasizes that different cables can retain exposure to the same corridor or operating constraints. They argue for diversity across seas, landing environments and geopolitical exposures. For buyers, this makes the relationship between a proposed route and the existing network a material part of its value. An additional path provides stronger continuity when the disruption affecting one connection is less likely to affect the alternative (Gupta & Manock, 2026). The authors also recognize the difficulties of developing less established routes. Supporting ecosystems may be less mature, traffic assumptions less familiar and commercial models slower to validate. Route diversification therefore involves an investment judgment about future demand and continuity as well as distance and latency. July provides a specific regional example in Indonesia. Maguire positions BTI-1 within a west-to-east corridor already served by Indonesia Global Gateway, identifying higher fiber count, optical flexibility and an open wholesale proposition as potential differentiators. Its significance lies in the additional transport options it could provide if successfully delivered (Gupta & Manock, 2026; Maguire, 2026a).

CONTINUED

Policy and Competition January and March connect the cost of resilience with the financial exposure created by interruption. Diverse routing, protected landing facilities and access to repair resources require expenditure, while outages can generate service penalties and wider business losses. Maguire's January observation that customers increasingly value resilience draws partly on his commercial experience. It supports considering diversity and restoration capability as attributes of a capacity offer. The articles do not establish a measured price premium, but they explain why continuity can influence purchasing decisions alongside the quoted charge for bandwidth (Maguire, 2026b, 2026c). Repair access is an important part of that assessment. March describes how vessel availability, weather and administrative approvals can affect restoration, even after a fault has been identified. July's Indonesian discussion brings these issues into project planning through its account of designated corridors, gateways and installation and repair requirements. As presented in those articles, policy shapes both development conditions and the practical ability to maintain infrastructure. Clearer approval processes and coordination can support planning, while the customer's service requirements still depend on the arrangements applicable to the individual route (Maguire, 2026a, 2026b).

Outlook Taken together, the four installments suggest that capacity procurement will require closer attention to the relationship between technical scale and dependable access. Hyperscaler investment supports substantial new infrastructure, but ownership influences the supply available to other buyers. Open architectures and higher fiber counts expand future options, while the route and its connected network determine where those options can become useful services. The May discussion adds a further consideration: network value depends on whether alternative paths provide meaningful independence from existing exposures (Gupta & Manock, 2026; Maguire, 2026a, 2026c).

John Maguire is Director, EMEA at APTelecom. Based in Dublin, he has 30 years of telecommunications experience across global markets, working with OEMs and service providers in fixed and mobile networks. His roles have spanned general management, sales, operations and business development.

Submarine Telecoms Industry Report 2026/2027

02 / CAPACITY / 2.3 · 63


SUBTEL FORUM

CHAPTER 03

OWNERSHIP FINANCING ANALYSIS CUMULATIVE INVENTORY / FINANCING CATEGORIES

Recorded financing mix at 2026 Self-finance Debt / equity MDB

INTERPRETATION

Three financing categories total 463 in this reviewed inventory; bars represent category counts, not amounts raised or annual expenditure.

Financing describes more than the source of a project's initial capital. It also relates to the parties taking construction exposure, the customers committing to capacity and the obligations continuing after service begins.

64

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

cumulative 2026 point

cumulative 2026 point

372

64

self-financed systems

debt/equity-financed systems

Charted cumulative financing category, not a global systems census.

Within the same cumulative chart total of 463 systems.

cumulative charted category counts

372 64 27

FROM THE CHAPTER

The combined category total rises from 298 to 463. Within that total, self-finance moves from about 91.3% at the 2015 point to 80.3% at 2026; debt and equity finance moves from 4.7% to 13.8%.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

65


SUBTEL FORUM

3.1

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS

HISTORIC FINANCING PERSPECTIVE

Financing describes more than the source of a project's initial capital. It also relates to the parties taking construction exposure, the customers committing to capacity and the obligations continuing after service begins. The reviewed charts establish the recorded financing mix and its physical and financial scale. Their contrasts show the durable role of self-finance, the expansion of debt and equity categories in the cumulative inventory, and the distinct regional profiles associated with each channel. Selected STF reporting then illustrates business mechanisms that a financing label alone cannot capture.

36

Figure 36: Cumulative system counts by financing type across report cohort years 2015–2026, including preperiod history.

Self-finance remains the largest category in the cumulative inventory, increasing from 272 systems at the 2015 point to 372 at 2026. Debt and equity finance rises from 14 to 64, while multilateral development bank finance moves from 12 to 27. Their increases across the displayed interval are 100, 50 and 15 systems, respectively. The self-financed base is therefore extensive, even as the other channels become more prominent among the later report cohorts in this current inventory.

Submarine Telecoms Industry Report 2026/2027

The combined category total rises from 298 to 463. Within that total, self-finance moves from about 91.3% at the 2015 point to 80.3% at 2026; debt and equity finance moves from 4.7% to 13.8%. This is an internal comparison of the reviewed inventory organized by report cohort year. It demonstrates a broader recorded financing mix in later cohorts, while self-finance remains the leading category at every displayed point.

03 / OWNERSHIP FINANCING ANALYSIS / 3.1 · 66


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

3.1 HISTORIC FINANCING PERSPECTIVE The cohort steps show how the mix develops. Debt and equity finance adds ten systems between the 2017 and 2018 points, five in 2019 and seven in 2020. It adds only one between 2023 and 2024 before adding three in 2025 and one in the 2026 report cohort. Self-finance adds three in 2024, thirteen in 2025 and seven in the 2026 report cohort. These contrasting steps reveal distinct financing groups in the recorded project history. The latest cohort strengthens the self-financed base, while the longer interval also establishes the growing presence of outside capital.

37

CONTINUED

For the industry, the cumulative result supports a plural investment landscape. Sponsor groups continue to finance many systems, while financial institutions and outside investors occupy a larger role in the later recorded cohorts. The relevant commercial questions concern which parties commit funds and capacity, how construction exposure is distributed, and what operating responsibilities accompany ownership. Figure 37 addresses financial scale in a separate manufactured cost cohort, helping distinguish the prevalence of a financing category from the project value associated with it.

Figure 37: Known reported whole-project cost (USD) by financing type for report cohorts 2015–2026.

Submarine Telecoms Industry Report 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS / 3.1 · 67


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

3.1 HISTORIC FINANCING PERSPECTIVE The financing selection for the 2015–2026 reporting cohorts records USD 38.6235 billion in known whole-system cost across the three displayed categories. Self-finance accounts for USD 24.3785 billion, or 63.1%; debt and equity finance contributes USD 6.900 billion, or 17.9%; multilateral development bank finance contributes USD 7.345 billion, or 19.0%. Reported costs are available for 74 of 83 self-financed entries, 23 of 25 debt-andequity entries and 14 of 15 multilateral-bank entries. These are whole-project values associated with financing categories, not loan amounts or annual spending. Self-finance leads both this cost distribution and the cumulative inventory, giving sponsorled capital allocation a substantial position in the recorded cable build market. The relative cost positions add meaning to the inventory profile. The cost chart captures a manufactured cohort with known financing, while Figure 36 includes the cumulative eligible inventory and earlier-year history. Their percentages answer different questions. Used together, they establish the importance of each financing channel without implying a common average project cost from unmatched counts and values. The result is a clearer distinction between the number of recorded projects and the financial scale of the specified project cohort.

Submarine Telecoms Industry Report 2026/2027

CONTINUED

Keppel reported commitments covering all five fiber pairs in its Bifrost portfolio and approximately USD 1.3 billion in total contract value, including 25-year operations and maintenance income. Its investment is held through a 40–60 joint venture with private-fund co-investors. Those figures describe portfolio commercialization and long-term contracts, rather than wholesystem construction cost or annual revenue. The case shows why a cost category does not fully describe the economics of ownership. Capacity commitments, investor participation and continuing operating income can coexist within one project arrangement. For suppliers and project sponsors, understanding those relationships helps explain who is supporting the commercial proposition and who remains responsible over the asset's life. The chart establishes the recorded distribution of reported whole-project value; the transaction example explains a mechanism by which capital and customer commitments can be connected.

03 / OWNERSHIP FINANCING ANALYSIS / 3.1 · 68


SUBTEL FORUM

3.2

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS

REGIONAL DISTRIBUTION OF FINANCING

Multilateral Development Banks

38

Figure 38: Known reported MDB-financed whole-project cost (USD) attributed to regions for report cohorts 2015, 2017–2019 and 2021–2026.

The regional attribution of reported project values for MDBfinanced systems places EMEA first at USD 1.720 billion, followed by Transpacific at USD 1.458 billion and AustralAsia at USD 911 million. Polar records USD 788 million, followed by the Indian Ocean at USD 608 million, the Americas at USD 538 million and Transatlantic at USD 300 million. This profile covers the specified reporting-cohort selection of 2015, 2017–2019 and 2021–2026. These are whole-project values linked to financing categories, not the amounts lent by multilateral banks. The view places institutional financing across a broad range of route geographies. The distribution has a different shape from the debt and equity profile. Polar's attributed value is larger here than in either of the other financing charts, while EMEA is also prominent. These contrasts identify where this financing cohort sits in the regional record. They support discussion of the diversity of capital channels serving connectivity infrastructure, rather than a single hierarchy in which every region is financed in the same way. Submarine Telecoms Industry Report 2026/2027

Public funding can also serve specific access objectives through a separate grant mechanism. The completed EMCS cable was handed over to operators in Micronesia, Kiribati, and Nauru with grants from Australia, Japan, and the United States. Its access objective gives the delivered project a different commercial starting point from a privately financed ocean route serving large capacity buyers. Capital can enter before a project reaches construction. In February 2025, IDC committed development capital for a definitive SAEx East feasibility study. This historical milestone illustrates a distinct function of finance: creating the basis on which a later construction decision can be made. The development-capital and grant-funded cases show why the purpose, instrument and maturity of finance matter alongside the regional cost position.

03 / OWNERSHIP FINANCING ANALYSIS / 3.2 · 69


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

3.2 REGIONAL DISTRIBUTION OF FINANCING The industrial implication is a procurement landscape with several investment objectives. Access-oriented sponsors and commercial route developers may seek different outcomes from the same engineering capability. A supplier therefore needs to understand the project's funding mechanism and delivery responsibilities as well as its physical specification. The MDB attribution establishes the geographic breadth of one institutional channel, while the examples explain why public participation itself is a broader set of arrangements.

39

CONTINUED

Debt/Equity Financing Debt and equity connect outside capital with cable development, but their role varies by project. The regional comparison uses known whole-project values, rather than amounts borrowed or invested, to show where this recorded financing category is concentrated.

Figure 39: Known reported whole-project cost (USD) of debt- and equity-financed systems attributed to regions, report cohorts 2015–2026.

Debt and equity financed systems have their largest regional attributions of reported project value in Transpacific, at USD 4.371 billion, and Transatlantic, at USD 3.840 billion. AustralAsia records USD 2.868 billion, the Americas USD 2.470 billion and the Indian Ocean USD 1.222 billion. EMEA and Polar have smaller displayed values of USD 195 million and USD 60 million. Major ocean-crossing categories therefore occupy a prominent position in this financing selection.

Submarine Telecoms Industry Report 2026/2027

That profile connects outside capital with substantial long-haul infrastructure value. It also differs markedly from the MDB attribution, where EMEA and Polar carry more weight. The contrast matters because the industry's investment opportunity is not uniform across geographies or funding routes. A region can be prominent in one financing cohort and less prominent in another, reflecting the composition of the projects recorded under those categories rather than a universal measure of its attractiveness.

03 / OWNERSHIP FINANCING ANALYSIS / 3.2 · 70


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

3.2 REGIONAL DISTRIBUTION OF FINANCING In January 2026, the SING investment agreement contemplated project financing and majority ownership for Cerberus upon closing. SING targets RFS in 2030. The agreement links the ownership of the developer with the funding of construction, placing the sponsor relationship and the future cable program within a combined investment proposition.

CONTINUED

For investors, agreement, closing and service describe different points in the deployment of capital. For customers and suppliers, those milestones connect the sponsor's commercial proposition with a future delivery program. A combined ownership and projectfinancing arrangement also creates two related decisions: who participates in the developer, and how the construction is funded. The regional cost chart establishes the scale of the reviewed debt and equity cohort; this case explains the more detailed relationships through which such capital can enter the industry.

Self-Financed

Polar (smallest slice): USD 315 million. 40

Figure 40: Known reported whole-project cost (USD) of self-financed systems attributed to regions, report cohorts 2015–2026.

Submarine Telecoms Industry Report 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS / 3.2 · 71


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

3.2 REGIONAL DISTRIBUTION OF FINANCING Self-financed systems have a particularly large Transpacific attribution of reported project value of USD 9.339 billion. Transatlantic follows at USD 5.049 billion, the Americas at USD 4.315 billion, AustralAsia at USD 3.800 billion and EMEA at USD 3.4175 billion. The Indian Ocean records USD 1.619 billion and Polar USD 315 million. The spread combines a strong long-haul position with substantial value across several regional markets. The distribution shows why self-finance should not be associated with only one route type or sponsor objective. Its recorded project value extends across ocean crossings and regional infrastructure. The relative balance also differs from the other funding channels: EMEA's self-financed value is much larger than its debt and equity attribution. Transpacific leads the self-financed and debt/ equity views, while EMEA leads the multilateral bank view. These are differences in the charted project mix, with overlapping regional memberships retained in the underlying attribution.

Submarine Telecoms Industry Report 2026/2027

CONTINUED

For the industry, the breadth of self-finance makes the investment priorities of sponsor groups commercially significant. A sponsor evaluating a route can consider its role in a wider network, the capacity requirements it is intended to serve and the operating responsibilities attached to ownership. This connects the capital decision with the sponsor's broader infrastructure position. The extensive regional values indicate the scale at which that relationship is relevant, across both long-haul routes and regional connections. The combined financing conclusion is coexistence rather than replacement. Self-finance remains the leading recorded channel, while debt, equity and institutional financing support substantial project groups. Owners and suppliers consequently need to understand both the route and the capital relationships behind it. A regional cost position helps identify financial scale; project-specific commitments explain how that scale becomes procurement, customer rights and continuing operating obligations.

03 / OWNERSHIP FINANCING ANALYSIS / 3.2 · 72


SUBTEL FORUM

3.3

41

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS

CURRENT FINANCING

Figure 41: Known reported whole-project cost (USD) by report cohort year, 2015–2026; 2026 is partial.

The known reported whole-project value series by reporting cohort reaches USD 8.379 billion in 2025, compared with USD 3.672 billion in 2024, a 128.2% increase between the two cohort values. Earlier high points are USD 6.176 billion in 2022, USD 4.295 billion in 2017 and USD 4.079 billion in 2018. The lowest displayed value is USD 2.379 billion in 2015. The partial 2026 cohort totals USD 5.1945 billion as of October 25, not a full-year comparison. The 2025 value uses known costs for 14 of the 15 systems in that cohort; costs are known for all seven in 2024. These values represent project values, not annual spending or proven operational delivery. The record therefore shows several substantial report cohorts separated by lower-value years. The 2025 value is about 105% above the 2018 value, but the path between them is uneven. Known reported project value rises from the 2019 cohort to 2020, falls in 2021, rises in 2022, falls in 2023 and then increases in 2024 and 2025. This pattern is more informative than describing the entire interval as a continuous investment boom. It indicates that the scale of projects associated with reporting cohort years varies sharply within a continuing development cycle. Submarine Telecoms Industry Report 2026/2027

These values attach reported whole-system costs to the relevant reporting cohorts. Construction payments and financing commitments may occur at different times, so the series describes the financial scale of recorded project groups rather than annual cash investment flows. That distinction helps connect the cost pattern with industry activity: a large cohort can embody work and commitments developed over several years, while its reporting classification groups the value in one chart column. For manufacturers, owners and financial participants, the practical conclusion is to examine the projects behind a highvalue year and the following pipeline. The 2025 peak concentrates considerable reported whole-project value in one report cohort. That concentration makes the timing of customer access and the completion of connected infrastructure especially consequential to the projects involved. Figure 42 supplies the reported length view, allowing the financial and physical dimensions of the recent cycle to be assessed together.

03 / OWNERSHIP FINANCING ANALYSIS / 3.3 · 73


SUBTEL FORUM

3.3 CURRENT FINANCING

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

The difference between the 2022 and 2023 cohorts is also useful: reported cost falls from USD 6.176 billion to USD 3.058 billion before the later rebound. The reported project mix therefore contains alternating large and smaller cohorts. For a business serving this market, the composition of its own commitments across those groups matters more than assuming that one global annual column will translate directly into its future workload or revenue.

42

Figure 42: Reported whole-system length (km) of manufactured systems by report cohort year, 2015–2026; 2026 is partial.

Reported system length reaches 105,456 km for the 2025 report cohort, up from 48,945 km in 2024, an increase of 115.5%. Known lengths cover 14 of 15 systems in 2025 and all seven in 2024. Earlier peaks are 85,864 km in 2017 and 81,520 km in 2018; 2021 records 36,725 km. The 2025 rebound is therefore substantial, and the 2025 cohort has the highest reported length in the displayed interval.

Submarine Telecoms Industry Report 2026/2027

The comparison with cost gives the recent cycle additional meaning. Both reported kilometers and whole-system cost rise strongly between 2024 and 2025. The 2025 cohort has both the highest displayed cost value and the highest length value. The two cohort series therefore share the same historical peak. Their complementary planning value is to describe financial scale and physical extent separately, allowing industry participants to examine which projects create each pattern.

03 / OWNERSHIP FINANCING ANALYSIS / 3.3 · 74


SUBTEL FORUM

3.3 CURRENT FINANCING Length provides an industrial view of that mix. It relates directly to the extent of wet infrastructure associated with the cohort, while production and marine requirements also depend on cable design, route conditions and project scope. The sequence from 36,725 km in 2021 to 82,345 km in 2022, 39,801 km in 2023 and the later 2025 high shows how sharply the physical scale of consecutive groups can differ. These are meaningful variations for businesses supplying and installing the infrastructure.

43

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

The industry conclusion is that the 2025 financial rebound has a substantial physical counterpart. Tracking both measures helps owners and delivery partners understand the scale and composition of the reported program. The 2025 peaks in length and cost emphasize the physical and financial dimensions of the cycle. Reading them together gives a more useful account of the industry's recorded development program than selecting one measure as the sole indicator of its scale.

Figure 43: Known reported whole-project cost (USD) attributed to regions for report cohorts 2022–2026.

Transpacific leads the 2022–2026 regional reported-project-value view as of October 25 at USD 13.105 billion. EMEA records USD 5.5995 billion, the Americas USD 3.405 billion and AustralAsia USD 4.052 billion. The Indian Ocean and Transatlantic record USD 1.958 billion and USD 2.190 billion respectively, with Polar at USD 1.103 billion. Transpacific's attributed value is more than twice EMEA's, despite its much smaller recent system-entry count.

Submarine Telecoms Industry Report 2026/2027

This is a particularly clear contrast between project frequency and attributed infrastructure value. The recent manufacturedsystem chart gives EMEA 23 regional entries and Transpacific eight, while this recent regional cost view gives Transpacific the leading value. AustralAsia ranks second in manufactured count and third in cost; the Americas share third place in manufactured count with Transpacific and rank fourth in cost. Read as separate views, these patterns show why project frequency and financial scale lead to different assessments of a geography's role in the industry.

03 / OWNERSHIP FINANCING ANALYSIS / 3.3 · 75


SUBTEL FORUM

3.3 CURRENT FINANCING The financing views reinforce that importance. EMEA has the largest attributed whole-project cost in the MDB chart, while Transpacific leads the debt and equity and self-financed charts. Those views cover different cohorts and selections; their projectvalue attributions are not loan amounts or annual spending. Transpacific's prominence across them makes it a substantial geography in several recorded capital channels. EMEA's position changes more noticeably across financing categories, giving its total recent cost position a different composition.

Submarine Telecoms Industry Report 2026/2027

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

For the industry, the chapter's main conclusion is that investment scale, project count and capital structure must be considered together. The 2025 cohort is large in both reported value and manufactured length; regional patterns show how that scale is distributed among different kinds of routes. Documented financing cases explain how ownership, customer commitments and continuing operations can be connected. None of these dimensions substitutes for the others, but together they give a fuller account of how cable development becomes a commercial infrastructure program.

03 / OWNERSHIP FINANCING ANALYSIS / 3.3 · 76


SUBTEL FORUM

3.4

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS

REALISTIC OUTLOOK

A planned cable and a funded cable present different forecasting questions. This edition updates SubTel Forum’s project-success research to assess which defined systems in the current register are likely to enter service by the end of 2030, while identifying later completions and the limits of the available evidence.

Model Development The starting point is Kieran Clark’s SubOptic 2019 paper, Building a Predictive Model to Determine Probability of Success in Developing a Submarine Cable System. That study organized development around announcement, contract in force (CIF), marine route survey, manufacture and commissioning. Its central industry finding was that securing the commercial and financing commitment at CIF sharply changes the outlook for eventual completion. This edition retains that distinction. The original sample’s conversion rate and fitted stage curve describe that historical sample; they are not carried forward as a blanket probability for today’s announced projects (Clark, 2019). Clark’s 2025 follow-up, Forecasting Submarine Cable Deployment: A Machine Learning Framework for Infrastructure Planning and Project Viability, broadened the framework to include sponsor characteristics, demand, regulatory conditions, financial signals and deployment timing. The present report turns its project-delivery component into an auditable planning assessment. It combines reconstructed outcomes with current project evidence and explicit scenarios. It does not claim to have implemented the paper’s wider demand-forecasting or real-time machine-learning architecture (Clark, 2025). The first step was to fix the question and the population. The assessment begins with the October 19, 2026 Planned register and asks whether each original, defined physical system will reach full-scope service by December 31, 2030. Overdue and undated projects remain candidates. Operating assets, duplicate names, existing-fiber service products and programs without a distinct new wet-plant unit are reconciled separately. Later optional branches are not allowed to inflate the count or prevent an otherwise complete original system from being recognized. A published cable landing or a ready station is distinguished from whole-system service.

Submarine Telecoms Industry Report 2026/2027

Historical reconstruction starts with the published 2021 plannedsystem cohort and follows it through dated archives and issuer, supplier and regulatory evidence. Event dates, publication dates and later database observations are kept separate. An unfinished project remains an incomplete observation, rather than becoming a failure because news coverage ends. Related projects are kept together in validation. Missing milestone dates remain unknown. After removing projects documented as hyperscaler-backed at the historical origin, 43 usable histories in 42 project groups provide 20 completion observations and 23 censored observations for the statistical reference curve. The principal change is to separate financing attrition from execution timing. SubTel Forum treats genuine hyperscalerfunded announcements as funded projects that have already reached CIF. Missing public financial-close or CIF dates do not reverse that industry premise. These systems receive individual scope, construction, permitting and service-date reviews. Other systems enter the committed project case where public evidence establishes CIF, actual wet manufacture or installation under a delivery contract, or secured construction funding with an executed delivery agreement. Specific adverse evidence can prevent that treatment. These delivery-case weights are planning judgments, not fitted probabilities of 100 percent. For the remaining listings, a simple residual-time Weibull model estimates completion over the stated horizon. It uses tenure since the first matched archived Planned observation, which is a proxy rather than a known announcement age. Unknown tenure receives an explicit zero-tenure reference and a separate fouryear sensitivity. Earlier-origin tests use only training outcomes available by each cutoff and hold out related project groups. Only 27 later-origin observations from 20 systems, including three new completions, could be scored over approximately one year. The narrower documented-non-hyperscaler check performed poorly. These tests do not establish calibration to the full 2030 horizon, and the report therefore presents a conditional planning case without an overall statistical confidence interval.

03 / OWNERSHIP FINANCING ANALYSIS / 3.4 · 77


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

3.4 REALISTIC OUTLOOK Aggregation preserves these distinctions. System weights are summed for the delivery count; each weight is multiplied by an available whole-system wet-route estimate for kilometers. Approximate disclosed project values are used where the scope is identified; otherwise, USD 75,000 per route kilometer is an explicit reference estimate. Missing dimensions remain unquantified. Project values can include associated onshore works and are not remaining expenditure or annual cash spending. A separate 2031–2035 allowance, source ledger, scope decisions, model inputs and reproducible calculations preserve the process for the methodology chapter and future editions.

Project Cohort In the model as of October 19, 2026, the 131 Planned listings reconcile to 89 unfinished physical-system candidates, eight operating entries, eight scope holds, 23 offshore exclusions, two duplicates and one component of an operating parent. Four candidates are placed in a separate later-targeted case: PACS, Polar Connect and the two SAEx phases. The central 2030 population therefore contains 85 listings. This is a forecast of the recorded pipeline, including its remaining status and identity uncertainties; future unannounced systems are outside the population (Submarine Telecoms Forum, 2026).

44

CONTINUED

The review removes TPU, which the FCC records as first entering service on May 23, 2026, and SEA-H2X, whose owner announced commercial launch in July. Trans-Caspian was completed and launched in October. TGN-IA2 is an operating ADC service identity, and Unitel North was inaugurated in 2023 (AICEP, 2023; China Mobile International, 2026; Federal Communications Commission, 2026; Samruk-Kazyna, 2026; Tata Communications, 2025). Humboldt is held from the incremental physical tally because its marketed route appears to use Halaihai and Honomoana infrastructure already counted here. That mapping is a scope inference supported by route and licensing evidence, rather than a published primary allocation agreement (Google, 2024; Subsecretaría de Telecomunicaciones, 2025).

Delivery Through 2030 SubTel Forum's central case yields 55.6 delivery equivalents by the end of 2030 from these 85 reviewed listings. It comprises 20 hyperscaler-backed project assessments, 12 other committed listings, and 23.6 delivery equivalents assigned to the remaining 53 listings under the historical reference curve. These weighted estimates provide a planning view, not a count of guaranteed full-system service entries. The result depends on the defined project scope and execution gates; the project-assessed and fitted components remain distinct.

Figure 44: Eligible Listings and Central Delivery Assessment by 2030

Submarine Telecoms Industry Report 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS / 3.4 · 78


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

3.4 REALISTIC OUTLOOK

CONTINUED

The dimension totals cover 60 of the 85 listings. Their delivery-weighted contribution is approximately 288,161 route km and USD 21.70 billion in associated project value. Twenty-five listings, representing 12.1 modeled or assessed deliveries, lack a usable wetroute length and remain outside both dimension subtotals. Umoja is an unmeasured hyperscaler system. These figures must not be described as complete physical or financial totals for all 85 projects. Table 2: Central Delivery Case and Dimension Coverage Cohort

Listed

Delivery equivalents

Route km with estimates

Project value USD bn

Length coverage

Hyperscaler funded

20

20.0

182,634

13.70

19/20

Other committed

12

12.0

57,171

4.15

12/12

Remaining listings

53

23.6

48,356

3.85

29/53

Total

85

55.6

288,161

21.70

60/85

Of the 60 available route estimates, 42 have independent source support and 18 retain registry estimates without independently verified whole-route measurements. The latter contribute approximately 44,244 weighted km. Published designs, lower bounds and early concept estimates also differ in precision. The model retains these grades rather than treating every kilometer as an as-built measurement.

The strongest dated cases include NEC’s 8,900 km AUG East contract with a Q3 2029 service target and Candle’s contracted 2028 program (Meta, 2025; NEC, 2025).

Hyperscaler Commitments

The regulator granted Fastnet’s maritime-area consent in August 2026; subsequent development consent remains a separate gate (Maritime Area Regulatory Authority, 2026).

Hyperscaler backing changes the commercial starting point. The assessment asks when committed infrastructure can be delivered, with attention to route scope and execution, instead of reapplying the historical financing hurdle. The original 21-name review loses TPU to completed service and holds Humboldt’s apparent overlapping commercial path; the official EU review identifies Meta participation in IEX, adding that unfinished system to the funded cohort. This leaves 20 distinct systems in the central hyperscaler delivery case.

Submarine Telecoms Industry Report 2026/2027

Fastnet has an owner target of 2028. Ireland’s maritime regulator records approximately 6,300 km for the whole system in its July assessment (Maritime Area Regulatory Authority, 2026).

The Bulikula and Sol length estimates have been replaced by licensed or filed segment totals rather than their earlier registry placeholders (Federal Communications Commission, 2026; Federal Communications Commission, 2026).

03 / OWNERSHIP FINANCING ANALYSIS / 3.4 · 79


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

3.4 REALISTIC OUTLOOK

CONTINUED

Table 3: Hyperscaler Systems Assessed for Delivery by 2030 System

Route km estimate

Basis and remaining delivery gate

AUG East

8,900

NEC target Q3 2029; delivery case by 2030

Aurora

7,268

Meta application proposes 2028; license and build pending

Australia Connect Interlink

6,800

New wet plant distinct from SMAP; STF case by 2030

Bosun

2,800

Darwin landing execution gate; STF case by 2030

Bulikula

21,703

Multiple landings completed; full-scope service unverified

Candle

8,000

Contracted 2028 target; optional branches separate

Dhivaru

4,000

Funded owner project; public whole-RFS date unavailable

Fastnet

6,300

Owner 2028 target; surveys and consent progressed

Halaihai

17,483

Guam–Chile physical design; STF case by 2030

Honomoana

15,215

2028 local-government forecast; marine work progressed

IEX

10,000

Partial service; full route depends on Red Sea resolution

JAKO

260

Turnkey EPC; consortium Q3 2027 target

Nuvem

6,900

Bermuda and Portugal landings; 2027 government target

ORCA

12,482

Temporary-authority renewal unresolved; by-2030 case conditional

Proa

2,891

Original full-scope service unverified; branches tracked separately

System

Route km estimate

Basis and remaining delivery gate

Raman

7,028

Commissioning reported; full Raman service unverified

SEA-ME-WE 6

21,700

SubCom CIF and landings; whole-system acceptance pending

Sol

8,153

Bermuda landed; regulatory and full-system service gates remain

Tabua

14,751

Fiji landed; Natadola civil-route permit remains a gate

Umoja

Unquantified

SubCom engaged; subsea length and whole-RFS date unverified

Submarine Telecoms Industry Report 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS / 3.4 · 80


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

3.4 REALISTIC OUTLOOK Three cases illustrate why funding certainty does not remove scheduling questions. IEX’s Red Sea crossing is reported on hold even though its Oman–India section has been commissioned. ORCA’s earlier temporary authority expired in September, and a renewal grant was not verified. Fiji’s ministry reports an unresolved Natadola civil permit affecting Tabua’s original design. The central case assumes these full-scope gates are cleared by 2030. If IEX alone remains unresolved at that deadline, the assessment falls by one delivery, 10,000 weighted km and USD 0.75 billion of reference value; partial service is not erased by that full-scope delay case (European Commission, 2026; Federal Communications Commission, 2026; Ministry of Environment and Climate Change Fiji, 2026).

FIGURE 45

The same financing distinction is applied to other developers where evidence supports it. The 12 committed cases are Africa-1, ALC, APX-East, Arctic Way, CELIA, CSN-1, MANTA, Nome to Homer Express, SHV-HK, TAM-1, Tamtam and UGARIT 2. An executed procurement agreement alone is insufficient: E2A, HIFL and I-AM remain within the statistical reference group until the relevant financing or physical-execution gate is established. This is an evidence threshold, not a finding that those projects are unlikely to proceed. UGARIT 2 is retained once on issuer-reported evidence of an executed Construction & Maintenance Agreement and manufacturing underway; its naming and scope overlap with Ebla remains unresolved, and no separate Ebla listing is counted. Its 240-km route is issuer-stated as planned, while USD 18 million is the report's kilometer-based benchmark estimate, not a disclosed project budget or expenditure.

Route Length and Cost

45

Figure 45: Delivery-Weighted Route Estimates and Associated Project Value by 2030

Submarine Telecoms Industry Report 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS / 3.4 · 81


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

3.4 REALISTIC OUTLOOK

CONTINUED

Five included projects have usable published approximate project values: ALC’s original USD 300 million consortium estimate, HIFL at USD 120 million, I-AM at approximately USD 1 billion, Nome to Homer at USD 160.56 million including associated terrestrial works, and Tamtam at approximately USD 54 million. Tamtam’s full original scope includes 411 km internationally and 525 km domestically, or 936 km. Funding amounts, individual member stakes and mixed cable/data-center program budgets are not substituted for whole cable-project costs (European Investment Bank, 2026; NTT DATA, Sumitomo Corporation and JA Mitsui Leasing, 2026; Ocean Networks, 2025; Quintillion, n.d.; Unified National Networks, 2022).

Only USD 1.07 billion of the delivery-weighted value comes from those disclosed estimates; USD 20.63 billion comes from the USD 75,000/km reference. Keeping disclosed estimates fixed while changing the reference rate to USD 50,000 or USD 100,000/ km produces covered values of approximately USD 14.82 billion and USD 28.58 billion, respectively. These are cost-assumption cases, not confidence bounds or forecasts of cash spent. They exclude the projects without usable dimension estimates.

Later Completions The same 85-project population produces an additional 10.6 delivery equivalents during 2031–2035 under the reference curve, bringing cumulative assessed delivery to 66.2. The four later-targeted candidates form a separate schedule case and add approximately 1.5 equivalents by 2035, conditional on remaining unfinished until their stated earliest case year. PACS uses the owner’s early-2030s planning window; Polar Connect uses the 2026 EU review’s 2031 indication; SAEx timing retains unverified registry years. Their route identity and funding remain uncertain, and the figures are not promises of full service by 2035.

Table 4: Later Completion Allowance and Named Sensitivities Case

Delivery equivalents

Route km with estimates

Estimated value USD bn

Central case by 2030

55.6

288,161

21.70

Additional 2031–2035, same 85

10.6

24,149

1.90

Cumulative by 2035, same 85

66.2

312,310

23.60

Separate four later-targeted candidates by 2035

1.5

8,650

0.65

2030 case with IEX full route still on hold

54.6

278,161

20.95

2030 case with AUG East target delayed 24 months

54.6

279,261

21.03

Unknown tenure remains an important sensitivity. Assigning four additional years unfinished to the 31 reference-group listings without a matched historical age reduces the 2030 assessment from 55.6 to 50.3 delivery equivalents. This is an input scenario rather than a statistical interval. Shared supplier, permitting or corridor delays may affect several systems together. Projects unresolved after 2035 are not classified as cancelled, and the model does not estimate permanent abandonment from missing news.

Submarine Telecoms Industry Report 2026/2027

Large programs can add infrastructure beyond the quantified population. Waterworth exceeds 50,000 km at program scale, but its distinct unfinished phases and their full-scope completion dates cannot yet be assigned consistently to the system forecast. Apricot, Blue and Connected Coast also require separation of operating and remaining scope. Their exclusion from the physical tally represents unquantified delivery scope, not a zero expectation of further development. The forecast should be updated as these boundaries, construction milestones and commissioning evidence become clearer (Meta, 2025).

03 / OWNERSHIP FINANCING ANALYSIS / 3.4 · 82


SUBTEL FORUM

3.4 REALISTIC OUTLOOK Non-Hyperscaler Outlook SubTel Forum’s assessment points to selective implementation across the pipeline outside the identified hyperscaler cohort. In the 85-project model as of October 19, 2026, this group’s 65 listings contribute approximately 35.6 delivery equivalents to the central 2030 case. Only twelve already meet the committedproject threshold; the remaining 53 depend on the historical reference curve and unresolved project-specific conditions. This group includes projects whose backing remains unidentified. The broader implication is that announced scale substantially exceeds the development that can presently be treated as committed (Submarine Telecoms Forum, 2026). For a developer relying on future wholesale capacity sales, the commercial task begins well before cable manufacture. A proposed route must attract customers on terms that support the investment, while financing depends on confidence in those revenues and the delivery schedule. Prospective buyers, in turn, need confidence that the system will be funded and built. Binding anchor commitments or consortium participation can help resolve that interdependence. Until they do, a sound connectivity rationale can coexist with an unsettled investment case (Clark, 2019). Commercial progress must also align with the permissions and contracts needed to execute the route. Landing arrangements, national approvals and the procurement and marine program must support the same scope and timetable. A financing delay can require delivery arrangements to be revisited; a permitting delay can alter the service date on which customer commitments were based. Sponsors may have to carry development expenditure while these conditions remain unresolved. In SubTel Forum’s interpretation, these linked dependencies help explain why an announced service year carries less weight than evidence that the project has crossed its financing and execution milestones (Submarine Telecoms Forum, 2026).

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

Independent and consortium-led systems retain an important role in serving regional markets and developing alternative routes. Their contribution to the 2030 build will depend on converting those opportunities into funded construction programs. The announcement pipeline expresses the breadth of developer ambition; customer commitments, executable delivery agreements and permission to build determine how much of that ambition becomes operating infrastructure.

Delivery-Weighted Project Value by Delivery Target The charts compare planned or reference project value with the same project values after applying the existing delivery-byend-2030 weights. The all-systems view covers USD 27.061 billion in planned/reference value and USD 21.701 billion after weighting (80.2%) for 60 costed listings within the 85-project population. The model-classified non-hyperscaler view covers 35 costed listings within 49, with USD 11.703 billion before weighting and USD 7.276 billion after (62.2%); it excludes 16 listings of unknown backing. Both views use the October 19, 2026 model and the same endof-2030 delivery horizon. The labels group values by supported future delivery targets; former targets without a supported future year remain in a 2027-or-later unallocated group, while undated and ranged targets remain separate. The bars are not annual spending or year-specific delivery forecasts. Thirty-two committed projects, including all 20 identified hyperscaler-backed systems, receive weight one as a planning assumption, not a fitted 100% probability; the other 53 use the historical reference curve. This model comparison does not estimate relative failure rates by ownership class.

The twelve other committed systems demonstrate that projects can establish this foundation through several ownership and funding structures. Tamtam provides a current example: the European Investment Bank records financing approval in September 2026 and reports that the main supply and installation contracts have already been awarded. Its resilience and domestic-connectivity objectives support a specific investment program with a defined physical scope. The wider outlook therefore depends on each project’s commercial and institutional support, rather than on a hyperscaler label alone (European Investment Bank, 2026).

Submarine Telecoms Industry Report 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS / 3.4 · 83


SUBTEL FORUM

3.4 REALISTIC OUTLOOK

46

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURE 46

Figure 46: Planned/reference versus delivery-weighted known project value (USD billions), using fixed end-2030 weights across all timing groups in the full 85-entry delivery model. Usable values cover 60 of 85 entries.

Submarine Telecoms Industry Report 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS / 3.4 · 84


SUBTEL FORUM

3.4 REALISTIC OUTLOOK

47

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURE 47

Figure 47: Planned/reference versus delivery-weighted known project value (USD billions), using fixed end-2030 weights across all timing groups in the 49-entry model-classified other-backed cohort. Unknown backing is excluded; usable values cover 35 of 49 entries.

Submarine Telecoms Industry Report 2026/2027

03 / OWNERSHIP FINANCING ANALYSIS / 3.4 · 85


SUBTEL FORUM

CHAPTER 04

SUPPLIER ANALYSIS RECORDED ROLES / SUPPLIER PARTICIPATION

Selected supplier participation counts ASN NEC SubCom

INTERPRETATION

Top three shown for visual comparison only; firms can hold distinct recorded roles and these counts do not measure all projects or revenue.

The supplier landscape has several dimensions. System supply, installation and survey are distinct recorded roles, and companies may appear in more than one.

86

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

2022–2026 manufactured cohort

same 2022–2026 cohort

20

9

ASN participations

NEC participations

Recorded supplier participations in 48 charted entries; not an exclusive global market share.

Recorded supplier participations, not an exclusive global market share.

2022–2026 · 48 charted participations overall

20 9 6

FROM THE CHAPTER

ASN leads recorded supplier participation in the 2022–2026 manufactured cohort with 20 systems. NEC follows with nine, SubCom with six, HMN Technologies with five and Prysmian Group/NSW with three. Hexatronic, Nexans, Xtera, Orient Link and Elettra each record one. Across the 48 charted supplier participations, ASN represents 41.7%.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

87


SUBTEL FORUM

4.1

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

04 / SUPPLIER ANALYSIS

SYSTEM SUPPLIERS

The supplier landscape has several dimensions. System supply, installation and survey are distinct recorded roles, and companies may appear in more than one. Project counts show the breadth of participation; reported kilometers show physical scale; surveyed planned systems show a particular development milestone. The figures below use those dimensions to examine the composition of recent activity and the forward project record. The result is a more useful view of the delivery chain than a single league table: the industry's leading firms can have different project mixes and different positions at successive engineering and commercial stages.

48

Current Systems Current-system records show where suppliers participated in the manufactured 2022–2026 reporting cohorts. Project counts capture repeated engagements, while reported route length describes physical extent. Read together, the views explain the supplier landscape without treating either measure as manufacturing capacity or available future output.

Figure 48: Manufactured system counts by recorded supplier for report cohorts 2022–2026.

ASN leads recorded supplier participation in the 2022–2026 manufactured cohort with 20 systems. NEC follows with nine, SubCom with six, HMN Technologies with five and Prysmian Group/NSW with three. Hexatronic, Nexans, Xtera, Orient Link and Elettra each record one. Across the 48 charted supplier participations, ASN represents 41.7%. The distribution combines a clear leading position with a group of firms participating in different parts of the recent build cycle. Submarine Telecoms Industry Report 2026/2027

04 / SUPPLIER ANALYSIS / 4.1 · 88


SUBTEL FORUM

4.1 SYSTEM SUPPLIERS The supplier counts also reveal why the number of engagements is an incomplete account of supplier scale. Prysmian Group/ NSW has three recorded participations compared with one for Elettra, but Figure 49 assigns 8,760 reported km to Elettra and 1,824 km to Prysmian Group/NSW. The supplier choices behind long-haul and shorter routes can therefore produce different rankings depending on the measure. Buyers examining delivery experience need to consider the type and extent of the projects alongside how many entries a company has. Capital can also enter at the supplier level. In April 2026, SubCom's continuation vehicle closed with approximately USD 2.3 billion in commitments, led by CVC Secondary Partners, while Cerberus funds retained control. That is ownership financing of a delivery business. It demonstrates an investment mechanism supporting the supply-chain platform, distinct from financing or construction cost for an individual cable system.

49

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

For the industry, this separation of investment levels matters. A cable owner commits to an infrastructure project; a supplier's investors commit to the business providing engineering, manufacturing and marine capabilities. Those positions are related through procurement, but they have different assets and commercial exposures. The participation chart identifies which suppliers are associated with the recent manufactured record, while the transaction case illustrates a separate channel through which capital supports the industry's delivery businesses. The conclusion is a concentrated leading supplier profile with varied participation below it. ASN's count position is substantial, but the wider group remains important to the technical and commercial choices available to developers. Supplier assessment should begin with the actual role and project scope required. Count and length together establish the profile of recorded activity; company-specific commitments and capabilities determine how that profile relates to a particular procurement decision.

Figure 49: Known reported whole-system length (km) by recorded supplier for report cohorts 2022–2026.

Submarine Telecoms Industry Report 2026/2027

04 / SUPPLIER ANALYSIS / 4.1 · 89


SUBTEL FORUM

4.1 SYSTEM SUPPLIERS

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

The reported supplier length view is led by ASN at 99,741 km, followed by NEC at 74,350 km and SubCom at 63,485 km. HMN Technologies records 33,404 km, Elettra 8,760 km, Orient Link 8,100 km and Xtera 7,000 km. Nexans, Prysmian Group/ NSW and Hexatronic record 2,500 km, 1,824 km and 200 km, respectively. ASN, SubCom and NEC together account for about 79.4% of the charted reported supplier-attributed kilometer total. Known lengths cover 46 of the 48 supplier participations; one ASN and one HMN entry lack a reported length.

That upstream investment has a different unit of activity from the finished-system kilometers shown here. A system supplier must bring fiber, cable construction, repeaters where required, terminal capability and project engineering into a delivered proposition. Growth at one stage supports part of that proposition, while the rest of the production and delivery sequence remains relevant. This is why a strong route pipeline needs to be assessed across the chain rather than reduced to a single assertion about factory capacity.

Their prominence in physical scale is stronger than a simple reading of supplier counts might suggest. ASN, SubCom and NEC have 35 of the 48 supplier participations, or 72.9%, compared with their 79.4% share of reported supplier-attributed kilometers. Prysmian Group/NSW ranks fifth in count but ninth in reported length. The leading group's physical concentration is therefore greater than its count concentration. This gives the supplier market a project-mix dimension, in which the frequency of engagements and the extent of wet infrastructure create different forms of commercial prominence.

The count and length views establish the scale and composition of recorded supplier work. They also frame a more specific commercial discussion: which firms are associated with extensive ocean routes, which have repeated shorter engagements, and how the next project group fits their delivery programs. The industry implication is to examine both the infrastructure quantity and the required system architecture. These dimensions connect an owner's procurement decision to the capabilities needed to execute it.

Upstream production is another part of the delivery chain. In September 2026, Lightera announced submarine optical-fiber capacity investment in Denmark and the United States intended to nearly triple submarine optical-fiber capacity by 2029. The program addresses existing customer commitments and future requirements. It illustrates how optical-fiber production can be planned ahead of cable deployment, with its own facilities and technology decisions.

Submarine Telecoms Industry Report 2026/2027

04 / SUPPLIER ANALYSIS / 4.1 · 90


SUBTEL FORUM

4.1 SYSTEM SUPPLIERS

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURE 50

Future Systems

50

Figure 50: Counts of survey-completed planned systems by supplier for the 2027–2029 report cohorts.

Among survey-completed planned systems in the 2027–2029 reporting cohorts, NEC and HMN Technologies each have one recorded supplier participation. Each accounts for 50.0% of the two charted participations. The mix differs from the recent manufactured participation view, where ASN leads. This smaller forward selection identifies suppliers associated with a recorded survey milestone, not a complete account of future supply contracts. Survey completion gives route development a more concrete basis. It is associated with the investigation of the marine alignment on which further engineering and installation planning can proceed. For a supplier, a surveyed project presents a different set of questions from an early route concept: the design can be considered in relation to the route information and the responsibilities assigned to delivery partners. The milestone helps explain project maturity without equating it with completed manufacture or service.

NEC accounts for 50.0% of this survey-completed supplier group, compared with nine of 48 recent manufactured supplier participations (18.8%). HMN Technologies also has 50.0% of the forward group, compared with five of 48 (10.4%) in the recent view. The windows and milestones differ, but the comparison shows how recorded supplier prominence changes with the project selection being examined. ASN, NEC and SubCom are the leading three firms in recent supplier-attributed length, while only NEC and HMN Technologies appear in this surveyed planned selection. Their different presence and shares show why one role chart cannot stand for the entire supplier pipeline. For owners, the relevant assessment is the particular system proposition and the commitments around it. The chart identifies a recorded survey milestone through which a selected part of the next supplier program can be investigated.

The resulting conclusion is a forward mix with equal NEC and HMN Technologies participation in this small surveyed selection. It should be read with the broader survey-status chart, which shows recorded completions, non-completions and unknown survey status across planned regional entries. Together, the views describe both who is associated with the surveyed project group and how that group sits within the larger recorded development program. Submarine Telecoms Industry Report 2026/2027

04 / SUPPLIER ANALYSIS / 4.1 · 91


SUBTEL FORUM

4.2

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

04 / SUPPLIER ANALYSIS

INSTALLERS

Recorded Installer Participation

51

Figure 51: Manufactured system counts by recorded installer for report cohorts 2022–2026.

ASN leads recorded installer participation with 15 entries in the 2022–2026 manufactured reporting cohorts, or 42.9% of the 35 charted participations. Orange follows with five (14.3%), SubCom has three, and Global Marine, HMN Technologies and Optic Marine Services each have two. Six other companies have one apiece. The leading two firms account for 57.1% of the displayed total, with the remainder spread across a broader group of marine providers.

Submarine Telecoms Industry Report 2026/2027

This distribution differs from the supplier chart. Some firms appear across roles, while others are prominent specifically in installation. The recorded landscape therefore includes both integrated delivery businesses and a range of marine participants. For a developer, that distinction is relevant to the allocation of responsibilities: system supply and marine installation can be represented by different commercial relationships even when they serve the same infrastructure program.

04 / SUPPLIER ANALYSIS / 4.2 · 92


SUBTEL FORUM

4.2 INSTALLERS The role profiles make the organizational differences more specific. ASN records 20 supplier, 15 installer and eight surveyor participations in the respective recent charts. Orange records five installer and one surveyor participation, while Fugro appears with six surveyor participations. These separate counts identify different patterns of recorded involvement. They show a leading company present across several delivery roles and other firms prominent in particular marine functions, without requiring the same set of projects to underlie each count.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

For the industry, the leading ASN and Orange positions sit alongside a distributed set of specialist engagements. That mix gives the delivery chain more than one organizational form. Owners can evaluate the accountability of an integrated package or the responsibilities within separately assigned work. In either case, the important commercial issue is the completeness of the scope and the interfaces between parties, rather than assuming that a common company name across charts means identical responsibilities. The comparison with Figure 52 adds a distinct concentration pattern. The leading two installer categories account for 57.1% of company participations, while EMEA and Transpacific account for 68.5% of the regional attributed kilometers in that view. Company involvement and physical geography have different distributions. The industrial meaning is a delivery chain with a broad provider group supporting infrastructure whose reported length is concentrated in major regional categories.

52

Figure 52: Known reported whole-system length (km) of manufactured systems with a recorded installer, attributed by region for report cohorts 2022–2026.

Submarine Telecoms Industry Report 2026/2027

04 / SUPPLIER ANALYSIS / 4.2 · 93


SUBTEL FORUM

4.2 INSTALLERS The regional length view for manufactured systems with a recorded installer is led by EMEA at 53,995 km and Transpacific at 30,417 km. AustralAsia records 17,231 km of known length, Transatlantic 14,312 km, the Indian Ocean 3,200 km, the Americas 2,344 km and Polar 1,800 km. One AustralAsia entry has no recorded length. EMEA and Transpacific together represent about 68.5% of the charted known regional kilometer total. The physical profile is strongly concentrated in those two categories. Their prominence has different counterparts in the recent systemcount chart. EMEA has repeated regional project entries, while Transpacific has fewer entries and substantial route scale. This helps explain why marine delivery can involve both a series of separate regional programs and large ocean-crossing work. The commercial opportunity is shaped by the quantity and character of infrastructure, rather than the frequency of projects alone.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

For owners, the route program must connect the wet installation with the facilities and interfaces at each end. For contractors, the relevant project characteristics include route length and the work assigned along it. EMEA's repeated activity and Transpacific's large length position create different combinations of these characteristics. The charts establish their recorded roles and known reported lengths in the reviewed cohorts; they do not establish the dates or completion of installation work. The industry conclusion is a physical installation profile concentrated in two major geographies, supported by a more distributed company-participation landscape. That is consistent with a market in which a relatively small number of extensive routes and repeated shorter programs create different kinds of work. Owners assessing execution need the responsibilities assigned to their own route, while the regional profile establishes the wider physical context in which those engagements sit.

The concentration is substantial within this geographic view. EMEA represents about 43.8% of the charted known kilometers and Transpacific about 24.7%; the remaining five categories together represent 31.5%. AustralAsia and Transatlantic are the next two largest values, while the Americas and Polar have smaller positions. The physical program associated with recorded installation roles is therefore distributed very unevenly across regions. That pattern gives marine businesses a geographic dimension to examine alongside the companies and systems involved.

Submarine Telecoms Industry Report 2026/2027

04 / SUPPLIER ANALYSIS / 4.2 · 94


SUBTEL FORUM

4.3

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

04 / SUPPLIER ANALYSIS

SURVEYORS

Recorded Surveyor Participation

53

Figure 53: System counts by recorded surveyor for the 2022–2026 report cohorts.

The surveyor chart records 21 participations across seven companies for the surveyed 2022–2026 reporting cohorts. ASN leads with eight (38.1%), followed by Fugro with six and Elettra with three. EGS, IT International Telecom, Axians and Orange each have one. The leading three companies account for 81.0% of the displayed participations, while the remainder extends the recorded provider group.

Submarine Telecoms Industry Report 2026/2027

04 / SUPPLIER ANALYSIS / 4.3 · 95


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

4.3 SURVEYORS

CONTINUED

The composition differs from both supplier and installer rankings. Fugro is prominent in this survey role, while several system and marine firms also appear. That pattern establishes survey as a distinct part of the delivery chain with its own provider landscape. It is useful to owners because the acquisition and interpretation of route information have a different immediate purpose from cable manufacture or installation: they support the engineering basis on which subsequent work is designed.

For developers, this distinct role creates a substantive procurement question. The scope of route investigation and the use of its findings have to fit the eventual system and installation requirements. The supplier, surveyor and installer may be part of an integrated arrangement or assigned separately. Their interfaces matter because the industry delivers one physical network through several linked responsibilities. Understanding the recorded provider mix helps explain where those responsibilities sit.

The survey function also links technical decisions with project development. The route under investigation influences the alignment and the conditions that later engineering must address. A named survey participation identifies who is associated with that work, while the resulting project information informs the system design and marine program. The chart does not need to rank every aspect of survey performance to make this role visible within the industry's recent activity.

The leading ASN participation and the substantial specialist survey group therefore describe complementary organizational forms. The industry conclusion is to treat survey capability as part of the route's engineering foundation, with its own commercial relationships and evidence of completion. Figure 54 extends that view into the planned regional record, showing how survey status varies across project groups rather than assuming that the entire pipeline has reached the same stage.

54

Figure 54: Planned system counts by region and survey status for the 2027–2029 report cohorts.

Submarine Telecoms Industry Report 2026/2027

04 / SUPPLIER ANALYSIS / 4.3 · 96


SUBTEL FORUM

4.3 SURVEYORS Planned Survey Status Survey status varies across regional entries in the planned 2027–2029 report cohorts. AustralAsia has 12 not-surveyed and one survey-completed entry. EMEA has one completed and seven not surveyed. The Americas have six not surveyed and one unknown. Transatlantic has three not-surveyed entries; Transpacific has two not surveyed and one unknown. Indian Ocean has two not-surveyed entries, and Polar has four. The regional project groups therefore have different recorded engineering profiles. EMEA and AustralAsia each have one survey-completed entry in this view, while AustralAsia has the largest not-surveyed group. That contrast adds a development-stage dimension to their regional activity. A high planned route or capacity position does not imply that every associated project has the same survey milestone. The industry's forward assessment becomes more specific when it distinguishes the scale of intended infrastructure from the route information already recorded for particular systems.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

Across the 40 charted regional participations in the 2027–2029 reporting cohorts, two have a completed-survey record, 36 are recorded as not surveyed and two have unknown status: 5.0%, 90.0% and 5.0%, respectively. The regional proportions differ. EMEA has one completed of eight, or 12.5%; AustralAsia has one of 13, or 7.7%; the Americas have none of seven, or 0.0%. These differences make the recorded survey composition concrete, showing that the largest planned activity categories do not all have the same recorded completion profile. The supplier chapter's broader conclusion is a delivery chain with concentrated physical scale, varied organizational roles and different recorded regional engineering milestones. The top three suppliers account for a larger share of attributed length than of participations; installation involves a wider company group; and survey completion is more prominent in EMEA’s planned regional profile (one of eight, 12.5%) than in AustralAsia’s (one of 13, 7.7%). Those specific relationships connect the industry's commercial opportunity with the kinds of businesses and project stages involved in delivering it.

The August 2026 agreement for the planned 2,300-km Invercargill-Melbourne system assigns supply to ASN and survey and installation to OMS. Survey completion remains a separate milestone from contract signing.

Submarine Telecoms Industry Report 2026/2027

04 / SUPPLIER ANALYSIS / 4.3 · 97


SUBTEL FORUM

CHAPTER 05

SYSTEM MAINTENANCE ARTICLE COVERAGE / DISRUPTION-RELATED REPORTING

Selected reporting focuses Fault / status Restoration Planned maintenance

INTERPRETATION

Ten fault/operational-status, five restoration and two planned-maintenance articles are shown; other reporting focuses are not silently assigned to zero.

SubTel Forum reviewed all 295 newsfeed articles published from January 1 through October 19, 2026. Twenty-four substantially concerned a reported submarine telecommunications cable disruption, service-affecting maintenance, restoration, or an investigation or court proceeding involving identified cable damage.

98

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

of 295 STF newsfeed articles · 2026

of 24 selected · 2026 coverage

24

15

selected articles

Asia-Pacific articles

Published January 1–October 19, 2026; contentselected disruption, maintenance, restoration and investigation coverage, not a fault count.

Principal geographic focus of selected articles; not a ranking of regional engineering risk.

among 24 selected articles · non-exhaustive

10 5 2

FROM THE CHAPTER

Asia-Pacific accounted for 15 of the 24 articles, followed by the Baltic Sea with four, South Asia and the Caribbean with two each, and West Africa with one. Each article is assigned to its principal geographic focus.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

99


SUBTEL FORUM

5.1

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

05 / SYSTEM MAINTENANCE

PUBLICITY

Cable maintenance attracts attention well beyond the technical teams that manage it. The ICPC’s May 2026 media guidance responds to heavy press interest, including overstated claims about the global importance of the Strait of Hormuz (International Cable Protection Committee, 2026). Public communication has become part of managing disruption: customers need service information while governments and the media seek explanations of cause and responsibility. The value of this attention depends on how clearly reporting connects those questions to the available evidence.

Coverage and Events SubTel Forum reviewed all 295 newsfeed articles published from January 1 through October 19, 2026. Twenty-four substantially concerned a reported submarine telecommunications cable disruption, service-affecting maintenance, restoration, or an investigation or court proceeding involving identified cable damage. Selection followed article content across the feed. General security warnings, vessel and product announcements, network exercises, and cloud outages without an identified submarine cable disruption were excluded. Each published article counts once, including follow-ups. Publication date determines inclusion, so a 2026 trial concerning earlier damage belongs to the coverage record. An article can describe several affected cables, and several articles can follow the same disruption. The resulting totals measure the subjects receiving coverage in this newsfeed. They provide no count of unique physical faults or estimate of global failure frequency. The revised selection method and partial-year cutoff also prevent a direct trend comparison with the story totals in previous editions.

55

Figure 55: Cable Disruption Coverage by Geography and Reporting Focus, January 1–October 19, 2026

Submarine Telecoms Industry Report 2026/2027

05 / SYSTEM MAINTENANCE / 5.1 · 100


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

5.1 PUBLICITY

CONTINUED

Regional Visibility

Public Communication

Asia-Pacific accounted for 15 of the 24 articles, followed by the Baltic Sea with four, South Asia and the Caribbean with two each, and West Africa with one. Each article is assigned to its principal geographic focus. This distribution reflects the availability and selection of public accounts, the impact visible to customers, and the continuing interest in particular cases. It should inform an understanding of public attention rather than a ranking of regional engineering risk.

Ten articles primarily addressed faults or operational status, five reported restoration, and two announced planned serviceaffecting maintenance. This mix shows why publicity needs to follow the response as well as the initial disruption. A maintenance notice can help customers prepare for an interruption; a restoration update can close an account that would otherwise continue to imply that a route remains unavailable.

Vietnam’s August coverage illustrates the difference between a story and an event. One report described problems affecting SJC2, AAE-1, AAG, and Intra-Asia, with different onset information and repair expectations. Operators were balancing traffic through working submarine and terrestrial routes (VOV.VN, 2026). Baltic coverage followed another pattern: the September Fitburg trial concerned alleged damage associated with December 31, 2025. That article extended the public life of an earlier case (AFP, 2026). Both patterns can increase coverage without establishing a corresponding increase in newly occurring faults.

The October Philippines–Singapore C2C coverage separated observed latency from identification of the affected link. InfiniVAN subsequently reported restored service under monitoring and said a Reason for Outage report would follow. Those statements established a service milestone while leaving the physical cause and any particular repair operation unresolved (Solano, 2026). For customers, the immediate question was whether connectivity had returned. For reliability analysis, the explanation of the preceding disruption remained a separate requirement.

Evidence and Attribution Investigations and court proceedings were the main focus of seven articles. Their contribution is partly to revise what is publicly known. April coverage reported suspicion that a salvage barge had damaged the Dongyin–Beigan cable during the recovery of a stranded fishing vessel. In July, a follow-up reported that prosecutors declined to prosecute the captain because of insufficient evidence (Focus Taiwan, 2026; The Maritime Executive, 2026). The later decision matters to the interpretation of the original allegation. Keeping the two accounts connected helps prevent an early security narrative from outlasting the evidence supporting it. Cause, intent, and responsibility require separate support. ICPC’s anchor-damage guidance explains that one anchor-drag event can damage several cables, while its media guidance cautions that dragging an anchor does not itself establish intent to damage infrastructure (International Cable Protection Committee, 2025; International Cable Protection Committee, 2026). For the report’s purposes, an operational notice, a suspected mechanism, a charge, and a judicial finding carry different evidentiary weight. Publicity is most useful when readers can identify which stage has actually been reached.

Submarine Telecoms Industry Report 2026/2027

Cirion’s Venezuela coverage also progressed through distinct stages. The initial July repair report described Wave Sentinel at the work area, recovery-related inspection, and testing of the broken cable ends. The later restoration report carried Conatel’s statement that repairs and definitive link tests were complete (Rodríguez, 2026; Cirion Technologies, 2026). Such updates help customers and public authorities distinguish mobilization, work underway, and completed restoration. They also give operators a way to communicate progress without turning an estimated schedule into an assurance of completion.

Better Reporting The commercial value of clear reporting lies in reducing uncertainty about service and response. A useful update identifies who supplied the information, the affected service or system, the confirmed milestone, and the remaining uncertainty. Follow-ups can then explain whether the situation has improved, whether an explanation has changed, or whether an investigation has reached a new stage. Consistent publication of those distinctions would make the public record more useful to customers, policymakers, and the industry.

05 / SYSTEM MAINTENANCE / 5.1 · 101


SUBTEL FORUM

5.1 PUBLICITY

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

A stronger operational evidence base also requires information beyond the news cycle. The International Advisory Body on Submarine Cable Resilience’s Working Group 2 recommended developing voluntary, anonymized sharing of information about cable delays, marine faults, and other outages, separated from the identity of individual systems (International Advisory Body on Submarine Cable Resilience, 2026). This proposed approach could support comparison while recognizing disclosure sensitivities; it does not establish an implemented global reporting system. Publicity and structured reporting serve complementary purposes. The former shows how cable disruption reaches public attention, while the latter can improve the evidence available for assessing resilience and maintenance performance. Section 5.2 examines the separate evidence on reported repairs and response times.

Submarine Telecoms Industry Report 2026/2027

05 / SYSTEM MAINTENANCE / 5.1 · 102


SUBTEL FORUM

5.2

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

05 / SYSTEM MAINTENANCE

REPORTING TRENDS AND REPAIR TIMES

The public repair summaries form a partial record, and successive publication vintages do not establish a consistent trend. As Section 5.2.1 explains, the ICPC's published totals for 2023 differ and the summaries do not reconcile the difference. The long-term global repair trajectory therefore remains unresolved. The operating conclusion is more direct: each new system adds infrastructure that requires protection and repair readiness throughout its service life. ICPC 2025 Plenary Highlights identifies regional variation in repair activity. For owners, this makes geography part of the operating proposition. A global total cannot describe conditions confronting every system, and the same engineering task can sit within very different access and mobilization arrangements. Resilience planning needs both visibility into reported activity and an understanding of the conditions under which a particular route is supported. Repair commencement is especially important because it precedes the physical repair operation. Time between identifying a problem and beginning marine work can affect the period for which an owner's normal network configuration is unavailable. The commercial implications extend to customers whose service plans depend on that route. This gives mobilization and access arrangements a direct relationship with infrastructure value: the cable's technical capability is only one part of the service that its owner is responsible for sustaining. The distinction between commencing a repair and completing it also helps organize operating responsibilities. Detection and fault investigation, arrangements for a vessel and the requirements for access to the work area are different parts of the response. The owner needs an effective path through that sequence, while marine providers need the information and authority required to undertake the work. The reviewed findings place attention on those preparatory stages, making readiness a substantive part of the maintenance program rather than an administrative detail.

Submarine Telecoms Industry Report 2026/2027

The ITU's February 2, 2026 article The world is coming together to strengthen submarine cable resilience describes international cooperation on resilience. For the industry, the importance of that cooperation is the relationship between a cross-border asset and the institutions involved in supporting it. Cable owners, marine businesses and authorities have different responsibilities, but an effective response requires those responsibilities to meet at the point of operation. The commercial service crosses borders even when the physical repair occurs in one jurisdiction. A useful operating assessment also distinguishes cable faults from the service experienced by a customer. The owner's network may have alternative routes, while a customer's access arrangement determines which alternatives it can use. The significance of a fault therefore depends on both the damaged infrastructure and the wider service configuration. This is why route diversity and maintenance readiness belong in the same strategic discussion: alternatives address continuity during a problem, while repair arrangements restore the affected asset's contribution to the network. The growth charts give this operating discussion an investment context. Large new capacity and length cohorts create infrastructure that must be supported over its service life. Owners can evaluate that obligation when deciding how a route fits their wider network, and customers can evaluate it when selecting capacity and service arrangements. The industry's conclusion is that the usefulness of new connectivity extends beyond construction: dependable operation requires the commercial and institutional relationships needed to respond when an asset is damaged. The supported operating conclusion is that protection and timely repair commencement remain central to network value. New construction extends the range of routes an owner can use, while maintenance sustains their contribution after service begins. For customers, the distinction becomes practical during an interruption: alternative connectivity can support continuity, and an effective repair response restores the damaged route. The industry's investment and maintenance agendas therefore meet in the quality of the service that the infrastructure is intended to provide.

05 / SYSTEM MAINTENANCE / 5.2 · 103


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

5.2 REPORTING TRENDS AND REPAIR TIMES 5.2.1 Cable Faults and Maintenance: 2016– 2025 and 2026 Year to Date Submarine cable maintenance records show a substantial reported repair workload, but the public annual figures available here form a partial reporting series rather than a complete census of cable faults. International Cable Protection Committee (ICPC) public summaries list 240 reported cable repairs in 2017 and 197 in 2018; an ENISA report reproduces 185 for 2021; ICPC summaries list 184 for 2022, 201 for 2023, 204 for 2024 and 178 for 2025. For 2023, the 2024-plenary summary’s earlier 206 is superseded for this report by the later 2025 summary’s 201. The public summaries do not explain the five-repair difference, so it is a difference between published vintages rather than a confirmed correction. (ICPC 2019 summary; ENISA report; ICPC 2023 summary; ICPC 2024 summary; ICPC 2025 summary; ICPC 2026 summary)

56

CONTINUED

These values describe repairs reported through maintenanceprovider data, not necessarily distinct incidents, damaged cables or customer outages. The public sources do not establish exhaustive or constant coverage across years. Exact annual totals were unavailable in the reviewed public evidence for 2016, 2019 and 2020, and no 2026 year-to-date total was verified through the October 17 evidence cutoff. Those are unavailable observations, not zero-repair years. With genuine gaps, changing reporting coverage and no aligned cable-kilometer-year or cableyear denominator, this series describes reported workload but does not establish a global fault-rate trend.

Figure 56: Reported cable Repairs in the Public Maintenance-Provider Reporting Sample, 2016–2025 (Reported cable repairs)

Submarine Telecoms Industry Report 2026/2027

05 / SYSTEM MAINTENANCE / 5.2 · 104


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

5.2 REPORTING TRENDS AND REPAIR TIMES A limited operational view is available for response stages. The ICPC 2025 public summary gives 2024 averages of 22.5 days from notification to vessel departure and 6.5 days in transit. These measure different stages before work at the fault site; they do not report time from vessel arrival to physical repair or service restoration. The ICPC 2026 summary lists 23.4 and 7.7 days, respectively, but does not specify the statistical period or cohort. These later figures therefore remain unassigned to a year. The two stage averages should not be added into one duration because compatible sample membership and definitions are not established. (ICPC 2025 summary; ICPC 2026 summary) Named cases show why physical repair, service restoration and customer outage duration are separate measures. Ghana’s National Communications Authority attributes one West African disruption on March 14, 2024, to cuts affecting SAT-3, ACE, WACS and MainOne, and reports each cable offering full capacity from its respective repair date. Physical repair completion ranged from April 6 for SAT-3 to May 8 for MainOne. From the reported disruption date, the elapsed calendar intervals were 23 days for SAT-3, 34 for ACE, 46 for WACS and 55 for MainOne. All four systems belong to one disruption group. The NCA’s full-capacity statement is a cable-level service milestone, not an endpoint for recovery of every affected customer. (Ghana NCA update 7, May 22, 2024)

Submarine Telecoms Industry Report 2026/2027

CONTINUED

The Tonga-Fiji international cable provides a second sourcebacked interval. World Bank reporting says volcanic activity severed the submarine fiber cable on January 15, 2022, and repair was completed February 22, a 38-calendar-day interval. The source says Tongatapu telecommunications were re-established following repair but gives no separate precise service-restoration date; the 38 days should not be labeled a measured outage duration. A different milestone appears in the FALCON Gulf Loop case: an operator-origin statement reports repair completion and full cable-traffic restoration on April 3, 2020, and identifies C.S. Maram. Because onset is unknown, FALCON can anchor a repair milestone but cannot supply an onset-to-repair interval. (World Bank financing supplement; World Bank GRADE report; FALCON operator-origin statement)

05 / SYSTEM MAINTENANCE / 5.2 · 105


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

5.2 REPORTING TRENDS AND REPAIR TIMES

57

FIGURE 57

Figure 57: Elapsed Calendar Days From Reported Disruption/Onset Date to Documented Physical Repair Completion (Calendar days)

Preventive maintenance is documented more clearly as an activity than as a measured outcome. AARNet’s 2024 annual report describes patrol boats and AIS monitoring across a 100-kilometer high-risk stretch near Jakarta after repeated faults; it supplies no count of prevented incidents or evaluation of effectiveness. At the broader level, ICPC’s 2025 summary of 2024 data attributes 86 percent of faults to fishing or anchoring and reports a location split of 43 percent in territorial waters, 55 percent in exclusive economic zones and 2 percent on the high seas. These are source-rounded percentages, not exact counts or exposure-adjusted risks. Together, these sources point to the operating importance of route protection and repair readiness while leaving the effect of specific interventions unmeasured. (AARNet 2024 annual report; ICPC 2025 summary)

Submarine Telecoms Industry Report 2026/2027

05 / SYSTEM MAINTENANCE / 5.2 · 106


SUBTEL FORUM

5.3

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

05 / SYSTEM MAINTENANCE

CLUB AND PRIVATE MAINTENANCE AGREEMENTS

Club and private agreements both organize access to repair capability. Cooperative zones pool owners' funding and oversight, while private arrangements secure services through directly negotiated contracts. Their geographic coverage can overlap (International Telecommunication Union, 2026).

Traditional Club Agreements Club agreements bring cable owners together to share maintenance resources and costs. Participating owners act as maintenance authorities, with collective management arrangements governing their relationship with marine service providers and depot operators. This gives members a mechanism for supervising suppliers without requiring each owner to organize the entire service independently (ACMA, n.d.; North America Zone Agreement, n.d.). The economics distinguish standing readiness from individual repairs. ACMA, for example, separates annual fixed costs from repair costs and uses cable length in allocating cable costs. Its cooperative arrangements include collective enforcement of supplier performance indicators and oversight of vessel location and outside work. Owners therefore need to assess both their recurring contribution and their exposure when a fault occurs. Shared resources also require agreed procedures for competing demands (ACMA, n.d.). Long-term readiness includes vessel replacement. In July 2026, Global Marine announced a construction contract for a maintenance newbuild scheduled for delivery in the fourth quarter of 2029, describing it as the first step in phased fleet renewal. The delivery schedule highlights the need to align longterm maintenance commitments with the renewal of the vessels that will fulfill them (Global Marine Group, 2026).

2 Oceans Cable Maintenance Agreement The 2 Oceans Cable Maintenance Agreement, or 2OCMA, provides cooperative maintenance coverage for cables in the southern Atlantic and Indian Oceans (International Telecommunication Union, 2026).

Submarine Telecoms Industry Report 2026/2027

Atlantic Cable Maintenance Agreement ACMA covers the North and South Atlantic, English Channel, North Sea, Caribbean and southeast Pacific. Its service combines marine repair resources with depot support, linking vessel availability with the shore-based preparation needed for repairs. The geographic scope also makes the position of vessels and spare plant relevant to the service offered to each cable (Global Marine, n.d.).

Mediterranean Cable Maintenance Agreement The Mediterranean Cable Maintenance Agreement, or MECMA, serves the Mediterranean, Black Sea and Red Sea region. Orange Marine's La Seyne-sur-Mer base provides logistics and depot support for the agreement. Cable storage, jointing facilities and laboratories form part of the preparation behind a repair campaign, alongside the vessels contracted to the agreement (Orange, 2025; Orange Marine, n.d.).

North American Zone Cable Maintenance Agreement The North American Zone Cable Maintenance Agreement serves the northeastern Pacific, extending from Alaska toward Mexico and between the mid-Pacific and North America's west coast. Cable Innovator and depot resources around Victoria, British Columbia, support this Pacific-facing maintenance framework (North America Zone Agreement, n.d.).

Southeast Asia and Indian Ocean Cable Maintenance Agreement The Southeast Asia and Indian Ocean Cable Maintenance Agreement spans Djibouti to Guam and Taiwan to Australia. Global Marine's Cable Retriever and Subic Bay depot support regional readiness. Fault diagnosis, suitable spares and depot loading remain distinct requirements alongside the availability of a vessel; a mobilization commitment consequently describes one stage of the repair process (Global Marine, n.d.).

05 / SYSTEM MAINTENANCE / 5.3 · 107


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

5.3 CLUB AND PRIVATE MAINTENANCE AGREEMENTS Yokohama Zone Cable Maintenance Agreement The Yokohama Zone serves East Asia through a cooperative regional framework. S. B. Submarine Systems participates as a maintenance provider, with repair, jointing and storage capabilities that include its Wujing cable depot. These supporting facilities connect the regional repair offering with the equipment and technical preparation required for work at sea (International Telecommunication Union, 2026; S. B. Submarine Systems, n.d.).

Private Maintenance Agreements Private maintenance agreements let owners negotiate service obligations around their systems. Contracts may permit outside work during periods without active faults, creating a balance between vessel utilization and availability for the contracted cables (International Telecommunication Union, 2026). Priority rules matter under either model. In 2025 parliamentary evidence, ASN's marine operations executive described private arrangements that prioritize traffic-affecting faults and coordinate notification order with owners. ACMA's chairman similarly described owner discussion of repair priorities. Transit, weather and the availability of suitable vessels affect the response under both approaches, so the agreement model alone does not establish repair speed (Joint Committee on the National Security Strategy, 2025). Owners should also compare the service package behind the marine response. Maintenance can include spare-inventory management, depot storage, fishing liaison, documentation and geographic information services. These supporting functions affect whether contracted capability can be put to work when a fault occurs. For owners, the commercial assessment connects standing charges, repair-specific costs and priority rules with the system's outage exposure and the resources needed throughout its operating life (SubCom, 2025).

Submarine Telecoms Industry Report 2026/2027

CONTINUED

Atlantic Private Maintenance Agreement The Atlantic Private Maintenance Agreement, or APMA, represents private maintenance coverage in the Atlantic. It operates alongside cooperative zone coverage, giving owners a choice of contracting structures in the same ocean market. ASN's marine operations executive described the company's Atlantic repair ships in 2025 parliamentary evidence, illustrating the provider-led capacity available through this part of the market (International Telecommunication Union, 2026; Joint Committee on the National Security Strategy, 2025).

Asia Pacific Marine Maintenance Service Agreement The Asia Pacific Marine Maintenance Service Agreement, or APMMSA, represents private maintenance coverage in Asia Pacific. Regional support also requires shore logistics: SubCom's published network includes a Guam marine depot and a Subic Bay forward-deployment center. For a system owner, the relevant connection is between the contracted repair resources and the facilities holding its compatible spare plant (International Telecommunication Union, 2026; SubCom, n.d.).

E-marine E-marine provides customized maintenance, repair and storage services across the Gulf, western Indian Ocean and Red Sea. Its Hamriya and Salalah depots support this regional footprint, with Salalah providing access to western Indian Ocean and East African routes. The service combines marine work with the storage and handling of the spare plant needed to support it (E-marine, n.d.).

South Pacific Maintenance Agreement The South Pacific Maintenance Agreement, or SPMA, provides a private maintenance framework for the South Pacific (International Telecommunication Union, 2026). Long ocean transits make the location of repair vessels and spare plant particularly relevant to the owners of island connections. As in other regions, the practical value of coverage depends on the operating resources and access arrangements supporting the contract.

05 / SYSTEM MAINTENANCE / 5.3 · 108


SUBTEL FORUM

5.4

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

05 / SYSTEM MAINTENANCE

FAULT HISTORY AND RECOVERY

Across the 2016–2025 window, industry reporting describes a recurring repair workload, while individual cases show how differently recovery can unfold. The annual figures in Section 5.2.1 provide a broad view. Selected histories add the operating context: several cables can be affected together, an international connection can return before a domestic network is repaired, and traffic can continue over other routes while marine work remains outstanding. These differences matter when assessing what a cable fault means for the people and businesses using the network. The ICPC's public summaries document repair activity, but they do not establish that reported repairs remained stable as the network expanded. The 2016-2025 record has gaps, and the published 2023 counts differ by source vintage, as detailed in Section 5.2.1. The practical implication is that new routes bring continuing obligations to protect and maintain infrastructure already in service. That obligation shapes a system's operating value alongside capacity and geographic reach (International Cable Protection Committee, 2019; International Cable Protection Committee, 2023; International Cable Protection Committee, 2025; International Cable Protection Committee, 2026). Tonga’s 2022 volcanic disaster illustrates why recovery needs a geographic scope. As the international repair timeline in Section 5.2.1 shows, restoring that connection re-established telecommunications in Tongatapu. The World Bank’s May financing document still described domestic cable repairs as expected later in 2022. Returning the international link therefore did not establish that every island’s cable connection had been repaired. Local connections carrying traffic beyond the international landing are part of the same resilience assessment (World Bank, 2022). The 2024 West African disruption described in Section 5.2.1 shows how several systems can share a physical exposure. Ghana’s National Communications Authority reported that cable providers located faults on the four affected systems at the crossing of Le Trou Sans Fond Canyon off Abidjan. Following the disruption, the regulator required backup and redundancy plans and directed mobile operators to retain redundant links within Ghana while adding a connection to a provider not landing there. The case gives route diversity a concrete test: owners and customers need to consider where apparently separate connections encounter the same geography and how alternatives reach the wider network (National Communications Authority, 2024).

Submarine Telecoms Industry Report 2026/2027

Vocus’s account of the late-January 2025 DJSC and North-West Cable System breaks adds the practical demands of recovery at sea. The response involved CS Lodbrog traveling from Fiji and work interrupted by Cyclone Zelia. Vocus reported a successful repair operation, but its March 3 account supplies no exact completion day for DJSC. The statement that normal operation returned after one month refers specifically to the North-West Cable System. The account shows how transit and weather can shape a repair campaign; it cannot establish a typical repair duration or a quantified weather effect for the industry (Vocus, 2025). 2026 Year to Date. A case spanning the year boundary makes the difference between connectivity and physical recovery especially clear. Chunghwa Telecom reported a fault on SJC2’s S1.4 segment on December 25, 2025, while stating that traffic had been rerouted and service remained unaffected. Its February 14, 2026 notice separately confirmed completed repair and a return to normal segment operation. The onset belongs to 2025 and the repair milestone to 2026. Earlier rerouting had protected service without repairing the damaged segment (Chunghwa Telecom, 2025; Chunghwa Telecom, 2026). Practitioner-reported maintenance activity. A supplied practitioner compilation drawn from Philippe Devaux’s LinkedIn activity adds context on repair campaigns and vessel work during 2025–2026. Its compiler and custodian are unconfirmed. It reports EAC-1 and Coral Sea Cable campaigns with completion unconfirmed. Devaux’s June 10, 2025 WACS post says branchingunit replacement work finished June 9, illustrating why a recorded date and a work milestone must remain separate. These are attributed accounts, not a count of independently verified faults. The four-system Red Sea update remains one reporting group. Fitburg’s investigation, ACE rerouting and planned maintenance, and Teliri’s propulsion breakdown are separately classified. The complete companion register preserves the entries and their source limitations (Devaux, 2025; Practitioner maintenance activity register, 2026). For the next phase of network growth, these histories support examining repair readiness alongside the independence of alternative routes. A customer may retain connectivity while an owner is still working to restore the damaged asset, and a regional disruption may require several repairs before the original network configuration returns. Clear reporting of those milestones would help owners assess maintenance performance and customers understand their exposure. 05 / SYSTEM MAINTENANCE / 5.4 · 110


SUBTEL FORUM

5.5

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

05 / SYSTEM MAINTENANCE

GLOBAL MAINTENANCE CHALLENGES AND TRENDS

Fishing and anchoring account for most classified faults in the reviewed ICPC analyses. That cause profile places protection at the interface between submarine infrastructure and other maritime activity. For owners, route engineering and protection choices are therefore connected with the ways in which the surrounding marine area is used. The industry's operating challenge is to sustain communications infrastructure within a shared environment, where the cable and other users may have different commercial purposes. The physical route matters to this challenge. A long system can connect many markets, but the exposure of individual parts of it depends on where the cable lies and what activity occurs nearby. This makes protection a route-specific task rather than a simple function of total system length. The cause profile gives practical meaning to marine awareness and engagement: understanding how infrastructure and maritime activity meet can inform the measures considered for the relevant portions of the route. Repair readiness supplies the response side of that protection strategy. Andy Palmer-Felgate's Global Submarine Cable Faults and Repair Dynamics: A Statistical Analysis, first published online September 16, 2026, provides further context for repair dynamics and governance. The relevant industry distinction is between the technical ability to repair a cable and the operating conditions under which that ability can be mobilized. A repair capability becomes useful to an owner when the resources, information and access arrangements can be brought together. The ITU International Advisory Body on Submarine Cable Resilience: Report of the Working Groups places protection and repair readiness within an international cooperation agenda. Its recommendations address the conditions needed to support resilience. For the industry, this framework connects private infrastructure responsibilities with public authority and crossborder operation. The value of a recommendation lies in the operating problem it seeks to resolve; its practical effect depends on how the relevant participants implement it in their own arrangements.

Submarine Telecoms Industry Report 2026/2027

The marine-asset discussion elsewhere in this report reinforces that distinction. Registered ownership identifies a resource landscape, while a repair response depends on suitable capability and availability for a particular task. A large vessel count does not answer every operational question. The owner needs to understand the arrangements through which its system can obtain the required support, and the marine provider needs a workable program for carrying out that support. The relationship between the asset register and an effective response is therefore commercial and operational as well as physical. Network diversity has a similarly practical dimension. A different ocean route can add geographic choice, but end-to-end continuity also depends on the landing, terrestrial and operating relationships connecting it to the customer. Two wet routes can share other infrastructure, while a customer's rights may cover only part of the available alternatives. For owners developing new systems, the implication is to evaluate how the route adds useful service options and how those options function during an interruption. Lifecycle decisions also belong within this resilience assessment. The EOS chart identifies substantial route length attached to estimated service milestones. Continuing operation, replacement and migration each create different support requirements. A transition is commercially meaningful when customers can retain access to the connections they need, with appropriate operating arrangements on the assets serving them. The industry therefore has to consider maintenance readiness for mature infrastructure alongside the delivery of new routes. The supported conclusion is an operating agenda with two linked objectives: reduce exposure to damage and enable an effective response when damage occurs. The dominant classified causes make the first objective concrete; repair commencement findings make the second consequential. Together they explain why resilient connectivity depends on more than adding cable kilometers or design capacity. It also depends on how the infrastructure is protected, supported and integrated into the services for which it was built.

05 / SYSTEM MAINTENANCE / 5.5 · 111


SUBTEL FORUM

CHAPTER 06

CABLE SHIPS ROSTERS / CAPABILITY / CONTINUING SUPPORT

Selected named rosters SubCom ASN Global Marine Orange Marine / Elettra

INTERPRETATION

These four selected rosters illustrate operating capability; their counts do not establish a unique global fleet total.

Marine assets connect planned projects with construction and continuing support. Figure 58 compares named telecomserving ships across 14 operating rosters, including vessels that also perform other subsea work.

112

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

named telecom-serving ships

largest named roster in the comparison

14

8

operating rosters

SubCom ships

Reviewed operating rosters include ships that perform other subsea work; not a unique global vessel total.

Named ships in the reviewed operating roster, not vessels exclusively committed to telecom work.

within 14 reviewed rosters

8 7 6 6

FROM THE CHAPTER

The 14 plotted rosters range from one to eight ships. SubCom leads with eight, followed by ASN with seven; Global Marine and Orange Marine with Elettra each have six.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

113


SUBTEL FORUM

6.1

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

06 / CABLE SHIPS

CURRENT CABLE SHIPS

Marine assets connect planned projects with construction and continuing support. Figure 58 compares named telecomserving ships across 14 operating rosters, including vessels that also perform other subsea work. The shore-end charts show landing participations associated with 2022–2026 current and 2027–2029 planned reporting cohorts, which do not establish operational ready-for-service status. Together, these views describe the resources and interfaces that turn a route into an operating network.

58

Fleet Distribution Fleet distribution describes a roster of named telecom-serving ships, rather than vessels available for immediate deployment. It shows the operating resources across reviewed organizations, while equipment, crews, geography and existing commitments determine whether a ship can serve a particular project.

Figure 58: Named Telecom-Serving Ships Across 14 Operating Rosters

Note: Bars count named telecom installation and maintenance ships in the reviewed operating rosters. ≥ marks a documented minimum; † marks six confirmed Global Marine ships, with a further conversion excluded. Source: SubTel Forum fleet roster audit, October 24, 2026. The 14 plotted rosters range from one to eight ships. SubCom leads with eight, followed by ASN with seven; Global Marine and Orange Marine with Elettra each have six. E-Marine has at least five. SBSS's published fleet listing separately names three DP2 cable-laying and maintenance vessels: Fu Tai, CS Fu Hai and Bold Maverick (S. B. Submarine Systems, n.d.). Submarine Telecoms Industry Report 2026/2027

A count does not show whether a ship can take a particular assignment. Availability depends on vessel configuration and existing commitments, location relative to the work, weather, access approvals and the maintenance arrangement covering the route. The roster is a starting point for matching capability and timing, not a promise of immediate capacity. Fleet renewal also has its own timeline. A July 7, 2026 steelcutting milestone at CRIST shipyard began construction of CS Resilience, which is scheduled to enter service in 2028. The milestone shows the time between a newbuild commitment and a vessel becoming available for work. 06 / CABLE SHIPS / 6.1 · 114


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

6.1 CURRENT CABLE SHIPS For vessel-level context, the Cableship Codex, published May 29, 2026, covers vessel specifications, ownership, mapped activity, and AIS-derived analysis. It complements this report's aggregate owner profile with more detailed marine information. The two resources serve different purposes: the report summarizes the resource landscape, while vessel-level analysis addresses capability and geographic questions. These ships serve different combinations of installation and repair work. Future deliveries will add modern capability as they enter service, while project schedules depend on matching a suitable vessel, crew and operating area to the assignment.

Operational Activity An Issue 150 vessel-movement analysis (p. 32), based on JulyAugust 2026 position reports, follows vessels after their latest qualifying depot or factory stop. It provides a broader movement trail than a map of facility pauses alone and makes repairassociated and installation-associated movement easier to inspect. It is a dated published analysis, not a report-wide fleet chart; movement patterns are not proof of a completed job or confirmed task.

Regional Hotspots In the July-August sample, positions span the North Atlantic and European waters, southern Africa and the Indian Ocean, East and Southeast Asia, and Pacific approaches off North America, Japan, Australia, and New Zealand. Facility-linked positions cluster near Singapore, Curaçao, Cape Town, and La Seynesur-Mer for depots, and near Yokohama, Calais, and Newington for factories. The map's industry lesson is geographic: marine support is distributed across operating basins, so port access and the location of depots and spares matter to the routes a vessel can support.

Submarine Telecoms Industry Report 2026/2027

CONTINUED

Depot and Factory Proximity The article's July-August sample records 2,201 idle reports near depots and 463 near factories, using a 50-kilometer facility radius. A depot can support cable and spare staging and maintenance preparation; a factory stop can precede cable or equipment loading for installation. These are repeated position reports, so one vessel remaining near a site can generate many observations. They describe presence near facility references, not unique visits or completed work.

Data Limitations These observations cover two months of AIS reports, the vessel identities and facilities in the article, and its stated stop rule. Position, speed and proximity cannot by themselves verify a vessel's task, work completion, condition, contractual obligation or availability. Report totals can include repeated positions from one vessel; the article's post-stop activity labels are operational inferences.

Fleet Outlook The current owner register and the construction pipeline point to a fleet being renewed over several years. Seven purpose-built telecom newbuilds have target deliveries from 2027 to 2029: four for OMS Group, two Orange replacements and one for Global Marine. The Orange ships modernize existing repair tonnage; corresponding retirements have not been identified for the other projects. The delivery profile is therefore a mix of renewal and potential expansion, not seven assured net additions. New hulls can change carrying capacity and capability even where the active vessel count changes little, with commissioning, mission equipment, crews and later retirements shaping the operational result.

06 / CABLE SHIPS / 6.1 · 115


SUBTEL FORUM

6.2

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

06 / CABLE SHIPS

FUTURE CABLE SHIPS

The announcements and construction milestones reported during 2026 point to a concentrated newbuilding cycle for the telecommunications cable fleet. As of October 19, seven future purpose-built telecom cable ships are supported by operator or shipyard commitments: four for OMS Group, two for Orange Marine and one for Global Marine. Their published delivery targets span 2027–2029. This is a gross delivery program. Its eventual contribution to the active fleet depends on the older vessels that leave service as the new ships arrive (Global Marine Group, 2026; Orange, 2025; Royal IHC, 2025; Ulstein Group, 2026).

Newbuild Pipeline

The scale of investment recalls the purpose-built fleet expansion around the turn of the century, but the present cycle combines additional installation capability with replacement of aging assets. New ships can increase carrying capacity, renew maintenance coverage and improve operating efficiency while producing a much smaller change in the number of vessels available. That distinction is central to assessing what the announced build-out will deliver.

OMS’s second pair was publicly announced in January 2026 following contract signature in December 2025. Both Ulstein SX252 vessels are targeted for 2028 (Ulstein Group, 2026). CS Resilience reached steel cutting in July and keel laying in September, with the latter milestone disclosed in October. Hull construction is at CRIST in Poland, followed by completion at Ulstein in Norway. Together, the two OMS programs account for four ships; the second Ulstein vessel is identified here by yard number 329 to preserve a clear hull count (Ulstein Group, 2026).

SubTel Forum’s January coverage of CS Genesis and CS Triumph followed the twin-keel milestone announced by Royal IHC in December 2025. The two fiber-optic cable-laying and maintenance vessels are being built at Pacific Shipbuilding in Vietnam, with delivery targets of 2027 and 2028, respectively. Each design has 6,500 metric tons of cable-carrying capacity. These are two physical hulls progressing through construction, rather than additional orders each time a milestone is reported (Royal IHC, 2025; Submarine Telecoms Forum, 2026).

Table 5: Confirmed Future Telecom Newbuilds and Fleet Implications Operator

Vessel or hull

Delivery target

Fleet count implication

OMS Group

CS Genesis

2027

Depends on subsequent withdrawals

OMS Group

CS Triumph

2028

Depends on subsequent withdrawals

OMS Group

CS Resilience / Yno 328

2028

Depends on subsequent withdrawals

OMS Group

Second Ulstein SX252 / Yno 329

2028

Depends on subsequent withdrawals

Orange Marine

First Colombo newbuild

2028

Replacement; no net growth from pair

Orange Marine

Second Colombo newbuild

2029

Replacement; no net growth from pair

Global Marine

New maintenance vessel

Q4 2029

Phased renewal; retirement not identified

Targets are subject to construction and commissioning; future withdrawals remain incompletely specified (Global Marine Group, 2026; Orange, 2025; Royal IHC, 2025; Ulstein Group, 2026). The target-year profile places one of the seven deliveries in 2027, four in 2028 and two in 2029. It therefore represents a substantial investment in the latter part of the decade, with the main increase in modern tonnage still ahead. The 2026 news record brings together earlier orders, construction progress and new commitments; it should not be read as seven shipbuilding contracts placed during this calendar year.

Submarine Telecoms Industry Report 2026/2027

06 / CABLE SHIPS / 6.2 · 116


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

6.2 FUTURE CABLE SHIPS

59

FIGURE 59

Figure 59: Targeted Gross Telecom Newbuild Deliveries by Year and Operator

Replacement and Expansion Orange Marine’s two vessels are explicit replacements for Léon Thévenin, built in 1983, and Antonio Meucci, built in 1987. The new ships, announced in November 2025 and followed through design and construction reporting in 2026, are due from Colombo Dockyard in 2028 and 2029. Their principal role is maintenance, with the ability to lay connecting segments up to 1,000 km. If the replacement program proceeds as described, two deliveries and two withdrawals leave the ship count unchanged while modernizing the service provided (Orange, 2025; VARD, 2026). The same longer-term issue matters within OMS’s expansion program. Its current fleet listing includes Peter Faber, an early1980s vessel now more than 40 years old. The four newbuilds can expand the fleet during their introduction while also creating options to retire older tonnage later. No dated retirement plan for Peter Faber has been verified, so a withdrawal is not deducted from the announced program. Equally, four incoming ships should not be assumed to produce a permanent four-ship increase (Ministère de la Transition écologique et solidaire, 2019; OMS Group, n.d.).

Submarine Telecoms Industry Report 2026/2027

Ship count also conceals differences in capability. OMS describes Peter Faber as a smaller, approximately 78-meter repair and laying vessel with about 575 metric tons of cable capacity. The new designs carry 6,500 metric tons each. They are not equivalent units of work: a large installation vessel and a smaller maintenance vessel serve different combinations of assignments. Renewal can improve the amount or reliability of work supported even where the eventual number of hulls changes little (OMS Group, n.d.; Royal IHC, 2025; Ulstein Group, 2026). Global Marine’s July announcement describes its Colombobuilt fiber-optic repair vessel, targeted for the fourth quarter of 2029, as the first step in phased fleet renewal. The release does not identify a corresponding withdrawal. Across the sevenship program, two replacements are therefore explicit, while the eventual retirement effects of the other five remain unresolved. New and old vessels may overlap during commissioning before the longer-term fleet position becomes clear (Global Marine Group, 2026).

06 / CABLE SHIPS / 6.2 · 117


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

6.2 FUTURE CABLE SHIPS

CONTINUED

Historical Context

Fleet Outlook

The early-2000s fleet expansion remains a useful historical reference. Louis Dreyfus Armateurs records three new purposebuilt cable layers, Île de Sein, Île de Batz and Île de Bréhat, arriving in November 2001. Its Île de Ré joined after conversion in 2002. SubTel Forum’s 2021 Industry Report identified a pronounced 2001–2003 addition cycle in its tracked fleet, followed by no additions during 2004–2010 and much more gradual investment thereafter (Louis Dreyfus Armateurs, n.d.; Submarine Telecoms Forum, 2021).

A separate Chinese procurement points to further telecom tonnage. A final award published in May 2026 names ZPMC as builder of one vessel for Linghang Xianxingzhe Maritime Technology in Shanghai (China CNTC International Tendering, 2026). The tender specifies a deep-water telecom cable-laying and repair ship, with delivery within 21 months of contract signature. A signed construction date and calendar delivery target have not been verified, so this awarded hull is kept separate from the seven-ship delivery schedule. The tender’s intended followon vessel is also outside the count (China CNTC International Tendering, 2026).

The subsequent downturn demonstrated how quickly marine investment could outlast the work that originally supported it. In results for 2003, published in March 2004, James Fisher reported Oceanic Princess and Oceanic Pearl in lay-up throughout the year and estimated that approximately 15 cable vessels had been scrapped. That contemporary account illustrates the severity of the adjustment, rather than supplying a complete global fleet census (James Fisher and Sons, 2004). Against that background, SubTel Forum sees the current clustering of purpose-built projects as a substantial return to fleet investment, with echoes of the building cycle surrounding the last industry boom. Historical records differ in their coverage of newbuilds, conversions and support vessels, preventing a precise worldwide ranking of successive investment cycles. The evidence supports the broader conclusion: several operators are committing to a new generation of ships after a long period of selective renewal. Part of that investment expands capability; part replenishes the assets on which existing service depends.

Submarine Telecoms Industry Report 2026/2027

Other news concerns different forms of capacity. China Classification Society confirmed Tianyi Linghangzhe’s delivery in July 2026, placing it outside the future-delivery count. LD Armateurs’ September introduction of TVO Mariner involved an existing 2011 multipurpose hull. Power-led newbuilds such as LS Marine’s vessel under construction at Tersan can also carry optical cable, but that technical capability does not establish availability for telecom work. These developments complement the future program without being interchangeable with seven dedicated telecom newbuilds (China Classification Society, 2026; LD Armateurs, 2026; Tersan Shipyard, 2026). The outlook is therefore one of significant modernization with a phased effect on available resources. Most of the confirmed deliveries are targeted for 2028–2029, while their deployment will depend on crews, mission equipment, operating regions and existing contractual obligations. The important measure will be the work supported after commissioning and subsequent retirements. The announced ships demonstrate confidence in the next phase of the sector, while also recognizing that sustaining the present fleet’s contribution requires continuing investment.

06 / CABLE SHIPS / 6.2 · 118


SUBTEL FORUM

6.3

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

06 / CABLE SHIPS

SHORE-END ACTIVITY

Current Shore-End Activity

60

Figure 60: Cable–landing participations by system region for the 2022–2026 report cohorts.

Cable-landing participations in the 2022–2026 report cohort as of October 25 are concentrated in EMEA and AustralAsia, at 151 and 116, respectively. Together they account for 59.3% of the 450 displayed regional participations. The Americas record 79, Transpacific 56, the Indian Ocean 23, Transatlantic 10 and Polar 15. The distribution makes the shore interface a substantial part of the industry's recent regional activity, with repeated participation across a broad geography. The contrast with ocean-crossing length is useful. Transpacific is prominent in the physical and financial views of long-haul infrastructure, while the largest landing-participation categories here are EMEA and AustralAsia. A long route and a group of routes with many shore interfaces therefore create different local development patterns. The marine program extends beyond the offshore extent of a cable to the points where systems connect with facilities and terrestrial networks.

Submarine Telecoms Industry Report 2026/2027

The completed Batam landing of the approximately 50-km, 24pair NCC cable connects with a broader backhaul and data-center proposition at Nongsa Digital Park. Landing is a documented deployment milestone on the path toward operational readiness. The example shows why a relatively short wet link can matter commercially through the infrastructure to which it connects. For the industry, the shore-end stage makes those interfaces concrete. The cable has to meet the landing arrangements that connect it with the network beyond the beach. A developer's commercial proposition may depend on access to onward routes and customer facilities as much as on the marine crossing itself. The landing profile helps identify where repeated interfaces occur in the reviewed record, while project-level reporting explains what a particular interface is intended to serve.

06 / CABLE SHIPS / 6.3 · 119


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

6.3 SHORE-END ACTIVITY The NCC reporting places the cable within Indonesia Cable Express alongside another Batam–Singapore system, and identifies Citra Connect as part of BW Digital's terrestrial infrastructure. That is a concrete integrated-gateway mechanism: the short crossing connects with local backhaul and a wider development proposition. The commercial opportunity arises from the connected platform as well as the wet route. Bringing the wet route and accessible backhaul together could turn the infrastructure proposition into connections that customers can use.

CONTINUED

The regional distribution also matters to the interpretation of opportunity. A high participation count can indicate numerous system-to-shore relationships within a category, creating a different pattern of engagement from one large ocean crossing. It does not require every participation to represent a separate physical site. Its analytical value is to show the breadth of recorded shore connections associated with the projects, making local integration visible alongside global route construction. The conclusion is that landing development is a substantive part of the infrastructure cycle. The leading EMEA and AustralAsia counts show where that relationship is particularly prominent in the recent record. The NCC case supplies a focused example of its commercial meaning: the wet route, shore milestone and onward infrastructure form one customer-facing proposition, with operational readiness established through the completion of the relevant stages.

Future Shore-End Activity

61

Figure 61: Cable–landing participations by system region for the 2027–2029 report cohorts.

Submarine Telecoms Industry Report 2026/2027

06 / CABLE SHIPS / 6.3 · 120


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

6.3 SHORE-END ACTIVITY The planned 2027–2029 report-cohort landing profile is led by AustralAsia with 66 of the 148 charted regional participations, or 44.6%. The Americas record 30 and EMEA 19, followed by Transpacific with 12, Polar with ten, Transatlantic with eight, and the Indian Ocean with three. AustralAsia records more than three times EMEA's participations in this selection, while the forward shore program still spans all charted regions. The pattern differs from the recent profile, where EMEA records 151 landing participations and AustralAsia 116. In the planned selection, AustralAsia records 66 and EMEA 19. This gives the planned regional profile a more pronounced AustralAsia shoreinterface position. The change in composition describes regional landing participations in the selected report cohorts, with the three-year planned 2027–2029 cohort considered on its own terms rather than annualized against the five-year 2022–2026 record as of October 25. AustralAsia, EMEA and the Americas together account for 115 of 148 planned participations (77.7%). The same categories account for 346 of 450 recent participations (76.9%). AustralAsia's share moves from 25.8% in the recent profile to 44.6% in the planned profile. This is a composition comparison between the threeyear planned 2027–2029 report cohort and the five-year current 2022–2026 report cohort as of October 25, not an annualized growth rate. The combination of shore participation and planned length adds a fuller physical view. AustralAsia leads both this landing category and the planned regional kilometers chart. Transpacific has a large, planned length position with fewer landing participations. These separate dimensions frame different types of work: extensive routes require marine programs, while landing relationships connect those routes with local facilities and onward access. Both are necessary to understand the infrastructure a project is intended to deliver.

6.4

CONTINUED

For customers, the significance of a future cable depends partly on the networks reachable from its landings. A new ocean path is useful when the customer can obtain the rights and connections needed to reach its endpoints. For developers, this places the landing proposition within the commercial design of the system. The regional participation chart makes the number of recorded relationships visible; it directs attention to the projectspecific infrastructure through which those relationships become accessible services. Polar's ten planned landing participations also give context to its relatively small current system base. The forward profile can be meaningful in local connection terms even when the current inventory has few systems. Similarly, the Americas and EMEA retain substantial participation counts despite AustralAsia's leading position. The planned shore program therefore includes both expansion around major regional categories and distinct interfaces associated with smaller ones. The marine chapter's conclusion is that resource development and shore integration describe different requirements of the same construction cycle. Vessel investment supports the ability to undertake marine work; landing arrangements connect the resulting wet infrastructure to operating networks. The data gives both requirements a geographic and organizational context. Their practical value becomes clear at project level, where the scope of the marine program and the availability of onward connections meet the customer's intended use.

VESSEL DEMAND AND FLEET ADEQUACY

Table 5 lists seven future purpose-built telecom ships with target deliveries from 2027 through 2029. Two Orange vessels are explicit replacements for older ships, so the gross pipeline is not seven net additions to the active fleet. Newbuilds are meaningful investment in future marine capability, but they enter service only after delivery and commissioning.

Whether the fleet can meet a particular need depends on mission and location. Installation and repair vessels carry different equipment and cable-handling capability; crew, spares, port access, permits, weather and existing commitments shape where a ship can work and when it can mobilize. A project-specific match between vessel, route and maintenance arrangement is more useful than a single global hull count. The evidence shows a significant delivery pipeline, but it does not establish a global surplus or shortage. The next assessment should follow deliveries, commissioning, retirements and regional commitments together. Fleet adequacy ultimately turns on capable ships being positioned to serve the work required, not on the orderbook alone.

Submarine Telecoms Industry Report 2026/2027

06 / CABLE SHIPS / 6.3 · 121


GLOBAL SUBSEA EXPERTISE.

FROM STRATEGY TO SEA. Submarine cable consulting, engineering and client-side delivery for every phase of your project. TELECOM / POWER / HYBRID SYSTEMS

25

7

YEARS ACTIVE

CONTINENTS

FULL-LIFECYCLE CAPABILITY

01

CONSULTING Strategy, feasibility, system design, procurement and regulatory planning.

02

IMPLEMENTATION Project controls, supplier coordination, testing, commissioning and acceptance.

ISO 9001 / 14001 / 27001 / 45001

Independent thinking. Practical execution. Clear accountability from shore to offshore.

HAVE A PROJECT IDEA?

LET'S DISCUSS.


INDEPENDENT BY DESIGN

50

224

COUNTRIES

PROJECTS

CLIENT-SIDE. VENDOR-NEUTRAL.

03

IN-FIELD

04

Independent oversight for survey, installation, repair and marine operations.

OPERATIONS Maintenance, asset stewardship and practical system evolution.

COMMERCIAL / GOVERNMENT / OFFSHORE ENERGY

+1 703 861 3647

info@wfnstrategies.com

wfnstrategies.com


SUBTEL FORUM

CHAPTER 07

Hyperscalers and data centers CURRENT AND PLANNED / RECORDED INVOLVEMENT

Recorded involvement by distinct cohort Manufactured 2022–2026

Recorded involvement 19/66 Other / unrecorded 47/66

INTERPRETATION

Separate denominators 66 and 59; 'other' means no recorded hyperscaler flag, including uncertain backing. No joined total or implied owner identity.

124

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

recorded hyperscaler involvement · 2022–2026

recorded hyperscaler involvement · planned 2027–2029

19 / 66

16 / 59

systems

systems

28.8% of the manufactured reporting cohort; other category includes systems with backing not fully identified.

27.1% of the distinct core planned reporting cohort; not the 65-system extended 2027–2030 selection.

manufactured 2022–2026 vs planned 2027–2029

Planned 2027–2029

Recorded involvement 16/59 Other / unrecorded 43/59

HYPERSCALER ANALYSIS

7.1

Hyperscaler involvement can describe a system's development model, while hyperscaler demand can also support infrastructure owned by other businesses. The reviewed classification charts examine the first relationship through system counts and reported project cost. Selected STF cases explain the second through customer commitments and independent wholesale development. Considering both relationships gives a fuller commercial picture of the sector: large cloud platforms can be infrastructure sponsors and capacity buyers, with different consequences for ownership, suppliers and the networks serving their demand.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

125


SUBTEL FORUM

7.1 HYPERSCALER ANALYSIS

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

Current Systems Impacted

62

Figure 62: System counts by recorded hyperscaler involvement for the 2022–2026 report cohorts.

Systems with recorded hyperscaler involvement account for 19 of the 66 manufactured systems in the 2022–2026 report cohort, or 28.8%; other systems account for 47, or 71.2%. Here, 'other systems' means systems without recorded hyperscaler involvement, including records whose backing is not fully identified. Hyperscaler involvement is therefore substantial in the recent project record. The count view establishes the composition of the cohort, providing a basis for examining how the forward mix differs.

Submarine Telecoms Industry Report 2026/2027

07 / HYPERSCALERS AND DATA CENTERS / 7.1 · 126


SUBTEL FORUM

7.1 HYPERSCALER ANALYSIS Demand and ownership can connect in several ways. One example is the announced EXA Meridian project, an independent wholesale project with anchor commitments from hyperscale and neocloud customers. The announcement reports a contract in force with Xtera, a 24-pair design exceeding 500 Tbps, and a Q4 2029 RFS target. The project is to connect directly with EXA's owned terrestrial network, linking the capacity commitment to infrastructure customers can use to reach other markets.

63

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

For the industry, the case distinguishes a customer's capacity requirements from the ownership model of the route serving them. The system classification is useful for understanding development, while the commercial customer relationship can extend beyond that classification. The count result and the wholesale example together show why hyperscaler influence should be investigated through both sponsorship and procurement, rather than assuming that it is confined to one organizational form.

Figure 63: Cumulative system counts by recorded hyperscaler involvement at report cohort years 2022–2026, retaining preperiod history.

In the cumulative manufactured inventory, systems with recorded hyperscaler involvement rise from 23 at the 2022 point to 38 at 2026, while other systems rise from 533 to 566. The increases are 15 and 33 respectively, or 65.2% and 6.2% within each category. The group with recorded hyperscaler involvement has the larger proportional increase in this cumulative view from its smaller base, while the other category adds more systems in absolute terms. The contrast captures both the increasing prominence of the newer sponsor group and the continued development associated with the much larger other-system base.

Submarine Telecoms Industry Report 2026/2027

At the 2022 point, systems with recorded hyperscaler involvement represent about 4.1% of the combined 556-system total; at 2026 they represent about 6.3% of 604. The share rises by roughly 2.2 percentage points within the cumulative record. This is a different perspective from the 28.8% share in the recently manufactured report cohort. The cumulative series includes earlier report cohorts, showing how a large legacy base can coexist with a more prominent hyperscaler role in newer projects.

07 / HYPERSCALERS AND DATA CENTERS / 7.1 · 127


SUBTEL FORUM

7.1 HYPERSCALER ANALYSIS The industry implication is a transition within an extensive infrastructure landscape. Greater hyperscaler prominence in newer projects develops alongside a large, recorded base associated with other owners and development models. Suppliers and customers consequently operate within both relationships. The cumulative and recent views help explain that coexistence, identifying the relative importance of a newer sponsor group without treating the industry's established system base as commercially irrelevant.

64

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

For procurement, this coexistence is significant. A customer may evaluate new company-led routes while also buying services from existing wholesale infrastructure. An owner may develop a new system around anchor requirements while continuing to operate an established network. The different count perspectives explain why these relationships can develop together: the newer project mix changes, but it remains embedded within a much larger recorded history of infrastructure serving varied sponsors and customers.

Figure 64: Planned system counts by recorded hyperscaler involvement for the 2027–2029 report cohorts.

Submarine Telecoms Industry Report 2026/2027

07 / HYPERSCALERS AND DATA CENTERS / 7.1 · 128


SUBTEL FORUM

7.1 HYPERSCALER ANALYSIS Future Systems Impacted The planned 2027–2029 reporting cohorts contain 16 systems with recorded hyperscaler involvement and 43 other systems, for a total of 59. The first group represents 27.1%, which is 1.7 percentage points below its 28.8% share of the recent manufactured selection. Other systems still account for most planned project numbers. The planned record therefore extends well beyond the systems with identified hyperscaler involvement.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURE 65

The forward count mix and this announced example identify a substantial hyperscaler development role while retaining the importance of other sponsors. For the industry, the commercial question is how those projects complement or compete with the wider network offerings available to customers. The delivery program remains diverse in ownership, geography and customer relationships, with large-platform requirements influencing more than one route-development model.

A February 2025 SubTel Forum article on Project Waterworth reproduces Meta's announcement of a multi-year, multibillion-dollar program spanning more than 50,000 km and five continents, with a 24-fiber-pair design. The announced scale illustrates the geographic ambition possible within a companyled infrastructure program. Meta presents AI and connectivity as its rationale; that rationale is distinct from measured attribution of cable traffic to particular workloads.

65

Figure 65: Known reported whole-project cost (USD) by recorded hyperscaler involvement for the 2027–2029 report cohorts.

Submarine Telecoms Industry Report 2026/2027

07 / HYPERSCALERS AND DATA CENTERS / 7.1 · 129


SUBTEL FORUM

7.1 HYPERSCALER ANALYSIS

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

The planned 2027–2029 known-cost selection records USD 11.5346 billion for systems with recorded hyperscaler involvement and USD 7.228625 billion for other systems, totaling USD 18.763225 billion. Their shares are 61.5% and 38.5%. Known costs cover 14 of the 16 systems in the first group and 29 of the other 43. The first group has a substantially larger share of known whole-project value than its 27.1% share of system numbers. These values describe project scale, not the amount contributed by a particular investor or annual spending.

The chapter's conclusion is a substantial hyperscaler role in the planned mix and a particularly strong share of known project value, alongside continuing activity by other sponsors. Independent wholesale development and company-led programs offer different ways of serving large-platform demand. For the wider industry, those models connect ownership, procurement and network access in different combinations. Their practical importance lies in the infrastructure delivered and the services customers can obtain, rather than the ownership label alone.

That contrast has consequences for the commercial interpretation of the build market. A sponsor group can be important to reported construction value without accounting for most projects. Manufacturers and marine providers therefore need to consider the scale of the infrastructure associated with customers as well as the frequency of engagements. The count and known-cost profiles identify different dimensions of opportunity, with project design and route scope providing the details behind individual commitments.

Physical Scale and Recorded Milestones of Hyperscaler Development

66

The physical length of planned systems adds another dimension to the hyperscaler comparison. In the 65-system planned 2027– 2030 reporting cohorts, 16 systems have recorded hyperscaler involvement, representing 24.6% of project count. Those systems account for 145,790 reported km among 13 known-length entries. The other 49 systems account for 128,194 reported km among 31 known-length entries. The first group therefore represents 53.2% of the 273,984 known reported kilometers, a considerably larger share than its proportion of systems. Figure 66 keeps count, length and known reported cost on their separate percentage bases.

Figure 66: Hyperscaler shares of planned systems, known reported length and known project cost, 2027–2030 report cohorts (percentages use separate totals for each measure).

Submarine Telecoms Industry Report 2026/2027

07 / HYPERSCALERS AND DATA CENTERS / 7.1 · 130


SUBTEL FORUM

7.1 HYPERSCALER ANALYSIS The difference is visible in the typical known-length project as well as in the total. Median reported length is 6,800 km for systems with recorded hyperscaler involvement and 2,571 km for other systems, making the former approximately 2.6 times the latter. This does not establish why any individual route is longer. It describes a forward portfolio whose physical extent is more heavily weighted toward the hyperscaler group than a count of projects alone suggests. For the construction industry, that extent adds useful context to the distribution of customer engagements. Known reported cost points in the same broad direction. The group with recorded hyperscaler involvement contributes USD 11.5346 billion, or 54.0%, of the cohort's USD 21.365725 billion known-cost total. Cost coverage is 14 of 16 hyperscaler-driven systems and 31 of 49 other systems, while length coverage is 13 of 16 and 31 of 49. Because disclosure coverage differs, each percentage describes its own known-value total. Together the views show a larger recorded role in physical and financial scale than in project frequency, without implying a fixed relationship between kilometers and cost.

67

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

Recorded development milestones provide a further connection. Nine of the 16 systems with recorded hyperscaler involvement record a contract in force (56.2%), compared with six of 49 other systems (12.2%). A completed survey is recorded for one of 16 and two of 49, respectively. Both milestones are recorded for none of the first group and two other systems. Figure 67 uses every system in each group as the denominator, retaining unknowns. The contract contrast is substantial, while the intersection of commercial and survey milestones remains a smaller part of each group.

Figure 67: Planned-system counts and recorded CIF/survey milestone percentages by hyperscaler involvement, 2027–2030 report cohorts.

The industry implication is more specific than a general claim that hyperscalers drive all future demand. Their recorded portfolio has considerable route extent and reported cost, and a larger share with CIF recorded, while other sponsors still account for most project numbers. Manufacturers, installers and landing partners consequently face different combinations of project scale and commercial position across their potential customers. These comparisons describe portfolios; they do not measure procurement concentration among individual companies, prove negotiating power or establish how many vessels a route will require.

Submarine Telecoms Industry Report 2026/2027

A company-led program such as Project Waterworth illustrates the geographic scope that multiyear infrastructure plans can seek. The database comparison looks beyond one prominent announcement to the classified forward cohort. Sponsor composition, physical scale, and recorded milestones need to be read together. Customers assessing the resulting connectivity still need route, landing, commercial-access, and service evidence. A large sponsor program can change the development mix without making every announced cable equally advanced or every market equally well served.

07 / HYPERSCALERS AND DATA CENTERS / 7.1 · 131


SUBTEL FORUM

7.2

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

07 / HYPERSCALERS AND DATA CENTERS

DATA CENTER EXPANSION AND STRATEGIC GROWTH

PTC’DC 2026 placed data centers within a wider buildout of AI infrastructure. At the September 17 event in Reston, published sessions paired the global race for power and capital with land and infrastructure, and with fiber's investment profile relative to towers and data centers. A May interview with PTC CEO Brian Moon and Chairman/President Tony Rossabi had already linked AI demand with energy constraints, digital sovereignty, policy, and security. Read together, the PTC’DC 2026 program and the May PTC interview show how industry leaders frame the connection between compute and network decisions; they do not provide a market-wide demand forecast. The project examples already in this report make that connection concrete. WIOCC's investment spans data-center deployment, terrestrial fiber, and subsea assets. MDC's minority investment links border-market data-center growth to proposed landing hubs in Mexico. Firmus's APX East capacity agreement connects Australian AI infrastructure plans to a transpacific route still under development. Together, these examples show three distinct routes to connectivity: investment across several infrastructure businesses, minority capital to support expansion, and a longterm customer capacity commitment. They also sit at different delivery stages, so they do not imply a common funding model or build schedule. At PTC’DC 2026, a July 2026 Bain base-case model showed global critical IT capacity at 49 gigawatts (GW) in 2021 and forecast 99 GW in 2026E and 262 GW in 2031E (slide 3775). Here, critical IT capacity means the computing equipment installed in data centers. It differs from the electricity available to power a whole facility and from the traffic carried on submarine cables. The total includes general-purpose computing as well as AI. Four slide panels show the same forecast by operator type, use case, region and site size; they are different views of one total, not quantities to add. The use-case view forecasts inference capacity (computing that serves a trained model to users) rising from 15 GW in 2026E to 124 GW in 2031E, while training capacity is forecast to rise from 12 GW to 44 GW (slide 3777). A companion slide presents training as concentrated at large campuses with substantial power supplies and inference as closer to users. That is one illustrative planning lens, not a universal siting rule (slides 3778–3779). As an analytical implication, this difference may make route-diverse long-haul connections valuable for some concentrated campuses, while distributed services may place more weight on local fiber and network interconnection.

Submarine Telecoms Industry Report 2026/2027

One U.S. grid model presented at PTC’DC estimates that datacenter demand served through utility-grid connections (front of meter) would rise from 41 GW in 2026 to 104 GW in 2031 while preserving modeled reliability reserves (slide 3780). This 104 GW is modeled grid-supplied data-center demand, not the approximately 90 GW of pre-new-data-center grid headroom shown elsewhere on the same slide. Both are transmissionadjusted U.S. electricity measures and differ from the global critical IT-capacity forecast above. The served-demand estimate includes operating, under-construction and announced projects, and excludes on-site supply; it is not a count of confirmed utility contracts. The slide also shows regional mismatch: spare grid capacity in one area cannot necessarily serve a campus elsewhere. Timing compounds the power challenge. Some planned campuses of 500 MW to 2 GW aim for two-to-three-year construction schedules after groundbreaking, in addition to more than a year for site selection and design and at least four months of testing before operation (slide 3782). The presentation also flags grid connections, long waits for power equipment such as transformers and switchgear, skilled workers and permits as dependencies (slide 3783). These are targets and estimates, not evidence that the full capacity is operating. Each phase should be judged by whether it has power, has completed testing and is ready to serve customers. People and community acceptance also shape delivery. One PTC’DC workforce scenario estimates a need for 346,000 U.S. data-center electricians by 2028, compared with an estimated 83,000 employed in 2025 (slide 3785). It assumes accelerated hiring and training and recruitment from adjacent industries; this is a conditional staffing requirement, not a measured shortage or completed hiring total. A separate slide identifies water use, electricity costs, noise and local employment as recurring community concerns (slide 3789). A practical response is to pair a credible power and workforce plan with transparent local benefits, including jobs, tax revenue, grid investment and reliability (slide 3791).

07 / HYPERSCALERS AND DATA CENTERS / 7.2 · 132


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

7.2 DATA CENTER EXPANSION AND STRATEGIC GROWTH Demand growth alone is not an investment case. A PTC’DC slide frames execution risk as a financial risk: power, computing equipment and customer commitments need to arrive on a compatible schedule, while falling prices under long-term capacity contracts can narrow margins (slide 3790). That principle complements the project examples above—integrated infrastructure investment, expansion equity and long-term capacity commitments—without treating those models as equivalent or at the same delivery stage. Investment plans are more credible when each construction phase has a realistic power path, land-based fiber connections and customers prepared to buy capacity.

Submarine Telecoms Industry Report 2026/2027

CONTINUED

These constraints put the network plan in sequence. Developers can start with the site’s power and land, then confirm permits, land-based fiber routes, nearby submarine cable landing stations and international routes against each construction phase. Some sites can use existing submarine cables; others may need a new landing station or route. As inference spreads closer to users, local fiber and links between networks matter as well. The cable case is specific to each corridor; local access and timing matter as much as the site’s announced computing load. The outlook is substantial, but conditional. The July 2026 base case points to a much larger global compute footprint by 2031E, yet projects will come online in stages and along different geographic paths. Existing submarine routes may serve early demand, while new landings, route diversity and local fiber become more relevant where campuses have power, permits and customers in place. For cable owners, suppliers and investors, the signal to watch is whether project opening schedules, regional power access and customer commitments align. Announcement volume alone is not enough.

07 / HYPERSCALERS AND DATA CENTERS / 7.2 · 133


SUBTEL FORUM

CHAPTER 08

SPECIAL MARKETS UNREPEATERED ARCHITECTURE / MANUFACTURED SELECTION

Unrepeatered regional entries EMEA Americas AustralAsia

INTERPRETATION

Region counts for this architecture selection only; these are entries, not route kilometers or project value.

Unrepeatered systems form a distinct architecture segment within the reviewed manufactured record. The five figures below examine its annual counts, regional distribution, reported length, cost and planned regional entries.

134

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

unrepeatered · manufactured 2022–2026

EMEA unrepeatered · 2022–2026

16 / 66

10 / 16

systems

regional entries

24.2% of the broader manufactured cohort; architecture segment, not a global installed-network share.

62.5% of charted unrepeatered regional entries; do not generalize to all regional cables.

2022–2026 manufactured cohorts · 16 total

10 4 2

FROM THE CHAPTER

Across the same manufactured 2022–2026 reporting cohorts, the 16 unrepeatered systems represent 24.2% of the 66 systems in the broader manufactured selection. This makes the architecture a sizeable component of the recorded project mix.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

135


SUBTEL FORUM

8.1

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

08 / SPECIAL MARKETS

UNREPEATERED SYSTEMS

Unrepeatered systems form a distinct architecture segment within the reviewed manufactured record. The five figures below examine its annual counts, regional distribution, reported length, cost and planned regional entries. The measures reveal different aspects of its industry position. Project frequency describes the breadth of engagements, while physical and financial scale identify the infrastructure associated with those engagements. Their contrasts make this smaller segment commercially meaningful without assuming that every regional connection has the same purpose or technical design.

68

Figure 68: Unrepeatered system counts by report cohort year for 2022–2026.

The unrepeatered count series records eight systems in the 2022 report cohort, three in 2023, three in 2025 and two in the partial 2026 cohort. The 2024 axis position remains explicit, with no qualifying count. Eight of the 16 entries across the displayed cohorts are concentrated in 2022. The later groups are smaller, with the chronology showing an uneven sequence rather than consecutive populated cohorts compressed together.

Submarine Telecoms Industry Report 2026/2027

This pattern gives the segment a different rhythm from the wider manufactured length rebound in 2025. Unrepeatered project numbers stand at three in that year, while the industry's broader reported-length cohort is substantial. The architecture-specific view is useful precisely because it does not have to mirror the whole market. It identifies a defined project group whose count profile can differ from long-haul and other system programs.

08 / SPECIAL MARKETS / 8.1 · 136


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

8.1 UNREPEATERED SYSTEMS Across the same manufactured 2022–2026 reporting cohorts, the 16 unrepeatered systems represent 24.2% of the 66 systems in the broader manufactured selection. This makes the architecture a sizeable component of the recorded project mix. Its industry importance is particularly clear in the regional proportions below, where it accounts for a substantial part of qualifying activity.

69

CONTINUED

For developers and suppliers, the next question concerns the scale and purpose of the projects within that group. Figure 70 shows a much larger 2025 reported-length value than 2023, despite the same qualifying cohort count. The segment's industry role therefore requires count and physical extent together. Fewer projects can still represent meaningful infrastructure, while repeated smaller engagements can create a different commercial pattern.

Figure 69: Unrepeatered system counts by region for the 2022–2026 report cohorts.

EMEA leads the unrepeatered regional count view with ten of the 16 charted regional entries, or 62.5%. The Americas record four (25.0%) and AustralAsia two (12.5%). EMEA's position makes the unrepeatered architecture a visible part of its recent project profile alongside its broader system activity.

Submarine Telecoms Industry Report 2026/2027

The regional cost view changes that ordering. The Americas have the largest attributed cost in Figure 71, while EMEA leads this count chart. These separate views indicate different kinds of commercial prominence. EMEA has repeated qualifying project entries; the Americas have a larger reported financial position in the known-cost selection. The segment is consequently more varied than a single regional ranking would imply.

08 / SPECIAL MARKETS / 8.1 · 137


REACH

into the future Hexatronic is a reliable partner specializing in submarine fiber optic cables ranging from just a few kilometers up to thousands. We focus on providing customized logistics solutions according to the specific requirements for each project and help you every step of the way.

Time and cost efficient solutions Hexatronic offers complete submarine cable solutions and passive fiber infrastructure based on scalable and future proof technology. • Flexible approach for each and every project • High fiber count cables • Fast response, turnaround and delivery times • No project is too big or small • Swedish quality and technical proficiency • Easy to do business with!


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

8.1 UNREPEATERED SYSTEMS Relative to the same manufactured regional count selections, unrepeatered systems account for ten of EMEA's 23 entries (43.5%) and four of the Americas' eight (50.0%). AustralAsia's two of 14 represent 14.3%. These proportions establish the architecture as an important component of recent regional development. They also show why the absolute leading EMEA count and the Americas' financial prominence can be considered within a broader regional infrastructure mix.

70

CONTINUED

For the industry, the distinction directs attention to route-level propositions. A regional connection can have significance through the markets and facilities it links as well as its physical length. The shore-end analysis elsewhere in the report illustrates that broader commercial relationship. Within this architecture segment, count, length and cost provide complementary evidence of activity, helping suppliers and owners assess the type of opportunity associated with the projects.

Figure 70: Known reported whole-system length (km) of unrepeatered systems by report cohort year for 2022–2026.

Known reported unrepeatered length is 3,183 km in the 2022 reporting cohort, 818 km in 2023, 4,296 km in 2025 and 505 km in the partial 2026 cohort. The 2024 position remains explicit, with no eligible reported kilometers. The 2025 value is more than five times the 2023 value, while the qualifying cohort count is three in both years. The physical profile therefore changes markedly even when the project count is the same.

Submarine Telecoms Industry Report 2026/2027

This contrast is a particularly useful account of the segment's project mix. The 2023 and 2025 cohorts each contain three systems, but the latter has a much larger reported length. The partial 2026 cohort contains two systems and 505 known km. A similar count is consequently compatible with substantial variation in physical extent. The chart makes that variation visible without requiring a change in the architecture classification.

08 / SPECIAL MARKETS / 8.1 · 139


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

8.1 UNREPEATERED SYSTEMS

CONTINUED

For manufacturing and marine analysis, the implication is to connect engagements with the quantity of infrastructure involved. The 2025 cohort has a meaningful length position within the segment despite its smaller project count relative to 2022. Reading the two measures together gives a more useful account of the work associated with these routes and avoids treating project frequency as the sole indicator of industrial scale.

71

Figure 71: Known reported whole-project cost (USD) of unrepeatered systems, attributed by region for report cohorts 2022–2026.

The unrepeatered regional known-cost distribution places the Americas first at USD 366 million, or 54.4% of the USD 672.5 million charted total. EMEA records USD 240.5 million (35.8%) and AustralAsia USD 66 million (9.8%). These are reported whole-project values, not annual spending. The financial profile is therefore concentrated in a different category from the count view.

Submarine Telecoms Industry Report 2026/2027

The comparison is commercially important. EMEA's ten regional entries establish its leading position in project participation, while the Americas' cost attribution establishes a leading financial position in the known-cost cohort. Neither ranking alone describes the segment. One identifies the breadth of qualifying engagements; the other identifies where the reported project value is attributed. The differing orderings show that commercial scale and project frequency need separate attention.

08 / SPECIAL MARKETS / 8.1 · 140


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

8.1 UNREPEATERED SYSTEMS

CONTINUED

For the industry, this makes the unrepeatered market relevant in more than one way. Repeated projects can sustain a sequence of supplier and landing relationships, while a larger financial program can be significant to the businesses providing it. The count, length and cost views establish those dimensions. Their synthesis is a segment with a strong EMEA participation base and a substantial Americas cost position, whose individual routes determine the detailed commercial requirements.

72

Figure 72: Counts of systems classified as planned and unrepeatered, by region for the 2027–2029 report cohorts.

Systems classified as planned and unrepeatered in the 2027– 2029 reporting cohorts have eight charted regional entries. EMEA has four (50.0%), AustralAsia two (25.0%), and the Americas and Indian Ocean one each (12.5% apiece). EMEA remains the largest category in this defined planned selection. The smaller categories contain one or two entries, each with a substantial share of the displayed group.

The profile gives the forward segment a focused regional composition. Compared with the recent unrepeatered count view, AustralAsia remains represented, while the Indian Ocean appears in this planned selection. Those differences identify the geography of the particular planned group. They also illustrate why a small architecture-specific cohort can have a distinct shape from the wider planned route program.

The segment's overall conclusion is a combination of concentrated regional participation and varied physical and financial scale. EMEA leads both recent and planned count views; the Americas lead the known-cost distribution; reported cohort length changes substantially between cohorts with the same count. Together, these findings explain why the unrepeatered market should be assessed through its actual route propositions. Architecture, geographic purpose and project scale each contribute to its role within the broader submarine cable industry. Submarine Telecoms Industry Report 2026/2027

08 / SPECIAL MARKETS / 8.1 · 141


SUBTEL FORUM

8.2

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

08 / SPECIAL MARKETS

OFFSHORE ENERGY

Offshore energy creates demand for dependable connections to shore, including submarine fiber where operational requirements and network economics support it. In 2026, that demand is visible in contracts for new oilfield connections, managed services for floating production facilities, and monitoring of offshore wind infrastructure. The opportunity extends across communications and sensing, with different implications for cable suppliers and network operators. Assessing it requires distinguishing dedicated telecommunications routes from optical fibers incorporated into power cables, and new construction from services delivered over existing infrastructure.

A September five-year framework agreement with BW Offshore illustrates another form of demand. Building on services already supplied to three floating production, storage and offloading vessels, the agreement establishes a location-specific approach to managed connectivity across the fleet. Tampnet will combine available connections according to each facility’s requirements. It is a service commitment, with no announced cable length or confirmation that every vessel will receive a direct fiber connection. For offshore operators, reliable access to applications and onshore expertise can therefore generate both new network construction and additional business over existing networks (Tampnet, 2026c).

Oil and Gas

Offshore Wind

Tampnet’s June announcement provides a concrete example of demand tied to field development. The company was selected to provide subsea optical fiber and 5G connectivity for two deepwater projects in Keathley Canyon in the Gulf of Mexico. To support those projects and other regional customers, it announced approximately 400 kilometers of additional subsea fiber and 10,000 square kilometers of additional 4G/5G coverage. The resulting network is projected to exceed 1,900 kilometers of subsea fiber, connecting 24 offshore facilities from 2029. These are expansion plans associated with the announced contracts, rather than infrastructure completed during 2026 (Tampnet, 2026a).

The wind market provides a substantial base for communications and monitoring, although development remains uneven. GWEC’s June 2026 report announcement recorded 9.3 gigawatts of offshore wind commissioned during 2025, bringing the worldwide total to 92.5 gigawatts at year-end. It also identified approximately 25 gigawatts outside China with consent and planning permission that were still awaiting final investment decisions. Grid connections, auction outcomes and support arrangements could all affect when those projects advance. These figures describe generation capacity and project readiness; they do not measure telecommunications cable deployment (Global Wind Energy Council, 2026).

Tampnet identifies digital twins and remote visualization among the intended uses, connecting offshore installations with teams on land. Fiber supplies the offshore backhaul, while cellular networks extend access around the assets. The distinction matters commercially: an increase in wireless coverage is not an equal increase in submarine cable length. The announced 400-kilometer program also serves several developments and should not be counted again as a separate build for every customer (Tampnet, 2026a).

Progress during 2026 also occurred at different stages. The United Kingdom’s January Allocation Round 7 secured 8.4 gigawatts of offshore wind through its Contracts for Difference auction, establishing a procurement milestone for future generation (Department for Energy Security and Net Zero, 2026). In the United States, Ørsted reported a January preliminary injunction allowing Revolution Wind construction to resume while litigation continued (Ørsted, 2026b), followed by first power from the 704-megawatt project in March (Ørsted, 2026a). An auction award, permission to resume work, and first power each improve visibility into a project’s progress, but none alone establishes its full commercial commissioning.

Submarine Telecoms Industry Report 2026/2027

08 / SPECIAL MARKETS / 8.2 · 142


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

8.2 OFFSHORE ENERGY

CONTINUED

Wind also has a different cable architecture from a dedicated oilfield telecom network. Optical fibers can be incorporated into submarine power cables for communications, control and monitoring. Becerril’s September magazine article discusses using those fibers for sensing as well (Becerril, 2026). The resulting demand may be supplied through the design and instrumentation of array and export cables, alongside any separate communications links. Wind capacity growth consequently expands the potential market for optical technology without implying a corresponding number of standalone submarine telecommunications systems.

Floating wind introduces further development work because dynamic cables move with floating structures and experience wave and current loading. The VigieCâble consortium, announced in April, brings together FEBUS Optics, EDF, École Centrale de Nantes and Fondation OPEN-C to develop fiber-based monitoring of those cables. Its 48-month program, launched in early 2026, progresses through laboratory work, test benches and offshore trials toward pre-commercial maturity. It is evidence of investment in a monitoring capability whose performance and industrial viability are still being validated (Fondation OPEN-C, 2026).

Fiber Sensing

New Energy Uses

Sensing gives fiber a second operational role. Becerril describes distributed acoustic sensing as a way to observe vibration and dynamic strain along a cable, potentially identifying external activity or changes that warrant inspection. Its usefulness depends on interpreting the signals against normal environmental conditions and combining them with information such as vessel positions and maintenance history. The potential contribution is earlier, more targeted investigation; a detected anomaly still requires assessment and an operational response (Becerril, 2026).

Changing the purpose of offshore assets can also create communications demand. Tampnet’s March contract for Porthos concerns P18-A, a former Dutch gas platform being converted into an unmanned carbon dioxide injection installation. The announced redundant 25-megabit-per-second service is intended to support monitoring and remote control from shore. The release does not identify the project-specific transmission medium, so the award cannot be counted as a confirmed new submarine fiber route. It nevertheless demonstrates how the offshore communications customer base can extend into carbon capture and storage as existing facilities take on new roles (Tampnet, 2026b).

A May case study from AP Sensing describes temperature and acoustic monitoring delivered for RTE’s Fécamp, SaintBrieuc and Gruissan offshore wind connections in France. The submarine power cables incorporate optical fiber, with monitoring instruments installed onshore. Temperature sensing supports hotspot detection, while acoustic sensing supports the detection of external activity and cable faults. This supplier-reported deployment shows a practical market for fiber instrumentation within energy infrastructure, distinct from selling transmission capacity on a new telecom route (AP Sensing, 2026).

Table 6: Selected Offshore Energy Connectivity Developments in 2026 Development

Announced milestone

Cable market implication

US Gulf expansion

June contracts; projected network expansion serving 24 facilities from 2029 (Tampnet, 2026a)

About 400 km of additional subsea fiber in a wider regional program; not 400 km for each field.

BW Offshore fleet

Five-year connectivity framework signed in September (Tampnet, 2026c)

Managed service opportunity; no fleet-wide fiber construction quantity announced.

French wind links

May case study reports delivered monitoring for three RTE connections (AP Sensing, 2026)

Sensing uses optical fiber incorporated in submarine power cables.

VigieCâble

Four-year development program launched in early 2026 (Fondation OPEN-C, 2026)

Dynamic-cable monitoring research; pre-commercial validation remains part of the work.

Submarine Telecoms Industry Report 2026/2027

08 / SPECIAL MARKETS / 8.2 · 143


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

8.2 OFFSHORE ENERGY

CONTINUED

Development

Announced milestone

Cable market implication

Porthos P18-A

Communications contract announced in March (Tampnet, 2026b)

New offshore energy use; the release does not specify a new fiber route.

Market Outlook For the submarine cable industry, the most visible opportunities are projects with defined customers, operational requirements and delivery commitments. New field connections can justify extensions to established offshore networks. Wind development creates requirements for embedded fiber and sensing, with timing dependent on financing and construction. Managed connectivity can generate recurring service revenue even when no new wet plant is announced. Together, these activities support a broader offshore market, but the selected announcements provide no basis for estimating a global telecom cable growth rate or converting gigawatts of generation into cable kilometers.

Submarine Telecoms Industry Report 2026/2027

Dependence on shore-based applications also makes continuity and security part of the service requirement. Berlocher’s September magazine contribution brings attention to the exposure created as oil and gas operational systems become more connected (Berlocher, 2026). NIST’s operational technology guide by Stouffer et al. (2023) provides a basis for addressing that exposure through layered defenses, network segmentation, and tested response and recovery planning, while accounting for safety and availability requirements. For an offshore customer, bandwidth is therefore one part of the procurement decision. The network must also support the required operation during disruption and provide a credible path to recovery. That combination will shape the value of offshore communications investment alongside its geographic reach.

08 / SPECIAL MARKETS / 8.2 · 144


SUBTEL FORUM

8.3

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

08 / SPECIAL MARKETS

SUBSEA SUSTAINABILITY YEAR IN REVIEW

Sustainability in the subsea sector became a more practical discussion in the Sustainable Subsea articles published from January through September 2026. Landing-station energy measurement, riverine connectivity, cable-ship fuels and resilient network design were connected by a common question: how can environmental objectives inform the decisions that build and sustain a network? Across the five published installments, the emphasis broadened from establishing credible baselines to evaluating lifecycle choices and sharing evidence of effective practice. The resulting narrative places sustainability within engineering, procurement and operational responsibility, with accountability extending from individual facilities to the wider industry (Alaaeldin & Tisopulos, 2026; Bojczuk, Paulino, & Starosielski, 2026; Cassidy, Morris, & Parsons, 2026; Howard, d’Avezac de Moran, & Cassidy, 2026; Paulino, et al., 2026).

That boundary also determines what a ratio can explain. Power Usage Effectiveness can support internal tracking of cooling upgrades, conversion improvements and operational changes, although climate, building age and a relatively small telecom load complicate comparisons between stations. A better ratio can accompany unchanged or higher absolute consumption if its denominator changes. January therefore advocated a suite combining PUE with Carbon Usage Effectiveness, Water Usage Effectiveness and Renewable Energy Factor, alongside absolute electricity and water consumption and disclosed emissions factors. Capacity-related indicators could add a service perspective, provided their definitions remain clear. This gives owners a more useful basis for assessing a retrofit: the reported ratio, physical resource use and operating context need to be read together before an improvement claim becomes defensible (Bojczuk, Paulino, & Starosielski, 2026).

Measurement Boundaries

Inclusion and Maintenance

January established the measurement problem at the cable landing station, where terminal equipment, power feeding and building services meet. Total site electricity provides a starting point, while separate measurements of telecom load, power feed equipment and supporting infrastructure explain how consumption arises. The distinction matters because power feeding connects onshore supply to the wet plant, while cooling and conversion losses describe different operating functions. Mixed-use facilities add an allocation problem: shared power and cooling must be assigned consistently before station-level indicators become credible. The article’s discussion of existing research identified incomplete submetering despite the availability of consumption histories and building-management systems. For operators, the immediate investment question concerns the instrumentation and reporting discipline needed to identify which intervention merits funding (Bojczuk, Paulino, & Starosielski, 2026).

March extended the boundary of inquiry into the Brazilian Amazon through a new Sustainable Subsea Networks partnership with Brazil’s National Research and Education Network, RNP. The planned research connected maintenance-related emissions with the social value of resilient subfluvial infrastructure. Its starting point was the difference between nominal access and meaningful connectivity, including affordability, quality, reliable electricity and usable services. Riverbed fiber offered a way to work with the region’s settlement geography while avoiding some impacts associated with opening terrestrial corridors through forest. The partnership set out to investigate these environmental and social outcomes, beginning with maintenance-related emissions. Findings from ocean systems need reassessment against the river basin’s distinct conditions (Paulino, et al., 2026).

Submarine Telecoms Industry Report 2026/2027

08 / SPECIAL MARKETS / 8.3 · 145


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

8.3 SUBSEA SUSTAINABILITY YEAR IN REVIEW The neutral-operator model gave that agenda an institutional dimension. Under the arrangement described for the infovias, participating operators and regional providers share infrastructure and assume operation and maintenance responsibilities through an open consortium. This structure links access to fiber with responsibility for keeping the route viable over time. In a highcost, low-density region, that allocation affects both commercial durability and the logistics through which environmental impacts arise. Changing channels, sediment movement, vessel access and repair requirements make maintenance central to the infrastructure proposition. The research partnership consequently connected inclusion, sharing and resilience through practical questions: who maintains the system, how interventions are organized and whether dependable service can be sustained. Those questions also prepared the ground for May’s examination of vessel choices (Howard, d’Avezac de Moran, & Cassidy, 2026; Paulino, et al., 2026).

Vessel Fuels May carried the measurement argument offshore by examining fuel choices across survey, installation, maintenance and recovery. Its central accounting principle was well-to-wake assessment, which includes fuel production and delivery as well as use aboard the vessel. A fuel’s production pathway therefore matters to any claim about its climate performance. The article reviewed alternative options without establishing a single preferred replacement for conventional marine fuels. Ship designers face linked decisions about lifetime cost, fuel availability, safety, maintenance support and crew capability. These choices extend over long service lives, making uncertainty expensive. The regulatory uncertainty described in May added to the difficulty of specifying vessels whose propulsion and fuel arrangements must remain viable over decades (Howard, d’Avezac de Moran, & Cassidy, 2026).

Submarine Telecoms Industry Report 2026/2027

CONTINUED

Mission requirements further limit the usefulness of a universal fuel ranking. Long ocean deployments, shorter coastal work and river maintenance create different demands for endurance, storage, replenishment and support infrastructure. Battery and hybrid approaches were discussed as possibilities for selected shorter-link and nearshore activities, with charging or swapping logistics still requiring attention. Their suitability for short missions would not establish their ability to support long transoceanic deployments. Alternative fuels likewise introduce design and handling requirements whose acceptability depends on where a ship works and how it is supported. Read alongside March, the implication is that river systems deserve their own vesseldevelopment evidence. The sustainability case for a propulsion choice depends on the complete mission and supply chain, including whether the vessel can perform necessary repairs reliably (Howard, d’Avezac de Moran, & Cassidy, 2026; Paulino, et al., 2026).

Lifecycle Resilience July brought the onshore and marine discussions together through the environmental consequences of failure and intervention. A fault can trigger vessel mobilization, port activity, spares movement and urgent restoration work. Avoiding failures or organizing repairs more deliberately could therefore improve both service continuity and lifecycle environmental performance. The article offered a framework for assessing those opportunities, with routing, shore-end protection, monitoring, repair readiness and utility robustness among the relevant decisions. It also preserved important qualifications. Diverse landings need sufficient surviving capacity and backhaul; collocation can reduce duplicated facilities while introducing shared-risk concerns; reconfigurable optical architectures may create repair-planning flexibility only where the system supports them. Each potential benefit depends on architecture, location and operating capability (Cassidy, Morris, & Parsons, 2026).

08 / SPECIAL MARKETS / 8.3 · 146


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

8.3 SUBSEA SUSTAINABILITY YEAR IN REVIEW Procurement provides a route for testing those claims before equipment and services are selected. July proposed using prequalification and tender scoring to compare resilience and sustainability attributes, supported where available by lifecycle information and Environmental Product Declarations. Its armored-cable comparison illustrated how additional material at installation might be justified by reduced intervention over the asset life. The scoring and cost examples remained illustrative, requiring project-specific evidence. Component declarations also have limits: the article identified the absence of a widely adopted subsea-system Product Category Rule, restricting whole-system comparability. Buyers consequently need evidence about manufacturing impacts, failure exposure, maintenance and endof-life treatment, together with explicit assumptions. This extends January’s measurement discipline into procurement, where an attractive score requires a transparent explanation of what has been counted (Bojczuk, Paulino, & Starosielski, 2026; Cassidy, Morris, & Parsons, 2026).

Shared Evidence The May editorial transition addressed how this technical knowledge could continue to circulate. Caroline Crowley’s appointment accompanied the formalization of a rotating editorship, with topics developed through the SSN Working Group and contributions connecting researchers with industry practitioners. The rotating role was intended to widen participation by researchers and industry members while bringing the complexity of sustainability to a broader audience. This exchange matters to an industry in which operational experience, academic research and engineering practice must inform one another. The column provided a continuing forum for developing that common understanding and examining emerging methods (Tortorella & Starosielski, 2026).

CONTINUED

September considered a further mechanism for organizing shared knowledge through a proposed Sustainable Subsea Network Award. The SSN Working Group was considering the initiative as a way to recognize measurable sustainability outcomes across the network lifecycle. The proposal envisioned research papers and practical case studies, transparent criteria and independent expert evaluation. Its intended value included a repository of documented practices that operators, suppliers, contractors and researchers could examine and adapt. That ambition connects directly with the earlier articles: credible examples would need defined measurement boundaries, mission-specific fuel accounting and lifecycle comparisons supported by operational evidence. Developing those benchmarks would be part of turning the proposal into a credible recognition program (Alaaeldin & Tisopulos, 2026). September also acknowledged evidence from other sectors that recognition can reward marketable claims without sufficient verification. Its case for an award therefore depended on measurable outcomes, transparent reporting and independent assessment. This returns the published conversation to January’s concern with the quality of the underlying data. A station ratio, a shared river network, a fuel pathway or a resilient design each requires evidence appropriate to the claim being made. The year’s published discussion consequently points toward a common operating discipline: define the boundary, compare alternatives over the asset life and retain evidence of the outcome. For owners and suppliers, that makes sustainability relevant to investment and service continuity as well as reporting. Further progress will depend on turning research, design frameworks and proposed benchmarks into documented operational results (Alaaeldin & Tisopulos, 2026; Bojczuk, Paulino, & Starosielski, 2026).

Nicole Starosielski is Professor of Film and Media at the University of California, Berkeley. Author of The Undersea Network, she researches communications technology and the environment, leads the SubOptic Foundation's Sustainable Subsea Networks initiative, and directs Berkeley's Global Digital Infrastructure certificate. She previously served as Sustainable Subsea's informal editor.

Caroline Crowley became editor of Sustainable Subsea in May 2026. She studied Environmental Economics and Policy and Data Science at the University of California, Berkeley and worked as a research assistant with the SubOptic Foundation's Sustainable Subsea Networks team. Her research examines policy affecting data centers and other digital infrastructure.

Submarine Telecoms Industry Report 2026/2027

08 / SPECIAL MARKETS / 8.3 · 147


SUBTEL FORUM

Technology

four-core multicore optical fiber

DEVELOPMENT AND INTEGRATION

NTT’s multicore development pairs four-core multicore optical fiber with the parts needed to connect it to a submarine system.

148

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


CHAPTER 09

DEVELOPMENT AND INTEGRATION

NTT targets practical deployment around 2029.

undersea and factory joint boxes

a terminal rack existing land-based fiber and transmission equipment

FROM THE CHAPTER

Meta’s Petal announcement applies two-core fiber to a planned 7,000-kilometer France–United States route, with a one-petabit-per-second design target and an expected 2029 service date. The announced design lists 24 two-core fiber pairs; its comparison to a 48-pair conventional design concerns cores, not additional physical cable pairs.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

149


SUBTEL FORUM

9.1

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

09 / TECHNOLOGY

PETABIT-SCALE MULTI-CORE FIBER BREAKTHROUGHS

NTT’s multicore development pairs four-core multicore optical fiber with the parts needed to connect it to a submarine system. The company describes a 192-core cable system that could raise transmission capacity fourfold while retaining a conventional system design. It also developed undersea and factory joint boxes and a terminal rack linking multicore cable with existing land-based fiber and transmission equipment. NTT targets practical deployment around 2029. The engineering idea is to add optical channels within the cable while preserving the connections that make the system usable and maintainable. This is a development path, not an installed 2026 network. The four-core design only adds useful capacity if light can travel through each core with little loss or interference from its neighbors. NTT says its fiber keeps both attenuation and crosstalk low while retaining the outside dimensions used in conventional cable construction. That matters at sea, where a larger cable would affect handling and installation. NTT's 192 cores are an architecture count, however, not a measurement of traffic carried across a completed route. The next proof point is how the cable, joints and transmission equipment perform together over the intended distance (NTT, Inc., 2026).

Meta’s Petal announcement applies two-core fiber to a planned 7,000-kilometer France–United States route, with a one-petabitper-second design target and an expected 2029 service date. The announced design lists 24 two-core fiber pairs; its comparison to a 48-pair conventional design concerns cores, not additional physical cable pairs. Together, the NTT and Meta projects show system owners and suppliers exploring more channels per cable. Their commercial tests will include reliability, repairability, cost, and readiness as the projects approach service. Petal makes the repeater problem unusually clear. Its planned 24 physical fiber pairs would contain 48 pairs of optical cores, but those extra paths still need amplification along roughly 7,000 kilometers. Meta describes a fan-in/fan-out interface that separates the two cores into conventional single-core paths inside each repeater, then combines them again. The design shares pump resources and is intended to stay within the existing 18-kilovolt power-feeding limit. That is a specific system design claim, not a field record from an operating petabit cable (Rivera Hartling, Pecci, & Mitchell, 2026; NEC Corporation, 2026). The two designs attack interference in different ways. Meta says Petal limits crosstalk by controlling the fiber's refractive index and sending signals in opposite directions through neighboring cores. NTT reports low crosstalk in its four-core cable but must also make reliable connections among four precisely positioned paths. Keeping a familiar outer fiber size helps cable construction; it does not remove the need to separate, amplify and reconnect each channel. Those details make the optical design and its interfaces as important as the headline count of cores (NTT, Inc., 2026; Rivera Hartling, Pecci, & Mitchell, 2026).

Submarine Telecoms Industry Report 2026/2027

09 / TECHNOLOGY / 9.1 · 150


SUBTEL FORUM

9.2

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

09 / TECHNOLOGY

HIGH-CAPACITY TRANSMISSION ON LIVE SUBMARINE NETWORKS

Ciena and Meta’s March trial transmitted a single 800-gigabitper-second optical carrier over a 16,608-kilometer unregenerated route on the Bifrost system. The companies also reported 18 terabits per second of total capacity on the tested fiber pair. Because this was a trial on one path, it demonstrates what newer optical equipment can do over installed wet plant; it does not mean every Bifrost pair or similar route sells that throughput as a customer product. Its practical value is showing how equipment upgrades can expand a route without laying another cable. Modern coherent terminals adjust their signaling to the optical path they encounter. Ciena says the WaveLogic 6 Extreme equipment used in Bifrost has programmable baud and line rates, allowing engineers to tune the rate against the available signal margin. The reported 800-gigabit single carrier and 18-terabit tested pair therefore describe different layers of the same trial. A higher carrier rate on one route does not establish that another fiber pair has the same noise, loss or usable spectrum. Operators still need a route-specific engineering assessment before turning a laboratory or field trial setting into an offered wavelength (Lavallée, 2026).

Submarine Telecoms Industry Report 2026/2027

The landing-station footprint is part of the result, too. Ciena reports that its tested submarine line terminal equipment occupied ten rack units and used 50% fewer watts per bit than its previous modem generation. Those are vendor comparisons for terminal equipment, not measurements of the power required by the entire submarine system. They still matter because space and electricity at a landing station can limit how much capacity an owner can add to an existing cable. An upgrade decision should examine the complete terminal configuration, its operating margin and the route's commercial demand together (Lavallée, 2026). Colt and Ciena’s June demonstration delivered an encrypted 800-gigabit Ethernet service across the Atlantic on a roughly 6,900-kilometer network combining subsea and terrestrial sections. This is an end-to-end service demonstration, not a new cable design. The commercial lesson is that higher-speed optical equipment can support customer services across existing networks, while the route and its equipment still determine where those rates are available. The Colt demonstration adds service security to the capacity question. Its 800-gigabit Ethernet rate describes an encrypted service carried over a mixed terrestrial and submarine route, rather than the raw capacity of a cable pair. Colt and Ciena describe the trial as quantum-safe and identify post-quantum key establishment in the equipment. NIST's FIPS 203 specifies the ML-KEM key-establishment mechanism; that standard does not, by itself, certify the security of an end-to-end service. Buyers need to confirm the actual service endpoints, protection method and availability on their route as well as the advertised bit rate (Colt Technology Services and Ciena, 2026; National Institute of Standards and Technology, 2024).

09 / TECHNOLOGY / 9.2 · 151


SUBTEL FORUM

9.3

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

09 / TECHNOLOGY

DIVERGENT PATHS TOWARD PETABIT-SCALE CABLES

The next generation does not depend on one breakthrough. On existing routes, newer optical equipment can carry more data over installed fiber when system margins, equipment, and commercial availability permit. On new routes, more fiber pairs or multicore fiber add spatial channels within a new cable. These strategies address different constraints: upgrades make better use of infrastructure already in service, while multicore engineering changes the design and interfaces of future systems. They can complement one another. The right choice depends on route capacity, power, landing equipment, customer demand, and the cost and time of building. Meta sets out three ways a new Atlantic design might add spatial or spectral room: more conventional fiber pairs, another optical transmission band, or multiple cores inside each fiber. Petal chooses the third route with 24 two-core pairs. More pairs increase the number of glass strands and associated amplifier paths; a wider optical band asks more of the repeaters and terminal equipment; multicore fiber introduces new interfaces within a familiar cable size. None is a universal winner. The relevant constraint may be available electrical power, cable diameter, equipment maturity or the time and cost of a new marine build (Rivera Hartling, Pecci, & Mitchell, 2026; NTT, Inc., 2026).

Submarine Telecoms Industry Report 2026/2027

Power is a binding part of that choice on long repeatered routes. Each additional optical path must be supported through many undersea amplification stages. Petal's proposed fan-in/fan-out and shared-pump repeater are meant to double core paths without a proportional increase in feed power, while remaining within existing equipment limits. That does not make the extra paths free: fiber loss, repeater architecture, terminal ports and installation requirements all affect the whole-system result. Mateo's submarine multicore analysis likewise treats equipment size and marine cost as linked tradeoffs rather than assuming that the lowest fiber cost delivers the cheapest cable (Rivera Hartling, Pecci, & Mitchell, 2026; Mateo, 2024). For buyers, a headline rate or petabit target is not interchangeable with available capacity. It helps to ask whether a figure describes a per-wavelength trial, equipped fiber-pair capacity, a system design, or an end-to-end service. That distinction turns engineering milestones into practical purchasing questions and avoids comparing unlike measures. Mateo's comparison helps explain why a capacity choice is also a marine and maintenance choice. The paper models conventional cables with different fiber counts and cable sizes, then examines multicore alternatives, equipment footprint and repair assumptions. Some modeled configurations change cable weight, laying costs or estimated repair work, but these are scenario results, not field savings. A project business case should therefore use its own route, vessel and equipment assumptions and define the usable capacity it expects to equip. The smallest cable or highest core count may not produce the lowest cost once connection and restoration work is included (Mateo, 2024).

09 / TECHNOLOGY / 9.3 · 152


SUBTEL FORUM

9.4

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

09 / TECHNOLOGY

SYSTEM-LEVEL INTEGRATION AND OUTLOOK

Multicore fiber depends on a complete connection system. NTT's work includes undersea joints, factory joint boxes, and a terminal rack that links multicore cable to conventional fiber and transmission equipment. Those pieces make landing stations and repair procedures part of the innovation. For the detailed design, see NTT's announcement; a May SubTel Forum engineering article on scale-across and scale-out network testing adds a practical counterpart: a new capacity architecture must be tested across the interfaces where it will operate, not only as a standalone component.

The landing station is where the new spatial channels meet existing network operations. NTT's rack maps four-core fiber into conventional fibers for transmission equipment; Petal's repeater design also depends on reliably separating and recombining two-core paths. Owners will need port and core records, optical test baselines and procedures for reconnecting the correct paths after maintenance. Clear identification through joints and terminals supports testing and restoration as the system gains more parallel optical paths (NTT Corporation, 2024; NTT, Inc., 2026; Rivera Hartling, Pecci, & Mitchell, 2026).

Joining multicore fiber is more demanding than joining a single central core. A technician must line up the rotational position of the fibers so each core meets its intended partner. NTT's earlier field work used side-view imaging to align four-core fiber in a portable splicer and developed a fan-in/fan-out device to connect those cores to separate conventional fibers. Its 2026 submarine program adds joint boxes for the cable system. The distinction matters: a workable field-connection method is an important step, while the submarine cable and its joints still require qualification for the intended marine environment (NTT Corporation, 2024; NTT, Inc., 2026).

Near-term progress is likely to follow two tracks: optical upgrades can extend service on existing routes, while multicore systems remain in development with 2029 targets. Watch for integrated long-distance trials, manufacturable joints and repeaters, tested landing interfaces, and public readiness milestones. The industry outlook is a parallel program: use current wet plant where practical and prepare new architectures for the routes and customers that can support them.

Submarine Telecoms Industry Report 2026/2027

The marine environment makes that handoff consequential. NTT cites submarine design requirements that include pressure resistance at depths up to 8,000 meters and reliability over more than 25 years. Its announcement does not mean the new multicore system has already accumulated that service history. The relevant 2029 milestones for both NTT and Petal are qualification of the manufactured cable, repeaters and joints, followed by installed-route optical tests and workable repair procedures. Until then, each result should be identified by its stage, from component development through field trial to accepted service (NTT, Inc., 2026; Rivera Hartling, Pecci, & Mitchell, 2026; NEC Corporation, 2026).

09 / TECHNOLOGY / 9.4 · 153


SUBTEL FORUM

REGULATORY & BUSINESS OUTLOOK It is how different public policy objectives can be pursued without undermining the resilience they are intended to strengthen.

PROTECTION AND RESILIENCE

The regulatory challenge emerging in 2026 is therefore no longer simply whether submarine cables should receive greater protection.

154

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


CHAPTER 10

PROTECTION AND RESILIENCE

Resilience; security; competition; environmental protection; digital sovereignty

FROM THE CHAPTER

The year 2026 has confirmed that submarine cables can no longer be considered solely as telecommunications infrastructure. Their growing importance for national security, cloud computing, artificial intelligence, financial services and the digital economy has brought them to the attention of an increasingly broad range of government agencies, regulators and international organizations.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

155


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10 / REGULATORY & BUSINESS OUTLOOK

10.1

LEGAL & REGULATORY MATTERS: A YEAR IN REVIEW WITH ANDRÉS FÍGOLI*

* The views expressed are solely those of the author and do not necessarily reflect the views or positions of the author’s current or former employers, affiliated organizations, or consulting or advisory clients. The year 2026 has confirmed that submarine cables can no longer be considered solely as telecommunications infrastructure. Their growing importance for national security, cloud computing, artificial intelligence, financial services and the digital economy has brought them to the attention of an increasingly broad range of government agencies, regulators and international organizations. This attention is welcome. However, it also creates a new challenge. Resilience, security, competition, environmental protection and digital sovereignty are legitimate policy objectives, but measures adopted to pursue them do not necessarily point in the same direction. A security requirement may restrict suppliers; a lengthy authorization may delay a repair; an accelerated permitting procedure may unintentionally favor established cable owners; and greater regulatory transparency may conflict with the confidentiality required to protect critical infrastructure. The regulatory challenge emerging in 2026 is therefore no longer simply whether submarine cables should receive greater protection. It is how different public policy objectives can be pursued without undermining the resilience they are intended to strengthen.

Resilience Continues to Matter Resilience has moved decisively from industry discussions into public policy. In January 2026, the Association of Southeast Asian Nations (Association of Southeast Asian Nations, 2026) endorsed its Enhanced Guidelines for Strengthening Resilience and Repair of Submarine Cables, an update of the version released some years ago that enabled many regional countries to update their legal frameworks. By February 2026, the European Commission published its Submarine Cable Security Toolbox and Cable Projects of European Interest report (European Commission, 2026). Rather than introducing new regulatory obligations, the focus shifted towards implementation through financial support, coordinated risk management and the development of strategic infrastructure.

Submarine Telecoms Industry Report 2026/2027

Accordingly, the Commission announced an additional €347 million in funding for submarine cable initiatives during 2026– 2027, supporting projects aimed at increasing route diversity, resilience, repair capabilities and SMART cable technologies. In parallel to this, the EU also established two Regional Cable Hubs, in Finland and Italy, intended to improve regional coordination, incident response, information sharing and preparedness for future cable disruptions, with their main focus being on geopolitical risks. At the global level, the International Advisory Body on Submarine Cable Resilience, jointly established by the International Telecommunication Union (ITU) and the International Cable Protection Committee (ICPC), completed its two-year mandate. During its session held in Porto, Portugal on 2 February 2026, the Advisory Body approved the recommendations developed by its three Working Groups: (i) Timely Deployment and Repair; (ii) Risk Identification, Monitoring and Mitigation; and (iii) Fostering Connectivity and Geographic Diversity. Together, these recommendations covered a broad range of legal, regulatory, and operational issues affecting submarine cable resilience. On 10 July 2026, the Advisory Body subsequently approved the final Working Groups Report (International Advisory Body on Submarine Cable Resilience, 2026), which further expanded those recommendations by documenting best practices, practical experiences and regulatory approaches from around the world. The Report provides governments, regulators, industry and international organizations with a practical roadmap for strengthening submarine cable resilience while respecting their respective mandates and national circumstances. The Advisory Body's greatest achievement was not simply the publication of its report, but the broad international consensus it succeeded in building. Through three Working Groups involving more than 160 participants from governments, industry, international organizations and academia, representatives of major maritime, telecommunications and digital players – many of whom hold different regulatory traditions, commercial interests and geopolitical perspectives – worked together to develop a common set of recommendations on submarine cable resilience.

10 / REGULATORY & BUSINESS OUTLOOK / 10.1 · 156


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10.1 LEGAL & REGULATORY MATTERS: A YEAR IN REVIEW WITH ANDRÉS FÍGOLI* In an increasingly fragmented international environment, reaching agreement on practical recommendations for critical digital infrastructure is itself a significant accomplishment. The recommendations are not the product of a single government or industry sector, but reflect a carefully negotiated balance among stakeholders with different priorities and perspectives.

Market Sustainability and Competition The transformation of cable ownership continued during 2026. Hyperscalers have evolved from major purchasers of international bandwidth into some of the world's largest investors in submarine cable infrastructure. Their investment has contributed enormous new capacity and accelerated technological development. At the same time, the increasing integration of submarine cables, cloud platforms, data centers and artificial intelligence infrastructure has also increased regulatory attention to the long-term structure of the subsea connectivity market. National regulators are therefore assessing not only whether individual security measures are justified, but also their cumulative effect on competition and market entry. This question is particularly important because the economics of submarine capacity are changing. Where the largest generators of international traffic increasingly transport that traffic through their own infrastructure, traditional telecommunications companies may lose important customers that historically helped support investment in shared systems. Competition authorities themselves are also adapting to increasingly complex and fast-moving digital markets. Recent enforcement trends (A&O Shearman, 2026) across industries show growing use of so-called "soft enforcement" tools alongside traditional fines and structural remedies. Antitrust watchdogs are increasingly combining traditional enforcement tools with regulatory dialogue, behavioral commitments, market studies, data science and digital forensic techniques. Some authorities are also exploring the use of artificial intelligence in competition enforcement. For example, Spain's National Commission on Markets and Competition (CNMC) has continued developing AI-based tools to identify bid-rigging patterns and detect potential algorithmic collusion in public procurement.

Submarine Telecoms Industry Report 2026/2027

CONTINUED

Authorities continue to impose significant fines, structural remedies and, where appropriate, less traditional sanctions such as procurement bans, disgorgement of illicit gains and other corrective measures. Hard sanctions remain the principal response.

Regulatory Visibility and Digital Sovereignty Several governments recognized during 2026 that resilience depends not only on physical infrastructure, but also on regulatory visibility over who owns, controls and operates submarine cable systems. Modern cable ownership structures are also challenging traditional licensing models. Cable landing agreements have become increasingly common in many jurisdictions, including those whose telecommunications legislation neither expressly contemplated nor prohibited such arrangements. Under these structures, an international cable owner may rely on a locally licensed telecommunications operator to obtain the cable landing permit, own the portion of the cable located within national jurisdiction, and provide access to the cable landing station, while the international investor retains ownership or long-term rights over the remainder of the submarine system. As a result, the entity identified in the landing license does not necessarily reveal who effectively owns, finances or economically controls the international cable system. In many cases, the licensed landing party is responsible only for the domestic segment, whereas ownership and operational control over the vast majority of the system – including the wet plant extending through the Exclusive Economic Zone (EEZ), continental shelf and high seas – remain with one or more international major investors. Ownership of the wet plant, fiber pairs, spectrum, terminal equipment and landing infrastructure may be distributed among several entities. Long-term Indefeasible Rights of Use (IRUs) can further separate legal ownership from effective commercial control of capacity. For national authorities, this creates a potential regulatory visibility gap. These ownership structures may require authorities to consider information beyond that contained in the formal landing license, including ownership, capacity allocation, operational responsibility and restoration arrangements. Regulatory approaches to obtaining such information vary among jurisdictions and may include licensing and disclosure requirements.

10 / REGULATORY & BUSINESS OUTLOOK / 10.1 · 157


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10.1 LEGAL & REGULATORY MATTERS: A YEAR IN REVIEW WITH ANDRÉS FÍGOLI* Several national initiatives during 2026 illustrate how governments are moving beyond general policy statements towards more operational approaches to submarine cable governance. In the United States, the FCC's Second Report and Order (Federal Communications Commission, 2026) expanded the regulatory framework to cover new aspects of cable security and operation. The wider legal framework addresses coastal-state authority to protect submarine cables and pipelines in peacetime and the status of that infrastructure during international armed conflict (Pedrozo, 2025). Brazil's National Telecommunications Agency (ANATEL), for example, launched a broad public consultation (Agência Nacional de Telecomunicações, 2026) examining potential regulatory gaps affecting submarine cables, including governance, cybersecurity, incident reporting, geographic diversity, investment incentives and repair capabilities. The consultation is expected to support a Regulatory Impact Assessment and may ultimately lead to new regulatory measures by the end of 2026. One issue attracting increasing attention is repair preparedness. The Atlantic Ocean, despite hosting a rapidly growing number of submarine cable systems, continues to be served by a limited number of maintenance agreements covering vast geographical areas that have expanded well beyond the assumptions under which they were originally established. Brazil illustrates this challenge. Although geographically nearly as big as the whole of Europe and hosting more than fifteen international submarine cable systems, the country currently has no submarine cable repair depot, requiring repair vessels to obtain spare cable and equipment from facilities located elsewhere in the Atlantic. Japan reached similar conclusions from a different perspective. Following a comprehensive review of its submarine cable resilience (Ministry of Internal Affairs and Communications, 2026), by July of this year the Japanese Government had recommended measures to strengthen route diversity, improve the geographic distribution of cable landing stations, enhance domestic repair capabilities and establish additional cable depots to reduce the transit time of repair vessels to damaged systems. Rather than concentrating exclusively on prevention, the report recognizes that rapid restoration capability constitutes an equally important component of national resilience.

Submarine Telecoms Industry Report 2026/2027

CONTINUED

The report also highlights the need to modernize Japan's legal framework. It recommends revising the Wired Telecommunications Act of 1953 to reflect today's submarine cable ecosystem by clarifying the obligations of emerging categories of cable owners, expanding notification requirements for the installation, modification and operation of cable systems, and strengthening enforcement mechanisms for non-compliance. More broadly, the recommendation recognizes that legislation drafted for an earlier generation of telecommunications infrastructure may no longer adequately reflect the ownership structures, technologies and resilience challenges of modern submarine cable networks. Indonesia adopted a different approach. Rather than introducing new substantive licensing rules, a decree (Coordinating Ministry for Food Affairs, Republic of Indonesia, 2026) fundamentally reorganized the governance of submarine cables and pipelines by establishing a National Team for the Management of Submarine Cable and Pipeline Operations. The new framework brings together the numerous ministries and government agencies involved in submarine cable matters under a single ministerially chaired coordination structure, with responsibility for synchronizing policies and programs, resolving inter-agency issues and formulating recommendations on the management of submarine cable and pipeline operations. The reform does not eliminate the statutory powers of the participating authorities. Instead, it creates a formal coordination mechanism through which agencies continue exercising their respective mandates while aligning their decisions within a common institutional framework. The framework is intended to facilitate coordination among the multiple competent authorities involved in submarine cable deployment. For countries where submarine cable permitting involves telecommunications regulators, maritime administrations, environmental authorities, defense agencies, customs, fisheries and port authorities, Indonesia's model illustrates an approach based on institutional coordination without comprehensive legislative reform. Qatar focused on a different aspect of submarine cable regulation: ensuring transparent and non-discriminatory access to international connectivity infrastructure. A decision by the Communications Regulatory Authority (Communications Regulatory Authority, 2026) introduced a comprehensive regulatory framework governing access to submarine cable landing station (SCLS) international connectivity services.

10 / REGULATORY & BUSINESS OUTLOOK / 10.1 · 158


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10.1 LEGAL & REGULATORY MATTERS: A YEAR IN REVIEW WITH ANDRÉS FÍGOLI* The new regime requires licensed operators of submarine cable landing stations to prepare CRA-approved Offers of Access describing the services available, applicable charges and the terms and conditions under which access will be provided. Once approved, these offers must be published, replacing the traditional reliance on individually negotiated commercial arrangements with a more transparent and predictable regulatory framework, covering a broad range of associated services, including colocation, cross-connections, backhaul facilities and managed services. This illustrates a broader regulatory focus that now extends beyond cable landings to include access to cable infrastructure. Other jurisdictions are also reviewing their legal frameworks, although many initiatives remain at the proposal or consultation stage. In the European Union, discussions continue on extending the scope of the NIS2 framework to encompass the entire submarine cable ecosystem, beyond traditional telecommunications operators, as part of the broader effort to strengthen the cybersecurity and resilience of critical digital infrastructure. Regulators are no longer regulating submarine cables in isolation. They are regulating the ecosystem surrounding submarine cables. In the United Kingdom, the Government opened a consultation on October 22, 2026, on proposed legislation introducing tougher criminal penalties for damage to critical undersea infrastructure, security and resilience duties, and national security direction powers (UK Government, 2026). These measures remain proposals, not enacted law. Thailand and several other countries are likewise reviewing their regulatory frameworks in light of increasing concerns over resilience and critical infrastructure protection. A recent example is Malaysia's Exclusive Economic Zone Regulations 2026 (Malaysia, 2026), which criminalize the breaking or damaging of submarine cables within its EEZ or continental shelf and allow marine sensitive areas to be designated where activities may be restricted to protect marine structures, including submarine cables. In this sense, Recommendation 1 of International Advisory Body Working Group 2 emphasizes the systematic collection and analysis of reliable submarine cable incident data to support evidence-based regulatory approaches. ICPC’s public 2026 plenary summary records 178 telecom-cable repairs reported for 2025. This maintenance-provider reporting sample is not a complete global fault census (International Cable Protection Committee, 2026).

Submarine Telecoms Industry Report 2026/2027

CONTINUED

Maritime Prevention and International Cooperation Despite growing attention to intentional interference, traditional maritime activities continue to represent the principal source of submarine cable damage. This has also increased cooperation between the telecommunications and maritime communities. The 2026 report of the International Advisory Body includes several recommendations aimed at improving prevention through existing maritime frameworks. One of these recommendations concerns awareness of submarine telecommunications cables within maritime training. It was suggested that cablerelated considerations could be incorporated into existing training frameworks under the IMO International Convention on Standards of Training, Certification and Watchkeeping for Seafarers (STCW), rather than creating an entirely separate training regime. Another recommendation concerns anchor stowage. Improperly secured or unintentionally deployed anchors can cause substantial cable damage. Verification of appropriate anchor stowage and securing arrangements through existing flag-State and Port State Control procedures could therefore provide a relatively straightforward preventive measure. All these recommendations, together with others contained in the report, are expected to be considered by the IMO Maritime Safety Committee at its December 2026 session. Depending on the Committee's deliberations, they may subsequently be referred to the relevant IMO sub-committees for further consideration during 2027. Hydrographic information also plays a critical role in prevention. Consistent implementation of International Hydrographic Organization (IHO) recommendations on charting and cautionary notes can reduce risks from anchoring, fishing and dredging activities. Under the revised IMO ECDIS performance standards, S-100-compatible equipment can be installed voluntarily from January 1, 2026, and is required for applicable new ECDIS installations from January 1, 2029 (International Maritime Organization, 2026b). These dates do not impose a blanket retrofit requirement on existing equipment. The transition may create new opportunities for prevention through enhanced electronic navigation. In particular, the digital navigation systems that are progressively replacing traditional paper charts aboard commercial vessels could eventually incorporate automated alerts when vessel behavior indicates seabed-interaction activities near submarine cable routes.

10 / REGULATORY & BUSINESS OUTLOOK / 10.1 · 159


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10.1 LEGAL & REGULATORY MATTERS: A YEAR IN REVIEW WITH ANDRÉS FÍGOLI* Such functionality would be particularly valuable for bottomtrawling operations, where cable chart layers may not always be actively displayed in order to reduce screen clutter, and for other seabed-interaction activities such as the recovery of lost fishing gear. Rather than relying solely on the operator to activate specific chart layers, behavioral alerts based on vessel speed, course or operational patterns could provide an additional layer of protection. As the IHO's S-100 standards become operational, further discussions within the IMO may be expected on how such capabilities could be incorporated into future navigational guidance, complementing existing IHO recommendations and strengthening the prevention of accidental cable damage. The International Seabed Authority (ISA) also witnessed significant developments during 2026. The protection of submarine telecommunications cables also remained under consideration in the ongoing ISA negotiations on the Mining Code. A Friends of the President Group, facilitated by Singapore, continued discussions on draft regulations addressing the accommodation of exploitation activities in the Area and the protection of submarine cables and pipelines. In this evolving legal environment, developers of future submarine cable systems crossing areas beyond national jurisdiction – referred to under UNCLOS as "the Area" – may increasingly need to engage not only with coastal States where cables land, but also with the broader international regulatory framework and stakeholders whose activities may overlap in the Area, in order to minimize future legal and operational uncertainties. While consensus has not yet been reached, discussions focused on the obligations of mining contractors to minimize the risk of cable damage, the exchange of information between stakeholders, and the appropriate institutional role of the ISA. These discussions are expected to continue as work on the Mining Code progresses.

Sustainability and Environmental Regulation Sustainability is emerging as one of the newest regulatory dimensions affecting submarine telecommunications infrastructure. Traditionally, environmental assessments focused primarily on the direct impacts of submarine cable installation and operation. Increasingly, however, national regulators are taking a broader view, considering the wider digital ecosystem that submarine cables enable, including hyperscale data centers, artificial intelligence infrastructure, electricity demand, water availability, maritime decarbonization and environmental monitoring.

Submarine Telecoms Industry Report 2026/2027

CONTINUED

As a result, submarine cable policy is progressively becoming integrated with energy, environmental and industrial policy, rather than being treated as a standalone telecommunications matter. A similar evolution may eventually emerge in financial markets. As investment in AI infrastructure expands beyond chips and data centers to encompass the broader digital ecosystem, emerging financing models such as so-called "circular financing" could increasingly place associated infrastructure, including submarine cable systems, within investors' strategic focus. Environmental considerations are also becoming more complex. The environmental footprint of a submarine telecommunications cable itself is generally limited, particularly during its operational life. However, new subsea cable systems are increasingly promoted as catalysts for much larger digital ecosystems, including hyperscale data centers, cloud infrastructure and artificial intelligence facilities. Where new cable systems are associated with the development of larger digital ecosystems, environmental permitting processes may increasingly consider interactions with related infrastructure, including data centers and AI facilities. The question is particularly relevant in regions experiencing water scarcity or pressure on electricity networks. Japan's recent review of submarine cable resilience analyzed above reached a similar conclusion, recommending that future cable landing stations be geographically diversified and integrated into broader national energy and digital infrastructure planning under the country's "Watt–Bit Integration" policy. This approach recognizes that the location of future landing stations should be influenced not only by marine engineering considerations, but also by the long-term availability of electricity, water and other strategic infrastructure. Furthermore, climate litigation trends across industries show growing scrutiny of the manner in which environmental and transition risks are incorporated into project approvals and investment decisions. Regulators and courts are increasingly examining whether environmental assessments adequately consider foreseeable impacts rather than treating climate effects exclusively as future externalities (World Economic Forum, Centre for Nature and Climate, 2026). Environmental claims associated with infrastructure projects are also subject to increasing scrutiny under emerging greenwashing frameworks. Sustainability policy will also affect the vessels required to install and maintain cables. Discussions within the IMO concerning its Net-Zero Framework continued during 2026 following the postponement of final consideration the previous year. 10 / REGULATORY & BUSINESS OUTLOOK / 10.1 · 160


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10.1 LEGAL & REGULATORY MATTERS: A YEAR IN REVIEW WITH ANDRÉS FÍGOLI* At MEPC 84 in April–May 2026, IMO members agreed to further intersessional work to resolve concerns and seek broader convergence on the proposed Net-Zero Framework, with further discussions scheduled for later in 2026 (International Maritime Organization, 2026a). The outcome of these negotiations will shape future greenhouse gas measures for international shipping, including the potential introduction of global economic mechanisms and fuel transition requirements. For the submarine cable sector, these developments may also have implications for the availability, operating costs and longterm economics of specialized cable maintenance vessels. The International Advisory Body on Submarine Cable Resilience identifies long mobilization distances as a particular challenge for some remote repairs. For remote repairs in the South Atlantic and Pacific islands, the IAB report describes mobilization transits of 10–14 days or more. These are journeys to the work site, not the duration of repair or service restoration. In the repair-cost figures the report cites, fuel accounts for 30–70% of total costs (International Advisory Body on Submarine Cable Resilience, 2026). Beyond operational sustainability, submarine cables are also contributing to environmental monitoring. SMART cables present significant opportunities but also unresolved regulatory challenges. By integrating environmental, oceanographic and seismic sensors into submarine telecommunications infrastructure, they can generate valuable data for tsunami early-warning systems, earthquake monitoring, climate research and civil protection without requiring separate dedicated sensor networks. European funding initiatives launched during 2026 have already recognized this potential by supporting the integration of sensing capabilities into submarine cable infrastructure. However, the legal and governance framework for SMART cables remains largely undeveloped. Questions concerning data ownership, access rights, confidentiality, liability and the dissemination of scientific information are currently being addressed on a project-by-project basis, often through discussions with each coastal State along the cable route. As a result, developers increasingly need to engage with the relevant authorities from the earliest planning stages to clarify regulatory expectations and avoid unexpected requirements during marine installation.

CONTINUED

Similar governance challenges are also emerging in relation to Distributed Acoustic Sensing (DAS) technologies, whose ability to transform optical fibers into continuous sensing systems raises comparable legal and security considerations. One governance model being considered is for scientific and environmental data generated by SMART cables to be transmitted directly to the relevant coastal State authorities. Under this approach, the coastal State assumes responsibility for validating, processing and distributing the information to scientific institutions, navies and other authorized users. Although this model may help reconcile scientific cooperation with national security concerns, regulatory approaches continue to differ among jurisdictions. Unlike traditional submarine cable regulation, where international practices are relatively mature, SMART cable governance is still being developed in real time, often through project-specific negotiations with each coastal State.

Looking Ahead The legal and regulatory developments of 2026 demonstrate the increasing interaction between submarine cable resilience, security, competition, digital sovereignty, maritime safety, environmental sustainability and international law. Measures adopted in one area can have implications for deployment, operation and repair in others. For governments, regulators and industry, this increasingly interconnected environment places greater emphasis on coordination across authorities and on consideration of regulatory requirements throughout the lifecycle of submarine cable projects. Ownership structures, supply chains, environmental considerations, repair arrangements and resilience strategies are increasingly addressed from the earliest stages of project development. If 2025 was characterized by growing international attention to submarine cable resilience, 2026 saw that attention increasingly reflected in regulatory, institutional and operational initiatives across different jurisdictions. Further developments can be expected during 2027 as national and regional regulatory initiatives described above continue to evolve, with some moving from consultation and policy development towards implementation.

Andrés Fígoli is the author of the two-volume book “Legal and Regulatory Aspects of Telecommunication Submarine Cables” and is the director of Fígoli Consulting (Switzerland), where he provides legal and regulatory advice on all aspects of subsea cable work. Mr. Fígoli graduated in 2002 from the Law School of the University of the Republic (Uruguay), holds a Master of Laws (LLM) from Northwestern University, and has more than two decades of experience in submarine cable matters. He also served as Director and Member of the Executive Committee of the International Cable Protection Committee (2015-2023). Submarine Telecoms Industry Report 2026/2027

10 / REGULATORY & BUSINESS OUTLOOK / 10.1 · 161


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10 / REGULATORY & BUSINESS OUTLOOK

10.2

THE IAB ON CABLE RESILIENCE: TWO YEARS OF GLOBAL COOPERATION

Submarine telecommunications cables form the backbone of global digital connectivity. As economies and societies become increasingly dependent on digital services, the resilience of this infrastructure has attracted growing attention from governments, regulators, industry and international organizations. Against this background, the International Telecommunication Union (ITU) and the International Cable Protection Committee (ICPC) established the International Advisory Body on Submarine Cable Resilience (Advisory Body or IAB) in 2024. Its purpose was to bring together a diverse group of stakeholders to exchange experiences, identify common challenges and develop practical recommendations for strengthening submarine cable resilience. The Advisory Body was designed from the outset as a multistakeholder initiative. Its members brought together governments and regulatory authorities from different regions, alongside senior representatives of the submarine cable industry. Its work also benefited from the participation of international organizations and experts from the wider cable community. This diversity is important. Submarine cable resilience does not depend on a single actor, nor can it be addressed through a single policy instrument. The deployment and operation of a cable system can involve telecommunications authorities, maritime administrations, environmental agencies, port authorities and other public bodies, as well as cable owners, operators, suppliers and maintenance providers. International organizations also have relevant mandates in areas ranging from telecommunications and maritime activities to hydrography and the law of the sea. The IAB therefore provided a forum in which these different perspectives could be considered together.

From dialogue to recommendations During its two-year mandate, the Advisory Body organized its substantive work around three Working Groups: • Working Group 1 – Timely Deployment and Repair examined regulatory and operational issues affecting the deployment and repair of submarine cables, including permitting processes and measures that may facilitate timely access to infrastructure and resources.

Submarine Telecoms Industry Report 2026/2027

• Working Group 2 – Risk Identification, Monitoring and Mitigation considered approaches to understanding the causes of cable faults and improving prevention, including the collection of reliable incident data and cooperation with relevant maritime stakeholders. • Working Group 3 – Fostering Connectivity and Geographic Diversity considered the broader conditions that support resilient international connectivity, particularly in countries and regions where geographic, economic or infrastructure constraints can make the development of diverse connectivity more difficult. The Working Groups brought together more than 160 participants from governments, industry, international organizations and academia representing stakeholders from across all continents. Their discussions drew upon practical experiences and regulatory approaches from different parts of the world, reflecting the geographical diversity of the Advisory Body and enriching its work with a broad range of regional and national perspectives. The objective was not to develop a single regulatory model applicable to every country. National circumstances vary considerably. Geography, market structure, existing infrastructure, institutional arrangements and exposure to natural and human-related risks can all influence the measures that may be appropriate in a particular jurisdiction. Instead, the process sought to identify approaches and experiences that governments, regulators and industry could consider within their respective mandates and national circumstances.

Completing the two-year mandate An important milestone was reached in Porto, Portugal, on 2 February 2026, when the Advisory Body approved the recommendations developed by its three Working Groups. The process continued during the following months as the Working Groups documented the experiences, regulatory approaches and practical examples underlying those recommendations. On 10 July 2026, the IAB approved its final Working Groups Report, completing its two-year mandate.

10 / REGULATORY & BUSINESS OUTLOOK / 10.2 · 163


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10.2 THE IAB ON CABLE RESILIENCE The resulting report covers a broad range of issues affecting submarine cable resilience. These include regulatory coordination, deployment and repair procedures, incident data, maritime prevention, repair preparedness, connectivity and geographic diversity. The recommendations are non-binding. They are intended to provide a resource that governments, regulators, industry and relevant international organizations can consider according to their respective responsibilities and circumstances. This distinction is important. Strengthening submarine cable resilience requires action across different areas of competence. Some issues are primarily national and regulatory; others depend on operational practices within the cable industry; and others intersect with the mandates of international organizations. The Advisory Body provided a common space in which these different dimensions could be discussed together.

Resilience through cooperation One of the lessons emerging from the Advisory Body's work is the value of continued dialogue between communities that have not always addressed submarine cable issues together. Telecommunications regulators, for example, may have responsibility for licensing and connectivity, while maritime authorities deal with navigation and activities at sea. Cable owners and maintenance providers possess operational knowledge concerning cable faults and repairs, while other public authorities may be responsible for environmental permitting, ports, customs or fisheries. Improving resilience therefore often involves coordination across institutional boundaries. The Advisory Body's work also highlighted the importance of considering the full lifecycle of submarine cable infrastructure. Resilience begins before a cable is installed, with planning, permitting and route selection. It continues through operation and protection and, when faults occur, depends upon the ability to mobilize vessels, equipment, personnel and permits required for repair. This broader perspective was reflected across the work of the three Working Groups.

CONTINUED

This spirit of cooperation was also reflected in the leadership of the Advisory Body. As Co-Chairs, representing Nigeria and Portugal, we came from different continents, countries with distinct realities and challenges, and institutions with different responsibilities. Rather than seeing these differences as obstacles, we found in them a source of strength. They enriched our discussions, broadened our understanding of the challenges at stake and helped ensure that the outcomes of our work were more relevant and meaningful to the diverse communities and countries we sought to serve. The same spirit was embodied in the partnership between the International Telecommunication Union (ITU) and the International Cable Protection Committee (ICPC), which jointly provided the Secretariat of the Advisory Body. Their collaboration brought together ITU's unique capacity to foster global dialogue and international cooperation on digital matters with ICPC's specialized technical and operational expertise in submarine cable protection and resilience. This complementarity proved particularly valuable throughout our mandate, and we are grateful for the dedication and support of both organizations. We sincerely hope that this experience will serve as a foundation for further cooperation between ITU, ICPC and other relevant organizations and stakeholders, strengthening the collective efforts of the international submarine cable community.

Looking beyond the Advisory Body The completion of the Advisory Body's mandate does not mean that the issues it examined have been resolved. Submarine cable networks continue to expand, technologies continue to evolve, and governments around the world are reviewing the resilience of the infrastructure supporting their international connectivity. The Working Groups Report provides a reference point for these continuing discussions. Some recommendations may be considered through national regulatory and policy processes. Others may inform regional cooperation or discussions within relevant international organizations. Industry will also continue to play a central role through investment, operational practices, information sharing and the maintenance and repair of global cable networks. How individual recommendations are considered will necessarily differ across jurisdictions and institutions.

Submarine Telecoms Industry Report 2026/2027

10 / REGULATORY & BUSINESS OUTLOOK / 10.2 · 164


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10.2 THE IAB ON CABLE RESILIENCE What can continue, however, is the cooperation that characterized the Advisory Body's work. The experience of the past two years has demonstrated the value of bringing governments, regulators, industry, international organizations and technical experts together around a shared understanding of submarine cable resilience.

CONTINUED

As global dependence on digital connectivity continues to grow, maintaining this dialogue will remain important. The IAB has provided a platform for that conversation and, through its Working Groups Report and recommendations, a body of practical experience that can continue to inform the work of the international submarine cable community.

Dr. Bosun Tijani is Nigeria’s Minister of Communications, Innovation and Digital Economy and Co-Chair of the International Advisory Body on Submarine Cable Resilience. He co-founded Co-Creation Hub, a pan-African technology and innovation center, and served as its CEO. He holds a doctorate in Innovation and Economic Development from the University of Leicester.

Professor Sandra Maximiano is Chairwoman of ANACOM, Portugal’s national communications regulator, and Co-Chair of the International Advisory Body on Submarine Cable Resilience. An Associate Professor of Economics at ISEG, University of Lisbon, she specializes in experimental and behavioral economics. She holds a PhD in Economics from the University of Amsterdam and previously taught at Purdue University.

Submarine Telecoms Industry Report 2026/2027

10 / REGULATORY & BUSINESS OUTLOOK / 10.2 · 165


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10 / REGULATORY & BUSINESS OUTLOOK

10.3

PERMITTING PATHWAYS

Permitting Pathways: A Year in Review with Anjali Sugadev and Michelle Elsa George Anjali Sugadev’s Permitting Pathways installments examine two connected questions: how developers can understand a national cable-approval system, and how telecommunications and energy projects interact within it. The practical value lies in identifying responsibilities, information requirements and points of coordination before uncertainty becomes embedded in a project schedule. Across the two articles, the emphasis is on diagnosing approval systems and understanding interfaces, rather than presenting a single model that every jurisdiction should adopt.

For project teams, that understanding can inform choices before capital commitments narrow the available options. Transparent requirements and digital access support early screening. A coordinating agency and a predictable sequence help organize work across institutions. Environmental review and marine spatial planning bring shared-use constraints into route design. Landing and telecommunications rights raise further questions about who may install, own or operate the local interface. Each dimension addresses a different source of uncertainty.

In July, Sugadev introduced a framework covering transparency, digital access, lead-agency coordination, predictable timelines, environmental review, marine spatial planning, and telecommunications and landing rights. These dimensions give developers and public bodies a structured way to examine how a process works. The article uses an illustrative Country X to show how those questions can be applied. The framework helps explain an approval process rather than rank national performance.

In September, Sugadev and Michelle Elsa George extended the discussion to the relationship between power and data cables. Their article contrasts international-law categories with national telecommunications and energy regimes, drawing on the United Kingdom, United States, Australia and Norway. Its practical focus is where routes, power infrastructure, crossings, protection and repair access meet. Hybrid projects bring these interfaces into sharper focus because communications and energy responsibilities may not align.

A central distinction is that permitting maturity does not mean permissiveness. A restrictive system can still make its decisionmaking process understandable. Applicants need to know which institutions decide, what information they require and how approvals are sequenced. Clear procedures do not remove substantive review. They provide a basis for preparing applications, evaluating route alternatives and assessing the exposure of a construction schedule to decisions outside the developer’s control.

Together, the installments suggest a sequence: first clarify how approvals work within national institutions, then examine the interfaces between communications and energy projects. For owners and public bodies, this approach can help identify schedule and coordination risks while preserving regulators’ distinct responsibilities. The aim is an understandable process in which project teams can identify decisions, prepare relevant information and plan work around the responsibilities of the institutions involved.

Anjali Sugadev Anjali Sugadev is Co-Founder and CEO at OceanJuris, with more than 12 years of subsea cable permitting experience across multiple jurisdictions. She holds a Master of Laws from the National University of Singapore and is an ICPC Rhodes Academy Award recipient. Her work spans regulatory, permitting and policy advisory for the global subsea cable sector.

Submarine Telecoms Industry Report 2026/2027

10 / REGULATORY & BUSINESS OUTLOOK / 10.3 · 166


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10 / REGULATORY & BUSINESS OUTLOOK

10.4

OTHER LEGAL AND REGULATORY DEVELOPMENTS

The following editorial synthesis draws on related SubTel Forum Magazine articles; these summaries are not guest-authored contributions. Permit feasibility studies. Denise Toombs’s treatment of Permit Feasibility Studies placed permitting risk within early project design. A permit matrix identifies approvals; a suitably scoped feasibility study investigates whether a landing or route is workable, which assumptions remain unverified and where critical-path constraints may arise. Her examples showed why direct contact with authorities and communities can change a project’s interpretation of available documents. The commercial implication is strongest before site selection and supply commitments reduce the freedom to respond to unfavorable findings (Toombs, 2026). Early route screening. Toombs also distinguished the level of investigation appropriate to established landing infrastructure from that warranted by unfamiliar jurisdictions, sensitive environments or technically difficult shore ends. This supports a proportionate approach to due diligence. Teams need findings that influence decisions, supported by identified data gaps, realistic schedules and usable spatial information. A rapid desktop exercise may help screen options, while first-hand verification becomes particularly valuable where a mistaken assumption could invalidate the preferred route or installation method (Toombs, 2026). Government coordination. Grace Koh’s contribution called for government coordination that supports investment and resilience alongside security review (Koh, 2026). U.S. security oversight. The March article by Ulises R. Pin and Thomas J. Garrity III examined the U.S. Federal Communications Commission (FCC) and its broader regulatory view of the cable system. Their account of the Commission’s 2025 Report and Order covered an expanded system definition encompassing submarine line terminal equipment, more detailed technical and location disclosures, security-plan certifications and recurring reporting. The retained 25-year license term preserved an important investment horizon. Operationally, the combination placed greater emphasis on knowing where equipment sits, who controls it and which third parties perform sensitive functions (Pin & Garrity, 2026).

Submarine Telecoms Industry Report 2026/2027

Implementation status. The March analysis distinguished the adopted order from the proposals accompanying it. Many provisions of the 2025 order had become effective, while certain obligations required further implementation notices. The authors separately described the Further Notice’s proposals for additional SLTE licensing, expanded certifications and conditions, and potential referral exemptions for qualifying applicants. These were the further measures under discussion when the article appeared. The authors associated the order with increased compliance work and treated potential streamlining benefits under the proposals as conditional (Pin & Garrity, 2026). European cybersecurity proposals. The May feature by Mike Conradi and colleagues examined a proposed expansion of the EU’s second Network and Information Systems Directive (NIS2). The European Commission’s proposal would expressly bring operators of Submarine Data Transmission Infrastructure into scope, including infrastructure essential to cable operation. The authors identified potential consequences for private-network operators, hyperscalers and consortium participants that might fall outside existing public-network categories. The May analysis treated the scope expansion as a proposal whose reach and implementation remained under discussion (Conradi, de LacyBrown, Keogh, Kilding, & Stirling, 2026). Shared-operator responsibility. Its immediate planning value lay in responsibility mapping. The authors asked which entity operates shared infrastructure, implements controls and manages incident notification when ownership, fiber use and landing operations are divided. They recommended applicability assessments, gap analysis and contractual allocation across consortium and landing-party arrangements. Read beside the FCC coverage, this suggested an end-to-end compliance discipline: equipment inventories, third-party access, reporting responsibilities and executive oversight need to align with the operating structure of the system (Conradi, de Lacy-Brown, Keogh, Kilding, & Stirling, 2026; Pin & Garrity, 2026).

10 / REGULATORY & BUSINESS OUTLOOK / 10.4 · 167


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10.4 OTHER LEGAL AND REGULATORY DEVELOPMENTS Conflict-related performance. Conflict risk brought the same allocation problem into project delivery. Conradi, David Ossack and Lola Stirling described how crew safety, insurance availability, port access, vessel restrictions and route feasibility can interrupt different parts of a cable program. Their contractual recommendations centered on controlled suspension, evidencebased cost treatment and a defined route back to performance. Where one branch is affected, the agreement should help establish which activities can continue and what evidence justifies pausing the remainder (Conradi, Ossack, & Stirling, 2026). Suspension and resumption. The authors also recommended linking suspension with variation and resumption procedures. A vessel released during an interruption may be unavailable later, and the original marine window or route assumptions may have changed. Insurance clauses and defined routing flexibility can address these consequences before disagreement develops. Their recommended package retained force majeure and termination as safeguards while giving greater attention to project continuity. These were drafting recommendations, whose effect would depend on the agreed terms and governing law (Conradi, Ossack, & Stirling, 2026). Sanctions and financial operability. Laurence Ridgway and colleagues added a distinct compliance layer through their sanctions analysis. They emphasized that international sanctions comprise multiple national regimes, with potentially different restrictions and jurisdictional connections. Counterparty screening therefore needs to extend into ownership and control, consortium participation, payment flows and the goods or services involved. Banks’ compliance responses may also delay transactions even where parties believe performance remains lawful. For cable projects, financial operability and marine readiness consequently need to be considered together (Ridgway, Caulfield, Blythe, & Luther, 2026).

Submarine Telecoms Industry Report 2026/2027

CONTINUED

Contract design. The sanctions coverage recommended precise contractual triggers, including distinctions between prohibited performance and increased cost, together with appropriate due diligence and communication with relevant authorities. This complements the war-risk article’s emphasis on evidence and controlled adjustment. Project agreements need to connect legal restrictions with decisions about payments, vessels, insurance and restart planning. The practical objective is a response process that can identify the affected obligation and the available lawful options without assuming that every geopolitical disruption has the same contractual consequence (Conradi, Ossack, & Stirling, 2026; Ridgway, Caulfield, Blythe, & Luther, 2026). Repair operations. Gaya Byrne’s July feature supplied an operator perspective on the coordination problem. Her account of regional disruption described how nearby vessels could remain difficult to deploy because of maintenance-zone boundaries, permitting and cabotage constraints. She identified daily operational coordination, partner engagement and traffic rerouting as practical responses, while calling for standing crosszone support arrangements and faster approvals. The example shows why repair readiness includes authority to mobilize assets, agreed decision processes and workable access to the fault area (Byrne, 2026).

10 / REGULATORY & BUSINESS OUTLOOK / 10.4 · 168


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10 / REGULATORY & BUSINESS OUTLOOK

10.5

RECENT MERGERS, ACQUISITIONS, AND INDUSTRY ACTIVITIES

Corporate activity in the submarine cable industry from January 1 to October 18, 2026 included completed acquisitions, new financing agreements and proposed ownership changes. Prysmian expanded its systems and marine-services capabilities, while Cerberus extended its investment in SubCom through a continuation vehicle. Other announcements concerned transactions still subject to closing conditions or reported sales for which completion had not been verified (Cerberus Capital Management, 2026; SubTel Forum, 2026i). Investment also extended across cable development, manufacturing, marine operations and landing infrastructure. Financing and long-term capacity agreements supported new routes, while suppliers and vessel operators announced expansion programs with delivery dates later in the decade. Government activity included Japanese landing-infrastructure support, revised U.S. licensing requirements and international cable-resilience initiatives. These developments covered both operating businesses and projects still awaiting construction, approvals or service entry (Ma, 2026; SubTel Forum, 2026d; SubTel Forum, 2026e). Prysmian Acquisitions. Prysmian completed its acquisition of Xtera Topco on October 13 through a venture owned 80% by Prysmian and 20% by Fincantieri. The transaction, announced in December 2025, carried a $65 million enterprise value and added repeater technology, optical engineering and systems integration. Separately, Prysmian closed its ACSM acquisition on February 10, following its January announcement. ACSM contributes submarine installation, route-planning and seabedpreparation services and was consolidated from February, extending Prysmian’s capabilities across system supply and marine delivery. Prysmian also reported that it is doubling submarine telecom cable production at Nordenham, where cable for EXA Meridian will be manufactured (Prysmian, 2026; SubTel Forum, 2026i). SubCom Ownership. Cerberus announced the closing of a single-asset continuation vehicle for SubCom on April 20, securing approximately $2.3 billion in commitments. CVC Secondary Partners led the vehicle, while Cerberus-managed funds made an additional investment and retained a controlling stake in SubCom. The arrangement extends Cerberus’s partnership with SubCom and supports expansion of its integrated engineering, manufacturing, marine installation and maintenance platform (Cerberus Capital Management, 2026).

Submarine Telecoms Industry Report 2026/2027

EXA Meridian. The January newsfeed reported EXA Infrastructure’s completed acquisition of Aqua Comms, which closed in late December 2025 and strengthened its transatlantic and intra-European portfolio. EXA followed that expansion with its September 16 announcement of EXA Meridian, which had reached Contract in Force with Xtera. The planned 6,552-kilometer system between New Jersey and Brean, UK, is designed with 24 fiber pairs and more than 500 Tbps of capacity. Supported by anchor customer commitments, it targets service in the fourth quarter of 2029 (Blackman, 2026; EXA Infrastructure, 2026). GCI and Quintillion. GCI announced a definitive agreement on April 22 to acquire all of Quintillion’s equity at a $310 million enterprise value, subject to adjustments, regulatory approval and customary closing conditions. Separate terms include reimbursement of up to $50 million in qualifying Nome-to-Homer Express capital expenditure, potential performance-based earnouts and a $160 million unsecured loan shortly after signing. The proposed combination would integrate complementary Alaskan subsea and terrestrial routes, supporting ringed network architecture and coordinated operations (GCI, 2026). Telxius Sale Reports. Europa Press reported on July 16, citing industry sources, that Telefónica and Pontegadea had agreed to sell Telxius for approximately €1.2 billion. The report concerned the business consolidating Telefónica’s subsea cable operations and identified the existing ownership split as 70% Telefónica and 30% Pontegadea. It did not name a buyer or provide a signing or completion timetable. The announcement is included as a reported transaction; completion was not verified by the October 18 cutoff (Europa Press, 2026). Sparkle Sale Timetable. TIM’s April 14 update extended the Sparkle sale’s long-stop date to October 15, 2026, under an agreement with Boost BidCo, controlled by Italy’s Ministry of Economy and Finance, with Retelit participating. That release anticipated second-quarter completion. TIM’s July 29 results subsequently expected closing during the third quarter following U.S. regulatory authorizations and repeated the October deadline. A completion announcement was not verified by October 18, so the dated timetable updates are reported without treating the proposed transfer as closed (TIM, 2026a; TIM, 2026b).

10 / REGULATORY & BUSINESS OUTLOOK / 10.5 · 169


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10.5 RECENT MERGERS, ACQUISITIONS, AND INDUSTRY ACTIVITIES

CONTINUED

Aventa Acquisition. Aventa’s acquisition of Irish Sea Contractors, reported in October, added an Irish marine-delivery base and capabilities in cable landfalls, pull-ins, nearshore installation, burial, protection and repair. The transaction also brought the DNV-qualified AERSUB cable-repair solution into the group. Irish Sea Contractors retains its name, leadership and Wexford operating base, with Managing Director Áine Kinsella also leading Aventa’s expanded Operations business. Aventa plans further investment in the Irish operation and a Dublin presence, combining offshore delivery with its existing engineering and consulting services (SubTel Forum, 2026a).

WIOCC Investment Agreement. WIOCC announced a Shareholder Subscription Agreement with Africa Finance Corporation and Vision Invest on September 1, providing for a combined $300 million investment. The agreed capital is intended to support data-center deployment and consolidation, expansion of open-access terrestrial fiber and strategic investment in subsea assets. These activities extend across WIOCC’s African infrastructure platform rather than a single cable project. The agreement links institutional equity with continued development of interconnected African subsea, terrestrial and data-center assets (WIOCC Group, 2026).

OFN and SK Horizon. Ooredoo announced Ooredoo Fiber Networks in February as a dedicated international connectivity and submarine infrastructure platform, with the asset carve-out expected to finish by 2027. Separately, SK Telecom announced plans in August to establish SK Horizon through an SK Broadband split, targeting the first quarter of 2027 subject to approvals. KKR-managed funds and an IMM Investment and Stonebridgeled consortium agreed to phased investment totaling KRW3.08 trillion. SK Telecom would retain management control. Both announcements separate the creation of a dedicated investment platform from the subsequent transfer of assets and completion of investment phases (Sharma, 2026; SK Telecom, 2026).

APX East Capacity. Firmus and SUBCO announced a transPacific connectivity agreement in September under which Firmus plans to invest approximately $300 million for up to 150 Tbps of dedicated APX East capacity over 25 years. The proposed capacity would connect Firmus’s Australian AI infrastructure with U.S. and wider international markets. APX East remains under development, with a fourth-quarter 2028 ready-for-service target. The agreement makes Firmus a cornerstone customer for the proposed system and links a long-term connectivity commitment with the development of Australian AI infrastructure (SubTel Forum, 2026b).

SING Investment Agreement. Datawave announced a binding investment and financing agreement with Cerberus affiliates on January 19 for the Singapore–India–Gulf cable system. Under the agreement, Cerberus would make a significant equity investment, obtain majority ownership of Datawave and provide project financing upon closing. Datawave also reported a supplier agreement covering system design, manufacture and deployment. SING is planned to connect Oman, the United Arab Emirates, India, Malaysia and Singapore, with service targeted for 2030. The agreement connects an independent developer with a majority-equity and project-financing partner, with the ownership change conditional on closing (Datawave Networks, 2026). I-2SEA Debt Financing. Lightstorm announced on August 11 that it had secured a Rs25 billion, approximately $262 million, debt facility led by IndusInd Bank for I-2SEA. The planned 3,600-kilometer system would connect India with Malaysia and Singapore, with Indian landings at Machilipatnam and South Chennai. Development involves Lightstorm, Microsoft, Singtel and Tata Communications through a consortium and joint-build agreement. NEC is the system supplier and ASEAN Cableship the installation partner. The financing adds debt support to the consortium’s development arrangements as it works toward its stated fourth-quarter 2029 service target (Ma, 2026). Submarine Telecoms Industry Report 2026/2027

Bifrost Capacity Commitments. Keppel announced on July 13 that it had signed an indefeasible-right-of-use agreement with a hyperscaler for the final available fiber pair in its Bifrost portfolio. All five pairs were consequently committed across telecommunications operators, hyperscalers and technology companies. Keppel estimated their aggregate contract value at approximately $1.3 billion, including operations and maintenance income over 25 years. The investment is held through a venture owned 40% by Keppel and 60% by private fund co-investors (Keppel, 2026). MDC Minority Investment. MDC Data Centers announced in September that Columbia Capital had taken a minority position to support expansion in U.S. border markets and Mexico. Founder Juan Salazar remains majority owner and chief executive, with the management team and neutral operating model unchanged. Planned investment areas include existing border facilities, Querétaro interconnection infrastructure and future MANTA cable landing hubs in Cancún and Veracruz. The investment amount, valuation and ownership percentage were not disclosed. The backing connects border interconnection expansion with development of neutral coastal landing infrastructure (MDC Data Centers, 2026).

10 / REGULATORY & BUSINESS OUTLOOK / 10.5 · 170


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

10.5 RECENT MERGERS, ACQUISITIONS, AND INDUSTRY ACTIVITIES PISCES Joint Venture. Equitix, MDM and Orange announced PISCES Cable System Ltd in October to develop direct connectivity between Ireland and mainland Europe. The planned approximately 3,125-kilometer, 16-fiber-pair system would connect Galway, Saint-Hilaire-de-Riez, Sopelana and Carcavelos, with Orange building a new Sopelana landing station. The project has Connecting Europe Facility support, while Equitix invests through Equitix Infra Ireland. Marine surveys were completed in August, and engineering and permitting were progressing. Installation is expected during 2028, with engineering and permitting forming the next delivery steps (SubTel Forum, 2026h). Manufacturing Expansion. ASN announced approximately €100 million of investment across Calais and Greenwich over 2026–2028, covering equipment modernization and building expansion or fit-out. Lightera’s September program aims to nearly triple submarine optical-fiber manufacturing capacity by 2029 through facilities in Denmark and the United States. Hexatronic separately plans a Hudiksvall production line entering service in 2028, more than doubling submarine cable manufacturing capacity and supporting an NKT supply agreement. Together, the programs address different parts of the supply chain, from optical fiber to cable production and system components, with output increases scheduled over several years (Alcatel Submarine Networks, 2026; SubTel Forum, 2026e; TGS, 2026). Fleet Investment. OMS’s January report covered two Ulstein vessel contracts signed on December 23, 2025, with service expected in 2028. CS Resilience reached keel laying on September 17, a construction milestone disclosed in October. Orange Marine’s February announcement covered two VARDdesigned cable-laying and repair vessels to be built at Colombo Dockyard. April coverage then reported keel laying for an Orange Marine newbuild at the yard. Global Marine separately ordered a maintenance vessel from that yard in July, scheduling delivery for the fourth quarter of 2029. The orders and construction milestones extend fleet-renewal commitments into the latter part of the decade (Annals, 2026; Hiru News, 2026; MarineLink, 2026; OMS Group, 2026; SubTel Forum, 2026f). Remote Survey Operations. OMS announced the opening of its Singapore Remote Operations Centre on September 22 for its OMS Geometra survey business. The facility brings vessel pilots, survey specialists and project personnel together to supervise unmanned surface vessels, review incoming survey data and coordinate craft operating in different locations. Operations remain under continuous professional watchkeeping. The opening followed OMS’s April announcement of a second DriX O-16 acquisition and supports its developing remote-survey capability. The investment extends the group’s marine capabilities into shore-based control and survey-data management (SubTel Forum, 2026g; Tarre, 2026). Submarine Telecoms Industry Report 2026/2027

CONTINUED

Japan Infrastructure Support. CIAJ announced four landinginfrastructure subsidy recipients on October 9: SoftBank, IPS, IPS Pro and Shikoku Electric Power, covering locations in Hokkaido, Wakayama and Tokushima. Projects remained subject to grant procedures before work could begin. Separately, September reporting described a ministry budget proposal to cover half the construction cost of qualifying cable vessels. The vessel measure remained a budget proposal, while the landing program had advanced to recipient selection. Both address infrastructure diversity through different parts of the delivery chain (SubTel Forum, 2026c; SubTel Forum, 2026d). Dominican Republic Digital Hub. February reporting described a $500 million Google investment announced by the Dominican Republic presidency for an international digital exchange hub. The initiative includes submarine connectivity to two U.S. locations, reportedly South Carolina and Virginia, alongside a planned facility of approximately 7,000 square meters. Reported schedules envisioned work beginning in March 2026 and completion in early 2027. The planned hub combines cable infrastructure with regional traffic exchange, placing the Caribbean within Google’s wider connectivity investment program (BeBeez International, 2026). FCC Licensing Rules. On June 25, the FCC adopted a blanket licensing regime for submarine line terminal equipment operations, associated security obligations and streamlined processing for trusted applicants. Separately, 17 countries launched GUIDE on May 30 as a voluntary framework for underwater-infrastructure information exchange, without legal or financial obligations. On July 10, the ITU–ICPC International Advisory Body approved its final resilience report, addressing deployment and repair, risk mitigation and geographical diversity. These initiatives combine national licensing reform with cross-border information exchange and shared resilience recommendations (Conway, Richter, Sriram, Van Cleef, & Nash, 2026; ITU, 2026; Telecom Review Asia, 2026). APTelecom and WFN Collaboration. APTelecom and WFN Strategies announced the continued expansion of their longstanding collaboration on January 28. Their 2026 work covers submarine cable projects across the Atlantic, Pacific, South American and Indian Ocean regions, combining commercial advice with technical planning and implementation support. The announcement described ongoing cooperation across commercial and government engagements, including assistance with planning, execution and operational requirements. The collaboration brings commercial development, engineering and implementation advice into a shared service offering across several international markets (APTelecom & WFN Strategies, 2026).

10 / REGULATORY & BUSINESS OUTLOOK / 10.5 · 171


SUBTEL FORUM

CHAPTER 11

REGIONAL ANALYSIS REGIONAL INVENTORY / SELECTED COMPARISONS

Selected 2026 regional endpoints EMEA AustralAsia Americas

INTERPRETATION

EMEA, AustralAsia and Americas are selected regional attributions; do not sum them or present them as a complete global inventory.

The regional series describe different infrastructure histories and commercial programs. Current inventory that meets the report’s manufacturing readiness criteria is organized by reporting cohort, while planned CIF profiles identify the recorded commitments of each defined project group. Reporting cohorts do not establish operational entry into service.

172

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

cumulative 2026 regional point

cumulative 2026 regional point

229

139

EMEA systems

AustralAsia systems

Region-attributed current inventory endpoint, not a global unique-system count.

Region-attributed current inventory endpoint; crossregion values are not summed into a global total.

2018–2026 cumulative report-cohort series

229 139 93

FROM THE CHAPTER

EMEA's cumulative system series rises from 191 at the 2018 point to 229 at 2026, an increase of 38 systems or 19.9%. Its largest cohort step is nine in 2022, followed by seven in 2020 and five each in 2021, 2023, and 2025.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

173


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11 / REGIONAL ANALYSIS

11.1

AMERICAS REGION

The regional series describe different infrastructure histories and commercial programs. Current inventory that meets the report’s manufacturing readiness criteria is organized by reporting cohort, while planned CIF profiles identify the recorded commitments of each defined project group. Reporting cohorts do not establish operational entry into service. The analysis connects those views with each region's count, length, and wider role in the report. The July issue's regional coverage addresses regional commercialization, resilience, and governance; the figures here provide the numerical context for that broader discussion.

11.1.1 Current Systems

73

Figure 73: Cumulative systems in the Americas by report cohort year, 2018–2026.

The Americas cumulative system series rises from 73 at the 2018 point to 93 at 2026, a gain of 20 systems or 27.4%. Its largest cohort step is six systems between 2018 and 2019. Subsequent additions are smaller, including two in each of 2024, 2025 and 2026. The count profile therefore combines a substantial starting base with recurring project groups, rather than concentrating all of its recorded expansion at the end of the interval.

Submarine Telecoms Industry Report 2026/2027

The length view gives that history a different emphasis. The 2024 and 2025 cohorts account for nearly half of the interval's reported kilometer increase, even though their count steps are modest. The recent regional program consequently has both repeated project development and a later concentration of physical scale. This is useful to businesses evaluating the Americas because frequency of engagements and the extent of infrastructure create different kinds of commercial opportunity.

11 / REGIONAL ANALYSIS / 11.1 · 174


SUBTEL FORUM

11.1 AMERICAS REGION

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

The regional count also provides context for architecture. Four of the eight Americas entries in the recent 2022–2026 manufactured cohort are classified unrepeatered. The region's project activity thus includes a sizeable architecture-specific component alongside the larger physical route programs visible in the length series. The industry meaning is a varied infrastructure mix, whose commercial role depends on the actual connections and scale associated with the individual systems.

74

Figure 74: Cumulative reported whole-system length attributed to the Americas by report cohort year, 2018–2026 (km).

The Americas reported-length series increases from 235,356 km at the 2018 point to 292,772 km at 2026, a gain of 57,416 km or 24.4%. The 2024 and 2025 cohort steps add 16,517 km and 10,400 km, respectively. Together, those 26,917 km represent 46.9% of the interval's increase. The physical program is therefore concentrated more strongly in the later cohorts than the count profile alone suggests. Known lengths cover 70 of 73 systems at the 2018 point and 90 of 93 at the partial 2026 endpoint.

Submarine Telecoms Industry Report 2026/2027

Earlier steps reinforce the difference. The 2019 count adds six systems, with a reported length increase of 14,262 km; the 2024 and 2025 count steps are two each. These separate series describe a changing regional project mix. The later length concentration gives manufacturers and marine businesses a significant physical program to investigate, while the recurring count entries identify a continuing sequence of distinct projects and customer relationships.

11 / REGIONAL ANALYSIS / 11.1 · 175


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11.1 AMERICAS REGION

CONTINUED

11.1.2 Future Systems

Cable Systems by Year Americas 2018 2026 observed | 2027 2029 modeled scenarios 102

100 all 97 half

Number of systems

96

93

93 none

90 84 78 72 2018

2023 2024 2025 2026 2027 Report cohort year Modeled range: no to all listed plans Observed report cohorts Midpoint case: about half Shading: illustrative sensitivity for listed plans, not a confidence interval. Report cohort dates are not actual service dates.

75

2019

2020

2021

2022

2028

2029

Figure 75: Cumulative Americas systems by report cohort year, 2018–2026, and illustrative 2027–2029 scenarios for seven listed planned systems. Orange shading spans zero to full realization of those plans; the dashed line shows approximately half, rounded to whole systems. These modeled paths are sensitivities, not delivery probabilities, expected deliveries, or statistical confidence intervals.

For the region's infrastructure proposition, the next question is how those routes connect with the networks and facilities that customers need to reach. The shore-participation chart gives the Americas a substantial recent position, and its known-cost profile shows meaningful financial scale. Taken together, these dimensions describe a region with an extensive recorded base and ongoing development across different route types. The practical value of a new connection comes from its role within that wider network landscape.

Submarine Telecoms Industry Report 2026/2027

11 / REGIONAL ANALYSIS / 11.1 · 176


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11.1 AMERICAS REGION The 2026 cumulative report-cohort series stands at 93 systems. Seven listed planned systems fall in the 2027–2029 selection, all in the 2027 cohort. If none, approximately half, or all of those listings materialize, the illustrative 2029 paths end at 93, 97, or 100 systems. The separate CIF record shows one contract in force, three not in force, and three with unknown status, or 14.3%, 42.9%, and 42.9%. A contract in force is a recorded commitment; unknown status cannot be assigned to either contractual group. Each listing still needs its own route and schedule evidence. The cone describes count sensitivity, not actual service dates or commercial readiness.

Submarine Telecoms Industry Report 2026/2027

CONTINUED

11.1.3 Region Outlook The Americas combines an extensive established network with recurring projects and several large recent physical cohorts. New routes matter through their landing access, terrestrial links, and customer reach, not simply through additions to the count. Those features can vary among projects in the same cohort. The next test is how commitments move into buildable routes and customer-facing services, particularly where a proposed connection must integrate with existing local networks. The count scenarios leave those questions open while showing the scale of the currently listed program.

11 / REGIONAL ANALYSIS / 11.1 · 177


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11 / REGIONAL ANALYSIS

11.2

AUSTRALASIA REGION

11.2.1 Current Systems

76

Figure 76: Cumulative systems in AustralAsia by report cohort year, 2018–2026.

AustralAsia's cumulative system series rises from 108 at the 2018 point to 139 at 2026, an increase of 31 systems or 28.7%. It advances in every displayed year. The largest step is seven systems in 2019, followed by five in each of 2020 and 2021. The cohort additions then change to three, four and one before returning to four in 2025 and two in 2026. The record shows repeated development with a changing pace across cohorts. That sequence is different from a single large project step. It places successive system groups within an already extensive inventory, making the region's infrastructure development a continuing program. The length profile nevertheless shows considerable variation in the size associated with those groups. For the industry, this combination means that the breadth of projects and the physical extent of construction need to be considered together when evaluating regional activity.

Submarine Telecoms Industry Report 2026/2027

AustralAsia's wider report profile strengthens its forward significance. It has the largest planned regional kilometer category and the largest planned landing-participation category. Its known planned design-capacity entries are substantial in the 2027 and 2028 report cohorts; the 2029 value is unknown. These are distinct dimensions of regional development. The current count series supplies the established project context from which those programs are being considered, connecting an extensive recorded base with a broad set of new infrastructure propositions.

11 / REGIONAL ANALYSIS / 11.2 · 178


SUBTEL FORUM

11.2 AUSTRALASIA REGION

77

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURE 77

Figure 77: Cumulative reported whole-system length attributed to AustralAsia by report cohort year, 2018–2026 (km).

AustralAsia's reported-length series moves from 297,253 km at the 2018 point to 377,543 km at the 2026 report-cohort endpoint. The gain is 80,290 km, or 27.0%. The 2025 step contributes 26,667 km, compared with 2,500 km in 2024 and 4,322 km in 2023. It is the largest cohort length addition in the displayed interval, giving the 2025 cohort a substantial physical position within the regional record. Known lengths cover 100 of 108 systems at the 2018 point and 129 of 139 at the partial 2026 endpoint.

The industry implication is to evaluate the regional program through both its recurring engagements and its larger route groups. The 2025 physical step provides a bridge to the sizeable, planned length and landing profiles elsewhere in the report. Those profiles make AustralAsia important to marine construction and shore integration as well as technical capacity. The next projects will have their own geographic purposes, with the usefulness of each route defined by the markets and networks it is intended to connect.

The earlier 2019 step adds 15,738 km. The two large additions are therefore located near the beginning and end of the interval, while system counts advance throughout it. This is a distinctive regional pattern: recurring project groups contain routes with markedly different physical scale. A continuing stream of system development does not imply a uniform quantity of wet infrastructure in each year.

Submarine Telecoms Industry Report 2026/2027

11 / REGIONAL ANALYSIS / 11.2 · 179


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11.2 AUSTRALASIA REGION

FIGURE 78

11.2.2 Future Systems

Cable Systems by Year AustralAsia 2018 2026 observed | 2027 2029 modeled scenarios 152 all

150

146 half 139

Number of systems

140

139 none

130 120 110 2018

2023 2024 2025 2026 2027 Report cohort year Modeled range: no to all listed plans Observed report cohorts Midpoint case: about half Shading: illustrative sensitivity for listed plans, not a confidence interval. Report cohort dates are not actual service dates.

78

2019

2020

2021

2022

2028

2029

Figure 78: Cumulative AustralAsia systems by report cohort year, 2018–2026, and illustrative 2027–2029 scenarios for thirteen listed planned systems. Orange shading spans zero to full realization of those plans; the dashed line shows approximately half, rounded to whole systems. These modeled paths are sensitivities, not delivery probabilities, expected deliveries, or statistical confidence intervals.

The 2026 cumulative report-cohort count is 139. Thirteen listed planned systems span the next three cohorts: nine in 2027, three in 2028, and one in 2029. The illustrative 2029 paths end at 139 if none realizes, 146 at the rounded midpoint, or 152 if all do. The separate CIF record shows six of thirteen with contracts in force, or 46.2%, and seven not in force, or 53.8%. Those contractual positions describe recorded commitments; the cone does not convert them into delivery probabilities. The route purpose of each system also differs. AustralAsia's sizeable listed program remains subject to project-specific schedules, development, and execution before it adds operating connectivity.

Submarine Telecoms Industry Report 2026/2027

11.2.3 Region Outlook AustralAsia combines continuing project additions with uneven route scale: a few cohorts account for much of the reported physical expansion. The proposed Invercargill–Melbourne Tasman Ring would create a separate South Island gateway for New Zealand; an August 2026 agreement assigns supply to ASN and survey and installation to OMS. That example shows why a route's geography and onward network matter alongside a regional count. The planned program also has substantial route length and landing participation, but its service contribution depends on completion and usable connections beyond the shore.

11 / REGIONAL ANALYSIS / 11.2 · 180


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11 / REGIONAL ANALYSIS

11.3

EMEA REGION

11.3.1 Current Systems

79

Figure 79: Cumulative systems in EMEA by report cohort year, 2018–2026.

EMEA's cumulative system series rises from 191 at the 2018 point to 229 at 2026, an increase of 38 systems or 19.9%. Its largest cohort step is nine in 2022, followed by seven in 2020 and five each in 2021, 2023, and 2025. The region has both the largest starting count and the largest absolute increase among these regional count series. Its lower proportional increase than the Americas or AustralAsia reflects the much larger starting base.

The architecture profile adds specificity: 10 of the 23 EMEA manufactured entries in the recent 2022–2026 cohort are classified unrepeatered. About 43.5% of those recent regional entries therefore belong to that segment. EMEA's leading project count includes more than one kind of infrastructure proposition. Reading the count with the length and architecture views helps explain why its role spans repeated regional connections as well as larger route programs.

This combination gives EMEA a distinctive industry position. Repeated project groups develop within a broad recorded infrastructure landscape, rather than transforming a small category with one addition. Owners and suppliers encounter a range of routes and interfaces in that setting. The count's commercial meaning is the breadth of activity and the continued development of an already extensive regional base.

Submarine Telecoms Industry Report 2026/2027

11 / REGIONAL ANALYSIS / 11.3 · 181


SUBTEL FORUM

11.3 EMEA REGION

80

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURE 80

Figure 80: Cumulative reported whole-system length attributed to EMEA by report cohort year, 2018–2026 (km).

EMEA reported length increases from 226,539 km at the 2018 point to 300,044 km at 2026, a gain of 73,505 km or 32.4%. The 2023 step adds 17,744 km, about 24.1% of the interval's increase. The series then adds 7,028 km in 2024, 9,975 km in 2025, and 19,140 km in 2026. Its reported length continues to increase through the end of the window, with particularly substantial 2023 and 2026 report cohorts. Known lengths cover 177 of 191 systems at the 2018 point and 213 of 229 at the partial 2026 endpoint.

For the industry, the length series gives the region's repeated activity a substantial construction dimension. The different relative increases in count and length describe two profiles of the current inventory's project history. They support a discussion of regional work that includes both the breadth of engagements and the extent of wet infrastructure. EMEA's position is consequently significant to multiple parts of the delivery chain, from system and marine programs to the shore relationships connecting them with customers.

The cohort profile differs from the count peak in 2022. Nine system entries appear in that year's count step, while a larger kilometer addition occurs a year later and the largest occurs in the 2026 report cohort. This makes EMEA's development a useful example of why project frequency and physical scale have different cohort profiles. A year with more projects need not be the year with the most cable length associated with its report cohort.

Submarine Telecoms Industry Report 2026/2027

11 / REGIONAL ANALYSIS / 11.3 · 182


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11.3 EMEA REGION

FIGURE 81

11.3.2 Future Systems

Cable Systems by Year EMEA 2018 2026 observed | 2027 2029 modeled scenarios 240 229

Number of systems

230

237 all 233 half 229 none

220 210 200 190 2018

2023 2024 2025 2026 2027 Report cohort year Modeled range: no to all listed plans Observed report cohorts Midpoint case: about half Shading: illustrative sensitivity for listed plans, not a confidence interval. Report cohort dates are not actual service dates.

81

2019

2020

2021

2022

2028

2029

Figure 81: Cumulative EMEA systems by report cohort year, 2018–2026, and illustrative 2027–2029 scenarios for eight listed planned systems. Orange shading spans zero to full realization of those plans; the dashed line shows approximately half, rounded to whole systems. These modeled paths are sensitivities, not delivery probabilities, expected deliveries, or statistical confidence intervals.

EMEA's cumulative report-cohort count reached 229 in 2026. Eight listed planned systems fall in the 2027–2029 selection: three in 2027 and five in 2028. The 2029 scenario paths reach 229, 233, or 237 systems under no, approximately half, or full realization. The separate CIF record shows one contract in force and seven not in force, or 12.5% and 87.5%. That split identifies a small contracted group without assigning a delivery chance to either group. It is also distinct from survey progress: one completed survey participation appears among eight in the planned survey selection. Commercial and engineering milestones must be read separately from this count sensitivity.

Submarine Telecoms Industry Report 2026/2027

11.3.3 Region Outlook EMEA's broad established network includes regional systems and longer routes, with a sizeable unrepeatered component in its recent profile. Future projects can add a connection or strengthen a proposition within that network, but they will not serve a uniform market. Landing access, terrestrial reach, customer networks, and route purpose determine how each addition can be used. The current survey and CIF records show different stages of development, so the meaningful forward test is how individual projects turn those milestones into routes that can be delivered and operated.

11 / REGIONAL ANALYSIS / 11.3 · 183


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11 / REGIONAL ANALYSIS

11.4

INDIAN OCEAN REGION

11.4.1 Current Systems

82

Figure 82: Cumulative systems in the Indian Ocean by report cohort year, 2018–2026.

The Indian Ocean cumulative system series moves from 25 at the 2018 point to 33 at 2026, an increase of eight systems or 32.0%. Its largest cohort step is three in 2024; the other additions are two in 2019 and one in each of 2020, 2021 and 2023. The count is unchanged at the 2022, 2025 and 2026 points. Its pattern is consequently defined by particular project groups rather than additions in every year. That is commercially meaningful in a smaller regional category. A few systems can change the recorded count noticeably and create a concentrated group of industry engagements. The associated physical profile gives the 2024 group particular importance, with the largest length step also appearing in that year. Count and length therefore identify a clear project concentration within the region's current manufactured inventory.

Submarine Telecoms Industry Report 2026/2027

The regional analysis benefits from this cohort profile. It would be incomplete to read the unchanged 2025 and 2026 points as a general statement about the importance of Indian Ocean connectivity, just as it would be incomplete to treat the 2024 step as an assured annual rate. These records describe distinct reporting cohorts. Their industry significance lies in the routes and commercial connections involved, and in the construction program represented by the larger groups.

11 / REGIONAL ANALYSIS / 11.4 · 184


SUBTEL FORUM

11.4 INDIAN OCEAN REGION

83

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURE 83

Figure 83: Cumulative reported whole-system length attributed to the Indian Ocean by report cohort year, 2018–2026 (km).

Indian Ocean reported length rises from 98,347 km at the 2018 point to 128,453 km at 2026, a gain of 30,106 km or 30.6%. The 2024 step adds 22,900 km, representing 76.1% of that increase. The 2025 and 2026 points are unchanged. The regional physical history is therefore strongly concentrated in one reporting cohort within the displayed interval. Known lengths cover 22 of 25 systems at the 2018 point and 30 of 33 at the partial 2026 endpoint. The contrast with the broader industry's historical 2025 reportedlength rebound is informative. The Indian Ocean's large step occurs in 2024, while other geographies contribute prominent later cohorts. These regional reporting cohorts have different profiles; they do not establish the schedules of construction programs. For manufacturers and marine businesses, the physical significance of a route group can be substantial despite a relatively small cumulative system category.

Submarine Telecoms Industry Report 2026/2027

This gives the region an industry role that is best understood through the reported project mix. Three count additions in 2024 accompany the year of the large length step, while earlier groups have smaller physical increments. The resulting program includes cohorts with concentrated reported route length and others with no increase in the displayed series. A useful regional assessment follows that composition and the networks served by the projects, rather than applying a uniform annual growth assumption.

11 / REGIONAL ANALYSIS / 11.4 · 185


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11.4 INDIAN OCEAN REGION

FIGURE 84

11.4.2 Future Systems

Cable Systems by Year Indian Ocean 2018 2026 observed | 2027 2029 modeled scenarios 36

35 all 34 half

33

33 none

Number of systems

33 30 27 24 2018

2023 2024 2025 2026 2027 Report cohort year Modeled range: no to all listed plans Observed report cohorts Midpoint case: about half Shading: illustrative sensitivity for listed plans, not a confidence interval. Report cohort dates are not actual service dates.

84

2019

2020

2021

2022

2028

2029

Figure 84: Cumulative Indian Ocean systems by report cohort year, 2018–2026, and illustrative 2027–2029 scenarios for two listed planned systems. Orange shading spans zero to full realization of those plans; the dashed line shows approximately half, rounded to whole systems. These modeled paths are sensitivities, not delivery probabilities, expected deliveries, or statistical confidence intervals.

The Indian Ocean cumulative report-cohort count stood at 33 in 2026. Two listed planned systems fall in the 2027–2029 selection, one in 2027 and one in 2028. The illustrative 2029 paths end at 33, 34, or 35 systems. The separate CIF record has one contract in force and one not in force, a 50.0% split in this small group. Those facts describe project listings and contractual position, not a likelihood of delivery. The January 2026 SING investment agreement concerns a proposed Middle East–South Asia–Southeast Asia connection with a 2030 RFS target. SING sits beyond this shorter plotted selection and should not be counted within its cone.

Submarine Telecoms Industry Report 2026/2027

11.4.3 Region Outlook The Indian Ocean record is shaped by a few consequential project groups, with some cohorts showing little change and others accounting for substantial physical additions. That pattern makes route purpose and cross-regional partnerships especially important. SING illustrates a longer-horizon proposition tied to contemplated financing and majority ownership upon closing; its progress should be followed on its own terms. For the nearer-term listings, engineering, commitments, and landing relationships will determine whether a small change in system count becomes a meaningful addition to regional connectivity.

11 / REGIONAL ANALYSIS / 11.4 · 186


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11 / REGIONAL ANALYSIS

11.5

POLAR REGION

11.5.1 Current Systems

85

Figure 85: Cumulative systems in the Polar region by report cohort year, 2018–2026.

The Polar cumulative system series has one system at each point from 2018 through 2021, rises to two in 2022 and remains at two through 2026. A single addition doubles the displayed count. The percentage change is large because the starting category is small, making the absolute project number essential to the interpretation. This scale gives individual systems a particularly prominent role in the regional history. The accompanying length series also has one step in 2022, followed by a flat profile. The two charts identify a discrete change in the current manufactured inventory rather than a continuous sequence of annual additions. The resulting industry picture is one in which a single route program can materially alter the recorded regional position.

Submarine Telecoms Industry Report 2026/2027

The planned views provide a separate perspective. Four systems appear in the Polar CIF selection, and the planned regional length chart attributes 9,850 km to Polar. Those views establish a forward program that is substantial relative to the small, recorded base. Its commercial significance depends on the individual projects and their progression toward commitments, which the CIF chart makes particularly clear. The current count supplies context for evaluating the scale of that prospective development.

11 / REGIONAL ANALYSIS / 11.5 · 187


SUBTEL FORUM

11.5 POLAR REGION

86

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURE 86

Figure 86: Cumulative reported whole-system length attributed to the Polar region by report cohort year, 2018–2026 (km).

Polar reported length stays at 1,200 km from the 2018 through 2021 points, rises to 3,000 km in 2022 and remains there through 2026. The 1,800-km step is a 150.0% increase over the starting value. The same report cohort contains an increase from one to two systems in the count series, giving the physical and project views a shared cohort pattern. The size of the relative change is meaningful alongside its absolute extent. A small starting length category can have a large percentage increase from one project group. For industry assessment, the recorded kilometers establish the physical program, while the count establishes the number of engagements represented. Both are needed to avoid giving a large percentage change the same industrial interpretation in every region.

Submarine Telecoms Industry Report 2026/2027

The planned length view has a different scale, with 9,850 known reported km attributed to Polar in the 2027–2029 selection. Compared with the current manufactured length profile, it frames a substantial prospective route program. The relevant commercial question is how the planned systems progress and what connections they are intended to provide. The physical contrast supplies context for that question, while the all-not-inforce CIF profile identifies the contractual milestone central to the recorded forward group.

11 / REGIONAL ANALYSIS / 11.5 · 188


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11.5 POLAR REGION

FIGURE 87

11.5.2 Future Systems

Cable Systems by Year Polar 2018 2026 observed | 2027 2029 modeled scenarios

8

6 all

Number of systems

6

4 half

4 2

2

0 2018

2023 2024 2025 2026 2027 Report cohort year Modeled range: no to all listed plans Observed report cohorts Midpoint case: about half Shading: illustrative sensitivity for listed plans, not a confidence interval. Report cohort dates are not actual service dates.

87

2019

2020

2021

2022

2 none

2028

2029

Figure 87: Cumulative Polar systems by report cohort year, 2018–2026, and illustrative 2027–2029 scenarios for four listed planned systems. Orange shading spans zero to full realization of those plans; the dashed line shows approximately half, rounded to whole systems. These modeled paths are sensitivities, not delivery probabilities, expected deliveries, or statistical confidence intervals.

The Polar cumulative report-cohort series stood at two systems in 2026. Four listed planned systems appear across the next three cohorts: one in 2027, one in 2028, and two in 2029. The illustrative 2029 paths end at two, four, or six systems. In the separate CIF record, all four are marked not in force, or 100.0% of this selection. That common contractual position matters because the proposed physical program is large relative to the established base. The shaded cone shows how much those listings could change the count; it does not imply contracts have been secured or that the systems will enter service on schedule.

Submarine Telecoms Industry Report 2026/2027

11.5.3 Region Outlook A single project can materially change Polar's count and physical profile, so headline numbers require close attention to project stage. The forward length view describes a larger prospective program, while the contractual record identifies an early commercial position. Specific customer commitments, landing plans, and route development will show whether announced infrastructure can become a deliverable network. Those milestones provide a firmer basis for suppliers and customers than treating the report cohort as committed work. The wider scenario fan is therefore a prompt to follow individual routes, not a forecast of confirmed capacity.

11 / REGIONAL ANALYSIS / 11.5 · 189


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11 / REGIONAL ANALYSIS

11.6

TRANSATLANTIC REGION

11.6.1 Current Systems

88

Figure 88: Cumulative Transatlantic systems by report cohort year, 2018–2026.

The Transatlantic cumulative system series remains at 23 in 2018 and 2019, rises to 24 in 2020 and 26 in 2021, remains there in 2022, rises to 27 in 2023 and stays there through 2025, then reaches 29 in the 2026 report cohort. The interval's increase is six systems, or 26.1%. This count profile includes several discrete additions, rather than a single step. The region's wider technical profile gives that count additional meaning. The recent design-capacity chart records 352 Tbps in its Transatlantic 2023 entry, while capacity is unknown for the eligible planned groups in the 2027 and 2029 report cohorts. A mature count category can still sit within a significant technical development program, whose individual designs require projectlevel evidence. System frequency and the capability associated with individual routes describe different aspects of its commercial evolution.

Submarine Telecoms Industry Report 2026/2027

For the industry, the recorded base establishes an extensive route history within which new propositions develop. A new system's significance depends on its capacity, endpoints and connection to customers, rather than only its contribution to the cumulative count. The length and CIF charts add the physical and commercial dimensions needed to assess that evolution. Together, they connect the count profile with meaningful infrastructure development in the region.

11 / REGIONAL ANALYSIS / 11.6 · 190


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11.6 TRANSATLANTIC REGION

89

FIGURE 89

Figure 89: Cumulative reported whole-system length attributed to the Transatlantic region by report cohort year, 2018–2026 (km).

Transatlantic reported length remains at 226,377 km in 2018 and 2019, increases to 233,677 km in 2020 and 249,377 km in 2021, remains there in 2022, increases to 256,568 km in 2023 and remains there through 2025, then reaches 271,289 km in the 2026 report cohort. The increase is 44,912 km, or 19.8%. The steps occur in the same years as the count series' additions, identifying several distinct reported route-length steps within a large cumulative category. The Transatlantic record has length additions spread across several cohorts in the displayed interval, while its starting length is extensive. The commercial context is consequently an established infrastructure landscape with several newer route groups.

Submarine Telecoms Industry Report 2026/2027

The forward regional length view attributes 4,100 known reported km to planned systems in the 2027–2029 selection. It supplies a separate physical horizon for the next project group. For owners and suppliers, the significance of that group lies in the propositions being developed across the ocean and their network connections on land. Reading the recorded physical base with the planned program supports a fuller assessment of the region's continuing role than either an established cumulative base or a new-project announcement alone.

11 / REGIONAL ANALYSIS / 11.6 · 191


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11.6 TRANSATLANTIC REGION

FIGURE 90

11.6.2 Future Systems

Cable Systems by Year Transatlantic 2018 2026 observed | 2027 2029 modeled scenarios 33

32 all 31 half

Number of systems

30

29

29 none

27 24 21 2018

2023 2024 2025 2026 2027 Report cohort year Modeled range: no to all listed plans Observed report cohorts Midpoint case: about half Shading: illustrative sensitivity for listed plans, not a confidence interval. Report cohort dates are not actual service dates.

90

2019

2020

2021

2022

2028

2029

Figure 90: Cumulative Transatlantic systems by report cohort year, 2018–2026, and illustrative 2027–2029 scenarios for three listed planned systems. Orange shading spans zero to full realization of those plans; the dashed line shows approximately half, rounded to whole systems. These modeled paths are sensitivities, not delivery probabilities, expected deliveries, or statistical confidence intervals.

The Transatlantic cumulative report-cohort series reached 29 systems in 2026. Three listed planned systems appear in the 2027–2029 selection: two in 2027 and one in 2029. The illustrative 2029 paths end at 29, 31, or 32 systems. The separate CIF record shows one contract in force, or 33.3%, and two not in force, or 66.7%. No status is unknown in this selection. That distinction matters when assessing the maturity of each proposal. These contractual facts do not assign delivery probabilities. EXA Meridian's stated 2029 target falls within the plotted period, but the count cone cannot establish when its intended Brean landing and terrestrial links will be completed.

Submarine Telecoms Industry Report 2026/2027

11.6.3 Region Outlook Transatlantic is a mature corridor where a substantial installed base coexists with technical and commercial change. EXA Meridian illustrates the importance of onward access: its proposed Brean landing would connect through terrestrial routes to Slough and EXA's pan-European backbone. That network proposition reaches beyond wet capacity alone. For each future system, the useful assessment combines contractual stage, route design, landing access, and customer reach. The modest count range should therefore be read alongside those qualitative differences, which can make one addition more consequential than another.

11 / REGIONAL ANALYSIS / 11.6 · 192


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11 / REGIONAL ANALYSIS

11.7

TRANSPACIFIC REGION

11.7.1 Current Systems

91

Figure 91: Cumulative Transpacific systems by report cohort year, 2018–2026.

The Transpacific cumulative system series rises from 21 at the 2018 point to 30 at 2026, an increase of nine systems or 42.9%. It adds one in 2020, two in 2022, one in 2023, three in 2025 and two in 2026. The largest count step occurs in 2025, within a pattern of repeated project groups in the region's recorded development history. The length view gives those groups substantial physical scale. The 2022 and 2025 kilometer additions together account for most of the interval's increase. This makes Transpacific a clear example of a comparatively small count category with extensive ocean infrastructure. For manufacturers and marine businesses, the important commercial dimension is the scale of the routes associated with those engagements, alongside the timing of the project groups.

Submarine Telecoms Industry Report 2026/2027

The cost profiles reinforce the region's financial significance. Transpacific leads the recent regional cost attribution and the debt and equity and self-financed attribution charts, while EMEA leads the MDB-linked view. Each uses its defined selection of reported whole-project values, rather than annual spending or actual financing amounts. The count history therefore sits within a broader position in physical and financial scale. Its industry meaning is repeated long-haul development with substantial recorded project value, making the actual route programs consequential to several parts of the delivery chain.

11 / REGIONAL ANALYSIS / 11.7 · 193


SUBTEL FORUM

11.7 TRANSPACIFIC REGION

92

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

FIGURE 92

Figure 92: Cumulative reported whole-system length attributed to the Transpacific region by report cohort year, 2018–2026 (km).

Transpacific reported length increases from 283,685 km at the 2018 point to 392,036 km at 2026, a gain of 108,351 km or 38.2%. The 2022 step adds 30,417 km and the 2025 step 47,414 km. Together, their 77,831 km account for 71.8% of the interval's increase. Much of the physical expansion is therefore concentrated in two substantial report cohorts. Known lengths cover 17 of 21 systems at the 2018 point and 26 of 30 at the partial 2026 endpoint. The other additions are 12,900 km in 2020, 7,000 km in 2023 and 10,620 km in 2026. The five steps give the region a pattern of distinct ocean-route groups rather than a uniform annual increase. The large 2022 and 2025 values establish the physical significance of those groups within an extensive starting inventory. Project-specific delivery timing must be checked separately when assessing the work associated with the industry's wider construction cycle.

Submarine Telecoms Industry Report 2026/2027

For the industry, the paired count and length series explain how repeated small numbers of systems can represent large quantities of cable infrastructure. The planned regional length category of 25,180 known reported km adds a separate forward dimension. Physical scale makes the region important to production and marine programs, while the CIF profile describes another part of the prospective project record. The useful commercial assessment connects those dimensions through the individual routes and the markets they are intended to serve.

11 / REGIONAL ANALYSIS / 11.7 · 194


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11.7 TRANSPACIFIC REGION

FIGURE 93

11.7.2 Future Systems

Cable Systems by Year Transpacific 2018 2026 observed | 2027 2029 modeled scenarios 33 all 32 half

33 30

Number of systems

30

30 none

27 24 21 2018

2023 2024 2025 2026 2027 Report cohort year Modeled range: no to all listed plans Observed report cohorts Midpoint case: about half Shading: illustrative sensitivity for listed plans, not a confidence interval. Report cohort dates are not actual service dates.

93

2019

2020

2021

2022

2028

2029

Figure 93: Cumulative Transpacific systems by report cohort year, 2018–2026, and illustrative 2027–2029 scenarios for three listed planned systems. Orange shading spans zero to full realization of those plans; the dashed line shows approximately half, rounded to whole systems. These modeled paths are sensitivities, not delivery probabilities, expected deliveries, or statistical confidence intervals.

The Transpacific cumulative report-cohort count reached 30 systems in 2026. Three listed planned systems fall in the 2027– 2029 selection: one in 2027 and two in 2028. The illustrative 2029 paths end at 30, 32, or 33 systems. The separate CIF record contains one contract in force, one not in force, and one unknown, each 33.3% of the selection. An unknown status cannot be assigned a contractual position, and none of these categories supplies a delivery probability. The Bifrost commercialization case adds useful context: its Singapore-to-U.S. route via Indonesia connects capacity rights with portfolio commitments and longterm operations, a different dimension from the count cone.

Submarine Telecoms Industry Report 2026/2027

11.7.3 Region Outlook Transpacific development includes physically large route programs, so three planned systems can imply substantial marine and manufacturing work. Project count alone cannot show route scale or the investment relationships behind it. Bifrost illustrates the commercial role of private co-investment and onward capacity rights, while the wider regional record includes different financing and contractual paths. Future value will depend on completed routes, their geography, and services customers can use. The scenario fan makes the listed count exposure visible while leaving those engineering and commercial outcomes to project-level evidence.

11 / REGIONAL ANALYSIS / 11.7 · 195


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11 / REGIONAL ANALYSIS

11.8

REGIONAL RENEWAL AND FORWARD DEVELOPMENT BALANCE

The operating and service-ready reference inventory and the recorded pipeline describe different regional starting points. Placing them side by side reveals where future project numbers are large or small relative to existing systems, while the reported RFS-year profile identifies the age of entries in that reference. Figure 94 compares these dimensions using the database's regional categories. Regional membership is available for 476 of 523 reference systems and 42 of the 65 Planned systems in report cohorts from 2027 through 2030. The remaining systems are not allocated to a region in this analysis, so the comparison describes the classified record rather than a complete geographic forecast.

94

Figure 94: Regional operating/service-ready inventory age by reported original RFS year, alongside planned systems in report cohorts 2027–2030.

EMEA has the largest classified reference inventory, with 204 systems. Ninety-five of its 191 dated entries have reported RFS years of 2006 or earlier, giving it a 49.7% older share within that dated group. Its eight recorded forward systems in the 2027– 2030 report cohorts are equivalent to 3.9% of the current regional system count. This juxtaposition identifies a large older inventory alongside a modest, classified pipeline by number, giving owners a reason to examine renewal needs and the functions of new projects without implying that one group is intended to replace the other.

Submarine Telecoms Industry Report 2026/2027

The Americas and AustralAsia show different balances. The Americas have 89 reference systems, with 30 older entries among 85 dated systems, or 35.3%; eight planned systems in the 2027–2030 report cohorts equal 9.0% of current count. AustralAsia has 110 reference systems and 17 older entries among 107 dated systems, or 15.9%; thirteen planned systems in the 2027–2030 report cohorts equal 11.8% of the current count. Their development programs therefore begin from different age profiles even where both regions have substantial established networks. A common global construction narrative obscures those differences.

11 / REGIONAL ANALYSIS / 11.8 · 196


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11.8 REGIONAL RENEWAL AND FORWARD DEVELOPMENT BALANCE The ocean-crossing categories place smaller inventories beside proportionately larger planned groups. Transatlantic has 19 reference systems and four forward entries in the 2027–2030 report cohorts, a planned-to-reference ratio of 21.1%. Eight of its 18 dated reference entries have reported RFS years of 2006 or earlier. Transpacific has 20 reference systems and three forward entries, a ratio of 15.0%, with five older systems among 20 dated entries. The comparison shows the scale of the recorded pipeline relative to the number of established systems alongside a meaningful older stock. The commercial significance depends on the landings, route architectures and customer access of those particular projects.

Submarine Telecoms Industry Report 2026/2027

CONTINUED

Polar illustrates why a percentage must always be read with its base. Four planned entries in the 2027–2030 report cohorts compared with two reference systems produce a ratio of 200.0%, but the absolute difference is a small number of systems. Indian Ocean has two recorded forward systems against 32 reference entries, a ratio of 6.2%, and six older entries among 30 dated systems. Neither result should be expanded into a universal statement about demand or supply adequacy. Small inventories magnify ratios, while incomplete regional classification can omit development that matters to the markets being discussed. For owners, suppliers and public infrastructure planners, the comparison provides a disciplined starting point for project investigation. The useful question is how a region's new systems relate to its established connectivity functions, customer requirements and aging assets. Answering it requires route-level evidence, particularly where a new long-haul link and several local systems perform different jobs. This database view identifies contrasting renewal and expansion balances without treating regional counts as interchangeable capacity or assuming that a high forward ratio guarantees geographically diverse service.

11 / REGIONAL ANALYSIS / 11.8 · 197


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11 / REGIONAL ANALYSIS

11.9

LANDING IDENTITY OVERLAP AND NETWORK EXPANSION

The forward network combines planned systems with existing and other recorded landing identities. Among the 65 Planned systems in the 2027 through 2030 report cohorts, 54 have recorded landings. The selected record contains 229 system-landing connections: 149 (65.1%) lead to identities also associated with operating or service-ready systems, and 80 (34.9%) lead to other recorded identities. Figure 95 counts each distinct system relationship, so a landing identity associated with several planned systems appears once for each connection.

95

Figure 95: Planned system–landing connections by recorded identity match to the operating/service-ready network, report cohorts 2027–2030.

The system-level view supplies a different and complementary denominator. Thirty-eight Planned systems have recorded landings at both existing service identities and other identities, while 15 have recorded landings only at identities already associated with operating or service-ready systems. One has recorded landings only at other identities, and 11 have no recorded landings in this dataset. Figure 96 includes all 65 systems. The dominant pattern in the recorded landings is a combination of established landing identities and additional recorded endpoints within the same project, rather than a portfolio composed principally of entirely separate landing sets.

Submarine Telecoms Industry Report 2026/2027

11 / REGIONAL ANALYSIS / 11.9 · 198


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

11.9 LANDING IDENTITY OVERLAP AND NETWORK EXPANSION

96

FIGURE 96

Figure 96: Planned systems by recorded landing-identity match mix against the operating/service-ready network, report cohorts 2027–2030, including systems with no recorded landings.

This pattern helps explain why cable expansion can also require development at established gateways. Adding a wet route at an existing landing identity raises project-specific questions about landing access, terminal accommodation, power, backhaul and onward interconnection. The relationship record does not show whether new facilities are required or whether spare infrastructure already meets those requirements. It does establish that a substantial part of the classified forward topology interacts with identities also recorded for operating or service-ready systems, making those gateway interfaces relevant to delivery and commercial access.

The industry value lies in directing more specific route and gateway questions. A buyer seeking another international route can investigate how its landing interfaces relate to existing services and whether the terrestrial continuation provides the required alternatives. A developer can examine the interfaces at both established and additional endpoints before describing a project as a new geographic option. The proposed Tasman Ring gateway would add a geographically separate South Island option alongside existing North Island routes. A project count alone cannot establish the actual geography or complete end-toend physical diversity.

The additional identities also deserve careful interpretation. An identity absent from the operating and service-ready comparison may be associated with a planned system or a historical system, and it need not represent a newly constructed station. Conversely, two distinct identities are not necessarily two physically independent facilities. The database retains landing entities at different geographic and asset scopes. These connections therefore describe the recorded topology; they cannot certify separate buildings, beach routes, terrestrial paths or fault domains. That distinction is essential when using the comparison to discuss network resilience.

The resulting conclusion is that planned expansion and overlap with established landing identities occur together in the recorded network. The majority of planned systems with recorded landings include both existing service identities and other identities, while nearly two thirds of recorded connections match identities in the established landing set. This is useful evidence about the interfaces through which new cable programs meet the existing network. Site construction, operational readiness, and common exposure remain questions for project-specific evidence.

Submarine Telecoms Industry Report 2026/2027

11 / REGIONAL ANALYSIS / 11.9 · 199


SUBTEL FORUM

CONCLUSION INDUSTRY OUTLOOK IN PERSPECTIVE

2026 REPORTING COHORT / KNOWN-VALUE COVERAGE

A cohort measure, not a service claim

The central challenge is to translate those commitments into accessible connectivity that can be operated reliably throughout its service life.

INTERPRETATION

Manufacturing readiness does not establish annual spending or confirmed entry into service.

The submarine telecommunications industry enters 2027 with substantial investment, expanding technical capability, and a growing responsibility to sustain the infrastructure on which the digital economy depends. The findings of this report describe a market shaped by large individual projects, increasingly influential hyperscaler commitments, varied regional development, and continuing demands on manufacturing, marine operations, and maintenance.

200

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

2026 cohort · 11/12 known

2026 cohort · 12/12 known

64,106

5.1945

known reported km

USD billion whole-project value

October 25, 2026 snapshot; manufacturing readiness, not operational service.

Reported whole-project value, not annual spending; October 25, 2026 snapshot.

READING THE SNAPSHOT

The recorded activity is substantial without establishing uninterrupted growth across every market or measure.

FROM THE CHAPTER

The scale of recent development is significant. In the October 25, 2026 snapshot, the 2026 reporting cohort accounts for 64,106 kilometers of reported route length across 11 of 12 systems and USD 5.1945 billion in reported whole-project value across all 12. These figures reflect manufacturing readiness, not annual spending or confirmed entry into service.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

201


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

12.1 OUTLOOK AND DELIVERY The submarine telecommunications industry enters 2027 with substantial investment, expanding technical capability, and a growing responsibility to sustain the infrastructure on which the digital economy depends. The findings of this report describe a market shaped by large individual projects, increasingly influential hyperscaler commitments, varied regional development, and continuing demands on manufacturing, marine operations, and maintenance. The central challenge is to translate those commitments into accessible connectivity that can be operated reliably throughout its service life. The scale of recent development is significant. In the October 25, 2026 snapshot, the 2026 reporting cohort accounts for 64,106 kilometers of reported route length across 11 of 12 systems and USD 5.1945 billion in reported whole-project value across all 12. These figures reflect manufacturing readiness, not annual spending or confirmed entry into service. The recorded activity is substantial without establishing uninterrupted growth across every market or measure. For owners, suppliers, and investors, the composition and timing of individual project commitments remain essential to understanding future workload and commercial opportunity. The survey's 92.6% optimistic view and 81.5% reporting more work sit alongside a substantial recorded project cycle, but the two sources cover different periods and concepts. In the report's historical 2025 reporting cohort, reported route length rose 115.5% and whole-system cost value 128.2% from the corresponding 2024 cohort, reaching 105,456 kilometers and USD 8.379 billion. Each measure has known values for 14 of 15 systems. The survey was collected in October 2026 and asks about the preceding year. Reporting-cohort values are not that year's spending or revenue. The figures support a picture of activity without proving continuous growth (SubTel Forum, 2026). The 51.9% choosing Above Average on the investment item cannot be treated as a measured increase: its original response bands describe assessments, although the question asks about change. The report's system costs are likewise not annual investment flows. The survey also did not ask about backers, so it cannot test the report's separate finding that hyperscalerdriven systems represent 27.1% of a selected 2027–2029 planned-system count but 61.5% of a known-cost total. Those percentages use different denominators and should not be read as a survey result.

Submarine Telecoms Industry Report 2026/2027

PERSPECTIVE

Execution is where the survey and the project record can be read together most usefully. Among applicable survey respondents, 87.0% said some or significant delay had been their most common schedule outcome. Vessel availability, permitting and financing drew the largest individual shares as expected delivery constraints. In the report's separate 64-system contract-status view for the 2027–2029 reporting cohorts, 26.6% have contracts in force, 64.1% do not and 9.4% have unknown status. This selection is not restricted to planned systems. Contract status does not measure the surveyed projects' schedules, but it helps show why a proposed service date is not proof of delivery. The seven purpose-built cable-ship newbuilds targeted for 2027– 2029, including two replacements, signal future investment rather than current fleet adequacy. Repair confidence offers a useful counterpoint: 63.0% of respondents were somewhat or very confident, 22.2% neutral and 14.8% unconfident. The report cites 178 repairs reported for 2025 in an ICPC maintenance-provider summary, which is a sample rather than a complete fault census. Separate 2024 averages of 22.5 days from notification to vessel departure and 6.5 days in transit describe pre-work stages, not repair or restoration time. None of these figures alone establishes whether global capacity is adequate. Meanwhile, 66.7% of respondents assessed skilled labor as insufficient or critically short; the report's data-center electrician scenario concerns a different workforce and cannot validate that perception for submarine cables (International Cable Protection Committee, 2026). The 29.6% selecting the Transpacific as the corridor with most observed activity are describing where they noticed work. The report's system-count view for the 2022–2026 reporting cohorts instead is led by EMEA, with 23 regional entries. One measure is respondent observation; the other is a count within the recorded system selection. Long Transpacific routes carry substantial weight in the report's length and cost views, so project counts and physical scale can point to different centers of activity without contradiction.

CONCLUSION · 202


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

12.2 INVESTMENT AND VALUE The report's end-of-2030 model, as of October 19, 2026, adds a conditional financial perspective. Among 60 valued listings in an 85-project planning population, the delivery-weighted USD 21.701 billion is 80.2% of USD 27.061 billion in planned or reference project value. Among the 49 listings classified as having other backing, 35 have usable values; USD 7.276 billion after weighting is 62.2% of USD 11.703 billion before weighting. Both cases use the same end-of-2030 horizon. Listings without usable values are excluded, target service years do not allocate annual spending, and the gap is not canceled investment. Model assumptions, project mix and cost coverage shape the group difference. Beside the survey's optimism and delays, these estimates show the scale of opportunity and the steps still required to reach service, not an observed ownership-class performance gap (Submarine Telecoms Forum, 2026). The contract-status view shows differing recorded commercial positions in the 2027–2029 reporting cohorts. Within this separate 64-system selection, which is not restricted to planned systems, 17 systems have a recorded contract in force, 41 do not, and six have unknown status. These distinctions matter when examining the commitments behind each system. A proposed service date expresses an intended outcome; the commercial, regulatory, and physical milestones behind that date provide the evidence needed to assess its credibility. The separate assessment through 2030 develops this distinction further. Its central planning case produces approximately 55.6 delivery equivalents from 85 reviewed listings. For the 60 listings with available route and value estimates, the delivery-weighted contribution is approximately 288,161 kilometers and $21.7 billion in associated project value. These figures represent a conditional assessment with incomplete dimensional coverage. Their significance lies in the scale of infrastructure that could enter service if the identified financing and execution assumptions hold.

INVESTMENT

Independent developers, carriers, consortia, and public institutions retain an essential role. They provide regional connections, wholesale access, alternative routes, and infrastructure serving markets outside the largest private network programs. Their opportunities depend on aligning customer commitments, financing, executable supply arrangements, and permission to build. Across ownership models, commercial success ultimately requires a service proposition that customers can access and sustain. Technical development is increasing the capability of both existing and future networks. Higher-speed optical transmission can extend the usefulness of installed wet infrastructure, while higher fiber counts and multicore architectures create additional possibilities for new systems. The report’s examples demonstrate progress across these approaches, from longdistance 800-gigabit-per-second trials to multicore developments targeting deployment later in the decade. These advances reinforce the need for precise interpretation. Design capacity, equipped capacity, sold capacity, and traffic carried describe different stages of infrastructure use. A technical demonstration establishes performance under its stated conditions; a system design establishes an intended capability. Neither alone establishes the volume of service commercially available at particular endpoints. The same discipline applies to financial performance. Growth in capacity sales does not translate automatically into equivalent revenue growth or improved profitability. Pricing, product mix, contract terms, operating costs, and revenue timing influence the outcome. The commercial value of technical progress therefore depends on how effectively owners convert capability into dependable services and durable customer relationships.

Hyperscaler backing changes the commercial starting point for a substantial part of this program. In the planned 2027– 2029 reporting cohort, hyperscaler-driven systems account for approximately 27.1 percent of project count and, in the separate known-cost view, approximately 61.5 percent of reported wholeproject value. Their participation supports large infrastructure commitments and influences architecture, route selection, and delivery priorities. Funding, however, leaves important execution questions: permissions, construction progress, landing readiness, and full-system acceptance still determine when a route becomes operational.

Submarine Telecoms Industry Report 2026/2027

CONCLUSION · 203


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

12.3 RESILIENCE AND RENEWAL

RESILIENCE

These financial and commercial questions carry through to the way networks are built and supported. A route gains value from the locations it connects, the service paths available beyond its landings, and the organizations prepared to keep it working. Expansion, diversity and renewal therefore need to be assessed together. Additional system counts can widen the set of opportunities, but project-specific evidence is needed to establish whether a new path changes an existing exposure or simply adds capacity through familiar interfaces.

Matches in the landing records point to potential use of existing infrastructure; physical reuse and any associated cost benefits require verification for each project. Additional cables or distinct landing identities do not independently establish separate facilities, terrestrial routes, or fault domains. Effective diversity depends on the physical and operational independence of the complete service path. Buyers and developers need to investigate those relationships before treating a new route as an assured improvement in resilience.

Data center expansion adds to this opportunity while introducing further dependencies. Forecast computing capacity and announced investment indicate strategic direction, but usable facilities require power, equipment, labor, permissions, and terrestrial connectivity. Their implications for submarine demand must be assessed through actual locations, network architectures, and service requirements. The connection between computing growth and international bandwidth is consequential, but its scale and timing require evidence.

The industry’s construction ambitions depend on specialized marine resources that also support continuing repair obligations. Seven purpose-built telecommunications cable ships have announced delivery targets between 2027 and 2029. This investment represents meaningful modernization, combining explicit replacement programs with potential expansion. Its eventual contribution will depend on commissioning, mission equipment, crews, geographic deployment, contractual commitments, and older-vessel withdrawals.

The regional findings demonstrate why a single global growth narrative is insufficient. EMEA’s repeated system development differs from the physical and financial weight of Transpacific crossings. AustralAsia has a substantial position in the forward program, while mature Transatlantic infrastructure continues to evolve through individual new routes, technical upgrades, and terrestrial integration. Smaller regional and unrepeatered systems contribute through different combinations of access, project frequency, and local network development.

Fleet counts alone cannot establish delivery or repair capacity. Vessel capability, location, depot support, spare plant, and access arrangements determine the work that can be performed. Most confirmed newbuild deliveries remain ahead, making the management of existing resources important during the transition.

The landing records highlight the potential role of established infrastructure in the next construction cycle. Within the report's selected planned-system landing analysis, approximately 65 percent of recorded system-landing connections lead to identities already associated with operating and serviceready systems. These matches bring landing access, terminal accommodation, power, backhaul, and interconnection into the delivery assessment.

Submarine Telecoms Industry Report 2026/2027

CONCLUSION · 204


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

12.3 RESILIENCE AND RENEWAL Maintenance deserves equal attention throughout project development and operation. The public repair evidence describes a substantial continuing workload, while gaps and changing reporting coverage limit conclusions about global faultrate trends. It also demonstrates the importance of distinguishing mobilization, transit, physical repair, cable-level restoration, and customer recovery. Each stage has different dependencies and can require different action. Asset renewal extends beyond the marine fleet. A substantial stock of older cable infrastructure remains operational, with different age profiles across regions. Age alone does not establish a retirement requirement: route function, technical condition, upgrade potential, customer dependence, and maintenance economics all matter. The appropriate response is an asset-specific assessment of how existing systems and new investment can support continuity together. That operating perspective also connects the report’s commercial and public-policy findings. A project can have strong demand and credible financing while still depending on permissions, access arrangements and local infrastructure outside a single owner’s control. The practical question is whether those dependencies are visible early enough to be managed. Cooperation between owners, suppliers, marine operators and public authorities helps turn separate commitments into a service that can be built, maintained and restored. The policy developments examined in this report show greater attention to submarine infrastructure across governments and international institutions. The International Advisory Body on Submarine Cable Resilience has provided recommendations and practical experience covering deployment, repair, risk management, and geographic diversity. The next phase depends on how authorities and industry apply that work within their respective responsibilities.

Submarine Telecoms Industry Report 2026/2027

CONTINUED

Effective implementation requires coordination among telecommunications, maritime, environmental, security, customs, and port authorities. Predictable procedures and clear responsibilities can improve planning and emergency response while supporting legitimate public-policy objectives. The operational test is whether the framework enables infrastructure to be deployed, protected, and restored effectively. Sustainability similarly requires evidence across the asset lifecycle. Landing-station efficiency, vessel fuel pathways, manufacturing impacts, protection measures, maintenance interventions, and end-of-life treatment all contribute. Progress will depend on transparent boundaries, comparable information, and documented outcomes. Resilience and environmental performance can reinforce one another where sound design and dependable operations reduce avoidable intervention. Taken together, the report points toward an industry whose future will be determined by its ability to connect investment, engineering, commercial access, and long-term operation. The priorities for 2027 and beyond are practical: advance credible projects, prepare landing and terrestrial interfaces, develop marine capability, strengthen repair readiness, and assess performance through evidence appropriate to each claim. The opportunity is substantial. Realizing it will require sustained cooperation across the organizations that finance, authorize, build, operate, and use submarine networks. Success will be measured in the connections delivered, the markets served, and the continuity maintained over decades of operation.

CONCLUSION · 205


SUBTEL FORUM

AFTERWORD

the networks at either end

DEPENDABLE CONNECTIONS

What stays with me after reading this year's report is how much has to happen between announcing a cable and giving someone a connection they can depend on.

206

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027


CHAPTER 13

DEPENDABLE CONNECTIONS

For people buying connectivity, the useful outcome is a service available where they need it.

Kieran Clark

FROM THE CHAPTER

There is good reason to feel encouraged. The scale reported here is substantial, and the October survey records more work and a broadly positive outlook among respondents. Yet many of those same respondents also describe delays.

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

207


SUBTEL FORUM

13

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

AFTERWORD

Dear Readers, What stays with me after reading this year’s report is the distance between a compelling infrastructure announcement and a connection someone can depend on. A cable route, a network upgrade or a ship order can express confidence in the future. Each also begins a sequence of decisions about funding, permissions, equipment, people and access. I find the industry’s ambition encouraging. I also think we have a responsibility to explain what remains unresolved before those ambitions become dependable service. I want to know what a system enables for its users, how its routes connect, and who can obtain service. More fibers and faster transmission create possibilities, but those capabilities need landing access, backhaul and an operating business behind them. AI adds urgency to investment decisions, alongside the continuing needs of regional operators, carriers and communities. Those uses give growth meaning beyond the size of a project announcement. That is why I keep returning to the sequence between a proposal and dependable service. Power, capital and policy were useful themes at PTC’DC, but these questions run through the whole industry. A route needs financing, surveys, permissions, suitable equipment and arrangements at both ends before its potential can become useful. The timing of those commitments matters as much as their scale. I would rather understand how the pieces fit together than treat a target date as a promise. The broader subsea story reaches across regional systems, ocean crossings and established routes. Some projects open another market; others strengthen connections that matter to their users. More fiber and better transmission expand possibilities, but customers still need usable endpoints, commercial access and dependable operations. Count, length and capacity tell us different things about a network. None should take the place of understanding what the service will do and how it will be sustained. Ownership adds another dimension to that discussion. Large platforms can support substantial projects, while independent developers, carriers, consortia and public institutions serve needs beyond any one company’s network. Capacity commitments can help make an independent wholesale project possible, so ownership and procurement should not be treated as interchangeable. I want the industry’s investment story to leave room for that variety, including the operators willing to develop alternative routes and connect places outside the largest private programs. I worry that, if a few very large buyers define connectivity only by unit price and volume, independent operators may have less room to invest in route diversity, service quality and new ideas. That is a commercial risk to examine, not a conclusion this report measures. I want innovation and a skilled workforce to remain part of the buying conversation: engineering choices, resilient paths and people able to operate and repair them have value beyond the cheapest capacity quote. Independent networks can still serve major platforms and other customers when access and investment terms support a viable service. That value becomes especially clear when an established cable needs attention. Building another system does not remove the obligation to maintain the networks already carrying services. Repair arrangements, spare equipment, capable vessels and experienced people belong in the investment conversation from the beginning. The same care is needed ashore, where landing access, power and terrestrial connections determine how a cable reaches its users. I would judge an expansion plan partly by how well it accounts for those continuing responsibilities and the communities around its infrastructure.

Submarine Telecoms Industry Report 2026/2027

AFTERWORD / 13 · 208


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

13. AFTERWORD

CONTINUED

For me, this brings the financial discussion back to the life of the service. Financing gets a project moving, but permissions, landing readiness, customer commitments and acceptance still determine when infrastructure can earn its keep. Falling prices under long-term capacity contracts can narrow the room available for maintenance and reinvestment. Demand growth creates opportunity, but the operating model must carry that opportunity through to a durable business. I want new investment to support both a credible delivery plan and the years of work that follow. I also want national security considered alongside expansion and innovation. Cables are critical infrastructure, and governments have reasons to examine ownership, equipment, access and repair arrangements. I worry when responsibilities become so fragmented that a sound project cannot establish who must decide or act. Clear processes can support protection, deployment and restoration together. The report's policy and permitting discussion shows how many authorities touch a route, from telecommunications and maritime agencies to environmental, security, customs and port bodies. Cooperation with operators should make decisions more predictable while preserving the scrutiny these systems deserve. People remain central to every part of that work. The survey’s concern about skilled labor reflects a question running through these plans: who will design, install, operate and repair the infrastructure already proposed? New ships need crews and specialized equipment. Landings need local knowledge. Existing systems need experienced maintenance teams even while new ones are built. We cannot order experience on the same schedule as equipment. Training, mentoring and bringing new people into the field deserve investment now, so the next generation can sustain the networks it inherits. Looking toward 2027, I want us to give existing networks the same care as new programs. Older cables can remain valuable; another landing identity does not necessarily create an independent path; and future ships do not establish today’s repair capacity. Thank you for reading and for following the people behind these systems. I hope the report helps you assess opportunity while asking specific questions about access, delivery and longterm service.

Kieran Clark Senior Analyst, Submarine Telecoms Forum Kieran Clark is Senior Analyst at Submarine Telecoms Forum. He joined in 2013 as a Broadcast Technician supporting live event streaming and became an Analyst in 2014. He leads research and maintenance for the SubTel Forum Submarine Cable Database and Online Map, with analysis featured across the company's publications.

Submarine Telecoms Industry Report 2026/2027

AFTERWORD / 13 · 209


SUBTEL FORUM

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

REFERENCES A&O Shearman. (2025, March). Global Antitrust Enforcement Report, March 2025. Retrieved from A&O Shearman: https:/​/​ www.​aoshearman.​com/​en/​insights/​global-​antitrust-​enforcement-​ report

APTelecom & WFN Strategies. (2026, January 28). APTelecom and WFN Strategies Expand Subsea Collaboration. Retrieved from SubTel Forum: https:/​/s​ ubtelforum.​com/​aptelecom-​and-​ wfn-​strategies-​expand-​subsea-​collaboration/

A&O Shearman. (2026, March). Global antitrust enforcement report. A&O Shearman. Retrieved from https:/​/​www.​aoshearman.​ com/​en/​insights/​global-​antitrust-​enforcement-​report

ASN. (2025, March 24). E2A Consortium Unveils NextGeneration Submarine Cable Connecting Asia and the United States. Retrieved from ASN: https:/​/w ​ ww.​asn.​com/​press-​release/​ e2a-​pacifc-​submarine-​cable/

ACMA. (n.d.). FAQs. Retrieved from ACMA: https:/​/w ​ ww.​ acma2017.​com/​about/​faqs/

Association of Southeast Asian Nations. (2026, January 16). Enhanced ASEAN guidelines for strengthening resilience and repair of submarine cables. Association of Southeast Asian Nations. Retrieved from https:/​/a ​ sean.​org/​wp-​content/​uploads/​ 2026/​01/​Enhanced-​ASEAN-​Guidelines-​for-​SR-​and-​Repair-​of-​ Submarine.​pdf

AFP. (2026, September 8). Fitburg Trial Opens Over Baltic Cable Damage. Retrieved October 19, 2026, from https:/​/​subtelforum.​ com/​fitburg-​trial-​opens-​over-​baltic-​cable-​damage/ Agência Nacional de Telecomunicações. (2026, May 26). Tomada de Subsídios No. 2/2026 – Submarine Cables. Retrieved from Agência Nacional de Telecomunicações: https:/​ /​apps.​anatel.​gov.​br/​ParticipaAnatel/​VisualizarTextoConsulta.​ aspx?​TelaDeOrigem=​2&​ConsultaId=​20400 AICEP. (2023, March 7). Sistema de cabo submarino norte da Unitel entra em serviço. Retrieved from https:/​/​www.​aicep.​com/​ sistema-​de-​cabo-​submarino-​norte-​da-​unitel-​entra-​em-​servico/ AInvest/Nikkei. (2025). Japan to back undersea cable investments for national security. Retrieved from AInvest/Nikkei: https:/​/​www.​ ainvest.​com/​news/​japan-​to-​back-​undersea-​cable-​investments-​ for-​national-​security-​nikkei-​2502100003bc6cd838731fe5/ Alaaeldin, S., & Tisopulos, M. (2026, September). Raising the bar: Why the subsea cable industry needs a sustainability award. SubTel Forum Magazine(150), pp. 24-30. Alcatel Submarine Networks. (2026, March 12). Alcatel Submarine Networks invests in its industrial production facilities. Retrieved from Alcatel Submarine Networks: https:/​/​www.​asn.​ com/​p ress-​r elease/​a sn-​invests-​in-​its-​industrial-​p roduction-​ facilities/ Annals, M. (2026, July 27). Global Marine Orders Cable Maintenance Vessel. Retrieved from SubTel Forum: https:/​/​ subtelforum.​c om/​g lobal-​m arine-​o rders-​c able-​m aintenance-​ vessel/ Anritsu. (2025, September 30). World’s First Successful Remote Diagnosis for Multicore Optical Fiber Cable by Anritsu and KDDI Research. Retrieved from Anritsu: https:/​/​www.​anritsu.​com/​en-​ us/​test-​measurement/​news/​news-​releases/​2025/​2025-​09-​30-​ us01 AP Sensing. (2026, May 18). Fiber Optic Monitoring for Offshore Wind Export Cables. Retrieved October 19, 2026, from https:/​/​ www.​apsensing.​com/​en/​news/​case-​study-​fiber-​optic-​monitoring-​ for-​offshore-​wind-​export-​cables Submarine Telecoms Industry Report 2026/2027

BeBeez International. (2026, February 27). Google Invests $500M in Dominican Republic Digital Port. Retrieved from SubTel Forum: https:/​/s​ ubtelforum.​com/​google-​invests-​500m-​in-​ dominican-​republic-​digital-​port/ Becerril, C. (2026, September). From Reactive to Preventive: Strengthening the Resilience of Critical Energy Infrastructure with Distributed Acoustic Sensing. SubTel Forum(150), pp. 48– 53. Retrieved October 19, 2026, from https:/​/s​ ubtelforum.​com/​ subtel-​forum-​issue-​150-​offshore-​energy/ Berlocher, G. (2026, September). Beyond the Firewall: Why Oil & Gas Needs Preemptive Cybersecurity Now. SubTel Forum(150), pp. 60–65. Retrieved October 19, 2026, from https:/​/​subtelforum.​ com/​subtel-​forum-​issue-​150-​offshore-​energy/ Blackman, J. (2026, January 6). EXA Acquires Aqua Comms in Distressed Subsea Fiber Deal. Retrieved from SubTel Forum: https:/​/s​ ubtelforum.​com/​exa-​acquires-​aqua-​comms-​in-​ distressed-​subsea-​fiber-​deal/ BNAmericas. (2024, November 22). Data Insight: The upcoming submarine cables for Latin America and the Caribbean. Retrieved from BNAmericas: https:/​/w ​ ww.​bnamericas.​com/​en/​features/​ data-​insight-​the-​upcoming-​submarine-​cables-​for-​latin-​america-​ and-​the-​caribbean Bojczuk, I., Paulino, C., & Starosielski, N. (2026, January). Measuring power at the shore: Energy metrics for the cable landing station. SubTel Forum Magazine(146), pp. 22-29. Business Norway. (2024, December 19). Offshore wind farm locations: a global overview. Retrieved from Business Norway: https:/​/ ​b usinessnorway.​c om/​a rticles/​o ffshore-​w ind-​f arm-​ locations-​a-​global-​overview

REFERENCES · 210


SUBTEL FORUM

REFERENCES Byrne, G. (2026, July). When Subsea Cables Fail, Repair Coordination Becomes the Real Fault Line. SubTel Forum Magazine(149), pp. 96-97. Retrieved from https:/​/​subtelforum.​ com/​article-​index/​issue/​149/ Cassidy, D., Morris, N., & Parsons, A. (2026, July). Exploring alignment of resilience and sustainability in subsea telecoms networks. SubTel Forum Magazine(149), pp. 20-31. Cerberus Capital Management. (2026, April 24). Cerberus Closes $2.3 Billion Continuation Vehicle for SubCom. Retrieved from SubTel Forum: https:/​/​subtelforum.​com/​cerberus-​closes-​2-​ 3-​billion-​continuation-​vehicle-​for-​subcom/ China Classification Society. (2026, July 24). CCS supports successful delivery of Tianyi Linghangzhe. Retrieved October 19, 2026, from https:/​/​www.​ccs.​org.​cn/​ccswz/​/​specialDetail?​id=​ 202607240923676112&​type=​1 China CNTC International Tendering. (2026, March 30). 新质 生产力海光缆施工船建造项目 招标公告. Retrieved October 19, 2026, from https:/​/​www.​cntcitc.​com.​cn/​more.​html?​chanId=​12&​ chanType=​3&​contentId=​0e1756e6cda345b99158a01ba667feda China CNTC International Tendering. (2026, May 8). 新质生产 力海光缆施工船建造项目中标结果公示. Retrieved October 19, 2026, from https:/​/​www.​cntcitc.​com.​cn/​more.​html?​chanId=​13&​ chanType=​3&​contentId=​546f1086fced44e0abb0463f4af7f568 China Mobile International. (2026, July 22). China Mobile led and invested SEA H2X international submarine cable project launches commercially. Retrieved from https:/​/​www.​prnewswire.​com/​ apac/​news-​releases/​china-​mobile-​led-​and-​invested-​sea-​h2x-​ international-​submarine-​cable-​project-​launches-​commercially-​ paving-​the-​way-​for-​digital-​and-​intelligent-​interconnectivity-​in-​ asia-​pacific-​302832300.​html Chunghwa Telecom. (2025, December 25). SJC2 S1.4 segment fault notice [English description of Chinese notice]. Retrieved from Chunghwa Telecom: https:/​/​www.​cht.​com.​tw/​zh-​tw/​home/​ cht/​messages/​2025/​msg-​251225 Chunghwa Telecom. (2026, February 14). SJC2 S1.4 segment repair notice [English description of Chinese notice]. Retrieved from Chunghwa Telecom: https:/​/​www.​cht.​com.​tw/​zh-​tw/​home/​ cht/​messages/​2026/​msg-​260214-​002847 Ciena. (2025, September 8). Altibox Carrier Achieves World’s First 1.6 Tb/s Submarine Cable with Ciena. Retrieved from Ciena: https:/​/​www.​ciena.​com/​about/​newsroom/​press-​releases/​ altibox-​carrier-​achieves-​worlds-​first-​1-​6-​tbs-​submarine-​cable-​ with-​ciena

Submarine Telecoms Industry Report 2026/2027

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

Ciena. (2025, June 25). Telxius and Ciena Achieve First Live 1.3 Tb/s Data Transmission Across the Atlantic. Retrieved from Ciena: https:/​/w ​ ww.​ciena.​com/​about/​newsroom/​press-​releases/​ telxius-​and-​ciena-​achieve-​first-​live-​1.​3-​tbs-​data-​transmission-​ across-​the-​atlantic Cirion Technologies. (2026, July 22). Cirion Begins Venezuela Subsea Cable Repair. Retrieved October 19, 2026, from https:/​ /​subtelforum.​com/​cirion-​begins-​venezuela-​subsea-​cable-​repair/ Cisco. (2024, February 12). Cisco Delivers 800Gbps on Amitié Transatlantic Cable in Collaboration with Microsoft to Support Exponential Growth of Cloud and AI Services. Retrieved from Cisco: https:/​/n ​ ewsroom.​cisco.​com/​c/​r/​newsroom/​en/​us/​a/​ y2024/​m 02/​c isco-​d elivers-​8 00gbps-​o n-​a mitie-​t ransatlantic-​ cable-​in-​collaboration-​with-​microsoft-​to-​support-​exponential-​ growth-​of-​cloud-​and-​ai-​services.​html Clark, K. (2019). Building a Predictive Model to Determine Probability of Success in Developing a Submarine Cable System. SubOptic 2019. Clark, K. (2025). Forecasting Submarine Cable Deployment: A Machine Learning Framework for Infrastructure Planning and Project Viability. SubOptic 2025. Colt Technology Services and Ciena. (2026, 6 10). Colt and Ciena Set New Benchmark with Fastest Ever Quantum-Safe Transatlantic Data Transmission. Retrieved from Colt Technology Services and Ciena: https:/​/w ​ ww.​ciena.​com/​about/​newsroom/​ press-​releases/​colt-​and-​ciena-​set-​new-​benchmark-​with-​fastest-​ ever-​quantum-​safe-​transatlantic-​data-​transmission Communications Regulatory Authority. (2026, April). Decision No. 12 of 2026 on the regulation for offer of access to submarine cable landing station (SCLS) international connectivity services and accompanying guidelines. Retrieved from Communications Regulatory Authority: https:/​/w ​ ww.​cra.​gov.​qa/​en/​Law-​and-​ Regulations/​R egulatory-​F ramework/​D ecisions/​R egulation-​ and-​G uidelines-​f or-​O ffer-​o f-​A ccess-​t o-​S CLS-​I nternational-​ Connectivity-​Services Conradi, M., de Lacy-Brown, N., Keogh, C., Kilding, H., & Stirling, L. (2026, May). NIS2’s Extended Scope Takes a Deep Dive: Unpacking the EU Commission’s Proposed Expansion to Submarine Data Transmission Infrastructure. SubTel Forum Magazine(148), pp. 84-86. Retrieved from https:/​/​subtelforum.​ com/​article-​index/​issue/​148/ Conradi, M., Ossack, D., & Stirling, L. (2026, March). Risk Allocation for Submarine Cables in High War-Risk Areas – WarRisk Contracting for Submarine Cable Projects. SubTel Forum Magazine(147), pp. 78-81. Retrieved from https:/​/​subtelforum.​ com/​article-​index/​issue/​147/

REFERENCES · 211


SUBTEL FORUM

REFERENCES Converge! Digest. (2025, August). US FCC Adopts Order to Accelerate and Secure U.S. Subsea Cables. Retrieved from Converge! Digest: https:/​/​convergedigest.​com/​fcc-​adopts-​new-​ rules-​to-​accelerate-​and-​secure-​u-​s-​subsea-​cables Conway, S., Richter, J., Sriram, S., Van Cleef, A., & Nash, J. (2026, July 17). FCC Adopts New Submarine Cable Licensing Regime. Retrieved from SubTel Forum: https:/​/​subtelforum.​com/​ fcc-​adopts-​new-​submarine-​cable-​licensing-​regime/ Coordinating Ministry for Food Affairs, Republic of Indonesia. (2026, April 28). Keputusan Menteri Koordinator Bidang Pangan Republik Indonesia Nomor 46/M.PANGAN/KEP/04/2026 tentang Tim Nasional Pengelolaan Penyelenggaraan Pipa dan/atau Kabel Bawah Laut. Retrieved from Coordinating Ministry for Food Affairs, Republic of Indonesia. CSIS. (2025). The Strategic Future of Subsea Cables: Japan Case Study. Retrieved from CSIS: https:/​/​www.​csis.​org/​analysis/​ strategic-​future-​subsea-​cables-​japan-​case-​study Datawave Networks. (2026, January 19). Datawave, Cerberus Back SING Subsea Cable System. Retrieved from SubTel Forum: https:/​/​subtelforum.​com/​datawave-​cerberus-​back-​sing-​ subsea-​cable-​system/ De Bevoise LLP Insights. (2024, November). FCC Proposes New Rules to Strengthen National Security in Submarine Cable Systems. Retrieved from De Bevoise LLP Insights: https:/​/w ​ ww.​ debevoise.​com/​insights/​publications/​2024/​11/​fcc-​proposes-​new-​ rules-​to-​strengthen-​national-​sec Department for Energy Security and Net Zero. (2026, January 14). Record breaking auction for offshore wind secured to take back control of Britain's energy. Retrieved October 19, 2026, from https:/​/​www.​gov.​uk/​government/​news/​record-​breaking-​ auction-​f or-​o ffshore-​w ind-​s ecured-​t o-​t ake-​b ack-​c ontrol-​o f-​ britains-​energy

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

European Commission. (2026, January). Security and resilience of EU submarine cable infrastructures Submarine Cable Toolbox. Retrieved from https:/​/w ​ ww.​mtc.​government.​bg/​sites/​default/​ files/​documents/​2026-​02/​Submarine%20Cable%20Toolbox.​pdf European Commission. (2026). Submarine cable security toolbox and cable projects of European interest. European Commission. Retrieved from https:/​/d ​ igital-​strategy.​ec.​europa.​eu/​en/​library/​ submarine-​cable-​security-​toolbox-​and-​cable-​projects-​european-​ interest European Investment Bank. (2026, June 30). Tamtam submarine cable system Project 20250236. Retrieved from https:/​/​www.​eib.​ org/​en/​projects/​all/​20250236 European National Competition Authorities. (2025, April 22). Strengthening Competitiveness and Competition in the EU Single Market . Retrieved from Authority for Consumers and Markets (ACM): https:/​/w ​ ww.​acm.​nl/​system/​files/​documents/​ strengthening-​c ompetitiveness-​a nd-​c ompetition-​i n-​t he-​e u-​ single-​market.​pdf EXA Infrastructure. (2026, September 16). EXA Announces Ninth Transatlantic Cable, EXA Meridian. Retrieved from SubTel Forum: https:/​/s​ ubtelforum.​com/​exa-​meridian-​links-​new-​jersey-​ and-​bristol/ FCC. (2025). Review of Submarine Cable Landing License Rules and Procedures to Assess Evolving National Security, Law Enforcement, Foreign Policy, and Trade Policy Risks. Retrieved from FCC: https:/​/w ​ ww.​fcc.​gov/​document/​fcc-​acts-​accelerate-​ submarine-​cable-​buildout-​security-​0 Federal Communications Commission (FCC). (2025, May 7). Cable Landing License Act: Amendment of Section 1.767 – FCC 25-49A1. Retrieved from Federal Communications Commission: https:/​/d ​ ocs.​fcc.​gov/​public/​attachments/​FCC-​25-​49A1.​docx

Devaux, P. (2025, June 10). WACS branching-unit outage repair off Namibia [LinkedIn post]. Retrieved from LinkedIn: https:/​/w ​ ww.​ linkedin.​com/​posts/​philippe-​devaux-​218423199_​10jun25-​wacs-​ cable-​b u-​o utage-​r epair-​o ff-​a ctivity-​7 338248141382602752-​ 0Qo3

Federal Communications Commission. (2026, February 5). Actions taken under the Cable Landing License Act DA 26 121. Retrieved from https:/​/d ​ ocs.​fcc.​gov/​public/​attachments/​DA-​26-​ 121A1.​pdf

E-marine. (n.d.). Submarine cable installation, maintenance and repair. Retrieved from E-marine: https:/​/​www.​emarine.​ae/​en/​ Services/​SubmarineCableInstallationServic​e

Federal Communications Commission. (2026). Actions taken under the Cable Landing License Act DA 26 534. Retrieved from https:/​/d ​ ocs.​fcc.​gov/​public/​attachments/​DA-​26-​534A1.​pdf

Europa Press. (2026, July 21). Telxius Subsea Cable Business Set for €1.2B Sale. Retrieved from SubTel Forum: https:/​/​ subtelforum.​com/​telxius-​subsea-​cable-​business-​1-​2b-​sale/

Federal Communications Commission. (2026, April 13). ORCA special temporary construction authority DA 26 373. Retrieved from https:/​/d ​ ocs.​fcc.​gov/​public/​attachments/​DA-​26-​373A1.​pdf Federal Communications Commission. (2026). Second report and order (FCC-26-42A1). Federal Communications Commission. Retrieved from https:/​/d ​ ocs.​fcc.​gov/​public/​attachments/​FCC-​26-​ 42A1.​pdf

Submarine Telecoms Industry Report 2026/2027

REFERENCES · 212


SUBTEL FORUM

REFERENCES Federal Communications Commission. (2026, February 13). Sol cable landing application accepted for filing DA 26 155. Retrieved from https:/​/​docs.​fcc.​gov/​public/​attachments/​DA-​26-​155A1.​pdf Fígoli, A. (2026a, January). Cable awareness campaigns: Value and utility. SubTel Forum Magazine(146), pp. 104-106. Fígoli, A. (2026b, March). Chokepoints: Why anticipation and preparedness matter. SubTel Forum Magazine(147), pp. 102106. Fígoli, A. (2026c, September). Climate change and submarine cables: Three immediate challenges. SubTel Forum Magazine(150), pp. 98-102. Fígoli, A. (2026d, July). Nautical charts and submarine cables. SubTel Forum Magazine(149), pp. 112-116. Fígoli, A. (2026e, May). Rethinking submarine cable repair priorities. SubTel Forum Magazine(148), pp. 104-108. Financial Times. (2025, September 16). Japan set to make subsea cables a national security issue with support for new fleet. Retrieved from Financial Times: https:/​/​www.​ft.​com/​content/​ 8bf18101-​4afa-​4110-​aad8-​66fc76c4c70a Focus Taiwan. (2026, July 17). Taiwan Declines Prosecution in Dongyin Subsea Cable Case. Retrieved October 19, 2026, from https:/​/​subtelforum.​com/​taiwan-​declines-​prosecution-​in-​dongyin-​ subsea-​cable-​case/ Fondation OPEN-C. (2026, April 9). VigieCâble: a leading consortium to revolutionize dynamic subsea cable monitoring. Retrieved October 19, 2026, from https:/​/​fondation-​open-​c.​org/​ en/​vigiecable-​a-​leading-​consortium-​to-​revolutionize-​dynamic-​ subsea-​cable-​monitoring/ GCI. (2026, April 24). GCI to Acquire Quintillion, Expanding Alaska Fiber Network. Retrieved from SubTel Forum: https:/​/​ subtelforum.​com/​gci-​to-​acquire-​quintillion-​expanding-​alaska-​ fiber-​network/ Global Marine. (2026, July 27). Introducing our next-generation cable maintenance vessel. Retrieved from Global Marine: https:/​ /​g lobalmarine.​c o.​u k/​introducing-​o ur-​n ext-​g eneration-​c able-​ maintenance-​vessel/ Global Marine Group. (2026, July 27). Introducing Our Next Generation Cable Maintenance Vessel. Retrieved October 19, 2026, from https:/​/​globalmarine.​group/​introducing-​our-​next-​ generation-​cable-​maintenance-​vessel/ Global Marine. (n.d.). Subsea cable maintenance. Retrieved from Global Marine: https:/​/​globalmarine.​co.​uk/​services/​subsea-​ cable-​maintenance/

Submarine Telecoms Industry Report 2026/2027

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

Global Wind Energy Council. (2026, June 9). GWEC Report: Fast-Track Offshore Wind To Help Prevent Future Energy Crises. Retrieved October 19, 2026, from https:/​/w ​ ww.​gwec.​net/​news/​ gwec-​report-​fast-​track-​o ffshore-​w ind-​to-​h elp-​prevent-​f uture-​ energy-​crises Google. (2024, January 11). Announcing Humboldt the first cable route between South America and Asia Pacific. Retrieved from https:/​/c​ loud.​google.​com/​blog/​products/​infrastructure/​ announcing-​h umboldt-​t he-​f irst-​c able-​r oute-​b etween-​s outh-​ america-​and-​asia-​pacific Grey, D. (2025, March 17). NTT DATA commissions MIST submarine cable system to link India and Southeast Asia. Retrieved from w.media: https:/​/w ​ .​media/​ntt-​data-​commissions-​ mist-​submarine-​cable-​system-​to-​link-​india-​and-​southeast-​asia/ Gupta, A., & Manock, J. (2026, May). The road less routed: Why diversity is the new resilience. SubTel Forum Magazine(148), pp. 38-41. GWEC. (2025, June 25). Offshore wind installed capacity reaches 83 GW as new report finds 2024 a record year for construction and auctions. Retrieved from Global Wind Energy Council: https:/​ /​www.​gwec.​net/​gwec-​news/​offshore-​wind-​installed-​capacity-​ reaches-​8 3-​g w-​a s-​n ew-​r eport-​f inds-​2 024-​a -​r ecord-​y ear-​f or-​ construction-​and-​auctions Hamilton, D. D. (2024, March). The Transatlantic Digital Economy Chapter 5. Retrieved from Transatlantic Relations: https:/​/​transatlanticrelations.​org/​wp-​content/​uploads/​2024/​03/​ Chapter-​5.​pdf Hardy, S. (2023, June 6). Meta’s Anjana submarine cable to land at DC BLOX South Carolina cable landing station. Retrieved from Lightwave Online: https:/​/w ​ ww.​lightwaveonline.​ com/​network-​design/​packet-​transport/​article/​14294806/​metas-​ anjana-​s ubmarine-​c able-​t o-​land-​a t-​d c-​b lox-​s outh-​c arolina-​ cable-​landing-​station Hiru News. (2026, April 3). Colombo Dockyard Begins Orange Marine Cable Vessel. Retrieved from SubTel Forum: https:/​/​ subtelforum.​c om/​c olombo-​d ockyard-​b egins-​o range-​m arine-​ cable-​vessel/ Howard, D., d’Avezac de Moran, R., & Cassidy, D. (2026, May). Green cable ships for a greener internet – from survey to end of life: Alternative fuel choices for cable marine operations. SubTel Forum Magazine(148), pp. 24-30. Huston, G. (2022, June 2). The politics of submarine cables in the Pacific. Retrieved from APNIC: https:/​/b ​ log.​apnic.​net/​2022/​ 06/​02/​the-​politics-​of-​submarine-​cables-​in-​the-​pacific/

REFERENCES · 213


SUBTEL FORUM

REFERENCES IEEE ComSoc Tech Blog. (n.d.). FCC updates subsea cable regulations; repeals 98 outdated broadcast rules and regulations. Retrieved from IEEE ComSoc Tech Blog: https:/​/t​echblog.​ comsoc.​org/​2025/​08/​09/​fcc-​updates-​subsea-​cable-​regulations-​ repeals-​98-​outdated-​broadcast-​rules-​and-​regulations Insikt Group. (2025, July 17). Submarine Cables Face Increasing Threats Amid Geopolitical Tensions and Limited Repair Capacity. Retrieved from Recorded Future: https:/​/​assets.​recordedfuture.​ com/​insikt-​report-​pdfs/​2025/​ta-​2025-​0717.​pdf International Advisory Body on Submarine Cable Resilience. (2025, February 26). The International Advisory Body on Submarine Cable Resilience Declaration . Retrieved from ITU: https:/​/​www.​itu.​int/​digital-​resilience/​submarine-​cables/​wp-​ content/​uploads/​sites/​2/​2025/​02/​summit-​declaration-​nigeria-​ 2025.​pdf International Advisory Body on Submarine Cable Resilience. (2026, July 10). IAB report of the working groups. International Telecommunication Union & International Cable Protection Committee. Retrieved from https:/​/​www.​itu.​int/​digital-​resilience/​ submarine-​cables/​iab-​working-​groups/ International Advisory Body on Submarine Cable Resilience. (2026, February). Working Group 2 Recommendations: Risk Identification, Monitoring & Mitigation. Retrieved October 19, 2026, from https:/​/​www.​itu.​int/​digital-​resilience/​submarine-​ cables/​w p-​c ontent/​u ploads/​s ites/​2 /​2 026/​0 2/​I AB-​W G2-​ Recommendations-​1.​pdf International Cable Protection Committee. (2019). 2019 plenary highlights. Retrieved from International Cable Protection Committee: https:/​/​www.​iscpc.​org/​events/​2019-​plenary-​meeting/ International Cable Protection Committee. (2023). 2023 plenary highlights. Retrieved from International Cable Protection Committee: https:/​/​www.​iscpc.​org/​events/​2023-​plenary-​meeting/ International Cable Protection Committee. (2025). 2025 plenary highlights. Retrieved from International Cable Protection Committee: https:/​/​www.​iscpc.​org/​events/​2025-​plenary-​meeting/ International Cable Protection Committee. (2025, February 24). Damage to Submarine Cables from Dragged Anchors. Retrieved October 19, 2026, from https:/​/​www.​iscpc.​org/​publications/​ icpc-​viewpoints/​damage-​to-​submarine-​cables-​from-​dragged-​ anchors/ International Cable Protection Committee. (2026). 2026 plenary highlights. Retrieved from International Cable Protection Committee: https:/​/​iscpc.​org/​events/​2026-​plenary-​meeting/

Submarine Telecoms Industry Report 2026/2027

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

International Cable Protection Committee. (2026, May 20). Media Enquiries & Frequently Asked Questions. Retrieved October 19, 2026, from https:/​/i​scpc.​org/​news/​media-​enquiries/ International Maritime Organization. (2026a). Marine Environment Protection Committee (MEPC 84), 27 April to 1 May 2026. Retrieved from International Maritime Organization: https:/​/​www.​imo.​org/​en/​mediacentre/​meetingsummaries/​pages/​ temporary-​mepc-​84th-​session.​aspx International Maritime Organization. (2026b). Raft of shipping rules in force from 1 January 2026. Retrieved from International Maritime Organization: https:/​/w ​ ww.​imo.​org/​en/​mediacentre/​ pressbriefings/​p ages/​r aft-​o f-​s hipping-​r ules-​in-​f orce-​f rom-​1 -​ january-​2026.​aspx International Telecommunication Union. (2026). International Advisory Body on Submarine Cable Resilience: Report of the working groups 2026. International Telecommunication Union. Retrieved from https:/​/w ​ ww.​itu.​int/​dms_​pub/​itu-​s/​opb/​iab/​S-​IAB-​ WG-​2026-​PDF-​E.​pdf ITU. (2026, July 17). ITU, ICPC Advisory Body Approves Cable Resilience Report. Retrieved from SubTel Forum: https:/​ /​s ubtelforum.​c om/​i tu-​i cpc-​a dvisory-​b ody-​a pproves-​c able-​ resilience-​report/ James Fisher and Sons. (2004, March 8). Preliminary results for the year ended 31 December 2003. Retrieved October 19, 2026, from https:/​/w ​ ww.​investegate.​co.​uk/​announcement/​rns/​fisher-​ james-​sons-​-f​sj/​final-​results-​/​593550 JFIR. (2025). Strengthening Economic Resilience and Security through US‑Japan Cooperation. Retrieved from JFIR: https:/​/​ www.​jfir.​or.​jp/​en/​studygroup_​article/​4628/ Joint Committee on the National Security Strategy. (2025, June 9). Oral evidence: Undersea cables, questions 47–56. Joint Committee on the National Security Strategy. Retrieved from https:/​/c​ ommittees.​parliament.​uk/​oralevidence/​16071/​html/ Keppel. (2025, October 2). Bifrost Cable System achieves Ready for Service status, primed for trans-pacific connectivity. Retrieved from Keppel: https:/​/w ​ ww.​keppel.​com/​media/​bifrost-​ cable-​s ystem-​a chieves-​r eady-​f or-​s ervice-​s tatus-​p rimed-​f or-​ trans-​pacific-​connectivity/ Keppel. (2026, July 16). Keppel Secures IRUs for All Five Bifrost Fibre Pairs. Retrieved from SubTel Forum: https:/​/​subtelforum.​ com/​keppel-​secures-​irus-​for-​all-​five-​bifrost-​fibre-​pairs/ Koh, G. (2026, January). Public–Private Protection of the Global Submarine Network. SubTel Forum Magazine(146), pp. 88-92. Retrieved from https:/​/s​ ubtelforum.​com/​article-​index/​issue/​146/

REFERENCES · 214


SUBTEL FORUM

REFERENCES Latham & Watkins. (2024). FCC Reviews Submarine Cable Rules to Address National Security and Law Enforcement Risks. Retrieved from Latham & Watkins: https:/​/​www.​lw.​com/​en/​admin/​ upload/​SiteAttachments/​FCC-​Reviews-​Submarine-​Cable-​Rules-​ to-​Address-​National-​Security-​and-​Law-​Enforcement-​Risks.​pdf Lavallée, B. (2026, 3 18). Ciena and Meta achieve world record 800 Gb/s across 16,608 km on transpacific submarine cable. Retrieved from Ciena: https:/​/​www.​ciena.​com/​insights/​blog/​ 2026/​ciena-​and-​meta-​achieve-​world-​record-​800-​gbs-​across-​ 16%2C608-​km-​on-​transpacific-​submarine-​cable LD Armateurs. (2026, September 24). LD Armateurs expands its specialized fleet with the TVO Mariner a DP2 Multipurpose Vessel. Retrieved October 19, 2026, from https:/​/​www.​lda.​fr/​en/​ ld-​armateurs-​expands-​its-​specialized-​fleet-​with-​the-​tvo-​mariner-​ a-​dp2-​multipurpose-​vessel/ Louis Dreyfus Armateurs. (n.d.). Our history 1998 2005. Retrieved October 19, 2026, from https:/​/​www.​lda.​fr/​en/​the-​group/​our-​ history/​1998-​2005/ Ma, J. (2026, August 12). Lightstorm Secures $262M for I-2SEA Cable. Retrieved from SubTel Forum: https:/​/​subtelforum.​com/​ lightstorm-​secures-​262m-​for-​i-​2sea-​cable/ Maguire, J. (2026, March). Beneath the waves: Legal and financial issues in submarine cable protection, maintenance and repair. SubTel Forum Magazine(147), pp. 38-42. Maguire, J. (2026, July). The Barat-Timur Indonesia 1 (BTI1) submarine cable system. SubTel Forum Magazine(149), pp. 3842. Maguire, J. (2026, January). The internet's circulatory system: What may the commercial future of submarine cables hold? SubTel Forum Magazine(146), pp. 36-40. Malaysia. (2026, June 26). Exclusive Economic Zone Regulations 2026, P.U. (A) 233. Retrieved from Laws of Malaysia: https:/​/l​om.​ agc.​gov.​my/​ilims/​upload/​portal/​akta/​outputp/​3577352/​PUA%20 233%20(2026).​pdf MarineLink. (2026, February 20). Orange Marine Orders Two Cable Laying Vessels. Retrieved from SubTel Forum: https:/​ /​s ubtelforum.​c om/​o range-​m arine-​o rders-​t wo-​c able-​l aying-​ vessels/ Maritime Area Regulatory Authority. (2026, August 13). MAC250018 determination grant with conditions. Retrieved from https:/​/​www.​maritimeregulator.​ie/​application/​mac250018/ Maritime Area Regulatory Authority. (2026, July 16). MAC250018 final assessment report Fastnet cable system. Retrieved from https:/​/​www.​maritimeregulator.​ie/​wp-​content/​uploads/​2025/​12/​ MAC_​Report_​MAC250018.​pdf

Submarine Telecoms Industry Report 2026/2027

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

MARITIME, RIVER AND LAKE NAVIGATION REGIME. (2025, January 20). Retrieved from Boletin Oficial: https:/​/​www.​ boletinoficial.​gob.​ar/​detalleAviso/​primera/​319825/​20250120 MarketsandMarkets. (2025, October 25). Oilfield Communications Market worth $8.60 billion by 2030 | MarketsandMarkets™. Retrieved from PRNewswire: https:/​/w ​ ww.​prnewswire.​com/​ news-​r eleases/​o ilfield-​c ommunications-​m arket-​w orth-​8 -​6 0-​ billion-​by-​2030-​-​marketsandmarkets-​302572190.​html Mateo, E. F. (2024, 10 7). Multicore-fiber submarine systems [Invited]. Journal of Optical Communications and Networking, 16(11), H1-H8. doi:10.1364/JOCN.532163 MDC Data Centers. (2026, September 4). Columbia Capital Backs MDC’s MANTA Landing Hubs. Retrieved from SubTel Forum: https:/​/s​ ubtelforum.​com/​columbia-​capital-​backs-​mdc-​s-​ manta-​landing-​hubs/ Mercosur. (2025, July). SEGURIDAD Y RESILIENCIA DE INFRAESTRUCTURAS DE CABLES. Retrieved from MERCOSUR: https:/​/n ​ ormas.​mercosur.​int/​simfiles/​normativas/​ 107695_​R EC_​0 01-​2 025_​E S_​S eguridad%20Infraest%20 cable%20s​ubmarinos.​pdf Meta. (2025, October 5). Introducing the Candle subsea cable and updates to our Asia Pacific connectivity projects. Retrieved from https:/​/e ​ ngineering.​fb.​com/​2025/​10/​05/​connectivity/​ introducing-​t he-​c andle-​s ubsea-​c able-​u pdates-​t o-​o ur-​a sia-​ pacific-​connectivity-​projects/ Meta. (2025). Unlocking global AI potential with next-generation subsea infrastructure. Retrieved from Engineering at Meta: https:/​/ ​e ngineering.​f b.​c om/​2 025/​0 2/​1 4/​c onnectivity/​p roject-​ waterworth-​ai-​subsea-​infrastructure/ Ministère de la Transition écologique et solidaire. (2019). Flotte de commerce au 1er juillet 2019. Retrieved October 19, 2026, from https:/​/w ​ ww.​rif.​mer.​gouv.​fr/​IMG/​pdf/​flotte_​de_​commerce_​ au_​1er_​juillet_​2019.​pdf Ministry of Environment and Climate Change Fiji. (2026). Ministry clarifies status of proposed Natadola cable landing development. Retrieved from https:/​/m ​ ecc.​gov.​fj/​ministry-​of-​environment-​and-​ climate-​change-​clarifies-​status-​o f-​p roposed-​n atadola-​c able-​ landing-​development/ Ministry of Internal Affairs and Communications. (2026). Report on measures to strengthen the resilience of submarine cable infrastructure. Ministry of Internal Affairs and Communications. Retrieved from https:/​/w ​ ww.​soumu.​go.​jp/​main_​content/​ 001081795.​pdf

REFERENCES · 215


SUBTEL FORUM

REFERENCES National Communications Authority (Federal Republic of Somalia). (2025, May). Submarine Cable Regulations 2025. Retrieved from National Communications Authority (NCA): https:/​/ ​n ca.​g ov.​s o/​w p-​c ontent/​u ploads/​2 025/​0 5/​S ubmarine-​ Cable-​Regulations-​2025.​pdf National Communications Authority. (2024, May 22). Update 7 on the March 14 undersea cable disruptions. Retrieved from National Communications Authority: https:/​/​nca.​org.​gh/​2024/​05/​ 22/​update-​7-​undersea-​cable-​disruptions-​affect-​data-​services-​ repair-​works-​on-​all-​undersea-​cable-​cuts-​repaired-​as-​of-​may-​8-​ 2024-​nca/ National Institute of Standards and Technology. (2024, 8 13). FIPS 203: Module-Lattice-Based Key-Encapsulation Mechanism Standard. doi:10.6028/NIST.FIPS.203 NEC. (2025, July 16). NEC to build Asia United Gateway East submarine cable. Retrieved from https:/​/​www.​nec.​com/​en/​press/​ 202507/​global_​20250716_​01.​html NEC Corporation. (2026, 9 22). Meta, NEC, and Sumitomo Electric to Collaborate on Petal, the World's First Petabit Transoceanic Submarine Cable System. Retrieved from NEC Corporation: https:/​/​www.​nec.​com/​en/​press/​202609/​global_​ 20260922_​01.​html NICT. (2025, May 29). World Record Achieved in Transmission Capacity and Distance: With 19-core Optical Fiber with Standard Cladding Diameter 1,808 km Transmission of 1.02 Petabits per Second. Retrieved from National Institute of Information and Communications Technology: https:/​/​www.​nict.​go.​jp/​en/​press/​ 2025/​05/​29-​1.​html North America Zone Agreement. (n.d.). North America Zone Agreement. Retrieved from North America Zone Agreement: https:/​/​nazagreement.​com/ NTT Corporation. (2024, 11 15). Lineup of multi-core optical fiber construction, operation, and maintenance technologies that realize four times the capacity with a single optical fiber. Retrieved from NTT Corporation: https:/​/​group.​ntt/​en/​newsrelease/​2024/​ 11/​15/​241115a.​html NTT Data. (2025, March 18). NTT DATA Announces Commissioning of 8,100-km MIST Submarine Cable System by 2025. Retrieved from Wire & Cable India: https:/​/​www.​wirecable.​ in/​ntt-​data-​announces-​commissioning/ NTT DATA, Sumitomo Corporation and JA Mitsui Leasing. (2026, January 13). Establishment of a new company to operate submarine communication cables connecting Japan and Asia. Retrieved from https:/​/​www.​sumitomocorp.​com/​en/​europe/​news/​ release/​2026/​group/​20690

Submarine Telecoms Industry Report 2026/2027

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

NTT, Inc. (2026, 3 13). NTT Develops the World's HighestCapacity 192-Core Submarine Cable System Using Multicore Optical Fiber. Retrieved from NTT, Inc.: https:/​/​group.​ntt/​en/​ newsrelease/​2026/​03/​13/​260313a.​html Ocean Networks. (2025, August 20). Ocean Networks selects Prysmian and IT International Telecom for HIFL cable. Retrieved from https:/​/s​ ubtelforum.​com/​ocean-​networks-​picks-​prysmian-​it-​ for-​hifl-​cable/ Offshore Mag. (2024, October 1). Pioneer Consulting to support deployment of Petrobras’ fiber-optic cable system offshore Brazil. Retrieved from Offshore Mag: https:/​/w ​ ww.​offshore-​mag.​ com/​regional-​reports/​latin-​a merica/​n ews/​5 5172943/​pioneer-​ consulting-​to-​support-​deployment-​of-​petrobras-​fiber-​optic-​cable-​ system-​offshore-​brazil OMS Group. (2026, January 19). OMS Group Expands GREATClass Fleet With New Vessels. Retrieved from SubTel Forum: https:/​/​subtelforum.​com/​oms-​group-​expands-​great-​class-​fleet-​ with-​new-​vessels/ OMS Group. (n.d.). Vessels. Retrieved October 19, 2026, from https:/​/o ​ pticmarine.​com/​vessels/ Orange. (2025, November 3). Orange Marine modernizes its fleet of cable ships to secure digital infrastructure in Europe Africa and the Middle East. Retrieved October 19, 2026, from https:/​/​www.​ orange.​com/​assets/​document/​318888/​download Orange. (2025, November 3). Orange Marine modernizes its fleet of cable ships to secure digital infrastructure in Europe, Africa and the Middle East. Retrieved from Orange: https:/​/​newsroom.​ orange.​com/​orange-​marine-​modernizes-​its-​fleet-​of-​cable-​ships-​ to-​secure-​digital-​infrastructure-​in-​europe-​africa-​and-​the-​middle-​ east/​?​lang=​eng Orange Marine. (n.d.). Cable storage. Orange Marine. Retrieved from https:/​/m ​ arine.​orange.​com/​wp-​content/​uploads/​sites/​17/​ 2018/​11/​specscablestorageen.​pdf Ørsted. (2026a, March 14). Revolution Wind begins delivering power to New England. Retrieved October 19, 2026, from https:/​ /​orsted.​com/​en/​media/​news/​2026/​03/​revolution-​wind-​begins-​ delivering-​power-​to-​new-​eng-​14833936 Ørsted. (2026b, January 12). US federal court grants preliminary injunction allowing Revolution Wind construction to resume. Retrieved October 19, 2026, from https:/​/o ​ rsted.​com/​en/​media/​ news/​2026/​01/​us-​federal-​court-​grants-​preliminary-​injunction-​all-​ 1474935811 Palmer-Felgate, A. (2025). Global Cable Repair Data Analysis. ICPC Annual Plenary. Montreal. Palmer-Felgate, A. (2026, April). Global cable repair data analysis. International Cable Protection Committee Annual Plenary. Athens, Greece. REFERENCES · 216


SUBTEL FORUM

REFERENCES Paulino, C., Bojczuk, I., Starosielski, N., Haddad, A., Grizendi, E., & Lozano, J. (2026, March). Wiring the “lungs of the planet”: Subfluvial fibre-optic cables and network resilience in the Brazilian Amazon. SubTel Forum Magazine(147), pp. 20-30. Pedrozo, R. (2025). Safeguarding submarine cables and pipelines in times of peace and war. International Law Studies, 106(1), 45-65. Retrieved from https:/​/​digital-​commons.​usnwc.​ edu/​ils/​vol106/​iss1/​2/ Pin, U., & Garrity, T. (2026, March). FCC Takes Steps to Modernize Its Submarine Cable Licensing Rules for the First Time Since the Turn of the Century. SubTel Forum Magazine(147), pp. 58-61. Retrieved from https:/​/​subtelforum.​com/​article-​index/​issue/​147/ Poutonnet, P. (2020, July 31). Infrastructure for all: What happened at Next OnAir this week. Retrieved from Google Cloud Blog: https:/​/​cloud.​google.​com/​blog/​topics/​google-​cloud-​next/​ what-​happened-​week3-​of-​google-​cloud-​next20-​onair (2026, October 23). Practitioner maintenance activity register. Prysmian. (2026, February 10). Prysmian closes the acquisition of ACSM. Retrieved from Prysmian: https:/​/​www.​prysmian.​com/​ en/​media/​press-​releases/​prysmian-​closes-​the-​acquisition-​of-​ acsm Qiu, W. (2024, December 10). Aqua Comms and Ciena Trial 1.3Tbps Wavelength on 5500km Trans-Atlantic AEC-1 Cable Route. Retrieved from Submarine Cable Networks: https:/​/w ​ ww.​ submarinenetworks.​com/​en/​systems/​trans-​atlantic/​aeconnect/​ aqua-​comms-​and-​ciena-​trial-​1-​3tbps-​wavelength-​on-​5500km-​ trans-​atlantic-​aec-​1-​cable-​route Quintillion. (n.d.). Nome to Homer Express. Retrieved from https:/​ /​quintillionglobal.​com/​projects/​nome-​to-​homer-​express/ Reuters. (2025, July 16). US aims to ban Chinese technology in undersea telecommunications cables. Retrieved from Reuters: https:/​/ ​w ww.​r euters.​c om/​w orld/​c hina/​u s-​a ims-​b an-​c hinese-​ technology-​submarine-​cables-​ft-​reports-​2025-​07-​16/ Ridgway, L., Caulfield, C., Blythe, S., & Luther, P. (2026, March). Subsea Cables and International Sanctions in 2026: Lessons for Businesses Navigating a ‘New World Order’. SubTel Forum Magazine(147), pp. 92-96. Retrieved from https:/​/​subtelforum.​ com/​article-​index/​issue/​147/ RioTimes Online. (2025). Japan Bolsters Submarine Cable Investments Amid Rising Security Concerns. Retrieved from RioTimes Online: https:/​/​riotimesonline.​com/​japan-​bolsters-​ submarine-​cable-​investments-​amid-​rising-​security-​concerns

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

Rivera Hartling, E., Pecci, P., & Mitchell, M. (2026, 9 21). Inside Petal: Building the World's First Petabit-Class Transoceanic Subsea Cable. Retrieved from Engineering at Meta: https:/​ /​e ngineering.​f b.​c om/​2 026/​0 9/​2 1/​c onnectivity/​p etal-​p etabit-​ transoceanic-​subsea-​cable/ Rodríguez, B. (2026, July 27). Venezuela Restores International Subsea Cable Capacity. Retrieved October 19, 2026, from https:/​ /​s ubtelforum.​c om/​v enezuela-​r estores-​international-​s ubsea-​ cable-​capacity/ Roy, A. (2023, January 3). Submarine Cable – A Critical Component of Offshore Wind Project. Retrieved from TATA Consulting Engineers Limited: https:/​/w ​ ww.​tataconsultingengineers.​com/​ blogs/​submarine-​cable-​a-​critical-​component-​of-​offshore-​wind-​ project/ Royal IHC. (2025, December 16). Construction begins on CS Genesis and CS Triumph for OMS Group. Retrieved October 19, 2026, from https:/​/w ​ ww.​royalihc.​com/​news/​construction-​begins-​ cs-​genesis-​and-​cs-​triumph-​oms-​group S. B. Submarine Systems. (n.d.). Assets and fleet. Retrieved from S. B. Submarine Systems: https:/​/w ​ ww.​sbss.​com/​en/​site/​ asset S. B. Submarine Systems. (n.d.). Telecommunications. Retrieved from S. B. Submarine Systems: https:/​/w ​ ww.​sbss.​com/​en/​site/​ markets_​details/​34 Samruk-Kazyna. (2026, October 15). Kazakhstan and Azerbaijan launch Trans Caspian fibre optic communication line. Retrieved from https:/​/s​ k.​kz/​press-​center/​news/​79533/​?​lang=​en Semafor. (2025, September). Japan invests in subsea cablelaying ships. Retrieved from Semafor: https:/​/w ​ ww.​semafor.​com/​ article/​09/​16/​2025/​japan-​invests-​in-​subsea-​cable-​laying-​ships Sharma, R. (2026, February 19). Ooredoo Launches OFN to Scale AI, Cloud & Subsea Networks. Retrieved from SubTel Forum: https:/​/s​ ubtelforum.​com/​ooredoo-​launches-​ofn-​to-​scale-​ ai-​cloud-​subsea-​networks/ SK Telecom. (2026, August 27). SK Telecom Spins Off Subsea Cable Business as SK Horizon. Retrieved from SubTel Forum: https:/​/ ​s ubtelforum.​c om/​s k-​t elecom-​s pins-​o ff-​s ubsea-​c able-​ business-​as-​sk-​horizon/ Softbank Corp. (2025, September 22). SoftBank Corp. and Partners Agree to Build "Candle" Submarine Cable System Connecting Japan and Singapore. Retrieved from SoftBank: https:/​/ ​w ww.​s oftbank.​j p/​e n/​c orp/​n ews/​p ress/​s bkk/​2 025/​ 20250922_​01/ Solano, D. (2026, October 5). Philippines-Singapore C2C Link Restored. Retrieved October 19, 2026, from https:/​/​subtelforum.​ com/​philippines-​singapore-​c2c-​link-​restored/

Submarine Telecoms Industry Report 2026/2027

REFERENCES · 217


SUBTEL FORUM

REFERENCES Steventon-Barnes, J. (2025, March 6). Written evidence submitted by Jeremy Steventon-Barnes, former Chief Technology & Information Officer, EXA Infrastructure. Retrieved from UK Parliament: https:/​/​committees.​parliament.​uk/​writtenevidence/​ 138729/​pdf/ Stouffer, K., Pease, M., Tang, C., Zimmerman, T., Pillitteri, V., Lightman, S., . . . Thompson, M. (2023, September 28). Guide to Operational Technology (OT) Security. National Institute of Standards and Technology. Retrieved October 19, 2026, from https:/​/​doi.​org/​10.​6028/​NIST.​SP.​800-​82r3 SubCom. (2025). Company overview. SubCom. Retrieved from https:/​/​www.​subcom.​com/​documents/​SubCom-​OverviewFlyer-​ 2025-​web.​pdf SubCom. (n.d.). Resources. Retrieved from SubCom: https:/​/​ www.​subcom.​com/​resources.​html Submarine Cable Networks. (2025). TPU. Retrieved from Submarine Cable Networks: https:/​/​www.​submarinenetworks.​ com/​en/​systems/​trans-​pacific/​tpu Submarine Networks. (2025). U.S. FCC Adopts Order to Accelerate Submarine Cable Buildout & Security. Retrieved from Submarine Networks: https:/​/​www.​submarinenetworks.​com/​en/​ nv/​insights/​us-​fcc-​adopts-​order-​to-​accelerate-​submarine-​cable-​ buildout-​security

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

SubTel Forum. (2026a, October 15). Aventa Acquires Irish Sea Cable Services Provider. Retrieved from SubTel Forum: https:/​ /​s ubtelforum.​c om/​a venta-​a cquires-​irish-​s ea-​c able-​s ervices-​ provider/ SubTel Forum. (2026b, September 4). Firmus Commits $300M to SUBCO’s APX East Cable. Retrieved from SubTel Forum: https:/​ /​subtelforum.​com/​firmus-​commits-​300m-​to-​subco-​s-​apx-​east-​ cable/ SubTel Forum. (2026c, September 17). Japan Backs New Undersea Cable-Laying Fleet. Retrieved from SubTel Forum: https:/​/ ​s ubtelforum.​c om/​japan-​b acks-​n ew-​u ndersea-​c able-​ laying-​fleet/ SubTel Forum. (2026d, October 12). Japan Selects Four Cable Landing Subsidy Recipients. Retrieved from SubTel Forum: https:/​/ ​s ubtelforum.​c om/​j apan-​s elects-​f our-​c able-​l anding-​ subsidy-​recipients/ SubTel Forum. (2026e, September 23). Lightera Expands Submarine Fiber Capacity. Retrieved from SubTel Forum: https:/​ /​subtelforum.​com/​lightera-​expands-​submarine-​fiber-​capacity/ SubTel Forum. (2026f, October 13). OMS Group CS Resilience Reaches Keel-Laying Milestone. Retrieved from SubTel Forum: https:/​/s​ ubtelforum.​com/​oms-​group-​cs-​resilience-​keel-​laying/

Submarine Telecoms Forum. (2021). Submarine Telecoms Industry Report 2021 2022. Retrieved October 19, 2026, from https:/​/​cnetworks.​info/​wp-​content/​uploads/​2021/​11/​Submarine-​ Telecoms-​Industry-​Report-​Issue-​10.​pdf

SubTel Forum. (2026g, September 22). OMS Opens Singapore Remote Survey Operations Centre. Retrieved from SubTel Forum: https:/​/s​ ubtelforum.​com/​oms-​opens-​singapore-​remote-​ survey-​operations-​centre/

Submarine Telecoms Forum. (2026, January 7). OMS Group Begins G Class Cable Laying Vessel Assembly. Retrieved October 19, 2026, from https:/​/​subtelforum.​com/​oms-​group-​ begins-​g-​class-​cable-​laying-​vessel-​assembly/

SubTel Forum. (2026h, October 14). Pisces JV Advances EUBacked Atlantic Cable Project. Retrieved from SubTel Forum: https:/​/s​ ubtelforum.​com/​pisces-​jv-​eu-​backed-​atlantic-​cable/

Submarine Telecoms Forum. (2026). Planned submarine cable delivery assessment as of 19 October 2026.

SubTel Forum. (2026i, October 16). Prysmian Completes Xtera Acquisition. Retrieved from SubTel Forum: https:/​/​subtelforum.​ com/​prysmian-​completes-​xtera-​acquisition/

Subsea Cables Industry News. (2025). Japan Backs NEC Fleet to Secure Undersea Cable Infrastructure. Retrieved from Subsea Cables Industry News: https:/​/​www.​subseacables.​net/​ industry-​news/​japan-​backs-​nec-​fleet-​to-​secure-​undersea-​cable-​ infrastructure

Sugadev, A. (2026, July). Subsea Cable Permitting Maturity: A Self-Assessment Framework for National Permitting Systems. SubTel Forum Magazine(149), p. 104. Retrieved from https:/​ /​e mbed-​r ech-​0 1.​d ialog.​c m/​s ubtelforum/​d ocs/​s ubtel_​f orum_​ issue_​149_​-_ ​ ​regional_​systems

Subsecretaría de Telecomunicaciones. (2025, June 6). Desarrollo País y Google se unen para crear Humboldt Connect. Retrieved from https:/​/​www.​subtel.​gob.​cl/​desarrollo-​pais-​y-​google-​se-​ unen-​p ara-​c rear-​h umboldt-​c onnect-​e mpresa-​a -​c argo-​d el-​ primer-​cable-​submarino-​que-​cruzara-​el-​pacifico-​sur/

Sugadev, A., & George, M. (2026, September). How Jurisdictions Split Power and Data: Why National Jurisdictions Regulate Telecom and Power Cables Differently, When the International Law of the Sea Does Not. SubTel Forum Magazine(150), pp. 8892. Retrieved from https:/​/e ​ mbed-​rech-​01.​dialog.​cm/​subtelforum/​ docs/​subtel_​forum_​issue_​150_​-​_​offshore_​energy

SubTel Forum. (2026). Industry sentiment survey. SubTel Forum.

Submarine Telecoms Industry Report 2026/2027

REFERENCES · 218


SUBTEL FORUM

REFERENCES Tagare, S. (2025, July 10). Takeaways From Lisbon SubOptic 2025. Retrieved from Internet Society Pulse: https:/​/p ​ ulse.​ internetsociety.​org/​blog/​takeaways-​from-​lisbon-​suboptic-​2025 Tampnet. (2025, March 4). Tampnet to provide high-speed, fibre based connectivity enabling remote operations for Woodside’s Trion Project in the Gulf of Mexico. Retrieved from Tampnet: https:/​/ ​w ww.​t ampnet.​c om/​p ress/​t ampnet-​t o-​p rovide-​h igh-​ speed-​fibre-​based-​connectivity-​enabling-​remote-​operations-​for-​ woodsides-​trion-​project-​in-​the-​gulf-​of-​mexico Tampnet. (2026a, June 22). Tampnet awarded connectivity contracts for two new deepwater developments in the US Gulf. Retrieved October 19, 2026, from https:/​/​www.​tampnet.​com/​ press/​t ampnet-​a warded-​c onnectivity-​c ontracts-​f or-​t wo-​n ew-​ deepwater-​developments-​in-​the-​us-​gulf Tampnet. (2026b, March 17). Tampnet delivers real-time connectivity for the first CO2 injection platform on the Dutch Continental Shelf. Retrieved October 19, 2026, from https:/​/w ​ ww.​ tampnet.​com/​press/​tampnet-​delivers-​real-​time-​connectivity-​for-​ the-​first-​co2-​injection-​platform-​on-​the-​dutch-​continental-​shelf Tampnet. (2026c, September 16). Tampnet signs five-year framework agreement for delivering connectivity across BW Offshore's FPSO fleet. Retrieved October 19, 2026, from https:/​/​www.​tampnet.​com/​press/​tampnet-​signs-​five-​year-​frame-​ agreement-​for-​delivering-​connectivity-​across-​bw-​offshores-​fpso-​ fleet Tarre, M. (2026, April 10). OMS Group Buys Second DriX Vessel for Cable Surveys. Retrieved from SubTel Forum: https:/​/​ subtelforum.​com/​oms-​group-​buys-​second-​drix-​vessel-​for-​cable-​ surveys/ Tata Communications. (2025, June 3). Tata Communications unveils new cable system to supercharge next generation global connectivity. Retrieved from https:/​/​www.​tatacommunications.​ com/​p ress-​r elease/​t ata-​c ommunications-​u nveils-​n ew-​c able-​ system-​to-​supercharge-​next-​gen-​global-​connectivity Telecom Review Asia. (2026, June 5). 17 Nations Launch GUIDE Undersea Cable Security Framework. Retrieved from SubTel Forum: https:/​/​subtelforum.​com/​17-​nations-​launch-​guide-​ undersea-​cable-​security-​framework/ Telecommunications Regulatory Authority – Oman. (2025, May 4). Decision No. 1151/2/30/2025-9. Retrieved from Telecommunications Regulatory Authority – Oman: https:/​/​www.​ tra.​gov.​om/​En/​DownloadFile.​jsp?​type=​PublicationList&​code=​ 295

Submarine Telecoms Industry Report 2026/2027

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

Tersan Shipyard. (2026, June 5). Tersan Shipyard hold steel cutting ceremony for next generation cable laying vessel NB1139. Retrieved October 19, 2026, from https:/​/t​ersanshipyard.​com/​ en/​news/​tersan-​shipyard-​hold-​steel-​cutting-​ceremony-​for-​next-​ generation-​cable-​laying-​vessel-​nb1139 TGS. (2026, June 30). Hexatronic Expands Submarine Cable Capacity. Retrieved from SubTel Forum: https:/​/​subtelforum.​ com/​hexatronic-​expands-​submarine-​cable-​capacity/ The Maritime Executive. (2026, April 3). Taiwan Accuses Salvage Barge of Damaging Subsea Cable. Retrieved October 19, 2026, from https:/​/s​ ubtelforum.​com/​taiwan-​accuses-​salvage-​barge-​of-​ damaging-​subsea-​cable/ TIM. (2026a, July 29). TIM: Confermate le guidance 20262027; nel secondo trimestre ritorno all’utile, nel primo semestre crescono ricavi e margini. Retrieved from TIM: https:/​/​www.​ gruppotim.​it/​it/​a rchivio-​s tampa/​c orporate/​2 026/​C S-​C dA-​2 9-​ luglio-​2026.​html TIM. (2026b, April 14). TIM: Long stop date for the sale of Sparkle extended. Retrieved from TIM: https:/​/w ​ ww.​gruppotim.​it/​ en/​press-​archive/​sparkle/​2026/​PR-​TIM-​Waiver-​Sparkle.​html Tom’s Hardware. (2025, September). Japan subsidizes undersea cable vessels over ‘very serious’ national security concerns. Retrieved from Tom’s Hardware: https:/​/w ​ ww.​tomshardware.​ com/​networking/​japan-​to-​subsidize-​undersea-​cable-​vessels-​ over-​very-​serious-​national-​security-​concerns-​will-​front-​up-​to-​ half-​the-​cost-​for-​usd300-​million-​vessels-​bought-​by-​nec Toombs, D. (2026, March). Permit Feasibility Studies as Risk Management Tools. SubTel Forum Magazine(147), pp. 64-70. Retrieved from https:/​/s​ ubtelforum.​com/​article-​index/​issue/​147/ Tortorella, F., & Starosielski, N. (2026, May). Welcoming Caroline Crowley as the new editor of the Sustainable Subsea column. SubTel Forum Magazine(148), p. 31. TS2.Tech. (2025). Japan’s $300 Million Undersea Cable Gamble: Inside the Global Race to Secure the Internet’s Lifelines. Retrieved from TS2.Tech: https:/​/t​s2.​tech/​en/​japans-​300-​million-​ undersea-​cable-​gamble-​inside-​the-​global-​race-​to-​secure-​the-​ internets-​lifelines/ UK Government. (2026, October 22). Critical undersea infrastructure security and resilience: proposals for modernising the UK’s legislation (White Paper). Retrieved from GOV.UK: https:/​/w ​ ww.​gov.​uk/​government/​consultations/​ proposals-​f or-​n ew-​l egislation-​t o-​s trengthen-​t he-​s ecurity-​ and-​resilience-​o f-​critical-​u ndersea-​infrastructure-​cui/​critical-​ undersea-​infrastructure-​security-​and-​resilience-​proposals-​for-​ modernising-​the-​uks-​legislation-​white-​paper

REFERENCES · 219


SUBTEL FORUM

REFERENCES

SUBMARINE TELECOMS INDUSTRY REPORT / 2026/2027

CONTINUED

Ulstein Group. (2026, October 13). Keel laying milestone for Yno 328 a fibre optic CLV newbuild for OMS. Retrieved October 19, 2026, from https:/​/​ulstein.​com/​news/​keel-​laying-​milestone-​for-​ yno-​328-​a-​fibre-​optic-​clv-​newbuild-​for-​oms

VOV.VN. (2026, August 28). Four Cable Faults Disrupt Vietnam International Traffic. Retrieved October 19, 2026, from https:/​/​ subtelforum.​com/​four-​cable-​faults-​disrupt-​vietnam-​international-​ traffic/

Ulstein Group. (2026, January 19). OMS Group contracts Ulstein for two next generation cable laying vessels. Retrieved October 19, 2026, from https:/​/​ulstein.​com/​news/​oms-​group-​contracts-​ ulstein-​for-​two-​next-​generation-​cable-​laying-​vessels

WIOCC Group. (2026, September 2). WIOCC Secures $300M for African Digital Expansion. Retrieved from SubTel Forum: https:/​/​subtelforum.​com/​wiocc-​secures-​300m-​for-​african-​digital-​ expansion/

UNESCO Intergovernmental Oceanographic Commission / The Ocean Decade. (2025, August 27). Advancing Ocean Data Sharing for Sustainable Development in Areas Within National Jurisdiction. Retrieved from The Ocean Decade: https:/​/​oceandecade.​org/​publications/​advancing-​ocean-​data-​ sharing-​for-​sustainable-​development-​in-​areas-​within-​national-​ jurisdiction/

Wong, S. (2022, April 6). Google's subsea fiber optics, explained. Retrieved from Google Cloud Blog: https:/​/c​ loud.​google.​com/​ blog/​t opics/​d evelopers-​p ractitioners/​g oogles-​s ubsea-​f iber-​ optics-​explained

Unified National Networks. (2022). UNN CTG Globe DITO and Singtel invest USD300 million for a submarine cable system in Southeast Asia. Retrieved from https:/​/​unn.​com.​bn/​unn-​ together-​with-​ctg-​globe-​dito-​and-​singtel-​invest-​usd300mil-​for-​a-​ submarine-​cable-​system-​in-​southeast-​asia VARD. (2026, February 20). VARD once again proved worthy of trust. Retrieved October 19, 2026, from https:/​/​www.​vard.​com/​ press-​releases/​vard-​once-​again-​proved-​worthy-​of-​trust Vocus. (2025, March 3). Fixing Australia’s internet lifelines. Retrieved from Vocus: https:/​/​www.​vocus.​com.​au/​news/​ship-​ happens-​repairing-​australias-​submarine-​internet-​lifelines

Submarine Telecoms Industry Report 2026/2027

World Bank. (2022, May 10). Tonga Second Resilience Development Policy Financing Supplemental Financing. Retrieved from World Bank Group: https:/​/​documents1.​ worldbank.​o rg/​c urated/​e n/​5 29241654609629236/​p df/​ Tonga-​S econd-​R esilience-​D evelopment-​P olicy-​F inancing-​ Supplemental-​Financing.​pdf World Economic Forum, Centre for Nature and Climate. (2026, April). Climate litigation: From compliance to strategic imperative—Global trends and board-level implications. World Economic Forum, Centre for Nature and Climate. Retrieved from https:/​/r​ eports.​weforum.​org/​docs/​WEF_​Climate_​Litigation_​ 2026.​pdf

REFERENCES · 220


2026/2027 SUBMARINE TELECOMS INDUSTRY REPORT

Analyzing global and regional trends in submarine cables, including infrastructure expansion, security initiatives, and technology advancements.

A publication of Submarine Telecoms Forum, Inc. subtelforum.com