Almanac Issue 16

Page 1


submarine cable ALMANAC

While all reasonable steps to verify information from the public domain have been taken, based on changing circumstances and dynamic factors, incomplete information subject to change may exist. Our goal is to periodically update and modify such information. If you have a correction, please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing almanac@subtelforum.com.

WIntroduction

elcome to the sixteenth edition of the Submarine Cable Almanac, one of our most popular reference tools. The Almanac has been completely revamped in this issue, with almost evey system being updated with new information. Additionally, we added 15 new systems.

If you’re interested in finding a specific system, or wish to see all systems in a region, simply type that name or region into the search function. We hope that you, our readers, will participate in this almanac as you’ve done with our previous products.

There is always room for additional data, so let us know if there is something else we should include in future editions. Please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing almanac@subtelforum.com.

Finally, I want to thank all of the sponsors, staff and dedicated readers that contributed to this Almanac. Your feedback has been invaluable.

Submarine Cable Almanac Issue 16 | November 2015

Copyright © 2015 by Submarine Telecoms Forum, Inc.

November, 2015

All rights reserved. No part of this book may be used or reproduced by any means, graphic, eletronic, or mechanical, including photocopying, recording, taping or by any information storage retrieval system without the written permission of the publisher except in the case of brief quotations embodied in critical articles and reviews.

Submarine Telecoms Forum, Inc.

21495 Ridgetop Circle Suite 201

Sterling, Virginia 20166 USA www.subtelforum.com

Submarine Cables of The World

............................................. 454 SOUTHERN CROSS ........................ 456

SVALBARD ....................................... 458

TANGERINE ..................................... 460

TASMAN GLOBAL ACCESS ......... 462

TAT 14 ................................................ 464

TE NORTH ........................................ 466

TEAMS ............................................... 468

TGN EURASIA ................................. 470

TGN GULF ........................................ 472

TGN INTRA-ASIA ........................... 474

TGN NORTHERN EUROPE .......... 476

TGN TRANSATLANTIC ................ 478

TGN TRANSPACIFIC ..................... 480

TGN WESTERN EUROPE .............. 482

TGN-TATA INDIACOM ................. 484

TGN-TIC ............................................ 486

TIERRA DEL FUEGO ...................... 488

TIS ....................................................... 490

TONGA-FIJI 492

TPE 494

TRIDENT 496

TRINIDAD-CURAÇAO 498

TRIPOLI-BENGHAZI CABLE ....... 500

TSE-1 .................................................. 502

............................................. 508

.............................................

................................................

NEW

516

............................................... 518

................................................. 520

................................................. 522 WESTERN VISAYAS-PALAWAN .. 524

SPONSORS

Emerging Subsea Networks

Sponsorship and Exhibition Opportunities are now available online and our Call for Papers will be issued in June 2015

Celebrating ofSubOptic 30 years

The world’s expanding treasure

Hosted by

System Name: Asia Africa Europe

Landing Points: Barcelona (Spain), Marseilles (France), Palermo (Italy), Abu Talat (Egypt), Zafrana (Egypt), Djibouti, Oman, Fujairah (UAE), Mumbai (India), Kenya, Sri Lanka, Cox Bazaar (Bangladesh), Myanmar, Singapore, Hong Kong, Shanghai (China)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $600,000,000

Total Length (kms): 25,000

Project Completion Phases: Pre-Engineering

Survey

System Manufacture

System Installation Commissioning & Acceptance

Design Capacity: 40 Tbps

Channels: 80

Channel Capacity: 100 Gbps

Owners: British Telecom, China Unicom, Chuan Wei, Djibouti Telecom, Etisalat, HKT (PCCW Global), Mobily, Omantel, Ooredoo, PTCL, Telecom Egypt, Telecom Yemen, Vittel, OTEG, Reliance Jio, Time.com, TOT

System Supplier: TE SubCom, NEC

System Installer: TE SubCom

Marine Surveyor: Fugro

Region: Indian Ocean Pan-East Asian

Lantau La Union

Tau Tungku

Tanguisson

Keawaula

System Name: Asia-America Gateway

Landing Points: Changi (Singapore), Keawaula (Hawaii), Lantau (Hong Kong), La Union (Philippines), Mersing (Malaysia), San Luis Obispo (USA), Sri Racha (Thailand), Tanguisson (Guam), Tungku (Brunei), Vung Tau (Vietnam)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $500,000,000

Total Length (kms): 20,547

Initial Capacity: 2.88 Tbps

Owners: AT&T Inc., Bayan, Bharti, BT Global Network Services, CAT Telecom, ETPI, FPT Telecom, the Government of Brunei Darussalam, PT Indosat, PLDT, Saigon Postel Corporation, StarHub, Telcotech, TELKOM Indonesia, Telstra, Telekom Malaysia, TNZL, Viettel, VNPT

System Supplier: Alcatel Submarine Networks, NEC

System Installer: Alcatel Submarine Networks, ASEAN Cableship, NEC, Orange Marine

Cableship: Rene Descartes

Upgrader: Mitsubishi, Ciena

Upgrade Year: 2011, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Transpacific

San Luis Obispo

Westerland

Whitesands Bay Beverwijk

Brookhaven

System Name: Atlantic Crossing 1

Landing Points: Beverwijk (Netherlands), Brookhaven (USA), Westerland (Germany), Whitesands Bay (UK)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $875,000,000

Total Length (kms): 13,377

Initial Capacity: 40 Gbps

Design Capacity: 1 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Level 3 Communications

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Upgrader: Xtera Communications

Upgrade Year: 2010

Upgraded Capacity: 20 Gbps

Region: Transatlantic

System Name: Atlantic Crossing 2

Landing Points: Bellport (USA), Widemouth (UK)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $700,000,000

Total Length (kms): 6,185

Initial Capacity: 320 Gbps

Design Capacity: 640 Gbps

Owners: Level 3 Communications

Upgrader: Infinera

Upgrade Year: 2010

Upgraded Capacity: 10 Gbps

Region: Transatlantic

System Name: Africa Coast To Europe

Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Asilah (Morocco), Banjul (The Gambia), Bata (Equatorial Guinea), Cape Town (South Africa), Conakry (Guinea), Cotonou (Benin), Dakar (Senegal), Freetown (Sierra Leone), Kribi (Cameroon), Lagos (Nigeria), Libreville (Ga

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $700,000,000

Total Length (kms): 17,000

Design Capacity: 5.12 Tbps

Owners: Benin Telecoms, Cable Consortium of Liberia, Canalink Africa SL, Côte d’Ivoire Telecom, Dolphin Telecom JLT, Gambia Submarine Cable, Guinéenne de Large Bande, International Mauritania Telecom, MEO, MTN, Orange (France), Orange Cameroun, Orange Mali, Orang

System Supplier: Alcatel-Lucent Submarine Networks (Main contractors), TE SubCom (Sub contractors)

System Installer: Orange Marine

Marine Surveyor: Fugro

Region: EMEA

System Name: Adones

Landing Points: Benguela (Angola), Cabinda (Angola), Luanda (Angola), Lucira (Angola), Namibe (Angola), Nzeto (Angola), Porto Amboim (Angola), Soyo (Angola)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $35,000,000

Total Length (kms): 1,800

Initial Capacity: 30 Gbps

Design Capacity: 80 Gbps

Owners: Angola Telecom

System Supplier: Ericsson

System Installer: Elettra

Cableship: Teleri

Region: EMEA

Cabinda Soyo
Nzeto
Luanda
Porto Amboim
Benguela
Lucira
Namibe

System Name: ADRIA-1

Landing Points: Corfu (Greece), Dubrovnik (Croatia), Durres (Albania)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $13,400,000

Total Length (kms): 430

Initial Capacity: 622 Mbps

Owners: Deutsche Telekom AG, OTE

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks Region: EMEA

Dubrovnik
Durres
Corfu ADRIA-1

System Name: America Europe Connect

Landing Points: Shirley, New York (United States); Killala, Ireland

RFS Year: 2016

Est. End of Service Date: 2040

Est. System Cost (US$): $300,000,000

Total Length (kms): 5,400

Design Capacity: 78 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 130

Channel Capacity: 100 Gbps

Owners: AquaComms

System Supplier: TE SubCom

System Installer: TE SubCom

Cableship: Reliance

Region: Transatlantic

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Killala

System Name: Australia-Japan Cable

Landing Points: Maruyama (Japan), Oxford Falls (Australia), Shima (Japan), Sydney (Australia), Tanguisson (Guam), Tumon (Guam)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $520,000,000

Total Length (kms): 12,224

Initial Capacity: 320 Gbps

Design Capacity: 25.6 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: Australia Japan Cable Limited, Communications Global Network Services Limited, NTT Communications Corporation, SOFTBANK Telecom Corp., Telstra Holdings (Bermuda) No. 1 Limited, Worldcom Global Networks Limited

System Supplier: Ocean Cable Company, Tyco Telecommunications

System Installer: FCR, KDD

Cableship: Fresnel, Subaru

Upgrader: Ciena, Infinera

Upgrade Year: 2012, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Transpacific

Shima
Tanguisson Tumon
Oxford Falls Sydney

Anchorage

System Name: Akorn

Landing Points: Anchorage (USA), Florence (USA)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $100,000,000

Total Length (kms): 2,968

Initial Capacity: 10 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Alaska Communications

System Supplier: Tyco Telecommunications

Region: Americas

ALASIA

System Name: Alasia

Landing Points: Pentaskhinos (Cyprus), Tartus (Syria)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $15,000,000

Total Length (kms): 350

Design Capacity: 25.6 Tbps

Fiber Pairs: 8 Fiber Pairs

Owners: Cyprus Telecommunications Authority, Syrian Telecommunications Authority

Region: EMEA

Valdez Whittier

Juneau

System Name: Alaska United East

Landing Points: Harbor Pointe (USA), Juneau (USA), Valdez (USA), Whittier (USA)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $100,000,000

Total Length (kms): 3,751

Initial Capacity: 2.5 Gbps

Design Capacity: 10 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: GCI

System Supplier: NEC

Region: Americas

Harbor Pointe

ALASKA UNITED WEST

Whittier

System Name: Alaska United West

Landing Points: Ketchikan (USA), Warrenton (USA), Whittier (USA)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): $30,000,000

Total Length (kms): 2,483

Initial Capacity: 10 Gbps

Design Capacity: 640 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: GCI

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Cableship: Global Sentinel Region: Americas

Ketchikan Warrenton

System Name: ALBA-1

Landing Points: Camuri (Venezuela), Havana (Cuba), Morant Point (Jamaica), Santiago De Cuba (Cuba)

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): $72,000,000

Total Length (kms): 1,600

Initial Capacity: 640 Gbps

Owners: Telecom Venezuela, Transbit SA

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Shanghai Bell, Telecomunicaciones Gran Caribe

Marine Surveyor: EGS

Survey Boat: RV Ridley Thomas

Region: Americas

Alexandria

Tartus

System Name: Aletar

Landing Points: Alexandria (Egypt), Tartus (Syria)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $23,000,000

Total Length (kms): 733

Initial Capacity: 5 Gbps

Fiber Pairs: 1 Fiber Pair

Owners: Lebanese Ministry of Telecom (6.25%), Syrian Telecom (46.875%), Telecom Egypt (46.875%)

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Vercors Region: EMEA

System Name: Alexandros

Landing Points: Alexandria (Egypt), Marseille (France), Pentaskhinos (Cyprus)

RFS Year: 2010

Est. End of Service Date: 2035

Design Capacity: 10 Tbps

Owners: Cyprus Telecommunications Authority, Telecom Egypt

Region: EMEA

ALONSO DE OJEDA

Oranjestad

System Name: Alonso De Ojeda

Landing Points: Oranjestad (Aruba), Willemstad (Netherlands Antilles)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $8,678,000

Total Length (kms): 128

Initial Capacity: 15 Gbps

Design Capacity: 100 Gbps

Owners: Antelecom NV

System Supplier: Alcatel Submarine Networks

System Installer: IT International Telecom

Region: Americas

Willemstad

System Name: Alpal-2

Landing Points: El Djemila (Algeria), Ses Covetes (Majorca)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): $17,600,000

Total Length (kms): 312

Initial Capacity: 10 Gbps

Design Capacity: 160 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: APT, France Telecom, Telefonica

System Supplier: Pirelli

System Installer: Global Marine Systems Limited

Cableship: Maersk Responder

Region: EMEA

AMERICAN SAMOA-FIJI [Planned]

System Name: American Samoa-Fiji

Landing Points: Pago Pago (American Samoa), Fiji

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $35,000,000

Initial Capacity: 40 Gbps

Owners: American Samoa Hawaii Cable

Region: AustralAsia

American Samoa

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

AMERICAS I

Magens Bay

System Name: Americas I

Landing Points: Magens Bay (Virgin Islands), Vero Beach (USA)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $220,000,000

Total Length (kms): 2,013

Initial Capacity: 120 Gbps

Design Capacity: 320 Gbps

Owners: AT&T, CANTV (Venezuela), Embratel, TSTT

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Upgrader: Xtera Communications

Upgrade Year: 2010

Upgraded Capacity: 20 Gbps

Region: Americas

AMERICAS I SOUTH

System Name: Americas I South

Landing Points: Camuri (Venezuela), Fortaleza (Brazil), Macqueripe (Trinidad), Magens Bay (Virgin Islands)

RFS Year: 1994

Est. End of Service Date: 2019

Total Length (kms): 6,014

Initial Capacity: 560 Mbps

Owners: AT&T, CANTV (Venezuela), Embratel, TSTT

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications SSI

System Installer: C&W (Marine)

Cableship: Cable Installer, Agile, Fresnel

Region: Americas

Magens Bay

Camuri Macqueripe

Initial Capacity: 80 Gbps

Design Capacity: 210 Gbps

Owners: Antelecom NV, AT&T, Brazil Telecom, CANTV (Venezuela), Embratel, France Telecom, GT&T, Sprint, Telecom Italia, Telefonica, Telesur, Telintar, Trescom Int., TSTT, Verizon

System Supplier: ASN Australia, Tyco Telecommunications

System Installer: Tyco Telecommunications SSI

Cableship: Global Link

Region: Americas

System Name: Americas II

Landing Points: Camuri (Venezuela), Cayenne (French Guiana), Chaguaramas (Trinidad), Fortaleza (Brazil), Hollywood (USA), Lamentine (France), Miramar (Puerto Rico), St Croix (US Virgin Islands), Willemstad (Netherlands Antilles)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $350,000,000

Total Length (kms): 8,373

AMERIGO VESPUCCI

Bonaire

Curaçao

System Name: Amerigo Vespucci

Landing Points: Bonaire (Netherlands), Curacao (Curacao)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $15,000,000

Total Length (kms): 84

Region: Americas

System Name: America Movil Submarine Cable System-1

Landing Points: Jacksonville (United States), Miami (United States), San Juan (Puerto Rico), Puerto Barrios (Guatemala), Barranquilla (Colombia), Cartagena (Colombia), Fortaleza (Brazil), Salvador de Bahia (Brazil), Rio de Janeiro (Brazil), Puerto Plata (Dominican Repub

RFS Year: 2014

Est. End of Service Date: 2038

Est. System Cost (US$): $700,000,000

Total Length (kms): 17,800

Initial Capacity: 100 Gbps

Owners: America Movil

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro, EGS

Region: Americas

Fortaleza
Rio de Janeiro Maimi
Puerto Plata San Juan
Barranquilla Cartagena
Cancun
Puerto Barrios

Las Toninas

System Name: Antel

Landing Points: Las Toninas (Argentina), Maldonado (Uruguay)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $15,000,000

Total Length (kms): 250

Initial Capacity: 50 Gbps

Design Capacity: 3.84 Tbps

Owners: Antel (Uruguay), Telecom Argentina

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: IT Telecom

Region: Americas

Maldonado

ANTILLES CROSSING

System Name: Antilles Crossing

Landing Points: Bridgetown (Barbados), Hams Bluff (Virgin Islands), Port Castries (St Lucia)

RFS Year: 2006

Est. End of Service Date: 2031

Total Length (kms): 952

Initial Capacity: 40 Gbps

Design Capacity: 80 Gbps

Owners: Antilles Crossing, Barbados Light & Power, Leucadia, Telebarbados

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: Americas

Marine Surveyor: C&C Technologies

Upgrader: NEC

Upgrade Year: 2011, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: AustralAsia

System Name: Asia-Pacific Cable Network 2

Landing Points: Batangas (Philippines), Chikura (Japan), Chongming (China), Katong (Singapore), Kitaibaraki (Japan), Kuantan New Port (Malaysia), Lantau (Hong Kong), Pusan (South Korea), Shantou (China), Tanshui (Taiwan)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): $1,100,000,000

Total Length (kms): 19,000

Initial Capacity: 160 Gbps

Design Capacity: 6.4 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: China Telecom, Chunghwa Telecom International, CTM, France Telecom, KDDI, KT Coropration, NTT Communications, PLDT (Philippines), Reach NHK, Singtel, Telekom Malaysia

System Supplier: Ocean Cable Company

System Installer: Global Marine Systems Limited

Cableship: Cable Retriever, Bold Endurance, Fu Lai, Asean Restorer, Maersk Recorder, Maersk Repeater, Maersk Responder, Maersk Reliance, Subaru, Kuroshio Maru, Cable Installer. Barges, Networker, Elbe, Chin Ann 3

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Asia Pacific Gateway

Landing Points: Chongming (China), Da Nang (Vietnam), Kuantan (Malaysia), Tseung Kwan (Hong Kong), ShinMaruyama (Japan), Nanhui District (China), Busan (South Korea), Shima (Japan), Songkhla (Thailand), Toucheng (Taiwan), Tanah Merah (Singapore)

RFS Year: 2016

Est. End of Service Date: 2040

Est. System Cost (US$): $313,000,000

Total Length (kms): 10,000

Design Capacity: 38.4 Tbps

Channel Capacity: 40 Gbps

Owners: China Telecom, China Unicom, Chunghwa Telecom International, Facebook, KT Coropration, NTT Communications, PLDT (Philippines), StarHub (Singapore), Telekom Malaysia, TIME dotCom, VNPT

System Supplier: NEC

System Installer: NTT Com, S.B. Submarine Systems, NEC

Region: AustralAsia

Pusan Shima
Chongming
Toucheng
Lantau
Da Nang
Songkhla
Kuantan
Tuas
Nanhu
Maruyama

Chania

Yeroskipos

System Name: Aphrodite 2

Landing Points: Chania (Greece), Yeroskipos (Cyprus)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $30,000,000

Total Length (kms): 868

Initial Capacity: 1.12 Gbps

Owners: AT&T, Belgacom, British Telecom, Cyprus Telecommunications Authority (62%), France Telecom, OTE, Sprint, Verizon

System Supplier: Alcatel Submarine Networks

Cableship: Skandi Hav

Region: EMEA

System Name: Australia Papua New Guinea 2

Landing Points: Port Moresby (Papua New Guinea), Sydney (Australia)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $11,000,000

Total Length (kms): 3,400

Initial Capacity: 1.12 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Telikom PNG, Telstra (Australia)

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Re

Region: AustralAsia

Point Moresby

Brookhaven

Manasquan

System Name: Apollo

Landing Points: Brookhaven (USA), Lannion (France), Manasquan (USA), Widemouth (UK)

RFS Year: 2003

Est. End of Service Date: 2028

Est. System Cost (US$): $350,000,000

Total Length (kms): 12,700

Initial Capacity: 10 Gbps

Design Capacity: 25 Tbps

Fiber Pairs: 4 Fiber Pairs

Channel Capacity: 100 Gbps

Owners: Alcatel, Apollo SCS Limited, C&W

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Batz, Ile de Brehat, Ile de Sein, Skandi Neptune

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2012, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Transatlantic

APX-CENTRAL [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Asia Pacific Express Central

Landing Points: Adelaide (Australia), Hobart (Australia), Melbourne (Australia), Perth (Australia)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $150,000,000

Total Length (kms): 4,800

Design Capacity: 32 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 80

Channel Capacity: 100 Gbps

Owners: SubPartners

System Supplier: TE SubCom

Region: AustralAsia

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Asia Pacific Express East

Landing Points: Auckland (New Zealand), Hermosa Beach (United States), Oahu, Hawaii (United States), Sydney (Australia)

RFS Year: 2017

Est. End of Service Date: 2040

Est. System Cost (US$): $350,000,000

Total Length (kms): 12,700

Design Capacity: 40 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: SubPartners

System Supplier: TE SubCom

Region: Transpacific

APX-WEST [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Asia Pacific Express West

Landing Points: Jakarta (Indonesia), Christmas Island (Australia), Perth (Australia), Singapore

RFS Year: 2016

Est. End of Service Date: 2040

Est. System Cost (US$): $150,000,000

Total Length (kms): 4,600

Design Capacity: 32 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 80

Channel Capacity: 100 Gbps

Owners: SubPartners

System Supplier: TE SubCom

Region: AustralAsia

System Name: Arcos-1

Landing Points: Bluefields (Nicuragua), Cancun (Mexico), Cartagena (Columbia), Cat Island (Bahamas), Crooked Island (Bahamas), Hollywood (USA), Ladyville (Belize), Maria Chiquita (Panama), Nassau (The Bahamas), Providenciales (Turks and Caicos Islands), Puerto Barrios (G

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $250,000,000

Total Length (kms): 8,700

Initial Capacity: 80 Gbps

Design Capacity: 1 Tbps

Owners: Alestra (Mexico), AT&T, Axtel (Mexico), BTC (Bahamas), BTL (Belize), CANTV (Venezuela), Codetel (Dominican Republic), Colombus Networks, Enitel (Nicaragua), Hondutel (Honduras), ICE (Costa Rica), Impsat (USA), Internexa (Colombia), Orbinet SA (Colombia),

System Supplier: Norddeutsche Seekabelwerke (Tyco Telecommunications, Partial)

Marine Surveyor: Fugro

Upgrader: Xtera Communications

Upgrade Year: 2008

Upgraded Capacity: 40 Gbps

Region: Americas

ASC [Planned]

Singapore

Anyer

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Australia-Singapore Cable

Landing Points: Perth (Australia), Tanah Mera (Singapore), Anyer (Indonesia)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $160,000,000

Total Length (kms): 4,600

Design Capacity: 36 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 120

Channel Capacity: 100 Gbps

Owners: Australia-Singapore Cable International Limited

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: AustralAsia

Hong Kong

Philippines

Japan

System Name: Asia Submarine-cable Express

Landing Points: Japan, Philippines, Hong Kong, Malaysia, Singapore, Cambodia

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): $412,000,000

Total Length (kms): 7,200

Design Capacity: 15.36 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 128

Channel Capacity: 40 Gbps

Owners: NTT Communications (Japan), PLDT (Philippines), StarHub (Singapore), Telekom Malaysia

System Supplier: Fujitsu Limited, NEC Corporation

System Installer: S.B. Subarine Systems, NTT, NEC

Region: AustralAsia

Keawaula

System Name: America Samoa Hawaii

Landing Points: Keawaula (Hawaii), Pago Pago (American Samoa)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $100,000,000

Total Length (kms): 4,680

Initial Capacity: 1.2 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: ASH Cable Company

System Supplier: Alcatel-Lucent Submarine Networks

Cableship: Ile de Ré

Region: AustralAsia

System Name: Athena

Landing Points: Koropi (Greece), Pentaskhinos (Cyprus)

RFS Year: 2011

Est. End of Service Date: 2036

Total Length (kms): 600

Owners: Cypress Telecommunications Authority, Telecom Italia Sparkle

Region: EMEA

Pentaskhinos

System Name: Atlantis-2

Landing Points: Conil (Spain), Dakar (Senegal), El Medano (Spain), Fortaleza (Brazil), Funchal (Portugal), Las Toninas (Argentina), Lisbon (Portugal), Praia (Cape Verde), Rio de Janeiro (Brazil)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $370,000,000

Total Length (kms): 13,100

Initial Capacity: 40 Gbps

Design Capacity: 160 Gbps

Fiber Pairs: 2 Fiber Pairs, Initial: 2 wavelengths, Design: 8 wavelengths

Channels: 2 to 8

Channel Capacity: 40 Gbps

Owners: Cabo Verde Telecom, Deutsche Telekom AG, Embratel, France Telecom, Marconi, Sonatel, Telecom Argentina, Telecom Italia, Telefonica, Telefonica de Argentina, Telintar, Verizon

System Supplier: Alcatel Submarine Networks, Pirelli, Fujitsu

System Installer: FCR

Cableship: Raymond Croze, Fresnel, Vercors, Teneo, Teliri, Maersk Defender

Region: Transatlantic

Fortaleza
Rio de Janeiro
Las Toninas
Dakar
El Medano
Funchal
Conil
Lisbon
Praia

System Name: Atlas Offshore

Landing Points: Asilah (Morocco), Marseille (France)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $31,000,000

Total Length (kms): 1,634

Initial Capacity: 40 Gbps

Design Capacity: 320 Gbps

Owners: Maroc Telecom of Morocco

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: EMEA

AUSTRAL [Planned]

Puerto Montt

System Name: Austral

Landing Points: Puerto Montt (Chile), Punta Arenas (Chile)

RFS Year: 2016

Est. End of Service Date: 2040

Est. System Cost (US$): $100,000,000

Total Length (kms): 1,800

Owners: AUSTRAL University of Magellan, Magellan CPC

System Supplier: Huawei Marine Networks

System Installer: IT International Telecom

Region: Americas

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Punta Arenas

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Australia West Express

Landing Points: Perth, Australia; Djibouti

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $300,000,000

Design Capacity: 20 Tbps

Channel Capacity: 200 Gbps

Owners: GoTo Networks

System Supplier: Alcatel-Lucent Submarine Networks

Region: Indian Ocean Pan-East Asian

Perth
Djibouti

BAHAMAS-2

System Name: Bahamas-2

Landing Points: Eight Mile Rock (Bahamas), Nassau (The Bahamas), Vero Beach (USA)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $25,000,000

Total Length (kms): 478

Initial Capacity: 2.5 Gbps

Owners: AT&T, Balteco, Verizon

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Marine Surveyor: C&C Technologies

Region: Americas

BALTICA

Gedser Ystad

System Name: Baltica

Landing Points: Dueodde (Bornholm), Gedser (Denmark), Kolobrzeg (Poland), Ystad (Sweden)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $16,000,000

Total Length (kms): 437

Initial Capacity: 5 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Polish Telecom, TDC, Telecom Finland, Telenor, Teliasonera

Region: EMEA

Dueodde

Kolobrzeg

Barcelona

System Name: BAR-SAV

Landing Points: Barcelona (Spain), Savona (Italy)

RFS Year: 1996

Est. End of Service Date: 2021

Est. System Cost (US$): $39,000,000

Total Length (kms): 760

Initial Capacity: 5 Gbps

Owners: Telecom Italia, Telefonica

System Supplier: Alcatel Submarine Networks

Region: EMEA

Savona

Inverloch Stanley

System Name: Bass Strait 2

Landing Points: Inverloch (Australia), Stanley (Tasmania, Australia)

RFS Year: 2003

Est. End of Service Date: 2028

Est. System Cost (US$): $17,000,000

Total Length (kms): 240

Initial Capacity: 10 Gbps

Owners: Telstra (Australia)

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Batz

Region: AustralAsia

System Name: Bay of Bengal Gateway

Landing Points: Sri Lanka, Singapore, Oman, UAE

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): $30,000,000

Total Length (kms): 8,000

Initial Capacity: 100 Gbps

Design Capacity: 30 Tbps

Fiber Pairs: 3 Fiber Pairs, 10 Tbps per pair

Channel Capacity: 100 Gbps

Owners: Bay of Bengal Consortium

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Cableship: Ile De Brehat

Marine Surveyor: EGS

Survey Boat: Northern Endeavour

Region: Indian Ocean Pan-East Asia

BCS EAST

System Name: BCS East

Landing Points: Liepaja (Latvia), Sventoji (Lithuania)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $15,000,000

Total Length (kms): 98

Initial Capacity: 2.5 Gbps

Owners: Teliasonera

Region: EMEA

Sventoji Liepaja

Sandviken

System Name: BCS East-West Interlink

Landing Points: Sandviken (Sweden), Sventoji (Lithuania)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $20,000,000

Total Length (kms): 218

Initial Capacity: 2.5 Gbps

Owners: Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

Region: EMEA

Sventoji

Stavsnas

Mariehamn Haraldsholm

Hango Helsingfors

Kotka Logi

System Name: BCS North

Landing Points: Hango (Finland), Haraldsholm (Finland), Helsingfors (Finland), Kotka (Finland), Mariehamn (Finland), Stavsnas (Sweden)

RFS Year: 2003

Est. End of Service Date: 2028

Est. System Cost (US$): $30,000,000

Total Length (kms): 793

Initial Capacity: 10 Gbps

Owners: Rostelecom, Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

Region: EMEA

System Name: Batam-Dumai-Melaka

Landing Points: Batam (Indonesia), Dumai (Indonesia), Melaka (Malaysia)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $76,000,000

Total Length (kms): 400

Initial Capacity: 80 Gbps

Design Capacity: 2.56 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 64

Channel Capacity: 10 Gbps

Owners: PT Mora Telematika, PT XL Axiata, Telekom Malaysia

System Supplier: Huawei Marine Networks

System Installer: Huawei Marine Networks

Region: AustralAsia

Melaka Dumai
Batam

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Best Cable System

Landing Points: Brunei; Sabah; Malaysia; Southern Philippines; Kalimantan, Indonesia; extension to Guam

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): $150,000,000

Total Length (kms): 5,092

Owners: Best Cable Corp. Pte. Ltd.

Region: AustralAsia

Palau
Yap Philippines
Malaysia
Brunei Indonesia

BHARAT-LANKA

System Name: Bharat-Lanka

Landing Points: Dehiwala-Mount Lavinia (Sri Lanka), Tuticorin (India)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $40,000,000

Total Length (kms): 338

Initial Capacity: 40 Gbps

Design Capacity: 960 Gbps

Channel Capacity: 40 Gbps

Owners: BSNL, Sri Lanka Telecom Limited (SLT), Sri Lanka

System Supplier: NEC

System Installer: NEC

Region: Indian Ocean Pan-East Asian

Boca

Raton

Crown

Haven

Riding Point

Freeport

Marsh Harbour

Sandy Point

Nassau

Upper Bogue

Rock Sound

System Name: Bahamas Internet Cable System

Landing Points: Boca Raton (USA), Crown Haven (Bahamas), Freeport (Bahamas), Marsh Harbour (Bahamas), Nassau (The Bahamas), Riding Point (Bahamas), Rock Sound (Bahamas), Sandy Point (Bahamas), Upper Bogue (Bahamas)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $31,000,000

Total Length (kms): 1,000

Initial Capacity: 10 Gbps

Design Capacity: 12 Tbps

Channel Capacity: 10 Gbps

Owners: Carribbean Crossings

Region: Americas

System Name: Balkans-Italy Network

Landing Points: Bari (Italy), Durres (Albania)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $21,636,744

Total Length (kms): 276

Initial Capacity: 40 Gbps

Channel Capacity: 40 Gbps

Owners: Unifi

Region: EMEA

Bari
Durres

System Name: BIOS/Jonah

Landing Points: Tel Aviv (Israel), Bari (Italy)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $15,000,000

Total Length (kms): 2,300

Owners: Bezeq International

System Supplier: Alcatel-Lucent Submarine Networks

Marine Surveyor: Elettra

Region: EMEA

Bari

System Name: Broadband Linking the American Samoa Territory

Landing Points: Fogagogo, Tu’tuila (American Samoa), Ofu Harbor, Ofu (American Samoa), Luma, Ta’u (American Samoa), Aunu’u Warf, Aunu’u (American Samoa)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $11,000,000

Total Length (kms): 250

Owners: ASTCA (American Samoa)

System Supplier: IT International Telecom

Marine Surveyor: IT International Telecom

Region: AustralAsia

Ofu

Tutuila
Luma
Aunu'u

System Name: Boracay-Palawan

Landing Points: Taytay (Philippines), San Jose (Philippines), Coron (Philippines); Boracay (Philippines), Caticlan (Philippines)

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): $20,000,000

Total Length (kms): 332

Design Capacity: 4.8 Tbps

Fiber Pairs: 12 Fiber Pairs

Channels: 40

Channel Capacity: 10 Gbps

Owners: Globe Telecom

System Supplier: Huawei Marine Networks

Region: AustralAsia

System Name: Botnia

Landing Points: Umea (Sweden), Vaasa (Finland)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $8,500,000

Total Length (kms): 77

Initial Capacity: 1.2 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Teliasonera

System Supplier: NKT

System Installer: AKN

Cableship: Pleijel

Region: EMEA

Vaasa

System Name: Batam-Rengit Cable System

Landing Points: Batam (Indonesia), Sungai Rengit (Malaysia)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $10,000,000

Total Length (kms): 63

Initial Capacity: 10 Gbps

Owners: Excelcom

Region: AustralAsia

System Name: Batam Singapore Cable System

Landing Points: Batam (Indonesia), Changi (Singapore)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $13,100,000

Total Length (kms): 73

Initial Capacity: 80 Gbps

Fiber Pairs: 3 Fiber Pairs

Owners: Telekom Indonesia

System Supplier: Ocean Cable Company

System Installer: Stena Offshore, ASEAN Cableship, NEC

Cableship: Northern Installer

Region: AustralAsia

Changi
Batam

System Name: Black Sea Fibre Optic Cable System

Landing Points: Novorossiysk (Russia), Odesa (Ukraine), Varna (Bulgaria)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $51,000,000

Total Length (kms): 933

Initial Capacity: 2.5 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Armentel, AT&T, BTC, Cypress Telecommunications Authority, DTAG, HT, KDDI, OTE, Rostelecom, Telecom Slovenia, Ukrtelecom

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications SSI

System Installer: Global Marine Systems Limited

Cableship: Maersk Fighter

Region: EMEA

Odesa

System Name: Caribbean-Bermuda US

Landing Points: Manasquan (USA), Tortola (British Virgin Islands)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $10,000,000

Total Length (kms): 1,609

Owners: LIME

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI, IT International Telecom

Upgrader: Xtera Communications Region: Americas

Tortola
Manasquan

Pentaskhinos

System Name: Cadmos

Landing Points: Beirut (Lebanon), Pentaskhinos (Cyprus)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $8,000,000

Total Length (kms): 262

Design Capacity: 622 Mbps

Fiber Pairs: 2 Fiber Pairs

Owners: Cyprus Telecommunications Authority (62%), Lebanese Ministry of Telecommunications (38%)

System Supplier: Tyco Telecommunications Region: EMEA

Beirut

Fortaleza

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Cameroon-Brazil

Landing Points: Fortaleza, Brazil; Cameroon

RFS Year: 2018

Est. End of Service Date: 2043

Est. System Cost (US$): $487,000,000

Total Length (kms): 5,900

System Supplier: Huawei Marine

System Installer: Global Marine

Region: Transatlantic

Cameroon

Tenerife

System Name: Canalink

Landing Points: Cadiz (Spain), Tenerife (Spain)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $157,000,000

Total Length (kms): 2,000

Design Capacity: 5.12 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 128

Channel Capacity: 10 Gbps

Owners: Isalink, IT3

System Supplier: Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro, Elettra

Region: EMEA

Cadiz

System Name: Caucasus Cable System

Landing Points: Poti (Georgia), Varna (Bulgaria)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $76,000,000

Total Length (kms): 1,187

Design Capacity: 1.2Tbps

Fiber Pairs: 2 Fiber Pairs

Owners: Caucasus Online

System Supplier: Tyco Telecommunications

Region: EMEA

Poti

Charlestown

Bermuda

System Name: Challenger Bermuda-1

Landing Points: Bermuda (Bermuda), Charleston, RI (USA)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $50,000,000

Total Length (kms): 1,448

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: Cable Company Ltd, Verizon

System Supplier: Alcatel-Lucent Submarine Networks

Region: Americas

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Ceiba-2

Landing Points: Malabo, Equatorial Guinea; Bata, Equatorial Guinea; branching unit to Kribi, Cameroon

RFS Year: 2016

Est. End of Service Date: 2040

Est. System Cost (US$): $15,000,000

Total Length (kms): 290

Design Capacity: 8 Tbps

Owners: Republic of Equatorial Guinea

System Supplier: Huawei Marine

Region: EMEA

Malabo

Bata Kribi

System Name: Celtix Connect

Landing Points: Dublin (Ireland), Holyhead (UK)

RFS Year: 2011

Est. End of Service Date: 2035

Est. System Cost (US$): $21,900,000

Total Length (kms): 131

Initial Capacity: 960 Gbps

Fiber Pairs: 72 Fiber Pairs

Owners: Sea Fibre Networks

System Supplier: Alcatel Submarine Networks

System Installer: Global Marine Systems Limited Region: EMEA

System Name: Colombia-Florida Subsea Fiber

Landing Points: Boca Raton (USA), Cartagena (Columbia), Morant Point (Jamaica)

RFS Year: 2008

Est. End of Service Date: 2033

Total Length (kms): 2,439

Initial Capacity: 110 Gbps

Design Capacity: 2 Tbps

Fiber Pairs: 2.5 Tbps per Fiber Pair

Owners: Columbus Networks

System Supplier: Tyco Telecommunications Telecommunications

Upgrader: TE SubCom

Upgrade Year: 2011

Upgraded Capacity: 40 Gbps, 2.5 Tbps per fiber pair

Region: Americas

Cartagena
Morant Point
Boca Raton

Chongming Chikura

Okinawa

Shantou

Tanguisson

Owners: China-US Consortium (KDD (Japan), NTT Worldwide Network (Japan), AT&T (USA), MCI Communications (USA), Sprint (USA), Teleglobe USA (USA), SBC Communications (USA), China Telecom (China), HongKong Telecom (Hong Kong), Chunghwa Telecom (Taiwan), Korea Telec

System Supplier: Alcatel Submarine Networks, Fujitsu, Ocean Cable Co, Tyco Telecommunications

Cableship: Flexservice III, Kuroshio Maru, Cable Innovator

Marine Surveyor: C&C Technologies

Region: Transpacific

System Name: China-US

Landing Points: Bandon (USA), Chikura (Japan), Chongming (China), Fangshan (Taiwan), Okinawa Prefecture (Japan), Pusan (South Korea), San Luis Obispo (USA), Shantou (China), Tanguisson (Guam)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $1,100,000,000

Total Length (kms): 30,444

Initial Capacity: 80 Gbps

Fiber Pairs: 4 Fiber Pairs

Channels: 8

Channel Capacity: 2.5 Gbps

System Name: Cyprus-Israel Optical System

Landing Points: Ayia Napa (Cyprus), Nahariya (Israel)

RFS Year: 1994

Est. End of Service Date: 2018

Est. System Cost (US$): $16,000,000

Total Length (kms): 262

Design Capacity: 622 Mbps

Fiber Pairs: 1 Fiber Pair

Owners: Bezeq, Cypress Telecommunications Authority

Region: EMEA

Nahariya
Ayia Napa Nahariya

CJFS

Half-Moon Bay

System Name: Cayman Jamaica Fibre System

Landing Points: Half-Moon Bay (Cayman Islands), Montego Bay (Jamaica)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $6,500,000

Total Length (kms): 870

Initial Capacity: 2.5 Gbps

Owners: LIME

Region: Americas

Montego Bay

Palermo

West Palm

Beach

Cancun

Magens Bay

Funchal

Sardinia

System Name: Colombus II

Landing Points: Cancun (Mexico), Funchal (Portugal), Magens Bay (Virgin Islands), Palermo (Italy), Sardinia (Gran Canaria), West Palm Beach (USA)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $600,000,000

Total Length (kms): 12,165

Initial Capacity: 560 Mbps

Design Capacity: 2.5 Gbps

Owners: Columbus II Consortium

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications SSI, Pirelli

Upgrader: Xtera Communications

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Transatlantic

System Name: Colombus III

Landing Points: Miami, Florida (USA); Ponta Delgada, Azores Islands (Portugal); Lisbon, Portugal; Conil, Spain; Mazara del Vallo, Sicily (Italy)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $236,000,000

Total Length (kms): 9,833

Initial Capacity: 40 Gbps

Design Capacity: 160 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Columbus III Consortium

System Supplier: Alcatel Submarine Networks, Pirelli, Tyco Telecommunications

Cableship: Vercors, Skandi Hav

Upgrader: Xtera Communications

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Transatlantic

CONCERTO-1

System Name: Concerto-1

Landing Points: Bruges (Belguim), Thorpeness (United Kingdom), Zandvoort (Netherlands)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $25,000,000

Total Length (kms): 574

Initial Capacity: 2.5 Gbps

Fiber Pairs: 96 Fiber Pairs

Owners: Flute

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Region: EMEA

System Name: Corfu-Bar

Landing Points: Bar (Montenegro), Corfu (Greece)

RFS Year: 1998

Est. End of Service Date: 2023

Est. System Cost (US$): $19,000,000

Total Length (kms): 320

Initial Capacity: 622 Mbps

Fiber Pairs: 3 Fiber Pairs

Owners: Crngorski Telecom, OTE

Region: EMEA

DANICA NORTH

System Name: Danica North

Landing Points: Barseback (Sweden), Tuborg (Denmark)

RFS Year: 1998

Est. End of Service Date: 2023

Est. System Cost (US$): $10,000,000

Total Length (kms): 25

Initial Capacity: 10 Gbps

Fiber Pairs: 96 Fiber Pairs

Owners: Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: EMEA

Barseback

DANICA SOUTH

System Name: Danica South

Landing Points: Bjarred (Sweden), Copenhagen (Denmark)

RFS Year: 1998

Est. End of Service Date: 2023

Total Length (kms): 20

Initial Capacity: 10 Gbps

Fiber Pairs: 24 Fiber Pairs

Owners: Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: EMEA

Landeyjarsandur

System Name: Danice

Landing Points: Blaabjerg (Denmark), Landeyjarsandur (Iceland)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $76,000,000

Total Length (kms): 2,291

Initial Capacity: 1000 Gbps

Design Capacity: 5.1 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Farice Ltd.

System Supplier: Tyco Telecommunications

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: EMEA

Blaabjerg

Colombo

Hulhumalé

System Name: Dhiraagu Domestic Submarine Cable Network

Landing Points: Colombo (Sri Lanka), Hulhumale (Maldives)

RFS Year: 2012

Est. End of Service Date: 2031

Est. System Cost (US$): $27,000,000

Total Length (kms): 1,000

Owners: Dhiraagu

System Supplier: NEC

System Installer: NEC

Region: Indian Ocean Pan-East Asian

DENMARK-NORWAY 5

Ardendal

System Name: Denmark-Norway 5

Landing Points: Ardendal (Norway), Hjrorring (Denmark)

RFS Year: 1992

Est. End of Service Date: 2017

Est. System Cost (US$): $9,560,000

Total Length (kms): 123

Initial Capacity: 2 Gbps

Owners: Norway PTT, TDC

Region: EMEA

Hjorring

DENMARK-NORWAY 6

Kristiansand

System Name: Denmark-Norway 6

Landing Points: Kristiansand (Norway), Thisted (Denmark)

RFS Year: 1992

Est. End of Service Date: 2017

Est. System Cost (US$): $8,950,000

Total Length (kms): 124

Initial Capacity: 1.5 Gbps

Owners: Norway PTT, TDC

Region: EMEA

DENMARK-POLAND 2

System Name: Denmark-Poland 2

Landing Points: Gedebak Odde (Denmark), Mielno (Poland)

RFS Year: 1991

Est. End of Service Date: 2016

Est. System Cost (US$): $4,500,000

Total Length (kms): 110

Initial Capacity: 2.5 Gbps

Owners: Polish Telecom, TDC Region: EMEA

Gedebak
Mielno

System Name: Didon

Landing Points: Kélibia (Tunisia), Mazara del Vallo, Sicily (Italy)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): $15,000,000

Total Length (kms): 173

Design Capacity: 18 Tbps

Channel Capacity: 100 Gbps

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Region: EMEA

Kélibia
Mazara del Vallo

System Name: Dumai-Melaka Cable System

Landing Points: Dumai (Indonesia), Melaka (Malaysia)

RFS Year: 2005

Est. End of Service Date: 2030

Est. System Cost (US$): $15,000,000

Total Length (kms): 150

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: PT Telekom, Telekom Malaysia

System Supplier: NEC

System Installer: ASEAN Cableship

Region: AustralAsia

ChungHomKokTseungKwahO

System Name: EAC-C2C

Landing Points: Capepisa (Philippines), Changi (Singapore), Chikura (Japan), Chung Hom Kok (Hong Kong), Fangshan (Taiwan), Nanhui District (China), Nasugbu (Philippines), Pali (Taiwan), Pusan (South Korea), Shima (Japan), Singapore (Singapore), Taean (South Korea), Tansh

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $850,000,000

Total Length (kms): 35,429

Design Capacity: 30 Tbps

Owners: PACNET

System Supplier: NEC

Marine Surveyor: C&C Technologies

Upgrader: Infinera

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: AustralAsia

Vung Tau
Nasugbu
Capepisa
Fangshan
Tanshui Pali
Nanhui
Taean
Pusan
Ajigaura Chikura Shima

System Name: Eastern Africa Submarine Cable System

Landing Points: Dar es Salaam (Tanzania), Djibouti (Republic of Djibouti), Maputo (Mozambique), Mogadishu (Somalia), Mombasa (Kenya), Moroni (Comoros), Mtunzini (South Africa), Port Sudan (Sudan), Toliary (Madagascar)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $247,000,000

Total Length (kms): 9,900

Initial Capacity: 30 Gbps

Design Capacity: 10 Tbps

Fiber Pairs: 2 Fiber Pairs

Channel Capacity: 100 Gbps

Owners: Bharti Airtel, Botswana Telecommunications Corporation, British Telecom, Comores Telecom, Etisalat, France Telecom, Mauritius Telecom, MTN Group, Neotel, Saudi Telecom Company (STC), Saudi Arabia, SPV2, Sudan Telecom Limited, Sudatel, Tanzania Telecommuni

System Supplier: Alcatel-Lucent Submarine Networks

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: EMEA

Djibouti
Port Sudan Mogadishu
Mombasa
Dar es Salaam
Moroni
Toliary
Maputo Mtunzini

Morant Point

System Name: East-West

Landing Points: Morant Point (Jamaica), Santo Domingo (Dominican Republic), Tortola (British Virgin Islands)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $35,000,000

Total Length (kms): 1,700

Initial Capacity: 120 Gbps

Design Capacity: 720 Gbps

System Installer: Orange Magine

Upgrader: Xtera Communications

Region: Americas

System Name: East Caribbean Fiber System

Landing Points: Anguilla (Anguilla), Baliff (Guadeloupe), Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Canefield (Dominica), Dickenson Bay (Antigua), Kingstown (St. Vincent), Martinique (Martinique), Montserrat (Montserrat), Port Salines (Grenada), St. Lucia (S

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $56,000,000

Total Length (kms): 1,875

Initial Capacity: 2.5 Gbps

Owners: AT&T, BET (Barbados), C&W, France Telecom, TSTT

System Supplier: Alcatel Submarine Networks

System Installer: C&W (Marine)

Cableship: Mercury

Upgrader: Xtera Communications

Upgrade Year: 2009, 2013

Upgraded Capacity: 10 Gbps, 100 Gbps

Region: Americas

System Name: Europe India Gateway

Landing Points: Abu Talat (Egypt), Bude (United Kingdom), Djibouti (Republic of Djibouti), Fujairah (United Arab Emirates), Gibraltar (Gibraltar), Jeddah (Saudi Arabia), Monaco (Monaco), Mumbai (India), Muscat (Oman), Zafarana (Egypt), Sesimbra (Portugal), Tripoli (Libya

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $700,000,000

Total Length (kms): 15,000

Initial Capacity: 3.84 Tbps

Channel Capacity: 100 Gbps

Owners: AT&T, Bharti Airtel, British Telecom, BSNL, C&W, Djibouti Telecom, Du, Gibtelecom, Libyan Post, Telecom, and Information Technology Company, MTN Group, Omantel, PT Comunicações, Saudi Telecom Company (STC), Telekom SA, Verizon, Telecom Egypt

System Supplier: Tyco Telecommunications, Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro, UTEC, GEMS

Upgrader: Ciena

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: EMEA

Fujairah
Muscat
Mumbai
Djibouti
Jeddah
Zafarana
Abu Talat Tripoli Gibraltar
Sesimbra

Sydney

Keawaula

System Name: Endeavour

Landing Points: Keawaula (Hawaii), Sydney (Australia)

RFS Year: 2008

Est. End of Service Date: 2033

Total Length (kms): 9,125

Initial Capacity: 80 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Telstra (Australia)

Upgrader: Infinera

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: AustralAsia

System Name: Estepona-Tetouan

Landing Points: Estepona (Spain), Tetouan (Morocco)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $10,000,000

Total Length (kms): 113

Initial Capacity: 3.7 Gbps

Owners: Telefonica

System Supplier: STC Submarine Systems

System Installer: FCR

Cableship: Vercors

Region: EMEA

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Eulalink

Landing Points: Lisbon, Portugal; Madeira, Portugal; Gran Canaria, Spain; Praia, Cabo Verde; Fortaleza, Brazil

RFS Year: 2016

Est. End of Service Date: 2040

Est. System Cost (US$): $1,130,000,000

Total Length (kms): 5,875

Initial Capacity: 30 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Telebras, Islalink

Region: Transatlantic

Fortaleza
Lisbon
Madeira
Gran Canaria
Praia

EUROPA

System Name: Europa

Landing Points: Pentaskhinos (Cyprus), Tripoli (Lebanon)

RFS Year: 2013

Est. End of Service Date: 2038

Fiber Pairs: 8 Fiber Pairs

Owners: CYTA, Lebanese ministry of Telecommunications

Region: EMEA

The Power of Submarine Information Transmission

There’s a new power under ocean uniting the world in a whole new way With unparalleled development expertise and outstanding technology, Huawei Marine is revolutionizing trans-ocean communications with a new generation of repeaters and highly reliable submarine cable systems that offer greater transmission capacity, longer transmission distances and faster response to customer needs. Huawei Marine: connecting the world one ocean at a time.

Porthcurno

Northport

Island Park

System Name: FLAG Atlantic 1 North/South

Landing Points: Island Park (USA), Northport (USA), Plerin (France), Porthcurno (United Kingdom)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $900,000,000

Total Length (kms): 12,820

Initial Capacity: 4.68 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: Global Cloud Xchange

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Marine Surveyor: Svitzer, SAIC

Survey Boat: Vessel of Opportunity

Upgrader: Infinera, Ciena

Upgrade Year: 2010, 2011, 2013

Upgraded Capacity: 10 Gbps, 100 Gbps

Region: Transatlantic

System Name: Falcon

Landing Points: Al Ghaydah (Yemen), Al Hudaydah (Yemen), Al-Khobar (Saudi Arabia), Al Seeb (Oman), Aqaba (Jordan), Bandar-E Abbas (Iran), Chabahar (Iran), Colombo (Sri Lanka), Dubai (UAE), Hulhumalé (India), Jeddah (Saudi Arabia), Kuwait City (Kuwait), Manama (Bahrain),

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $900,000,000

Total Length (kms): 12,181

Initial Capacity: 90 Gbps

Design Capacity: 2.56 Tbps

Fiber Pairs: 8 Fiber Pairs

Owners: Global Cloud Xchange

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Upgrader: Infinera

Region: Indian Ocean Pan-East Asian

Hulhumalé
Colombo
Trivandrum Mumbai
Bandar Abbas
Al Ghaydah
Al Hudaydah
Port Sudan
Jeddah
Suez Aqaba

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Magadan

System Name: Far East

Landing Points: Mys Levashova (Russia), Okha (Russia), Magadan (Russia)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $50,000,000

Total Length (kms): 1,844

Design Capacity: 1.6 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 8

Channel Capacity: 100 Gbps

Owners: Rostelcom

System Supplier: Huawei Marine Networks

System Installer: Global Marine Systems Limited

Cableship: Cable Innovator

Region: AustralAsia

Okha
Mys Levashova

System Name: Farice-1

Landing Points: Dunnet Bay (Scotland), Funningsfjør_ur (Faroe Islands), Sey_isfjör_ur (Iceland)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): $25,000,000

Total Length (kms): 1,395

Initial Capacity: 20 Gbps

Owners: Farice Ltd., Iceland Telecom Ltd.

System Supplier: Pirelli

Cableship: Pertinacia

Marine Surveyor: Fugro

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: EMEA

Aldeburgh

System Name: Farland

Landing Points: Aldeburgh (United Kingdom), Domburg (Netherlands)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $10,000,000

Total Length (kms): 149

Initial Capacity: 18 Gbps

Owners: British Telecom

System Supplier: Tyco Telecommunications

Region: EMEA

Domburg

Shima

Chikura

China

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Faster

Landing Points: China; Chikura, Japan; Shima, Japan; Oregon, USA

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $350,000,000

Total Length (kms): 9,000

Initial Capacity: 28 Tbps

Design Capacity: 60 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Google, China Telecom, China Mobile, Global Transit, KDDi, SingTel, TIME dotCom

System Supplier: NEC

System Installer: Orange Marine

Cableship: René Descartes

Region: Transpacific

System Name: Fehmarn Belt

Landing Points: Puttgarden (Germany), Rödbyhavn (Denmark)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $10,000,000

Total Length (kms): 20

Initial Capacity: 2.5 Gbps

Owners: Teliasonera

System Supplier: Ericsson

System Installer: Nexans

Cableship: Pleijel

Region: EMEA

Rios

System Name: FibraLink

Landing Points: Kingstown (St. Vincent), Montego Bay (Jamaica), Ocho Rios (Jamaica), Puerto Plata (Dominican Republic)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $30,000,000

Total Length (kms): 2,438

Initial Capacity: 40 Gbps

Design Capacity: 320 Gbps per fiber pair

Fiber Pairs: 2 Fiber Pairs

Owners: Colombus Networks

System Supplier: Alcatel

System Installer: International Telecom

Cableship: IT Intrepid

Region: Americas

Virginia Beach

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Fibre Atlantic

Landing Points: Bordeaux (France), Virginia Beach, Virginia (USA)

RFS Year: 2018

Est. End of Service Date: 2042

Est. System Cost (US$): $250,000,000

Total Length (kms): 6,250

Design Capacity: 60 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: SemanticNet BV

Region: Transatlantic

Bordeaux

Porthcurno Estepona

System Name: FLAG Europe-Asia

Landing Points: Alexandria (Egypt), Aqaba (Jordan), Ben Pak Para (Thailand), Estepona (Spain), Fujairah (United Arab Emirates), Hong Kong (China), Jeddah (Saudi Arabia), Keoje (South Korea), Miura (Japan), Mumbai (India), Nanhui District (China), Ninomiya (Japan), Palerm

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $720,000,000

Total Length (kms): 27,433

Initial Capacity: 20 Gbps

Design Capacity: 80 Gbps

Owners: Global Cloud Xchange

Upgrader: Ciena

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Indian Ocean Pan-East Asian, EMEA

Jeddah
Fujairah
Mumbai
Penang
Songkhla
Hong Kong
Nanhui
Keoje
Ninomiya
Ban Pak
Para
Miura
Satun
Port Said

System Name: Flores-Corvo

Landing Points: Flores (Azores), Corvo (Azores), Graciosa (Azores), Faial (Azores)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): $20,000,000

Total Length (kms): 685

Design Capacity: 0.96 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 16

Channel Capacity: 10 Gbps

Owners: Viatel (Azores)

System Supplier: Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks

Region: EMEA

Graciosa

Faial

Flores Corvo

System Name: Fiber Optic Gulf

Landing Points: Doha (Qatar), Dubai (UAE), Kuwait City (Kuwait), Manama (Bahrain)

RFS Year: 1998

Est. End of Service Date: 2023

Est. System Cost (US$): $80,000,000

Total Length (kms): 1,286

Initial Capacity: 20 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Bahrain Telephone Co., Kuwait Ministry of Communications, Qatar Telecommunication Company, UAE Telecommunications Company

System Supplier: Fujitsu

Region: EMEA

System Name: Gulf Bridge International Cable System

Landing Points: Alexandria (Egypt), Al Hidd (Bahrain), Al-Khobar (Saudi Arabia), Al Seeb (Oman), Bushehr (Iran), Doha (Qatar), Dubai (United Arab Emirates), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Kuwait City (Kuwait), Mazara (Italy), Mumbai (India), Zafa

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $445,000,000

Total Length (kms): 4,719

Design Capacity: 2.5 Tbps

Fiber Pairs: 4 Fiber Pairs express route, 2 Fiber Pairs other landings

Channels: 128

Channel Capacity: 10 Gbps

Owners: Gulf Bridge International

System Supplier: TE SubCom

System Installer: e-Marine

Upgrader: Xtera Communications

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: EMEA

System Name: Global Caribbean Network

Landing Points: Baie-Mahault (Guadeloupe), Baliff (Guadeloupe), Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Canefield (Dominica), Dickenson Bay (Antigua), Galisbay (St Martin), Hams Bluff (Virgin Islands), Kingstown (St. Vincent), Le Lamentin (Martinique), Mac

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $17,520,000

Total Length (kms): 1,926

Initial Capacity: 1.2 Tbps

Owners: Global Carribean Network

System Supplier: Alcatel Submarine Networks

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: Americas

Canefield
Le Lamentin
Port Castries
Kingstown
Bridgetown
Port Salines
Macqueripe
Baliff

GEMINI BERMUDA

Bermuda

System Name: Gemini Bermuda

Landing Points: Manasquan, NJ (USA), Bermuda

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $40,000,000

Total Length (kms): 1,500

Owners: C&W, Verizon

System Installer: Orange Marine

Region: Americas

GEORGIA-RUSSIA

Novorossiysk

System Name: Georgia-Russia

Landing Points: Novorossiysk (Russia), Poti (Georgia), Sochi (Russia)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $20,000,000

Total Length (kms): 280

Initial Capacity: 2.5 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: DanTelco, FOPTNET, Rostelecom

Region: EMEA

Sochi
Poti

System Name: Globacom-1

Landing Points: Accra (Ghana), Bude (United Kingdom), Casablanca (Morocco), Dakar (Senegal), Lagos (Nigeria), Nouakchott (Mauritania), Sesimbra (Portugal), Vigo (Spain)

RFS Year: 2010

Est. End of Service Date: 2034

Est. System Cost (US$): $260,000,000

Total Length (kms): 8,717

Initial Capacity: 640 Gbps

Design Capacity: 2.5 Tbps

Fiber Pairs: 2 Fiber Pairs

Owners: Globacom Ltd.

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks, IT International Telecom

Cableship: Ile de Batz, IT Intrepid

Marine Surveyor: Alcatel Submarine Networks

Region: EMEA

Vigo
Sesimbra
Casablanca
Dakar
Accra Lagos
Nouakchott

GLOBENET

System Name: GlobeNet

Landing Points: Bermuda (Bermuda), Boca Raton (USA), Fortaleza (Brazil), Maiquetia (Venezuela), Rio de Janeiro (Brazil), Tuckerton (USA)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $610,000,000

Total Length (kms): 22,690

Initial Capacity: 40 Gbps

Design Capacity: 1.28 Tbps

Owners: Globenet

System Supplier: TE SubCom

Upgrader: Xtera Communications

Upgrade Year: 2010

Upgraded Capacity: 100 Gbps

Region: Americas

Boca Raton
Tuckerton Bermuda
Punta Gorda
Fortaleza
Rio de Janeiro

System Name: GO-1

Landing Points: Cantina (Sicily), Mazara (Italy), St George’s Bay (Malta), St Paul’s Bay (Malta)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $10,000,000

Total Length (kms): 290

Initial Capacity: 20 Gbps

Owners: GO

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Elettra

Cableship: Teliri

Region: EMEA

System Name: GOKI

Landing Points: Incheon (Korea), Kita-Kyushu (Japan), Okinawa Prefecture (Japan), Tumon (Guam)

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): $120,000,000

Total Length (kms): 4,200

Design Capacity: 80 Gbps

Owners: AT&T

System Supplier: Xtera Communications

System Installer: Kokusai Cable Ship

Region: AustralAsia

Tumon
Okinawa
Kita-Kyushu
Incheon

System Name: Gondwana-1

Landing Points: Lifou (New Caledonia), Mouli Island (New Caledonia), Noum’ea (New Caledonia), Poindimie (New Caledonia), Sydney (Australia)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $57,500,000

Total Length (kms): 2,152

Initial Capacity: 640 Gbps

Owners: Post and Telecommunications Office of New Caledonia

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Re

Region: AustralAsia

Noum’ea
Lifou Mouli Island Poindimie

System Name: Greenland Connect

Landing Points: Landeyjarsandur (Iceland), Milton (Canada), Nuuk (Greenland), Qaqortoq (Greenland)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $126,000,000

Total Length (kms): 4,733

Initial Capacity: 20 Gbps

Design Capacity: 960 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Tele Greenland

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Cableship: Maersk Responder, Blue Castor, Ile de Sein

Marine Surveyor: Elettra

Region: Americas

GUANTÁNAMO BAY CABLE [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

South Florida

System Name: Guantánamo Bay Cable

Landing Points: Guantánamo Bay (Cuba), Florida (USA)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $31,000,000

Total Length (kms): 1,500

Channel Capacity: 100 Gbps

Owners: US Government

System Supplier: Xtera Communications, NSW

System Installer: IT International Telecom

Marine Surveyor: US Government

Region: Americas

Guantánamo Bay

System Name: Greece to Western Europe Network

Landing Points: Bari (Italy), Corfu (Greece)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): $20,000,000

Total Length (kms): 647

Fiber Pairs: 4 Fiber Pairs

Owners: OTE

Region: EMEA

Corfu
Bari

System Name: Hannibal

Landing Points: Kelibia (Tunisia), Mazara (Italy)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $10,000,000

Total Length (kms): 180

Design Capacity: 9.6 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 80

Channel Capacity: 40 Gbps

Owners: Tunisie Telecom (Tunisia)

System Supplier: Huawei Marine Networks

System Installer: Global Marine Systems Limited, Huawei Marine Networks

Cableship: Sovereign

Marine Surveyor: UTEC

Region: EMEA

Mazara

Kelibia

System Name: Hantru-1

Landing Points: Ebeye (Kwajalein), Majuro (Marshall Islands), Pohnpei (Micronesia), Reagan Test Site (Kwajalein), Tumon (Guam)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $130,000,000

Total Length (kms): 2,908

Owners: Hannon Armstrong

System Supplier: TE SubCom

System Installer: TE SubCom

Region: AustralAsia

Pohnpei
Ebeye
Majuro
Reagan Test Site
Tumon

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Whangarei

System Name: Hawaiki

Landing Points: Oregon (USA), Sydney (Australia), Hawaii (USA), Norfolk Island, New Caledonia, Fiji, Samoa, American Samoa, Whangarei (New Zealand)

RFS Year: 2018

Est. End of Service Date: 2043

Est. System Cost (US$): $300,000,000

Total Length (kms): 14,000

Design Capacity: 12.8 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: Hawaiki Submarine Cable

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Transpacific

Marseille

System Name: Hawk Cable System

Landing Points: Alexandria (Egypt), Anatoliko (Cyprus), Marseille (France)

RFS Year: 2011

Est. End of Service Date: 2035

Est. System Cost (US$): $250,000,000

Total Length (kms): 3,181

Initial Capacity: 2.72 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 68

Channel Capacity: 10 Gbps

Owners: Global Cloud Xchange

System Supplier: Fujitsu

System Installer: Elettra, Orange Marine

Marine Surveyor: Fugro

Region: EMEA

Alexandria
Anatoliko

System Name: Hibernia Atlantic

Landing Points: Coleraine (Ireland), Dublin (Ireland), Herring Cove (Canada), Lynn (USA), Southport (United Kingdom)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $320,000,000

Total Length (kms): 12,111

Initial Capacity: 10.16 Tbps

Owners: Columbia Ventures Corporation

System Supplier: Tyco Telecommunications SSI

System Installer: FCR

Cableship: Vercors, Iberus, Nordic King, Teneo, Dock Express 20, Global Mariner, Atlantida

Upgrader: Huawei Marine Networks

Upgrade Year: 2011

Upgraded Capacity: 100 Gbps

Region: Transatlantic

New York

System Name: Hibernia Express

Landing Points: Halifax, Nova Scotia (Canada); London, UK; Cork, Ireland

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $120,000,000

Total Length (kms): 4,600

Design Capacity: 53 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps, 200 Gbps on select segments

Owners: Hibernia Atlantic

System Supplier: TE SubCom

System Installer: TE SubCom

Marine Surveyor: EGS

Survey Boat: RV Ridley Thomas

Region: Transatlantic

London
Cork

Spencer Beach

System Name: Honotua

Landing Points: Huahine (French Polynesia), Moorea (French Polynesia), Papeete (French Polynesia), Spencer Beach, Hawaii (USA), Uturoa (Raiatea, French Polynesia), Vaitape (Bora Bora, French Polynesia)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $122,000,000

Total Length (kms): 4,634

Initial Capacity: 640 Gbps

Owners: OPT French Polynesia

System Supplier: Alcatel-Lucent Submarine Networks

Region: AustralAsia

System Name: Hokkaido-Sakhalin Cable System

Landing Points: Ishikari (Japan), Nevelsk (Russia)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $20,000,000

Total Length (kms): 559

Design Capacity: 640 Gbps

Owners: NTT Communications, TTK

System Supplier: NEC

System Installer: KDD

Cableship: Subaru

Region: AustralAsia

System Name: Hugo

Landing Points: Guernsey (Guernsey), Lannion (France), Porthcurno (United Kingdom)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $11,960,000

Total Length (kms): 426

Initial Capacity: 3.3 Tbps

Owners: C&W

System Supplier: Alcatel Submarine Networks

System Installer: Tyco SSI

Cableship: Tycom Reliance

Region: EMEA

Porthcurno Guernsey

Marseille

Owners: Bharti Airtel, Etisalat, France Telecom, Ogero (Lebanon), PTCL (Pakistan), STC (Saudi Arabia), Tata Communications, Telecom Egypt, Telecom Italia Sparkle

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: S.B. Submarine Systems, NEC

Cableship: Cable Innovator

Marine Surveyor: Fugro

Upgrader: Mitsubishi

Upgrade Year: 2012

Upgraded Capacity: 40 Gbps

Region: EMEA

System Name: India-Middle East-Western Europe

Landing Points: Alexandria (Egypt), Catania (Italy), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Karachi (Pakistan), Marseille (France), Mumbai (India), Suez (Egypt), Tripoli (Lebanon)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $320,000,000

Total Length (kms): 13,000

Initial Capacity: 520 Gbps

Design Capacity: 3.84 Tbps

Jeddah
Fujairah
Karachi
Mumbai

Chennai

System Name: i2i

Landing Points: Chennai (India), Tuas (Singapore)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): $90,000,000

Total Length (kms): 3,100

Initial Capacity: 160 Gbps

Design Capacity: 42 Tbps

Fiber Pairs: 8 Fiber Pairs

Channels: 105

Channel Capacity: 100 Gbps

Owners: Bharti Airtel

Marine Surveyor: C&C Technologies

Upgrader: Ciena

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: Indian Ocean Pan-East Asian

Tuas

System Name: Interchange I

Landing Points: Port Vila (Vanuatu), Suva (Fiji)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): $32,000,000

Total Length (kms): 1,259

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: Interchange Limited

System Supplier: TE SubCom, Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: AustralAsia

Port Vila
Suva

System Name: Interchange II

Landing Points: Port Moresby (Papau New Guinea), Port Vila (Vanuatu), Luganville (Vanuatu), Honiara (Solomon Islands)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $72,000,000

Total Length (kms): 3,500

Design Capacity: 1.28 Tbps

Fiber Pairs: 1 Fiber Pair

Channels: 32

Channel Capacity: 40 Gbps

Owners: Interchange Limited

Region: AustralAsia

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Port Vila
Port Moresby
Honiara
Luganville

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Mumbai

System Name: India Cloud Xchange

Landing Points: Mumabi (India), Singapore

RFS Year: 2016

Est. End of Service Date: 2041

Total Length (kms): 5,060

Design Capacity: 32 Tbps

Fiber Pairs: 4 Fiber Pair

Channels: 80

Channel Capacity: 100 Gbps

Owners: Global Cloud Xchange

Region: Indian Ocean Pan-East Asian

Durres

Bari

System Name: Italy-Albania

Landing Points: Bari (Italy), Durres (Albania)

RFS Year: 1998

Est. End of Service Date: 2023

Est. System Cost (US$): $10,000,000

Total Length (kms): 236

Initial Capacity: 2.5 Gbps

Fiber Pairs: 1 Fiber Pair

Owners: Telecom Italia Sparkle

Region: EMEA

System Name: Italy-Greece

Landing Points: Corfu (Greece), Otranto (Italy)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $10,000,000

Total Length (kms): 161

Initial Capacity: 1.69 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Telecom Italia

Region: EMEA

Otranto

Corfu

System Name: Italy-Libya

Landing Points: Mazara (Italy), Tripoli (Libya)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $10,000,000

Total Length (kms): 570

Initial Capacity: 2.5 Gbps

Design Capacity: 40 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Telecom Italia

Upgrade Year: 2011

Upgraded Capacity: 40 Gbps

Region: EMEA

Mazara

ITALY-MONACO

Monaco Savona

System Name: Italy-Monaco

Landing Points: Monaco (Monaco), Savona (Italy)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $10,000,000

Total Length (kms): 162

Initial Capacity: 565 Mbps

Fiber Pairs: 1 Fiber Pairs

Owners: Telecom Italia

Region: EMEA

System Name: JaKa2DeLeMa

Landing Points: Bandjermasin (Indonesia), Benculuk (Indonesia), Jember (Indonesia), Ketapang (Indonesia), Mataram (Indonesia), Pangkalanbun (Indonesia), Pontianak (Indonesia), Sangata (Indonesia), Toweli (Indonesia)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $116,000,000

Total Length (kms): 1,800

Initial Capacity: 960 Gbps

Design Capacity: 9.6 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 32

Channel Capacity: 10 Gbps, 100 Gbps

Owners: PT Telekomunikasi Indonesia

System Supplier: NSW, Fujitsu

System Installer: Fujitsu, Orange Marine

Upgrader: Fujitsu

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: AustralAsia

JAKABARE

System Name: JAKABARE

Landing Points: Batam (Indonesia), Jakarta (Indonesia), Pontianak (Indonesia), Tuas (Singapore)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $40,000,000

Total Length (kms): 1,330

Initial Capacity: 160 Gbps

Design Capacity: 1.28 Tbps

Owners: Indosat

System Supplier: NEC

System Installer: NEC, ASEAN Cableship, Orange Marine

Cableship: Cable Innovator

Region: AustralAsia

System Name: Japan-US

Landing Points: Kitaibaraki (Japan), Makaha (Hawaii), Maruyama (Japan), Morro Bay (USA), Point Arena (USA), Shima (Japan)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $590,000,000

Total Length (kms): 21,880

Initial Capacity: 640 Gbps

Fiber Pairs: 4 Fiber Pairs

Channels: 16

Channel Capacity: 10 Gbps

Owners: AT&T, Japan Telecom, KDDI, MCI-WorldCom, NTTWN

System Supplier: Alcatel Submarine Networks, Fujitsu, Ocean Cable Company

System Installer: Global Marine Systems Limited

Cableship: Subaru, Cable Innovator

Upgrader: Ciena

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Transpacific

System Name: Jasuka

Landing Points: Batam (Indonesia), Jakarta (Indonesia), Pontianak (Indonesia), Tanjung Pandan (Indonesia)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $280,000,000

Total Length (kms): 354

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: PT Telekom

System Supplier: Nokia Siemens Networks

System Installer: Nokia Siemens Networks

Marine Surveyor: Nokia Siemens Networks

Upgrader: Nokia Siemens Networks

Upgrade Year: 2011

Upgraded Capacity: 40 Gbps

Region: AustralAsia

System Name: Karadeniz Fiber Optik Sistemi

Landing Points: Istanbul (Turkey), Mangalia (Romania), Varna (Bulgaria)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $20,000,000

Total Length (kms): 4,640

Initial Capacity: 1.2 Gbps

Owners: BTC, Turk Telecom

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Vercors

Region: EMEA

System Name: Kattegat-1

Landing Points: Gothenburg (Sweden), Jutland (Denmark)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $10,000,000

Total Length (kms): 180

Initial Capacity: 20 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: TDC

Region: EMEA

System Name: Keltra-2

Landing Points: Kelibia (Tunisia), Trapini (Italy)

RFS Year: 2007

Est. End of Service Date: 2032

Total Length (kms): 209

Design Capacity: 20 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Telecom Italia, Tunisie Telecom (Tunisia)

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: EMEA

KHULNA-CHENNAI

System Name: Khulna-Chennai

Landing Points: Chennai (India), Khulna (Bangladesh)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $48,000,000

Total Length (kms): 115

Owners: Bangladesh Submarine Cable Company

Region: Indian Ocean Pan-East Asian

Khulna

System Name: Korea-Japan Cable Network

Landing Points: Fukuoka (Japan), Kita-Kyushu (Japan), Pusan (South Korea)

RFS Year: 2002

Est. End of Service Date: 2027

Total Length (kms): 500

Initial Capacity: 2.88 Tbps

Design Capacity: 28.8 Tbps

Fiber Pairs: 12 Fiber Pairs

Channels: 24

Channel Capacity: 10 Gbps, 100 Gbps

Owners: KEPCO, KT Coropration, NTT Communications, SOFTBANK Telecom Corp

System Supplier: Fujitsu

System Installer: Fujitsu

Cableship: Maersk Recorder

Upgrader: Ciena

Upgrade Year: 2015

Upgraded Capacity: 100 Gbps

Region: AustralAsia

Narrow

Cape

System Name: Kodiak Kenai

Landing Points: Anchorage (USA), Homer (USA), Kenai (USA), Kodiak (USA), Narrow Cape (USA), Seward (USA)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $30,000,000

Total Length (kms): 971

Initial Capacity: 2.5 Gbps

Design Capacity: 10 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Kodiak Kenai Cable Company

Upgrader: Infinera

Upgrade Year: 2010

Upgraded Capacity: 10 Gbps

Region: Americas

System Name: Kuwait-Iran

Landing Points: Kharg (Iran), Soroosh (Iran), Failaka (Kuwait)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $20,000,000

Total Length (kms): 334

Initial Capacity: 2.5 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Ministry of Communication, Kuwait and Telecommunication Infrastructure Company, Iran

System Installer: e-Marine Region: EMEA

Failaka
Kharg
Soroosh

Mazara

System Name: LEV

Landing Points: Mazara (Italy), Tel Aviv (Israel), Yeroskipos (Cyprus)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $177,658,000

Total Length (kms): 2,600

Initial Capacity: 2.5 Gbps

Fiber Pairs: 2 Fiber Pairs

Channels: 8 wavelengths of 1550 nm

Owners: Telecom Italia Sparkle

System Supplier: Alcatel Submarine Networks, Tyco

Telecommunications Region: EMEA

System Name: Lower Indian Ocean Network

Landing Points: Sainte Marie (Reunion Island), Terre Rouge (Mauritius), Toamasina (Madagascar)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $30,000,000

Total Length (kms): 1,091

Initial Capacity: 20 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: France Telecom, Mauritius Telecom, Orange Madagascar

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: FCR, Orange Marine

Cableship: Chamarel

Region: Indian Ocean Pan-East Asian

Tomasina
Sainte Marie
Terre Rouge

LION-2

Mombasa

System Name: Lower Indian Ocean Network 2

Landing Points: Mombasa (Kenya), Mayotte (Mayotte)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $76,000,000

Total Length (kms): 3,000

Design Capacity: 1.28 Tbps

Owners: France Telecom-Orange, Mauritius Telecom, Orange Madagascar, Telkom Kenya, Emtel Ltd

System Installer: Alpha Logistics, Elettra, Orange Marine

Region: Indian Ocean Pan-East Asian

Mayotte

System Name: Mid-Atlantic Crossing

Landing Points: Brookhaven (USA), Hollywood (USA), St Croix (US Virgin Islands)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $200,000,000

Total Length (kms): 7,461

Initial Capacity: 20 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Global Crossing

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Fresnel

Upgrader: Infinera

Upgrade Year: 2010, 2011

Upgraded Capacity: 10 Gbps, 40 Gbps

Region: Americas

Brookhaven

St. Croix
Hollywood

MAIN ONE

Seixal

System Name: Main One

Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Casablanca (Morocco), Dakar (Senegal), Lagos (Nigeria), Port Harcourt (Nigeria), Seixal (Portugal), Tenerife (Spain)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $240,000,000

Total Length (kms): 7,000

Initial Capacity: 1.92 Tbps

Owners: Main One Cable Company

System Supplier: TE SubCom

System Installer: TE SubCom

Cableship: Resolute

Region: EMEA

Accra Lagos

MAIN ONE EXPANSION [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Main One Expansion

Landing Points: Lagos (Nigeria), Port Harcourt (Nigeria)

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): $40,000,000

Total Length (kms): 1,100

Owners: Main One

Region: EMEA

Accra Lagos PortHarcourt

System Name: Matrix

Landing Points: Batam (Indonesia), Changi (Singapore), Jakarta (Indonesia)

RFS Year: 2008

Est. End of Service Date: 2032

Est. System Cost (US$): $30,000,000

Total Length (kms): 1,438

Initial Capacity: 60 Gbps

Design Capacity: 2.56 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Matrix Networks and NAP Info

System Supplier: TE Subcom

System Installer: Global Marine Systems Limited

Cableship: Wave Mercury, Cable Networker (barge)

Region: AustralAsia

MAURITIUS-RODRIGUES ISLAND [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Mauritius-Rodrigues Island

Landing Points: Mauritius, Rodrigues Island

RFS Year: 2016

Est. End of Service Date: 2040

Est. System Cost (US$): $32,000,000

Total Length (kms): 550

Owners: Ministry of Information and Communication Technology (Mauritius)

Region: Indian Ocean Pan-East Asian

Mauritius
Rodrigues Island

Cancun

Hollywood

System Name: Maya-1

Landing Points: Cancun (Mexico), Hollywood (USA), Maria Chiquita (Panama), Puerto Limon (Costa Rica), Tolu (Colombia)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $120,000,000

Total Length (kms): 4,506

Initial Capacity: 10 Gbps

Owners: MAYA-1 Consortium

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications

Marine Surveyor: C&C Technologies

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2012

Upgraded Capacity: 40 Gbps

Region: Americas

Maria Chiquita
Tolu
Puerto Limon

System Name: Moratelindo Batam - Dumai Cable

Landing Points: Batam (Indonesia), Dumai (Indonesia)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $40,000,000

Total Length (kms): 330

Initial Capacity: 10 Gbps

Owners: Moratelindo

Region: AustralAsia

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Cherating

Sihanoukville

System Name: Malaysia-Cambodia-Thailand

Landing Points: Cherating, Malaysia; Rayoung, Thailand; branching unit to Sihanoukville, Cambodia

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $40,000,000

Total Length (kms): 1,425

Design Capacity: 30 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 50

Channel Capacity: 100 Gbps

Owners: Telekom Malaysia Berhad, Symphony Communication Public Company Limited, Telcotech limited

System Supplier: Huawei Marine Networks

Region: AustralAsia

MED CABLE NETWORK

System Name: Med Cable Network

Landing Points: Algiers (Algeria), Annaba (Algeria), Marseille (France)

RFS Year: 2005

Est. End of Service Date: 2030

Est. System Cost (US$): $40,000,000

Total Length (kms): 1,300

Initial Capacity: 20 Gbps

Owners: Med Cable

Region: EMEA

Marseille

System Name: MedNautilus

Landing Points: Catania (Italy), Chania (Greece), Haifa (Israel), Istanbul (Turkey), Koropi (Greece), Tel Aviv (Israel)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $190,000,000

Total Length (kms): 5,729

Initial Capacity: 3.84 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 64

Channel Capacity: 10 Gbps

Owners: Telecom Italia Sparkle

System Supplier: Alcatel Submarine Networks

System Installer: Orange Marine

Upgrader: Infinera

Upgrade Year: 2011, 2012, 2013

Upgraded Capacity: 10 Gbps, 40 Gbps, 100 Gbps

Region: EMEA

MELITA-1

System Name: Melita-1

Landing Points: Pozallo (Italy), St Paul’s Bay (Malta)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $14,000,000

Total Length (kms): 100

Initial Capacity: 50 Mbps

Owners: Melita Infrastructure Ltd.

Region: EMEA

Mazara

Zafarana

System Name: Middle East North Africa

Landing Points: Abu Talat (Egypt), Al Seeb (Oman), Jeddah (Saudi Arabia), Mazara (Italy), Mumbai (India), Zafarana (Egypt)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): $210,000,000

Total Length (kms): 8,800

Initial Capacity: 57.6 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 96

Channel Capacity: 100 Gbps

Owners: Orascom Telecom

System Supplier: Alcatel Submarine Networks, TE SubCom

System Installer: Alcatel Submarine Networks, TE SubCom, e-Marine

Cableship: Maersk Responder, Ile de Sein, Niwa, Decisive

Marine Surveyor: EGS, Blue Star, Elettra Region: EMEA

Alexandria Suez
Jeddah
Al Seeb Mumbai

System Name: Moratel International Cable 1

Landing Points: Batam (Indonesia), Changi (Singapore)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $10,000,000

Total Length (kms): 70

Initial Capacity: 10 Gbps

Owners: Moratelindo

System Installer: Global Marine Systems Limited

Region: AustralAsia

MICRONESIA CABLE SYSTEM

System Name: Micronesia Cable System

Landing Points: Majuro (Marshall Islands), Kwajalein (Marshall Islands), Pohnpei (Micronesia), Guam

RFS Year: 2011

Est. End of Service Date: 2036

Total Length (kms): 174

Owners: Federals States of Micronesia Telecommunications Authority, Marshall Island National Telecommunications Authority

System Supplier: TE SubCom

System Installer: TE SubCom

Region: AustralAsia

Mazara Catania

Yeroskipou

System Name: Minerva

Landing Points: Catania (Italy), Mazara (Italy), Yeroskipos (Cyprus)

RFS Year: 2007

Est. End of Service Date: 2032

Initial Capacity: 10 Gbps

Channels: DWDM wavelengths

Owners: Telecom Italia Sparkle

System Supplier: Alcatel-Lucent Submarine Systems

Region: EMEA

System Name: Mataram-Kupang Cable System

Landing Points: Mataram (Indonesia), Sumbawa Besar (Indonesia), Ambalawi (Indonesia), Saraemee (Indonesia), Waingapu (Indonesia), Ende (Indonesia), Kupang (Indonesia)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $94,000,000

Total Length (kms): 1,318

Design Capacity: 1.8 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 30

Channel Capacity: 10

Owners: PT Telkom

System Supplier: Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks

Region: AustralAsia

MONET [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Monet

Landing Points: Santos (Brazil), Fortaleza (Brazil), Boca Raton, Florida (United States)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $280,000,000

Total Length (kms): 10,556

Design Capacity: 64 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: Algar Telecom, Angola Cables, Antel, Google

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Americas

Fortaleza Santos
Boca Raton

Korea Taiwan Japan USA

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: New Cross Pacific

Landing Points: Hillsboro, Oregon (USA); Chongming, China; Nanhui, China; Lingang, China; Busan, South Korea; Toucheng, Taiwan; Maruyama, Japan

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): $350,000,000

Total Length (kms): 14,000

Design Capacity: 80 Tbps

Channel Capacity: 100 Gbps

Owners: China Mobile, China Telecom, China Unicom, Chunghwa Telecom, KT Corporation, Microsoft, Softbank Mobile Corp

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Transpacific

System Name: Nigeria-Cameroon Submarine Cable System

Landing Points: Kribi, Cameroon; Lagos, Nigeria

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $30,000,000

Total Length (kms): 1,100

Initial Capacity: 12.8 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: Cameroon Government, MainOne

System Supplier: Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks

Region: EMEA

Lagos

Kribi

There's a more flexible and cost-effective way to guarantee end-to-end network performance from data center to data center. Ciena's WaveLogic-based transport, intelligent switching, and unified network management system ensure a future-proof global network solution, overland and undersea, as cloud-related traffic patterns continue to evolve. See how at www.ciena.com/GeoMesh

There's a more flexible and cost-effective way to guarantee end-to-end network performance from data center to data center. Ciena's WaveLogic-based transport, intelligent switching, and unified network management system ensure a future-proof global network solution, overland and undersea, as cloud-related traffic patterns continue to evolve.

System Name: Neptune Canada

Landing Points: Port Alberni (Canada)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $62,000,000

Total Length (kms): 800

Owners: University of Victoria

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Sein

Marine Surveyor: NEPTUNE Canada

Region: Americas

System Name: Norsea Com-1

Landing Points: Lowestoft (United Kingdom), Tysvær (Norway)

RFS Year: 1999

Est. End of Service Date: 2024

Total Length (kms): 800

Initial Capacity: 160 Gbps

Owners: North Sea Communications AS

System Supplier: Alcatel AKN

Region: EMEA

Whittier

System Name: Northstar

Landing Points: Juneau (USA), Nedonna Beach (USA), Valdez (USA), Whittier (USA)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $90,000,000

Total Length (kms): 3,385

Initial Capacity: 10 Gbps

Owners: Alaska Communications Systems

System Supplier: Alcatel Submarine Networks

System Installer: C&W (Marine)

Cableship: Maersk Fighter, Fu Lai

Region: Americas

Valencia

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Orval

Landing Points: Oran, Algeria; Valencia, Spain

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $20,000,000

Total Length (kms): 560

Design Capacity: 20 Tbps

Channel Capacity: 100 Gbps

Owners: Algerian Ministry of Post, Information Technology and Communications

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: EMEA

Oran

Grover Beach

Tijuana

System Name: Pan-American Crossing

Landing Points: Colon (Panama), Fort Amadour (Panama), Grover Beach (USA), Mazatlán (Mexico), Puerto Viejo (Venezuela), St Croix (US Virgin Islands), Tijuana (Mexico)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $350,000,000

Total Length (kms): 9,451

Initial Capacity: 10 Gbps

Owners: Global Crossing

System Supplier: Tyco Telecommunications

Cableship: Agile

Marine Surveyor: C&C Technologies

Upgrader: Xtera Communications

Region: Americas

Mazatlán
Colon Fort Amadour
Puerto Viejo
St. Croix

PALAU-GUAM [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Palau-Guam

Landing Points: Palau, Guam

RFS Year: 2016

Est. End of Service Date: 2041

Owners: Palau Telecoms

System Supplier: Xtera Communications

System Installer: IT International Telecom

Region: AustralAsia

Palau

Magens Bay Butler’s Bay

System Name: PanAm

Landing Points: Arica (Chile), Baby Beach (Aruba), Barranquilla (Colombia), Battery Pratt (Panama), Butler’s Bay (St. Croix), Lurin (Peru), Magens Bay (Virgin Islands), Panama City (Panama), Punto Fijo (Venezuela), Salinas (Ecuador)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $260,000,000

Total Length (kms): 6,867

Initial Capacity: >10 Gbps

Owners: Antel (El Salvador), AT&T, Cable Andino, CANTV (Venezuela), CNT, C&W, Embratel, Entel (Chile), Setar, Telecom Colombia, Telmex

Marine Surveyor: C&C Technologies

Region: Americas

Lurin
Arica
Panama City
Barranquilla Punto Fijo
Baby Beach

Redcar

System Name: Pangea

Landing Points: Beverwijk (Netherlands), Fanø (Denmark), Lowestoft (United Kingdom), Måde (Denmark), Redcar (United Kingdom)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $20,000,000

Total Length (kms): 511

Initial Capacity: 7 Tbps

Owners: Pangea Ltd

System Supplier: Alcatel Submarine Networks

System Installer: Nexans

Cableship: Pleijel

Marine Surveyor: Fugro

Region: EMEA

Shima Ajigaura

Harbor Pointe Grover Beach

System Name: Pacific Crossing 1

Landing Points: Grover Beach (USA), Harbor Pointe (USA), Shima (Japan), Shima (Japan)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $650,000,000

Total Length (kms): 20,910

Initial Capacity: 1.8 Tbps

Design Capacity: 3 Tbps

Owners: NTT Communications

System Supplier: Tyco Telecommunications

Marine Surveyor: C&C Technologies

Upgrader: Infinera

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Transpacific

System Name: Pacific Caribbean Cable System

Landing Points: Jacksonville, Florida (USA); Tortola, Virgin Islands (UK); Isla Verde, Puerto Rico; Hudishibana, Aruba; Cartagena, Colombia; Maria Chiquita, Panama; Balboa, Panama; Manta, Ecuador

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $160,000,000

Total Length (kms): 6,000

Design Capacity: 80 Tbps

Channel Capacity: 100 Gbps

Owners: Cable & Wireless Communications, Setar, Telconet, Telefónica Global Solutions, United Telecommunication Services

System Supplier: Alcatel-Lucent Submarine Networks

Marine Surveyor: EGS

Survey Boat: RV Ridley Thomas Region: Americas

MariaChiquita
Cartagena
Hudishibana
IslaVerde
Balboa
Manta
Tortola
Jacksonville

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Tokyo

California

System Name: Pacific Cloud Xchange

Landing Points: Tokyo (Japan), California (USA)

RFS Year: 2016

Est. End of Service Date: 2040

Est. System Cost (US$): $250,000,000

Total Length (kms): 8,300

Design Capacity: 40 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Global Cloud Xchange

Region: Transpacific

Seaford

Broadstairs

System Name: Pan-European Crossing

Landing Points: Bredene (Belguim), Broadstairs (United Kingdom), Seaford (United Kingdom), Veules-les-Roses (France)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $20,000,000

Total Length (kms): 170

Initial Capacity: 10 Gbps

Owners: Global Crossing

Region: EMEA

Veules-les-Roses

Bredene

System Name: Pipe Pacific Cable

Landing Points: Madang (Papua New Guinea), Piti (Guam), Sydney (Australia)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $180,000,000

Total Length (kms): 7,185

Initial Capacity: 40 Gbps

Design Capacity: 2.56 Tbps

Owners: PIPE Networks Ltd.

System Supplier: Tyco Telecommunications

System Installer: Tyco Telecommunications

Cableship: Durable, Decisive

Upgrader: Infinera

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: AustralAsia

Madang

QATAR-UAE

Halul

Das

System Name: Qatar-UAE

Landing Points: Das Island (UAE), Halul (Qatar)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): $10,000,000

Total Length (kms): 208

Initial Capacity: 20 Gbps

System Installer: e-Marine

Cableship: Etisalat

Region: EMEA

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Quintillian Subsea

Landing Points: Oliktok (USA), Barrow (USA), Wainright (USA), Kotzebue (USA), Point Hope (USA), Nome (USA)

RFS Year: 2016

Est. End of Service Date: 2041

Total Length (kms): 1,800

Owners: Quintillian Subsea Holdings

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Americas

Point Hope
Wainwright Barrow
Prudhoe Bay

Telecoms consulting of submarine cable systems for regional and trans-oceanic applications

System Name: Russian-Japan Cable Network

Landing Points: Nakhodka (Russia), Naoetsu (Japan)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $50,000,000

Total Length (kms): 1,795

Initial Capacity: 640 Gbps

Owners: Rostelecom

Region: AustralAsia

Nakhodka
Naoetsu

Fuk

System Name: Reach North Asia Loop

Landing Points: Pusan (South Korea), Tong Fuk (Hong Kong), Toucheng (Taiwan), Wada (Japan)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $900,000,000

Total Length (kms): 9,792

Initial Capacity: 80 Gbps

Fiber Pairs: 6 Fiber pairs

Owners: FLAG Telecom, Level 3 Communications

Upgrader: Ciena, Infinera

Upgrade Year: 2011, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: AustralAsia

System Name: South American Crossing

Landing Points: Fortaleza (Brazil), Fort Amadour (Panama), Las Toninas (Argentina), Lurin (Peru), Puerto Viejo (Venezuela), Rio de Janeiro (Brazil), Santos (Brazil), St Croix (US Virgin Islands), Valparaiso (Chile)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $520,000,000

Total Length (kms): 15,983

Initial Capacity: 100 Gbps

Design Capacity: 1.2 Tbps

Owners: Global Crossing

System Supplier: Alcatel Submarine Networks

Upgrader: Infinera

Upgrade Year: 2010, 2011

Upgraded Capacity: 10 Gbps, 40 Gbps

Region: Americas

Valparaiso
Lurin
Las Toninas
Fort Amadour Puerto Viejo
St. Croix
Fortaleza
Santos
Rio de Janeiro

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: South Atlantic Cable System

Landing Points: Luanda (Angola), Fortaleza (Brazil)

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): $170,000,000

Total Length (kms): 6,165

Initial Capacity: 40 Tbps

Design Capacity: 40 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Angola Cables

System Supplier: NEC

System Installer: NEC Region: Transatlantic

Fortaleza
Luanda

System Name: South Africa-Far East

Landing Points: Baie du Jacotet (Mauritius), Cape Town (South Africa), Cochin (India), Durban (South Africa), Penang (Malaysia), SaintPaul (Reunion)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): $350,000,000

Total Length (kms): 13,669

Initial Capacity: 440 Gbps

Owners: France Telecom, Tata Communications, Telekom SA

System Supplier: Tyco Telecommunications

System Installer: FCR

Cableship: Vercors

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2014

Upgraded Capacity: 40 Gbps

Region: Indian Ocean Pan-East Asian

System Name: South America-1

Landing Points: Arica (Chile), Barranquilla (Colombia), Boca Raton (USA), Fortaleza (Brazil), Las Toninas (Argentina), Lurin (Peru), Mancora (Peru), Puerto Barrios (Guatemala), Puerto San Jose (Guatemala), Rio de Janeiro (Brazil), Salinas (Ecuador), Salvador (Brazil), Sa RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $650,000,000

Total Length (kms): 24,140

Initial Capacity: 160 Gbps

Design Capacity: 1.92 Tbps

Owners: Telefonica

System Supplier: Tyco Telecommunications

Marine Surveyor: C&C Technologies

Upgrader: Infinera

Upgrade Year: 2009, 2010, 2012

Upgraded Capacity: 10 Gbps, 40 Gbps, 100 Gbps

Region: Americas

San Juan
Barranquilla
Fortaleza
Salinas Mancora
Puerto San Jose
Puerto Barrios
Lurin
Arica
Valparaiso
Las Toninas
Santos
Rio de Janeiro
Salvador
Boca Raton

System Name: Samoa-Fiji

Landing Points: Samoa-Fiji

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): $32,500,000

Region: Austral-Asia

Samoa

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: South America Pacific Link

Landing Points: Oahu, Hawaii (USA); Balboa, Panama; Santiago, Chile; branching units to: Hilo, Hawaii (USA), Manta (Ecuador), Lima (Peru), Arica (Chile)

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): $460,000,000

Total Length (kms): 14,200

Design Capacity: 30 Tbps

Fiber Pairs: 3 Fiber Pairs, 10 Tbps per pair

Channels: 100

Channel Capacity: 100 Gbps

Owners: Ocean Networks

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks, IT International Telecom Region: Transpacific

Manta
Hilo
Oahu
Balboa

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Jacksonville

System Name: South America Pacific Link Caribbean Express

Landing Points: Jacksonville, Florida (USA); Panama

RFS Year: 2017

Est. End of Service Date: 2042

Total Length (kms): 3,400

Design Capacity: 60 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Ocean Networks, Inc.

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Americas

System Name: Saudi Arabia-Sudan

Landing Points: Jeddah (Saudi Arabia), Port Sudan (Sudan)

RFS Year: 2003

Est. End of Service Date: 2028

Est. System Cost (US$): $20,000,000

Total Length (kms): 333

Initial Capacity: 1.28 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: STC (Saudi Arabia)

Region: EMEA

Jeddah

System Name: South Atlantic 3

Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Alta Vista (Spain), Chipiona (Spain), Cotonou (Benin), Dakar (Senegal), Douala (Cameroon), Lagos (Nigeria), Libreville (Gabon), Luanda (Angola), Melkbosstrand (South Africa), Sesimbra (Portugal)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): $370,000,000

Total Length (kms): 14,350

Initial Capacity: 340 Gbps

Design Capacity: 800 Gbps

Fiber Pairs: 2 Fiber Pairs

Channel Capacity: 40 Gbps

Owners: Angola Telecom, AT&T, British Telecom, Camtel of Cameroon, CIT, Cote dIvoire Telecom, CPRM, C&W, France Telecom (12.08%), Ghana Telecom, Maroc Telecom of Morocco, Mauritius Telecom, Nigerian Telecommunications Ltd, Nitel (8.39%), OPT Benin, OPT Gabon, PT

System Supplier: Alcatel Submarine Networks

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2014

Upgraded Capacity: 40 Gbps

Region: EMEA

Sesimbra Chipiona
Alta Vista
Dakar
AbidjanAccra Cotonou Lagos
Douala
Libreville
Luanda

Hong Kong

System Name: Submarine Cable Asia Network

Landing Points: Hong Kong, Indonesia

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $337,000,000

Total Length (kms): 4,300

Initial Capacity: 40 Gbps

Design Capacity: 1.92 Tbps

Owners: PT. Fangbian Iskan Corporindo, Telemedia Pacific Inc.

System Supplier: NEC

Region: AustralAsia

System Name: SCF-CN

Landing Points: Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Kingstown (St. Vincent), Martinique (Martinique), Port Castries (St Lucia), Port Salines (Grenada), Redcar (Trinidad and Tobago)

RFS Year: 2007

Est. End of Service Date: 2032

Total Length (kms): 1,186

Initial Capacity: 1.28 Tbps

Owners: SCF (Group Loret)

Region: Americas

SCOTLAND-ORKNEY-SHETLAND

System Name: Scotland-Orkney-Shetland

Landing Points: Scotland-Orkney-Shetland

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): $12,000,000

Total Length (kms): 400

Owners: British Telecom

Region: EMEA

Orkney
Scotland
Shetland

Rostock-Ribnitz

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Sea Lion

Landing Points: Helsinki, Finland; Rostock-Ribnitz, Germany

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $74,000,000

Total Length (kms): 1,100

Design Capacity: 15 Tbps

Channel Capacity: 100 Gbps

Owners: Cinia Group

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro

Region: EMEA

GoonhillyPenmarch

Sesimbra

Teutan

Norden

Mazara Chania Marmaris Yeroskipou

Alexandria

Suez

System Name: South East Asia-Middle East-Western Europe 3

Landing Points: Alexandria (Egypt), Al Seeb (Oman), Batangas (Philippines), Chania (Greece), Cochin (India), Da Nang (Vietnam), Deep Water Bay (Hong Kong), Dehiwala-Mount Lavinia (Sri Lanka), Djibouti (Republic of Djibouti), Fangshan (Taiwan), Fujairah (United Arab Emira

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $1,500,000,000

Total Length (kms): 39,622

Initial Capacity: 40 Gbps

Design Capacity: 55 Gbps

Oostende Perth Pyapon

Fiber Pairs: 2 Fiber Pairs

Channels: 8

Channel Capacity: 2.5 Gbps, 10 Gbps

Owners: SEA-ME-WE 3 Consortium

System Supplier: Alcatel Submarine Networks, Fujitsu, Pirelli, KDDSCS, Tyco Telecommunications

Nanhui

Keoje

Taipa ShantouDeepWater Bay Fangshan Toucheng

Okinawa

Medan SatunPenang Tuas MersingTungku

Cableship: Agile, Maersk Defender, Maersk Fighter, Fresnel, Fu Lai, Nexus, Leon Thevinin, Vercors, Raymond Croze, Etisalat, Umm Al Anber

Marine Surveyor: C&C Technologies

Region: EMEA, Indian Ocean Pan-East Asian, AustralAsia

Jeddah
Djibouti
Fujairah

Initial Capacity: 1.28 Tbps

Design Capacity: 12.8 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: Algerie Telecom, Algeria, Bangladesh Submarine

Cable Company Limited (BSCCL), Bangladesh, Bharti Airtel, CAT Telecom (Thailand), Du, France Telecom, Pakistan Telecommunication Company Limited, Pakistan, Saudi Telecom Company (STC), Saudi Arabia, Sri Lanka

System Name: South East Asia-Middle East-Western Europe 4

Landing Points: Alexandria (Egypt), Annaba (Algeria), Bizerte (Tunisia), Chennai (India), Colombo (Sri Lanka), Cox’s Bazaar (Bangladesh), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Karachi (Pakistan), Marseille (France), Melaka (Malaysia), Mumbai (India), Mu

RFS Year: 2005

Est. End of Service Date: 2030

Est. System Cost (US$): $500,000,000

Total Length (kms): 18,846

System Supplier: Alcatel Submarine Networks, Fujitsu

System Installer: Orange Marine

Cableship: Niwa, Descartes

Upgrader: Alcatel-Lucent Submarine Networks, Mitsubishi Electric

Upgrade Year: 2011, 2015

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: EMEA, Indian Ocean Pan-East Asian

Cox’s Bazaar
TuasMelaka

System Name: South East Asia-Middle East-Western Europe 5

Landing Points: Marseille (France), Annaba (Algeria), Palermo (Italy), Bizerte (Tunisia), Jedda (Saudi Arabia), Fujairah (UAE), Karachi (Pakistan), Mumbai (India), Chennai (India), Colombo (Sri Lanka), Cox’s Bazar (Bangladesh), Satun (Thailand), Singapore (Singapore), Ma

RFS Year: 2016

Est. End of Service Date: 2040

Est. System Cost (US$): $1,000,000,000

Total Length (kms): 20,000

Design Capacity: 24 Tbps

Channel Capacity: 100 Gbps

Project Completion Phases: Pre-Engineering Survey

System Manufacture

System Installation Commissioning & Acceptance

Owners: Bangladesh Submarine Cable Company Ltd, China Mobile International Ltd, China Global Telecommunications Limited, China Network Communications Group Co Ltd, Emirates Integrated Telecommunications Co, Orange, Myanmar Post and Telecom, PT Telekomunikasi Indo

System Supplier: Alcatel-Lucent Submarine Networks, NEC

System Installer: Alcatel-Lucent Submarine Networks, NEC

Marine Surveyor: Elettra

Region: EMEA, Indian Ocean Pan-East Asian

MalaccaSingapore

Los Angeles

Davao City

Manado Guam Hawaii

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: South East Asia-United States

Landing Points: Manado (Indonesia), Davao (Phillippines), Piti, Guam: Oahu, Hawaii (United States), Los Angeles, California (United States)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $250,000,000

Total Length (kms): 15,000

Design Capacity: 20 Tbps

Channel Capacity: 100 Gbps

Owners: Telekomunikasi Indonesia International (Telin), Globe Telecom, RAM Telecom International (RTI), Hawaiian Telcom, GTI Corporation, Telkom USA, GTA

System Supplier: NEC

System Installer: NEC

Region: Transpacific

System Name: Seabras-1

Landing Points: Miami (USA), Fortaleza (Brazil), Sao Paolo (Brazil)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $509,000,000

Total Length (kms): 10,750

Initial Capacity: 100 Gbps

Design Capacity: 60 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Seaborn Networks

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Marine Surveyor: Gardline

Survey Boat: Sea Surveyor Region: Americas

Project Completion Phases: Pre-Engineering

Survey

System Manufacture

System Installation Commissioning & Acceptance

Dar es Salaam

Djibouti

System Name: Seacom

Landing Points: Abu Talat (Egypt), Dar es Salaam (Tanzania), Djibouti (Republic of Djibouti), Maputo (Mozambique), Mombasa (Kenya), Mtunzini (South Africa), Mumbai (India), Zafarana (Egypt)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $600,000,000

Total Length (kms): 13,601

Initial Capacity: 110 Gbps

Design Capacity: 1.28 Tbps

Owners: Convergence Partners (12.50%), Herakles Telecom LLC (25%), Industrial Promotion Services (25%), Shanduka Group (12.50%), VenFin Limited (25%)

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Cableship: Durable, Decisive, Dependable, Resolute, Responder

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Indian Ocean Pan-East Asian

Mombasa

Juneau

Hawk

Inlet

Angoon

Sitka

Petersburg

System Name: South East Alaska

Landing Points: Angoon (USA), Hawk Inlet (USA), Juneau (USA), Ketchikan (USA), Petersburg (USA), Sitka (USA), Wrangell (USA)

RFS Year: 2008

Est. End of Service Date: 2033

Initial Capacity: 10 Gbps

Owners: GCI

Region: Americas

Wrangell

Ketchikan

Chaguaramas

System Name: Suriname-Guyana Submarine Cable System

Landing Points: Chaguaramas (Trinidad), Georgetown (Guyana), Totness (Suriname)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $54,000,000

Total Length (kms): 1,249

Design Capacity: 1.28 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 64

Channel Capacity: 10 Gbps

Owners: Guyana Telephone and Telegraph Co. Ltd, Telesur of Suriname

System Supplier: Huawei Marine Networks, Nexans

System Installer: Global Marine Systems Limited, Huawei Marine Networks

Cableship: Sovereign Region: Americas

Georgetown Totness

System Name: Shetland-Faroesm 2

Landing Points: Ayre of Cara (UK), Banff (UK), Maywick (UK), Sandwick (Scotland), Tórshavn (Faroe Islands)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $27,000,000

Total Length (kms): 828

Initial Capacity: 20 Gbps

Design Capacity: 570 Gbps

Owners: Faroese Telecom

System Supplier: NSW

System Installer: International Telecom

Cableship: IT Intrepid

Marine Surveyor: Fugro

Upgrader: Xtera Communications

Region: EMEA

System Name: Silphium

Landing Points: Chania (Greece), Darnah (Libya)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $20,000,000

Total Length (kms): 426

Initial Capacity: 70 Gbps

Design Capacity: 1.2 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 40

Channel Capacity: 10 Gbps

Owners: Libyan Post, Telecom, and Information Technology Company

System Supplier: Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks

Region: EMEA

Chania

Chikura

System Name: South-East Asia Japan Cable

Landing Points: Chikura (Japan), Lantau (Hong Kong), Nasugbu (Philippines), Shantou (China), Telisai (Brunei), Tuas (Singapore)

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): $400,000,000

Total Length (kms): 8,986

Initial Capacity: 17 Tbps

Fiber Pairs: 6 Fiber Pairs

Channel Capacity: 100 Gbps

Owners: SJC Consortium (Brunei International Gateway Sendirian Berhad, China Mobile, China Telecom, China Telecom (Hong Kong) International Ltd., Donghwa Telecom Co., Ltd., Globe Telecom, Inc., Google SJC Bermuda Ltd., KDDI Corporation, Singapore Telecom, Telin,

System Supplier: TE SubCom, NEC

System Installer: S.B. Submarine Systems, NEC

Upgrader: TE SubCom

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: AustralAsia

Nasugbu
Lantau

SKR1M [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Sistem Kabel Rakyat 1 Malaysia

Landing Points: Peninsular Malaysia; Sabah, Malaysia; Sarawak, Malaysia

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): $100,000,000

Total Length (kms): 3,500

Design Capacity: 4 Tbps

Owners: TIME dotCom Bhd

System Supplier: NEC

System Installer: Telekom Malaysia

Region: AustralAsia

Sabah
Sarawak

System Name: Sulawesi-Maluku-Papua Cable System

Landing Points: Papua Provinces, New Guinea

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $71,100,000

Total Length (kms): 2,000

Design Capacity: 40 Gbps

Owners: PT Telekom (Indonesia)

System Supplier: NEC, Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks, NTT, NEC

Marine Surveyor: Fugro

Survey Boat: Fugro Supporter

Region: AustralAsia

Sulawesi
Maluku
Papua

System Name: St. Maarten-Puerto Rico 1

Landing Points: San Juan (Puerto Rico), St Martin (Netherlands Antilles)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): $15,000,000

Total Length (kms): 382

Initial Capacity: 2.5 Gbps

Owners: Smitcoms

Region: Americas

SOLAS

System Name: Solas

Landing Points: Kilmore Quay (Ireland), Oxwich Bay (UK)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $6,000,000

Total Length (kms): 140

Initial Capacity: 5 Gbps

Owners: Eircom

System Installer: Global Marine Systems Limited

Cableship: Wave Sentinel

Region: EMEA

SOLOMON ISLAND TO THE WORLD [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Soloman Island to the World

Landing Points: Honiara (Solomon), Sydney (Australia), Auki (Soloman), Noro (Soloman)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $60,000,000

Total Length (kms): 827

Owners: Solomons Oceanic Cable Company

System Supplier: TE SubCom

Region: AustralAsia

Noro Auki

Honiara

Kahe Point

Brookvale

Alexandria Whenuapai Takapuna

System Name: Southern Cross Cable Network

Landing Points: Alexandria (Australia), Brookvale (Australia), Kahe Point (Hawaii), Morro Bay (USA), Nedonna Beach (USA), Spencer Beach (USA), Suva (Fiji), Takapuna (New Zealand), Whenuapai (New Zealand)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $1,300,000,000

Total Length (kms): 30,000

Initial Capacity: 640 Gbps

Design Capacity: 12 Tbps

Fiber Pairs: 3 Fiber Pairs Segments A,C,G1,G2,I. 4 Fiber Pairs

Segments D and F

Channels: 16

Spencer Beach

Owners: Southern Cross Cable Network

System Supplier: Alcatel Submarine Networks, Fujitsu

System Installer: Alcatel Submarine Networks

Cableship: Cable Innovator laid 13761 km, Nexus laid 3306 km, Vercors laid 10007 km. Fresnel laid 800 km

Upgrader: Ciena

Upgrade Year: 2012, 2013

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Transpacific

Hotellneset

System Name: Svalbard

Landing Points: Andøy (Norway), Harstad (Norway), Hotellneset (Norway)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): $80,000,000

Total Length (kms): 2,800

Initial Capacity: 4.8 Tbps

Owners: Telenor

System Supplier: Tyco Telecommunications, Nexans

System Installer: Global Marine Systems Limited

Cableship: Innovator

Region: EMEA

Harstad Andøy

System Name: Tangerine

Landing Points: Broadstairs (United Kingdom), Oostende (Belguim)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $10,000,000

Total Length (kms): 121

Initial Capacity: 240 Gbps

Fiber Pairs: 96 Fiber Pairs

Owners: Level 3 Communications

Region: EMEA

Broadstairs
Oostende

TASMAN

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Tasman Global Access

Landing Points: Australia, New Zealand

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $60,000,000

Total Length (kms): 2,300

Design Capacity: 20 Tbps

Channel Capacity: 100 Gbps

Owners: Spark New Zealand, Vodafone, Telstra

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: AustralAsia

Widemouth Bay

Saint-Valery-en-CauxKatwijkNorden

Manasquan

System Name: TAT-14

Landing Points: Blaabjerg (Denmark), Katwijk (Netherlands), Manasquan (USA), Norden (Germany), Saint-Valeryen-Caux (France), Tuckerton (USA), Widemouth (UK)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $400,000,000

Total Length (kms): 15,453

Initial Capacity: 160 Gbps

Design Capacity: 9.38 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 40

Channel Capacity: 40 Gbps

Owners: TAT-14 Consortium

System Supplier: Mitsubishi Electric Corporation

System Installer: Global Marine Systems Limited

Cableship: Cable Innovator, Cable Endeavour, Bold Endurance, Wave Sentinel, Subaru, Maersk Recorder, Maersk Forwarder, Sir Eric Sharp, Agile, Teliri, Fresnel, Vercors

Marine Surveyor: Fugro

Upgrader: Mitsubishi

Upgrade Year: 2012

Upgraded Capacity: 40 Gbps

Region: Transatlantic

Tuckerton
Blaabjerg

TE NORTH

System Name: Telecom Egypt North

Landing Points: Abu Talat (Egypt), Pentaskinos (Republic of Cyprus), Marseille (France)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $150,000,000

Total Length (kms): 2,938

Initial Capacity: 10 Tbps

Design Capacity: 20 Tbps

Fiber Pairs: 8 Fiber Pairs

Owners: Telecom Egypt

System Supplier: Alcatel-Lucent Submarine Networks

Upgrader: Infinera

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: EMEA

Fujairah

System Name: The East African Marine System

Landing Points: Fujairah (United Arab Emirates), Mombasa (Kenya)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $130,000,000

Total Length (kms): 4,500

Initial Capacity: 120 Gbps

Design Capacity: 1.28 Tbps

Owners: Etisalat (15%), TEAMS Ltd. (85%)

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: e-Marine

Cableship: Niwa

Marine Surveyor: Fugro

Region: Indian Ocean Pan-East Asian

Mombasa

System Name: TGN Eurasia

Landing Points: Abu Talat (Egypt), Djibouti (Republic of Djibouti), Jeddah (Saudi Arabia), Marseille (France), Mtunzini (South Africa), Mumbai (India), Zafarana (Egypt)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $250,000,000

Total Length (kms): 9,240

Initial Capacity: 160 Gbps

Design Capacity: 1.28 Tbps

Owners: SEACOM, Tata Communications, Telecom Egypt

Region: Indian Ocean Pan-East Asian

Djibouti
Jeddah

TGN GULF

System Name: TGN Gulf

Landing Points: Al-Khobar (Saudi Arabia), Dubai (UAE), Kuwait City (Kuwait), Manama (Bahrain), Sumaisma (Qatar)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $200,000,000

Total Length (kms): 2,306

Design Capacity: 1.28 Tbps

Fiber Pairs: 2 Fiber Pairs

Owners: Tata Communications

System Supplier: TE SubCom

Region: EMEA

System Name: TGN Intra-Asia

Landing Points: Ballesteros (Philippines), Deep Water Bay (Hong Kong), Piti (Guam), Singapore (Singapore), Toyohashi (Japan), Vung Tau (Vietnam)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $180,000,000

Ballesteros

Total Length (kms): 6,485

Initial Capacity: 3.84 Tbps

Channel Capacity: 100 Gbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

System Installer: Orange Marine

Upgrader: Ciena

Upgrade Year: 2014`

Upgraded Capacity: 100 Gbps

Region: AustralAsia

Vung Tau
Deep Water Bay
Toyohashi
Piti

System Name: TGN Northern Europe

Landing Points: De Marne (Netherlands), Humanby (UK)

RFS Year: 2002

Est. End of Service Date: 2027

Total Length (kms): 551

Initial Capacity: 3.84 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Tata Communications Region: EMEA

Marne

TGN TRANSATLANTIC

System Name: TGN Transatlantic

Landing Points: Highbridge (UK), Saunton Sands (UK), Wall Township (USA)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $340,000,000

Total Length (kms): 12,670

Initial Capacity: 2.56 Tbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Transatlantic

Emi

Toyohashi

Nedonna

Beach

Hermosa

Beach

System Name: TGN Transpacific

Landing Points: Emi (Japan), Hermosa Beach (USA), Nedonna Beach (USA), Toyohashi (Japan)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): $580,000,000

Total Length (kms): 21,424

Initial Capacity: 5.12 Tbps

Channel Capacity: 100 Gbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

Upgrader: Ciena

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: Transpacific

System Name: TGN Western Europe

Landing Points: Bilbao (Spain), Highbridge (UK), Seixal (Portugal)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): $100,000,000

Total Length (kms): 3,487

Initial Capacity: 3.84 Tbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

Region: EMEA

Highbridge
Bilbao
Seixal

Chennai

System Name: TGN-TATA IndiaCom

Landing Points: Chennai (India), Changi (Singapore)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): $90,000,000

Total Length (kms): 3,175

Initial Capacity: 640 Gbps

Fiber Pairs: 8 Fiber Pairs

Owners: Tata Communications

Region: Indian Ocean Pan-East Asian

Changi

Chennai

System Name: TGN-TIC

Landing Points: Chennai (India), Tuas (Singapore)

RFS Year: 2005

Est. End of Service Date: 2030

Total Length (kms): 3,175

Initial Capacity: 5.12 Tbps

Owners: Tata Communications

Region: Indian Ocean Pan-East Asian

Tuas

System Name: Tierra del Fuego

Landing Points: Punta Dungeness (Argentina), Espiritu Santo (Argentina)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $5,000,000

Total Length (kms): 27

Owners: AR-SAT

System Supplier: Boskalis, Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Cableship: Ile de Batz

Region: Americas

System Name: Thailand-Indonesia-Singapore

Landing Points: Batam (Indonesia), Songkhla (Thailand)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $36,000,000

Total Length (kms): 1,003

Initial Capacity: 30 Gbps

Owners: CAT Telecom (Thailand), PT Telekom, Singtel

System Supplier: Tyco Telecommunications

System Installer: ASEAN Cableship

Region: AustralAsia

TONGA-FIJI

System Name: Tonga-Fiji

Landing Points: Nuku’alofa (Tonga), Suva (Fiji)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $18,900,000

Total Length (kms): 827

Owners: Tonga Cable Limited

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: AustralAsia

Nedonna

Beach

Qingdao Keoje

Chongming

Fuzhou

Tanshui

System Name: Trans-Pacific Express

Landing Points: Chongming (China), Shin-Maruyama (China), Keoje (South Korea), Nedonna Beach (USA), Qingdao (China), Tanshui (Taiwan)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $440,000,000

Total Length (kms): 16,163

Initial Capacity: 1.28 Tbps

Design Capacity: 5.12 Tbps

Owners: AT&T, China Telecom, China Unicom, Chunghwa Telecom International, KT Coropration, Verizon, NTT Com

System Supplier: Tyco Telecommunications

System Installer: Global Marine Systems Limited, NTT

Cableship: Cable Innovator

Upgrader: TE SubCom

Upgrade Year: 2013

Upgraded Capacity: 10 Gbps

Region: AustralAsia

Jakarta

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Onslow

Perth

System Name: Trident

Landing Points: Perth, Onslow (Australia), Jakarta (Indonesia)

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): $290,000,000

Total Length (kms): 4,600

Design Capacity: 38 Tbps

Fiber Pairs: 2 Fiber pairs

Perth-Singapore (8 Tbps), 1 fibre pair

Perth-Jakarta (10 Tbps), 1 fibre pair Onslow-Jakarta (10 Tbps) and 1 fibre pair Perth-Onslow (10 Tbps)

Channels: Perth-Singapore 40, rest 100

Channel Capacity: 100 Gbps

Owners: Trident Subsea Cable

System Supplier: TE SubCom

System Installer: TE SubCom

Region: AustralAsia

Curaçao

System Name: Trinidad-Curaçao

Landing Points: Curacao (Curacao), Trinidad (Trinidad)

RFS Year: 2007

Est. End of Service Date: 2032

Total Length (kms): 1,240

Initial Capacity: 1.875 Tbps

Owners: Colombus Networks, New World Network

System Supplier: Tyco Telecommunications SSI, Alcatel, NEC

System Installer: Tyco SSI

Cableship: Tyco Durable, Ile de Sein, Ile de Batz, Fu Hai, Segero, Cable Innovator

Region: Americas

TRIPOLI-BENGHAZI CABLE [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Tripoli-Benghazi Cable

Landing Points: Benghazi (Libya), Tripoli (Libya)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $30,000,000

Total Length (kms): 1,000

Fiber Pairs: 10 Tbps per pair

Channel Capacity: 100 Gbps

Owners: Libyan International Telecommunication Company

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: EMEA

New Taipei City

System Name: Taiwan Strait Express

Landing Points: Changle, Fuzhou City, China; Tamsui District, New Taipei City, Taiwan

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): $10,000,000

Total Length (kms): 270

Design Capacity: 6.4 Tbps

Fiber Pairs: 8 Fiber Pairs

Owners: Taiwan International Gateway Corporation, China Mobile, Chunghwa Telecom, Taiwan Mobile, Far EasTone Telecommunications, China Unicom

System Installer: Huawei Marine Networks, NTT, S.B. Submarine Systems

Region: AustralAsia

Fuzhou

TUBROK-EMASED

System Name: Tubrok-Emased

Landing Points: Tobruk (Libya), El Quawef (Libya)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $10,000,000

Total Length (kms): 180

Design Capacity: 25.6 Tbps

Fiber Pairs: 8 Fiber Pairs

Channels: 80

Channel Capacity: 40 Gbps

Owners: Libyan Post Telecommunications & Information Technology Company

System Supplier: Huawei Marine Networks

System Installer: Huawei Marine Networks, Orange Marine Region: EMEA

Tobrok El-Quawef

System Name: Transworld Associates

Landing Points: Al Seeb (Oman), Fujairah (United Arab Emirates), Karachi (Pakistan)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $40,000,000

Total Length (kms): 1,300

Initial Capacity: 1.28 Tbps

Owners: Trans-World Associates

System Supplier: Tyco Telecommunications

System Installer: Tyco Telecommunications

Region: EMEA

System Name: Ugarit

Landing Points: Pentaskhinos (Cyprus), Tartus (Syria)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $16,000,000

Total Length (kms): 240

Initial Capacity: 622 Mbps

Owners: Cypress Telecommunications Authority

System Supplier: Tyco Telecommunications Region: EMEA

Florianopolis

System Name: Unisur

Landing Points: Florianopolis (Brazil), Las Toninas (Argentina), Maldonado (Uruguay)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $74,000,000

Total Length (kms): 1,720

Initial Capacity: 560 Mbps

Owners: Antel (Uruguay), Embratel, Telecom Argentina, Telefonica de Argentina

Region: Americas

Chikura

Hermosa Beach

System Name: Unity

Landing Points: Chikura (Japan), Los Angeles (USA)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $300,000,000

Total Length (kms): 9,486

Initial Capacity: 1.92 Tbps

Design Capacity: 4.8 Tbps

Fiber Pairs: 5 Fiber Pairs

Owners: Bharti Airtel, Global Transit, Google, KDDI, PACNET, Singtel

System Supplier: Tyco Telecommunications

System Installer: NEC, Kokusai Cable Ship

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Transpacific

Port Moresby

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Vanuatu-Papua New Guinea

Landing Points: Port Vila (Vanuatu); Port Moresby (Papua New Guinea); branches to Luganville, Vanuatu; Honiara, Solomon Islands

RFS Year: 2016

Est. End of Service Date: 2040

Total Length (kms): 3,000

Initial Capacity: 40 Gbps

Design Capacity: 1.2 Tbps

Channel Capacity: 40 Gbps

Owners: Interchange (Vanuatu)

System Supplier: Alcatel-Lucent Submarine Networks

Region: AustralAsia

Port Vila

VENTSPILS-GOTLAND

System Name: Vetnspils-Gotlan

Landing Points: Fårösund (Sweden), Stockholm (Sweden), Ventspils (Latvia)

RFS Year: 2004

Est. End of Service Date: 2029

Total Length (kms): 175

Initial Capacity: 2.5 Gbps

Fiber Pairs: 34 Fiber Pairs

Owners: Baltcom

System Supplier: TE SubCom

Region: EMEA

VMSCS

Catania

System Name: Vodafone Malta-Sicily Cable System

Landing Points: Balluta (Malta), Catania (Italy)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): $10,000,000

Total Length (kms): 250

Initial Capacity: 10 Gbps

Owners: Vodafone Malta

Region: EMEA

System Name: West Africa Cable System

Landing Points: Accra (Ghana), Alta Vista (Spain), Cape Verde (Cape Verde), Douala (Cameroon), Lagos (Nigeria), Lome (Togo), Luanda (Angola), Muanda (DRC), Pointe Noire (Congo), Sesimbra (Portugal), Walvis Bay (Namibia), Whitesands Bay (UK)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $600,000,000

Total Length (kms): 14,350

Initial Capacity: 5.12

Design Capacity: 12.8 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 32

Channel Capacity: 100 Gbps

Owners: Angola Cables, Broadband Infraco, Congo Telecom, C&W, MTN Group, Office Congolais de Poste et Telecommunication, PT Comunicações, Tata Communications, Telecom Namibia, Telekom SA, Togo Telecom, Vodacom

System Supplier: Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro

Upgrader: Huawei Marine Networks

Upgrade Year: 2015

Upgraded Capacity: 100 Gbps

Region: EMEA

Walvis Bay
Luanda
Pointe Noire
Muanda
Douala
Accra LomeLagos
Cape Verde
Alta Vista
Sesimbra
Whitesand Bay

Cochin

System Name: WARF

Landing Points: Cochin (India), Hulhumalé (India)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $20,000,000

Total Length (kms): 680

Owners: WARF Telecom International

System Supplier: Alcatel Submarine Networks

Marine Surveyor: Fugro

Region: Indian Ocean Pan-East Asian

WESTERN VISAYAS-PALAWAN

System Name: Western Visayas-Palawan

Landing Points: Taytay, Palawan; San Jose de Buenavista, Iloilo (Philippines)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): $20,000,000

Total Length (kms): 300

Owners: PLDT (Philippines)

Region: AustralAsia

Taytay
San Jose de Buenavista
Iloilo

Voice of the Industry

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.