While all reasonable steps to verify information from the public domain have been taken, based on changing circumstances and dynamic factors, incomplete information subject to change may exist. Our goal is to periodically update and modify such information. If you have a correction, please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing almanac@subtelforum.com.

WFOREWORD

elcome to the eighteenth edition of the Submarine Cable Almanac, one of our most popular reference tools. In this issue we removed 2 systems, updated 17 systems and added 4 new systems.

Coinciding with the recent release of our new interactive Submarine Cables of the World online map, we have added a “News” field, where you can find the current news related to a cable system, if available.

If you’re interested in finding a specific system, or wish to see all systems in a region, simply type that name or region into the search function. We hope that you, our readers, will participate in this almanac as you’ve done with our previous products.

There is always room for additional data, so let us know if there is something else we should include in future editions. Please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing almanac@subtelforum.com.

Finally, I want to thank all of the sponsors, staff and dedicated readers that contributed to this Almanac. Your feedback has been invaluable.

Submarine Cable Almanac Issue 19 | August 2016

Copyright © 2016 by Submarine Telecoms Forum, Inc.

Kristian Nielsen

+1 703.444.0845 Vice President www.subtelforum.com

All rights reserved. No part of this book may be used or reproduced by any means, graphic, eletronic, or mechanical, including photocopying, recording, taping or by any information storage retrieval system without the written permission of the publisher except in the case of brief quotations embodied in critical articles and reviews.

Submarine Telecoms Forum, Inc.

21495 Ridgetop Circle Suite 201

Sterling, Virginia 20166 USA www.subtelforum.com

CFX-1 ..................................................160

CHINA-US .........................................162

CONCERTO-1....................................174

CORFU-BAR ......................................176

DANICA NORTH 178

DANICA SOUTH 180

DANICE 182

DARE 184

DDSCN ...............................................186

DENMARK-NORWAY 5 ..................188

DENMARK-NORWAY 6 ..................190

DENMARK-POLAND 2 ..................192

DIDON................................................194

SEA-ME-WE

SEA-ME-WE

466

TANNAT ............................................468

TASMAN GLOBAL ACCESS ..........470

TAT 14 .................................................472

TE NORTH .........................................474

TEAMS ................................................476

TGN EURASIA ..................................478

TGN GULF .........................................480

TGN INTRA-ASIA ............................482

TGN NORTHERN EUROPE ...........484

TGN TRANSATLANTIC .................486

TGN TRANSPACIFIC ......................488

TGN WESTERN EUROPE ...............490

TGN-TATA INDIACOM ..................492

TGN-TIC .............................................494

TIERRA DEL FUEGO .......................496

TIS ........................................................498

TONGA-FIJI .......................................500

System Name: Asia Africa Europe [Planned]

Landing Points: Barcelona (Spain), Marseilles (France), Palermo (Italy), Abu Talat (Egypt), Zafrana (Egypt), Djibouti, Oman, Fujairah (UAE), Mumbai (India), Kenya, Sri Lanka, Cox Bazaar (Bangladesh), Myanmar, Singapore, Hong Kong, Shanghai (China)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 600,000,000

Total Length (kms): 25,000

News: http://subtelforum.com/articles/tag/aae-1/

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Design Capacity: 40 Tbps

Fiber Pairs: 5

Channels: 80

Channel Capacity: 100 Gbps

Owners: British Telecom, China Unicom, Chuan Wei, Djibouti Telecom, Etisalat, HKT (PCCW Global), Mobily, Omantel, Ooredoo, PTCL, Telecom Egypt, Telecom Yemen, Viettel, OTEG, Reliance Jio, Time.com, TOT

System Supplier: TE SubCom, NEC

System Installer: TE SubCom

Marine Surveyor: Fugro

Region: Indian Ocean Pan-East Asian

Lantau La Union

Tanguisson

Keawaula

System Name: Asia-America Gateway

Landing Points: Changi (Singapore), Keawaula (Hawaii), Lantau (Hong Kong), La Union (Philippines), Mersing (Malaysia), Grover Beach (USA), Sri Racha (Thailand), Tanguisson (Guam), Tungku (Brunei), Vung Tau (Vietnam)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 500,000,000

Total Length (kms): 20,547

Initial Capacity: 2.88 Tbps

Owners: AT&T Inc., Bayan, Bharti, BT Global Network Services, CAT Telecom, ETPI, FPT Telecom, the Government of Brunei Darussalam, PT Indosat, PLDT, Saigon Postel Corporation, StarHub, Telcotech, TELKOM Indonesia, Telstra, Telekom Malaysia, TNZL, Viettel, VNPT

System Supplier: Alcatel Submarine Networks, NEC

System Installer: Alcatel Submarine Networks, ASEAN Cableship, NEC, Orange Marine

Cableship: Rene Descartes

System Maintainer: AT&T, PLDT, Starhub Ltd, Telstra International, TM Berhad

Upgrader: Mitsubishi, Ciena

Upgrade Year: 2011, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Transpacific

News: http://subtelforum.com/articles/tag/aag/

San Luis Obispo

Brookhaven

Westerland

Whitesands Bay Beverwijk

System Name: Atlantic Crossing 1

Landing Points: Beverwijk (Netherlands), Brookhaven (USA), Westerland (Germany), Whitesands Bay (UK)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): 875,000,000

Total Length (kms): 13,377

Initial Capacity: 40 Gbps

Design Capacity: 1 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Level 3 Communications

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

System Maintainer: Level 3 Communications

Upgrader: Xtera Communications

Upgrade Year: 2010

Upgraded Capacity: 20 Gbps

Region: Transatlantic

News: http://subtelforum.com/articles/tag/ac-1/

Widemouth Bay

Bellport

System Name: Atlantic Crossing 2

Landing Points: Bellport (USA), Widemouth (UK)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 700,000,000

Total Length (kms): 6,185

Initial Capacity: 320 Gbps

Design Capacity: 640 Gbps

Owners: Level 3 Communications

System Maintainer: Level 3 Communications

Upgrader: Infinera

Upgrade Year: 2010

Upgraded Capacity: 10 Gbps

Region: Transatlantic

News: http://subtelforum.com/articles/tag/ac-2/

System Name: Africa Coast To Europe - Phase 1

Landing Points: Penmarch (France), Lisbon (Portugal), Tenerife (Spain), Nouakchott (Mauritania), Dakar (Senegal), Banjul (The Gambia), Conakry (Guinea), Freetown (Sierra Leone), Monrovia (Liberia), Abidjan (Ivory Coast), Accra (Ghana), Cotonou (Benin), Lagos (Nigeria), Kribi (Cameroon), Bata (Equatorial Guinea), Libreville (Gabon)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): 500,000,000

Total Length (kms): 12,000

Design Capacity: 12.8 Tbps

Channel Capacity: 100 Gbps

Owners: Benin Telecoms, Cable Consortium of Liberia, Canalink Africa SL, Côte d’Ivoire Telecom, Dolphin Telecom JLT, Gambia Submarine Cable, Guinéenne de Large Bande, International Mauritania Telecom, MEO, MTN, Orange (France), Orange Cameroun, Orange Mali, Orang

System Supplier: Alcatel-Lucent Submarine Networks (Main contractors), TE SubCom (Sub contractors)

System Installer: Orange Marine

Marine Surveyor: Fugro

System Maintainer: Orange, PT Comunicações S.A., Sonatel, Gestor de Infraestructuras de Guinea Ecuatorial (GITGE)

Region: EMEA

News: http://subtelforum.com/articles/tag/ace/

System Name: Africa Coast To Europe - Phase 2 [Planned]

Landing Points: Santana (São Tomé and Príncipe), Muanda (DRC), Luanda (Angola), Swakopmund (Namibia), Cape Town (South Africa),

RFS Year: 2016

Est. End of Service Date: 2037

Est. System Cost (US$): 200,000,000

Total Length (kms): 5,000

Design Capacity: 12.8 Tbps

Channel Capacity: 100 Gbps

Owners: Benin Telecoms, Cable Consortium of Liberia, Canalink Africa SL, Côte d’Ivoire Telecom, Dolphin Telecom JLT, Gambia Submarine Cable, Guinéenne de Large Bande, International Mauritania Telecom, MEO, MTN, Orange (France), Orange Cameroun, Orange Mali, Orang

System Supplier: Alcatel-Lucent Submarine Networks (Main contractors), TE SubCom (Sub contractors)

System Installer: Orange Marine

Marine Surveyor: Fugro

System Maintainer: Orange, PT Comunicações S.A., Sonatel, Gestor de Infraestructuras de Guinea Ecuatorial (GITGE)

Region: EMEA

News: http://subtelforum.com/articles/tag/ace/

Santana
Muanda Luanda
Swakopmund
CapeTown

System Name: Angola Domestic Network System

Landing Points: Benguela (Angola), Cabinda (Angola), Luanda (Angola), Lucira (Angola), Namibe (Angola), Nzeto (Angola), Porto Amboim (Angola), Soyo (Angola)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 35,000,000

Total Length (kms): 1,800

Initial Capacity: 30 Gbps

Design Capacity: 80 Gbps

Owners: Angola Telecom

System Supplier: Ericsson

System Installer: Elettra

Cableship: Teleri

Region: EMEA

News: http://subtelforum.com/articles/tag/ adones/

Cabinda Soyo
Nzeto
Luanda
Porto Amboim
Benguela
Lucira
Namibe

System Name: ADRIA-1

Landing Points: Corfu (Greece), Dubrovnik (Croatia), Durres (Albania)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 13,400,000

Total Length (kms): 430

Initial Capacity: 622 Mbps

Owners: Deutsche Telekom AG, OTE

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

System Maintainer: Hellenic Telecommunications Organization S.A.

Region: EMEA

Dubrovnik
Durres
Corfu

System Name: America Europe Connect

Landing Points: Shirley, New York (United States); Killala, Ireland

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 300,000,000

Total Length (kms): 5,536

Design Capacity: 52 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 130

Channel Capacity: 100 Gbps

Owners: AquaComms

System Supplier: TE SubCom

System Installer: TE SubCom

Cableship: Reliance

Region: Transatlantic News: http://subtelforum.com/articles/tag/aec/

Killala

System Name: Australia-Japan Cable

Landing Points: Maruyama (Japan), Oxford Falls (Australia), Shima (Japan), Sydney (Australia), Tanguisson (Guam), Tumon (Guam)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 520,000,000

Total Length (kms): 12,224

Initial Capacity: 320 Gbps

Design Capacity: 25.6 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: Australia Japan Cable Limited, Communications Global Network Services Limited, NTT Communications Corporation, SOFTBANK Telecom Corp., Telstra Holdings (Bermuda) No. 1 Limited, Worldcom Global Networks Limited

System Supplier: Ocean Cable Company, Tyco Telecommunications

System Installer: FCR, KDD

Cableship: Fresnel, Subaru

System Maintainer: Australia Japan Cable, SoftBank Telecom Corp

Upgrader: Ciena, Infinera

Upgrade Year: 2012, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Transpacific News: http://subtelforum.com/articles/tag/ajc/

Maruyama
Shima
Tanguisson Tumon
Oxford Falls Sydney

Anchorage

System Name: Akorn

Landing Points: Anchorage (USA), Florence (USA)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 100,000,000

Total Length (kms): 2,968

Initial Capacity: 10 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Alaska Communications

System Supplier: Tyco Telecommunications

System Maintainer: ACS Cable Systems

Region: Americas

ALASIA

System Name: Alasia

Landing Points: Pentaskhinos (Cyprus), Tartus (Syria)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): 15,000,000

Total Length (kms): 350

Design Capacity: 25.6 Tbps

Fiber Pairs: 8 Fiber Pairs

Owners: Cyprus Telecommunications Authority, Syrian Telecommunications Authority Region: EMEA

Valdez Whittier

Juneau

System Name: Alaska United East

Landing Points: Harbor Pointe (USA), Juneau (USA), Valdez (USA), Whittier (USA)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): 100,000,000

Total Length (kms): 3,751

Initial Capacity: 2.5 Gbps

Design Capacity: 10 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: GCI

System Supplier: NEC

System Maintainer: General Communication Incorporated

Region: Americas

Harbor Pointe

ALASKA UNITED WEST

Whittier

System Name: Alaska United West

Landing Points: Ketchikan (USA), Warrenton (USA), Whittier (USA)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): 30,000,000

Total Length (kms): 2,483

Initial Capacity: 10 Gbps

Design Capacity: 640 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: GCI

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Cableship: Global Sentinel

System Maintainer: General Communication Incorporated

Region: Americas

Ketchikan Warrenton

System Name: ALBA-1

Landing Points: Camuri (Venezuela), Ocho Rios (Jamaica), Santiago De Cuba (Cuba), Siboney (Cuba)

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): 72,000,000

Total Length (kms): 1,600

Initial Capacity: 640 Gbps

Owners: Telecom Venezuela, Transbit SA

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Shanghai Bell, Telecomunicaciones Gran Caribe

Marine Surveyor: EGS

Survey Boat: RV Ridley Thomas

Region: Americas News: http://subtelforum.com/articles/tag/ alba-1/

Camuri

Tartus

Alexandria

System Name: Aletar

Landing Points: Alexandria (Egypt), Tartus (Syria)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): 23,000,000

Total Length (kms): 733

Initial Capacity: 5 Gbps

Fiber Pairs: 1 Fiber Pair

Owners: Lebanese Ministry of Telecom (6.25%), Syrian Telecom (46.875%), Telecom Egypt (46.875%)

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Vercors

System Maintainer: Telecom Egypt

Region: EMEA

System Name: Alexandros

Landing Points: Alexandria (Egypt), Marseille (France), Pentaskhinos (Cyprus)

RFS Year: 2010

Est. End of Service Date: 2035

Total Length (kms): 3,500

Design Capacity: 10 Tbps

Owners: Cyprus Telecommunications Authority, Telecom Egypt

System Maintainer: Cypress Telecommunications Authority

Region: EMEA

News: http://subtelforum.com/articles/tag/ alexandros/

Marseille
Alexandria
Pentaskhinos

ALONSO DE OJEDA

System Name: Alonso De Ojeda

Landing Points: Oranjestad (Aruba), Willemstad (Netherlands Antilles)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): 8,700,000

Total Length (kms): 128

Initial Capacity: 15 Gbps

Design Capacity: 100 Gbps

Owners: Antelecom NV

System Supplier: Alcatel Submarine Networks

System Installer: IT International Telecom

System Maintainer: Setar NV, United Telecommunications Services

Region: Americas

Willemstad

Ses Covetes

System Name: Alpal-2

Landing Points: El Djemila (Algeria), Ses Covetes (Majorca)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): 17,600,000

Total Length (kms): 312

Initial Capacity: 10 Gbps

Design Capacity: 160 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: APT, France Telecom, Telefonica

System Supplier: Pirelli

System Installer: Global Marine Systems Limited

Cableship: Maersk Responder

System Maintainer: Telefonica de España, S.A.U.

Region: EMEA

El Djemila

AMERICAN

System Name: American Samoa-Fiji [Planned]

Landing Points: Pago Pago (American Samoa), Fiji

RFS Year: 2017

Est. End of Service Date: 2041

Est. System Cost (US$): 35,000,000

Initial Capacity: 40 Gbps

Owners: American Samoa Hawaii Cable

Region: AustralAsia

News: http://subtelforum.com/ articles/?s=american+samoa+fiji

American Samoa

Project Completion Phases: Pre-Engineering Survey

System Manufacture

System Installation Commissioning & Acceptance

AMERICAS I

System Name: Americas I

Landing Points: Magens Bay (Virgin Islands), Vero Beach (USA)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): 220,000,000

Total Length (kms): 2,013

Initial Capacity: 120 Gbps

Design Capacity: 320 Gbps

Owners: AT&T, CANTV (Venezuela), Embratel, TSTT

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

System Maintainer: AT&T, Telecom Services Trinidad & Tobago

Upgrader: Xtera Communications

Upgrade Year: 2010

Upgraded Capacity: 20 Gbps

Region: Americas

News: http://subtelforum.com/ articles/?s=americas+I

Vero Beach
Magens Bay

AMERICAS I SOUTH

System Name: Americas I South

Landing Points: Camuri (Venezuela), Fortaleza (Brazil), Macqueripe (Trinidad), Magens Bay (Virgin Islands)

RFS Year: 1994

Est. End of Service Date: 2019

Total Length (kms): 6,014

Initial Capacity: 560 Mbps

Owners: AT&T, CANTV (Venezuela), Embratel, TSTT

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications SSI

System Installer: C&W (Marine)

Cableship: Cable Installer, Agile, Fresnel Region: Americas

Magens Bay
Camuri Macqueripe
Fortaleza

System Name: Americas II

Landing Points: Camuri (Venezuela), Cayenne (French Guiana), Chaguaramas (Trinidad), Fortaleza (Brazil), Hollywood (USA), Lamentine (France), Miramar (Puerto Rico), St Croix (US Virgin Islands), Willemstad (Netherlands Antilles)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 350,000,000

Total Length (kms): 8,373

Initial Capacity: 80 Gbps

Design Capacity: 210 Gbps

Owners: Antelecom NV, AT&T, Brazil Telecom, CANTV (Venezuela), Embratel, France Telecom, GT&T, Sprint, Telecom Italia, Telefonica, Telesur, Telintar, Trescom Int., TSTT, Verizon

System Supplier: ASN Australia, Tyco Telecommunications

System Installer: Tyco Telecommunications SSI

Cableship: Global Link

System Maintainer: AT&T, Orange, Telecom Services Trinidad & Tobago, United Telecommunications Services

Region: Americas News: http://subtelforum.com/ articles/?s=Americas+II

Camuri Chaguaramas
Cayenne
Fortaleza
Hollywood

AMERIGO VESPUCCI

System Name: Amerigo Vespucci

Landing Points: Bonaire (Netherlands), Curacao (Curacao)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): 15,000,000

Total Length (kms): 84

System Maintainer: United Telecommunication Services

Region: Americas

Bonaire

Curaçao

System Name: America Movil Submarine Cable System-1

Landing Points: Jacksonville (United States), Miami (United States), San Juan (Puerto Rico), Puerto Barrios (Guatemala), Barranquilla (Colombia), Cartagena (Colombia), Fortaleza (Brazil), Salvador de Bahia (Brazil), Rio de Janeiro (Brazil), Puerto Plata (Dominican Repub

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): 700,000,000

Total Length (kms): 17,800

Initial Capacity: 100 Gbps

Owners: America Movil

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro, EGS

Region: Americas

News: http://subtelforum.com/articles/tag/ amx-1/

Fortaleza
Rio de Janeiro Maimi Puerto Plata San Juan
Barranquilla Cartagena
Cancun
Puerto Barrios

System Name: Antel

Landing Points: Las Toninas (Argentina), Maldonado (Uruguay)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): 15,000,000

Total Length (kms): 250

Initial Capacity: 50 Gbps

Design Capacity: 3.84 Tbps

Owners: Antel (Uruguay), Telecom Argentina

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: IT Telecom

Region: Americas News: http://subtelforum.com/articles/tag/ antel/

Las Toninas
Maldonado

Hams Bluff

System Name: Antilles Crossing

Landing Points: Bridgetown (Barbados), Hams Bluff (Virgin Islands), Port Castries (St Lucia)

RFS Year: 2006

Est. End of Service Date: 2031

Total Length (kms): 952

Initial Capacity: 40 Gbps

Design Capacity: 80 Gbps

Owners: Antilles Crossing, Barbados Light & Power, Leucadia, Telebarbados

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: Americas News: http://subtelforum.com/ articles/?s=antilles+crossing

Port Castries
Bridgetown

Upgrader: NEC

Upgrade Year: 2011, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ apcn2/

System Name: Asia-Pacific Cable Network 2

Landing Points: Batangas (Philippines), Chikura (Japan), Chongming (China), Katong (Singapore), Kitaibaraki (Japan), Kuantan New Port (Malaysia), Lantau (Hong Kong), Pusan (South Korea), Shantou (China), Tanshui (Taiwan)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): 1,100,000,000

Total Length (kms): 19,000

Initial Capacity: 160 Gbps

Design Capacity: 25.6 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: China Telecom, Chunghwa Telecom International, CTM, France Telecom, KDDI, KT Coropration, NTT Communications, PLDT (Philippines), Reach NHK, Singtel, Telekom Malaysia

System Supplier: Ocean Cable Company

System Installer: Global Marine Systems Limited

Cableship: Cable Retriever, Bold Endurance, Fu Lai, Asean Restorer, Maersk Recorder, Maersk Repeater, Maersk Responder, Maersk Reliance, Subaru, Kuroshio Maru, Cable Installer. Barges, Networker, Elbe, Chin Ann 3

Marine Surveyor: C&C Technologies

System Maintainer: China Telecommunications Corporation, Chunghwa Telecom Co., KDDI, KT Corporation, NTT Communications Corporation, PLDT, Singapore Telecommunications Ltd, TM Berhad

Batangas
Lantau Shantou
Tanshui
Chongming
Chikura Kitaibaraki
Pusan

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Da Nang

System Name: Asia Pacific Gateway [Planned]

Landing Points: Chongming (China), Da Nang (Vietnam), Kuantan (Malaysia), Tseung Kwan (Hong Kong), ShinMaruyama (Japan), Nanhui District (China), Busan (South Korea), Shima (Japan), Songkhla (Thailand), Toucheng (Taiwan), Tanah Merah (Singapore)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 313,000,000

Total Length (kms): 10,400

Design Capacity: 38.4 Tbps

Channel Capacity: 40 Gbps

Owners: China Telecom, China Unicom, Chunghwa Telecom International, Facebook, KT Coropration, NTT Communications, PLDT (Philippines), StarHub (Singapore), Telekom Malaysia, TIME dotCom, VNPT, FPT Corp.

System Supplier: NEC

System Installer: NTT Com, S.B. Submarine Systems, NEC

System Maintainer: China Telecommunications Corporation, Chunghwa Telecom Co.

Region: AustralAsia

News: http://subtelforum.com/articles/tag/apg/

Pusan Shima
Chongming Toucheng
Lantau
Songkhla
Maruyama

System Name: Aphrodite 2

Landing Points: Chania (Greece), Yeroskipos (Cyprus)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): 30,000,000

Total Length (kms): 868

Initial Capacity: 1.12 Gbps

Owners: AT&T, Belgacom, British Telecom, Cyprus Telecommunications Authority (62%), France Telecom, OTE, Sprint, Verizon

System Supplier: Alcatel Submarine Networks

Cableship: Skandi Hav

Region: EMEA

Chania

Yeroskipos

System Name: Australia Papua New Guinea 2

Landing Points: Port Moresby (Papua New Guinea), Sydney (Australia)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): 11,000,000

Total Length (kms): 3,400

Initial Capacity: 1.12 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Telikom PNG, Telstra (Australia)

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Re

System Maintainer: Telstra International

Region: AustralAsia

Point Moresby

Widemouth Bay Lannion

System Name: Apollo

Landing Points: Brookhaven (USA), Lannion (France), Manasquan (USA), Widemouth (UK)

RFS Year: 2003

Est. End of Service Date: 2028

Est. System Cost (US$): 350,000,000

Total Length (kms): 12,700

Initial Capacity: 10 Gbps

Design Capacity: 25 Tbps

Fiber Pairs: 4 Fiber Pairs

Channel Capacity: 100 Gbps

Owners: Alcatel, Apollo SCS Limited, C&W

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Batz, Ile de Brehat, Ile de Sein, Skandi Neptune

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2012, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Transatlantic News: http://subtelforum.com/articles/tag/ apollo/

Manasquan

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Asia Pacific Express Central [Planned]

Landing Points: Adelaide (Australia), Hobart (Australia), Melbourne (Australia), Perth (Australia)

RFS Year: 2017

Est. End of Service Date: 2041

Est. System Cost (US$): 150,000,000

Total Length (kms): 4,800

Design Capacity: 32 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 80

Channel Capacity: 100 Gbps

Owners: SubPartners

System Supplier: TE SubCom

Region: AustralAsia

News: http://subtelforum.com/articles/tag/apxcentral/

Hobart Melbourne

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Oahu

Hermosa Beach

System Name: Asia Pacific Express East [Planned]

Landing Points: Auckland (New Zealand), Hermosa Beach (United States), Oahu, Hawaii (United States), Sydney (Australia)

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 350,000,000

Total Length (kms): 12,700

Design Capacity: 40 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: SubPartners

System Supplier: TE SubCom

Region: Transpacific News: http://subtelforum.com/articles/?s=APXEast

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Asia Pacific Express West [Planned]

Landing Points: Jakarta (Indonesia), Christmas Island (Australia), Perth (Australia), Singapore

RFS Year: 2018

Est. End of Service Date: 2041

Est. System Cost (US$): 150,000,000

Total Length (kms): 4,600

Design Capacity: 20 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: SubPartners, Singtel, Telstra

System Supplier: TE SubCom

Region: AustralAsia

News: http://subtelforum.com/articles/?s=APXWest

System Name: Arcos-1

Landing Points: Bluefields (Nicuragua), Cancun (Mexico), Cartagena (Columbia), Cat Island (Bahamas), Crooked Island (Bahamas), Hollywood (USA), Ladyville (Belize), Maria Chiquita (Panama), Nassau (The Bahamas), Providenciales (Turks and Caicos Islands), Puerto Barrios (G

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 250,000,000

Total Length (kms): 8,700

Initial Capacity: 80 Gbps

Design Capacity: 1 Tbps

Owners: Alestra (Mexico), AT&T, Axtel (Mexico), BTC (Bahamas), BTL (Belize), CANTV (Venezuela), Codetel (Dominican Republic), Colombus Networks, Enitel (Nicaragua), Hondutel (Honduras), ICE (Costa Rica), Impsat (USA), Internexa (Colombia), Orbinet SA (Colombia),

System Supplier: Norddeutsche Seekabelwerke (Tyco Telecommunications, Partial)

Marine Surveyor: Fugro

System Maintainer: Colombus Networks USA Inc., United Telecommunications Services

Upgrader: Xtera Communications

Upgrade Year: 2008, 2016

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Americas

News: http://subtelforum.com/articles/?s=arcos

Riohacha Punto Fijo Willemstad
Tulum Cancun

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Australia-Singapore Cable [Planned]

Landing Points: Perth (Australia), Tanah Mera (Singapore), Anyer (Indonesia)

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 160,000,000

Total Length (kms): 4,600

Design Capacity: 36 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 120

Channel Capacity: 100 Gbps

Owners: Australia-Singapore Cable International Limited

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: AustralAsia

News: http://subtelforum.com/ articles/?s=australia-singapore+cable

System Name: Asia Submarine-cable Express

Landing Points: Japan, Philippines, Hong Kong, Malaysia, Singapore, Cambodia

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): 412,000,000

Total Length (kms): 7,200

Design Capacity: 15.36 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 128

Channel Capacity: 40 Gbps

Owners: NTT Communications (Japan), PLDT (Philippines), StarHub (Singapore), Telekom Malaysia

System Supplier: Fujitsu Limited, NEC Corporation

System Installer: S.B. Subarine Systems, NTT, NEC

System Maintainer: NTT Communications Corporation, PLDT, StarHub, TM Berhad

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ase/

System Name: America Samoa Hawaii

Landing Points: Keawaula (Hawaii), Pago Pago (American Samoa)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 100,000,000

Total Length (kms): 4,680

Initial Capacity: 1.2 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: ASH Cable Company

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Cableship: Ile de Ré

System Maintainer: Telecom New Zealand

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ash/

Keawaula

System Name: Athena

Landing Points: Koropi (Greece), Pentaskhinos (Cyprus)

RFS Year: 2011

Est. End of Service Date: 2036

Total Length (kms): 600

Owners: Cypress Telecommunications Authority, Telecom Italia Sparkle

Region: EMEA

Pentaskhinos

System Name: Atlantis-2

Landing Points: Conil (Spain), Dakar (Senegal), El Medano (Spain), Fortaleza (Brazil), Funchal (Portugal), Las Toninas (Argentina), Lisbon (Portugal), Praia (Cape Verde), Rio de Janeiro (Brazil)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 370,000,000

Total Length (kms): 13,100

Initial Capacity: 40 Gbps

Design Capacity: 160 Gbps

Fiber Pairs: 2 Fiber Pairs, Initial: 2 wavelengths, Design: 8 wavelengths

Channels: 2 to 8

Channel Capacity: 40 Gbps

Owners: Cabo Verde Telecom, Deutsche Telekom AG, Embratel, France Telecom, Marconi, Sonatel, Telecom Argentina, Telecom Italia, Telefonica, Telefonica de Argentina, Telintar, Verizon

System Supplier: Alcatel Submarine Networks, Pirelli, Fujitsu

System Installer: FCR

Cableship: Raymond Croze, Fresnel, Vercors, Teneo, Teliri, Maersk Defender

System Maintainer: PT Comunicações S.A., Sonatel, Telefonica de España S.A.U., Telefonica International Wholesale Services

Region: Transatlantic

Fortaleza
Rio de Janeiro
Las Toninas
Dakar
El Medano
Funchal
Conil
Lisbon
Praia

Asilah Marseille

System Name: Atlas Offshore

Landing Points: Asilah (Morocco), Marseille (France)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): 31,000,000

Total Length (kms): 1,634

Initial Capacity: 40 Gbps

Design Capacity: 320 Gbps

Owners: Maroc Telecom of Morocco

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: EMEA

Puerto Montt

System Name: Austral [Planned]

Landing Points: Puerto Montt (Chile), Punta Arenas (Chile)

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 100,000,000

Total Length (kms): 1,800

Owners: AUSTRAL University of Magellan, Magellan CPC

System Supplier: Huawei Marine Networks

System Installer: IT International Telecom Region: Americas

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Punta Arenas

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Australia West Express [Planned]

Landing Points: Perth, Australia; Djibouti

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 300,000,000

Total Length (kms): 10,100

Design Capacity: 20 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 100

Channel Capacity: 200 Gbps

Owners: GoTo Networks

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Indian Ocean Pan-East Asian News: http://subtelforum.com/ articles/?s=australia+west+express

Perth

BAHAMAS-2

System Name: Bahamas-2

Landing Points: Eight Mile Rock (Bahamas), Nassau (The Bahamas), Vero Beach (USA)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): 25,000,000

Total Length (kms): 478

Initial Capacity: 2.5 Gbps

Owners: AT&T, Balteco, Verizon

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Marine Surveyor: C&C Technologies

System Maintainer: AT&T, Bahamas Telecommunications Company

Region: Americas

Gedser

System Name: Baltica

Landing Points: Dueodde (Bornholm), Gedser (Denmark), Kolobrzeg (Poland), Ystad (Sweden)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): 16,000,000

Total Length (kms): 437

Initial Capacity: 5 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Polish Telecom, TDC, Telecom Finland, Telenor, Teliasonera

System Maintainer: Orange Polska S.A., TDC A/S, TeliaSonera International Carrier AB

Region: EMEA

Kolobrzeg

Barcelona

System Name: BAR-SAV

Landing Points: Barcelona (Spain), Savona (Italy)

RFS Year: 1996

Est. End of Service Date: 2021

Est. System Cost (US$): 39,000,000

Total Length (kms): 760

Initial Capacity: 5 Gbps

Owners: Telecom Italia, Telefonica

System Supplier: Alcatel Submarine Networks

System Maintainer: Telecom Italia Sparkle, Telefonica de España S.A.U.

Region: EMEA

Savona

Inverloch Stanley

System Name: Bass Strait 2

Landing Points: Inverloch (Australia), Stanley (Tasmania, Australia)

RFS Year: 2003

Est. End of Service Date: 2028

Est. System Cost (US$): 17,000,000

Total Length (kms): 240

Initial Capacity: 10 Gbps

Owners: Telstra (Australia)

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Batz

Region: AustralAsia

System Name: Bay of Bengal Gateway

Landing Points: Sri Lanka, Singapore, Oman, UAE

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): 30,000,000

Total Length (kms): 8,040

Initial Capacity: 6.4 Tbps

Design Capacity: 55 Tbps

Fiber Pairs: 3 Fiber Pairs

Channel Capacity: 100 Gbps

Owners: Bay of Bengal Consortium

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Cableship: Ile De Brehat

Marine Surveyor: EGS

Survey Boat: Northern Endeavour

System Maintainer: E-marine

Region: Indian Ocean Pan-East Asia

News: http://subtelforum.com/articles/tag/bbg/

BCS EAST

System Name: BCS East

Landing Points: Liepaja (Latvia), Sventoji (Lithuania)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): 15,000,000

Total Length (kms): 98

Initial Capacity: 2.5 Gbps

Owners: Teliasonera

Region: EMEA

Sventoji Liepaja

BCS EAST-WEST INTERLINK

Sandviken

System Name: BCS East-West Interlink

Landing Points: Sandviken (Sweden), Sventoji (Lithuania)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): 20,000,000

Total Length (kms): 218

Initial Capacity: 2.5 Gbps

Owners: Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

Region: EMEA

Sventoji

System Name: BCS North

Landing Points: Hango (Finland), Haraldsholm (Finland), Helsingfors (Finland), Kotka (Finland), Mariehamn (Finland), Stavsnas (Sweden)

RFS Year: 2003

Est. End of Service Date: 2028

Est. System Cost (US$): 30,000,000

Total Length (kms): 793

Initial Capacity: 10 Gbps

Owners: Rostelecom, Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

System Maintainer: TeliaSonera International Carrier AB

Region: EMEA

Stavsnas
Mariehamn Haraldsholm Hango Helsingfors
Kotka Logi

System Name: Batam-Dumai-Melaka

Landing Points: Batam (Indonesia), Dumai (Indonesia), Melaka (Malaysia)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 76,000,000

Total Length (kms): 400

Initial Capacity: 80 Gbps

Design Capacity: 2.56 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 64

Channel Capacity: 10 Gbps

Owners: PT Mora Telematika, PT XL Axiata, Telekom Malaysia

System Supplier: Huawei Marine Networks

System Installer: Huawei Marine Networks

System Maintainer: TM Berhad

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ bdm/

Melaka
Dumai
Batam

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Best Cable System [Planned]

Landing Points: Brunei; Sabah; Malaysia; Southern Philippines; Kalimantan, Indonesia; extension to Guam

RFS Year: 2017

Est. End of Service Date: 2041

Est. System Cost (US$): 150,000,000

Total Length (kms): 5,092

Owners: Best Cable Corp. Pte. Ltd.

Region: AustralAsia

Palau Yap
Brunei Indonesia

System Name: Bharat-Lanka

Landing Points: Dehiwala-Mount Lavinia (Sri Lanka), Tuticorin (India)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): 40,000,000

Total Length (kms): 338

Initial Capacity: 40 Gbps

Design Capacity: 960 Gbps

Channel Capacity: 40 Gbps

Owners: BSNL, Sri Lanka Telecom Limited (SLT), Sri Lanka

System Supplier: NEC

System Installer: NEC

System Maintainer: Sri Lanka Telecom

Region: Indian Ocean Pan-East Asian News: http://subtelforum.com/articles/tag/ bharat-lanka/

Tuticorin
Dehiwala-Mount Lavinia

System Name: Bahamas Internet Cable System

Landing Points: Boca Raton (USA), Crown Haven (Bahamas), Freeport (Bahamas), Marsh Harbour (Bahamas), Nassau (The Bahamas), Riding Point (Bahamas), Rock Sound (Bahamas), Sandy Point (Bahamas), Upper Bogue (Bahamas)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 31,000,000

Total Length (kms): 1,000

Initial Capacity: 10 Gbps

Design Capacity: 12 Tbps

Channel Capacity: 10 Gbps

Owners: Carribbean Crossings

Region: Americas

System Name: Balkans-Italy Network

Landing Points: Bari (Italy), Durres (Albania)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 21,700,000

Total Length (kms): 276

Initial Capacity: 40 Gbps

Channel Capacity: 40 Gbps

Owners: Unifi

Region: EMEA

Bari
Durres

BIOS / JONAH

System Name: BIOS/Jonah

Landing Points: Tel Aviv (Israel), Bari (Italy)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 15,000,000

Total Length (kms): 2,300

Owners: Bezeq International

System Supplier: Alcatel-Lucent Submarine Networks

Marine Surveyor: Elettra

Region: EMEA

Bari

System Name: Broadband Linking the American Samoa Territory

Landing Points: Fogagogo, Tu’tuila (American Samoa), Ofu Harbor, Ofu (American Samoa), Luma, Ta’u (American Samoa), Aunu’u Warf, Aunu’u (American Samoa)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): 11,000,000

Total Length (kms): 250

Owners: ASTCA (American Samoa)

System Supplier: IT International Telecom

System Installer: IT International Telecom

Marine Surveyor: IT International Telecom

Region: AustralAsia

Tutuila
Ofu
Luma
Aunu'u

System Name: Boracay-Palawan

Landing Points: Taytay (Philippines), San Jose (Philippines), Coron (Philippines); Boracay (Philippines), Caticlan (Philippines)

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): 20,000,000

Total Length (kms): 332

Design Capacity: 4.8 Tbps

Fiber Pairs: 12 Fiber Pairs

Channels: 40

Channel Capacity: 10 Gbps

Owners: Globe Telecom

System Supplier: Huawei Marine Networks Region: AustralAsia

System Name: Botnia

Landing Points: Umea (Sweden), Vaasa (Finland)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): 8,500,000

Total Length (kms): 77

Initial Capacity: 1.2 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Teliasonera

System Supplier: NKT

System Installer: AKN

Cableship: Pleijel

System Maintainer: TeliaSonera International Carrier AB Region: EMEA

Vaasa

System Name: Batam-Rengit Cable System

Landing Points: Batam (Indonesia), Sungai Rengit (Malaysia)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): 10,000,000

Total Length (kms): 63

Initial Capacity: 10 Gbps

Owners: Excelcom

Region: AustralAsia

Sungai Rengit
Batam

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Brazil-USA [Planned]

Landing Points: Rio de Janeiro, Brazil; Fortaleza, Brazil; San Juan, Puerto Rico; Virginia Beach, Virginia, USA

RFS Year: 2018

Est. End of Service Date: 2043

Total Length (kms): 1,1000

Owners: Telefonica

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Americas

Fortaleza
Rio de Janeiro
San Juan
Virginia Beach

System Name: Batam Singapore Cable System

Landing Points: Batam (Indonesia), Changi (Singapore)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 13,100,000

Total Length (kms): 73

Initial Capacity: 80 Gbps

Fiber Pairs: 3 Fiber Pairs

Owners: Telekom Indonesia

System Supplier: Ocean Cable Company

System Installer: Stena Offshore, ASEAN Cableship, NEC

Cableship: Northern Installer

Region: AustralAsia

Changi
Batam

System Name: Black Sea Fibre Optic Cable System

Landing Points: Novorossiysk (Russia), Odesa (Ukraine), Varna (Bulgaria)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 51,000,000

Total Length (kms): 933

Initial Capacity: 2.5 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Armentel, AT&T, BTC, Cypress Telecommunications Authority, DTAG, HT, KDDI, OTE, Rostelecom, Telecom Slovenia, Ukrtelecom

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications SSI

System Installer: Global Marine Systems Limited

Cableship: Maersk Fighter

System Maintainer: Cyprus Telecommunications Authority, Hellenic Telecommunications Organization S.A., OJSC “Rostelecom”

Region: EMEA

Pentaskhinos

System Name: Cadmos

Landing Points: Beirut (Lebanon), Pentaskhinos (Cyprus)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): 8,000,000

Total Length (kms): 262

Design Capacity: 622 Mbps

Fiber Pairs: 2 Fiber Pairs

Owners: Cyprus Telecommunications Authority (62%), Lebanese Ministry of Telecommunications (38%)

System Supplier: Tyco Telecommunications

System Maintainer: Cyprus Telecommunications Authority

Region: EMEA

Fortaleza Cameroon

System Name: Cameroon-Brazil [Planned]

Landing Points: Fortaleza, Brazil; Kribi, Cameroon

RFS Year: 2018

Est. End of Service Date: 2043

Est. System Cost (US$): 487,000,000

Total Length (kms): 5,900

Design Capacity: 32 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 80

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Channel Capacity: 100 Gbps

Owners: CamTel, China Unicom

System Supplier: Huawei Marine

System Installer: Global Marine

Region: Transatlantic News: http://subtelforum.com/ articles/?s=cameroon-brazil

System Name: Canalink

Landing Points: Cadiz (Spain), Tenerife (Spain)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 157,000,000

Total Length (kms): 2,000

Design Capacity: 5.12 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 128

Channel Capacity: 10 Gbps

Owners: Isalink, IT3

System Supplier: Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro, Elettra

Region: EMEA

News: http://subtelforum.com/articles/tag/ canalink/

Cadiz

Pennant

Point

Vestmannaeyjar

Tjөrnuvik

System Name: CanTaT-3

Landing Points: Blaabjerg (Denmark), Pennant Point (Canada), Redcar (United Kingdom), Tjørnuvík (Faroe Islands), Vestmannaeyjar (Iceland), Westerland (Germany)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): 385000000

Total Length (kms): 6450

Initial Capacity: 7.5 Gbps

Owners: Tata Communications

System Supplier: Alcatel Submarine Networks

System Installer: BT Marine, TeleDanmark, Orange Marine Region: Transatlantic

CAUCASUS CABLE SYSTEM

System Name: Caucasus Cable System

Landing Points: Poti (Georgia), Varna (Bulgaria)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): 76,000,000

Total Length (kms): 1,187

Design Capacity: 9 Tbps

Fiber Pairs: 2 Fiber Pairs

Owners: Caucasus Online

System Supplier: Tyco Telecommunications

Upgrader: TE SubCom

Upgrade Year: 2016

Upgraded Capacity: 100 Gbps

Region: EMEA

News: http://subtelforum.com/articles/tag/ caucasus-cable-system/

Charlestown

Bermuda

System Name: Challenger Bermuda-1

Landing Points: Bermuda (Bermuda), Charlestown, Rhode Island (United States)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 50,000,000

Total Length (kms): 1,448

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: Cable Company Ltd, Verizon

System Supplier: Alcatel-Lucent Submarine Networks

System Maintainer: Cable Co Ltd, Verizon Ltd

Region: Americas

System Name: Caribbean-Bermuda US

Landing Points: Manasquan (USA), Tortola (British Virgin Islands)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $10,000,000

Total Length (kms): 1,609

Owners: LIME

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI, IT

International Telecom

Upgrader: Xtera Communications

Upgrade Year: 2016

Upgraded Capacity: 100 Gbps

Region: Americas

News: http://subtelforum.com/articles/?s=cbus

Tortola
Manasquan

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Ceiba-2 [Planned]

Landing Points: Malabo, Equatorial Guinea; Bata, Equatorial Guinea; branching unit to Kribi, Cameroon

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 15,000,000

Total Length (kms): 290

Design Capacity: 8 Tbps

Owners: Republic of Equatorial Guinea

System Supplier: Huawei Marine Region: EMEA

Malabo

Bata Kribi

System Name: CeltixConnect

Landing Points: Dublin (Ireland), Holyhead (UK)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 22,000,000

Total Length (kms): 131

Initial Capacity: 960 Gbps

Fiber Pairs: 72 Fiber Pairs

Owners: Sea Fibre Networks

System Supplier: Alcatel Submarine Networks

System Installer: Global Marine Systems Limited

Region: EMEA

News: http://subtelforum.com/articles/tag/ celtixconnect/

System Name: Colombia-Florida Subsea Fiber

Landing Points: Boca Raton (USA), Cartagena (Columbia), Morant Point (Jamaica)

RFS Year: 2008

Est. End of Service Date: 2033

Total Length (kms): 2,439

Initial Capacity: 110 Gbps

Design Capacity: 2 Tbps

Fiber Pairs: 2.5 Tbps per Fiber Pair

Owners: Columbus Networks

System Supplier: Tyco Telecommunications

System Maintainer: Colombus Networks USA, Inc.

Upgrader: TE SubCom

Upgrade Year: 2011

Upgraded Capacity: 40 Gbps, 2.5 Tbps per fiber pair

Region: Americas

News: http://subtelforum.com/articles/?s=cfx-1

Boca Raton

Morant Point

Cartagena

Bandon

San Luis Obispo Shantou

Tanguisson

System Name: China-US

Landing Points: Bandon (USA), Chikura (Japan), Chongming (China), Fangshan (Taiwan), Okinawa Prefecture (Japan), Pusan (South Korea), Grover Beach (USA), Shantou (China), Tanguisson (Guam)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 1100,000,000

Total Length (kms): 30,444

Initial Capacity: 80 Gbps

Fiber Pairs: 4 Fiber Pairs

Channels: 8

Channel Capacity: 2.5 Gbps

Owners: China-US Consortium (KDD (Japan), NTT Worldwide Network (Japan), AT&T (USA), MCI Communications (USA), Sprint (USA), Teleglobe USA (USA), SBC Communications (USA), China Telecom (China), HongKong Telecom (Hong Kong), Chunghwa Telecom (Taiwan), Korea Telec

System Supplier: Alcatel Submarine Networks, Fujitsu, Ocean Cable Co, Tyco Telecommunications

Cableship: Flexservice III, Kuroshio Maru, Cable Innovator

Marine Surveyor: C&C Technologies

System Maintainer: AT&T, China Telecommunications Corporation, Chunghwa Telecom Co., KDDI, KT Corporation, NTT Communications Corporation

Region: Transpacific

System Name: Cyprus-Israel Optical System

Landing Points: Ayia Napa (Cyprus), Nahariya (Israel)

RFS Year: 1994

Est. End of Service Date: 2018

Est. System Cost (US$): 16,000,000

Total Length (kms): 262

Design Capacity: 622 Mbps

Fiber Pairs: 1 Fiber Pair

Owners: Bezeq, Cypress Telecommunications Authority

System Maintainer: Cyprus Telecommunications Authority

Region: EMEA

Nahariya
Ayia Napa
Nahariya

Half-Moon Bay

Montego Bay

System Name: Cayman Jamaica Fibre System

Landing Points: Half-Moon Bay (Cayman Islands), Montego Bay (Jamaica)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): 6,500,000

Total Length (kms): 870

Initial Capacity: 2.5 Gbps

Owners: LIME

Region: Americas

Rostock-Ribnitz

System Name: C-Lion1

Landing Points: Helsinki, Finland; Rostock-Ribnitz, Germany

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 74,000,000

Total Length (kms): 1,172

Design Capacity: 144 Tbps

Fiber Pairs: 8 Fiber Pairs

Channel Capacity: 300 Gbps

Owners: Cinia Group

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro

Region: EMEA

News: http://subtelforum.com/articles/tag/clion1/

Palermo

West Palm

Beach

Cancun

Magens Bay

Funchal

Sardinia

System Name: Colombus II

Landing Points: Cancun (Mexico), Funchal (Portugal), Magens Bay (Virgin Islands), Palermo (Italy), Sardinia (Gran Canaria), West Palm Beach (USA)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): 600,000,000

Total Length (kms): 12,165

Initial Capacity: 560 Mbps

Design Capacity: 2.5 Gbps

Owners: Columbus II Consortium

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications SSI, Pirelli

System Maintainer: AT&T, Telecom Italia Sparkle

Upgrader: Xtera Communications

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Transatlantic News: http://subtelforum.com/ articles/?s=columbus+II

Ponta Delgada Lisbon Conil

Hollywood

System Name: Colombus III

Landing Points: Miami, Florida (USA); Ponta Delgada, Azores Islands (Portugal); Lisbon, Portugal; Conil, Spain; Mazara del Vallo, Sicily (Italy)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): 236,000,000

Total Length (kms): 9,833

Initial Capacity: 40 Gbps

Design Capacity: 160 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Columbus III Consortium

System Supplier: Alcatel Submarine Networks, Pirelli, Tyco Telecommunications

Cableship: Vercors, Skandi Hav

System Maintainer: AT&T, PT Comunicações S.A., Telecom Italia Sparkle, Telefonica de España S.A.U.

Upgrader: Xtera Communications

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Transatlantic News: http://subtelforum.com/ articles/?s=columbus+III

Mazara

System Name: Concerto-1

Landing Points: Bruges (Belguim), Thorpeness (United Kingdom), Zandvoort (Netherlands)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): 25,000,000

Total Length (kms): 574

Initial Capacity: 2.5 Gbps

Fiber Pairs: 96 Fiber Pairs

Owners: Flute

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Region: EMEA

Bruges Zandvoort

System Name: Corfu-Bar

Landing Points: Bar (Montenegro), Corfu (Greece)

RFS Year: 1998

Est. End of Service Date: 2023

Est. System Cost (US$): 19,000,000

Total Length (kms): 320

Initial Capacity: 622 Mbps

Fiber Pairs: 3 Fiber Pairs

Owners: Crngorski Telecom, OTE

System Maintainer: Hellenic Telecommunications Organization S.A.

Region: EMEA

Corfu

DANICA NORTH

Barseback

System Name: Danica North

Landing Points: Barseback (Sweden), Tuborg (Denmark)

RFS Year: 1998

Est. End of Service Date: 2023

Est. System Cost (US$): 10,000,000

Total Length (kms): 25

Initial Capacity: 10 Gbps

Fiber Pairs: 96 Fiber Pairs

Owners: Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

System Maintainer: TeliaSonera International Carrier AB

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: EMEA

Tuborg

DANICA SOUTH

System Name: Danica South

Landing Points: Bjarred (Sweden), Copenhagen (Denmark)

RFS Year: 1998

Est. End of Service Date: 2023

Total Length (kms): 20

Initial Capacity: 10 Gbps

Fiber Pairs: 24 Fiber Pairs

Owners: Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

System Maintainer: TeliaSonera International Carrier AB

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: EMEA

Copenhagen
Bjarred

Landeyjarsandur

System Name: Danice

Landing Points: Blaabjerg (Denmark), Landeyjarsandur (Iceland)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): 76,000,000

Total Length (kms): 2,291

Initial Capacity: 1000 Gbps

Design Capacity: 5.1 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Farice Ltd.

System Supplier: Tyco Telecommunications

System Maintainer: Farice ehf

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: EMEA

News: http://subtelforum.com/ articles/?s=Danice

Blaabjerg

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Djibouti-Africa Regional Express [Planned]

Landing Points: Dar es Salaam, Mombasa, Mogadishu, Bossaso, Berbera, Mocha Djibouti

RFS Year: 2018

Est. End of Service Date: 2043

Total Length (kms): 5,500

Design Capacity: 60 Tbps

Channel Capacity: 100 Gbps

Owners: Djibouti Telecom, Africa Marine Express, TeleYemen, Telesom Company, Hormuud Telecom Somalia Inc., Golis Telecom, Somtel Group

System Supplier: TE SubCom

System Installer: TE SubCom

System Maintainer: TE SubCom

Region: EMEA

Djibouti
Mogadishu
Mombasa
Dar es Salaam
Bossaso
Berbera

Colombo

Hulhumalé

System Name: Dhiraagu Domestic Submarine Cable Network

Landing Points: Colombo (Sri Lanka), Hulhumale (Maldives)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): 27,000,000

Total Length (kms): 1,000

Owners: Dhiraagu

System Supplier: NEC

System Installer: NEC

Region: Indian Ocean Pan-East Asian News: http://subtelforum.com/articles/tag/ ddscn/

DENMARK-NORWAY 5

System Name: Denmark-Norway 5

Landing Points: Ardendal (Norway), Hjrorring (Denmark)

RFS Year: 1992

Est. End of Service Date: 2017

Est. System Cost (US$): 9,560,000

Total Length (kms): 123

Initial Capacity: 2 Gbps

Owners: Norway PTT, TDC

System Maintainer: TDC A/S

Region: EMEA

Ardendal

Hjorring

System Name: Denmark-Norway 6

Landing Points: Kristiansand (Norway), Thisted (Denmark)

RFS Year: 1992

Est. End of Service Date: 2017

Est. System Cost (US$): 8,950,000

Total Length (kms): 124

Initial Capacity: 1.5 Gbps

Owners: Norway PTT, TDC

System Maintainer: TDC A/S

Region: EMEA

Kristiansand

DENMARK-POLAND 2

System Name: Denmark-Poland 2

Landing Points: Gedebak Odde (Denmark), Mielno (Poland)

RFS Year: 1991

Est. End of Service Date: 2016

Est. System Cost (US$): 4,500,000

Total Length (kms): 110

Initial Capacity: 2.5 Gbps

Owners: Polish Telecom, TDC

System Maintainer: Orange Polska S.A., TDC A/S

Region: EMEA

System Name: Didon

Landing Points: Kélibia (Tunisia), Mazara del Vallo, Sicily (Italy)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): 15,000,000

Total Length (kms): 173

Design Capacity: 18 Tbps

Channel Capacity: 100 Gbps

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

System Maintainer: France Telecom

Region: EMEA

News: http://subtelforum.com/articles/tag/ didon/

Kélibia
Mazara del Vallo

System Name: Dumai-Melaka Cable System

Landing Points: Dumai (Indonesia), Melaka (Malaysia)

RFS Year: 2005

Est. End of Service Date: 2030

Est. System Cost (US$): 15,000,000

Total Length (kms): 150

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: PT Telekom, Telekom Malaysia

System Supplier: NEC

System Installer: ASEAN Cableship

System Maintainer: TM Berhad

Region: AustralAsia

Dumai
Melaka

System Name: EAC-C2C

Landing Points: Capepisa (Philippines), Changi (Singapore), Chikura (Japan), Chung Hom Kok (Hong Kong), Fangshan (Taiwan), Nanhui District (China), Nasugbu (Philippines), Pali (Taiwan), Pusan (South Korea), Shima (Japan), Singapore (Singapore), Taean (South Korea), Tansh

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 850,000,000

Total Length (kms): 35,429

Design Capacity: 30 Tbps

Owners: PACNET

System Supplier: NEC

Marine Surveyor: C&C Technologies

System Maintainer: Pacnet Global (Singapore) Pte.

Upgrader: Infinera

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: AustralAsia

News: http://subtelforum.com/articles/?s=EACC2C

Changi
Vung Tau
Nasugbu
Fangshan
Tanshui Pali Nanhui
Taean
Pusan
Ajigaura
Chikura Shima

System Name: Eastern Africa Submarine Cable System

Landing Points: Dar es Salaam (Tanzania), Djibouti (Republic of Djibouti), Maputo (Mozambique), Mogadishu (Somalia), Mombasa (Kenya), Moroni (Comoros), Mtunzini (South Africa), Port Sudan (Sudan), Toliary (Madagascar)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): 247,000,000

Total Length (kms): 9,900

Initial Capacity: 30 Gbps

Design Capacity: 10 Tbps

Fiber Pairs: 2 Fiber Pairs

Channel Capacity: 100 Gbps

Owners: Bharti Airtel, Botswana

Telecommunications Corporation, British Telecom, Comores Telecom, Etisalat, France Telecom, Mauritius Telecom, MTN Group, Neotel, Saudi Telecom Company (STC), Saudi Arabia, SPV2, Sudan Telecom Limited, Sudatel, Tanzania Telecommuni

System Supplier: Alcatel-Lucent Submarine Networks

System Maintainer: Telkom SA Limited

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: EMEA

News: http://subtelforum.com/articles/tag/ eassy/

Djibouti
Port Sudan Mogadishu
Mombasa
Dar es Salaam
Moroni
Toliary
Maputo
Mtunzini

System Name: East-West

Landing Points: Morant Point (Jamaica), Santo Domingo (Dominican Republic), Tortola (British Virgin Islands)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 35,000,000

Total Length (kms): 1,700

Initial Capacity: 120 Gbps

Design Capacity: 720 Gbps

System Installer: Orange Magine

Upgrader: Xtera Communications

Upgrade Year: 2016

Upgraded Capacity: 100 Gbps

Region: Americas News: http://subtelforum.com/articles/tag/eastwest-cable/

Morant Point
Santo Domingo
Tortola

System Name: East Caribbean Fiber System

Landing Points: Anguilla (Anguilla), Baliff (Guadeloupe), Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Canefield (Dominica), Dickenson Bay (Antigua), Kingstown (St. Vincent), Martinique (Martinique), Montserrat (Montserrat), Port Salines (Grenada), St. Lucia (S

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): 56,000,000

Total Length (kms): 1,875

Initial Capacity: 2.5 Gbps

Owners: AT&T, BET (Barbados), C&W, France Telecom, TSTT

System Supplier: Alcatel Submarine Networks

System Installer: C&W (Marine)

Cableship: Mercury

System Maintainer: Orange, Telecom Services Trinidad & Tobago

Upgrader: Xtera Communications

Upgrade Year: 2009, 2013, 2016

Upgraded Capacity: 10 Gbps, 40 Gbps, 100 Gbps

Region: Americas News: http://subtelforum.com/articles/?s=ECFS

System Name: Europe India Gateway

Landing Points: Abu Talat (Egypt), Bude (United Kingdom), Djibouti (Republic of Djibouti), Fujairah (United Arab Emirates), Gibraltar (Gibraltar), Jeddah (Saudi Arabia), Monaco (Monaco), Mumbai (India), Muscat (Oman), Zafarana (Egypt), Sesimbra (Portugal), Tripoli (Libya

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 700,000,000

Total Length (kms): 15,000

Initial Capacity: 3.84 Tbps

Channel Capacity: 100 Gbps

Owners: AT&T, Bharti Airtel, British Telecom, BSNL, C&W, Djibouti Telecom, Du, Gibtelecom, Libyan Post, Telecom, and Information Technology Company, MTN Group, Omantel, PT Comunicações, Saudi Telecom Company (STC), Telekom SA, Verizon, Telecom Egypt

System Supplier: Tyco Telecommunications, Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro, UTEC, GEMS

System Maintainer: Oman Telecommunications Company, Telecom Egypt, Verizon Ltd., Vodafone Limited

Upgrader: Ciena

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: EMEA

News: http://subtelforum.com/articles/tag/eig/

Fujairah
Muscat
Mumbai
Djibouti
Jeddah
Zafarana
Abu

Sydney

Keawaula

System Name: Endeavour

Landing Points: Keawaula (Hawaii), Sydney (Australia)

RFS Year: 2008

Est. End of Service Date: 2033

Total Length (kms): 9,125

Initial Capacity: 80 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Telstra (Australia)

System Maintainer: Telstra International

Upgrader: Infinera

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: AustralAsia

News: http://subtelforum.com/ articles/?s=endeavour

System Name: Estepona-Tetouan

Landing Points: Estepona (Spain), Tetouan (Morocco)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): 10,000,000

Total Length (kms): 113

Initial Capacity: 3.7 Gbps

Owners: Telefonica

System Supplier: STC Submarine Systems

System Installer: FCR

Cableship: Vercors

System Maintainer: Telefonica de España S.A.U.

Region: EMEA

The Power of Submarine Information Transmission

There’s a new power under ocean uniting the world in a whole new way. With unparalleled development expertise and outstanding technology, Huawei Marine is revolutionizing trans-ocean communications with a new generation of repeaters and highly reliable submarine cable systems that offer greater transmission capacity, longer transmission distances and faster response to customer needs. Huawei Marine: connecting the world one ocean at a time.

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Eulalink [Planned]

Landing Points: Fortaleza, Brazil; São Paulo, Brazil; Sines, Portugal

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 250,000,000

Total Length (kms): 5,875

Design Capacity: 30 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Telebras, Islalink

Region: Transatlantic News: http://subtelforum.com/ articles/?s=eulalink

Fortaleza
Lisbon
Madeira
Gran Canaria
Praia

System Name: Europa

Landing Points: Pentaskhinos (Cyprus), Tripoli (Lebanon)

RFS Year: 2013

Est. End of Service Date: 2038

Fiber Pairs: 8 Fiber Pairs

Owners: CYTA, Lebanese ministry of Telecommunications

Region: EMEA

News: http://subtelforum.com/articles/tag/ europa/

Pentaskhinos

Porthcurno

Northport Island Park

System Name: FLAG Atlantic 1 North/South

Landing Points: Island Park (USA), Northport (USA), Plerin (France), Porthcurno (United Kingdom)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 900,000,000

Total Length (kms): 12,820

Initial Capacity: 4.68 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: Global Cloud Xchange

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Marine Surveyor: Svitzer, SAIC

Survey Boat: Vessel of Opportunity

System Maintainer: Global Cloud Xchange

Upgrader: Infinera, Ciena

Upgrade Year: 2010, 2011, 2013

Upgraded Capacity: 10 Gbps, 100 Gbps

Region: Transatlantic

News: http://subtelforum.com/articles/?s=fa-1

Plerin

System Name: Falcon

Landing Points: Al Ghaydah (Yemen), Al Hudaydah (Yemen), Al-Khobar (Saudi Arabia), Al Seeb (Oman), Aqaba (Jordan), Bandar-E Abbas (Iran), Chabahar (Iran), Colombo (Sri Lanka), Dubai (UAE), Hulhumalé (India), Jeddah (Saudi Arabia), Kuwait City (Kuwait), Manama (Bahrain),

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): 900,000,000

Total Length (kms): 12,181

Initial Capacity: 90 Gbps

Design Capacity: 2.56 Tbps

Fiber Pairs: 8 Fiber Pairs

Owners: Global Cloud Xchange

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

System Maintainer: E-marine PJSC, Oman Telecommunications Company, Reliance Globalcom Ltd

Upgrader: Infinera

Region: Indian Ocean Pan-East Asian News: http://subtelforum.com/ articles/?s=Falcon

Hulhumalé Colombo
Trivandrum

System Name: Far East

Landing Points: Mys Levashova (Russia), Okha (Russia), Magadan (Russia)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): 50,000,000

Total Length (kms): 1,844

Design Capacity: 1.6 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 8

Channel Capacity: 100 Gbps

Owners: Rostelcom

System Supplier: Huawei Marine Networks

System Installer: Global Marine Systems Limited

Cableship: Cable Innovator

Region: AustralAsia

News: http://subtelforum.com/articles/tag/fareast/

Okha
Magadan
Mys Levashova

System Name: Farice-1

Landing Points: Dunnet Bay (Scotland), Funningsfjør_ur (Faroe Islands), Sey_isfjör_ur (Iceland)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): 25,000,000

Total Length (kms): 1,395

Initial Capacity: 20 Gbps

Owners: Farice Ltd., Iceland Telecom Ltd.

System Supplier: Pirelli

Cableship: Pertinacia

Marine Surveyor: Fugro

System Maintainer: Farice ehf

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: EMEA

News: http://subtelforum.com/articles/tag/ farice-1/

Dunnet Bay

Aldeburgh

System Name: Farland

Landing Points: Aldeburgh (United Kingdom), Domburg (Netherlands)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): 10,000,000

Total Length (kms): 149

Initial Capacity: 18 Gbps

Owners: British Telecom

System Supplier: Tyco Telecommunications

System Maintainer: British Telecommunications PLC

Region: EMEA

Domburg

Shima Oregon Chikura

China

System Name: Faster

Landing Points: Bandon, Oregon (USA); Chikura, Japan; Shima, Japan; Tanshui, Taiwan

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 350,000,000

Total Length (kms): 9,000

Initial Capacity: 28 Tbps

Design Capacity: 60 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Google, China Mobile International, China Telecom Global, Global Transit, KDDI and Singtel

System Supplier: NEC

System Installer: Orange Marine

Cableship: René Descartes

Region: Transpacific News: http://subtelforum.com/articles/tag/ faster/

System Name: Fehmarn Belt

Landing Points: Puttgarden (Germany), Rödbyhavn (Denmark)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 10,000,000

Total Length (kms): 20

Initial Capacity: 2.5 Gbps

Owners: Teliasonera

System Supplier: Ericsson

System Installer: Nexans

Cableship: Pleijel

System Maintainer: TeliaSonera International Carrier AB Region: EMEA

Rödbyhavn

Puttgarden

Rios

System Name: FibraLink

Landing Points: Kingstown (St. Vincent), Montego Bay (Jamaica), Ocho Rios (Jamaica), Puerto Plata (Dominican Republic)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): 30,000,000

Total Length (kms): 2,438

Initial Capacity: 40 Gbps

Design Capacity: 640 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Columbus Networks

System Supplier: Alcatel

System Installer: International Telecom

Cableship: IT Intrepid

Region: Americas News: http://subtelforum.com/articles/tag/ fibralink/

Porthcurno

System Name: FLAG Europe-Asia

Landing Points: Alexandria (Egypt), Aqaba (Jordan), Ben Pak Para (Thailand), Estepona (Spain), Fujairah (United Arab Emirates), Hong Kong (China), Jeddah (Saudi Arabia), Keoje (South Korea), Miura (Japan), Mumbai (India), Nanhui District (China), Ninomiya (Japan), Palerm

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): 720,000,000

Total Length (kms): 27,433

Initial Capacity: 20 Gbps

Design Capacity: 80 Gbps

Owners: Global Cloud Xchange

System Maintainer: China Telecommunications Corporation, E-marine PJSC, Reliance Globalcom Ltd

Upgrader: Ciena

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Indian Ocean Pan-East Asian, EMEA

News: http://subtelforum.com/articles/?s=FLAG

Penang
Songkhla
Hong Kong
Nanhui
Keoje
Ninomiya
Ban
Pak
Para
Miura
Satun
Port

System Name: Flores-Corvo

Landing Points: Flores (Azores), Corvo (Azores), Graciosa (Azores), Faial (Azores)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): 20,000,000

Total Length (kms): 685

Design Capacity: 0.96 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 16

Channel Capacity: 10 Gbps

Owners: Viatel (Azores)

System Supplier: Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks

Region: EMEA

News: http://subtelforum.com/articles/tag/ flores-corvo/

Graciosa Flores Corvo

Faial

System Name: Fiber Optic Gulf

Landing Points: Doha (Qatar), Dubai (UAE), Kuwait City (Kuwait), Manama (Bahrain)

RFS Year: 1998

Est. End of Service Date: 2023

Est. System Cost (US$): 80,000,000

Total Length (kms): 1,286

Initial Capacity: 20 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Bahrain Telephone Co., Kuwait Ministry of Communications, Qatar Telecommunication Company, UAE Telecommunications Company

System Supplier: Fujitsu

System Maintainer: E-marine PJSC

Region: EMEA

Manama
Doha
Dubai

System Name: Gulf Bridge International Cable System

Landing Points: Alexandria (Egypt), Al Hidd (Bahrain), Al-Khobar (Saudi Arabia), Al Seeb (Oman), Bushehr (Iran), Doha (Qatar), Dubai (United Arab Emirates), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Kuwait City (Kuwait), Mazara (Italy), Mumbai (India), Zafa

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 445,000,000

Total Length (kms): 4,719

Design Capacity: 2.5 Tbps

Fiber Pairs: 4 Fiber Pairs express route, 2 Fiber Pairs other landings

Channels: 128

Channel Capacity: 10 Gbps

Owners: Gulf Bridge International

System Supplier: TE SubCom

System Installer: e-Marine

System Maintainer: Gulf Bridge International Inc., Oman Telecommunications Company

Upgrader: Xtera Communications

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: EMEA

News: http://subtelforum.com/articles/tag/gbi/

System Name: Global Caribbean Network

Landing Points: Baie-Mahault (Guadeloupe), Baliff (Guadeloupe), Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Canefield (Dominica), Dickenson Bay (Antigua), Galisbay (St Martin), Hams Bluff (Virgin Islands), Kingstown (St. Vincent), Le Lamentin (Martinique), Mac

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): 17,520,000

Total Length (kms): 1,926

Initial Capacity: 1.2 Tbps

Owners: Global Carribean Network

System Supplier: Alcatel Submarine Networks

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: Americas

News: http://subtelforum.com/articles/tag/gcn/

Hams Bluff
Galisbay Gustavia
Basseterre
Dickenson Bay
Baie-Mahault
Canefield
Le Lamentin
Port Castries
Kingstown Bridgetown
Port Salines
Macqueripe
Baliff

System Name: Gemini Bermuda

Landing Points: Manasquan, NJ (USA), Bermuda

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): 40,000,000

Total Length (kms): 1,500

Owners: C&W, Verizon

System Installer: Orange Marine

System Maintainer: Verizon

Upgrader: Xtera

Upgrade Year: 2016

Upgraded Capacity: 100 Gbps

Region: Americas News: http://subtelforum.com/articles/tag/ gemini-bermuda/

Bermuda

System Name: Georgia-Russia

Landing Points: Novorossiysk (Russia), Poti (Georgia), Sochi (Russia)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 20,000,000

Total Length (kms): 280

Initial Capacity: 2.5 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: DanTelco, FOPTNET, Rostelecom

System Maintainer: OJSC “Rostelecom”

Region: EMEA

Novorossiysk
Sochi
Poti

System Name: Globacom-1

Landing Points: Accra (Ghana), Bude (United Kingdom), Casablanca (Morocco), Dakar (Senegal), Lagos (Nigeria), Nouakchott (Mauritania), Sesimbra (Portugal), Vigo (Spain)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): 260,000,000

Total Length (kms): 8,717

Initial Capacity: 640 Gbps

Design Capacity: 2.5 Tbps

Fiber Pairs: 2 Fiber Pairs

Owners: Globacom Ltd.

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks, IT

International Telecom

Cableship: Ile de Batz, IT Intrepid

Marine Surveyor: Alcatel Submarine Networks

System Maintainer: IT International Telecom Canada Region: EMEA

News: http://subtelforum.com/articles/tag/glo-1/

Vigo
Sesimbra
Casablanca
Dakar
Accra
Lagos
Nouakchott

System Name: GlobeNet

Landing Points: Bermuda (Bermuda), Boca Raton (USA), Fortaleza (Brazil), Maiquetia (Venezuela), Rio de Janeiro (Brazil), Tuckerton (USA)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 610,000,000

Total Length (kms): 22,690

Initial Capacity: 40 Gbps

Design Capacity: 1.28 Tbps

Owners: Globenet

System Supplier: TE SubCom

System Maintainer: IT International Telecom Canada

Upgrader: Xtera Communications

Upgrade Year: 2010

Upgraded Capacity: 100 Gbps

Region: Americas

News: http://subtelforum.com/articles/tag/ globenet/

Boca Raton
Tuckerton
Bermuda
Punta Gorda
Fortaleza
Rio de Janeiro

System Name: GO-1

Landing Points: Cantina (Sicily), Mazara (Italy), St George’s Bay (Malta), St Paul’s Bay (Malta)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): 10,000,000

Total Length (kms): 290

Initial Capacity: 20 Gbps

Owners: GO

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Elettra

Cableship: Teliri

Region: EMEA

System Name: GOKI

Landing Points: Incheon (Korea), Kita-Kyushu (Japan), Okinawa Prefecture (Japan), Tumon (Guam)

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): 120,000,000

Total Length (kms): 4,200

Design Capacity: 80 Gbps

Owners: AT&T

System Supplier: Xtera Communications

System Installer: Kokusai Cable Ship

Region: AustralAsia

Tumon
Okinawa
Kita-Kyushu
Incheon

System Name: Gondwana-1

Landing Points: Lifou (New Caledonia), Mouli Island (New Caledonia), Noum’ea (New Caledonia), Poindimie (New Caledonia), Sydney (Australia)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): 57,500,000

Total Length (kms): 2,152

Initial Capacity: 640 Gbps

Owners: Post and Telecommunications Office of New Caledonia

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Re

System Maintainer: OPT - Nouvelle Caledonie

Region: AustralAsia

Noum’ea
Lifou Mouli Island Poindimie

GREENLAND CONNECT

System Name: Greenland Connect

Landing Points: Landeyjarsandur (Iceland), Milton (Canada), Nuuk (Greenland), Qaqortoq (Greenland)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 126,000,000

Total Length (kms): 4,733

Initial Capacity: 20 Gbps

Design Capacity: 960 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Tele Greenland

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Cableship: Maersk Responder, Blue Castor, Ile de Sein

Marine Surveyor: Elettra

System Maintainer: TELE Greenland A/S

Region: Americas

South Florida

System Name: Guantánamo Bay Cable

Landing Points: Guantánamo Bay (Cuba), Florida (USA)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 31,000,000

Total Length (kms): 1,500

Channel Capacity: 100 Gbps

Owners: US Government

System Supplier: Xtera Communications, NSW

System Installer: IT International Telecom

Marine Surveyor: US Government

Region: Americas

News: http://subtelforum.com/articles/tag/ guantanamo/

Guantánamo Bay

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Guantánamo Bay 2 [Planned]

Landing Points: Puerto Rico; Guantánamo Bay, Cuba

RFS Year: 2018

Est. End of Service Date: 2043

Total Length (kms): 1,200

Owners: US Government

System Supplier: Xtera Communications

System Installer: Xtera Communications

Region: Americas

Guantánamo Bay
Puerto Rico

System Name: Greece to Western Europe Network

Landing Points: Bari (Italy), Corfu (Greece)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): 20,000,000

Total Length (kms): 647

Fiber Pairs: 4 Fiber Pairs

Owners: OTE

Region: EMEA

News: http://subtelforum.com/articles/tag/ gwen/

Bari

System Name: Hannibal

Landing Points: Kelibia (Tunisia), Mazara (Italy)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 10,000,000

Total Length (kms): 180

Design Capacity: 9.6 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 80

Channel Capacity: 40 Gbps

Owners: Tunisie Telecom (Tunisia)

System Supplier: Huawei Marine Networks

System Installer: Global Marine Systems Limited, Huawei Marine Networks

Cableship: Sovereign

Marine Surveyor: UTEC

Region: EMEA

News: http://subtelforum.com/articles/tag/ hannibal/

Mazara

System Name: Hantru-1

Landing Points: Ebeye (Kwajalein), Majuro (Marshall Islands), Pohnpei (Micronesia), Reagan Test Site (Kwajalein), Tumon (Guam)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): 130,000,000

Total Length (kms): 2,908

Owners: Hannon Armstrong

System Supplier: TE SubCom

System Installer: TE SubCom

System Maintainer: Truestone LLC

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ hantru-1/

Pohnpei
Ebeye
Majuro
Tumon

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Hawaiki [Planned]

Landing Points: Oregon (USA), Sydney (Australia), Hawaii (USA), Norfolk Island, New Caledonia, Fiji, Samoa, American Samoa, Whangarei (New Zealand)

RFS Year: 2018

Est. End of Service Date: 2043

Est. System Cost (US$): 300,000,000

Total Length (kms): 14,000

Initial Capacity: 12.8 Tbps

Design Capacity: 30 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: Hawaiki Submarine Cable

System Supplier: TE SubCom

System Installer: TE SubCom

Region: AustralAsia, Transpacific News: http://subtelforum.com/articles/tag/ hawaiki/

Marseille

System Name: Hawk Cable System

Landing Points: Alexandria (Egypt), Anatoliko (Cyprus), Marseille (France)

RFS Year: 2011

Est. End of Service Date: 2035

Est. System Cost (US$): 250,000,000

Total Length (kms): 3,181

Initial Capacity: 2.72 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 68

Channel Capacity: 10 Gbps

Owners: Global Cloud Xchange

System Supplier: Fujitsu

System Installer: Elettra, Orange Marine

Marine Surveyor: Fugro

Region: EMEA

News: http://subtelforum.com/articles/tag/ hawk/

Alexandria

Anatoliko

Lynn HerringCove

System Name: Hibernia Atlantic

Landing Points: Coleraine (Ireland), Dublin (Ireland), Herring Cove (Canada), Lynn (USA), Southport (United Kingdom)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 320,000,000

Total Length (kms): 12,111

Initial Capacity: 10.16 Tbps

Owners: Columbia Ventures Corporation

System Supplier: Tyco Telecommunications SSI

System Installer: FCR

Cableship: Vercors, Iberus, Nordic King, Teneo, Dock Express 20, Global Mariner, Atlantida

System Maintainer: Hibernia Netoworks

Upgrader: Huawei Marine Networks

Upgrade Year: 2011

Upgraded Capacity: 100 Gbps

Region: Transatlantic News: http://subtelforum.com/articles/tag/ hibernia-atlantic/

System Name: Hibernia Express

Landing Points: Halifax, Nova Scotia (Canada); London, UK; Cork, Ireland

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): 120,000,000

Total Length (kms): 4,600

Design Capacity: 53 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps, 200 Gbps on select segments

Owners: Hibernia Atlantic

System Supplier: TE SubCom

System Installer: TE SubCom

Marine Surveyor: EGS

Survey Boat: RV Ridley Thomas Region: Transatlantic News: http://subtelforum.com/articles/tag/ hibernia-express/

Spencer Beach

System Name: Honotua

Landing Points: Huahine (French Polynesia), Moorea (French Polynesia), Papeete (French Polynesia), Spencer Beach, Hawaii (USA), Uturoa (Raiatea, French Polynesia), Vaitape (Bora Bora, French Polynesia)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 122,000,000

Total Length (kms): 4,634

Initial Capacity: 640 Gbps

Owners: OPT French Polynesia

System Supplier: Alcatel-Lucent Submarine Networks

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ honotua/

VaitapeUturoa Huahine MooreaPapeete

System Name: Hokkaido-Sakhalin Cable System

Landing Points: Ishikari (Japan), Nevelsk (Russia)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): 20,000,000

Total Length (kms): 559

Design Capacity: 640 Gbps

Owners: NTT Communications, TTK

System Supplier: NEC

System Installer: KDD

Cableship: Subaru

System Maintainer: NTT Communications Corporation, TTK

Region: AustralAsia

Nevelsk
Ishikari

System Name: Hugo

Landing Points: Guernsey (Guernsey), Lannion (France), Porthcurno (United Kingdom)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): 11,960,000

Total Length (kms): 426

Initial Capacity: 3.3 Tbps

Owners: C&W

System Supplier: Alcatel Submarine Networks

System Installer: Tyco SSI

Cableship: Tycom Reliance

System Maintainer: Vodafone Limited

Region: EMEA

News: http://subtelforum.com/articles/tag/ hugo/

Porthcurno
Guernsey
Lannion

Chennai

System Name: i2i

Landing Points: Chennai (India), Tuas (Singapore)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): 90,000,000

Total Length (kms): 3,100

Initial Capacity: 160 Gbps

Design Capacity: 42 Tbps

Fiber Pairs: 8 Fiber Pairs

Channels: 105

Channel Capacity: 100 Gbps

Owners: Bharti Airtel

Marine Surveyor: C&C Technologies

Upgrader: Ciena

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: Indian Ocean Pan-East Asian

News: http://subtelforum.com/articles/tag/i2i/

Tuas

System Name: Interchange I

Landing Points: Port Vila (Vanuatu), Suva (Fiji)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): 32,000,000

Total Length (kms): 1,259

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: Interchange Limited

System Supplier: TE SubCom, Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ icn1/

Port Vila
Suva

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Interchange II [Planned]

Landing Points: Port Moresby (Papau New Guinea), Port Vila (Vanuatu), Luganville (Vanuatu), Honiara (Solomon Islands)

RFS Year: 2017

Est. End of Service Date: 2041

Est. System Cost (US$): 72,000,000

Total Length (kms): 3,500

Design Capacity: 1.28 Tbps

Fiber Pairs: 1 Fiber Pair

Channels: 32

Channel Capacity: 40 Gbps

Owners: Interchange Limited

Region: AustralAsia

Port Moresby Honiara

Port Vila
Luganville

System Name: India-Middle East-Western Europe

Landing Points: Alexandria (Egypt), Catania (Italy), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Karachi (Pakistan), Marseille (France), Mumbai (India), Suez (Egypt), Tripoli (Lebanon)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): 320,000,000

Total Length (kms): 13,000

Initial Capacity: 520 Gbps

Design Capacity: 5.6 Tbps

Owners: Bharti Airtel, Etisalat, France Telecom, Ogero (Lebanon), PTCL (Pakistan), STC (Saudi Arabia), Tata Communications, Telecom Egypt, Telecom Italia Sparkle

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: S.B. Submarine Systems, NEC

Cableship: Cable Innovator

Marine Surveyor: Fugro

System Maintainer: Orange, TATA Communications, Telecom Egypt, Telecom Italia Sparkle

Upgrader: Mitsubishi

Upgrade Year: 2012, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: EMEA

News: http://subtelforum.com/articles/ tag/i-me-we/ http://subtelforum.com/ articles/?s=I-ME-WE

Tripoli
Alexandria Suez
Jeddah
Fujairah Karachi
Mumbai

Durres

Bari

System Name: Italy-Albania

Landing Points: Bari (Italy), Durres (Albania)

RFS Year: 1998

Est. End of Service Date: 2023

Est. System Cost (US$): 10,000,000

Total Length (kms): 236

Initial Capacity: 2.5 Gbps

Fiber Pairs: 1 Fiber Pair

Owners: Telecom Italia Sparkle

Region: EMEA

Otranto

System Name: Italy-Greece

Landing Points: Corfu (Greece), Otranto (Italy)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): 10,000,000

Total Length (kms): 161

Initial Capacity: 1.69 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Telecom Italia

Region: EMEA

System Name: Italy-Libya

Landing Points: Mazara (Italy), Tripoli (Libya)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 10,000,000

Total Length (kms): 570

Initial Capacity: 2.5 Gbps

Design Capacity: 40 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Telecom Italia

System Maintainer: Telecom Italia Sparkle

Upgrade Year: 2011

Upgraded Capacity: 40 Gbps

Region: EMEA

Tripoli
Mazara

Monaco Savona

System Name: Italy-Monaco

Landing Points: Monaco (Monaco), Savona (Italy)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): 10,000,000

Total Length (kms): 162

Initial Capacity: 565 Mbps

Fiber Pairs: 1 Fiber Pairs

Owners: Telecom Italia

System Maintainer: Telecom Italia Sparkle

Region: EMEA

System Name: JaKa2DeLeMa

Landing Points: Bandjermasin (Indonesia), Benculuk (Indonesia), Jember (Indonesia), Ketapang (Indonesia), Mataram (Indonesia), Pangkalanbun (Indonesia), Pontianak (Indonesia), Sangata (Indonesia), Toweli (Indonesia)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): 116,000,000

Total Length (kms): 1,800

Initial Capacity: 960 Gbps

Design Capacity: 9.6 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 32

Channel Capacity: 100 Gbps

Owners: PT Telekomunikasi Indonesia

System Supplier: NSW, Fujitsu

System Installer: Fujitsu, Orange Marine

Upgrader: Fujitsu

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: AustralAsia

Pontianak
Ketapang
Pangkalanbun
Bandjermasin
Jember Benculuk
Mataram
Sangatta Toweli

System Name: JAKABARE

Landing Points: Batam (Indonesia), Jakarta (Indonesia), Pontianak (Indonesia), Tuas (Singapore)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 40,000,000

Total Length (kms): 1,330

Initial Capacity: 160 Gbps

Design Capacity: 1.28 Tbps

Owners: Indosat

System Supplier: NEC

System Installer: NEC, ASEAN Cableship, Orange Marine

Cableship: Cable Innovator

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ jakabare/

Jakarta
Pontianak
Tuas Batam

System Name: Japan-US

Landing Points: Kitaibaraki (Japan), Makaha (Hawaii), Maruyama (Japan), Morro Bay (USA), Point Arena (USA), Shima (Japan)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 590,000,000

Total Length (kms): 21,880

Initial Capacity: 640 Gbps

Design Capacity: 6.4 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 16

Channel Capacity: 100 Gbps

Owners: AT&T, Japan Telecom, KDDI, MCIWorldCom, NTTWN

System Supplier: Alcatel Submarine Networks, Fujitsu, Ocean Cable Company

System Installer: Global Marine Systems Limited

Cableship: Subaru, Cable Innovator

System Maintainer: AT&T, KDDI, NTT Communications Corporation, Softbank Telecom Corp, Verizon Ltd

Upgrader: Ciena

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Transpacific News: http://subtelforum.com/articles/tag/ japan-us/

System Name: Jasuka

Landing Points: Batam (Indonesia), Jakarta (Indonesia), Pontianak (Indonesia), Tanjung Pandan (Indonesia)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): 280,000,000

Total Length (kms): 354

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: PT Telekom

System Supplier: Nokia Siemens Networks

System Installer: Nokia Siemens Networks

Marine Surveyor: Nokia Siemens Networks

Upgrader: Nokia Siemens Networks

Upgrade Year: 2011

Upgraded Capacity: 40 Gbps

Region: AustralAsia

Tanjung Pandan

Mangalia

System Name: Karadeniz Fiber Optik Sistemi

Landing Points: Istanbul (Turkey), Mangalia (Romania), Varna (Bulgaria)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): 20,000,000

Total Length (kms): 4,640

Initial Capacity: 1.2 Gbps

Owners: BTC, Turk Telecom

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Vercors

Region: EMEA

Varna
Istanbul

System Name: Kattegat-2

Landing Points: Lyngsa, Denmark; Osterby, Denmark; Skalvik, Sweden; Vestero, Denmark

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 10,000,000

Total Length (kms): 75

Owners: TDC

Region: EMEA

System Name: Keltra-2

Landing Points: Kelibia (Tunisia), Trapini (Italy)

RFS Year: 2007

Est. End of Service Date: 2032

Total Length (kms): 209

Design Capacity: 20 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Telecom Italia, Tunisie Telecom (Tunisia)

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

System Maintainer: Telecom Italia Sparkle

Region: EMEA

System Name: Khulna-Chennai

Landing Points: Chennai (India), Khulna (Bangladesh)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): 48,000,000

Total Length (kms): 115

Owners: Bangladesh Submarine Cable Company

Region: Indian Ocean Pan-East Asian

Chennai

Khulna

System Name: Korea-Japan Cable Network

Landing Points: Fukuoka (Japan), Kita-Kyushu (Japan), Pusan (South Korea)

RFS Year: 2002

Est. End of Service Date: 2027

Total Length (kms): 500

Initial Capacity: 2.88 Tbps

Design Capacity: 28.8 Tbps

Fiber Pairs: 12 Fiber Pairs

Channels: 24

Channel Capacity: 100 Gbps

Owners: KEPCO, KT Coropration, NTT Communications, SOFTBANK Telecom Corp

System Supplier: Fujitsu

System Installer: Fujitsu

Cableship: Maersk Recorder

System Maintainer: KT Corporation, NTT Communications Corporation, SoftBank Telecom Corp

Upgrader: Ciena

Upgrade Year: 2015

Upgraded Capacity: 100 Gbps

Region: AustralAsia

News: http://subtelforum.com/articles/?s=KJCN

Fukuoka
Kitakyushu
Pusan

System Name: Kodiak Kenai

Landing Points: Anchorage (USA), Homer (USA), Kenai (USA), Kodiak (USA), Narrow Cape (USA), Seward (USA)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): 30,000,000

Total Length (kms): 971

Initial Capacity: 2.5 Gbps

Design Capacity: 10 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Kodiak Kenai Cable Company

Upgrader: Infinera

Upgrade Year: 2010

Upgraded Capacity: 10 Gbps

Region: Americas News: http://subtelforum.com/ articles/?s=kodiak

Narrow Cape
Kodiak
Homer Kenai
Anchorage Seward

System Name: Kuwait-Iran

Landing Points: Kharg (Iran), Soroosh (Iran), Failaka (Kuwait)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): 20,000,000

Total Length (kms): 334

Initial Capacity: 2.5 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Ministry of Communication, Kuwait and Telecommunication Infrastructure Company, Iran

System Installer: e-Marine

System Maintainer: E-marine PJSC

Region: EMEA

Failaka
Kharg Soroosh

Mazara

System Name: LEV

Landing Points: Mazara (Italy), Tel Aviv (Israel), Yeroskipos (Cyprus)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): 175,000,000

Total Length (kms): 2,600

Initial Capacity: 2.5 Gbps

Fiber Pairs: 2 Fiber Pairs

Channels: 8 wavelengths of 1550 nm

Owners: Telecom Italia Sparkle

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications

System Maintainer: Cyprus Telecommunications Authority

Region: EMEA

System Name: Lower Indian Ocean Network

Landing Points: Sainte Marie (Reunion Island), Terre Rouge (Mauritius), Toamasina (Madagascar)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 30,000,000

Total Length (kms): 1,091

Initial Capacity: 20 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: France Telecom, Mauritius Telecom, Orange Madagascar

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: FCR, Orange Marine

Cableship: Chamarel

System Maintainer: Mauritius Telecom, Orange

Region: Indian Ocean Pan-East Asian News: http://subtelforum.com/articles/tag/ lion/

Tomasina
Sainte
Marie
Terre
Rouge

System Name: Lower Indian Ocean Network 2

Landing Points: Mombasa (Kenya), Mayotte (Mayotte)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): 76,000,000

Total Length (kms): 3,000

Design Capacity: 1.28 Tbps

Owners: France Telecom-Orange, Mauritius Telecom, Orange Madagascar, Telkom Kenya, Emtel Ltd

System Installer: Alpha Logistics, Elettra, Orange Marine Region: Indian Ocean Pan-East Asian News: http://subtelforum.com/articles/tag/ lion-2/

Mayotte
Mombasa

System Name: Mid-Atlantic Crossing

Landing Points: Brookhaven (USA), Hollywood (USA), St Croix (US Virgin Islands)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 200,000,000

Total Length (kms): 7,461

Initial Capacity: 20 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Global Crossing

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Fresnel

System Maintainer: Level 3 Communications Ltd

Upgrader: Infinera

Upgrade Year: 2010, 2011

Upgraded Capacity: 10 Gbps, 40 Gbps

Region: Americas News: http://subtelforum.com/articles/?s=midatlantic+crossing

Brookhaven

St. Croix
Hollywood

Accra Lagos

System Name: Main One

Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Casablanca (Morocco), Dakar (Senegal), Lagos (Nigeria), Port Harcourt (Nigeria), Seixal (Portugal), Tenerife (Spain)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): 240,000,000

Total Length (kms): 7,000

Initial Capacity: 1.92 Tbps

Design Capacity: 10 Tbps

Channel Capacity: 100 Gbps

Owners: Main One Cable Company

System Supplier: TE SubCom

System Installer: TE SubCom

Cableship: Resolute

System Maintainer: Main One Cable Company, Tyco Electronics Subsea Communications LLC

Upgrader: Xtera

Upgrade Year: 2015

Upgraded Capacity: 100 Gbps

Region: EMEA

News: http://subtelforum.com/ articles/?s=Main+One

Virginia Beach

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: MAREA [Planned]

Landing Points: Virginia Beach, Virginia, USA; Bilbao, Spain

RFS Year: 2017

Est. End of Service Date: 2042

Total Length (kms): 6,600

Design Capacity: 160 Tbps

Fiber Pairs: 8 Fiber Pairs

Owners: Microsoft, Facebook, Telefónica

Region: Transatlantic News: http://subtelforum.com/articles/tag/ marea/

Bilbao

System Name: Matrix

Landing Points: Batam (Indonesia), Changi (Singapore), Jakarta (Indonesia)

RFS Year: 2008

Est. End of Service Date: 2032

Est. System Cost (US$): 30,000,000

Total Length (kms): 1,438

Initial Capacity: 60 Gbps

Design Capacity: 2.56 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Matrix Networks and NAP Info

System Supplier: TE Subcom

System Installer: Global Marine Systems Limited

Cableship: Wave Mercury, Cable Networker (barge)

Region: AustralAsia

System Name: MAYA-1

Landing Points: Cancun (Mexico), Hollywood (USA), Maria Chiquita (Panama), Puerto Limon (Costa Rica), Tolu (Colombia)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 120,000,000

Total Length (kms): 4,506

Initial Capacity: 10 Gbps

Owners: MAYA-1 Consortium

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications

Marine Surveyor: C&C Technologies

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2012

Upgraded Capacity: 40 Gbps

Region: Americas

News: http://subtelforum.com/ articles/?s=maya-1

Cancun
Maria Chiquita Tolu
Puerto Limon

System Name: Moratelindo Batam - Dumai Cable

Landing Points: Batam (Indonesia), Dumai (Indonesia)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 40,000,000

Total Length (kms): 330

Initial Capacity: 10 Gbps

Owners: Moratelindo

Region: AustralAsia

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Malaysia-Cambodia-Thailand [Planned]

Landing Points: Cherating, Malaysia; Rayoung, Thailand; branching unit to Sihanoukville, Cambodia

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 40,000,000

Total Length (kms): 1,425

Design Capacity: 30 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 50

Channel Capacity: 100 Gbps

Owners: Telekom Malaysia Berhad, Symphony Communication Public Company Limited, Telcotech limited

System Supplier: Huawei Marine Networks

Region: AustralAsia

News: http://subtelforum.com/articles/tag/mct/

Sihanoukville

System Name: Med Cable Network

Landing Points: Algiers (Algeria), Annaba (Algeria), Marseille (France)

RFS Year: 2005

Est. End of Service Date: 2030

Est. System Cost (US$): 40,000,000

Total Length (kms): 1,300

Initial Capacity: 20 Gbps

Owners: Med Cable

System Maintainer: Middle East & North Africa (MENA) Submarine Cable Systems

Region: EMEA

Algiers
Annaba
Marseille

Catania

System Name: MedNautilus

Landing Points: Catania (Italy), Chania (Greece), Haifa (Israel), Istanbul (Turkey), Koropi (Greece), Tel Aviv (Israel)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 190,000,000

Total Length (kms): 5,729

Initial Capacity: 3.84 Tbps

Design Capacity: 38.4 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: Telecom Italia Sparkle

System Supplier: Alcatel Submarine Networks

System Installer: Orange Marine

Upgrader: Infinera

Upgrade Year: 2011, 2012, 2013

Upgraded Capacity: 10 Gbps, 40 Gbps, 100 Gbps

Region: EMEA

News: http://subtelforum.com/ articles/?s=mednautilus

Koropi
Chania
Istanbul
Haifa
Tel Aviv

System Name: Melita-1

Landing Points: Pozallo (Italy), St Paul’s Bay (Malta)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 14,000,000

Total Length (kms): 100

Initial Capacity: 50 Mbps

Owners: Melita Infrastructure Ltd.

Region: EMEA

St. Paul’s Bay
Pozallo

System Name: Middle East North Africa

Landing Points: Abu Talat (Egypt), Al Seeb (Oman), Jeddah (Saudi Arabia), Mazara (Italy), Mumbai (India), Zafarana (Egypt)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): 210,000,000

Total Length (kms): 8,800

Initial Capacity: 57.6 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 96

Channel Capacity: 100 Gbps

Owners: Orascom Telecom

System Supplier: Alcatel Submarine Networks, TE SubCom

System Installer: Alcatel Submarine Networks, TE SubCom, e-Marine

Cableship: Maersk Responder, Ile de Sein, Niwa, Decisive

Marine Surveyor: EGS, Blue Star, Elettra

System Maintainer: Middle East & North Africa (MENA) Submarine Cable Systems, Oman Telecommunications Company

Region: EMEA

News: http://subtelforum.com/articles/tag/ mena/

Mazara Zafarana
Alexandria Suez
Jeddah
Al Seeb
Mumbai

System Name: Moratel International Cable 1

Landing Points: Batam (Indonesia), Changi (Singapore)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): 10,000,000

Total Length (kms): 70

Initial Capacity: 10 Gbps

Owners: Moratelindo

System Installer: Global Marine Systems Limited

Region: AustralAsia

Batam
Changi

System Name: Micronesia Cable System

Landing Points: Majuro (Marshall Islands), Kwajalein (Marshall Islands), Pohnpei (Micronesia), Guam

RFS Year: 2011

Est. End of Service Date: 2036

Total Length (kms): 174

Owners: Federals States of Micronesia Telecommunications Authority, Marshall Island National Telecommunications Authority

System Supplier: TE SubCom

System Installer: TE SubCom

Region: AustralAsia

Kwajalein
Guam
Pohnpei
Majuro

Mazara Catania Yeroskipou

System Name: Minerva

Landing Points: Catania (Italy), Mazara (Italy), Yeroskipos (Cyprus)

RFS Year: 2007

Est. End of Service Date: 2032

Initial Capacity: 10 Gbps

Channels: DWDM wavelengths

Owners: Telecom Italia Sparkle

System Supplier: Alcatel-Lucent Submarine Systems

Region: EMEA

System Name: Mataram-Kupang Cable System

Landing Points: Mataram (Indonesia), Sumbawa Besar (Indonesia), Ambalawi (Indonesia), Saraemee (Indonesia), Waingapu (Indonesia), Ende (Indonesia), Kupang (Indonesia)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 94,000,000

Total Length (kms): 1,318

Design Capacity: 1.8 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 30

Channel Capacity: 10 Gbps

Owners: PT Telkom

System Supplier: Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ mkcs/

Mataram
BesarSumbawaRaba
Waingapu
Kupang

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Moana Submarine Cable System [Planned]

Landing Points: New Zealand; Hawaii; Cook Islands; Samoa

RFS Year: 2018

Est. End of Service Date: 2043

Total Length (kms): 9,700

Design Capacity: 20 Tbps

Channel Capacity: 200 Gbps

Owners: Bluesky Pacific Group

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ moana/

System Name: Monet [Planned]

Landing Points: Santos (Brazil), Fortaleza (Brazil), Boca Raton, Florida (United States)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 280,000,000

Total Length (kms): 10,556

Design Capacity: 64 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: Algar Telecom, Angola Cables, Antel, Google

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Americas

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Fortaleza
Santos
Boca

Myanmar

Thailand

Malaysia

System Name: Mythic [Planned]

Landing Points: Myanmar branches to Malaysia and Thailand

RFS Year: 2017

Est. End of Service Date: 2042

Total Length (kms): 1,600

Design Capacity: 20 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Campana Group

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ mythic/

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: New Cross Pacific [Planned]

Landing Points: Hillsboro, Oregon (USA); Chongming, China; Nanhui, China; Lingang, China; Busan, South Korea; Toucheng, Taiwan; Maruyama, Japan

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 350,000,000

Total Length (kms): 14,000

Design Capacity: 80 Tbps

Channel Capacity: 100 Gbps

China

Korea Taiwan Japan USA

Owners: China Mobile, China Telecom, China Unicom, Chunghwa Telecom, KT Corporation, Microsoft, Softbank Mobile Corp

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Transpacific News: http://subtelforum.com/articles/tag/ NCP/

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Lagos

Kribi

System Name: Nigeria-Cameroon Submarine Cable System

Landing Points: Kribi, Cameroon; Lagos, Nigeria

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): 30,000,000

Total Length (kms): 1,100

Initial Capacity: 40 Gbps

Design Capacity: 12.8 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: Cameroon Government, MainOne

System Supplier: Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks

Region: EMEA

News: http://subtelforum.com/articles/tag/ ncscs/

System Name: NEPTUNE Canada

Landing Points: Port Alberni (Canada)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): 62,000,000

Total Length (kms): 800

Owners: University of Victoria

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Sein

Marine Surveyor: NEPTUNE Canada

Region: Americas

Tysvaer

System Name: Norsea Com-1

Landing Points: Lowestoft (United Kingdom), Tysvær (Norway)

RFS Year: 1999

Est. End of Service Date: 2024

Total Length (kms): 800

Initial Capacity: 160 Gbps

Owners: North Sea Communications AS

System Supplier: Alcatel AKN

System Maintainer: TeliaSonera International Carrier AB

Region: EMEA

Lowestoft

System Name: Northstar

Landing Points: Juneau (USA), Nedonna Beach (USA), Valdez (USA), Whittier (USA)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): 90,000,000

Total Length (kms): 3,385

Initial Capacity: 10 Gbps

Owners: Alaska Communications Systems

System Supplier: Alcatel Submarine Networks

System Installer: C&W (Marine)

Cableship: Maersk Fighter, Fu Lai

System Maintainer: ACS Cable Systems

Region: Americas

Valdez
Juneau
Nedonna Beach

System Name: Orval [Planned]

Landing Points: Oran, Algeria; Valencia, Spain

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 20,000,000

Total Length (kms): 560

Design Capacity: 20 Tbps

Channel Capacity: 100 Gbps

Owners: Algerian Ministry of Post, Information Technology and Communications

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: EMEA

News: http://subtelforum.com/articles/tag/ orval/

Valencia

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Oran

Grover Beach

Tijuana

System Name: Pan-American Crossing

Landing Points: Colon (Panama), Fort Amadour (Panama), Grover Beach (USA), Mazatlán (Mexico), Puerto Viejo (Venezuela), St Croix (US Virgin Islands), Tijuana (Mexico)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 350,000,000

Total Length (kms): 9,451

Initial Capacity: 10 Gbps

Owners: Global Crossing

System Supplier: Tyco Telecommunications

Cableship: Agile

Marine Surveyor: C&C Technologies

System Maintainer: Level 3 Communications Ltd

Upgrader: Xtera Communications

Region: Americas

Mazatlán
Colon Fort Amadour
Puerto Viejo
St. Croix

Palau

Guam

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Palau-Guam [Planned]

Landing Points: Palau, Guam

RFS Year: 2017

Est. End of Service Date: 2041

Owners: Palau Telecoms

System Supplier: Xtera Communications

System Installer: IT International Telecom

Region: AustralAsia

News: http://subtelforum.com/ articles/?s=palau+guam

Magens Bay Butler’s Bay

System Name: Pan American

Landing Points: Arica (Chile), Baby Beach (Aruba), Barranquilla (Colombia), Battery Pratt (Panama), Butler’s Bay (St. Croix), Lurin (Peru), Magens Bay (Virgin Islands), Panama City (Panama), Punto Fijo (Venezuela), Salinas (Ecuador)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): 260,000,000

Total Length (kms): 6,867

Initial Capacity: >10 Gbps

Owners: Antel (El Salvador), AT&T, Cable Andino, CANTV (Venezuela), CNT, C&W, Embratel, Entel (Chile), Setar, Telecom Colombia, Telmex

Marine Surveyor: C&C Technologies

System Maintainer: AT&T, Telefonica International Wholesale Services

Region: Americas

Lurin
Arica
Panama City Battery Pratt
Barranquilla Punto Fijo
Baby Beach

System Name: Pangea

Landing Points: Beverwijk (Netherlands), Fanø (Denmark), Lowestoft (United Kingdom), Måde (Denmark), Redcar (United Kingdom)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 20,000,000

Total Length (kms): 511

Initial Capacity: 7 Tbps

Owners: Pangea Ltd

System Supplier: Alcatel Submarine Networks

System Installer: Nexans

Cableship: Pleijel

Marine Surveyor: Fugro

Region: EMEA

Shima Ajigaura

Harbor Pointe Grover Beach

System Name: Pacific Crossing 1

Landing Points: Grover Beach (USA), Harbor Pointe (USA), Shima (Japan), Shima (Japan)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 650,000,000

Total Length (kms): 20,910

Initial Capacity: 1.8 Tbps

Design Capacity: 3 Tbps

Owners: NTT Communications

System Supplier: Tyco Telecommunications

Marine Surveyor: C&C Technologies

System Maintainer: Alcatel-Lucent Submarine Networks

Upgrader: Infinera

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Transpacific

News: http://subtelforum.com/articles/tag/pc1/ http://subtelforum.com/articles/tag/ pacific-crossing/

System Name: Pacific Caribbean Cable System

Landing Points: Jacksonville, Florida (USA); Tortola, Virgin Islands (UK); Isla Verde, Puerto Rico; Hudishibana, Aruba; Cartagena, Colombia; Maria Chiquita, Panama; Balboa, Panama; Manta, Ecuador; Tera Cora, Curaçao

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): 160,000,000

Total Length (kms): 6,000

Design Capacity: 80 Tbps

Channel Capacity: 100 Gbps

Owners: Cable & Wireless Communications, Setar, Telconet, Telefónica Global Solutions, United Telecommunication Services

System Supplier: Alcatel-Lucent Submarine Networks

Marine Surveyor: EGS

Survey Boat: RV Ridley Thomas

Region: Americas

News: http://subtelforum.com/articles/tag/ pccs/

MariaChiquita
Cartagena
Hudishibana
IslaVerde
Balboa
Manta
Tortola Jacksonville
Tera Corá

Broadstairs

Seaford

Veules-les-Roses

System Name: Pan-European Crossing

Landing Points: Bredene (Belguim), Broadstairs (United Kingdom), Seaford (United Kingdom), Veules-les-Roses (France)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): 20,000,000

Total Length (kms): 170

Initial Capacity: 10 Gbps

Owners: Global Crossing

System Maintainer: Level 3 Communications Region: EMEA

Bredene

Los Angeles

Hong Kong

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Pacific Light Cable Network [Planned]

Landing Points: Hong Kong; Los Angeles, USA

RFS Year: 2018

Est. End of Service Date: 2043

Est. System Cost (US$): 400,000,000

Total Length (kms): 12,800

Design Capacity: 120 Tbps

Fiber Pairs: 5 Fiber Pairs

Channels: 240

Channel Capacity: 100 Gbps

Owners: Pacific Light Data Communication

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Transpacific

System Name: Pipe Pacific Cable

Landing Points: Madang (Papua New Guinea), Piti (Guam), Sydney (Australia)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 180,000,000

Total Length (kms): 7,185

Initial Capacity: 40 Gbps

Design Capacity: 2.56 Tbps

Owners: PIPE Networks Ltd.

System Supplier: Tyco Telecommunications

System Installer: Tyco Telecommunications

Cableship: Durable, Decisive

Upgrader: Infinera

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: AustralAsia

News: http://subtelforum.com/articles/ tag/ppc-1/ http://subtelforum.com/ articles/?s=PPC-1

Sydney

Madang

System Name: Qatar-UAE

Landing Points: Das Island (UAE), Halul (Qatar)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): 10,000,000

Total Length (kms): 208

Initial Capacity: 20 Gbps

System Installer: e-Marine

Cableship: Etisalat

System Maintainer: E-marine PJSC Region: EMEA

QUINTILLION SUBSEA

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Quintillian Subsea [Planned]

Landing Points: Oliktok (USA), Barrow (USA), Wainright (USA), Kotzebue (USA), Point Hope (USA), Nome (USA)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 150,000,000

Total Length (kms): 1,200

Owners: Quintillion Subsea Holdings

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro Pelagos

Survey Boat: Pacific Star, Dreamcatcher

Region: Americas News: http://subtelforum.com/articles/tag/ quintillion/

Wainwright

System Name: Russian-Japan Cable Network

Landing Points: Nakhodka (Russia), Naoetsu (Japan)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): 50,000,000

Total Length (kms): 1,795

Initial Capacity: 640 Gbps

Owners: Rostelecom

System Maintainer: KDDI, OJSC “Rostelecom”

Region: AustralAsia

Nakhodka
Naoetsu

Telecoms consulting of submarine cable systems for regional and trans-oceanic applications

Toucheng

System Name: Reach North Asia Loop

Landing Points: Pusan (South Korea), Tong Fuk (Hong Kong), Toucheng (Taiwan), Wada (Japan)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 900,000,000

Total Length (kms): 9,792

Initial Capacity: 80 Gbps

Fiber Pairs: 6 Fiber pairs

Owners: FLAG Telecom, Level 3 Communications

System Maintainer: Global Cloud Xchange

Upgrader: Ciena, Infinera

Upgrade Year: 2011, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: AustralAsia

News: http://subtelforum.com/ articles/?s=reach+north+asia+loop

Tong Fuk
Pusan
Wada

System Name: South American Crossing

Landing Points: Fortaleza (Brazil), Fort Amadour (Panama), Las Toninas (Argentina), Lurin (Peru), Puerto Viejo (Venezuela), Rio de Janeiro (Brazil), Santos (Brazil), St Croix (US Virgin Islands), Valparaiso (Chile)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 520,000,000

Total Length (kms): 15,983

Initial Capacity: 100 Gbps

Design Capacity: 1.2 Tbps

Owners: Global Crossing

System Supplier: Alcatel Submarine Networks

System Maintainer: Level 3 Communications

Upgrader: Infinera

Upgrade Year: 2010, 2011

Upgraded Capacity: 10 Gbps, 40 Gbps

Region: Americas

Valparaiso
Lurin
Las Toninas
Fort Amadour Puerto Viejo
St. Croix
Fortaleza
Santos
Rio de Janeiro

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: South Atlantic Cable System [Planned]

Landing Points: Luanda (Angola), Fortaleza (Brazil)

RFS Year: 2018

Est. End of Service Date: 2043

Est. System Cost (US$): 170,000,000

Total Length (kms): 6,200

Initial Capacity: 40 Tbps

Design Capacity: 40 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Angola Cables

System Supplier: NEC

System Installer: NEC

Region: Transatlantic

News: http://subtelforum.com/articles/tag/ sacs/

Fortaleza
Luanda

Saint-Paul Cochin Penang

System Name: South Africa-Far East

Landing Points: Baie du Jacotet (Mauritius), Cape Town (South Africa), Cochin (India), Durban (South Africa), Penang (Malaysia), SaintPaul (Reunion)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): 350,000,000

Total Length (kms): 13,669

Initial Capacity: 440 Gbps

Owners: France Telecom, Tata Communications, Telekom SA

System Supplier: Tyco Telecommunications

System Installer: FCR

Cableship: Vercors

System Maintainer: Mauritius Telecom, Orange, TATA Communications, Telkom SA Limited, TM Berhad

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2014

Upgraded Capacity: 40 Gbps

Region: Indian Ocean Pan-East Asian

Cape Town
Durban
Baie du Jacotet

System Name: South America-1

Landing Points: Arica (Chile), Barranquilla (Colombia), Boca Raton (USA), Fortaleza (Brazil), Las Toninas (Argentina), Lurin (Peru), Mancora (Peru), Puerto Barrios (Guatemala), Puerto San Jose (Guatemala), Rio de Janeiro (Brazil), Salinas (Ecuador), Salvador (Brazil), Sa

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 650,000,000

Total Length (kms): 24,140

Initial Capacity: 160 Gbps

Design Capacity: 1.92 Tbps

Owners: Telefonica

System Supplier: Tyco Telecommunications

Marine Surveyor: C&C Technologies

System Maintainer: Telefonica International Wholesale Services

Upgrader: Infinera

Upgrade Year: 2009, 2010, 2012

Upgraded Capacity: 10 Gbps, 40 Gbps, 100 Gbps

Region: Americas

News: http://subtelforum.com/articles/?s=sam-1

San Juan
Barranquilla
Fortaleza
Salinas Mancora
Puerto San Jose
Puerto Barrios
Lurin
Arica
Valparaiso
Las Toninas
Santos
Rio de Janeiro
Salvador
Boca Raton

Fiji

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Samoa

System Name: Samoa-Fiji [Planned]

Landing Points: Upola, Samoa; Savai’I, Samoa; Suva, Fiji

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 57,400,000

Total Length (kms): 1,300

Owners: Samoa Submarine Cable Company

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ samoa-fiji/

System Name: South America Pacific Link [Planned]

Landing Points: Oahu, Hawaii (USA); Balboa, Panama; Valparaiso, Chile; Jacksonville, Florida (USA); future connectivity to: Hilo, Hawaii (USA); Manta, Ecuador; Lima, Peru; Arica, Chile; Cuba; Dominican Republic

RFS Year: 2018

Est. End of Service Date: 2043

Est. System Cost (US$): 460,000,000

Total Length (kms): 14,200

Design Capacity: 30 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Ocean Networks

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks, IT

International Telecom Region: Transpacific News: http://subtelforum.com/articles/tag/sapl/

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Manta
Hilo
Oahu
Balboa
Lima

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Jacksonville Panama

System Name: South America Pacific Link Caribbean Express [Planned]

Landing Points: Jacksonville, Florida (USA); Panama

RFS Year: 2017

Est. End of Service Date: 2042

Total Length (kms): 3,400

Design Capacity: 60 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Ocean Networks, Inc.

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Americas

News: http://subtelforum.com/articles/tag/ sapl/

System Name: Saudi Arabia-Sudan

Landing Points: Jeddah (Saudi Arabia), Port Sudan (Sudan)

RFS Year: 2003

Est. End of Service Date: 2028

Est. System Cost (US$): 20,000,000

Total Length (kms): 333

Initial Capacity: 1.28 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: STC (Saudi Arabia)

Region: EMEA

Jeddah

System Name: South Atlantic 3

Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Alta Vista (Spain), Chipiona (Spain), Cotonou (Benin), Dakar (Senegal), Douala (Cameroon), Lagos (Nigeria), Libreville (Gabon), Luanda (Angola), Melkbosstrand (South Africa), Sesimbra (Portugal)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): 370,000,000

Total Length (kms): 14,350

Initial Capacity: 340 Gbps

Design Capacity: 800 Gbps

Fiber Pairs: 2 Fiber Pairs

Channel Capacity: 40 Gbps

Owners: Angola Telecom, AT&T, British Telecom, Camtel of Cameroon, CIT, Cote dIvoire Telecom, CPRM, C&W, France Telecom (12.08%), Ghana Telecom, Maroc Telecom of Morocco, Mauritius Telecom, Nigerian Telecommunications Ltd, Nitel (8.39%), OPT Benin, OPT Gabon, PT

System Supplier: Alcatel Submarine Networks

System Maintainer: Angola Telecom, PT Comunicações S.A., Sonatel, Telefonica de España S.A.U., Telkom SA Limited, Vodafone Limited

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2014

Upgraded Capacity: 40 Gbps

Region: EMEA

News: http://subtelforum.com/articles/tag/sat-3/

Sesimbra Chipiona
Alta Vista
Dakar
AbidjanAccra Cotonou Lagos
Douala
Libreville
Luanda
Melkbosstrand

Hong Kong

System Name: Submarine Cable Asia Network

Landing Points: Hong Kong, Indonesia

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 337,000,000

Total Length (kms): 4,300

Initial Capacity: 40 Gbps

Design Capacity: 1.92 Tbps

Owners: PT. Fangbian Iskan Corporindo, Telemedia Pacific Inc.

System Supplier: NEC

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ scan/

System Name: SCF-CN

Landing Points: Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Kingstown (St. Vincent), Martinique (Martinique), Port Castries (St Lucia), Port Salines (Grenada), Macqueripe (Trinidad and Tobago)

RFS Year: 2007

Est. End of Service Date: 2032

Total Length (kms): 1,186

Initial Capacity: 1.28 Tbps

Owners: SCF (Group Loret)

Region: Americas

SCOTLAND-ORKNEY-SHETLAND

System Name: Scotland-Orkney-Shetland

Landing Points: Scotland-Orkney-Shetland

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): 12,000,000

Total Length (kms): 400

Owners: British Telecom Region: EMEA

Orkney
Scotland
Shetland

New York

System Name: Seabras-1 [Planned]

Landing Points: Sao Paolo, Brazil; New York, (USA); branching unit to Fortaleza, Brazil

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 509,000,000

Total Length (kms): 10,750

Design Capacity: 72 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 120

Channel Capacity: 100 Gbps

Owners: Seaborn Networks, Microsoft

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Marine Surveyor: Gardline

Survey Boat: Sea Surveyor

Region: Americas

News: http://subtelforum.com/articles/tag/ seabras-1/

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Fortaleza Sao Paulo

System Name: Seacom

Landing Points: Abu Talat (Egypt), Dar es Salaam (Tanzania), Djibouti (Republic of Djibouti), Maputo (Mozambique), Mombasa (Kenya), Mtunzini (South Africa), Mumbai (India), Zafarana (Egypt)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 600,000,000

Total Length (kms): 13,601

Initial Capacity: 110 Gbps

Design Capacity: 1.28 Tbps

Owners: Convergence Partners (12.50%), Herakles Telecom LLC (25%), Industrial Promotion Services (25%), Shanduka Group (12.50%), VenFin Limited (25%)

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Cableship: Durable, Decisive, Dependable, Resolute, Responder

System Maintainer: Seacom Ltd, E-marine PJSC

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Indian Ocean Pan-East Asian News: http://subtelforum.com/articles/tag/ seacom/

Djibouti
Mombasa
Dar es Salaam
Maputo Mtunzini

System Name: South East Alaska

Landing Points: Angoon (USA), Hawk Inlet (USA), Juneau (USA), Ketchikan (USA), Petersburg (USA), Sitka (USA), Wrangell (USA)

RFS Year: 2008

Est. End of Service Date: 2033

Initial Capacity: 10 Gbps

Owners: GCI

Region: Americas

Sitka
Angoon Hawk Inlet
Juneau
Petersburg
Wrangell
Ketchikan

System Name: South East Asia-Middle East-Western Europe 3

Landing Points: Alexandria (Egypt), Al Seeb (Oman), Batangas (Philippines), Chania (Greece), Cochin (India), Da Nang (Vietnam), Deep Water Bay (Hong Kong), Dehiwala-Mount Lavinia (Sri Lanka), Djibouti (Republic of Djibouti), Fangshan (Taiwan), Fujairah (United Arab Emira

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): 1,500,000,000

Total Length (kms): 39,622

Initial Capacity: 40 Gbps

Design Capacity: 55 Gbps

Fiber Pairs: 2 Fiber Pairs

Channels: 8

Channel Capacity: 2.5 Gbps, 10 Gbps

Owners: SEA-ME-WE 3 Consortium

System Supplier: Alcatel Submarine Networks, Fujitsu, Pirelli, KDDSCS, Tyco Telecommunications

Cableship: Agile, Maersk Defender, Maersk Fighter, Fresnel, Fu Lai, Nexus, Leon Thevinin, Vercors, Raymond Croze, Etisalat, Umm Al Anber

Marine Surveyor: C&C Technologies

System Maintainer: British Telecommunications PLC, China Telecommunications Corporation, Chunghwa Telecom Co., Cyprus Telecommunications Authority, Deutsche Telekom AG, Hellenic Telecommunications Organization S.A., KDDI, KT Corporation, Oman Telecommunications Company,

Nanhui Keoje

Bay Fangshan Toucheng Okinawa

Region: EMEA, Indian Ocean Pan-East Asian, AustralAsia

News: http://subtelforum.com/articles/tag/seame-we-3/

Initial Capacity: 1.28 Tbps

Design Capacity: 12.8 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: Algerie Telecom, Algeria, Bangladesh Submarine Cable Company Limited (BSCCL), Bangladesh, Bharti Airtel, CAT Telecom (Thailand), Du, France Telecom, Pakistan Telecommunication Company Limited, Pakistan, Saudi Telecom Company (STC), Saudi Arabia, Sri Lanka

Region: EMEA, Indian Ocean Pan-East Asian

News: http://subtelforum.com/articles/tag/ sea-me-we-4/ http://subtelforum.com/ articles/?s=sea-me-we+4

System Name: South East Asia-Middle East-Western Europe 4

Landing Points: Alexandria (Egypt), Annaba (Algeria), Bizerte (Tunisia), Chennai (India), Colombo (Sri Lanka), Cox’s Bazaar (Bangladesh), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Karachi (Pakistan), Marseille (France), Melaka (Malaysia), Mumbai (India), Mu

RFS Year: 2005

Est. End of Service Date: 2030

Est. System Cost (US$): 500,000,000

Total Length (kms): 18,846

System Supplier: Alcatel Submarine Networks, Fujitsu

System Installer: Orange Marine

Cableship: Niwa, Descartes

System Maintainer: E-marine PJSC, Orange, Singapore Telecommunications Limited, Sri Lanka Telecom Ltd, TATA Communications, Telecom Egypt, Telecom Italia Sparkle, TM Berhad, Verizon Ltd

Upgrader: Alcatel-Lucent Submarine Networks, Mitsubishi Electric

Upgrade Year: 2011, 2015

Upgraded Capacity: 40 Gbps, 100 Gbps

Cox’s Bazaar
TuasMelaka

System Name: South East Asia-Middle East-Western Europe 5 [Planned]

Landing Points: Marseille (France), Annaba (Algeria), Palermo (Italy), Bizerte (Tunisia), Jedda (Saudi Arabia), Fujairah (UAE), Karachi (Pakistan), Mumbai (India), Chennai (India), Colombo (Sri Lanka), Cox’s Bazar (Bangladesh), Satun (Thailand), Singapore (Singapore), Ma

RFS Year: 2016

Est. End of Service Date: 2040

Est. System Cost (US$): 1,000,000,000

Total Length (kms): 20,000

Design Capacity: 24 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 80

Channel Capacity: 100 Gbps

Owners: Bangladesh Submarine Cable Company Ltd, China Mobile International Ltd, China Global Telecommunications Limited, China Network Communications Group Co Ltd, Emirates Integrated Telecommunications Co, Orange, Myanmar Post and Telecom, PT Telekomunikasi Indo

System Supplier: Alcatel-Lucent Submarine Networks, NEC

System Installer: Alcatel-Lucent Submarine Networks, NEC

Marine Surveyor: Elettra

Region: EMEA, Indian Ocean Pan-East Asian News: http://subtelforum.com/articles/tag/seame-we-5/

Project Completion Phases:

Pre-Engineering Survey

System Manufacture

System Installation Commissioning & Acceptance

Cox’s Bazaar

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: South East Asia-United States [Planned]

Landing Points: Manado (Indonesia), Davao (Phillippines), Piti, Guam: Oahu, Hawaii (United States), Los Angeles, California (United States)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 250,000,000

Total Length (kms): 15,000

Design Capacity: 20 Tbps

Channel Capacity: 100 Gbps

Owners: Telekomunikasi Indonesia International (Telin), Globe Telecom, RAM Telecom International (RTI), Hawaiian Telcom, GTI Corporation, Telkom USA, GTA, Teleguam Holdings

System Supplier: NEC

System Installer: NEC

Region: Transpacific

News: http://subtelforum.com/articles/tag/sea-us/

Chaguaramas

System Name: Suriname-Guyana Submarine Cable System

Landing Points: Macqueripe (Trinidad), Georgetown (Guyana), Totness (Suriname)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): 54,000,000

Total Length (kms): 1,249

Design Capacity: 1.28 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 64

Channel Capacity: 10 Gbps

Owners: Guyana Telephone and Telegraph Co. Ltd, Telesur of Suriname

System Supplier: Huawei Marine Networks, Nexans

System Installer: Global Marine Systems Limited, Huawei Marine Networks

Cableship: Sovereign

Region: Americas

News: http://subtelforum.com/articles/tag/sg-scs/

Tórshavn

System Name: Shetland-Faroese 2

Landing Points: Ayre of Cara (UK), Banff (UK), Maywick (UK), Sandwick (Scotland), Tórshavn (Faroe Islands)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): 27,000,000

Total Length (kms): 828

Initial Capacity: 20 Gbps

Design Capacity: 570 Gbps

Owners: Faroese Telecom

System Supplier: NSW

System Installer: International Telecom

Cableship: IT Intrepid

Marine Surveyor: Fugro

System Maintainer: Faroese Telecom

Upgrader: Xtera Communications

Region: EMEA

News: http://subtelforum.com/articles/?s=shefa

Maywick

Sandwick

Ayre of Cara
Banff

System Name: Silphium

Landing Points: Chania (Greece), Darnah (Libya)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): 20,000,000

Total Length (kms): 426

Initial Capacity: 70 Gbps

Design Capacity: 1.2 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 40

Channel Capacity: 10 Gbps

Owners: Libyan Post, Telecom, and Information Technology Company

System Supplier: Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks

Region: EMEA

News: http://subtelforum.com/articles/tag/ silphium/

Darnah
Chania

Chikura

System Name: South-East Asia Japan Cable

Landing Points: Chikura (Japan), Lantau (Hong Kong), Nasugbu (Philippines), Shantou (China), Telisai (Brunei), Tuas (Singapore)

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): 400,000,000

Total Length (kms): 8,986

Initial Capacity: 28 Tbps

Fiber Pairs: 6 Fiber Pairs

Channel Capacity: 100 Gbps

Owners: SJC Consortium (Brunei International Gateway Sendirian Berhad, China Mobile, China Telecom, China Telecom (Hong Kong) International Ltd., Donghwa Telecom Co., Ltd., Globe Telecom, Inc., Google SJC Bermuda Ltd., KDDI Corporation, Singapore Telecom, Telin,

System Supplier: TE SubCom, NEC

System Installer: S.B. Submarine Systems, NEC

Upgrader: TE SubCom

Upgrade Year: 2014, 2016

Upgraded Capacity: 100 Gbps

Region: AustralAsia

News: http://subtelforum.com/articles/tag/sjc/

Nasugbu
Lantau

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Peninsular

System Name: Sistem Kabel Rakyat 1 Malaysia [Planned]

Landing Points: Peninsular Malaysia; Sabah, Malaysia; Sarawak, Malaysia

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 100,000,000

Total Length (kms): 3,500

Design Capacity: 4 Tbps

Owners: TIME dotCom Bhd

System Supplier: NEC

System Installer: Telekom Malaysia

Region: AustralAsia

Sabah
Sarawak

System Name: Sulawesi-Maluku-Papua Cable System

Landing Points: Papua Provinces, New Guinea

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): 71,100,000

Total Length (kms): 2,000

Design Capacity: 40 Gbps

Owners: PT Telekom (Indonesia)

System Supplier: NEC, Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks, NTT, NEC

Marine Surveyor: Fugro

Survey Boat: Fugro Supporter

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ smpcs/

Sulawesi
Maluku
Papua

System Name: St. Maarten-Puerto Rico 1

Landing Points: San Juan (Puerto Rico), St Martin (Netherlands Antilles)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): 15,000,000

Total Length (kms): 382

Initial Capacity: 2.5 Gbps

Owners: Smitcoms

System Maintainer: SMITCOMS

Region: Americas

System Name: Solomons Oceanic Cable Network [Planned]

Landing Points: Honiara (Solomon), Sydney (Australia), Auki (Soloman), Noro (Soloman)

RFS Year: 2017

Est. End of Service Date: 2041

Est. System Cost (US$): 54,000,000

Total Length (kms): 827

Owners: Solomons Oceanic Cable Company

System Supplier: TE SubCom

Region: AustralAsia

News: http://subtelforum.com/articles/?s=SOCC

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Honiara
Noro Auki

SOLAS

System Name: Solas

Landing Points: Kilmore Quay (Ireland), Oxwich Bay (UK)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): 6,000,000

Total Length (kms): 140

Initial Capacity: 5 Gbps

Owners: Eircom

System Installer: Global Marine Systems Limited

Cableship: Wave Sentinel

System Maintainer: Vodafone Limited

Region: EMEA

Kilmore Quay
Oxwich Bay

System Name: Southern Cross Cable Network FALSE

Landing Points: Alexandria (Australia), Brookvale (Australia), Kahe Point (Hawaii), Morro Bay (USA), Nedonna Beach (USA), Spencer Beach (USA), Suva (Fiji), Takapuna (New Zealand), Whenuapai (New Zealand)

RFS Year: 2000

Est. End of Service Date: 2030

Est. System Cost (US$): 1,300,000,000

Total Length (kms): 30,000

Initial Capacity: 3.6 Tbps

Design Capacity: 14 Tbps

Fiber Pairs: 3 Fiber Pairs Segments A,C,G1,G2,I. 4 Fiber Pairs Segments D and F

Channels: 16

Channel Capacity: 100 Gbps

Owners: Southern Cross Cable Network

System Supplier: Alcatel Submarine Networks, Fujitsu

System Installer: Alcatel Submarine Networks

Cableship: Cable Innovator laid 13761 km, Nexus laid 3306 km, Vercors laid 10007 km. Fresnel laid 800 km

System Maintainer: Southern Cross Cables Limited, Verizon

Upgrader: Ciena

Upgrade Year: 2012, 2013

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: AustralAsia, Transpacific News: http://subtelforum.com/articles/tag/ southern-cross/

Karachi

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Silk Route Gateway 1 [Planned]

Landing Points: Muscat, Oman; Karachi, Pakistan; future extension to Gwadar, Pakistan

RFS Year: 2018

Est. End of Service Date: 2043

Channel Capacity: 100 Gbps

Owners: Multinet Pakistan, Omantel

System Supplier: Xtera Communications

System Installer: Xtera Communications

Region: EMEA

Muscat
Gwadar

Hotellneset

System Name: Svalbard

Landing Points: Andøy (Norway), Harstad (Norway), Hotellneset (Norway)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): 80,000,000

Total Length (kms): 2,800

Initial Capacity: 4.8 Tbps

Owners: Telenor

System Supplier: Tyco Telecommunications, Nexans

System Installer: Global Marine Systems Limited

Cableship: Innovator

Region: EMEA

Harstad Andøy

System Name: Tangerine

Landing Points: Broadstairs (United Kingdom), Oostende (Belguim)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): 10,000,000

Total Length (kms): 121

Initial Capacity: 240 Gbps

Fiber Pairs: 96 Fiber Pairs

Owners: Level 3 Communications

System Maintainer: Level 3 Communications

Region: EMEA

Broadstairs
Oostende

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Maldinado

System Name: Tannat [Planned]

Landing Points: Santos (Brazil), Maldonado (Uruguay)

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 50,000,000

Total Length (kms): 2,000

Design Capacity: 90 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: Google, Government of Uruguay

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Marine Surveyor: EGS

Region: Americas News: http://subtelforum.com/articles/tag/ tannat/

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Tasman Global Access [Planned]

Landing Points: Australia, New Zealand

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): 60,000,000

Total Length (kms): 2,300

Design Capacity: 20 Tbps

Fiber Pairs: 2 Fiber Pairs

Channel Capacity: 100 Gbps

Owners: Spark New Zealand, Vodafone, Telstra

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: AustralAsia

News: http://subtelforum.com/articles/tag/tga/

Widemouth Bay

Saint-Valery-en-CauxKatwijkNorden

Manasquan

System Name: TAT-14

Landing Points: Blaabjerg (Denmark), Katwijk (Netherlands), Manasquan (USA), Norden (Germany), Saint-Valery-en-Caux (France), Tuckerton (USA), Widemouth (UK)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 400,000,000

Total Length (kms): 15,453

Initial Capacity: 160 Gbps

Design Capacity: 9.38 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 40

Channel Capacity: 40 Gbps

Owners: TAT-14 Consortium

System Supplier: Mitsubishi Electric Corporation

System Installer: Global Marine Systems Limited

Cableship: Cable Innovator, Cable Endeavour, Bold Endurance, Wave Sentinel, Subaru, Maersk Recorder, Maersk Forwarder, Sir Eric Sharp, Agile, Teliri, Fresnel, Vercors

Marine Surveyor: Fugro

System Maintainer: AT&T, British Telecommunications PLC, Deutsche Telekom AG, KPN Telecom International, Orange, TeliaSonera International Carrier AB

Upgrader: Mitsubishi

Upgrade Year: 2012

Upgraded Capacity: 40 Gbps

Region: Transatlantic News: http://subtelforum.com/articles/?s=tat-14

Tuckerton
Blaabjerg

Marseille

System Name: Telecom Egypt North

Landing Points: Abu Talat (Egypt), Pentaskinos (Republic of Cyprus), Marseille (France)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 150,000,000

Total Length (kms): 2,938

Initial Capacity: 10 Tbps

Design Capacity: 20 Tbps

Fiber Pairs: 8 Fiber Pairs

Channels: 25

Channel Capacity: 100 Gbps

Owners: Telecom Egypt

System Supplier: Alcatel-Lucent Submarine Networks

System Maintainer: Telecom Egypt

Upgrader: Infinera

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: EMEA

News: http://subtelforum.com/articles/tag/tenorth/

Alexandria
Cyprus

Fujairah

System Name: The East African Marine System

Landing Points: Fujairah (United Arab Emirates), Mombasa (Kenya)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 130,000,000

Total Length (kms): 4,500

Initial Capacity: 120 Gbps

Design Capacity: 1.28 Tbps

Owners: Etisalat (15%), TEAMS Ltd. (85%)

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: e-Marine

Cableship: Niwa

Marine Surveyor: Fugro

Region: Indian Ocean Pan-East Asian News: http://subtelforum.com/articles/tag/ teams/

Mombasa

System Name: TGN Eurasia

Landing Points: Abu Talat (Egypt), Djibouti (Republic of Djibouti), Jeddah (Saudi Arabia), Marseille (France), Mtunzini (South Africa), Mumbai (India), Zafarana (Egypt)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 250,000,000

Total Length (kms): 9,240

Initial Capacity: 160 Gbps

Design Capacity: 1.28 Tbps

Owners: SEACOM, Tata Communications, Telecom Egypt

System Maintainer: TATA Communications, Tyco Electronics Subsea Communications LLC

Region: Indian Ocean Pan-East Asian News: http://subtelforum.com/ articles/?s=TGN+Eurasia

Djibouti
Jeddah
Ras Sidr
Alexandria
Marseille

System Name: TGN Gulf

Landing Points: Al-Khobar (Saudi Arabia), Dubai (UAE), Kuwait City (Kuwait), Manama (Bahrain), Sumaisma (Qatar)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): 200,000,000

Total Length (kms): 2,306

Design Capacity: 1.28 Tbps

Fiber Pairs: 2 Fiber Pairs

Owners: Tata Communications

System Supplier: TE SubCom

System Maintainer: TATA Communications, Tyco Electronics Subsea Communications LLC

Region: EMEA

News: http://subtelforum.com/ articles/?s=TGN+Gulf

System Name: TGN Intra-Asia

Landing Points: Ballesteros (Philippines), Deep Water Bay (Hong Kong), Piti (Guam), Singapore (Singapore), Toyohashi (Japan), Vung Tau (Vietnam)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): 180,000,000

Total Length (kms): 6,485

Initial Capacity: 3.84 Tbps

Channel Capacity: 100 Gbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

System Installer: Orange Marine

System Maintainer: TATA Communications, Tyco Electronics Subsea Communications LLC

Upgrader: Ciena

Upgrade Year: 2014`

Upgraded Capacity: 100 Gbps

Region: AustralAsia

News: http://subtelforum.com/ articles/?s=TGN+Intra-Asia

Vung Tau
Ballesteros
Deep Water Bay
Toyohashi
Piti

System Name: TGN Northern Europe

Landing Points: De Marne (Netherlands), Humanby (UK)

RFS Year: 2002

Est. End of Service Date: 2027

Total Length (kms): 551

Initial Capacity: 3.84 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Tata Communications

System Maintainer: TATA Communications, Tyco Electronics

Subsea Communications LLC

Region: EMEA

News: http://subtelforum.com/ articles/?s=TGN+Northern+Europe

System Name: TGN Transatlantic

Landing Points: Highbridge (UK), Saunton Sands (UK), Wall Township (USA)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): 340,000,000

Total Length (kms): 12,670

Initial Capacity: 2.56 Tbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

System Maintainer: TATA Communications, Tyco Electronics Subsea Communications LLC

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Transatlantic

Highbridge Saunton Sands

Emi

Toyohashi

Nedonna

Beach

Hermosa

Beach

System Name: TGN Transpacific

Landing Points: Emi (Japan), Hermosa Beach (USA), Nedonna Beach (USA), Toyohashi (Japan)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): 580,000,000

Total Length (kms): 21,424

Initial Capacity: 5.12 Tbps

Channel Capacity: 100 Gbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

System Maintainer: TATA Communications, Tyco Electronics Subsea Communications LLC

Upgrader: Ciena

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: Transpacific

System Name: TGN Western Europe

Landing Points: Bilbao (Spain), Highbridge (UK), Seixal (Portugal)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): 100,000,000

Total Length (kms): 3,487

Initial Capacity: 3.84 Tbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

System Maintainer: TATA Communications, Tyco Electronics Subsea Communications LLC

Region: EMEA News: http://subtelforum.com/ articles/?s=TGN+WEstern+Europe

Highbridge
Bilbao
Seixal

Chennai

System Name: TGN-TATA IndiaCom

Landing Points: Chennai (India), Changi (Singapore)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): 90,000,000

Total Length (kms): 3,175

Initial Capacity: 640 Gbps

Fiber Pairs: 8 Fiber Pairs

Owners: Tata Communications

Region: Indian Ocean Pan-East Asian

Changi

System Name: TGN-TIC

Landing Points: Chennai (India), Tuas (Singapore)

RFS Year: 2005

Est. End of Service Date: 2030

Total Length (kms): 3,175

Initial Capacity: 5.12 Tbps

Owners: Tata Communications

System Maintainer: TATA Communications

Region: Indian Ocean Pan-East Asian News: http://subtelforum.com/ articles/?s=TGN+TIC

Tuas

System Name: Tierra del Fuego

Landing Points: Punta Dungeness (Argentina), Espiritu Santo (Argentina)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): 5,000,000

Total Length (kms): 27

Owners: AR-SAT

System Supplier: Boskalis, Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Cableship: Ile de Batz

Region: Americas

News: http://subtelforum.com/articles/tag/ tierra-del-fuego/

System Name: Thailand-Indonesia-Singapore

Landing Points: Batam (Indonesia), Songkhla (Thailand)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): 36,000,000

Total Length (kms): 1,003

Initial Capacity: 30 Gbps

Owners: CAT Telecom (Thailand), PT Telekom, Singtel

System Supplier: Tyco Telecommunications

System Installer: ASEAN Cableship

System Maintainer: Singapore Telecommunications Limited

Region: AustralAsia

Songkhla
Batam

System Name: Tonga-Fiji

Landing Points: Nuku’alofa (Tonga), Suva (Fiji)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): 18,900,000

Total Length (kms): 827

Owners: Tonga Cable Limited

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: AustralAsia

Nedonna

Beach

Qingdao Keoje

Chongming

Fuzhou

Tanshui

System Name: Trans-Pacific Express

Landing Points: Chongming (China), Shin-Maruyama (China), Keoje (South Korea), Nedonna Beach (USA), Qingdao (China), Tanshui (Taiwan)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): 440,000,000

Total Length (kms): 16,163

Initial Capacity: 1.28 Tbps

Design Capacity: 5.12 Tbps

Owners: AT&T, China Telecom, China Unicom, Chunghwa Telecom International, KT Coropration, Verizon, NTT Com

System Supplier: Tyco Telecommunications

System Installer: Global Marine Systems Limited, NTT

Cableship: Cable Innovator

System Maintainer: China Telecommunications Corporation, Chunghwa Telecom Co., KT Corporation, NTT Communications Corporation, Verizon Ltd

Upgrader: TE SubCom

Upgrade Year: 2013

Upgraded Capacity: 10 Gbps

Region: Transpacific

News: http://subtelforum.com/articles/ tag/TPE/ http://subtelforum.com/ articles/?s=TPE

Jakarta

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Onslow

Perth

System Name: Trident [Planned]

Landing Points: Perth, Onslow (Australia), Jakarta (Indonesia)

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): 290,000,000

Total Length (kms): 4,600

Design Capacity: 38 Tbps

Fiber Pairs: 2 Fiber pairs Perth-Singapore (8 Tbps), 1 fibre pair Perth-Jakarta (10 Tbps), 1 fibre pair Onslow-Jakarta (10 Tbps) and 1 fibre pair Perth-Onslow (10 Tbps)

Channels: Perth-Singapore 40, rest 100

Channel Capacity: 100 Gbps

Owners: Trident Subsea Cable

System Supplier: TE SubCom

System Installer: TE SubCom

Region: AustralAsia

News: http://subtelforum.com/articles/tag/ trident/

Curaçao

Trinidad

System Name: Trinidad-Curaçao

Landing Points: Curaçao (Curaçao), Trinidad (Trinidad)

RFS Year: 2007

Est. End of Service Date: 2032

Total Length (kms): 1,240

Initial Capacity: 1.875 Tbps

Owners: Columbus Networks, New World Network

System Supplier: Tyco Telecommunications SSI, Alcatel, NEC

System Installer: Tyco SSI

Cableship: Tyco Durable, Ile de Sein, Ile de Batz, Fu Hai, Segero, Cable Innovator

Region: Americas

SUBMARINE CABLE SYSTEM REPORTING

Presenting the industry’s most extensive collection of 375+ current and planned submarine cable systems impacting financiers, carriers, cable owners, system suppliers, component manufacturers and marine contractors, and detailing more than 50 menu-based data fields and maps in a customer-customizable report.

REPORTING IN 3-5 BUSINESS DAYS

New Taipei City

System Name: Taiwan Strait Express

Landing Points: Changle, Fuzhou City, China; Tamsui District, New Taipei City, Taiwan

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): 10,000,000

Total Length (kms): 270

Design Capacity: 6.4 Tbps

Fiber Pairs: 8 Fiber Pairs

Owners: Taiwan International Gateway Corporation, China Mobile, Chunghwa Telecom, Taiwan Mobile, Far EasTone Telecommunications, China Unicom

System Installer: Huawei Marine Networks, NTT, S.B. Submarine Systems

Region: AustralAsia

Fuzhou

System Name: Tubrok-Emased

Landing Points: Tobruk (Libya), El Quawef (Libya)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): 10,000,000

Total Length (kms): 180

Design Capacity: 25.6 Tbps

Fiber Pairs: 8 Fiber Pairs

Channels: 80

Channel Capacity: 40 Gbps

Owners: Libyan Post Telecommunications & Information Technology Company

System Supplier: Huawei Marine Networks

System Installer: Huawei Marine Networks, Orange Marine

Region: EMEA

Tobrok El-Quawef

System Name: Transworld Associates

Landing Points: Al Seeb (Oman), Fujairah (United Arab Emirates), Karachi (Pakistan)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): 40,000,000

Total Length (kms): 1,300

Initial Capacity: 1.28 Tbps

Owners: Trans-World Associates

System Supplier: Tyco Telecommunications

System Installer: Tyco Telecommunications

System Maintainer: E-marine PJSC, Oman Telecommunications Company

Upgrader: Huawei Marine

Upgrade Year: 2016

Upgraded Capacity: 100 Gbps

Region: EMEA

News: http://subtelforum.com/articles/tag/ twa-1/

System Name: Ugarit

Landing Points: Pentaskhinos (Cyprus), Tartus (Syria)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): 16,000,000

Total Length (kms): 240

Initial Capacity: 622 Mbps

Owners: Cypress Telecommunications Authority

System Supplier: Tyco Telecommunications

System Maintainer: Cyprus Telecommunications Authority Region: EMEA

Las Toninas

Maldonado

Florianopolis

System Name: Unisur

Landing Points: Florianopolis (Brazil), Las Toninas (Argentina), Maldonado (Uruguay)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): 74,000,000

Total Length (kms): 1,720

Initial Capacity: 560 Mbps

Owners: Antel (Uruguay), Embratel, Telecom Argentina, Telefonica de Argentina

System Maintainer: Telefonica International Wholesale Services

Region: Americas

Chikura

Hermosa Beach

System Name: Unity

Landing Points: Chikura (Japan), Los Angeles (USA)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): 300,000,000

Total Length (kms): 9,486

Initial Capacity: 1.92 Tbps

Design Capacity: 4.8 Tbps

Fiber Pairs: 5 Fiber Pairs

Owners: Bharti Airtel, Global Transit, Google, KDDI, PACNET, Singtel

System Supplier: Tyco Telecommunications

System Installer: NEC, Kokusai Cable Ship

System Maintainer: KDDI

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Transpacific

News: http://subtelforum.com/articles/tag/ unity/

VENTSPILS-GOTLAND

System Name: Vetnspils-Gotlan

Landing Points: Fårösund (Sweden), Stockholm (Sweden), Ventspils (Latvia)

RFS Year: 2004

Est. End of Service Date: 2029

Total Length (kms): 175

Initial Capacity: 2.5 Gbps

Fiber Pairs: 34 Fiber Pairs

Owners: Baltcom

System Supplier: TE SubCom

Region: EMEA

Ventspils
Fårösund
Stavsnas Stockholm

System Name: Vodafone Malta-Sicily Cable System

Landing Points: Balluta (Malta), Catania (Italy)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): 10,000,000

Total Length (kms): 250

Initial Capacity: 10 Gbps

Owners: Vodafone Malta

Region: EMEA

St. George’s Bay
Catania

System Name: West Africa Cable System

Landing Points: Accra (Ghana), Alta Vista (Spain), Cape Verde (Cape Verde), Douala (Cameroon), Lagos (Nigeria), Lome (Togo), Luanda (Angola), Muanda (DRC), Pointe Noire (Congo), Sesimbra (Portugal), Walvis Bay (Namibia), Whitesands Bay (UK)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): 600,000,000

Total Length (kms): 14,350

Initial Capacity: 5.12

Design Capacity: 14.5 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 32

Channel Capacity: 100 Gbps

Owners: Angola Cables, Broadband Infraco, Congo Telecom, C&W, MTN Group, Office Congolais de Poste et Telecommunication, PT Comunicações, Tata Communications, Telecom Namibia, Telekom SA, Togo Telecom, Vodacom

System Supplier: Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro

System Maintainer: Angola Cables, Telecom Nambia, Telkom SA Limited

Upgrader: Huawei Marine Networks

Upgrade Year: 2015

Upgraded Capacity: 100 Gbps

Region: EMEA

News: http://subtelforum.com/articles/ tag/wacs/ http://subtelforum.com/ articles/?s=WACS

Walvis Bay
Luanda
Pointe Noire
Muanda
Douala
Accra
LomeLagos
Cape Verde
Alta Vista
Sesimbra
Whitesand Bay

System Name: WARF

Landing Points: Cochin (India), Hulhumalé (India)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): 20,000,000

Total Length (kms): 680

Owners: WARF Telecom International

System Supplier: Alcatel Submarine Networks

Marine Surveyor: Fugro

Region: Indian Ocean Pan-East Asian

Hulhumalé

WESTERN VISAYAS-PALAWAN

System Name: Western Visayas-Palawan

Landing Points: Taytay, Palawan; San Jose de Buenavista, Iloilo (Philippines)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): 20,000,000

Total Length (kms): 300

Owners: PLDT (Philippines)

Region: AustralAsia

Taytay
San Jose de Buenavista
Iloilo

Voice of the Industry

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.