Almanac Issue 12

Page 1


submarine cable ALMANAC

While all reasonable steps to verify information from the public domain have been taken, based on changing circumstances and dynamic factors, incomplete information subject to change may exist. Our goal is to periodically update and modify such information. If you have a correction, please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing almanac@subtelforum.com.

WIntroduction

elcome to the twelfth edition of the Submarine Cable Almanac, one of our most popular reference tools. In the months since Issue 11 was released, 1 system was added, 1 system was removed and 19 systems were updated with new information.

If you’re interested in finding a specific system, or wish to see all systems in a region, simply type that name or region into the search function. We hope that you, our readers, will participate in this almanac as you’ve done with our previous products.

There is always room for additional data, so let us know if there is something else we should include in future editions. Please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing almanac@subtelforum.com.

Finally, I want to thank all of the sponsors, staff and dedicated readers that contributed to this Almanac. Your feedback has been invaluable.

Submarine

Cable Almanac Issue 12 | November 2014

Copyright © 2014 by Submarine Telecoms Forum, Inc.

November, 2014

All rights reserved. No part of this book may be used or reproduced by any means, graphic, eletronic, or mechanical, including photocopying, recording, taping or by any information storage retrieval system without the written permission of the publisher except in the case of brief quotations embodied in critical articles and reviews.

Submarine Telecoms Forum, Inc. 21495 Ridgetop Circle Suite 201

Sterling, Virginia 20166 USA www.subtelforum.com

ISBN: 978-0-615-46614-9

Submarine Cables of The World

Corsar 194

Danica North 196

Danica South 198 Danice 200

202 DenmarkGermany 2 204 DenmarkNorway 5 206 DenmarkNorway 6 208 DenmarkPoland 2 210 DenmarkRussia 212

Hugo 314

I-ME-WE 316

i2i 318 ICN1 320

ICN2 322 ICX 324

IslaLink 326

Italy-Albania 328

Italy-Greece 330

Italy-Libya 332

Italy-Monaco 334 ITUR 336

JaKa2DeLeMa 338

JAKABARE 340

Japan-US 342

Jasuka 344

JIH 346

KAFOS 348

Kattegat-1 350

Keltra-2 352

KhulnaChennai 354

KJCN 356

Kodiak Kenai 358

Kuantan-Kota Kinabaru 360

Kuwait-Iran 362

370

One 372

Domestic (Northern Link) 374 Malaysia Domestic (Southern Link) 376

Kupang

Rodrigues Island

SCAN 458

SCF-CN 460

SEA-ME-WE 3 462

SEA-ME-WE 4 464

SEA-ME-WE 5 466

SEA-US 468

Seabras-1 470

Seacom 472

SEAK 474

SF-S 4 476

SFL 478

SG-SCS 480

Shefa 2 482

Silphium 484

SJC 486

SKKL-JS 488

SMPR-1 490

Solas 492

Solomon Island to the World 494

Southern Cross Cable Network 496

498 Svalbard 500

502 Taino Carib 504 Tangerine 506 Tasman Global Access 508

14 512

North 514 TEAMS 518

TGN Eurasia 520

TGN Gulf 522

TGN Intra-Asia 524

TGN Northern Europe 526

TGN Transatlantic 528 TGN Transpacific 530 TGN Western Europe 532 TGN-TIC 534 Tierra del Fuego 536

538

540

542

Emased 554

562

564

Sponsors:

572

574

INTELLIGENCE, ANALYSIS, AND

THE INTERNATIONAL TELECOMMUNICATIONS INFRASTRUCTURE COMMUNITY

Terabit Consulting is a leading source of market intelligence, forecasting, and guidance for the international telecommunications infrastructure community. Its long history of accurate, innovative analysis and advisory services is in large part attributable to the trust and respect it has earned among industry leaders. Terabit Consulting has completed studies for dozens of leading telecom infrastructure projects worldwide and its analysts have traveled to research and deliver studies in more than 70 countries, giving it an unmatched level of experience in nearly every region of the globe.

Terabit’s primary clients include financial institutions, development agencies, government ministries, telecom carriers, project developers, suppliers, financiers, law offices, and industry associations, as well as other members of the international telecommunications infrastructure community.

Learn more at www.terabitconsulting.com or contact a Terabit Consulting representative today.

Terabit Consulting

245 First Street, 18th Floor

Cambridge, Massachusetts 02142 USA

Tel. +1 617 444 8605

info@terabitconsulting.com

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Asia Africa Europe

Landing Points: Barcelona (Spain), Marseilles (France), Palermo (Italy), Abu Talat (Egypt), Zafrana (Egypt), Djibouti, Oman, Fujairah (UAE), Mumbai (India), Kenya, Sri Lanka, Cox Bazaar (Bangladesh), Myanmar, Singapore, Hong Kong, Shanghai (China)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $600,000,000.00

Total Length (kms): 25,000

Design Capacity: 40 Tbps

Channel Capacity: 100 Gbps

Owners: Etisalat (UAE), China Unicom (China), Djibouti Telecom (Djibouti), Telecom Italia (Italy), TIME (Malaysia), Oteglobe (Greece), BT (UK), MPT (Myanmar), Chunghwa Telecom (Taiwan), BSCCL (Bangladesh), dU (UAE), OmanTel (Oman), PTCL (Pakistan)

System Supplier: TE SubCom, NEC

Region: Indian Ocean, Mediterranean, Middle East, Pacific

Mersing

System Name: Asia-America Gateway

Landing Points: Changi (Singapore), Keawaula (Hawaii), Lantau (Hong Kong), La Union (Philippines), Mersing (Malaysia), San Luis Obispo (USA), Sri Racha (Thailand), Tanguisson (Guam), Tungku (Brunei), Vung Tau (Vietnam)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $500,000,000.00

Total Length (kms): 20,547

Initial Capacity: 2.88 Tbps

Owners: AT&T Inc., Bayan, Bharti, BT Global Network Services, CAT Telecom, ETPI, FPT Telecom, the Government of Brunei Darussalam, PT Indosat, PLDT, Saigon Postel Corporation, StarHub, Telcotech, TELKOM Indonesia, Telstra, Telekom Malaysia, TNZL, Viettel, VNPT

System Supplier: Alcatel Submarine Networks, NEC

System Installer: Alcatel Submarine Networks

Cableship: Rene Descartes

Upgrader: Mitsubishi, Ciena

Upgrade Year: 2011, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Pacific

System Name: AC-1

Landing Points: Beverwijk (Netherlands), Brookhaven (USA), Westerland (Germany), Whitesands Bay (UK)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $875,000,000

Total Length (kms): 13,377

Initial Capacity: 40 Gbps

Design Capacity: 1 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Level 3 Communications

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Upgrader: Xtera Communications

Upgrade Year: 2010

Upgraded Capacity: 20 Gbps

Region: Atlantic

System Name: AC-2

Landing Points: Bellport (USA), Widemouth (UK)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $700,000,000

Total Length (kms): 6,185

Initial Capacity: 320 Gbps

Design Capacity: 640 Gbps

Owners: Level 3 Communications

Upgrader: Infinera

Upgrade Year: 2010

Upgraded Capacity: 10 Gbps

Region: Atlantic

System Name: ACE

Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Asilah (Morocco), Banjul (The Gambia), Bata (Equatorial Guinea), Cape Town (South Africa), Conakry (Guinea), Cotonou (Benin), Dakar (Senegal), Freetown (Sierra Leone), Kribi (Cameroon), Lagos (Nigeria), Libreville (Gabon), Lisbon (Portugal), Lome (Togo), Luanda (Angola), Monrovia (Liberia), Muanda (DRC), Nouakchott (Mauritania), Penmarch (France), Santana (São Tomé and Príncipe), Sucujaque (Guinea-Bissau), Swakopmund (Namibia), Tenerife (Spain)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $700,000,000

Total Length (kms): 17,000

Design Capacity: 5.12 Tbps

Owners: Benin Telecoms, Cable Consortium of Liberia Inc, Côte d’Ivoire Telecom, Expresso Telecom Group Ltd, Orange, Gambia Submarine Cable Company Ltd, Guinéenne de la Large Bande SA, International Mauritania Telecom, Orange Cameroun S.A., Orange Mali, Orange Niger S.A., PT Comunicações SA, Republic of Equatorial Guinea, Republic of Gabon, Sierra Leone Cable Company, Sonatel, STP Cabo

System Supplier: Alcatel-Lucent Submarine Networks (Main contractors), TE SubCom (Sub contractors)

Marine Surveyor: Fugro

Region: Atlantic

System Name: Adones

Landing Points: Benguela (Angola), Cabinda (Angola), Luanda (Angola), Lucira (Angola), Namibe (Angola), Nzeto (Angola), Porto Amboim (Angola), Soyo (Angola)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $35,000,000

Total Length (kms): 1,800

Initial Capacity: 30 Gbps

Design Capacity: 80 Gbps

Owners: Angola Telecom

System Supplier: Ericsson

System Installer: Elettra

Cableship: Teleri

Region: Atlantic

Cabinda Soyo Nzeto Luanda
Porto Amboim
Benguela
Lucira

System Name: ADRIA-1

Landing Points: Corfu (Greece), Dubrovnik (Croatia), Durres (Albania)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $13,400,000

Total Length (kms): 430

Initial Capacity: 622 Mbps

Owners: Deutsche Telekom AG, OTE

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Region: Mediterranean

Durres

System Name: America Europe Connect

Landing Points: Belmullet (Ireland), Brookhaven (USA), Grindavik (Iceland)

RFS Year: 2015

Est. End of Service Date: 2039

Est. System Cost (US$): 150,000,000

Total Length (kms): 5,200

Design Capacity: 60 Tb/s

Fiber Information: 6 Fiber Pairs, 100 wavelengths, 100 Gb/s per wavelength

Owners: Emerald Networks

System Supplier: TE SubCom

Region: Atlantic

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation Commissioning & Acceptance

System Name: AJC

Landing Points: Maruyama (Japan), Oxford Falls (Australia), Shima (Japan), Sydney (Australia), Tanguisson (Guam), Tumon (Guam)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $520,000,000

Total Length (kms): 12,224

Initial Capacity: 320 Gbps

Design Capacity: 25.6 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: Australia Japan Cable Limited, Communications Global Network Services Limited, NTT

Communications Corporation, SOFTBANK Telecom Corp., Telstra Holdings (Bermuda) No. 1 Limited, Worldcom Global Networks Limited

System Supplier: Ocean Cable Company, Tyco Telecommunications

System Installer: FCR, KDD

Cableship: Fresnel, Subaru

Upgrader: Ciena, Infinera

Upgrade Year: 2012, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Pacific

Maruyama
Shima
Tanguisson Tumon
Oxford Falls Sydney

Anchorage

System Name: Akorn

Landing Points: Anchorage (USA), Florence (USA)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $100,000,000

Total Length (kms): 2,968

Initial Capacity: 10 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Alaska Communications

System Supplier: Tyco Telecommunications

Region: Pacific

ALASIA

System Name: Alasia

Landing Points: Pentaskhinos (Cyprus), Tartus (Syria)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $15,000,000

Total Length (kms): 350

Design Capacity: 25.6 Tbps

Fiber Pairs: 8 Fiber Pairs

Owners: Cyprus Telecommunications Authority, Syrian Telecommunications Authority

Region: Mediterranean

Valdez

Whittier

System Name: Alaska United East

Landing Points: Harbor Pointe (USA), Juneau (USA), Valdez (USA), Whittier (USA)

RFS Year: 1999

Est. End of Service Date: 2024

Total Length (kms): 3,751

Initial Capacity: 2.5 Gbps

Design Capacity: 10 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: GCI

System Supplier: NEC

Region: Pacific

Juneau

Harbor Pointe

ALASKA UNITED WEST

Whittier

System Name: Alaska United West

Landing Points: Ketchikan (USA), Warrenton (USA), Whittier (USA)

RFS Year: 2004

Est. End of Service Date: 2029

Total Length (kms): 2,483

Initial Capacity: 10 Gbps

Design Capacity: 640 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: GCI

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Cableship: Global Sentinel

Region: Pacific

Ketchikan
Warrenton

System Name: ALBA-1

Landing Points: Camuri (Venezuela), Havana (Cuba), Morant Point (Jamaica), Santiago De Cuba (Cuba)

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): $72,000,000

Total Length (kms): 1,600

Initial Capacity: 640 Gbps

Owners: Telecom Venezuela, Transbit SA

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Shanghai Bell, Telecomunicaciones Gran Caribe

Marine Surveyor: EGS

Survey Boat: RV Ridley Thomas

Region: Carribean

System Name: Aletar

Landing Points: Alexandria (Egypt), Tartus (Syria)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $23,000,000

Total Length (kms): 733

Initial Capacity: 5 Gbps

Fiber Pairs: 1 Fiber Pair

Owners: Lebanese Ministry of Telecom (6.25%), Syrian Telecom (46.875%), Telecom Egypt (46.875%)

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Vercors

Region: Mediterranean

System Name: Alexandros

Landing Points: Alexandria (Egypt), Marseille (France), Pentaskhinos (Cyprus)

RFS Year: 2010

Est. End of Service Date: 2035

Design Capacity: 10 Tbps

Owners: Cyprus Telecommunications Authority, Telecom Egypt

Region: Mediterranean

ALONSO DE OJEDA

System Name: Alonso De Ojeda

Landing Points: Oranjestad (Aruba), Willemstad (Netherlands Antilles)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $8,678,000

Total Length (kms): 128

Initial Capacity: 15 Gbps

Design Capacity: 100 Gbps

Owners: Antelecom NV

System Supplier: Alcatel Submarine Networks

Region: Carribean

Willemstad

System Name: Alpal-2

Landing Points: El Djemila (Algeria), Ses Covetes (Majorca)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): $17,600,000

Total Length (kms): 312

Initial Capacity: 10 Gbps

Design Capacity: 160 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: APT, France Telecom, Telefonica

System Supplier: Pirelli

System Installer: Global Marine Systems Limited

Cableship: Maersk Responder

Region: Mediterranean

AMERICAN SAMOA-FIJI [Planned]

System Name: American Samoa-Fiji

Landing Points: Pago Pago (American Samoa), Fiji

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $35,000,000

Initial Capacity: 40 Gbps

Owners: American Samoa Hawaii Cable

Region: Pacific

American Samoa

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

AMERICAS I

Magens Bay

System Name: Americas I

Landing Points: Magens Bay (Virgin Islands), Vero Beach (USA)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $220,000,000

Total Length (kms): 2,013

Initial Capacity: 120 Gbps

Design Capacity: 320 Gbps

Owners: AT&T, CANTV (Venezuela), Embratel, TSTT

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Upgrader: Xtera Communications

Upgrade Year: 2010

Upgraded Capacity: 20 Gbps

Region: Carribean

AMERICAS I SOUTH

System Name: Americas I South

Landing Points: Camuri (Venezuela), Fortaleza (Brazil), Macqueripe (Trinidad), Magens Bay (Virgin Islands)

RFS Year: 1994

Est. End of Service Date: 2019

Total Length (kms): 6,014

Initial Capacity: 560 Mbps

Owners: AT&T, CANTV (Venezuela), Embratel, TSTT

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications SSI

System Installer: C&W (Marine)

Cableship: Cable Installer, Agile, Fresnel

Region: Carribean

Magens Bay

Camuri Macqueripe

System Name: Americas II

Landing Points: Camuri (Venezuela), Cayenne (French Guiana), Chaguaramas (Trinidad), Fortaleza (Brazil), Hollywood (USA), Lamentine (France), Miramar (Puerto Rico), St Croix (US Virgin Islands), Willemstad (Netherlands Antilles)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $350,000,000

Total Length (kms): 8,373

Initial Capacity: 80 Gbps

Design Capacity: 210 Gbps

Owners: Antelecom NV, AT&T, Brazil Telecom, CANTV (Venezuela), Embratel, France Telecom, GT&T, Sprint, Telecom Italia, Telefonica, Telesur, Telintar, Trescom Int., TSTT, Verizon

System Supplier: ASN Australia, Tyco Telecommunications

System Installer: Tyco Telecommunications SSI

Cableship: Global Link

Region: Carribean

AMERIGO VESPUCCI

Curaçao Bonaire

System Name: Amerigo Vespucci

Landing Points: Bonaire (Netherlands), Curaçao (Curaçao)

RFS Year: 1999

Est. End of Service Date: 2024

Total Length (kms): 84

Region: Atlantic, Carribean

System Name: AMX-1

Landing Points: Jacksonville (United States), Miami (United States), San Juan (Puerto Rico), Puerto Barrios (Guatemala), Barranquilla (Colombia), Cartagena (Colombia), Fortaleza (Brazil), Salvador de Bahia (Brazil), Rio de Janeiro (Brazil), Puerto Plata (Dominican Republic), Cancun (Mexico)

RFS Year: 2014

Est. End of Service Date: 2038

Est. System Cost (US$): $700,000,000

Total Length (kms): 17,800

Initial Capacity: 100 Gbps

Owners: America Movil

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro, EGS

Region: Atlantic, Carribean

Fortaleza
Rio de Janeiro
Maimi
Puerto Plata San Juan
Barranquilla Cartagena
Cancun
Puerto Barrios

System Name: Antel

Landing Points: Las Toninas (Argentina), Maldonado (Uruguay)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $15,000,000

Total Length (kms): 250

Initial Capacity: 50 Gbps

Design Capacity: 3.84 Tbps

Owners: Antel (Uruguay), Telecom Argentina

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: IT Telecom

Region: Atlantic

Maldonado

ANTILLES CROSSING

System Name: Antilles Crossing

Landing Points: Bridgetown (Barbados), Hams Bluff (Virgin Islands), Port Castries (St Lucia)

RFS Year: 2006

Est. End of Service Date: 2031

Total Length (kms): 952

Initial Capacity: 40 Gbps

Design Capacity: 80 Gbps

Owners: Antilles Crossing, Barbados Light & Power, Leucadia, Telebarbados

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: Carribean

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: APC

Landing Points: Japan, Hong Kong, Malaysia, Singapore, Taiwan

Total Length (kms): 7,600

Initial Capacity: 1.68 Gbps

Fiber Pairs: 3 Fiber Pairs

System Supplier: Fujitsu

Region: Pacific

Taiwan
Hong Kong

System Name: APCN

Landing Points: Batangas (Philippines), Changi (Singapore), Jakarta (Indonesia), Lantau (Hong Kong), Mersing (Malaysia), Miyazaki (Japan), Phetchaburi (Thailand), Port Hedland (Australia), Pusan (South Korea)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $640,000,000

Total Length (kms): 11,813

Initial Capacity: 10 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: CAT Telecom (Thailand), Chunghwa Telecom International, Indosat, KDDI, KT Coropration, PLDT (Philippines), Reach NHK, Singtel, TM

System Supplier: Ocean Cable Company, Fujitsu, Tyco Telecommunications

System Installer: C&W (Marine)

Cableship: Cable Venture, Cable Innovator, Ocean Link

Region: Pacific

Jakarta
Changi
Mersing
Petchaburi
Batangas
Lantau
Miyazaki
Pusan

Marine Surveyor: C&C Technologies

Upgrader: NEC

Upgrade Year: 2011, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Pacific

System Name: APCN 2

Landing Points: Batangas (Philippines), Chikura (Japan), Chongming (China), Katong (Singapore), Kitaibaraki (Japan), Kuantan New Port (Malaysia), Lantau (Hong Kong), Pusan (South Korea), Shantou (China), Tanshui (Taiwan)

RFS Year: 2002

Est. End of Service Date: 2027

Est. System Cost (US$): $1,100,000,000

Total Length (kms): 19,000

Initial Capacity: 160 Gbps

Design Capacity: 6.4 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: China Telecom, Chunghwa Telecom International, CTM, France Telecom, KDDI, KT Coropration, NTT Communications, PLDT (Philippines), Reach NHK, Singtel, Telekom Malaysia

System Supplier: Ocean Cable Company

System Installer: Global Marine Systems Limited

Cableship: Cable Retriever, Bold Endurance, Fu Lai, Asean Restorer, Maersk Recorder, Maersk Repeater, Maersk Responder, Maersk Reliance, Subaru, Kuroshio Maru, Cable Installer. Barges, Networker, Elbe, Chin Ann 3

Project Completion Phases: Pre-Engineering Survey System Manufacture

System Installation

Commissioning & Acceptance

System Name: Asia Pacific Gateway

Landing Points: Chongming (China), Da Nang (Vietnam), Kuantan New Port (Malaysia), Lantau (Hong Kong), Maruyama (Japan), Nanhui District (China), Pusan (South Korea), Shima (Japan), Songkhla (Thailand), Toucheng (Taiwan), Tuas (Singapore)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $313,144,000.00

Total Length (kms): 8,000

Design Capacity: 38.4 Tbps

Channel Capacity: 40 Gbps

Owners: China Telecom, China Unicom, Chunghwa Telecom International, Facebook, KT Coropration, NTT Communications, PLDT (Philippines), StarHub (Singapore), Telekom Malaysia, TIME dotCom, VNPT

System Supplier: NEC

System Installer: NTT Com

Region: Pacific

Pusan
Shima
Lantau
Da Nang
Songkhla
Kuantan
Tuas
Nanhu
Maruyama

APHRODITE 2

System Name: Aphrodite 2

Landing Points: Chania (Greece), Yeroskipos (Cyprus)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $30,000,000

Total Length (kms): 868

Initial Capacity: 1.12 Gbps

Owners: AT&T, Belgacom, British Telecom, Cyprus Telecommunications Authority (62%), France Telecom, OTE, Sprint, Verizon

System Supplier: Alcatel Submarine Networks

Cableship: Skandi Hav

Region: Mediterranean

System Name: APNG-2

Landing Points: Port Moresby (Papua New Guinea), Sydney (Australia)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $11,000,000

Total Length (kms): 3,400

Initial Capacity: 1.12 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Telikom PNG, Telstra (Australia)

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Re

Region: Pacific

Point Moresby

Brookhaven

Manasquan

System Name: Apollo

Landing Points: Brookhaven (USA), Lannion (France), Manasquan (USA), Widemouth (UK)

RFS Year: 2003

Est. End of Service Date: 2028

Total Length (kms): 12,700

Initial Capacity: 10 Gbps

Design Capacity: 3.2 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Alcatel, Apollo SCS Limited, C&W

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Batz, Ile de Brehat, Ile de Sein, Skandi Neptune

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2012, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Atlantic

APX-CENTRAL [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: APX-Central (Asia Pacific Express Central)

Landing Points: Adelaide (Australia), Hobart (Australia), Melbourne (Australia), Perth (Australia)

RFS Year: 2016

Est. End of Service Date: 2041

Total Length (kms): 4,800

Design Capacity: 32 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 80

Channel Capacity: 100 Gbps

Owners: SubPartners

System Supplier: TE SubCom

Region: Pacific

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: APX-East (Asia Pacific Express East)

Landing Points: Auckland (New Zealand), Hermosa Beach (United States), Oahu (United States), Sydney (Australia)

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): $350,000,000

Total Length (kms): 12,700

Design Capacity: 40 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: SubPartners

System Supplier: TE SubCom

Region: Pacific

APX-WEST [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: APX-West (Asia Pacific Express West)

Landing Points: Jakarta (Indonesia), Christmas Island (Australia), Perth (Australia), Singapore

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $150,000,000

Total Length (kms): 4,600

Design Capacity: 32 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 80

Channel Capacity: 100 Gbps

Owners: SubPartners

System Supplier: TE SubCom

Region: Pacific

There's a more flexible and cost-effective way to guarantee end-to-end network performance from data center to data center. Ciena's WaveLogic-based transport, intelligent switching, and unified network management system ensure a future-proof global network solution, overland and undersea, as cloud-related traffic patterns continue to evolve. See how at www.ciena.com/GeoMesh

There's a more flexible and cost-effective way to guarantee end-to-end network performance from data center to data center. Ciena's WaveLogic-based transport, intelligent switching, and unified network management system ensure a future-proof global network solution, overland and undersea, as cloud-related traffic patterns continue to evolve. See

System Name: Arcos-1

Landing Points: Bluefields (Nicuragua), Cancun (Mexico), Cartagena (Columbia), Cat Island (Bahamas), Crooked Island (Bahamas), Hollywood (USA), Ladyville (Belize), Maria Chiquita (Panama), Nassau (The Bahamas), Providenciales (Turks and Caicos Islands), Puerto Barrios (Guatemala), Puerto Cabezas (Nicuragua), Puerto Cortes (Honduras), Puerto Lempira (Honduras), Puerto Limon (Costa Rica), Puerto Plata (Dominican Republic), Punta Cana (Dominican Republic), Punto Fijo (Venezuela), Riohacha (Columbia), San Juan (Puerto Rico), Trojillo (Honduras), Tulum (Mexico), Ustupo (Panama), Willemstad (Netherlands Antilles)

RFS Year: 2001

Est. End of Service Date: 2026

Total Length (kms): 8,700

Initial Capacity: 80 Gbps

Design Capacity: 1 Tbps

Owners: Alestra (Mexico), AT&T, Axtel (Mexico), BTC (Bahamas), BTL (Belize), CANTV (Venezuela), Codetel (Dominican Republic), Colombus Networks, Enitel (Nicaragua), Hondutel (Honduras), ICE (Costa Rica), Impsat (USA), Internexa (Colombia), Orbinet SA (Colombia), Racsa (Costa Rica), Telecarrier (Panama), Tricom (Dominican Republic), Ultracom (Puerto Rico), UTS (Curacao), Verizon

System Supplier: Norddeutsche Seekabelwerke (Tyco Telecommunications, Partial)

Marine Surveyor: Fugro

Upgrader: Xtera Communications

Upgrade Year: 2008

Upgraded Capacity: 40 Gbps

Region: Carribean

Puerto Lempira
Puerto Cabezas
Bluefields
PuertoLimon MariaChiquita
Ustupo
Cartagena
Riohacha Punto Fijo
Willemstad
Tulum
Cancun
Punta Cana San Juan

Ajigaura

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Cambridge Bay

Prudhoe Bay

System Name: Arctic Fibre

Landing Points: Ajigaura (Japan), Gambell (United States), Nome (United States), Point Hope (United States), Wainwright (United States), Barrow (United States), Prudhoe Bay (United States), Tuktoyakatuk (Canada), Cambridge Bay (Canada), Gjoa Haven (Canada), Hall Beach (Canada), Cape Dorset (Canada), Milton (Canada), Highbridge (United Kingdom)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $800,000

Total Length (kms): 18,000

Initial Capacity: 100 Gbps

Owners: Arctic Fibre Inc.

Region: Atlantic, Pacific, Polar

Highbridge
Cork

System Name: Ariane 2

Landing Points: Chania (Greece), Marseille (France)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $70,000,000

Total Length (kms): 2,370

Initial Capacity: 1.12 Gbps

Owners: AT&T, Belgacom, Cypress Telecommunications Authority, France Telecom, OTE, Verizon

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Vercors

Region: Mediterranean

Marseille
Chania

ASC [Planned]

Singapore Anyer

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: ASC (Australia-Singapore Cable)

Landing Points: Perth (Australia), Tanah Mera (Singapore), Anyer (Indonesia)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $160,000,000

Total Length (kms): 4,600

Design Capacity: 36 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 120

Channel Capacity: 100 Gbps

Owners: Australia-Singapore Cable International Limited

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Pacific

Hong Kong

Philippines

Japan

System Name: ASE (Asia Submarine-Cable Express)

Landing Points: Japan, Philippines, Hong Kong, Malaysia, Singapore, Cambodia

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): $412,000,000

Total Length (kms): 7,200

Design Capacity: 15.36 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 128

Channel Capacity: 40 Gbps

Owners: NTT Communications (Japan), PLDT (Philippines), StarHub (Singapore), Telekom Malaysia

System Supplier: Fujitsu Limited, NEC Corporation

Region: Pacific

Keawaula

System Name: ASH

Landing Points: Keawaula (Hawaii), Pago Pago (American Samoa)

RFS Year: 2009

Est. End of Service Date: 2034

Total Length (kms): 4,680

Initial Capacity: 1.2 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: ASH Cable Company

System Supplier: Alcatel-Lucent Submarine Networks

Cableship: Ile de Ré

Region: Pacific

System Name: Athena

Landing Points: Koropi (Greece), Pentaskhinos (Cyprus)

RFS Year: 2011

Est. End of Service Date: 2036

Total Length (kms): 600

Owners: Cypress Telecommunications Authority, Telecom Italia Sparkle

Region: Mediterranean

Pentaskhinos

System Name: Atlantis-2

Landing Points: Conil (Spain), Dakar (Senegal), El Medano (Spain), Fortaleza (Brazil), Funchal (Portugal), Las Toninas (Argentina), Lisbon (Portugal), Praia (Cape Verde), Rio de Janeiro (Brazil)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $370,000,000

Total Length (kms): 13,100

Initial Capacity: 40 Gbps

Design Capacity: 160 Gbps

Fiber Pairs: 2 Fiber Pairs, Initial: 2 wavelengths, Design: 8 wavelengths

Channels: 2 to 8

Channel Capacity: 40 Gbps

Owners: Cabo Verde Telecom, Deutsche Telekom AG, Embratel, France Telecom, Marconi, Sonatel, Telecom Argentina, Telecom Italia, Telefonica, Telefonica de Argentina, Telintar, Verizon

System Supplier: Alcatel Submarine Networks, Pirelli, Fujitsu

System Installer: FCR

Cableship: Raymond Croze, Fresnel, Vercors, Teneo, Teliri, Maersk Defender

Region: Mediterranean

Fortaleza
Rio de Janeiro
Las Toninas
Dakar
El Medano
Funchal
Conil
Lisbon
Praia

System Name: Atlas Offshore

Landing Points: Asilah (Morocco), Marseille (France)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $31,000,000

Total Length (kms): 1,634

Initial Capacity: 40 Gbps

Design Capacity: 320 Gbps

Owners: Maroc Telecom of Morocco

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Mediterranean

Asilah

Marseille

AUSTRAL [Planned]

Puerto Montt

System Name: Austral

Landing Points: Puerto Montt (Chile), Punta Arenas (Chile)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $100,000,000

Total Length (kms): 1,800

Owners: AUSTRAL University of Magellan, Magellan CPC

System Supplier: Huawei Marine Networks

Region: Pacific

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

BAHAMAS-2

System Name: Bahamas-2

Landing Points: Eight Mile Rock (Bahamas), Nassau (The Bahamas), Vero Beach (USA)

RFS Year: 1997

Est. End of Service Date: 2022

Total Length (kms): 478

Initial Capacity: 2.5 Gbps

Owners: AT&T, Balteco, Verizon

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Marine Surveyor: C&C Technologies

Region: Carribean

BALTICA

System Name: Baltica

Landing Points: Dueodde (Bornholm), Gedser (Denmark), Kolobrzeg (Poland), Ystad (Sweden)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $16,000,000

Total Length (kms): 437

Initial Capacity: 5 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Polish Telecom, TDC, Telecom Finland, Telenor, Teliasonera

Region: Baltic

Dueodde

Gedser

Kolobrzeg

Ystad

Barcelona

System Name: BAR-SAV

Landing Points: Barcelona (Spain), Savona (Italy)

RFS Year: 1996

Est. End of Service Date: 2021

Est. System Cost (US$): $39,000,000

Total Length (kms): 760

Initial Capacity: 5 Gbps

Owners: Telecom Italia, Telefonica

System Supplier: Alcatel Submarine Networks

Region: Mediterranean

BASS STRAIT 1

System Name: Bass Strait 1

Landing Points: Boat Harbour (Tasmania), Sandy Point (Australia)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $22,500,000

Total Length (kms): 241

Initial Capacity: 622 Mbps

Design Capacity: 2.5 Gbps

Owners: Telstra (Australia)

System Supplier: Alcatel Submarine Networks

Region: Pacific

Inverloch

Stanley

System Name: Bass Strait 2

Landing Points: Inverloch (Australia), Stanley (Tasmania, Australia)

RFS Year: 2003

Est. End of Service Date: 2028

Est. System Cost (US$): $17,000,000

Total Length (kms): 240

Initial Capacity: 10 Gbps

Owners: Telstra (Australia)

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Batz

Region: Baltic

BBG [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: BBG (Bay of Bengal Gateway)

Landing Points: Sri Lanka, Singapore, Oman, UAE

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): $30,000,000

Total Length (kms): 8,000

Initial Capacity: 100 Gbps

Design Capacity: 30 Tbps

Fiber Pairs: 3 Fiber Pairs, 10 Tbps per pair

Owners: Bay of Bengal Consortium

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Indian Ocean

System Name: BCS East

Landing Points: Liepaja (Latvia), Sventoji (Lithuania)

RFS Year: 1997

Est. End of Service Date: 2022

Total Length (kms): 98

Initial Capacity: 2.5 Gbps

Owners: Teliasonera

Region: Baltic

Sventoji Liepaja

Sandviken

System Name: BCS East-West Interlink

Landing Points: Sandviken (Sweden), Sventoji (Lithuania)

RFS Year: 1997

Est. End of Service Date: 2022

Total Length (kms): 218

Initial Capacity: 2.5 Gbps

Owners: Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

Region: Baltic

Sventoji

Stavsnas

Mariehamn Haraldsholm

Hango Helsingfors

Kotka Logi

System Name: BCS North

Landing Points: Hango (Finland), Haraldsholm (Finland), Helsingfors (Finland), Kotka (Finland), Mariehamn (Finland), Stavsnas (Sweden)

RFS Year: 1998, 2003

Est. End of Service Date: 2023

Total Length (kms): 793

Initial Capacity: 10 Gbps

Owners: Rostelecom, Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

Region: Baltic

System Name: BDM (Batam-Dumai-Melaka)

Landing Points: Batam (Indonesia), Dumai (Indonesia), Melaka (Malaysia)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $76,000,000

Total Length (kms): 400

Initial Capacity: 80 Gbps

Design Capacity: 2.56 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 64

Channel Capacity: 10 Gbps

Owners: PT Mora Telematika, PT XL Axiata, Telekom

Malaysia

System Supplier: Huawei Marine Networks

System Installer: Huawei Marine Networks

Region: Pacific

Melaka
Dumai
Batam

System Name: Berytar

Landing Points: Beirut (Lebanon), Tartus (Syria)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $10,000,000

Total Length (kms): 134

Initial Capacity: 5 Gbps

Design Capacity: 5 Gbps

Owners: Telecom Egypt (6.25%), Lebanese Ministry of Telecom (46.875%), Syrian Telecom (46.875%)

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Vercors

Region: Mediterranean

BHARAT-LANKA

System Name: Bharat-Lanka

Landing Points: Dehiwala-Mount Lavinia (Sri Lanka), Tuticorin (India)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $40,000,000

Total Length (kms): 338

Initial Capacity: 40 Gbps

Design Capacity: 960 Gbps

Channel Capacity: 40 Gbps

Owners: BSNL, Sri Lanka Telecom Limited (SLT), Sri Lanka

System Supplier: NEC

System Installer: NEC

Region: Indian

Point

Boca

System Name: BICS

Landing Points: Boca Raton (USA), Crown Haven (Bahamas), Freeport (Bahamas), Marsh Harbour (Bahamas), Nassau (The Bahamas), Riding Point (Bahamas), Rock Sound (Bahamas), Sandy Point (Bahamas), Upper Bogue (Bahamas)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $31,000,000

Total Length (kms): 1,000

Initial Capacity: 10 Gbps

Design Capacity: 12 Tbps

Channel Capacity: 10 Gbps

Owners: Carribbean Crossings

Region: Caribbean

Indonesia

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: BIMP-EAGA (Brunei Darussalam-IndonesiaMalaysia-The Philippines East Asian Growth Area)

Landing Points: Brunei, Indonesia, Malaysia, Philippines, Palau, Yap, Guam

RFS Year: 2016

Est. End of Service Date: 2042

Est. System Cost (US$): $150,000,000

Owners: EATriLink (Philippines), Scomm (Malaysia), BIG ( Brunei)

Region: Pacific

Palau Yap Philippines
Malaysia
Brunei

System Name: BIN

Landing Points: Bari (Italy), Durres (Albania)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $21,636,744

Total Length (kms): 276

Initial Capacity: 40 Gbps

Channel Capacity: 40 Gbps

Owners: Unifi

Region: Mediterranean

Bari
Durres

System Name: BIOS / Jonah

Landing Points: Tel Aviv (Israel), Bari (Italy)

RFS Year: 2011

Est. End of Service Date: 2036

Total Length (kms): 2,300

Owners: Bezeq International

System Supplier: Alcatel-Lucent Submarine Networks

Region: Mediterranean

Bari

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: BLAST (Broadband Linking the American Samoa Territory)

Landing Points: Fogagogo, Tu’tuila (American Samoa), Ofu Harbor, Ofu (American Samoa), Luma, Ta’u (American Samoa), Aunu’u Warf, Aunu’u (American Samoa)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $11,000,000

Total Length (kms): 250

Owners: ASTCA (American Samoa)

System Supplier: IT International Telecom

Marine Surveyor: IT International Telecom

Region: Pacific

Ofu

Tutuila
Luma
Aunu'u

System Name: BMP (Brunei-Malaysia-Phillipines)

Landing Points: Brunei, Malaysia, Phillipines

Total Length (kms): 1,500

Initial Capacity: 1.12 Gbps

Fiber Pairs: 2 Fiber Pairs

System Supplier: Fujitsu

Region: Pacific

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Phillipines

System Name: Boracay-Palawan

Landing Points: Taytay (Philippines), San Jose (Philippines), Coron (Philippines); Boracay (Philippines), Caticlan (Philippines)

RFS Year: 2013

Est. End of Service Date: 2038

Total Length (kms): 332

Design Capacity: 4.8 Tbps

Fiber Pairs: 12 Fiber Pairs

Channels: 40

Channel Capacity: 10 Gbps

Owners: Globe Telecom

System Supplier: Huawei Marine Networks

Region: Pacific

System Name: Botnia

Landing Points: Umea (Sweden), Vaasa (Finland)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $8,500,000

Total Length (kms): 77

Initial Capacity: 1.2 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Teliasonera

System Supplier: NKT

System Installer: AKN

Cableship: Pleijel

Region: Baltic

Vaasa

System Name: BRCS

Landing Points: Batam (Indonesia), Sungai Rengit (Malaysia)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $10,000,000

Total Length (kms): 63

Initial Capacity: 10 Gbps

Owners: Excelcom

Region: Pacific

BRUNEI-SINGAPORE [Planned]

System Name: Brunei-Singapore

Landing Points: Brunei, Singapore

Total Length (kms): 1,500

Initial Capacity: 1.12 Gbps

Fiber Pairs: 2 Fiber Pairs

System Supplier: Fujitsu Region: Pacific

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Brunei Singapore

System Name: BSCS

Landing Points: Batam (Indonesia), Changi (Singapore)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $13,100,000

Total Length (kms): 73

Initial Capacity: 80 Gbps

Fiber Pairs: 3 Fiber Pairs

Owners: Telekom Indonesia

System Supplier: Ocean Cable Company

System Installer: Stena Offshore

Cableship: Northern Installer

Region: Pacific

Changi
Batam

System Name: BSFOCS

Landing Points: Novorossiysk (Russia), Odesa (Ukraine), Varna (Bulgaria)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $51,000,000

Total Length (kms): 933

Initial Capacity: 2.5 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Armentel, AT&T, BTC, Cypress Telecommunications Authority, DTAG, HT, KDDI, OTE, Rostelecom, Telecom Slovenia, Ukrtelecom

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications SSI

System Installer: Global Marine Systems Limited

Cableship: Maersk Fighter

Region: Black Sea

Odesa

Manasquan

System Name: C-BUS

Landing Points: Manasquan (USA), Tortola (British Virgin Islands)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $10,000,000

Total Length (kms): 1,609

Owners: LIME

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Upgrader: Xtera Communications

Region: Atlantic

Tortola

Nanhui

System Name: C-J FOSC

Landing Points: Miyazaki (Japan), Nanhui District (China)

RFS Year: 1993

Est. End of Service Date: 2018

Est. System Cost (US$): $70,300,000

Total Length (kms): 1,252

Design Capacity: 560 Mbps

Owners: China Telecom, KDDI

Region: Pacific

Pentaskhinos

System Name: Cadmos

Landing Points: Beirut (Lebanon), Pentaskhinos (Cyprus)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $8,000,000

Total Length (kms): 262

Design Capacity: 622 Mbps

Fiber Pairs: 2 Fiber Pairs

Owners: Cyprus Telecommunications Authority (62%), Lebanese Ministry of Telecommunications (38%)

System Supplier: Tyco Telecommunications Region: Mediterranean

Beirut

System Name: Canalink

Landing Points: Cadiz (Spain), Tenerife (Spain)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $156,788,000

Total Length (kms): 2,000

Design Capacity: 5.12 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 128

Channel Capacity: 10 Gbps

Owners: Isalink, IT3

System Supplier: Alcatel-Lucent Submarine Networks

Marine Surveyor: Fugro Region: Atlantic

Cadiz

Manasquan

System Name: CANUS-1

Landing Points: Manasquan (USA), Pennant Point (Canada)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $400,000,000

Total Length (kms): 1,360

Initial Capacity: 5 Gbps

Design Capacity: 5 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Optel, Tata Communications

System Supplier: Tyco Telecommunications

System Installer: Teleglobe

Region: Atlantic

System Name: CARAC

Landing Points: Bermuda (Bermuda), Tortola (British Virgin Islands)

RFS Year: 1989

Est. End of Service Date: 2014

Est. System Cost (US$): $115,000,000

Total Length (kms): 1,700

Initial Capacity: 420 Mbps

Owners: Cable & Wireless

System Supplier: Standard Telephones & Cables Ltd

System Installer: C&W (Marine)

Cableship: Mercury

Region: Carribean

Bermuda

Tortola

System Name: Caucasus Cable System

Landing Points: Poti (Georgia), Varna (Bulgaria)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $76,000,000

Total Length (kms): 1,187

Design Capacity: 1.2Tbps

Fiber Pairs: 2 Fiber Pairs

Owners: Caucasus Online

System Supplier: Tyco Telecommunications

Region: Black Sea

Varna
Poti

Charlestown

Bermuda

System Name: CB-1

Landing Points: Bermuda (Bermuda), Charleston, RI (USA)

RFS Year: 2009

Est. End of Service Date: 2034

Total Length (kms): 1,448

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: Cable Company Ltd, Verizon

System Supplier: Alcatel-Lucent Submarine Networks

Region: Atlantic

System Name: Celtix Connect

Landing Points: Dublin (Ireland), Holyhead (UK)

RFS Year: 2011

Est. End of Service Date: 2035

Est. System Cost (US$): $21,900,000

Total Length (kms): 131

Initial Capacity: 960 Gbps

Fiber Pairs: 72 Fiber Pairs

Owners: Sea Fibre Networks

System Supplier: Alcatel Submarine Networks

System Installer: Global Marine Systems Limited

Region: Atlantic

System Name: CFX-1

Landing Points: Boca Raton (USA), Cartagena (Columbia), Morant Point (Jamaica)

RFS Year: 2008

Est. End of Service Date: 2033

Total Length (kms): 2,439

Initial Capacity: 110 Gbps

Design Capacity: 2 Tbps

Fiber Pairs: 2.5 Tbps per Fiber Pair

Owners: Columbus Networks

System Supplier: Tyco Telecommunications Telecommunications

Upgrader: TE SubCom

Upgrade Year: 2011

Upgraded Capacity: 40 Gbps, 2.5 Tbps per fiber pair

Region: Carribean

Cartagena
Morant Point
Boca Raton

Bandon

San Luis Obispo

System Name: China - US

Landing Points: Bandon (USA), Chikura (Japan), Chongming (China), Fangshan (Taiwan), Okinawa Prefecture (Japan), Pusan (South Korea), San Luis Obispo (USA), Shantou (China), Tanguisson (Guam)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $1,100,000,000

Total Length (kms): 30,444

Initial Capacity: 80 Gbps

Fiber Pairs: 4 Fiber Pairs

Channels: 8

Channel Capacity: 2.5 Gbps

Owners: China-US Consortium (KDD (Japan), NTT Worldwide Network (Japan), AT&T (USA), MCI Communications (USA), Sprint (USA), Teleglobe USA (USA), SBC Communications (USA), China Telecom (China), HongKong Telecom (Hong Kong), Chunghwa Telecom (Taiwan), Korea Telecom (Korea), Singapore Telecom (Singapore), Telekom Malaysia (Malaysia), Telstra (Australia))

System Supplier: Alcatel Submarine Networks, Fujitsu, Ocean Cable Co, Tyco Telecommunications

Cableship: Flexservice III, Kuroshio Maru, Cable Innovator

Marine Surveyor: C&C Technologies

Region: Pacific

System Name: CIOS

Landing Points: Ayia Napa (Cyprus), Nahariya (Israel)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $16,000,000

Total Length (kms): 262

Design Capacity: 622 Mbps

Fiber Pairs: 1 Fiber Pair

Owners: Bezeq, Cypress Telecommunications Authority

Region: Mediterranean

Nahariya
Ayia Napa Nahariya

System Name: Circe North

Landing Points: Lowestoft (United Kingdom), Zandvoort (Netherlands)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $24,000,000

Total Length (kms): 203

Initial Capacity: 10 Gbps

Fiber Pairs: 48 Fiber Pairs

Owners: Viatel

System Supplier: Alcatel Submarine Networks

Region: Atlantic

Zandvoort

System Name: Circe South

Landing Points: Cayeux-sur-Mer (France), Pevensey Bay (UK)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $24,000,000

Total Length (kms): 115

Initial Capacity: 10 Gbps

Fiber Pairs: 48 Fiber Pairs

Owners: Viatel

System Supplier: Alcatel Submarine Networks

Region: Atlantic

Pevensey Bay

System Name: CJFS

Landing Points: Half-Moon Bay (Cayman Islands), Montego Bay (Jamaica)

RFS Year: 1997

Est. End of Service Date: 2022

Est. System Cost (US$): $6,500,000

Total Length (kms): 870

Initial Capacity: 2.5 Gbps

Owners: LIME

Region: Carribean

Montego Bay

COLUMBUS II

West Palm

Beach Funchal

Cancun Magens Bay

System Name: Columbus II

Landing Points: Cancun (Mexico), Funchal (Portugal), Magens Bay (Virgin Islands), Palermo (Italy), Sardinia (Gran Canaria), West Palm Beach (USA)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $600,000,000

Total Length (kms): 12,165

Initial Capacity: 560 Mbps

Design Capacity: 2.5 Gbps

Owners: Columbus II Consortium

System Supplier: Alcatel Submarine Networks, Tyco

Telecommunications SSI, Pirelli

Upgrader: Xtera Communications

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Atlantic, Carribean, Mediterranean

System Name: Columbus III

Landing Points: Conil (Spain), Hollywood (USA), Lisbon (Portugal), Mazara (Italy), Ponta Delgada (Portugal)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $236,000,000

Total Length (kms): 9,833

Initial Capacity: 40 Gbps

Design Capacity: 160 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Columbus III Consortium

System Supplier: Alcatel Submarine Networks, Pirelli, Tyco Telecommunications

Cableship: Vercors, Skandi Hav

Upgrader: Xtera Communications

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Atlantic, Carribean, Mediterranean

CONCERTO-1

System Name: Concerto-1

Landing Points: Bruges (Belguim), Thorpeness (United Kingdom), Zandvoort (Netherlands)

RFS Year: 1999

Est. End of Service Date: 2024

Total Length (kms): 574

Initial Capacity: 2.5 Gbps

Fiber Pairs: 96 Fiber Pairs

Owners: Flute

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Region: Atlantic

Thorpeness Bruges Zandvoort

System Name: Corfu-Bar

Landing Points: Bar (Montenegro), Corfu (Greece)

RFS Year: 1998

Est. End of Service Date: 2023

Est. System Cost (US$): $19,000,000

Total Length (kms): 320

Initial Capacity: 622 Mbps

Fiber Pairs: 3 Fiber Pairs

Owners: Crngorski Telecom, OTE

Region: Mediterranean

System Name: Corsar

Landing Points: Aranci (Italy), Ajaccio (France)

RFS Year: 1992

Est. End of Service Date: 2017

Est. System Cost (US$): $11,000,000

Total Length (kms): 168

Initial Capacity: 3 Gbps

Owners: France Telecom, Telecom Italia

System Supplier: Alcatel Submarine Networks

Region: Mediterranean

Aranci

DANICA NORTH

System Name: Danica North

Landing Points: Barseback (Sweden), Tuborg (Denmark)

RFS Year: 1998

Est. End of Service Date: 2023

Total Length (kms): 25

Initial Capacity: 10 Gbps

Fiber Pairs: 96 Fiber Pairs

Owners: Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: Baltic

Barseback

DANICA SOUTH

System Name: Danica South

Landing Points: Bjarred (Sweden), Copenhagen (Denmark)

RFS Year: 1998

Est. End of Service Date: 2023

Total Length (kms): 20

Initial Capacity: 10 Gbps

Fiber Pairs: 24 Fiber Pairs

Owners: Teliasonera

System Supplier: Ericsson

System Installer: AKN

Cableship: Pleijel

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: Baltic

Landeyjarsandur

System Name: Danice

Landing Points: Blaabjerg (Denmark), Landeyjarsandur (Iceland)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $76,000,000

Total Length (kms): 2,291

Initial Capacity: 1000 Gbps

Design Capacity: 5.1 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Farice Ltd.

System Supplier: Tyco Telecommunications

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Atlantic

Blaabjerg

System Name: DDSCN

Landing Points: Colombo (Sri Lanka), Hulhumalé (Maldives)

RFS Year: 2012

Est. End of Service Date: 2031

Est. System Cost (US$): $27,000,000

Total Length (kms): 1,000

Owners: Dhiraagu

System Supplier: NEC

Region: Indian Ocean

Hulhumalé
Colombo

DENMARK - GERMANY 2

System Name: Denmark - Germany 2

Landing Points: Gedser (Denmark), Ribnitz-Damgarten (Germany)

RFS Year: 1993

Est. End of Service Date: 2018

Est. System Cost (US$): $7,600,000

Total Length (kms): 45

Initial Capacity: 2.5 Gbps

Fiber Pairs: 8 Fiber Pairs

Owners: Deutsche Telekom AG, TDC

System Installer: Tele Danmark

Region: Baltic

Ribnitz-Damgarten

DENMARK - NORWAY 5

System Name: Denmark - Norway 5

Landing Points: Ardendal (Norway), Hjrorring (Denmark)

RFS Year: 1992

Est. End of Service Date: 2017

Est. System Cost (US$): $9,560,000

Total Length (kms): 123

Initial Capacity: 2 Gbps

Owners: Norway PTT, TDC

Region: Baltic

Hjorring

DENMARK - NORWAY 6

System Name: Denmark - Norway 6

Landing Points: Kristiansand (Norway), Thisted (Denmark)

RFS Year: 1992

Est. End of Service Date: 2017

Est. System Cost (US$): $8,950,000

Total Length (kms): 124

Initial Capacity: 1.5 Gbps

Owners: Norway PTT, TDC

Region: Baltic

Kristiansand

DENMARK - POLAND 2

System Name: Denmark - Poland 2

Landing Points: Gedebak Odde (Denmark), Mielno (Poland)

RFS Year: 1991

Est. End of Service Date: 2016

Est. System Cost (US$): $4,500,000

Total Length (kms): 110

Initial Capacity: 2.5 Gbps

Owners: Polish Telecom, TDC

Region: Baltic

Gedebak
Mielno

Copenhagen

System Name: Denmark - Russia

Landing Points: Copenhagen (Denmark), Kingisepp (Russia)

RFS Year: 1993

Est. End of Service Date: 2018

Est. System Cost (US$): $88,000,000

Total Length (kms): 1,250

Initial Capacity: 280 Mbps

Owners: TDC

Region: Baltic

Kingisepp

System Name: Didon

Landing Points: Kélibia (Tunisia), Mazara del Vallo, Sicily (Italy)

RFS Year: 2014

Est. End of Service Date: 2039

Total Length (kms): 173

Fiber Pairs: 100 Gbps

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Mediterranean

Kélibia
Mazara del Vallo

System Name: DMCS

Landing Points: Dumai (Indonesia), Melaka (Malaysia)

RFS Year: 2005

Est. End of Service Date: 2030

Total Length (kms): 150

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: PT Telekom, Telekom Malaysia

System Supplier: NEC

Region: Indian Ocean

System Name: EAC - C2C

Landing Points: Capepisa (Philippines), Changi (Singapore), Chikura (Japan), Chung Hom Kok (Hong Kong), Fangshan (Taiwan), Nanhui District (China), Nasugbu (Philippines), Pali (Taiwan), Pusan (South Korea), Shima (Japan), Singapore (Singapore), Taean (South Korea), Tanshui (Taiwan), Tseung Kwan O (Hong Kong), Vung Tau (Vietnam)

RFS Year: 2009

Est. End of Service Date: 2034

Total Length (kms): 35,429

Design Capacity: 30 Tbps

Owners: PACNET

System Supplier: NEC

Marine Surveyor: C&C Technologies

Upgrader: Infinera

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Pacific

Vung Tau
Tanshui Pali Nanhui Taean

System Name: EaSSy

Landing Points: Dar es Salaam (Tanzania), Djibouti (Republic of Djibouti), Maputo (Mozambique), Mogadishu (Somalia), Mombasa (Kenya), Moroni (Comoros), Mtunzini (South Africa), Port Sudan (Sudan), Toliary (Madagascar)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $263,000,000

Total Length (kms): 9,900

Initial Capacity: 30 Gbps

Design Capacity: 4.72 Tbps

Fiber Pairs: 2 Fiber Pairs

Owners: Bharti Airtel, Botswana Telecommunications Corporation, British Telecom, Comores Telecom, Etisalat, France Telecom, Mauritius Telecom, MTN Group, Neotel, Saudi Telecom Company (STC), Saudi Arabia, SPV2, Sudan Telecom Limited, Sudatel, Tanzania Telecommunications Company Limited, WIOCC

System Supplier: Alcatel-Lucent Submarine Networks

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: Indian Ocean

Morant Point

System Name: East - West

Landing Points: Morant Point (Jamaica), Santo Domingo (Dominican Republic), Tortola (British Virgin Islands)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $35,000,000

Total Length (kms): 1,700

Initial Capacity: 120 Gbps

Design Capacity: 720 Gbps

Upgrader: Xtera Communications

Region: Carribean

System Name: ECFS

Landing Points: Anguilla (Anguilla), Baliff (Guadeloupe), Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Canefield (Dominica), Dickenson Bay (Antigua), Kingstown (St. Vincent), Martinique (Martinique), Montserrat (Montserrat), Port Salines (Grenada), St. Lucia (St. Lucia), St Martin (Netherlands Antilles), Tortola (British Virgin Islands), Trinidad (Trinidad)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $56,000,000

Total Length (kms): 1,875

Initial Capacity: 2.5 Gbps

Owners: AT&T, BET (Barbados), C&W, France Telecom, TSTT

System Supplier: Alcatel Submarine Networks

System Installer: C&W (Marine)

Cableship: Mercury

Upgrader: Xtera Communications

Upgrade Year: 2009, 2013

Upgraded Capacity: 10 Gbps, 100 Gbps

Region: Carribean

System Name: EE-S1

Landing Points: Kärdla (Estonia), Stavsnas (Sweden), Tallinn (Estonia)

RFS Year: 1995

Est. End of Service Date: 2020

Total Length (kms): 228

Initial Capacity: 5 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Teliasonera

Region: Baltic

System Name: Europe India Gateway

Landing Points: Abu Talat (Egypt), Bude (United Kingdom), Djibouti (Republic of Djibouti), Fujairah (United Arab Emirates), Gibraltar (Gibraltar), Jeddah (Saudi Arabia), Monaco (Monaco), Mumbai (India), Muscat (Oman), Zafarana (Egypt), Sesimbra (Portugal), Tripoli (Libya)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $700,000,000.00

Total Length (kms): 15,000

Initial Capacity: 3.84 Tbps

Owners: AT&T, Bharti Airtel, British Telecom, BSNL, C&W, Djibouti Telecom, Du, Gibtelecom, Libyan Post, Telecom, and Information Technology Company, MTN Group, Omantel, PT Comunicações, Saudi Telecom Company (STC), Telekom SA, Verizon

System Supplier: Alcatel-Lucent, Tyco Telecommunications

Marine Surveyor: Fugro, UTEC and GEMS

Upgrader: Ciena

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: Atlantic, Indian Ocean, Mediterranean, Middle East

Fujairah
Muscat
Mumbai
Djibouti Jeddah

Lechaina

Palermo

System Name: EMOS-1

Landing Points: Lechaina (Greece), Marmaris (Turkey), Palermo (Italy), Tel Aviv (Israel)

RFS Year: 1990

Est. End of Service Date: 2015

Est. System Cost (US$): $101,000,000

Total Length (kms): 2,880

Initial Capacity: 280 Mbps

Owners: Telecom Italia

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Vercors

Region: Mediterranean

Marmaris

Sydney

Keawaula

System Name: Endeavour

Landing Points: Keawaula (Hawaii), Sydney (Australia)

RFS Year: 2008

Est. End of Service Date: 2033

Total Length (kms): 9,125

Initial Capacity: 80 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Telstra (Australia)

Upgrader: Infinera

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: Pacific

System Name: Estepona-Tetouan

Landing Points: Estepona (Spain), Tetouan (Morocco)

RFS Year: 1994

Est. End of Service Date: 2019

Total Length (kms): 113

Initial Capacity: 3.7 Gbps

Owners: Telefonica

System Supplier: STC Submarine Systems

System Installer: FCR

Cableship: Vercors

Region: Mediterranean

System Name: EurAfrica

Landing Points: Casablanca (Morocco), Funchal (Portugal), Sesimbra (Portugal), St. Hilaire (France)

RFS Year: 1992

Est. End of Service Date: 2017

Est. System Cost (US$): $150,000,000

Total Length (kms): 3,100

Initial Capacity: 1 Gbps

Owners: France Telecom, ONPT Morocco, PT Comunicações

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Vercors 1584 km., Northern Installer 1501 km.

Region: Atlantic

Funchal
Casablanca
Sesimbra
St. Hilaire

EUROPA

System Name: Europa

Landing Points: Pentaskhinos (Cyprus), Tripoli (Lebanon)

RFS Year: 2013

Est. End of Service Date: 2038

Fiber Pairs: 8 Fiber Pairs

Owners: CYTA, Lebanese ministry of Telecommunications

Region: Mediterranean

The Power of Submarine Information Transmission

There’s a new power under ocean uniting the world in a whole new way. With unparalleled development expertise and outstanding technology, Huawei Marine is revolutionizing trans-ocean communications with a new generation of repeaters and highly reliable submarine cable systems that offer greater transmission capacity, longer transmission distances and faster response to customer needs. Huawei Marine: connecting the world one ocean at a time.

Porthcurno

Northport Island Park

System Name: FA-1 North/South

Landing Points: Island Park (USA), Northport (USA), Plerin (France), Porthcurno (United Kingdom)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $900,000,000

Total Length (kms): 12,820

Initial Capacity: 4.68 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: Global Cloud Xchange

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Marine Surveyor: Svitzer, SAIC

Survey Boat: Vessel of Opportunity

Upgrader: Infinera, Ciena

Upgrade Year: 2010, 2011, 2013

Upgraded Capacity: 10 Gbps, 100 Gbps

Region: Atlantic

Plerin

System Name: Falcon

Landing Points: Al Ghaydah (Yemen), Al Hudaydah (Yemen), Al-Khobar (Saudi Arabia), Al Seeb (Oman), Aqaba (Jordan), Bandar-E Abbas (Iran), Chabahar (Iran), Colombo (Sri Lanka), Dubai (UAE), Hulhumalé (India), Jeddah (Saudi Arabia), Kuwait City (Kuwait), Manama (Bahrain), Mumbai (India), Port Sudan (Sudan), Suez (Egypt), Sumaisma (Qatar), Trivandrum (India)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $900,000,000

Total Length (kms): 12,181

Initial Capacity: 90 Gbps

Design Capacity: 2.56 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: Global Cloud Xchange

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Region: Indian Ocean, Middle East

Hulhumalé
Colombo
Trivandrum
Mumbai
Al Seeb
Chabahar
Bandar Abbas
Al Ghaydah
Al Hudaydah
Port Sudan Jeddah
Suez Aqaba

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Far East

Landing Points: Mys Levashova (Russia), Okha (Russia), Magadan (Russia)

RFS Year: 2015

Est. End of Service Date: 2040

Total Length (kms): 1,900

Design Capacity: 16 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 80

Channel Capacity: 100 Gbps

Owners: Rostelcom

System Supplier: Huawei Marine Networks

System Installer: Huawei Marine Networks

Region: Pacific

Okha
Magadan
Mys Levashova

System Name: Farice-1

Landing Points: Dunnet Bay (Scotland), Funningsfjørður (Faroe Islands), Seyoisfjörður (Iceland)

RFS Year: 2004

Est. End of Service Date: 2029

Total Length (kms): 1,395

Initial Capacity: 20 Gbps

Owners: Farice Ltd., Iceland Telecom Ltd.

System Supplier: Pirelli

Cableship: Pertinacia

Marine Surveyor: Fugro

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Atlantic

Aldeburgh

System Name: Farland

Landing Points: Aldeburgh (United Kingdom), Domburg (Netherlands)

RFS Year: 1994

Est. End of Service Date: 2019

Total Length (kms): 149

Initial Capacity: 18 Gbps

Owners: British Telecom

System Supplier: Tyco Telecommunications

Region: Atlantic

Domburg

FASTNETCONNECT [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: FastnetConnect

Landing Points: Cork (Ireland), Lannion (France)

RFS Year: 2015

Est. End of Service Date: 2040

Owners: Sea Fibre Networks Region: Atlantic

System Name: Fehmarn Belt

Landing Points: Puttgarden (Germany), Rödbyhavn (Denmark)

RFS Year: 2000

Est. End of Service Date: 2025

Total Length (kms): 20

Initial Capacity: 2.5 Gbps

Owners: Teliasonera

System Supplier: Ericsson

System Installer: Nexans

Cableship: Pleijel

Region: Baltic

Rios

System Name: FibraLink

Landing Points: Kingstown (St. Vincent), Montego Bay (Jamaica), Ocho Rios (Jamaica), Puerto Plata (Dominican Republic)

RFS Year: 2006

Est. End of Service Date: 2031

Total Length (kms): 2,438

Initial Capacity: 40 Gbps

Design Capacity: 320 Gbps per fiber pair

Fiber Pairs: 2 Fiber Pairs

Owners: Colombus Networks

System Supplier: Alcatel

System Installer: International Telecom

Cableship: IT Intrepid

Region: Carribean

FIBER OPTIC GULF

System Name: Fiber Optic Gulf

Landing Points: Doha (Qatar), Dubai (UAE), Kuwait City (Kuwait), Manama (Bahrain)

RFS Year: 1998

Est. End of Service Date: 2023

Est. System Cost (US$): $80,000,000

Total Length (kms): 1,286

Initial Capacity: 20 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Bahrain Telephone Co., Kuwait Ministry of Communications, Qatar Telecommunication Company, UAE Telecommunications Company

System Supplier: Fujitsu

Region: Middle East

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Fibre Atlantic

Landing Points: Paris (France), London (UK), New York (USA)

RFS Year: 2017

Est. End of Service Date: 2042

Est. System Cost (US$): $250,000,000

Total Length (kms): 6,250

Design Capacity: 60 Tbps

Fiber Pairs: 6-8 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: SemanticNet BV

Region: Atlantic

Porthcurno

System Name: FLAG Europe-Asia

Landing Points: Alexandria (Egypt), Aqaba (Jordan), Ben Pak Para (Thailand), Estepona (Spain), Fujairah (United Arab Emirates), Hong Kong (China), Jeddah (Saudi Arabia), Keoje (South Korea), Miura (Japan), Mumbai (India), Nanhui District (China), Ninomiya (Japan), Palermo (Italy), Penang (Malaysia), Porthcurno (United Kingdom), Satun (Thailand), Songkhla (Thailand), Suez (Egypt)

RFS Year: 1997

Est. End of Service Date: 2022

Total Length (kms): 27,433

Initial Capacity: 20 Gbps

Design Capacity: 80 Gbps

Owners: Global Cloud Xchange

Upgrader: Ciena

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Atlantic, Mediterranean, Pacific

Nanhui
Keoje
Ninomiya
Miura

FLAG/REACH NORTH ASIA LOOP

System Name: Flag/Reach North Asia Loop

Landing Points: Pusan (South Korea), Tong Fuk (Hong Kong), Toucheng (Taiwan), Wada (Japan)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $900,000,000

Total Length (kms): 9,792

Initial Capacity: 80 Gbps

Fiber Pairs: 6 Fiber pairs

Owners: FLAG Telecom, Level 3 Communications

Upgrader: Ciena, Infinera

Upgrade Year: 2011, 2014

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Pacific

FLORES - CORVO

Faial

System Name: Flores - Corvo

Landing Points: Flores (Azores), Corvo (Azores), Graciosa (Azores), Faial (Azores)

RFS Year: 2013

Est. End of Service Date: 2038

Total Length (kms): 685

Design Capacity: 0.96 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 16

Channel Capacity: 10 Gbps

Owners: Viatel (Azores)

System Supplier: Huawei Marine Networks

Region: Atlantic

Graciosa Flores Corvo

Batangas

System Name: G-P

Landing Points: Batangas (Philippines), Tanguisson (Guam)

RFS Year: 1999

Est. End of Service Date: 2024

Total Length (kms): 3,600

Initial Capacity: 52.5 Gbps

Fiber Pairs: 1 Fiber Pair

Owners: AT&T

System Supplier: Tyco Telecommunications

Region: Pacific

System Name: Gulf Bridge International Cable System

Landing Points: Alexandria (Egypt), Al Hidd (Bahrain), Al-Khobar (Saudi Arabia), Al Seeb (Oman), Bushehr (Iran), Doha (Qatar), Dubai (United Arab Emirates), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Kuwait City (Kuwait), Mazara (Italy), Mumbai (India), Zafa

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $445,000,000.00

Total Length (kms): 4,719

Design Capacity: 2.5 Tbps

Fiber Pairs: 4 Fiber Pairs express route, 2 Fiber Pairs other landings

Channels: 128

Channel Capacity: 10 Gbps

Owners: Gulf Bridge International

System Supplier: TE SubCom

Upgrader: Xtera Communications

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Mediterranean, Middle East, Indian Ocean

GEMINI BERMUDA

Bermuda

System Name: Gemini Bermuda

Landing Points: Manasquan, NJ (USA), Bermuda

RFS Year: 2007

Est. End of Service Date: 2032

Total Length (kms): 1,500

Owners: C&W, Verizon

Region: Atlantic

GEORGIA-RUSSIA

Novorossiysk

System Name: Georgia-Russia

Landing Points: Novorossiysk (Russia), Poti (Georgia), Sochi (Russia)

RFS Year: 2000

Est. End of Service Date: 2025

Total Length (kms): 280

Initial Capacity: 2.5 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: DanTelco, FOPTNET, Rostelecom

Region: Black Sea

Sochi
Poti

System Name: GLO-1

Landing Points: Accra (Ghana), Bude (United Kingdom), Casablanca (Morocco), Dakar (Senegal), Lagos (Nigeria), Nouakchott (Mauritania), Sesimbra (Portugal), Vigo (Spain)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $800,000,000

Total Length (kms): 8,717

Initial Capacity: 640 Gbps

Design Capacity: 2.5 Tbps

Fiber Pairs: 2 Fiber Pairs

Owners: Globacom Ltd.

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Batz, IT Intrepid

Marine Surveyor: Alcatel Submarine Networks

Region: Atlantic

Vigo
Sesimbra
Casablanca
Dakar
Accra
Lagos
Nouakchott

System Name: Global Caribbean Network

Landing Points: Baie-Mahault (Guadeloupe), Baliff (Guadeloupe), Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Canefield (Dominica), Dickenson Bay (Antigua), Galisbay (St Martin), Hams Bluff (Virgin Islands), Kingstown (St. Vincent), Le Lamentin (Martinique), Macqueripe (Trinidad), Port Castries (St Lucia), Port Salines (Grenada)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $17,520,000

Total Length (kms): 1,926

Initial Capacity: 1.2 Tbps

Owners: Global Carribean Network

System Supplier: Alcatel Submarine Networks

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps

Region: Carribean

Hams Bluff Galisbay Gustavia
Basseterre
Dickenson Bay
Baie-Mahault
Canefield
Le Lamentin
Port Castries
Kingstown
Bridgetown
Port Salines
Macqueripe
Baliff

GLOBAL NEXUS

System Name: Global Nexus

Landing Points: Freeport (Bahamas), Halifax (Canada)

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): $115,000,000

Total Length (kms): 2,500

Initial Capacity: 40 Gbps

Design Capacity: 100 Gbps

Owners: Global Nexus Telecommunications Ltd

System Supplier: TE SubCom

Region: Atlantic

Halifax

GLOBENET

System Name: GlobeNet

Landing Points: Bermuda (Bermuda), Boca Raton (USA), Fortaleza (Brazil), Maiquetia (Venezuela), Rio de Janeiro (Brazil), Tuckerton (USA)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $970,000,000

Total Length (kms): 22,690

Initial Capacity: 40 Gbps

Design Capacity: 1.28 Tbps

Owners: Globenet

Upgrader: Xtera Communications

Upgrade Year: 2010

Upgraded Capacity: 100 Gbps

Region: Atlantic, Carribean

Boca Raton
Tuckerton Bermuda
Punta Gorda
Fortaleza
Rio de Janeiro

System Name: GO-1

Landing Points: Cantina (Sicily), Mazara (Italy), St George’s Bay (Malta), St Paul’s Bay (Malta)

RFS Year: 1995

Est. End of Service Date: 2020

Total Length (kms): 290

Initial Capacity: 20 Gbps

Owners: GO

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Elettra

Cableship: Teliri

Region: Mediterranean

System Name: GOKI

Landing Points: Incheon (Korea), Kita-Kyushu (Japan), Okinawa Prefecture (Japan), Tumon (Guam)

RFS Year: 2013

Est. End of Service Date: 2038

Total Length (kms): 4,200

Design Capacity: 80 Gbps

Owners: AT&T

System Supplier: Xtera Communications

System Installer: Kokusai Cable Ship

Region: Pacific

Tumon
Okinawa
Kita-Kyushu
Incheon

System Name: Gondwana-1

Landing Points: Lifou (New Caledonia), Mouli Island (New Caledonia), Noum’ea (New Caledonia), Poindimie (New Caledonia), Sydney (Australia)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $57,500,000

Total Length (kms): 2,152

Initial Capacity: 640 Gbps

Owners: Post and Telecommunications Office of New Caledonia

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Re

Region: Pacific

Noum’ea
Lifou Mouli Island Poindimie

System Name: Greenland Connect

Landing Points: Landeyjarsandur (Iceland), Milton (Canada), Nuuk (Greenland), Qaqortoq (Greenland)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $126,000,000

Total Length (kms): 4,733

Initial Capacity: 20 Gbps

Design Capacity: 960 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Tele Greenland

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Cableship: Maersk Responder, Blue Castor, Ile de Sein

Marine Surveyor: Elettra

Region: Atlantic

GUANTÁNAMO BAY CABLE [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

South Florida

System Name: Guantánamo Bay Cable

Landing Points: Guantánamo Bay (Cuba), Florida (USA)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $31,000,000

Total Length (kms): 1,500

Channel Capacity: 100 Gbps

Owners: US Government

System Supplier: Xtera Communications, NSW

System Installer: IT International Telecom

Region: Carribean

Guantánamo Bay

System Name: GWEN

Landing Points: Bari (Italy), Corfu (Greece)

RFS Year: 2004

Est. End of Service Date: 2029

Total Length (kms): 647

Fiber Pairs: 4 Fiber Pairs

Owners: OTE

Region: Mediterranean

Corfu
Bari

System Name: Hannibal

Landing Points: Kelibia (Tunisia), Mazara (Italy)

RFS Year: 2009

Est. End of Service Date: 2034

Total Length (kms): 180

Design Capacity: 9.6 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 80

Channel Capacity: 40 Gbps

Owners: Tunisie Telecom (Tunisia)

System Supplier: Huawei Marine Networks

System Installer: Global Marine Systems Limited

Cableship: Sovereign

Region: Mediterranean

Kelibia
Mazara

System Name: Hantru-1

Landing Points: Ebeye (Kwajalein), Majuro (Marshall Islands), Pohnpei (Micronesia), Reagan Test Site (Kwajalein), Tumon (Guam)

RFS Year: 2010

Est. End of Service Date: 2035

Total Length (kms): 2,908

Owners: Hannon Armstrong

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Pacific

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Hawaiki

Landing Points: Oregon (USA), Sydney (Australia), Hawaii (USA), Norfolk Island, New Caledonia, Vanuatu, Fiji, Wallis, Samoa, American Samoa, Whangarei (New Zealand)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $300,000,000.00

Total Length (kms): 14,000

Design Capacity: 12.8 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: Hawaiki Cable Ltd.

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Pacific

Marseille

System Name: Hawk Cable System

Landing Points: Alexandria (Egypt), Anatoliko (Cyprus), Marseille (France)

RFS Year: 2011

Est. End of Service Date: 2035

Est. System Cost (US$): $249,371,314

Total Length (kms): 3,181

Initial Capacity: 2.72 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 68

Channel Capacity: 10 Gbps

Owners: Global Cloud Xchange

System Supplier: Fujitsu

Region: Mediterranean

Alexandria
Anatoliko

System Name: Hibernia Atlantic

Landing Points: Coleraine (Ireland), Dublin (Ireland), Herring Cove (Canada), Lynn (USA), Southport (United Kingdom)

RFS Year: 2001

Est. End of Service Date: 2026

Total Length (kms): 12,111

Initial Capacity: 10.16 Tbps

Owners: Columbia Ventures Corporation

System Supplier: Tyco Telecommunications SSI

System Installer: FCR

Cableship: Vercors, Iberus, Nordic King, Teneo, Dock Express 20, Global Mariner, Atlantida

Upgrader: Huawei Marine Networks

Upgrade Year: 2011

Upgraded Capacity: 100 Gbps

Region: Atlantic

New York

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Hibernia Express

Landing Points: London (UK), New York (USA)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $250,000,000.00

Total Length (kms): 6,387

Design Capacity: 53 Tbps

Fiber Pairs: 6 Fiber Pairs

Channel Capacity: 100 Gbps

Owners: Hibernia Atlantic

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Atlantic

London

HONG KONG-JAPAN-KOREA [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Hong Kong-Japan-Korea

Landing Points: Hong Kong, Japan, Korea

Total Length (kms): 4,700

Initial Capacity: 560 Mbps

Fiber Pairs: 2 Fiber Pairs

System Supplier: Fujitsu

Region: Pacific

Japan
Korea
Hong Kong

Spencer Beach

System Name: Honotua

Landing Points: Huahine (French Polynesia), Moorea (French Polynesia), Papeete (French Polynesia), Spencer Beach (USA), Uturoa (Raiatea, French Polynesia), Vaitape (Bora Bora, French Polynesia)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $122,000,000

Total Length (kms): 4,634

Initial Capacity: 640 Gbps

Owners: OPT French Polynesia

System Supplier: Alcatel-Lucent Submarine Networks

Region: Pacific

System Name: HSCS

Landing Points: Ishikari (Japan), Nevelsk (Russia)

RFS Year: 2008

Est. End of Service Date: 2033

Total Length (kms): 559

Design Capacity: 640 Gbps

Owners: NTT Communications, TTK

System Supplier: NEC

System Installer: KDD

Cableship: Subaru

Region: Pacific

System Name: Hugo

Landing Points: Guernsey (Guernsey), Lannion (France), Porthcurno (United Kingdom)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $11,960,000

Total Length (kms): 426

Initial Capacity: 3.3 Tbps

Owners: C&W

System Supplier: Alcatel Submarine Networks

System Installer: Tyco SSI

Cableship: Tycom Reliance

Region: Atlantic

Porthcurno Guernsey

System Name: I-ME-WE

Landing Points: Alexandria (Egypt), Catania (Italy), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Karachi (Pakistan), Marseille (France), Mumbai (India), Suez (Egypt), Tripoli (Lebanon)

RFS Year: 2010

Est. End of Service Date: 2035

Total Length (kms): 13,000

Initial Capacity: 520 Gbps

Design Capacity: 3.84 Tbps

Owners: Bharti Airtel, Etisalat, France Telecom, Ogero (Lebanon), PTCL (Pakistan), STC (Saudi Arabia), Tata Communications, Telecom Egypt, Telecom Italia Sparkle

System Supplier: Alcatel-Lucent Submarine Networks

Cableship: Cable Innovator

Marine Surveyor: Fugro

Upgrader: Mitsubishi

Upgrade Year: 2012

Upgraded Capacity: 40 Gbps

Region: Indian Ocean, Mediterranean, Middle East

Alexandria Suez
Jeddah
Fujairah
Karachi
Mumbai

Chennai

System Name: i2i

Landing Points: Chennai (India), Tuas (Singapore)

RFS Year: 2002

Est. End of Service Date: 2027

Total Length (kms): 3,100

Initial Capacity: 160 Gbps

Design Capacity: 42 Tbps

Fiber Pairs: 8 Fiber Pairs

Channels: 105

Channel Capacity: 100 Gbps

Owners: Bharti Airtel

Marine Surveyor: C&C Technologies

Upgrader: Ciena

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: Pacific

Tuas

System Name: ICN1 (Interchange I)

Landing Points: Port Vila (Vanuatu), Suva (Fiji)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): $32,000,000

Total Length (kms): 1,259

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: Interchange Limited

System Supplier: TE SubCom

System Installer: Alcatel-Lucent Submarine Networks

Region: Pacific

Port Vila
Suva

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: ICN2 (Interchange II)

Landing Points: Port Moresby (Papau New Guinea), Port Vila (Vanuatu), Luganville (Vanuatu), Honiara (Solomon Islands)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $72,000,000

Total Length (kms): 3,500

Design Capacity: 1.28 Tbps

Fiber Pairs: 1 Fiber Pair

Channels: 32

Channel Capacity: 40 Gbps

Owners: Interchange Limited

Region: Pacific

Port Moresby Honiara

Port Vila
Luganville

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Mumbai

System Name: ICX

Landing Points: Mumabi (India), Singapore

RFS Year: 2016

Est. End of Service Date: 2041

Total Length (kms): 5,060

Design Capacity: 32 Tbps

Fiber Pairs: 4 Fiber Pair

Channels: 80

Channel Capacity: 100 Gbps

Owners: Global Cloud Xchange

Region: Pacific

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Brazil

EU

System Name: IslaLink

Landing Points: Brazil, Europe

RFS Year: 2015

Est. End of Service Date: 2039

Est. System Cost (US$): $1,130,000,000.00

Total Length (kms): 24,000

Owners: Telebras

Region: Atlantic

Durres

Bari

System Name: Italy - Albania

Landing Points: Bari (Italy), Durres (Albania)

RFS Year: 1998

Est. End of Service Date: 2023

Total Length (kms): 236

Initial Capacity: 2.5 Gbps

Fiber Pairs: 1 Fiber Pair

Owners: Telecom Italia Sparkle

Region: Mediterranean

System Name: Italy - Greece

Landing Points: Corfu (Greece), Otranto (Italy)

RFS Year: 1995

Est. End of Service Date: 2020

Total Length (kms): 161

Initial Capacity: 1.69 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Telecom Italia

Region: Mediterranean

Otranto

Corfu

System Name: Italy - Libya

Landing Points: Mazara (Italy), Tripoli (Libya)

RFS Year: 2000

Est. End of Service Date: 2025

Total Length (kms): 570

Initial Capacity: 2.5 Gbps

Design Capacity: 40 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Telecom Italia

Upgrade Year: 2011

Upgraded Capacity: 40 Gbps

Region: Mediterranean

Mazara

Monaco Savona

System Name: Italy - Monaco

Landing Points: Monaco (Monaco), Savona (Italy)

RFS Year: 1995

Est. End of Service Date: 2020

Total Length (kms): 162

Initial Capacity: 565 Mbps

Fiber Pairs: 1 Fiber Pairs

Owners: Telecom Italia

Region: Mediterranean

Palermo

System Name: ITUR

Landing Points: Istanbul (Turkey), Novorossiysk (Russia), Odesa (Ukraine), Palermo (Italy)

RFS Year: 1996

Est. End of Service Date: 2021

Total Length (kms): 3,466

Initial Capacity: 1.6 Tbps

Owners: Telecom Italia

System Supplier: Pirelli, AT&T SSI

System Installer: FCR

Cableship: Vercors, Dock Express 20

Region: Black Sea, Mediterranean

System Name: JaKa2DeLeMa

Landing Points: Bandjermasin (Indonesia), Benculuk (Indonesia), Jember (Indonesia), Ketapang (Indonesia), Mataram (Indonesia), Pangkalanbun (Indonesia), Pontianak (Indonesia), Sangata (Indonesia), Toweli (Indonesia)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $116,000,000

Total Length (kms): 1,800

Initial Capacity: 960 Gbps

Design Capacity: 9.6 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 32

Channel Capacity: 10 Gbps, 100 Gbps

Owners: PT Telekomunikasi Indonesia

System Supplier: NSW, Fujitsu

System Installer: Fujitsu

Upgrader: Fujitsu

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Pacific

JAKABARE

System Name: JAKABARE

Landing Points: Batam (Indonesia), Jakarta (Indonesia), Pontianak (Indonesia), Tuas (Singapore)

RFS Year: 2009

Est. End of Service Date: 2034

Total Length (kms): 1,330

Initial Capacity: 160 Gbps

Design Capacity: 1.28 Tbps

Owners: Indosat

System Supplier: NEC

System Installer: NEC

Cableship: Cable Innovator

Region: Pacific

System Name: Japan-US

Landing Points: Kitaibaraki (Japan), Makaha (Hawaii), Maruyama (Japan), Morro Bay (USA), Point Arena (USA), Shima (Japan)

RFS Year: 2001

Est. End of Service Date: 2026

Total Length (kms): 21,880

Initial Capacity: 640 Gbps

Fiber Pairs: 4 Fiber Pairs

Channels: 16

Channel Capacity: 10 Gbps

Owners: AT&T, Japan Telecom, KDDI, MCI-WorldCom, NTTWN

System Supplier: Alcatel Submarine Networks, Fujitsu, Ocean Cable Company

System Installer: Global Marine Systems Limited

Cableship: Subaru, Cable Innovator

Upgrader: Ciena

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Pacific

System Name: Jasuka

Landing Points: Batam (Indonesia), Jakarta (Indonesia), Pontianak (Indonesia), Tanjung Pandan (Indonesia)

RFS Year: 2006

Est. End of Service Date: 2031

Total Length (kms): 354

Initial Capacity: 20 Gbps

Design Capacity: 320 Gbps

Owners: PT Telekom

System Supplier: Nokia Siemens Networks

System Installer: Nokia Siemens Networks

Marine Surveyor: Nokia Siemens Networks

Upgrader: Nokia Siemens Networks

Upgrade Year: 2011

Upgraded Capacity: 40 Gbps

Region: Pacific

System Name: JIH

Landing Points: Chikura (Japan), Fukuoka (Japan), Hamada (Japan), Ibaraki (Japan), Ishikari (Japan), Kochi (Japan), Kumihama (Japan), Matsutou (Japan), Miyazaki (Japan), Naoetsu (Japan), Niigata (Japan), Ninomiya (Japan), Okinawa Prefecture (Japan), Sendai (Japan), Shima (Japan), Toyohashi (Japan)

RFS Year: 1998

Est. End of Service Date: 2023

Total Length (kms): 10,300

Owners: KDDI, Telstra (Australia)

System Supplier: Ocean Cable Company, Hitachi Cable Ltd

System Installer: C&W (Marine)

Cableship: Cable Innovator, Nexus, Pacific Link, Oceanic Link

Upgrader: Infinera

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Pacific

Okinawa
Miyazaki
Kochi
Fukuoka
Hamada
Shima
Kumihama
Matsutou
Naoetsu
Niigata
Sendai
Akita
Ishikari
Ibaraki
Toyohashi
Ninomiya
Chikura

System Name: KAFOS

Landing Points: Istanbul (Turkey), Mangalia (Romania), Varna (Bulgaria)

RFS Year: 1997

Est. End of Service Date: 2022

Total Length (kms): 4,640

Initial Capacity: 1.2 Gbps

Owners: BTC, Turk Telecom

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Vercors

Region: Black Sea

System Name: Kattegat-1

Landing Points: Gothenburg (Sweden), Jutland (Denmark)

RFS Year: 1995

Est. End of Service Date: 2020

Total Length (kms): 180

Initial Capacity: 20 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: TDC

Region: Baltic

System Name: Keltra-2

Landing Points: Kelibia (Tunisia), Trapini (Italy)

RFS Year: 2007

Est. End of Service Date: 2032

Total Length (kms): 209

Design Capacity: 20 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Telecom Italia, Tunisie Telecom (Tunisia)

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Mediterranean

KHULNA - CHENNAI

System Name: Khulna - Chennai

Landing Points: Chennai (India), Khulna (Bangladesh)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $48,000,000

Total Length (kms): 115

Owners: Bangladesh Submarine Cable Company

Region: Indian Ocean

Khulna

System Name: KJCN (Korea-Japan Cable Network)

Landing Points: Fukuoka (Japan), Kita-Kyushu (Japan), Pusan (South Korea)

RFS Year: 2002

Est. End of Service Date: 2027

Total Length (kms): 500

Initial Capacity: 50 Gbps

Design Capacity: 2.88 Tbps

Fiber Pairs: 12 Fiber Pairs

Channels: 24

Channel Capacity: 10 Gbps

Owners: KEPCO, KT Coropration, NTT Communications, SOFTBANK Telecom Corp

System Supplier: Fujitsu

System Installer: Fujitsu

Cableship: Maersk Recorder

Region: Pacific

Narrow

System Name: Kodiak Kenai

Landing Points: Anchorage (USA), Homer (USA), Kenai (USA), Kodiak (USA), Narrow Cape (USA), Seward (USA)

RFS Year: 2006

Est. End of Service Date: 2031

Total Length (kms): 971

Initial Capacity: 2.5 Gbps

Design Capacity: 10 Gbps

Fiber Pairs: 4 Fiber Pairs

Owners: Kodiak Kenai Cable Company

Upgrader: Infinera

Upgrade Year: 2010

Upgraded Capacity: 10 Gbps

Region: Pacific

KUANTAN-KOTA KINABARU [Planned]

System Name: Kuantan-Kota Kinabaru

Landing Points: Kuantan (Malaysia), Kota Kinabaru (Malaysia)

Total Length (kms): 1,570

Initial Capacity: 840 Mbps

Fiber Pairs: 2 Fiber Pairs

System Supplier: Fujitsu

Region: Pacific

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Kuantan
Kota Kinabaru

System Name: Kuwait-Iran

Landing Points: Kharg (Iran), Soroosh (Iran), Failaka (Kuwait)

RFS Year: 2006

Est. End of Service Date: 2031

Total Length (kms): 334

Initial Capacity: 2.5 Gbps

Fiber Pairs: 6 Fiber Pairs

Owners: Ministry of Communication, Kuwait and Telecommunication Infrastructure Company, Iran

System Installer: e-Marine

Region: Middle East

Failaka
Kharg
Soroosh

Mazara

System Name: LEV

Landing Points: Mazara (Italy), Tel Aviv (Israel), Yeroskipos (Cyprus)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $177,658,000

Total Length (kms): 2,600

Initial Capacity: 2.5 Gbps

Fiber Pairs: 2 Fiber Pairs

Channels: 8 wavelengths of 1550 nm

Owners: Telecom Italia Sparkle

System Supplier: Alcatel Submarine Networks, Tyco

Telecommunications

Region: Mediterranean

System Name: LION

Landing Points: Sainte Marie (Reunion Island), Terre Rouge (Mauritius), Toamasina (Madagascar)

RFS Year: 2009

Est. End of Service Date: 2034

Total Length (kms): 1,091

Initial Capacity: 20 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: France Telecom, Mauritius Telecom, Orange Madagascar

System Installer: FCR

Cableship: Chamarel

Region: Indian Ocean

Tomasina
Sainte Marie Terre Rouge

LION-2

Mombasa

Mayotte

System Name: LION-2

Landing Points: Mombasa (Kenya), Mayotte (Mayotte)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $76,000,000

Total Length (kms): 3,000

Design Capacity: 1.28 Tbps

Owners: France Telecom-Orange, Mauritius Telecom, Orange Madagascar, Telkom Kenya, Emtel Ltd

System Installer: Alpha Logistics

Region: Indian Ocean

System Name: MAC

Landing Points: Brookhaven (USA), Hollywood (USA), St Croix (US Virgin Islands)

RFS Year: 2000

Est. End of Service Date: 2025

Total Length (kms): 7,461

Initial Capacity: 20 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Global Crossing

System Supplier: Alcatel Submarine Networks

System Installer: FCR

Cableship: Fresnel

Upgrader: Infinera

Upgrade Year: 2010, 2011

Upgraded Capacity: 10 Gbps, 40 Gbps

Region: Atlantic, Carribean

St. Croix
Hollywood
Brookhaven

System Name: Main One

Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Casablanca (Morocco), Dakar (Senegal), Lagos (Nigeria), Port Harcourt (Nigeria), Seixal (Portugal), Tenerife (Spain)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $240,000,000.00

Total Length (kms): 14,000

Initial Capacity: 1.92 Tbps

Owners: MainONE Cable Company Ltd.

System Supplier: TE SubCom

System Installer: TE SubCom

Cableship: Resolute

Region: Atlantic

MALAYSIA DOMESTIC (NORTHERN LINK)

System Name: Malaysia Domestic (Northern Link)

Landing Points: Mersing (Malaysia), Kuantan (Malaysia), Kota Kinabalu (Malaysia)

Total Length (kms): 1,800

Initial Capacity: 10 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Telekom Malaysia

System Supplier: Fujitsu

Region: Pacific

Mersing
Kota Kinabalu
Kuantan

MALAYSIA DOMESTIC (SOUTHERN LINK)

BintuluLabuan

System Name: Malaysia Domestic (Southern Link)

Landing Points: Mersing (Malaysia), Kuching (Malaysia), Miri (Malaysia), Labuan (Malaysia), Bintulu (Malaysia), Kota Kinabalu (Malaysia)

RFS Year: 1995

Est. End of Service Date: 2020

Total Length (kms): 2,342

Initial Capacity: 10 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Telekom Malaysia

System Supplier: Fujitsu

Region: Pacific

Mersing
Kota Kinabalu
Miri Kuching

MALAYSIA-THAILAND

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Phetchaburi

Songkhla

System Name: Malaysia-Thailand

Landing Points: Kuantan New Port (Malaysia), Phetchaburi (Thailand), Songkhla (Thailand)

RFS Year: 1994

Est. End of Service Date: 2019

Total Length (kms): 1,276

Initial Capacity: 560 Mbs

Fiber Pairs: 2 Fiber Pairs

System Supplier: Fujitsu

Region: Pacific

System Name: Mataram-Kupang

Landing Points: Mataram (Indonesia), Sumbawa Besar (Indonesia), Ambalawi (Indonesia), Saraemee (Indonesia), Waingapu (Indonesia), Ende (Indonesia), Kupang (Indonesia)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $94,000,000

Total Length (kms): 1,318

Design Capacity: 1.8 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 30

Channel Capacity: 10

Owners: PT Telkom

System Supplier: Huawei Marine Networks

System Installer: Huawei Marine Networks

Region: Pacific

System Name: Matrix

Landing Points: Batam (Indonesia), Changi (Singapore), Jakarta (Indonesia)

RFS Year: 2008

Est. End of Service Date: 2033

Total Length (kms): 1,438

Initial Capacity: 60 Gbps

Design Capacity: 2.56 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Matrix Networks and NAP Info

System Supplier: TE Subcom

System Installer: Global Marine Systems Limited

Cableship: Wave Mercury, Cable Networker (barge)

Region: Pacific

MAURITIUS-RODRIGUES ISLAND

[Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Mauritius-Rodrigues Island

Landing Points: Mauritius, Rodrigues Island

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $32,000,000

Total Length (kms): 550

Owners: Ministry of Information and Communication Technology (Mauritius)

Region: Indian Ocean

Mauritius
Rodrigues Island

Hollywood

System Name: Maya-1

Landing Points: Cancun (Mexico), Hollywood (USA), Maria Chiquita (Panama), Puerto Limon (Costa Rica), Tolu (Colombia)

RFS Year: 2000

Est. End of Service Date: 2025

Total Length (kms): 4,506

Initial Capacity: 10 Gbps

Owners: MAYA-1 Consortium

System Supplier: Alcatel Submarine Networks, Tyco Telecommunications

Marine Surveyor: C&C Technologies

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2012

Upgraded Capacity: 40 Gbps

Region: Carribean

Cancun
Maria Chiquita
Tolu
Puerto Limon

System Name: MBDC

Landing Points: Batam (Indonesia), Dumai (Indonesia)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $40,000,000

Total Length (kms): 330

Initial Capacity: 10 Gbps

Owners: Moratelindo

Region: Pacific

MED CABLE NETWORK

Marseille

System Name: Med Cable Network

Landing Points: Algiers (Algeria), Annaba (Algeria), Marseille (France)

RFS Year: 2005

Est. End of Service Date: 2030

Total Length (kms): 1,300

Initial Capacity: 20 Gbps

Owners: Med Cable

Region: Mediterranean

System Name: MedNautilus

Landing Points: Catania (Italy), Chania (Greece), Haifa (Israel), Istanbul (Turkey), Koropi (Greece), Tel Aviv (Israel)

RFS Year: 2001

Est. End of Service Date: 2026

Total Length (kms): 5,729

Initial Capacity: 3.84 Tbps

Fiber Pairs: 6 Fiber Pairs

Channels: 64

Channel Capacity: 10 Gbps

Owners: Telecom Italia Sparkle

System Supplier: Alcatel Submarine Networks

Upgrader: Infinera

Upgrade Year: 2011, 2012, 2013

Upgraded Capacity: 10 Gbps, 40 Gbps, 100 Gbps

Region: Mediterranean

MELITA-1

System Name: MELITA-1

Landing Points: Pozallo (Italy), St Paul’s Bay (Malta)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $14,000,000

Total Length (kms): 100

Initial Capacity: 50 Mbps

Owners: Melita Infrastructure Ltd.

Region: Mediterranean

System Name: MENA

Landing Points: Abu Talat (Egypt), Al Seeb (Oman), Jeddah (Saudi Arabia), Mazara (Italy), Mumbai (India), Zafarana (Egypt)

RFS Year: 2011

Est. End of Service Date: 2035

Est. System Cost (US$): $350,000,000

Total Length (kms): 8,000

Initial Capacity: 5.76 Tbps

Owners: Orascom Telecom

System Supplier: Alcatel Submarine Networks, TE SubCom

System Installer: Alcatel Submarine Networks, TE SubCom, e-Marine

Cableship: Maersk Responder, Ile de Sein, Niwa, Decisive

Marine Surveyor: EGS, Blue Star, Elettra

Region: Mediterranean, Middle East, Indian Ocean

Mazara
Zafarana
Alexandria Suez
Jeddah
Al Seeb
Mumbai

System Name: MIC-1

Landing Points: Batam (Indonesia), Changi (Singapore)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $12,000,000

Total Length (kms): 70

Initial Capacity: 10 Gbps

Owners: Moratelindo

System Installer: Global Marine Systems Limited

Region: Pacific

MICRONESIA CABLE SYSTEM

System Name: Micronesia Cable System

Landing Points: Majuro (Marshall Islands), Kwajalein (Marshall Islands), Pohnpei (Micronesia), Guam

RFS Year: 2011

Est. End of Service Date: 2036

Total Length (kms): 174

Owners: Federals States of Micronesia Telecommunications Authority, Marshall Island National Telecommunications Authority

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Pacific

Mazara Catania Yeroskipou

System Name: Minerva

Landing Points: Catania (Italy), Mazara (Italy), Yeroskipos (Cyprus)

RFS Year: 2007

Est. End of Service Date: 2032

Initial Capacity: 10 Gbps

Channels: DWDM wavelengths

Owners: Telecom Italia Sparkle

System Supplier: Alcatel-Lucent Submarine Systems

Region: Mediterranean

MONET [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Monet

Landing Points: Santos (Brazil), Fortaleza (Brazil), Boca Raton, Florida (United States)

RFS Year: 2016

Est. End of Service Date: 2041

Total Length (kms): 10,556

Design Capacity: 64 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: Algar Telecom, Angola Cables, Antel, Google

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Atlantic

Fortaleza
Santos
Boca Raton

China

Korea Taiwan Japan USA

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: New Cross Pacific

Landing Points: China, Korea, Taiwan, Japan, US

RFS Year: 2017

Est. End of Service Date: 2042

Total Length (kms): 14,000

Design Capacity: 80 Tbps

Channel Capacity: 100 Gbps

Owners: Chunghwa Telecom, KT Corp.

System Supplier: TE SubCom

Region: Pacific

System Name: Neptune Canada

Landing Points: Port Alberni (Canada)

RFS Year: 2007

Est. End of Service Date: 2032

Est. System Cost (US$): $62,000,000

Total Length (kms): 800

Owners: University of Victoria

System Supplier: Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Cableship: Ile de Sein

Marine Surveyor: NEPTUNE Canada

Region: Pacific

System Name: Norsea Com-1

Landing Points: Lowestoft (United Kingdom), Tysvær (Norway)

RFS Year: 1999

Est. End of Service Date: 2024

Total Length (kms): 800

Initial Capacity: 160 Gbps

Owners: North Sea Communications AS

System Supplier: Alcatel AKN

Region: Atlantic

Whittier

System Name: Northstar

Landing Points: Juneau (USA), Nedonna Beach (USA), Valdez (USA), Whittier (USA)

RFS Year: 1999

Est. End of Service Date: 2024

Total Length (kms): 3,385

Initial Capacity: 10 Gbps

Owners: Alaska Communications Systems

System Supplier: Alcatel Submarine Networks

System Installer: C&W (Marine)

Cableship: Maersk Fighter, Fu Lai

Region: Pacific

NPC [Planned]

System Name: NPC (North Pacific Cable)

Landing Points: Japan, USA

Total Length (kms): 9,400

Initial Capacity: 1.68 Gbps

Fiber Pairs: 4 Fiber Pairs

System Supplier: Fujitsu

Region: Pacific

Japan

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

USA

Grover Beach Tijuana

System Name: PAC

Landing Points: Colon (Panama), Fort Amadour (Panama), Grover Beach (USA), Mazatlán (Mexico), Puerto Viejo (Venezuela), St Croix (US Virgin Islands), Tijuana (Mexico)

RFS Year: 2001

Est. End of Service Date: 2026

Est. System Cost (US$): $350,000,000

Total Length (kms): 9,451

Initial Capacity: 10 Gbps

Owners: Global Crossing

System Supplier: Tyco Telecommunications

Cableship: Agile

Marine Surveyor: C&C Technologies

Upgrader: Xtera Communications

Region: Carribean, Pacific

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Palau - Guam

Landing Points: Palau, Guam

RFS Year: 2015

Est. End of Service Date: 2040

Owners: Palau Telecoms

System Supplier: Xtera Communications

System Installer: Xtera Communications

Region: Pacific

Palau

Battery

Pratt

Baby Beach

Barranquilla Punto Fijo

Panama City

Magens Bay Butler’s Bay

System Name: PanAm

Landing Points: Arica (Chile), Baby Beach (Aruba), Barranquilla (Colombia), Battery Pratt (Panama), Butler’s Bay (St. Croix), Lurin (Peru), Magens Bay (Virgin Islands), Panama City (Panama), Punto Fijo (Venezuela), Salinas (Ecuador)

RFS Year: 1999

Est. End of Service Date: 2024

Total Length (kms): 6,867

Initial Capacity: >10 Gbps

Owners: Antel (El Salvador), AT&T, Cable Andino, CANTV (Venezuela), CNT, C&W, Embratel, Entel (Chile), Setar, Telecom Colombia, Telmex

Marine Surveyor: C&C Technologies

Region: Carribean, Pacific

Lurin
Arica

Redcar

System Name: Pangea

Landing Points: Beverwijk (Netherlands), Fanø (Denmark), Lowestoft (United Kingdom), Måde (Denmark), Redcar (United Kingdom)

RFS Year: 2000

Est. End of Service Date: 2025

Total Length (kms): 511

Initial Capacity: 7 Tbps

Owners: Pangea Ltd

System Supplier: Alcatel Submarine Networks

System Installer: Nexans

Cableship: Pleijel

Marine Surveyor: Fugro

Region: Atlantic

Shima Ajigaura

Harbor Pointe

Grover Beach

System Name: PC-1

Landing Points: Grover Beach (USA), Harbor Pointe (USA), Shima (Japan), Shima (Japan)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $1,000,000,000

Total Length (kms): 20,910

Initial Capacity: 1.8 Tbps

Design Capacity: 3 Tbps

Owners: NTT Communications

System Supplier: Tyco Telecommunications

Marine Surveyor: C&C Technologies

Upgrader: Infinera

Upgrade Year: 2013

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Pacific

System Name: PCCS (Pacific Caribbean Cable System)

Landing Points: Jacksonville, Florida (USA), Manta (Ecuador), Tortola (Puerto Rico), Hudishibana (Aruba), Willemstad (Curaçao), Cartagena (Colombia), Maria Chiquita and Balboa (Panama)

RFS Year: 2014

Est. End of Service Date: 2039

Total Length (kms): 6,000

Initial Capacity: 100 Gbps

Design Capacity: 80 Tbps

Owners: Cable & Wireless Communications, Setar, Telconet, Telefónica Global Solutions, United Telecommunication Services

System Supplier: Alcatel-Lucent Submarine Networks

Region: Caribbean

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

MariaChiquita
Cartagena
Hudishibana
Willemstad
SanJuan
Balboa
Manta
Tortola

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

California Tokyo

System Name: PCX (Pacific Cloud Xchange)

Landing Points: Tokyo (Japan), California (USA)

RFS Year: 2015

Est. End of Service Date: 2040

Total Length (kms): 8,300

Design Capacity: 40 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Global Cloud Xchange

Region: Pacific

Seaford

Broadstairs

System Name: PEC

Landing Points: Bredene (Belguim), Broadstairs (United Kingdom), Seaford (United Kingdom), Veules-les-Roses (France)

RFS Year: 1999

Est. End of Service Date: 2024

Total Length (kms): 170

Initial Capacity: 10 Gbps

Owners: Global Crossing Region: Atlantic

Veules-les-Roses

Bredene

System Name: PPC-1

Landing Points: Madang (Papua New Guinea), Piti (Guam), Sydney (Australia)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $200,000,000

Total Length (kms): 7,185

Initial Capacity: 40 Gbps

Design Capacity: 2.56 Tbps

Owners: PIPE Networks Ltd.

System Supplier: Tyco Telecommunications

System Installer: Tyco Telecommunications

Cableship: Durable, Decisive

Upgrader: Infinera

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Pacific

Madang

QATAR-UAE

Halul

Das

System Name: Qatar-UAE

Landing Points: Das Island (UAE), Halul (Qatar)

RFS Year: 2004

Est. End of Service Date: 2029

Total Length (kms): 208

Initial Capacity: 20 Gbps

System Installer: e-Marine

Cableship: Etisalat

Region: Middle East

System Name: RJCN

Landing Points: Nakhodka (Russia), Naoetsu (Japan)

RFS Year: 2006

Est. End of Service Date: 2031

Total Length (kms): 1,795

Initial Capacity: 640 Gbps

Owners: Rostelecom

Region: Pacific

Nakhodka
Naoetsu

System Name: RJK (Russia-Japan-Korea)

Landing Points: Nakhodka (Russia), Naoetsu (Japan), Pusan (South Korea)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $93,000,000

Total Length (kms): 1,715

Initial Capacity: 1.12 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Rostelecom

System Supplier: Alcatel Submarine Networks, Fujitsu, Ocean Cable Company Segments B2-3

System Installer: KDD

Cableship: Kuroshio Maru, Maersk Recorder (473 km)

Region: Pacific

Nakhodka

System Name: SAC

Landing Points: Fortaleza (Brazil), Fort Amadour (Panama), Las Toninas (Argentina), Lurin (Peru), Puerto Viejo (Venezuela), Rio de Janeiro (Brazil), Santos (Brazil), St Croix (US Virgin Islands), Valparaiso (Chile)

RFS Year: 2001

Est. End of Service Date: 2026

Total Length (kms): 15,983

Initial Capacity: 100 Gbps

Design Capacity: 1.2 Tbps

Owners: Global Crossing

System Supplier: Alcatel Submarine Networks

Upgrader: Infinera

Upgrade Year: 2010, 2011

Upgraded Capacity: 10 Gbps, 40 Gbps

Region: Atlantic, Carribean, Pacific

Valparaiso
Lurin
Las Toninas
Fort Amadour Puerto Viejo
St. Croix
Fortaleza
Santos
Rio de Janeiro

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: SACS (South Atlantic Cable System)

Landing Points: Luanda (Angola), Fortaleza (Brazil)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $160,000,000

Total Length (kms): 6,000

Initial Capacity: 40 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Angola Cables

System Supplier: NEC

Region: Atlantic

Fortaleza
Luanda

Cape Town Durban

System Name: South Africa-Far East

Landing Points: Baie du Jacotet (Mauritius), Cape Town (South Africa), Cochin (India), Durban (South Africa), Penang (Malaysia), Saint-Paul (Reunion)

RFS Year: 2002

Est. End of Service Date: 2027

Total Length (kms): 13,669

Initial Capacity: 440 Gbps

Owners: France Telecom, Tata Communications, Telekom SA

System Supplier: Tyco Telecommunications

System Installer: FCR

Cableship: Vercors

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2014

Upgraded Capacity: 40 Gbps

Region: Indian Ocean, Pacific

System Name: SAM-1

Landing Points: Arica (Chile), Barranquilla (Colombia), Boca Raton (USA), Fortaleza (Brazil), Las Toninas (Argentina), Lurin (Peru), Mancora (Peru), Puerto Barrios (Guatemala), Puerto San Jose (Guatemala), Rio de Janeiro (Brazil), Salinas (Ecuador), Salvador (Brazil), San Juan (Puerto Rico), Santos (Brazil), Valparaiso (Chile)

RFS Year: 2001

Est. End of Service Date: 2026

Total Length (kms): 24,140

Initial Capacity: 160 Gbps

Design Capacity: 1.92 Tbps

Owners: Telefonica

System Supplier: Tyco Telecommunications

Marine Surveyor: C&C Technologies

Upgrader: Infinera

Upgrade Year: 2009, 2010, 2012

Upgraded Capacity: 10 Gbps, 40 Gbps, 100 Gbps

Region: Atlantic, Carribean, Pacific

San Juan
Barranquilla
Fortaleza
Salinas
Mancora
Puerto San Jose
Puerto Barrios
Lurin
Arica
Valparaiso
Las Toninas
Santos
Rio de Janeiro
Salvador
Boca Raton

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: SAPL (South America Pacific Link)

Landing Points: Hilo, Hawaii (USA), Oahu, Hawaii (USA), Balboa (Panama), Manta (Ecuador), Arica (Chile), Santiago (Chile), Lima (Peru)

RFS Year: 2016

Est. End of Service Date: 2041

Total Length (kms): 9,400

Design Capacity: 30 Tbps

Fiber Pairs: 3 Fiber Pairs, 10 Tbps per pair

Owners: Ocean Networks

System Supplier: Xtera Communications

System Installer: Xtera Communications

Region: Pacific

Manta
Hilo
Oahu
Balboa Arica

Port Sudan

System Name: SAS-1

Landing Points: Jeddah (Saudi Arabia), Port Sudan (Sudan)

RFS Year: 2003

Est. End of Service Date: 2028

Total Length (kms): 333

Initial Capacity: 1.28 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: STC (Saudi Arabia)

Region: Middle East

Jeddah

System Name: SAT-2

Landing Points: El Medano (Spain), Funchal (Portugal), Melkbosstrand (South Africa)

RFS Year: 1993

Est. End of Service Date: 2018

Est. System Cost (US$): $270,000,000

Total Length (kms): 9,500

Initial Capacity: 560 Mbps

Owners: Consortium

System Supplier: Standard Telephones & Cables Ltd, Alcatel Submarine Networks

System Installer: BT Marine, FCR Cableship: Vercors, Sovereign

Region: Atlantic

Funchal
El Medana

Sesimbra Chipiona

System Name: South Atlantic 3

Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Alta Vista (Spain), Chipiona (Spain), Cotonou (Benin), Dakar (Senegal), Douala (Cameroon), Lagos (Nigeria), Libreville (Gabon), Luanda (Angola), Melkbosstrand (South Africa), Sesimbra (Portugal)

RFS Year: 2002

Est. End of Service Date: 2027

Total Length (kms): 14,350

Initial Capacity: 340 Gbps

Fiber Pairs: 2 Fiber Pairs

Channel Capacity: 40 Gbps

Owners: Angola Telecom, AT&T, British Telecom, Camtel of Cameroon, CIT, Cote dIvoire Telecom, CPRM, C&W, France Telecom (12.08%), Ghana Telecom, Maroc Telecom of Morocco, Mauritius Telecom, Nigerian Telecommunications Ltd, Nitel (8.39%), OPT Benin, OPT Gabon, PT

System Supplier: Alcatel Submarine Networks

Upgrader: Alcatel-Lucent Submarine Networks

Upgrade Year: 2014

Upgraded Capacity: 40 Gbps

Region: Atlantic

Alta Vista
Dakar
AbidjanAccra Cotonou Lagos
Douala
Libreville
Luanda

Hong Kong

System Name: SCAN

Landing Points: Hong Kong, Indonesia

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $337,000,000

Total Length (kms): 4,300

Initial Capacity: 40 Gbps

Design Capacity: 1.92 Tbps

Owners: PT. Fangbian Iskan Corporindo, Telemedia Pacific Inc.

System Supplier: NEC

Region: Pacific

System Name: SCF-CN

Landing Points: Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Kingstown (St. Vincent), Martinique (Martinique), Port Castries (St Lucia), Port Salines (Grenada), Redcar (Trinidad and Tobago)

RFS Year: 2007

Est. End of Service Date: 2032

Total Length (kms): 1,186

Initial Capacity: 1.28 Tbps

Owners: SCF (Group Loret)

Region: Carribean

GoonhillyPenmarch

Sesimbra

Teutan

Mazara Chania Marmaris Yeroskipou

Alexandria Suez

Initial Capacity: 40 Gbps

Design Capacity: 55 Gbps

Fiber Pairs: 2 Fiber Pairs

Channels: 8

Channel Capacity: 2.5 Gbps, 10 Gbps

System Name: SEA-ME-WE 3

Landing Points: Alexandria (Egypt), Al Seeb (Oman), Batangas (Philippines), Chania (Greece), Cochin (India), Da Nang (Vietnam), Deep Water Bay (Hong Kong), Dehiwala-Mount Lavinia (Sri Lanka), Djibouti (Republic of Djibouti), Fangshan (Taiwan), Fujairah (United Arab Emirates), Goonhilly (United Kingdom), Jeddah (Saudi Arabia), Karachi (Pakistan), Keoje (South Korea), Marmaris (Turkey), Mazara (Italy), Medan (Indonesia), Mersing (Malaysia), Mumbai (India), Nanhui District (China), Norden (Germany), Okinawa Prefecture (Japan), Oostende (Belguim), Penang (Malaysia), Penmarch (France), Perth (Australia), Pyapon (Myanmar), Satun (Thailand), Sesimbra (Portugal), Shantou (China), Suez (Egypt), Taipa (Macau), Tetouan (Morocco), Toucheng (Taiwan), Tuas (Singapore), Tungku (Brunei), Yeroskipos (Cyprus)

RFS Year: 1999

Est. End of Service Date: 2024

Est. System Cost (US$): $1,500,000,000

Total Length (kms): 39,622

Nanhui Keoje

Taipa ShantouDeepWater Bay

Toucheng Okinawa

Fangshan

Owners: SEA-ME-WE 3 Consortium

System Supplier: Alcatel Submarine Networks, Fujitsu, Pirelli, KDDSCS, Tyco Telecommunications

Cableship: Agile, Maersk Defender, Maersk Fighter, Fresnel, Fu Lai, Nexus, Leon Thevinin, Vercors, Raymond Croze, Etisalat, Umm Al Anber

Marine Surveyor: C&C Technologies

Region: Atlantic, Indian Ocean, Mediterranean, Middle East, Pacific

System Name: SEA-ME-WE 4

Landing Points: Alexandria (Egypt), Annaba (Algeria), Bizerte (Tunisia), Chennai (India), Colombo (Sri Lanka), Cox’s Bazaar (Bangladesh), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Karachi (Pakistan), Marseille (France), Melaka (Malaysia), Mumbai (India), Mumbai (India), Palermo (Italy), Satun (Thailand), Suez (Egypt), Tuas (Singapore)

RFS Year: 2005

Est. End of Service Date: 2030

Est. System Cost (US$): $500,000,000

Total Length (kms): 18,846

Initial Capacity: 1.28 Tbps

Design Capacity: 5.12 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 64

Channel Capacity: 10 Gbps, 40 Gbps

Owners: Algerie Telecom, Algeria, Bangladesh Submarine Cable Company Limited (BSCCL), Bangladesh, Bharti Airtel, CAT Telecom (Thailand), Du, France Telecom, Pakistan Telecommunication Company Limited, Pakistan, Saudi Telecom Company (STC), Saudi Arabia, Sri Lanka Telecom Limited (SLT), Sri Lanka, Tata Communications (Network Administrator), Telecom Egypt, Telecom Italia Sparkle , Telekom Malaysia, Tunisie Telecom (Tunisia), Verizon

System Supplier: Alcatel Submarine Networks, Fujitsu

Cableship: Niwa, Descartes

Upgrader: Alcatel-Lucent Submarine Networks, Ciena

Upgrade Year: 2011

Upgraded Capacity: 40 Gbps

Region: Indian Ocean, Mediterranean, Middle East

Colombo
Cox’s Bazaar
TuasMelaka Satun

System Name: South East Asia-Middle East-Western Europe 5

Landing Points: Marseille (France), Annaba (Algeria), Palermo (Italy), Bizerte (Tunisia), Alexandria (Egypt), Suez (Egypt), Jedda (Saudi Arabia), Fujairah (UAE), Karachi (Pakistan), Mumbai (India), Chennai (India), Colombo (Sri Lanka), Cox’s Bazar (Bangladesh), Satun (Thailand), Singapore (Singapore), Malacca (Malacca)

RFS Year: 2016

Est. End of Service Date: 2040

Est. System Cost (US$): $1,000,000,000.00

Total Length (kms): 20,000

Design Capacity: 24 Tbps

Channel Capacity: 100 Gbps

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance

Owners: Bangladesh Submarine Cable Company Ltd, China Mobile International Ltd, China Global Telecommunications Limited, China Network Communications Group Co Ltd, Emirates Integrated Telecommunications Co, Orange, Myanmar Post and Telecom, PT Telekomunikasi Indo

System Supplier: Alcatel-Lucent Submarine Networks, NEC

System Installer: Alcatel-Lucent Submarine Networks, NEC

Region: Mediterranean, Indian Ocean, Pacific

Cox’s
MalaccaSingapore

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: South East Asia-United States

Landing Points: Manado (Indonesia), Davao (Phillippines), Guam, Hawaii (United States), Los Angeles, California (United States)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $250,000,000.00

Total Length (kms): 15,000

Design Capacity: 20 Tbps

Channel Capacity: 100 Gbps

Owners: Telekomunikasi Indonesia International (Telin), Globe Telecom, RAM Telecom International (RTI), Hawaiian Telcom, GTI Corporation, Telkom USA, GTA

System Supplier: NEC

Region: Pacific

System Name: Seabras-1

Landing Points: Miami (USA), Fortaleza (Brazil), Sao Paolo (Brazil)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $700,000,000.00

Total Length (kms): 10,750

Initial Capacity: 100 Gbps

Design Capacity: 60 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: Seaborn Networks, Microsoft

System Supplier: Alcatel-Lucent Submarine Networks

Region: Atlantic

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

es Salaam

Djibouti

System Name: Seacom

Landing Points: Abu Talat (Egypt), Dar es Salaam (Tanzania), Djibouti (Republic of Djibouti), Maputo (Mozambique), Mombasa (Kenya), Mtunzini (South Africa), Mumbai (India), Zafarana (Egypt)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $600,000,000

Total Length (kms): 13,601

Initial Capacity: 110 Gbps

Design Capacity: 1.28 Tbps

Owners: Convergence Partners (12.50%), Herakles Telecom LLC (25%), Industrial Promotion Services (25%), Shanduka Group (12.50%), VenFin Limited (25%)

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Cableship: Durable, Decisive, Dependable, Resolute, Responder

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Indian Ocean

Mombasa
Dar

Juneau

Hawk

Inlet

Angoon

Sitka

Petersburg

System Name: SEAK

Landing Points: Angoon (USA), Hawk Inlet (USA), Juneau (USA), Ketchikan (USA), Petersburg (USA), Sitka (USA), Wrangell (USA)

RFS Year: 2008

Est. End of Service Date: 2033

Initial Capacity: 10 Gbps

Owners: GCI

Region: Pacific

Wrangell

Ketchikan

Norrtälje

System Name: SF-S 4

Landing Points: Mariehamn (Finland), Norrtälje (Sweden), Turku (Finland)

RFS Year: 1993

Est. End of Service Date: 2018

Total Length (kms): 85

Initial Capacity: 40 Gbps

Owners: Teliasonera

System Supplier: Standard Telephones & Cables Ltd

System Installer: AKN

Cableship: Pleijel, Telepaatti

Region: Baltic

Mariehamn Turku

System Name: SFL

Landing Points: Mariehamn (Finland), Vaddo (Sweden)

RFS Year: 1994

Est. End of Service Date: 2029

Total Length (kms): 62

Initial Capacity: 2.5 Gbps

Owners: Teliasonera

Region: Baltic

Mariehamn

Chaguaramas

Georgetown

System Name: SG - SCS

Landing Points: Chaguaramas (Trinidad), Georgetown (Guyana), Totness (Suriname)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $54,000,000

Total Length (kms): 1,249

Design Capacity: 1.28 Tbps

Fiber Pairs: 2 Fiber Pairs

Channels: 64

Channel Capacity: 10 Gbps

Owners: Guyana Telephone and Telegraph Co. Ltd, Telesur of Suriname

System Supplier: Huawei Marine Networks

System Installer: Global Marine Systems Limited

Cableship: Sovereign

Region: Carribean

Totness

System Name: Shefa 2

Landing Points: Ayre of Cara (UK), Banff (UK), Maywick (UK), Sandwick (Scotland), Tórshavn (Faroe Islands)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $27,000,000

Total Length (kms): 828

Initial Capacity: 20 Gbps

Design Capacity: 570 Gbps

Owners: Faroese Telecom

System Supplier: NSW

System Installer: International Telecom

Cableship: IT Intrepid

Marine Surveyor: Fugro

Upgrader: Xtera Communications

Region: Atlantic

SILPHIUM

System Name: Silphium

Landing Points: Chania (Greece), Darnah (Libya)

RFS Year: 2012

Est. End of Service Date: 2037

Total Length (kms): 426

Initial Capacity: 70 Gbps

Design Capacity: 1.2 Tbps

Fiber Pairs: 3 Fiber Pairs

Channels: 40

Channel Capacity: 10 Gbps

Owners: Libyan Post, Telecom, and Information Technology Company

System Supplier: Huawei Marine Networks

Region: Mediterranean

Darnah
Chania

System Name: South-East Asia Japan Cable

Landing Points: Chikura (Japan), Lantau (Hong Kong), Nasugbu (Philippines), Shantou (China), Telisai (Brunei), Tuas (Singapore)

RFS Year: 2013

Est. End of Service Date: 2038

Est. System Cost (US$): $400,000,000.00

Total Length (kms): 9,841

Initial Capacity: 17 Tbps

Fiber Pairs: 6 Fiber Pairs

Owners: SJC Consortium (Brunei International Gateway Sendirian Berhad, China Mobile, China Telecom, China Telecom (Hong Kong) International Ltd., Donghwa Telecom Co., Ltd., Globe Telecom, Inc., Google SJC Bermuda Ltd., KDDI Corporation, Singapore Telecom, Telin,

System Supplier: TE SubCom, NEC

Region: Pacific

Tuas
Nasugbu
Lantau
Chikura

System Name: SKKL-JS

Landing Points: Jakarta (Indonesia), Surabaja (Indonesia)

RFS Year: 1996

Est. End of Service Date: 2021

Total Length (kms): 713

Initial Capacity: 5 Gbps

Owners: Indosat

Region: Pacific

Jakarta

Surabaja

System Name: SMPR-1

Landing Points: San Juan (Puerto Rico), St Martin (Netherlands Antilles)

RFS Year: 2004

Est. End of Service Date: 2029

Est. System Cost (US$): $15,000,000

Total Length (kms): 382

Initial Capacity: 2.5 Gbps

Owners: Smitcoms

Region: Carribean

SOLAS

System Name: Solas

Landing Points: Kilmore Quay (Ireland), Oxwich Bay (UK)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $6,000,000

Total Length (kms): 140

Initial Capacity: 5 Gbps

Owners: Eircom

System Installer: Global Marine Systems Limited

Cableship: Wave Sentinel

Region: Atlantic

SOLOMON ISLAND TO THE WORLD [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Solomon Island to the World

Landing Points: Honiara (Solomon), Sydney (Australia), Auki (Soloman), Noro (Soloman)

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $60,000,000

Total Length (kms): 827

Owners: Solomons Oceanic Cable Company

System Supplier: TE SubCom

Region: Pacific

Honiara
Noro Auki

Brookvale

Alexandria

System Name: Southern Cross Cable Network

Kahe

Point

Takapuna

Whenuapai

Landing Points: Alexandria (Australia), Brookvale (Australia), Kahe Point (Hawaii), Morro Bay (USA), Nedonna Beach (USA), Spencer Beach (USA), Suva (Fiji), Takapuna (New Zealand), Whenuapai (New Zealand)

RFS Year: 2000

Est. End of Service Date: 2025

Est. System Cost (US$): $1,300,000,000

Total Length (kms): 30,000

Initial Capacity: 640 Gbps

Design Capacity: 1.24 Tbps

Fiber Pairs: 3 Fiber Pairs Segments A,C,G1,G2,I. 4 Fiber Pairs

Segments D and F

Channels: 16

Spencer

Beach

Owners: Southern Cross Cable Network

System Supplier: Alcatel Submarine Networks, Fujitsu

System Installer: Alcatel Submarine Networks

Cableship: Cable Innovator laid 13761 km, Nexus laid 3306 km, Vercors laid 10007 km. Fresnel laid 800 km

Upgrader: Ciena

Upgrade Year: 2012, 2013

Upgraded Capacity: 40 Gbps, 100 Gbps

Region: Pacific

SUB System Name: Sub

Landing Points: Bandjermasin (Indonesia), Makassar (Indonesia), Surabaja (Indonesia)

RFS Year: 1998

Est. End of Service Date: 2023

Total Length (kms): 2,100

Initial Capacity: 50 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: PT Telekom

Region: Pacific

Surabaja Bandjermasin

Makassar

Hotellneset

System Name: Svalbard

Landing Points: Andøy (Norway), Harstad (Norway), Hotellneset (Norway)

RFS Year: 2004

Est. End of Service Date: 2029

Total Length (kms): 2,800

Initial Capacity: 4.8 Tbps

Owners: Telenor

System Supplier: Tyco Telecommunications

Region: Polar

Harstad Andøy

Deep Water Bay

System Name: T-V-H

Landing Points: Deep Water Bay (Hong Kong), Sri Racha (Thailand), Vung Tau (Vietnam)

RFS Year: 1996

Est. End of Service Date: 2021

Est. System Cost (US$): $155,600,000

Total Length (kms): 3,367

Initial Capacity: 1.12 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: Vietnam Telecom International

System Supplier: Fujitsu, Tyco Telecommunications

Region: Pacific

Sri Racha
Vung Tau

TAINO CARIB

System Name: Taino Carib

Landing Points: Magens Bay (Virgin Islands), San Juan (Puerto Rico), Tortola (British Virgin Islands)

RFS Year: 1992

Est. End of Service Date: 2017

Est. System Cost (US$): $17,000,000

Total Length (kms): 186

Initial Capacity: 560 Mbps

Owners: Trans-Caribbean Cable Company

System Supplier: AT&T SSI

System Installer: C&W (Marine)

Cableship: Mercury

Region: Carribean

System Name: Tangerine

Landing Points: Broadstairs (United Kingdom), Oostende (Belguim)

RFS Year: 2000

Est. End of Service Date: 2025

Total Length (kms): 121

Initial Capacity: 240 Gbps

Fiber Pairs: 96 Fiber Pairs

Owners: Level 3 Communications

Region: Atlantic

Broadstairs
Oostende

TASMAN

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Australia

System Name: Tasman Global Access

Landing Points: Australia, New Zealand

RFS Year: 2015

Est. End of Service Date: 2040

Est. System Cost (US$): $71,000,000

Total Length (kms): 2,300

Design Capacity: 30 Tbps

Owners: Telecom New Zealand, Vodafone, Telstra

Region: Pacific

System Name: Tasman-2

Landing Points: Sydney (Australia), Whenuapai (New Zealand)

RFS Year: 1992

Est. End of Service Date: 2017

Est. System Cost (US$): $100,000,000

Total Length (kms): 2,249

Initial Capacity: 3 x 560 Mbps

Owners: Telecom New Zealand

System Supplier: Standard Telephones & Cables Ltd

System Installer: FCR

Cableship: Vercors

Region: Pacific

Tuckerton

System Name: TAT-14

Landing Points: Blaabjerg (Denmark), Katwijk (Netherlands), Manasquan (USA), Norden (Germany), Saint-Valeryen-Caux (France), Tuckerton (USA), Widemouth (UK)

RFS Year: 2001

Est. End of Service Date: 2026

Total Length (kms): 15,453

Initial Capacity: 160 Gbps

Design Capacity: 9.38 Tbps

Fiber Pairs: 4 Fiber Pairs

Channels: 40

Channel Capacity: 40 Gbps

Owners: TAT-14 Consortium

System Supplier: Mitsubishi Electric Corporation

System Installer: Global Marine Systems Limited

Cableship: Cable Innovator, Cable Endeavour, Bold Endurance, Wave Sentinel, Subaru, Maersk Recorder, Maersk Forwarder, Sir Eric Sharp, Agile, Teliri, Fresnel, Vercors

Marine Surveyor: Fugro

Upgrader: Mitsubishi

Upgrade Year: 2012

Upgraded Capacity: 40 Gbps

Region: Atlantic

TE NORTH

Marseille

System Name: TE North

Landing Points: Abu Talat (Egypt), Pentaskinos (Republic of Cyprus), Marseille (France)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $150,000,000

Total Length (kms): 2,938

Initial Capacity: 10 Tbps

Design Capacity: 20 Tbps

Fiber Pairs: 8 Fiber Pairs

Owners: Telecom Egypt

System Supplier: Alcatel-Lucent Submarine Networks

Upgrader: Infinera

Upgrade Year: 2012

Upgraded Capacity: 100 Gbps

Region: Middle East

Fujairah

System Name: TEAMS

Landing Points: Fujairah (United Arab Emirates), Mombasa (Kenya)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $130,000,000

Total Length (kms): 4,500

Initial Capacity: 120 Gbps

Design Capacity: 1.28 Tbps

Owners: Etisalat (15%), TEAMS Ltd. (85%)

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: e-Marine

Cableship: Niwa

Region: Indian Ocean

Mombasa

System Name: TGN Eurasia

Landing Points: Abu Talat (Egypt), Djibouti (Republic of Djibouti), Jeddah (Saudi Arabia), Marseille (France), Mtunzini (South Africa), Mumbai (India), Zafarana (Egypt)

RFS Year: 2009

Est. End of Service Date: 2034

Est. System Cost (US$): $250,000,000

Total Length (kms): 9,240

Initial Capacity: 160 Gbps

Design Capacity: 1.28 Tbps

Owners: SEACOM, Tata Communications, Telecom Egypt

Region: Indian Ocean, Mediterranean, Middle East

Djibouti
Jeddah
Marseille

TGN GULF

System Name: TGN Gulf

Landing Points: Al-Khobar (Saudi Arabia), Dubai (UAE), Kuwait City (Kuwait), Manama (Bahrain), Sumaisma (Qatar)

RFS Year: 2011

Est. End of Service Date: 2036

Est. System Cost (US$): $200,000,000

Total Length (kms): 2,306

Design Capacity: 1.28 Tbps

Fiber Pairs: 2 Fiber Pairs

Owners: Tata Communications

System Supplier: TE SubCom

Region: Middle East

Ballesteros

System Name: TGN Intra-Asia (IA)

Landing Points: Ballesteros (Philippines), Deep Water Bay (Hong Kong), Piti (Guam), Singapore (Singapore), Toyohashi (Japan), Vung Tau (Vietnam)

RFS Year: 2009

Est. End of Service Date: 2034

Total Length (kms): 6,485

Initial Capacity: 3.84 Tbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

Region: Pacific

Vung Tau
Toyohashi
Piti

System Name: TGN Northern Europe

Landing Points: De Marne (Netherlands), Humanby (UK)

RFS Year: 2002

Est. End of Service Date: 2027

Total Length (kms): 551

Initial Capacity: 3.84 Tbps

Fiber Pairs: 4 Fiber Pairs

Owners: Tata Communications

Region: Atlantic

Marne

TGN TRANSATLANTIC

System Name: TGN Transatlantic

Landing Points: Highbridge (UK), Saunton Sands (UK), Wall Township (USA)

RFS Year: 2001

Est. End of Service Date: 2026

Total Length (kms): 12,670

Initial Capacity: 2.56 Tbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Atlantic

System Name: TGN Transpacific

Landing Points: Emi (Japan), Hermosa Beach (USA), Nedonna Beach (USA), Toyohashi (Japan)

RFS Year: 2002

Est. End of Service Date: 2027

Total Length (kms): 21,424

Initial Capacity: 5.12 Tbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

Upgrader: Ciena

Upgrade Year: 2014

Upgraded Capacity: 100 Gbps

Region: Pacific

System Name: TGN Western Europe

Landing Points: Bilbao (Spain), Highbridge (UK), Seixal (Portugal)

RFS Year: 2002

Est. End of Service Date: 2027

Total Length (kms): 3,487

Initial Capacity: 3.84 Tbps

Owners: Tata Communications

System Supplier: Tyco Telecommunications

Region: Atlantic

Highbridge Bilbao
Seixal

TGN-TIC

System Name: TGN-TIC

Landing Points: Chennai (India), Tuas (Singapore)

RFS Year: 2005

Est. End of Service Date: 2030

Total Length (kms): 3,175

Initial Capacity: 5.12 Tbps

Owners: Tata Communications

Region: Indian Ocean, Pacific

Chennai
Tuas

System Name: Tierra del Fuego

Landing Points: Punta Dungeness (Argentina), Espiritu Santo (Argentina)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $5,000,000

Total Length (kms): 27

Owners: AR-SAT

System Supplier: Boskalis, Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Cableship: Ile de Batz

Region: Atlantic

System Name: TIS

Landing Points: Batam (Indonesia), Songkhla (Thailand)

RFS Year: 2006

Est. End of Service Date: 2031

Est. System Cost (US$): $36,000,000

Total Length (kms): 1,003

Initial Capacity: 30 Gbps

Owners: CAT Telecom (Thailand), PT Telekom, Singtel

System Supplier: Tyco Telecommunications

Region: Pacific

Songkhla
Batam

Chennai

System Name: TISICS

Landing Points: Chennai (India), Changi (Singapore)

RFS Year: 2004

Est. End of Service Date: 2029

Total Length (kms): 3,175

Initial Capacity: 640 Gbps

Fiber Pairs: 8 Fiber Pairs

Owners: Tata Communications

Region: Indian Ocean

Changi

TONGA-FIJI

System Name: Tonga-Fiji

Landing Points: Nuku’alofa (Tonga), Suva (Fiji)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $18,900,000

Total Length (kms): 827

Owners: Tonga Cable Limited

System Supplier: Alcatel-Lucent Submarine Network

System Installer: Alcatel-Lucent Submarine Network

Region: Pacific

Ninomiya

Miyazaki

Keawaula Bandon San Luis Obispo

Tumon

System Name: TPC-5

Landing Points: Bandon (USA), Keawaula (Hawaii), Miyazaki (Japan), Ninomiya (Japan), San Luis Obispo (USA), Tumon (Guam)

RFS Year: 1996

Est. End of Service Date: 2021

Est. System Cost (US$): $171,000,000

Total Length (kms): 24,441

Initial Capacity: 10 Gbps

Fiber Pairs: 2 Fiber Pairs

Owners: AT&T, KDDI

System Supplier: Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Cableship: Durable

Region: Pacific

Nedonna

Beach

Qingdao Keoje

Chongming

Fuzhou

Tanshui

System Name: TPE

Landing Points: Chongming (China), Shin-Maruyama (China), Keoje (South Korea), Nedonna Beach (USA), Qingdao (China), Tanshui (Taiwan)

RFS Year: 2008

Est. End of Service Date: 2033

Est. System Cost (US$): $500,000,000

Total Length (kms): 17,772

Initial Capacity: 1.28 Tbps

Design Capacity: 5.12 Tbps

Owners: AT&T, China Telecom, China Unicom, Chunghwa Telecom International, KT Coropration, Verizon, NTT Com

System Supplier: Tyco Telecommunications

System Installer: Global Marine Systems Limited

Cableship: Cable Innovator

Upgrader: TE SubCom

Upgrade Year: 2013

Upgraded Capacity: 10 Gbps

Region: Pacific

Jakarta

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Onslow

Perth

System Name: Trident

Landing Points: Perth, Onslow (Australia), Jakarta (Indonesia)

RFS Year: 2016

Est. End of Service Date: 2041

Est. System Cost (US$): $290,000,000

Total Length (kms): 4,600

Design Capacity: 38 Tbps

Fiber Pairs: 2 Fiber pairs

Perth-Singapore (8 Tbps), 1 fibre pair

Perth-Jakarta (10 Tbps), 1 fibre pair Onslow-Jakarta (10 Tbps) and 1 fibre pair Perth-Onslow (10 Tbps)

Channels: Perth-Singapore 40, rest 100

Channel Capacity: 100 Gbps

Owners: Trident Subsea Cable

System Supplier: TE SubCom

System Installer: TE SubCom

Region: Pacific

TRINIDAD - CURAÇAO

Curaçao

Trinidad

System Name: Trinidad - Curaçao

Landing Points: Curaçao (Curaçao), Trinidad (Trinidad)

RFS Year: 2007

Est. End of Service Date: 2032

Total Length (kms): 1,240

Initial Capacity: 1.875 Tbps

Owners: Colombus Networks, New World Network

System Supplier: Tyco Telecommunications SSI, Alcatel, NEC

System Installer: Tyco SSI

Cableship: Tyco Durable, Ile de Sein, Ile de Batz, Fu Hai, Segero, Cable Innovator

Region: Carribean

TRIPOLI-BENGHAZI CABLE [Planned]

System Name: Tripoli-Benghazi Cable

Landing Points: Benghazi (Libya), Tripoli (Libya)

RFS Year: 2015

Est. End of Service Date: 2040

Total Length (kms): 1,000

Fiber Pairs: 10 Tbps per pair

Owners: Libyan International Telecommunication Company

System Supplier: Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Mediterranean

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

TUBROK-EMASED

System Name: Tubrok-Emased

Landing Points: Tobruk (Libya), El Quawef (Libya)

RFS Year: 2010

Est. End of Service Date: 2035

Total Length (kms): 180

Design Capacity: 25.6 Tbps

Fiber Pairs: 8 Fiber Pairs

Channels: 80

Channel Capacity: 40 Gbps

Owners: Libyan Post Telecommunications & Information Technology Company

System Supplier: Huawei Marine Networks

Region: Mediterranean

Tobrok El-Quawef

System Name: TWA-1

Landing Points: Al Seeb (Oman), Fujairah (United Arab Emirates), Karachi (Pakistan)

RFS Year: 2006

Est. End of Service Date: 2031

Total Length (kms): 1,300

Initial Capacity: 1.28 Tbps

Owners: Trans-World Associates

System Supplier: Tyco Telecommunications

System Installer: Tyco Telecommunications

Region: Middle East

Telecoms consulting of submarine cable systems for regional and trans-oceanic applications

System Name: Ugarit

Landing Points: Pentaskhinos (Cyprus), Tartus (Syria)

RFS Year: 1995

Est. End of Service Date: 2020

Est. System Cost (US$): $16,000,000

Total Length (kms): 240

Initial Capacity: 622 Mbps

Owners: Cypress Telecommunications Authority

System Supplier: Tyco Telecommunications

Region: Mediterranean

Las Toninas

Maldonado

Florianopolis

System Name: Unisur

Landing Points: Florianopolis (Brazil), Las Toninas (Argentina), Maldonado (Uruguay)

RFS Year: 1994

Est. End of Service Date: 2019

Est. System Cost (US$): $74,000,000

Total Length (kms): 1,720

Initial Capacity: 560 Mbps

Owners: Antel (Uruguay), Embratel, Telecom Argentina, Telefonica de Argentina

Region: Atlantic

Chikura

Hermosa Beach

System Name: Unity

Landing Points: Chikura (Japan), Los Angeles (USA)

RFS Year: 2010

Est. End of Service Date: 2035

Est. System Cost (US$): $300,000,000.00

Total Length (kms): 9,486

Initial Capacity: 1.92 Tbps

Design Capacity: 4.8 Tbps

Fiber Pairs: 5 Fiber Pairs

Owners: Bharti Airtel, Global Transit, Google, KDDI, PACNET, Singtel

System Supplier: Tyco Telecommunications

Upgrader: Ciena

Upgrade Year: 2013

Upgraded Capacity: 100 Gbps

Region: Pacific

VANUATU - PAPUA NEW GUINEA [Planned]

Project Completion Phases:

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

System Name: Vanuatu - Papua New Guinea

Landing Points: Port Vila (Vanuatu); Port Moresby (Papua New Guinea)

RFS Year: 2015

Est. End of Service Date: 2040

Total Length (kms): 3,000

Initial Capacity: 40 Gbps

Design Capacity: 1.2 Tbps

Owners: Interchange (Vanuatu)

System Supplier: Alcatel-Lucent Submarine Networks

Region: Pacific

Port Moresby

Port Vila

VENTSPILS-GOTLAND

System Name: Ventspils-Gotland

Landing Points: Fårösund (Sweden), Stockholm (Sweden), Ventspils (Latvia)

RFS Year: 2004

Est. End of Service Date: 2029

Total Length (kms): 175

Initial Capacity: 2.5 Gbps

Fiber Pairs: 34 Fiber Pairs

Owners: Baltcom

System Supplier: TE SubCom

Region: Baltic

VMSCS

System Name: VMSCS

Landing Points: Balluta (Malta), Catania (Italy)

RFS Year: 2004

Est. End of Service Date: 2029

Total Length (kms): 250

Initial Capacity: 10 Gbps

Owners: Vodafone Malta

Region: Mediterranean

System Name: WACS

Landing Points: Accra (Ghana), Alta Vista (Spain), Cape Verde (Cape Verde), Douala (Cameroon), Lagos (Nigeria), Lome (Togo), Luanda (Angola), Muanda (DRC), Pointe Noire (Congo), Sesimbra (Portugal), Walvis Bay (Namibia), Whitesands Bay (UK)

RFS Year: 2012

Est. End of Service Date: 2037

Est. System Cost (US$): $600,000,000

Total Length (kms): 11,378

Initial Capacity: 500 Gbps

Design Capacity: 5.1 Tbps

Owners: Angola Cables, Broadband Infraco, Congo Telecom, C&W, MTN Group, Office Congolais de Poste et Telecommunication, PT Comunicações, Tata Communications, Telecom Namibia, Telekom SA, Togo Telecom, Vodacom

Region: Atlantic

Walvis Bay
Luanda
Pointe Noire Muanda
Douala
Accra LomeLagos
Cape Verde
Alta Vista
Sesimbra
Whitesand Bay

Cochin

System Name: WARF

Landing Points: Cochin (India), Hulhumalé (India)

RFS Year: 2007

Est. End of Service Date: 2032

Total Length (kms): 680

Owners: WARF Telecom International

System Supplier: Alcatel Submarine Networks

Marine Surveyor: Fugro

Region: Indian Ocean

WESTERN VISAYAS - PALAWAN

System Name: Western Visayas - Palawan

Landing Points: Taytay, Palawan; San Jose de Buenavista, Iloilo (Philippines)

RFS Year: 2014

Est. End of Service Date: 2039

Est. System Cost (US$): $20,000,000

Total Length (kms): 300

Owners: PLDT (Philippines)

Region: Pacific

Taytay
San Jose de Buenavista
Iloilo

Voice of the Industry

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.