Almanac Issue 10

Page 1

s ub ma r in e cabl e

ALMANAC

10 I S S U E

Voice

of the Industry


While all reasonable steps to verify information from the public domain have been taken, based on changing circumstances and dynamic factors, incomplete information subject to change may exist. Our goal is to periodically update and modify such information. If you have a correction, please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing almanac@subtelforum.com.

Submarine Cable Almanac Issue 10 | May 2014

Copyright © 2014 by Submarine Telecoms Forum, Inc.

All rights reserved. No part of this book may be used or reproduced by any means, graphic, eletronic, or mechanical, including photocopying, recording, taping or by any information storage retrieval system without the written permission of the publisher except in the case of brief quotations embodied in critical articles and reviews. Submarine Telecoms Forum, Inc. 21495 Ridgetop Circle Suite 201 Sterling, Virginia 20166 USA www.subtelforum.com ISBN: 978-0-615-46614-9


Introduction

W

elcome to the eighth edition of the Submarine Cable Almanac, one of our most popular reference tools. In the months since Issue 8 was released, 11 systems were added, 7 systems were removed and 53 Entries were updated with new information. In the following pages you will find a detailed list of major international submarine cable systems. This document serves as complement to our annual Cable Map and Submarine Cable Indsutry Report. We hope that you, our readers, will participate in this almanac as you’ve done with our previous products. There is always room for additional data, so let us know if there is something else we should include in future editions. Please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing almanac@subtelforum.com. Finally, I want to thank all of the sponsors, staff and dedicated readers that contributed to this Almanac. Your feedback has been invaluable.

Kevin G. Summers May, 2014


AAG

9

APCN 2

36

*AAG 2

10

37

AC-1

11

AC-2

12

APG (Asia Pacific Gateway)

ACE

13

Aphrodite 2

38

ACSea

14

APNG-2

39

Adones

15

Apollo

40

ADRIA-1

16

*APX-East

41 42

*AJC

17

*APX-West

Akorn

18

Arcos-1

43

Alasia

19

Arctic Fibre

44

Alaska United East

20

Ariane 2

46 47

Alaska United West

21

*ASC (AustraliaSingapore Cable)

ALBA-1

22

*ASH

48

Aletar

23

49

Alexandros

24

*Asia Africa Europe (AAE-1)

Alonso De Ojeda

25

50

Alpal-2

26

Asia Submarinecable Express (ASE)

*American Samoa-Fiji

27

Athena

51

Americas I

28

Atlantis-2

52

Americas I South

29

Atlas Offshore

53

Bahamas-2

54

Americas II

30

Baltica

55

Amerigo Vespucci

31

Barsav

56

Bass Strait 1

57

*AMX-1

32

Bass Strait 2

58

Antel

33

59

Antilles Crossing

34

BBG (Bay of Bengal Gateway)

APCN

35

BCS East

60

BCS East-West Interlink

61

BCS North

62

BDM

63

Berytar

64

Bharat-Lanka

65

BICS

66

BIMP

67

BIN

68

BIOS / Jonah

69

BLAST (Broadband Linking the American Samoa Territory)

70

Botnia

71

Brazil - US

72

BRCS

73

BRICS Cable

74

BSCS

75

BSFOCS

76

Cable of the Americas

77

Cadmos

78

Canalink

79

CANUS-1

80

CARAC

81

Caucasus Cable System

83

CB-1

84

C-BUS

85

Celtix Connect

86

CFX-1

87


China - US

88

Emerald Express

115

CIOS

89

EMOS-1

116

Circe North

90

*Endeavour

117

Circe South

91

EsteponaTetouan

118

C-J FOSC

92

CJFS

93

EurAfrica

119

Columbus II

94

Columbus III

95

Europa

120

96

FA-1 North/ South

121

Concerto-1 Corfu-Bar

97

Falcon

123

Corsar

98

Farice-1

124

Danica North

99

Farland

125

Danica South

100

*Faster

126

Danice

101

DDSCN

102

Fehmarn Balt

128

Denmark Germany 2

103

FibraLink

129

Denmark Norway 5

104

Fibre Atlantic

130 131

Denmark Norway 6

105

FLAG EuropeAsia

132

Denmark Poland 2

106

Flag/Reach North Asia Loop

Denmark Russia

107

*Flores - Corvo

133

FOG

134

DMCS

108

GBI

135

EAC - C2C

109

136

*EaSSy

110

GCN (Global Caribbean Network)

East - West

111

137

ECFS

112

*Gemini Bermuda

EE-S1

113

Georgia-Russia

138

EIG

114

GLO-1

139

Global Nexus

140

127

Globenet

141

GO-1

142

GOKI

143

Gondwana-1

144

G-P

145

Greenland Connect

146

GWEN

147

Hannibal

148

*Hantru-1

149

Hawaiki

150

Hawk

151

Hibernia Atlantic

152

Honotua

153

HSCS

154

Hugo

155

i2i

156

I-ME-WE

157

Italy- Albania

158

Italy - Greece

159

Italy - Libya

160

Italy - Monaco

161

ITUR

162

JaKa2DeLeMa

163

JAKABARE

164

Japan-US

165

Jasuka

166

JIH

167

KAFOS

168

Kattegat-1

169

Keltra-2

170


Khulna Chennai

171

KJCN

172

Kodiak Kenai

173

Kuwait-Iran

174

LEV

175

*LION

176

LION-2

177

M-T

178

MAC

179

Main One

180

Malaysia Domestic

181

MataramKupang

182

Matrix

183

MauritiusRodrigues Island

184

Maya-1

185

MBDC

186

Med Cable

187

MedNautilus

188

MELITA-1

189

MENA

190

MIC-1

191

Micronesia Cable System

192

Minerva

193

MKCS

194

*NCP (New Cross Pacific)

195

Neptune Canada

196

Norsea Com-1

197

SEA-ME-WE 5

227

Northstar

198

SFL

228

PAC

199

SFS-4

229

Pakistan-UAE

201

SG - SCS

230

*Palau - Guam

202

Shefa 2

231

PanAm

203

Silphium

232

Pangea

204

SJC

233

PC-1

205

SKKL-JS

234

PCCS (Pacific Caribbean Cable System)

206

SMPR-1

235

Solas

236

PEC

207

237

PPC-1

208

Solomon Island to the World

Qatar-UAE

209

238

RJCN

210

RJK

211

*South America Pacific Link (SAPL)

SAC

212

*Southern Cross Cable Network

239

*SACS (South Atlantic Cable System)

213

Sub

240

Svalbard

241

SAFE

214

Taino Carib

242

SAM-1

215

Tangerine

243

SAS-1

216

244

SAT-2

217

*Tasman Global Access

SAT-3

218

Tasman-2

245

219

TAT 14

246

*SCAN SCF-CN

220

TE North

247

221

TEAMS

249

*SEA - US Seabras-1

222

TGN Atlantic

250

Seacom

223

TGN Eurasia

251

SEAK

224

TGN Gulf

252

SEA-ME-WE 3

225

*TGN IntraAsia (IA)

253

SEA-ME-WE 4

226


TGN Northern Europe

254

*TGN Pacific

255

TGN Western Europe

256

TGN-TIC

Sponsors: Ciena

8

Alcatel-Lucent

45

AP Telecom

82

257

GEG

122

Tierra del Fuego

258

State of Subsea

200

TIS

259

Telecom Egypt

248

TISICS

260

WFN Strategies

279

Tonga-Fiji

261

TPC-5

262

TPE

263

*Trident

264

Trinidad Curacao

265

*TripoliBenghazi Cable

266

T-V-H

267

TWA-1

268

Ugarit

269

Unisur

270

Unity

271

*Vanuatu - Fiji

272

*Vanuatu Papua New Guinea

273

VentspilsGotland

274

VMSCS

275

WACS

276

WARF

277

*Western Visayas Palawan

278


ler mo

Pa

Ba

rce Ma lona rse ille s

AAE-1 [Planned]

lat

Abu Ta

Fujairah

Djibouti Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance

Kenya

Oman


System Name:

Asia Africa Europe (AAE-1)

Landing Points: Barcelona (Spain), Marseilles (France), Palermo (Italy), Abu Talat (Egypt), Zafrana (Egypt), Djibouti, Oman, Fujairah (UAE), Mumbai (India), Kenya, Sri Lanka, Cox Bazaar (Bangladesh), Myanmar, Singapore, Hong Kong, Shanghai (China) RFS Year:

2016

Est. End of Service Date:

2041

Est. System Cost (US$):

600,000,000

Total Length (kms):

25,000

Design Capacity:

40 Tb/s

Fiber Information:

100 Gb per wavelength

Owners:

System Supplier: Region:

Etisalat (UAE), China Unicom (China), Djibouti Telecom (Djibouti), Telecom Italia (Italy), TIME (Malaysia), Oteglobe (Greece), BT (UK), MPT (Myanmar), Chunghwa Telecom (Taiwan), BSCCL (Bangladesh), dU (UAE), OmanTel (Oman), PTCL (Pakistan) TE SubCom Indian Ocean, Mediterranean, Middle East, Pacific

Shanghai Cox Bazaar

n Mumbai

Hong Kong

Myanmar

Sri Lanka Singapore


AAG

L a n t a u S r i R a c h a V u n g T a u M e r s i n g C h a n g i

L a U n i o n T u n g k u

T a n g u i s s o n


S a n L u i s O b i s p o

K e a w a u l a

System Name:

AAG

Landing Points: Changi (Singapore), Keawaula (Hawaii), Lantau (Hong Kong), La Union (Philippines), Mersing (Malaysia), San Luis Obispo (USA), Sri Racha (Thailand), Tanguisson (Guam), Tungku (Brunei), Vung Tau (Vietnam) RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:

500,000,000 20,547 2.88 Tb/s AT&T Inc., Bayan, Bharti, BT Global Network Services, CAT Telecom, ETPI, FPT Telecom, the Government of Brunei Darussalam, PT Indosat, PLDT, Saigon Postel Corporation, StarHub, Telcotech, TELKOM Indonesia, Telstra, Telekom Malaysia, TNZL, Viettel, VNPT

System Supplier:

Alcatel Submarine Networks, NEC

System Installer:

Alcatel Submarine Networks

Cableship:

Rene Descartes

Upgrader:

Mitsubishi, Infinera

Upgrade Year: Upgraded Capacity:

2011, 2014 40 Gb/s, 100 Gb/s

Region: Pacific


AC-1

B r o o k h a v e n


W e s t e r l a n d B e v e r w i j k W h i t e s a n d s B a y

System Name:

AC-1

Landing Points: Beverwijk (Netherlands), Brookhaven (USA), Westerland (Germany), Whitesands Bay (UK) RFS Year:

1999

Est. End of Service Date:

2024

Est. System Cost (US$):

875,000,000

Total Length (kms):

13,377

Initial Capacity:

40 Gb/s

Design Capacity:

1 Tb/s

Fiber Information:

4 Fiber Pairs

Owners:

Level 3 Communications

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

Upgrader:

Xtera

Upgrade Year:

2010

Upgraded Capacity:

20 Gb/s

Region:

Atlantic


AC-2

B e l l p o r t

System Name:

AC-2

Landing Points: Bellport (USA), Widemouth (UK) RFS Year:

2000

Est. End of Service Date:

2025

Est. System Cost (US$):

700,000,000

Total Length (kms):

6,185

Initial Capacity:

320 Gb/s

Design Capacity:

640 Gb/s

Owners: Upgrader: Upgrade Year:

Level 3 Communications Infinera 2010

Upgraded Capacity:

10 Gb/s

Region:

Atlantic


W i d e m o u t h B a y


pe

To w

n

Santana

Ca

D Su Ba ak N cu nj ar ou ak Fr Con jaq ul ch ot M eeto akr ue t on y wn ro vi a A Ac bi cr dja a n Lo C me La oto go no s u

ACE Penmarch

Lisbon

Asilah

Tenerife

Kribi Bata Libreville

Muanda

Luanda

Swakopmund


System Name:

ACE

Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Asilah (Morocco), Banjul (The Gambia), Bata (Equatorial Guinea), Cape Town (South Africa), Conakry (Guinea), Cotonou (Benin), Dakar (Senegal), Freetown (Sierra Leone), Kribi (Cameroon), Lagos (Nigeria), Libreville (Gabon), Lisbon (Portugal), Lome (Togo), Luanda (Angola), Monrovia (Liberia), Muanda (DRC), Nouakchott (Mauritania), Penmarch (France), Santana (São Tomé and Príncipe), Sucujaque (Guinea-Bissau), Swakopmund (Namibia), Tenerife (Spain) RFS Year:

2012

Est. End of Service Date:

2037

Est. System Cost (US$):

700,000,000

Total Length (kms): Design Capacity:

17,000 5.12 Tb/s

Owners:

Benin Telecoms, Cable Consortium of Liberia Inc, Côte d’Ivoire Telecom, Expresso Telecom Group Ltd, Orange, Gambia Submarine Cable Company Ltd, Guinéenne de la Large Bande SA, International Mauritania Telecom, Orange Cameroun S.A., Orange Mali, Orange Niger S.A., PT Comunicações SA, Republic of Equatorial Guinea, Republic of Gabon, Sierra Leone Cable Company, Sonatel, STP Cabo

System Supplier:

Alcatel-Lucent Submarine Networks (Main contractors) TE Subcom (Sub contractors)

Marine Surveyor:

Fugro

Region:

Atlantic


ACSEA [Planned]

B o c a R a t o n

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance

F o r t a l e z a

S a o P a u l o M a l d o n a d o


S e i x a l

S a n g a n o System Name:

ACSea

Landing Points: Boca Raton (United States), Seixal (Portugal), Sangano (Angola), Sao Paulo (Brazil), Maldonado (Uruguay), Fotaleza (Brazil) RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):

1,200,000,000

Total Length (kms):

27,000

Design Capacity:

400 Gb/s

Fiber Information:

4 Fiber Pairs

Owners:

Telebras, Odebrecht, Angola Cable

Region:

Atlantic


ADONES

Cabinda Soyo

Nzeto

Luanda

Porto

Bengu Lucira

Namibe


System Name:

Landing Points: Benguela (Angola), Cabinda (Angola), Luanda (Angola), Lucira (Angola), Namibe (Angola), Nzeto (Angola), Porto Amboim (Angola), Soyo (Angola) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

35,000,000

Total Length (kms):

1,800

Initial Capacity:

30 Gb/s

Design Capacity:

80 Gb/s

Owners:

Angola Telecom

System Supplier:

Ericsson

System Installer:

Elettra

Cableship:

Teleri

Region:

Atlantic

a

o Amboim

uela

Adones


ADRIA-1

D u b r o v n i k

D u r

C


System Name:

ADRIA-1

Landing Points: Corfu (Greece), Dubrovnik (Croatia), Durres (Albania) RFS Year:

2000

Est. End of Service Date:

2025

Est. System Cost (US$):

13,400,000

r r e s

C o r f u

Total Length (kms): Initial Capacity:

430 622 Mb/s

Owners:

Deutsche Telekom AG, OTE

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Region:

Mediterranean


AJC

System Name:

AJC

Landing Points: Maruyama (Japan), Oxford Falls (Australia), Shima (Japan), Sydney (Australia), Tanguisson (Guam), Tumon (Guam) RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$):

520,000,000

Total Length (kms):

12,224

Initial Capacity:

320 Gb/s

Design Capacity:

2.56 Tb/s

Fiber Information:

4 Fiber Pairs, 10 Gb/s wavelengths with a design capacity of up to 64 waves per fiber pair

Owners:

Australia Japan Cable Limited, Communications Global Network Services Limited, NTT Communications Corporation, SOFTBANK Telecom Corp., Telstra Holdings (Bermuda) No. 1 Limited, Worldcom Global Networks Limited

System Supplier:

Ocean Cable Company, Tyco Telecommunications

System Installer:

FCR, KDD

Cableship:

Fresnel, Subaru

Upgrader:

Ciena, Infinera

Upgrade Year: Upgraded Capacity: Region:

2012, 2014 40 Gb/s, 100 Gb/s Pacific


Maruyama Shima

Tumon

Tanguisson

Oxford Falls Sydney


AKORN

A n c h o r a g e


System Name:

Akorn

Landing Points: Anchorage (USA), Florence (USA) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

100,000,000

Total Length (kms): Initial Capacity: Fiber Information:

2,968 10 Gb/s 4 Fiber Pairs

Owners:

Alaska Communications

System Supplier:

Tyco Telecommunications

Region:

Pacific

F l o r e n c e


ALASIA

System Name:

Alasia

Landing Points: Pentaskhinos (Cyprus), Tartus (Syria) RFS Year:

2012

Est. End of Service Date:

2037

Est. System Cost (US$):

15,000,000

Total Length (kms):

350

Design Capacity:

25.6 Tb/s

Fiber Information:

8 Fiber Pairs

Owners:

Cyprus Telecommunications Authority, Syrian Telecommunications Authority

Region:

Mediterranean


ALASKA UNITED EAST

Valdez

Whittier

System Name:

Alaska United East

Landing Points: Harbor Pointe (USA), Juneau (USA), Valdez (USA), Whittier (USA) RFS Year:

1999

Est. End of Service Date:

2024

Total Length (kms):

3,751

Initial Capacity:

2.5 Gb/s

Design Capacity:

10 Gb/s

Fiber Information:

4 fiber strands

Owners:

GCI

System Supplier:

NEC

Region:

Pacific


Juneau

Harbor Pointe


ALASKA UNITED WEST

W h i t t i e r


System Name:

Alaska United West

Landing Points: Ketchikan (USA), Warrenton (USA), Whittier (USA) RFS Year:

2004

Est. End of Service Date:

2029

Total Length (kms):

2,483

Initial Capacity:

10 Gb/s

Design Capacity:

640 Gb/s

Fiber Information:

4 fiber strands

Owners:

GCI

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

Cableship: Region:

Global Sentinel Pacific

K e t c h i k a n

W a r r e n t o n


ALBA-1

H a v a n a

S a n t i M o r a n t P o i n t

System Name:

ALBA-1

Landing Points: Camuri (Venezuela), Havana (Cuba), Morant Point (Jamaica), Santiago De Cuba (Cuba) RFS Year:

2013

Est. End of Service Date:

2038

Est. System Cost (US$):

72,000,000

Total Length (kms): Initial Capacity: Owners:

1,600 640 Gb/s Telecom Venezuela, Transbit SA

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Shanghai Bell, Telecomunicaciones Gran Caribe

Marine Surveyor:

EGS

Survey Boat: Region:

RV Ridley Thomas Caribbean


i a g o d e C u b a

C a m u r i


ALETAR System Name:

Aletar

Landing Points: Alexandria (Egypt), Tartus (Syria) RFS Year:

1997

Est. End of Service Date:

2022

Est. System Cost (US$):

23,000,000

Total Length (kms): Initial Capacity: Fiber Information: Owners:

733 5 Gb/s 1 fiber Pair, 8 optical amplifiers Lebanese Ministry of Telecom (6.25%), Syrian Telecom (46.875%), Telecom Egypt (46.875%)

System Supplier:

Alcatel Submarine Networks

System Installer:

FCR

Cableship: Region:

Vercors Mediterranean

A l e x a n d r i a


T a r t u s


ALEXANDROS

M a r s e i l l e


System Name:

Alexandros

Landing Points: Alexandria (Egypt), Marseille (France), Pentaskhinos (Cyprus) RFS Year:

2010

Est. End of Service Date:

2035

Design Capacity:

10 Tb/s

Owners:

Cyprus Telecommunications Authority, Telecom Egypt

Region:

Mediterranean

P e n t a s k h i n o s

A l e x a n d r i a


ALONSO DE OJEDA

O r a n j e s t a d


System Name:

Alonso De Ojeda

Landing Points: Oranjestad (Aruba), Willemstad (Netherlands Antilles) RFS Year:

1999

Est. End of Service Date:

2024

Est. System Cost (US$):

8,678,000

Total Length (kms):

128

Initial Capacity:

15 Gb/s

Design Capacity:

100 Gb/s

Owners: System Supplier: Region:

d W i l l e m s t a d

Antelecom NV Alcatel Submarine Networks Caribbean


ALPAL-2

S e s C o v e t e s

E l D j e m i l a


System Name:

Alpal-2

Landing Points: El Djemila (Algeria), Ses Covetes (Majorca) RFS Year:

2002

Est. End of Service Date:

2027

Est. System Cost (US$):

17,600,000

Total Length (kms):

312

Initial Capacity:

10 Gb/s

Design Capacity:

160 Gb/s

Fiber Information:

4 Fiber Pairs

Owners:

APT, France Telecom, Telefonica

System Supplier:

Pirelli

System Installer:

Global Marine Systems Limited

Cableship: Region:

Maersk Responder Mediterranean


AMERICAN SAMOA-FIJI [Planned]

Fiji


System Name:

American Samoa-Fiji

Landing Points: Pago Pago (American Samoa), Fiji RFS Year:

2016

Est. End of Service Date:

2041

Est. System Cost (US$):

35,000,000

Initial Capacity:

40 Gb/s

Owners:

American Samoa Hawaii Cable

Region:

Pacific

American Samoa

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


AMERICAS I

Vero Beach

Magens Bay


System Name:

Americas I

Landing Points: Magens Bay (Virgin Islands), Vero Beach (USA) RFS Year:

1994

Est. End of Service Date:

2019

Est. System Cost (US$):

220,000,000

Total Length (kms):

2,013

Initial Capacity:

120 Gb/s

Design Capacity:

320 Gb/s

Owners:

AT&T, CANTV (Venezuela), Embratel, TSTT

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

Upgrader:

Xtera

Upgrade Year:

2010

Upgraded Capacity: Region:

20 Gb/s Caribbean


AMERICAS I SOUTH

Magens Bay

Camuri

Macque


System Name:

Americas I South

Landing Points: Camuri (Venezuela), Fortaleza (Brazil), Macqueripe (Trinidad), Magens Bay (Virgin Islands) RFS Year:

1994

Est. End of Service Date:

2019

Total Length (kms):

6,014

Initial Capacity: Owners:

560 Mb/s AT&T, CANTV (Venezuela), Embratel, TSTT

System Supplier:

Alcatel Submarine Networks, Tyco Telecommunications SSI

System Installer:

C&W (Marine)

Cableship: Region:

Cable Installer, Agile, Fresnel Caribbean

eripe

Fortaleza


AMERICAS II

H o l l y w o o d

M i r a m a r S t C r o i x

L e L W i l l e m s t a d C a m u r i

C h a g u a r a


L a m e n t i n

System Name: Americas II Landing Points: Camuri (Venezuela), Cayenne (French Guiana), Chaguaramas (Trinidad), Fortaleza (Brazil), Hollywood (USA), Lamentine (France), Miramar (Puerto Rico), St Croix (US Virgin Islands), Willemstad (Netherlands Antilles) RFS Year:

2000

Est. End of Service Date:

2025

Est. System Cost (US$): 350,000,000 Total Length (kms): 8,373 Initial Capacity: 80 Gb/s Design Capacity:

210 Gb/s

Owners: Antelecom NV, AT&T, Brazil Telecom, CANTV (Venezuela), Embratel, France Telecom, GT&T, Sprint, Telecom Italia, Telefonica, Telesur, Telintar, Trescom Int., TSTT, Verizon System Supplier: ASN Australia, Tyco Telecommunications System Installer: Tyco Telecommunications SSI Cableship: Global Link Region:

Caribbean

a m a s

C a y e n n e

F o r t a l e z a


AMERIGO VESPUCCI

Curacao


System Name:

Amerigo Vespucci

Landing Points: Bonaire (Netherlands), Curacao (Curacao) RFS Year:

1999

Est. End of Service Date:

2024

Total Length (kms): Region:

o Bonaire

84 Atlantic, Caribbean


AMX-1

Jacksonville Maimi Cancun Puerto Barrios

Puerto Plata

Barranquilla Cartagena

San Juan


System Name:

AMX-1

Landing Points: Jacksonville (United States), Miami (United States), San Juan (Puerto Rico), Puerto Barrios (Guatemala), Barranquilla (Colombia), Cartagena (Colombia), Fortaleza (Brazil), Salvador de Bahia (Brazil), Rio de Janeiro (Brazil), Puerto Plata (Dominican Republic), Cancun (Mexico) RFS Year:

2014

Est. End of Service Date:

2038

Est. System Cost (US$):

700,000,000

Total Length (kms): Initial Capacity: Owners:

17,800 100 Gb/s America Movil

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Marine Surveyor:

Fugro, EGS

Region:

Atlantic, Caribbean

Fortaleza

Rio de Janeiro


ANTEL

L a s T o n i n a s


System Name:

Antel

Landing Points: Las Toninas (Argentina), Maldonado (Uruguay) RFS Year:

2010

Est. End of Service Date:

2035

Est. System Cost (US$):

15,000,000

Total Length (kms):

250

Initial Capacity:

50 Gb/s

Design Capacity:

3.84 Tb/s

Owners:

Antel (Uruguay), Telecom Argentina

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

IT Telecom

Region:

M a l d o n a d o

Atlantic


ANTILLES CROSSING

H a m s B l u f f

P


System Name:

Antilles Crossing

Landing Points: Bridgetown (Barbados), Hams Bluff (Virgin Islands), Port Castries (St Lucia) RFS Year:

2006

Est. End of Service Date:

2031

Total Length (kms):

952

Initial Capacity:

40 Gb/s

Design Capacity:

80 Gb/s

Owners:

Antilles Crossing, Barbados Light & Power, Leucadia, Telebarbados

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

Upgrader:

Ciena

Upgrade Year:

2013

Upgraded Capacity: Region:

40 Gb/s Caribbean

P o r t C a s t r i e s B r i d g e t o w n


APCN Pusan

Miya

Lantau

Batangas

Petchaburi

Mersing Changi

Jakarta

Port Hedland


azaki

System Name:

APCN

Landing Points: Batangas (Philippines), Changi (Singapore), Jakarta (Indonesia), Lantau (Hong Kong), Mersing (Malaysia), Miyazaki (Japan), Phetchaburi (Thailand), Port Hedland (Australia), Pusan (South Korea) RFS Year:

1997

Est. End of Service Date:

2022

Est. System Cost (US$):

640,000,000

Total Length (kms):

11,813

Initial Capacity:

5 Gb/s

Design Capacity:

10 Gb/s

Owners:

CAT Telecom (Thailand), Chunghwa Telecom International, Indosat, KDDI, KT Coropration, PLDT (Philippines), Reach NHK, Singtel, TM

System Supplier:

Ocean Cable Company, Tyco Telecommunications

System Installer:

C&W (Marine)

Cableship: Region:

Cable Venture, Cable Innovator, Ocean Link Pacific


APCN 2

Pusa

Chongming

Shantou Lantau

Tanshui

Batangas

Kuantan Katong


an

Kitaibaraki Chikura

System Name:

APCN 2

Landing Points: Batangas (Philippines), Chikura (Japan), Chongming (China), Katong (Singapore), Kitaibaraki (Japan), Kuantan New Port (Malaysia), Lantau (Hong Kong), Pusan (South Korea), Shantou (China), Tanshui (Taiwan) RFS Year:

2002

Est. End of Service Date:

2027

Est. System Cost (US$):

1,100,000,000

Total Length (kms):

19,000

Initial Capacity:

160 Gb/s

Design Capacity:

2.56 Tb/s

Fiber Information:

4 Fiber pairs, 640GB/s each

Owners:

China Telecom, Chunghwa Telecom International, CTM, France Telecom, KDDI, KT Coropration, NTT Communications, PLDT (Philippines), Reach NHK, Singtel, Telekom Malaysia

System Supplier:

Ocean Cable Company

System Installer:

Global Marine Systems Limited

Cableship:

Marine Surveyor:

Cable Retriever, Bold Endurance, Fu Lai, Asean Restorer, Maersk Recorder, Maersk Repeater, Maersk Responder, Maersk Reliance, Subaru, Kuroshio Maru, Cable Installer. Barges, Networker, Elbe, Chin Ann 3 C&C Technologies

Upgrader:

NEC

Upgrade Year:

2014

Upgraded Capacity: Region:

100 Gb/s Pacific


APG [Planned]

Qingdao

Chongming

Toucheng Lantau

La Union

Vung Tau Songkhla Kuantan Tuas

Pus


san

Project Completion Phases: Pre-Engineering

Shima

Survey System Manufacture System Installation Commissioning & Acceptance

System Name:

APG (Asia Pacific Gateway)

Landing Points: Chongming (China), Da Nang (Vietnam), Kuantan New Port (Malaysia), Lantau (Hong Kong), Maruyama (Japan), Nanhui District (China), Pusan (South Korea), Shima (Japan), Songkhla (Thailand), Toucheng (Taiwan), Tuas (Singapore) RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):

313,144,000

Total Length (kms): Initial Capacity: Owners:

8,000 54 Tb/s China Telecom, China Unicom, Chunghwa Telecom International, KT Coropration, NTT Communications, PLDT (Philippines), StarHub (Singapore), Telekom Malaysia, VNPT

System Supplier:

NEC

System Installer:

NTT Com

Region:

Pacific


APGN-2

System Name:

APGN-2

Landing Points: Port Moresby (Papua New Guinea), Sydney (Australia) RFS Year:

2006

Est. End of Service Date:

2031

Est. System Cost (US$):

11,000,000

Total Length (kms):

3,400

Initial Capacity:

1.12 Gb/s

Fiber Information:

2 Fiber Pairs

Owners:

Telikom PNG, Telstra (Australia)

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Cableship:

Ile de Re

Region:

Pacific


Point Moresby

Sydney


APHRODITE 2

System Name:

Aphrodite 2

Landing Points: Chania (Greece), Yeroskipos (Cyprus) RFS Year:

1994

Est. End of Service Date:

2019

Est. System Cost (US$):

30,000,000

Total Length (kms): Initial Capacity: Owners:

System Supplier:

868 1.12 Gb/s AT&T, Belgacom, British Telecom, Cyprus Telecommunications Authority (62%), France Telecom, OTE, Sprint, Verizon Alcatel Submarine Networks

Cableship:

Skandi Hav

Region:

Mediterranean


APOLLO

B r o o k h a v e n M a n a s q u a n


W i d e m o u t h B a y L a n n i o n

System Name:

Apollo

Landing Points: Brookhaven (USA), Lannion (France), Manasquan (USA), Widemouth (UK) RFS Year:

2003

Est. End of Service Date:

2028

Total Length (kms):

12,700

Initial Capacity:

10 Gb/s

Design Capacity:

3.2 Tb/s

Fiber Information:

4 Fiber Pairs

Owners:

Alcatel, Apollo SCS Limited, C&W

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Cableship:

Ile de Batz, Ile de Brehat, Ile de Sein, Skandi Neptune

Upgrader:

Alcatel-Lucent Submarine Networks

Upgrade Year: Upgraded Capacity: Region:

2012, 2014 40 Gb/s, 100 Gb/s Atlantic


APX-EAST [Planned]

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


H e r m o s a B e a c h

O a h u

System Name:

APX-East

Landing Points: Auckland (New Zealand), Hermosa Beach, (United States), Oahu (United States), Sydney (Australia) RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):

350,000,000

Total Length (kms):

12,500

Design Capacity:

40 Tb/s

Fiber Information:

4 Fiber Pairs

Owners:

SubPartners

System Supplier:

TE SubCom

Region:

Pacific


APX-WEST [Planned]

Singapore

Jakarta Christmas Island

Perth


System Name:

APX-West

Landing Points: Jakarta (Indonesia), Christmas Island (Australia), Perth (Australia), Singapore RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):

150,000,000

Total Length (kms):

4,600

Design Capacity:

32 Tb/s

Fiber Information:

4 Fiber Pairs

Owners:

SubPartners

System Supplier:

TE SubCom

Region:

Pacific

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


ARCOS-1 Hollywood Nassau

Crooked Island

Cancun

Tulum

Providenciales

Puerto Plata Punta Cana

Ladyville

Tr oj

ill

o

Puerto Lempira Puerto Cabezas

Pu

e Pu rto er Ba to rr Co ios rte s

Cat Island

Bluefields

ia ar M

Pu

er

Ch

to

iq

ui

Li

ta

m

on

Riohacha Punto Fijo Cartagena Ustupo

Willemsta


ad

System Name:

San Juan

Arcos-1

Landing Points: Bluefields (Nicuragua), Cancun (Mexico), Cartagena (Columbia), Cat Island (Bahamas), Crooked Island (Bahamas), Hollywood (USA), Ladyville (Belize), Maria Chiquita (Panama), Nassau (The Bahamas), Providenciales (Turks and Caicos Islands), Puerto Barrios (Guatemala), Puerto Cabezas (Nicuragua), Puerto Cortes (Honduras), Puerto Lempira (Honduras), Puerto Limon (Costa Rica), Puerto Plata (Dominican Republic), Punta Cana (Dominican Republic), Punto Fijo (Venezuela), Riohacha (Columbia), San Juan (Puerto Rico), Trojillo (Honduras), Tulum (Mexico), Ustupo (Panama), Willemstad (Netherlands Antilles) RFS Year:

2001

Est. End of Service Date: 2026 Total Length (kms): 8,700 Initial Capacity: 80 Gb/s Design Capacity: Owners:

1 Tb/s Alestra (Mexico), AT&T, Axtel (Mexico), BTC (Bahamas), BTL (Belize), CANTV (Venezuela), Codetel (Dominican Republic), Colombus Networks, Enitel (Nicaragua), Hondutel (Honduras), ICE (Costa Rica), Impsat (USA), Internexa (Colombia), Orbinet SA (Colombia), Racsa (Costa Rica), Telecarrier (Panama), Tricom (Dominican Republic), Ultracom (Puerto Rico), UTS (Curacao), Verizon

System Supplier:

Norddeutsche Seekabelwerke (Tyco Telecommunications, Partial)

Marine Surveyor:

Fugro

Upgrader:

Xtera

Upgrade Year:

2008

Upgraded Capacity: Region:

40 Gb/s Caribbean


ARCTIC FIBRE [Planned]

Ca Prudhoe Bay

S Ajigaura

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


ambridge Bay

Cork Highbridge

Seattle

System Name:

Arctic Fibre

Landing Points: Ajigaura (Japan), Shemya (United States), Nome (United States), Kotzebue (United States), Point Hope (United States), Wainwright (United States), Barrow (United States), Prudhoe Bay (United States), Cambridge Bay (Canada), Gjoa Haven (Canada), Cape Dorset (Canada), Hall Beach (Canada), Igloolik (Canada), Iqaluit (Canada), Cork (Ireland), Seattle (United States), Highbridge (United Kingdom) RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):

800,000,000

Total Length (kms): Initial Capacity: Owners: System Supplier: Region:

18,000 100 Gb/s Arctic Fibre Inc. TE SubCom Polar, Atlantic, Pacific


.com

Telecoms consulting of submarine cable systems for regional and trans-oceanic applications


ARIANE 2

M a r s e i l l e


System Name:

Ariane 2

Landing Points: Chania (Greece), Marseille (France) RFS Year:

1995

Est. End of Service Date:

2020

Est. System Cost (US$):

70,000,000

Total Length (kms): Initial Capacity: Owners:

2,370 1.12 Gb/s AT&T, Belgacom, Cypress Telecommunications Authority, France Telecom, OTE, Verizon

System Supplier:

Alcatel Submarine Networks

System Installer:

FCR

Cableship: Region:

Vercors Mediterranean

C h a n i a


ASC [Planned]

S i n g a p o r e

P e r t h


System Name:

ASC (Australia-Singapore Cable)

Landing Points: Perth (Australia), Singapore (Singapore) RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):

160,000,000

Total Length (kms):

4,800

Design Capacity:

36 Tb/s

Fiber Information:

3 Fiber Pairs (120 x 100G wavelengths per fibre pair)

Owners: System Supplier: Region:

Australia-Singapore Cable International Limited Alcatel-Lucent Submarine Networks Pacific

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


ASE

Hong Kong

Philippines

Malaysia Singapore


Japan

System Name:

Asia Submarine-cable Express (ASE)

Landing Points: Japan, Philippines, Hong Kong, Malaysia, Singapore RFS Year:

2013

Est. End of Service Date:

2038

Est. System Cost (US$):

412,000,000

Total Length (kms):

7,200

Design Capacity:

15 Tb/s

Fiber Information:

6 Fiber Pairs

Owners: System Supplier: Region:

NTT Communications (Japan), PLDT (Philippines), StarHub (Singapore), Telekom Malaysia Fujitsu Limited, NEC Corporation Pacific


ASH Keawaula

Pago Pago


System Name:

ASH

Landing Points: Keawaula (Hawaii), Pago Pago (American Samoa) RFS Year:

2009

Est. End of Service Date:

2034

Total Length (kms):

4,680

Initial Capacity: Fiber Information: Owners: System Supplier:

1.2 Gb/s 2 Fiber Pairs ASH Cable Company Alcatel-Lucent Submarine Networks

Cableship:

Ile de Ré

Region:

Pacific


ATHENA

K o r o p i


System Name:

Athena

Landing Points: Koropi (Greece), Pentaskhinos (Cyprus) RFS Year:

2011

Est. End of Service Date:

2036

Total Length (kms):

600

Owners:

Cypress Telecommunications Authority, Telecom Italia Sparkle

Region:

Mediterranean

P e n t a s k h i n o s


ATLANTIS-2 Lisbon

Con

Funchal El Medano

Praia

Fortaleza

Rio de Janeiro

Las Toninas

Dakar


nil

System Name:

Atlantis-2

Landing Points: Conil (Spain), Dakar (Senegal), El Medano (Spain), Fortaleza (Brazil), Funchal (Portugal), Las Toninas (Argentina), Lisbon (Portugal), Praia (Cape Verde), Rio de Janeiro (Brazil) RFS Year:

2000

Est. End of Service Date:

2025

Est. System Cost (US$):

370,000,000

Total Length (kms):

13,100

Initial Capacity:

40 Gb/s

Design Capacity:

160 Gb/s

Fiber Information:

2 Fiber Pairs, Inital: 2 wavelengths, Design: 8 wavelengths

Owners:

Cabo Verde Telecom, Deutsche Telekom AG, Embratel, France Telecom, Marconi, Sonatel, Telecom Argentina, Telecom Italia, Telefonica, Telefonica de Argentina, Telintar, Verizon

System Supplier:

Alcatel Submarine Networks, Pirelli, Fujitsu

System Installer:

FCR

Cableship: Region:

Raymond Croze, Fresnel, Vercors, Teneo, Teliri, Maersk Defender Atlantic


ATLAS OFFSHORE

System Name:

Atlas Offshore

Landing Points: Asilah (Morocco), Marseille (France) RFS Year:

2007

Est. End of Service Date:

2032

Est. System Cost (US$):

31,000,000

Total Length (kms):

1,634

Initial Capacity:

40 Gb/s

Design Capacity:

320 Gb/s

Owners:

Maroc Telecom of Morocco

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent

Region:

Mediterranean

A s i l a h


M a r s e i l l e


AUSTRAL [Planned]

Puerto Montt

Punta Arenas


System Name:

Austral

Landing Points: Puerto Montt (Chile), Punta Arenas (Chile) RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):

100,000,000

Total Length (kms): Owners: System Supplier: Region:

1,800 AUSTRAL University of Magellan, Magellan CPC Huawei Marine Networks Pacific

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


BAHAMAS-2

V e r o B e a c h

E


System Name:

Bahamas-2

Landing Points: Eight Mile Rock (Bahamas), Nassau (The Bahamas), Vero Beach (USA) RFS Year:

1997

Est. End of Service Date:

2022

Total Length (kms):

478

Initial Capacity: Owners:

2.5 Gb/s AT&T, Balteco, Verizon

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

Marine Surveyor:

C&C Technologies

Region:

Caribbean

E i g h t M i l e R o c k

N a s s a u


BALTICA

Y s

G e d s e r


System Name:

Baltica

Landing Points: Dueodde (Bornholm), Gedser (Denmark), Kolobrzeg (Poland), Ystad (Sweden) RFS Year:

1997

Est. End of Service Date:

2022

Est. System Cost (US$):

16,000,000

Total Length (kms): Initial Capacity: Fiber Information:

437 5 Gb/s 6 Fiber Pairs

Owners:

Polish Telecom, TDC, Telecom Finland, Telenor, Teliasonera

Region:

Baltic

s t a d D u e o d d e

K o l o b r z e g


BAR-SAV

System Name:

BAR-SAV

Landing Points: Barcelona (Spain), Savona (Italy) RFS Year:

1996

Est. End of Service Date:

2021

Est. System Cost (US$):

39,000,000

Total Length (kms): Initial Capacity: Owners: System Supplier: Region:

760 5 Gb/s Telecom Italia, Telefonica Alcatel Submarine Networks Mediterranean

B a r c e l o n a


S a v o n a


BASS STRAIT 1

S a n d y P o i n t

B o a t H a r b o u r


System Name:

Bass Strait 1

Landing Points: Boat Harbour (Tasmania), Sandy Point (Australia) RFS Year:

1995

Est. End of Service Date:

2020

Est. System Cost (US$):

22,500,000

Total Length (kms):

241

Initial Capacity:

622 Mb/s

Design Capacity:

2.5 Gb/s

Owners: System Supplier: Region:

Telstra (Australia) Alcatel Submarine Networks Pacific


BASS STRAIT 2

I n v e r l o c h

S t a n l e y


System Name:

Bass Strait 2

Landing Points: Inverloch (Australia), Stanley (Tasmania, Australia) RFS Year:

2003

Est. End of Service Date:

2028

Est. System Cost (US$):

17,000,000

Total Length (kms): Initial Capacity: Owners:

240 10 Gb/s Telstra (Australia)

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Cableship: Region:

Ile de Batz Pacific


BBG [Planned]

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


System Name:

BBG (Bay of Bengal Gateway)

Landing Points: Sri Lanka, Singapore, Oman, UAE RFS Year:

2014

Est. End of Service Date:

2039

Est. System Cost (US$):

30,000,000

Total Length (kms):

8,000

Initial Capacity:

100 Gb/s

Design Capacity:

30 Tb/s

Fiber Information:

3 Fiber Pairs, 10 Tb/s per pair

Owners:

Bay of Bengal Consortium

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region:

Indian Ocean


BCS EAST

Liepaja Sventoji


System Name:

BCS East

Landing Points: Liepaja (Latvia), Sventoji (Lithuania) RFS Year:

1997

Est. End of Service Date:

2022

Total Length (kms): Initial Capacity:

98 2.5 Gb/s

Owners:

Teliasonera

Region:

Baltic


BCS EAST-WEST INTERLINK

Sandviken

Sventoji


System Name:

BCS East-West Interlink

Landing Points: Sandviken (Sweden), Sventoji (Lithuania) RFS Year:

1997

Est. End of Service Date:

2022

Total Length (kms):

218

Initial Capacity: Owners:

2.5 Gb/s Teliasonera

System Supplier:

Ericsson

System Installer:

AKN

Cableship:

Pleijel

Region:

Baltic


BCS NORTH

Mariehamn Haraldsholm Hango Stavsnas


o

Kotka

Helsingfors

Logi

System Name:

BCS North

Landing Points: Hango (Finland), Haraldsholm (Finland), Helsingfors (Finland), Kotka (Finland), Mariehamn (Finland), Stavsnas (Sweden) RFS Year:

1998, 2003

Est. End of Service Date:

2023

Total Length (kms):

793

Initial Capacity: Owners:

10 Gb/s Rostelecom, Teliasonera

System Supplier:

Ericsson

System Installer:

AKN

Cableship:

Pleijel

Region:

Baltic


BDM

M e l a k a D u m a i


System Name:

BDM

Landing Points: Batam (Indonesia), Dumai (Indonesia), Melaka (Malaysia) RFS Year:

2011

Est. End of Service Date:

2036

Est. System Cost (US$):

76,000,000

Total Length (kms):

400

Initial Capacity:

80 Gb/s

Design Capacity:

1.28 Tb/s

Fiber Information:

2 Fiber Pairs

Owners:

PT Mora Telematika, PT XL Axiata, Telekom Malaysia

System Supplier:

Huawei Marine Networks

System Installer:

Huawei Marine Networks

Region:

a

B a t a m

Pacific


BERYTAR

B e i r


System Name:

Berytar

Landing Points: Beirut (Lebanon), Tartus (Syria) RFS Year:

1997

Est. End of Service Date:

2022

Est. System Cost (US$):

10,000,000

Total Length (kms): Initial Capacity:

5 Gb/s

Design Capacity:

5 Gb/s

Owners:

Alcatel Submarine Networks

System Installer:

FCR

Region:

r u t

Telecom Egypt (6.25%), Lebanese Ministry of Telecom (46.875%), Syrian Telecom (46.875%)

System Supplier: Cableship:

T a r t u s

134

Vercors Mediterranean


BHARAT-LANKA

T u t i c o r i n


System Name:

Bharat-Lanka

Landing Points: Dehiwala-Mount Lavinia (Sri Lanka), Tuticorin (India) RFS Year:

2007

Est. End of Service Date:

2032

Est. System Cost (US$):

40,000,000

Total Length (kms):

338

Initial Capacity:

40 Gb/s

Design Capacity:

960 gb/s

Owners:

BSNL, Sri Lanka Telecom Limited (SLT), Sri Lanka

System Supplier:

NEC

System Installer:

NEC

Region:

D e h i w a l a - M o u n t L a v i n i a

Indian Ocean


BICS

B o c a R a t o n

System Name:

C H R i d i n g P o i n F r e e

BICS

Landing Points: Boca Raton (USA), Crown Haven (Bahamas), Freeport (Bahamas), Marsh Harbour (Bahamas), Nassau (The Bahamas), Riding Point (Bahamas), Rock Sound (Bahamas), Sandy Point (Bahamas), Upper Bogue (Bahamas) RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$):

31,000,000

Total Length (kms):

1,000

Initial Capacity:

10 Gb/s

Design Capacity:

12 Tb/s

Owners:

Caribbean Crossings

Region:

Caribbean


C r o w n H a v e n n t e p o r t

M a r s h H a r b o u r S a n d y P o i n t U p p e r B o g u e

N a s s a u

R o c k S o u n d


BIMP-EAGA [Planned]

Malaysia Brunei

Indonesia


Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation

Guam

Commissioning & Acceptance

Philippines

Yap

System Name:

Palau

BIMP-EAGA (Brunei Darussalam-Indonesia-MalaysiaThe Philippines East Asian Growth Area)

Landing Points: Brunei, Indonesia, Malaysia, Philippines, Palau, Yap, Guam RFS Year:

2016

Est. End of Service Date:

2042

Est. System Cost (US$):

150,000,000

Owners:

EATriLink (Philippines), Scomm (Malaysia), BIG (Brunei)

Region:

Pacific


BIN


System Name:

BIN

Landing Points: Bari (Italy), Durres (Albania) RFS Year:

2011

Est. End of Service Date:

2036

Est. System Cost (US$):

21,636,744

Total Length (kms): Initial Capacity:

B a r i

276 40 Gb/s

Owners:

Unifi

Region:

Mediterranean

D u r r e s


BIOS / JONAH

B a r i


System Name:

BIOS / Jonah

Landing Points: Bari (Italy), Tel Aviv (Israel) RFS Year:

2011

Est. End of Service Date:

2036

Total Length (kms):

2,300

Owners: System Supplier: Region:

Bezeq International Alcatel-Lucent Submarine Networks Mediterranean

T e l A v i v


BLAST [Planned] Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance

A

Tutuila


System Name:

BLAST (Broadband Linking the American Samoa Territory)

Landing Points: Fogagogo, Tu’tuila (American Samoa), Ofu Harbor, Ofu (American Samoa), Luma, Ta’u (American Samoa), Aunu’u Warf, Aunu’u (American Samoa) RFS Year:

2014

Est. End of Service Date:

2040

Est. System Cost (US$):

11,000,000

Aunu'u

Total Length (kms): Owners:

250 ASTCA (American Samoa)

System Supplier:

IT International Telecom

Marine Surveyor:

IT International Telecom

Region:

Pacific

Ofu Luma


BOTNIA

U m e a


System Name:

Botnia

Landing Points: Umea (Sweden), Vaasa (Finland) RFS Year:

1994

Est. End of Service Date:

2019

Est. System Cost (US$):

8,500,000

Total Length (kms): Initial Capacity:

77 1.2 Gb/s

Fiber Information:

6 Fiber Pairs

Owners:

Teliasonera

System Supplier:

NKT

System Installer:

AKN

Cableship:

Pleijel

Region:

Baltic

V a a s a


BRAZIL - US [Planned]

United States

Colombia

Fortaleza

Rio de Janeiro Sao Paulo Maldonado


Europe

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance

Luanda

System Name:

Brazil - US

Landing Points: Colombia, Europe, Fortaleza (Brazil), Luanda (Angola), Rio de Janeiro (Brazil), Sao Paulo (Brazil), Maldonado (Uruguay) RFS Year:

2015

Est. End of Service Date:

2039

Est. System Cost (US$):

1,130,000,000

Total Length (kms):

24,000

Owners:

Telebras

Region:

Atlantic


BRAZIL-EU [Planned]

Brazil

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


EU

System Name:

Brazil-EU

Landing Points: Unannounced RFS Year:

2016

Est. End of Service Date:

2041

Est. System Cost (US$):

185,000,000

Owners:

Telebras, IslaLink

Region:

Atlantic


BRCS

B a t a m


System Name:

BRCS

Landing Points: Batam (Indonesia), Sungai Rengit (Malaysia) RFS Year:

2007

Est. End of Service Date:

2032

Est. System Cost (US$):

10,000,000

Total Length (kms):

63

Initial Capacity:

10 Gb/s

Owners:

Excelcom

Region:

Pacific

S u n g a i R e n g i t


BRICS CABLE [Planned]

M i a m i

F o r t a l e z a

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance

C a T o


a p e o w n

System Name:

BRICS Cable

Landing Points: Miami (US), Fortaleza (Brazil), Cape Town (South Africa), Mauritius (Mauritius), Chennai (India), Singapore (Singapore), Shantou (China), Vladivostok (Russia) RFS Year:

2015

Est. End of Service Date:

2039

Est. System Cost (US$):

1,330,000,000

Total Length (kms):

34,000

Design Capacity:

12.8 Tb/s

Fiber Information:

2 Fiber Pairs

Owners:

Imphandze Subtel Services

Region:

Atlantic, Indian Ocean, Pacific

V l a d i v o s t o k

S h a n t o u C h e n n a i S i n g a p o r e

M a u r i t i u s


BSCS

C h a n g i


System Name:

BSCS

Landing Points: Batam (Indonesia), Changi (Singapore) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

13,100,000

Total Length (kms): Initial Capacity: Fiber Information: Owners:

80 Gb/s 3 Fiber Pairs Telekom Indonesia

System Supplier:

Ocean Cable Company

System Installer:

Stena Offshore

Cableship: Region:

B a t a m

73

Northern Installer Pacific


BSFOCS

O d e s a

V a r n a


N o v o r o s s i y s k

System Name:

BSFOCS

Landing Points: Novorossiysk (Russia), Odesa (Ukraine), Varna (Bulgaria) RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$):

51,000,000

Total Length (kms): Initial Capacity: Fiber Information:

933 2.5 Gb/s 2 Fiber Pairs

Owners:

Armentel, AT&T, BTC, Cypress Telecommunications Authority, DTAG, HT, KDDI, OTE, Rostelecom, Telecom Slovenia, Ukrtelecom

System Supplier:

Alcatel Submarine Networks, Tyco Telecommunications SSI

System Installer:

Global Marine Systems Limited

Cableship: Region:

Maersk Fighter Black Sea


C-BUS System Name:

C-BUS

Landing Points: Manasquan (USA), Tortola (British Virgin Islands) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

10,000,000

Total Length (kms):

1,609

Owners:

LIME

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

Upgrader:

Xtera

Region:

Atlantic


Manasquan

Tortola


C-J FOSC

N a n h u i


System Name:

C-J FOSC

Landing Points: Miyazaki (Japan), Nanhui District (China) RFS Year:

1993

Est. End of Service Date:

2018

Est. System Cost (US$):

70,300,000

Total Length (kms): Design Capacity:

1,252 560 Mb/s

Owners:

China Telecom, KDDI

Region:

Pacific

M i y a z a k i


CABLE OF THE AMERICAS [Planned]

Maimi

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


System Name:

Cable of the Americas

Landing Points: Forteleza (Brazil), Miami (USA) RFS Year:

2016

Est. End of Service Date:

2041

Fiber Information:

2 Fiber Pairs

Owners:

Angola Cable

Region:

Atlantic

Fortaleza


CADMOS

P e n t a s k h i n o s


System Name:

Cadmos

Landing Points: Beirut (Lebanon), Pentaskhinos (Cyprus) RFS Year:

1995

Est. End of Service Date:

2020

Est. System Cost (US$):

8,000,000

Total Length (kms):

262

Design Capacity:

622 Mb/s

Fiber Information:

2 Fiber Pairs

Owners: System Supplier: Region:

B e i r u t

Cyprus Telecommunications Authority (62%), Lebanese Ministry of Telecommunications (38%) Tyco Telecommunications Mediterranean


CANALINK System Name:

Canalink

Landing Points: Cadiz (Spain), Tenerife (Spain) RFS Year:

2011

Est. End of Service Date:

2036

Est. System Cost (US$):

156,788,000

Total Length (kms):

2,000

Design Capacity:

5.12 Tb/s

Fiber Information:

2 Fiber Pairs, 128 wavelengths, 10 Gb/s per wavelength

Owners:

Isalink, IT3

System Supplier:

Alcatel-Lucent

Marine Surveyor:

Fugro

Region:

Atlantic

T e n e r i f e


C a d i z


CANUS-1

M a n a s q u a n


P e n n a n t P o i n t

System Name:

CANUS-1

Landing Points: Manasquan (USA), Pennant Point (Canada) RFS Year:

1995

Est. End of Service Date:

2020

Est. System Cost (US$):

400,000,000

Total Length (kms): Initial Capacity: Fiber Information: Owners:

1,360 2.5 Gb/s 2.5Gb/s per Fiber pair Optel, Tata Communications

System Supplier:

Tyco Telecommunications

System Installer:

Teleglobe

Region:

Atlantic


CARAC

System Name:

CARAC

Landing Points: Bermuda (Bermuda), Tortola (British Virgin Islands) RFS Year:

1989

Est. End of Service Date:

2014

Est. System Cost (US$):

115,000,000

Total Length (kms): Initial Capacity: Owners:

1,700 420 Mb/s Cable & Wireless

System Supplier:

Standard Telephones & Cables Ltd

System Installer:

C&W (Marine)

Cableship:

Mercury

Region:

Caribbean


Bermuda

Tortola


CAUCASUS CABLE SYSTEM

V a r n a

System Name:

Caucasus Cable System

Landing Points: Poti (Georgia), Varna (Bulgaria) RFS Year:

2008

Est. End of Service Date:

2033

Est. System Cost (US$):

76,000,000

Total Length (kms):

1,187

Design Capacity:

1.2Tb/s

Fiber Information:

2 Fiber Pairs

Owners: System Supplier: Region:

Caucasus Online Tyco Telecommunications Black Sea


P o t i


CB-1

Charlestown

Bermuda


System Name:

CB-1

Landing Points: Bermuda (Bermuda), Charleston, RI (USA) RFS Year:

2009

Est. End of Service Date:

2034

Total Length (kms):

1,448

Initial Capacity:

20 Gb/s

Design Capacity:

320 Gb/s

Owners: System Supplier: Region:

Cable Company Ltd, Verizon Alcatel-Lucent Submarine Networks Atlantic


CELTIX CONNECT

D u b l i n


System Name:

Celtix Connect

Landing Points: Dublin (Ireland), Holyhead (UK) RFS Year:

2011

Est. End of Service Date:

2035

Est. System Cost (US$):

21,900,000

Total Length (kms): Initial Capacity: Fiber Information: Owners:

131 960 Gb/s 72 Fiber pairs Sea Fibre Networks

System Supplier:

Alcatel Submarine Networks

System Installer:

Global Marine Systems Limited

Region:

H o l y h e a d

Atlantic


CFX-1

System Name:

CFX-1

Landing Points: Boca Raton (USA), Cartagena (Columbia), Morant Point (Jamaica) RFS Year:

2008

Est. End of Service Date:

2033

Total Length (kms):

2,439

Initial Capacity:

110 Gb/s

Design Capacity:

2 Tb/s

Fiber Information:

2.5 Tb/s per fiber pair

Owners:

Columbus Networks

System Supplier: Upgrader: Upgrade Year: Upgraded Capacity: Region:

Tyco Telecommunications Telecommunications TE SubCom 2011 40G, 2.5 Tb/s per fiber pair Caribbean


Boca Raton

Morant Point

Cartagena


CHINA - US

F a n

g s

h a

n

P u s a n C h i k u r a C h o n g m i n g O k i n a w a S h a n t o u T a n g u i s s o n


B a n d o n S a n L u i s O b i s p o

System Name:

China - US

Landing Points: Bandon (USA), Chikura (Japan), Chongming (China), Fangshan (Taiwan), Okinawa Prefecture (Japan), Pusan (South Korea), San Luis Obispo (USA), Shantou (China), Tanguisson (Guam) RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$):

1,100,000,000

Total Length (kms):

30,444

Design Capacity:

80 Gb/s

Fiber Information:

4 Fiber pairs, 8x2.488 Gbps (STM-16) SDH over DWDM

Owners:

China-US Consortium (KDD (Japan), NTT Worldwide Network (Japan), AT&T (USA), MCI Communications (USA), Sprint (USA), Teleglobe USA (USA), SBC Communications (USA), China Telecom (China), HongKong Telecom (Hong Kong), Chunghwa Telecom (Taiwan), Korea Telecom (Korea), Singapore Telecom (Singapore), Telekom Malaysia (Malaysia), Telstra (Australia))

System Supplier: Cableship: Marine Surveyor: Region:

Alcatel Submarine Networks, Ocean Cable Co, Tyco Telecommunications Flexservice III, Kuroshio Maru, Cable Innovator C&C Technologies Pacific


CIOS

Ayia Napa

N


System Name:

CIOS

Landing Points: Ayia Napa (Cyprus), Nahariya (Israel) RFS Year:

1994

Est. End of Service Date:

2018

Est. System Cost (US$):

16,000,000

Total Length (kms):

262

Design Capacity:

622 Mb/s

Fiber Information:

(1+1)x 622 Mbit/s (Repeaterless)

Nahariya Nahariya

Owners:

Bezeq, Cypress Telecommunications Authority

Region:

Mediterranean


CIRCE NORTH

L o w e s t o f t

P e v e n s e y B a y C a y e u x - s u r - M e r


System Name:

Circe North

Landing Points: Lowestoft (United Kingdom), Zandvoort (Netherlands) RFS Year:

1999

Est. End of Service Date:

2024

Est. System Cost (US$):

24,000,000

Total Length (kms): Initial Capacity: Fiber Information: Owners: System Supplier: Region:

203 10 Gb/s 48 Fiber Pairs Viatel Alcatel Submarine Networks Atlantic

Z a n d v o o r t


CIRCE SOUTH

L o w e s t o f t

P e v e n s e y B a y C a y e u x - s u r - M e r


System Name:

Circe South

Landing Points: Cayeux-sur-Mer (France), Pevensey Bay (UK) RFS Year:

1999

Est. End of Service Date:

2024

Est. System Cost (US$):

24,000,000

Total Length (kms): Initial Capacity: Fiber Information: Owners: System Supplier: Region:

115 10 Gb/s 48 Fiber Pairs Viatel Alcatel Submarine Networks Atlantic

Z a n d v o o r t


CJFS

H a l f - M o o n B a y


System Name:

CJFS

Landing Points: Half-Moon Bay (Cayman Islands), Montego Bay (Jamaica) RFS Year:

1997

Est. End of Service Date:

2022

Est. System Cost (US$):

6,500,000

Total Length (kms): Initial Capacity:

870 2.5 Gb/s

Owners:

LIME

Region:

Caribbean

M o n t e g o B a y


COLUMBUS II

W e s t P a l m B e a c h C a n c u n

M a g e n s B a y


o r m P a l e F u n c h a l S a r d i n i a

System Name:

Columbus II

Landing Points: Cancun (Mexico), Funchal (Portugal), Magens Bay (Virgin Islands), Palermo (Italy), Sardinia (Gran Canaria), West Palm Beach (USA) RFS Year:

1994

Est. End of Service Date:

2019

Est. System Cost (US$):

600,000,000

Total Length (kms):

12,165

Initial Capacity:

560 Mb/s

Design Capacity:

2.5 Gb/s

Owners: System Supplier:

Columbus II Consortium Alcatel Submarine Networks, Tyco Telecommunications SSI, Pirelli

Upgrader:

Xtera

Upgrade Year:

2012

Upgraded Capacity: Region:

100 Gb/s Atlantic, Caribbean, Mediterranean


d

w o o

l y

o l

H COLUMBUS III


System Name:

M a z a r a

L i s b o n C o n i l

P o n t a D e l g a d a

Columbus III

Landing Points: Conil (Spain), Hollywood (USA), Lisbon (Portugal), Mazara (Italy), Ponta Delgada (Portugal) RFS Year:

1999

Est. End of Service Date:

2024

Est. System Cost (US$):

236,000,000

Total Length (kms):

9,833

Initial Capacity:

40 Gb/s

Design Capacity:

160 Gb/s

Fiber Information:

2 Fiber Pairs

Owners: System Supplier:

Columbus III Consortium Alcatel Submarine Networks, Pirelli, Tyco Telecommunications

Cableship:

Vercors, Skandi Hav

Upgrader:

Xtera

Upgrade Year:

2012

Upgraded Capacity: Region:

100 Gb/s Atlantic, Caribbean, Mediterranean


CONCERTO-1

T h o r p e n e s s

B r u


u g e s

System Name:

Concerto-1

Landing Points: Bruges (Belguim), Thorpeness (United Kingdom), Zandvoort (Netherlands) RFS Year:

1999

Est. End of Service Date:

2024

Total Length (kms):

574

Initial Capacity: Fiber Information: Owners:

2.5 Gb/s 96 Fiber Pairs Flute

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Region:

Atlantic

Z a n d v o o r t


CORFU-BAR

B a r

C o r f u


u

System Name:

Corfu-Bar

Landing Points: Bar (Montenegro), Corfu (Greece) RFS Year:

1998

Est. End of Service Date:

2023

Est. System Cost (US$):

19,000,000

Total Length (kms):

320

Initial Capacity:

622 Mb/s

Fiber Information:

3 Fiber Pairs

Owners:

Crngorski Telecom, OTE

Region:

Mediterranean


CORSAR

A j a


System Name:

Corsar

Landing Points: Aranci (Italy), Ajaccio (France) RFS Year:

1992

Est. End of Service Date:

2017

Est. System Cost (US$):

11,000,000

Total Length (kms): Initial Capacity:

168 3 Gb/s

Owners:

France Telecom, Telecom Italia

System Supplier:

Alcatel Submarine Networks

Region:

a c c i o

A r a n c i

Mediterranean


DANICA NORTH

T u b o r g


System Name:

Danica North

Landing Points: Barseback (Sweden), Tuborg (Denmark) RFS Year:

1998

Est. End of Service Date:

2023

Total Length (kms): Initial Capacity: Fiber Information: Owners:

25 10 Gb/s 96 Fiber Pairs Teliasonera

System Supplier:

Ericsson

System Installer:

AKN

Cableship:

Pleijel

Upgrader:

Ciena

Upgrade Year:

2013

Upgraded Capacity: Region:

B a r s e b a c k

40 Gb/s Baltic


DANICA SOUTH

C o p e n h a g e n


System Name:

Danica South

Landing Points: Bjarred (Sweden), Copenhagen (Denmark) RFS Year:

1998

Est. End of Service Date:

2023

Total Length (kms): Initial Capacity: Fiber Information: Owners:

20 10 Gb/s 24 Fiber Pairs Teliasonera

System Supplier:

Ericsson

System Installer:

AKN

Cableship:

Pleijel

Upgrader:

Ciena

Upgrade Year:

2013

Upgraded Capacity: Region:

B j a r r e d

40 Gb/s Baltic


DANICE

L a n d e y j a r s a n d u r

System Name:

Danice

Landing Points: Blaabjerg (Denmark), Landeyjarsandur (Iceland) RFS Year:

2008

Est. End of Service Date:

2033

Est. System Cost (US$):

76,000,000

Total Length (kms):

2,291

Initial Capacity:

1000 Gb/s

Design Capacity:

5.1 Tb/s

Fiber Information:

4 Fiber Pairs

Owners: System Supplier:

Farice Ltd. Tyco Telecommunications

Upgrader:

Ciena

Upgrade Year:

2013

Upgraded Capacity:

100 Gb/s

Region:

Atlantic


B l a a b j e r g


DDSCN

Hulhumalé


Colombo

System Name:

DDSCN

Landing Points: Colombo (Sri Lanka), Hulhumale (Maldives) RFS Year:

2012

Est. End of Service Date:

2031

Est. System Cost (US$):

27,000,000

Total Length (kms): Owners: System Supplier: Region:

1,000 Dhiraagu NEC Indian Ocean


DENMARK - GERMANY 2

G e d s e r


System Name:

Denmark - Germany 2

Landing Points: Gedser (Denmark), Ribnitz-Damgarten (Germany) RFS Year:

1993

Est. End of Service Date:

2016

Est. System Cost (US$):

7,600,000

Total Length (kms): Initial Capacity: Fiber Information: Owners: System Installer: Region:

45 2.5 Gb/s 8 Fiber Pairs Deutsche Telekom AG, TDC Tele Danmark Baltic

R i b n i t z - D a m g a r t e n


DENMARK - NORWAY 5

Ardendal


System Name:

Denmark- Norway 5

Landing Points: Ardendal (Norway), Hjrorring (Denmark) RFS Year:

1992

Est. End of Service Date:

2017

Est. System Cost (US$):

9,560,000

Total Length (kms): Initial Capacity:

Hjorring

123 2 Gb/s

Owners:

Norway PTT, TDC

Region:

Baltic


DENMARK - NORWAY 6

Kristiansand

Thisted


System Name:

Denmark - Norway 6

Landing Points: Kristiansand (Norway), Thisted (Denmark) RFS Year:

1992

Est. End of Service Date:

2017

Est. System Cost (US$):

8,950,000

Total Length (kms): Initial Capacity:

124 1.5 Gb/s

Owners:

Norway PTT, TDC

Region:

Baltic


DENMARK - POLAND 2

G e d e b a k O


System Name:

Denmark - Poland 2

Landing Points: Gedebak Odde (Denmark), Mielno (Poland) RFS Year:

1991

Est. End of Service Date:

2016

Est. System Cost (US$):

4,500,000

Total Length (kms): Initial Capacity:

O d d e

M i e l n o

110 2.5 Gb/s

Owners:

Polish Telecom, TDC

Region:

Baltic


DENMARK - RUSSIA

C o p e n h a g e n


K i n g i s e p p

System Name:

Denmark- Russia

Landing Points: Copenhagen (Denmark), Kingisepp (Russia) RFS Year:

1993

Est. End of Service Date:

2018

Est. System Cost (US$):

88,000,000

Total Length (kms): Initial Capacity:

1,250 280 Mb/s

Owners:

TDC

Region:

Baltic


DIDON

Mazara del Vallo

Kelibia


System Name:

Didon

Landing Points: Kélibia (Tunisia), Mazara del Vallo, Sicily (Italy) RFS Year:

2014

Est. End of Service Date:

2039

Total Length (kms):

173

Fiber Information:

100G

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region:

Mediterranean


DMCS

D u m a i

System Name:

DMCS

Landing Points: Dumai (Indonesia), Melaka (Malaysia) RFS Year:

2005

Est. End of Service Date:

2030

Total Length (kms):

150

Initial Capacity:

20 Gb/s

Design Capacity:

320 Gb/s

Owners: System Supplier: Region:

PT Telekom, Telekom Malaysia NEC Indian Ocean

M


M e l a k a


EAC - C2C Taean

Pus

Nanhui

O ah ok Kw K ng om eu H Ts ung Ch

Tanshui

Pali Fangshan

Capepisa Nasugbu Vung Tau

Changi


san

Ajigaura Chikura Shima

System Name:

EAC - C2C

Landing Points: Capepisa (Philippines), Changi (Singapore), Chikura (Japan), Chung Hom Kok (Hong Kong), Fangshan (Taiwan), Nanhui District (China), Nasugbu (Philippines), Pali (Taiwan), Pusan (South Korea), Shima (Japan), Singapore (Singapore), Taean (South Korea), Tanshui (Taiwan), Tseung Kwan O (Hong Kong), Vung Tau (Vietnam) RFS Year:

2009

Est. End of Service Date:

2034

Total Length (kms):

35,429

Design Capacity:

30 Tb/s

Owners:

PACNET

System Supplier:

NEC

Marine Surveyor:

C&C Technologies

Upgrader: Upgrade Year: Upgraded Capacity: Region:

Infinera 2013 100 Gb/s Pacific


EASSY

Port Sudan

Djibouti

Mogadishu

Mombasa Dar es Salaam

Moroni

Toliary Maputo Mtunzini


System Name:

EaSSy

Landing Points: Dar es Salaam (Tanzania), Djibouti (Republic of Djibouti), Maputo (Mozambique), Mogadishu (Somalia), Mombasa (Kenya), Moroni (Comoros), Mtunzini (South Africa), Port Sudan (Sudan), Toliary (Madagascar) RFS Year:

2010

Est. End of Service Date:

2035

Est. System Cost (US$):

263,000,000

Total Length (kms):

9,900

Initial Capacity:

30 Gb/s

Design Capacity:

4.72 Tb/s

Fiber Information:

2 Fiber Pairs

Owners:

Bharti Airtel, Botswana Telecommunications Corporation, British Telecom, Comores Telecom, Etisalat, France Telecom, Mauritius Telecom, MTN Group, Neotel, Saudi Telecom Company (STC), Saudi Arabia, SPV2, Sudan Telecom Limited, Sudatel, Tanzania Telecommunications Company Limited, WIOCC

System Supplier:

Alcatel-Lucent Submarine Networks

Upgrader:

Alcatel-Lucent Submarine Networks

Upgrade Year: Upgraded Capacity: Region:

2014 100 Gb/s Indian Ocean


EAST - WEST

S a n M o r a n t P o i n t


n t o D o m i n g o

T o r t o l a

System Name:

East - West

Landing Points: Morant Point (Jamaica), Santo Domingo (Dominican Republic), Tortola (British Virgin Islands) RFS Year:

2011

Est. End of Service Date:

2036

Est. System Cost (US$):

35,000,000

Total Length (kms):

1,700

Initial Capacity:

120 Gb/s

Design Capacity:

720 Gb/s

Upgrader: Region:

Xtera Caribbean


ECFS

Tortola

Anguilla St. Marti

Bassete D Mo

System Name:

ECFS

Landing Points: Anguilla (Anguilla), Baliff (Guadeloupe), Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Canefield (Dominica), Dickenson Bay (Antigua), Kingstown (St. Vincent), Martinique (Martinique), Montserrat (Montserrat), Port Salines (Grenada), St. Lucia (St. Lucia), St Martin (Netherlands Antilles), Tortola (British Virgin Islands), Trinidad (Trinidad) RFS Year:

1995

Est. End of Service Date:

2020

Est. System Cost (US$):

56,000,000

Total Length (kms): Initial Capacity:

1,875 2.5 Gb/s

Owners:

AT&T, BET (Barbados), C&W, France Telecom, TSTT

System Supplier:

Alcatel Submarine Networks

System Installer:

C&W (Marine)

Cableship:

Mercury

Upgrader:

Xtera Communications

Upgrade Year: Upgraded Capacity: Region:

2009, 2013 10 Gb/s, 100 Gb/s Caribbean

Kingstow


in

erre Dickenson Bay ontserrat Baliff Canefield

Martinique St. Lucia

wn

Bridgetown

Port Salines Trinidad


EE-S1

S t a v s n a s

System Name:

EE-S1

Landing Points: Kärdla (Estonia), Stavsnas (Sweden), Tallinn (Estonia) RFS Year:

1995

Est. End of Service Date:

2020

Total Length (kms):

228

Initial Capacity:

5 Gb/s

Fiber Information:

6 Fiber Pairs

Owners:

Teliasonera

Region:

Baltic


T a l l i n n K ä r d l a


EIG

Bude

Monaco Sesimbra Gibraltar Teutan

System Name:

Tripoli

EIG

Landing Points: Abu Talat (Egypt), Bude (United Kingdom), Djibouti (Republic of Djibouti), Fujairah (United Arab Emirates), Gibraltar (Gibraltar), Jeddah (Saudi Arabia), Monaco (Monaco), Mumbai (India), Muscat (Oman), Zafarana (Egypt), Sesimbra (Portugal), Tripoli (Libya) RFS Year:

2011

Est. End of Service Date:

2036

Est. System Cost (US$):

700,000,000

Total Length (kms): Initial Capacity: Owners:

15,000 3.84 Tb/s AT&T, Bharti Airtel, British Telecom, BSNL, C&W, Djibouti Telecom, Du, Gibtelecom, Libyan Post, Telecom, and Information Technology Company, MTN Group, Omantel, PT Comunicações, Saudi Telecom Company (STC), Telekom SA, Verizon

System Supplier:

Alcatel-Lucent, Tyco Telecommunications

Marine Surveyor:

Fugro, UTEC and GEMS

Region:

Atlantic, Indian Ocean, Mediterranean, Middle East


Alexandria Ras Sidr Fujairah Jeddah

Djibouti

Muscat

Mumbai


EMERALD EXPRESS [Planned]

System Name:

Emerald Express

Landing Points: Belmullet (Ireland), Brookhaven (USA), Grindavik (Iceland) RFS Year:

2015

Est. End of Service Date:

2039

Est. System Cost (US$):

150,000,000

Total Length (kms):

5,200

Design Capacity:

60 Tb/s

Fiber Information:

6 Fiber Pairs, 100 wavelengths, 100 Gb/s per wavelength

Owners: System Supplier: Region:

B r o o k h a v e n

Emerald Networks TE SubCom Atlantic


G r i n d a v i k

B e l m u l l e t

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


EMOS-1

P a l e r m o

System Name:

L e c h a i n a

EMOS-1

Landing Points: Lechaina (Greece), Marmaris (Turkey), Palermo (Italy), Tel Aviv (Israel) RFS Year:

1990

Est. End of Service Date:

2015

Est. System Cost (US$):

101,000,000

Total Length (kms): Initial Capacity: Owners:

2,880 280 Mb/s Telecom Italia

System Supplier:

Alcatel Submarine Networks

System Installer:

FCR

Cableship: Region:

Vercors Mediterranean


M a r m a r i s

T e l A v i v


ENDEAVOUR

S y d n e y


K e a w a u l a

System Name:

Endeavour

Landing Points: Keawaula (Hawaii), Sydney (Australia) RFS Year:

2008

Est. End of Service Date:

2033

Total Length (kms):

9,125

Initial Capacity: Fiber Information: Owners: Upgrader: Upgrade Year: Upgraded Capacity: Region:

80 Gb/s 2 Fiber Pairs Telstra (Australia) Infinera 2014 100 Gb/s Pacific


ESTEPONA-TETOUAN

E s t e p o n

T e u t a n


n a

System Name:

Estepona-Tetouan

Landing Points: Estepona (Spain), Tetouan (Morocco) RFS Year:

1994

Est. End of Service Date:

2019

Total Length (kms):

113

Initial Capacity:

3.7 Gb/s

Owners:

Telefonica

System Supplier:

STC Submarine Systems

System Installer:

FCR

Cableship: Region:

Vercors Mediterranean


EURAFRICA

System Name:

EurAfrica

Landing Points: Casablanca (Morocco), Funchal (Portugal), Sesimbra (Portugal), St. Hilaire (France) RFS Year:

1992

Est. End of Service Date:

2017

Est. System Cost (US$):

150,000,000

Total Length (kms): Initial Capacity: Owners:

3,100 1 Gb/s France Telecom, ONPT Morocco, PT Comunicações

System Supplier:

Alcatel Submarine Networks

System Installer:

FCR

Cableship: Region:

Vercors 1584 km., Northern Installer 1501 km. Atlantic

Funchal


St. Hilaire

Sesimbra

Casablanca


EUROPA


System Name:

Europa

Landing Points: Pentaskhinos (Cyprus), Tripoli (Lebanon) RFS Year:

2013

Est. End of Service Date:

2038

Fiber Information:

8 Fiber Pairs

Owners:

CYTA, Lebanese ministry of Telecommunications

Region:

Mediterranean


FA-1 NORTH/SOUTH

Northport Island Park


Porthcurno

System Name:

Plerin

FA-1 North/South

Landing Points: Island Park (USA), Northport (USA), Plerin (France), Porthcurno (United Kingdom) RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$):

900,000,000

Total Length (kms):

12,820

Initial Capacity:

4.68 Tb/s

Fiber Information:

6 Fiber Pairs

Owners:

Global Cloud Xchange (née Reliance Globalcom)

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Marine Surveyor:

Svitzer, SAIC

Survey Boat: Upgrader: Upgrade Year:

Vessel of Opportunity Infinera 2010, 2011

Upgraded Capacity:

10 Gb/s

Region:

Atlantic


FALCON

Aqaba

Kuwait City

Bandar Ab D Khuba as i ab

Al M -Kh Su an ob m am ar ai a sm a

Suez

Jeddah

Al Seeb

Port Sudan Al Hudaydah

System Name:

Al Ghaydah

Falcon

Landing Points: Al Ghaydah (Yemen), Al Hudaydah (Yemen), AlKhobar (Saudi Arabia), Al Seeb (Oman), Aqaba (Jordan), Bandar-E Abbas (Iran), Chabahar (Iran), Colombo (Sri Lanka), Dubai (UAE), Hulhumalé (India), Jeddah (Saudi Arabia), Kuwait City (Kuwait), Manama (Bahrain), Mumbai (India), Port Sudan (Sudan), Suez (Egypt), Sumaisma (Qatar), Trivandrum (India) RFS Year:

2006

Est. End of Service Date:

2031

Est. System Cost (US$):

900,000,000

Total Length (kms):

12,181

Initial Capacity:

90 Gb/s

Design Capacity:

2.56 Tb/s

Fiber Information:

6 Fiber Pairs

Owners:

Global Cloud Xchange (née Reliance Globalcom)

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Region:

Indian Ocean, Middle East


bbas Chabahar

Mumbai

Trivandrum Colombo Hulhumalé


FARICE-1


System Name:

Farice-1

Landing Points: Dunnet Bay (Scotland), Funningsfjørður (Faroe Islands), Seyoisfjörður (Iceland) RFS Year:

2004

Est. End of Service Date:

2029

Total Length (kms):

1,395

Initial Capacity: Owners: System Supplier: Cableship:

20 Gb/s Farice Ltd., Iceland Telecom Ltd. Pirelli Pertinacia

Marine Surveyor:

Fugro

Upgrader:

Ciena

Upgrade Year:

2013

Upgraded Capacity:

100 Gb/s

Region:

Atlantic

D u n n e t B a y


FARLAND

A l d e b u r g h


System Name:

Farland

Landing Points: Aldeburgh (United Kingdom), Domburg (Netherlands) RFS Year:

1994

Est. End of Service Date:

2019

Total Length (kms):

149

Initial Capacity: Owners: System Supplier: Region:

D o m b u r g

18 Gb/s British Telecom Tyco Telecommunications Atlantic


FASTNETCONNECT [Planned]

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


System Name:

FastnetConnect

Landing Points: Cork (Ireland), Lannion (France) RFS Year:

2015

Est. End of Service Date:

2040

Owners:

Sea Fibre Networks

Region:

Atlantic


FEHMARN BELT


System Name:

Fehmarn Belt

Landing Points: Puttgarden (Germany), Rödbyhavn (Denmark) RFS Year:

2000

Est. End of Service Date:

2025

Total Length (kms): Initial Capacity: Owners:

20 2.5 Gb/s Teliasonera

System Supplier:

Ericsson

System Installer:

Nexans

Cableship:

Pleijel

Region:

Baltic


FIBRALINK

K i

n

n g

s t o

M o n t e g o B a y

O c h o R i o s


P u e r t o P l a t a

System Name:

FibraLink

Landing Points: Kingstown (St. Vincent), Montego Bay (Jamaica), Ocho Rios (Jamaica), Puerto Plata (Dominican Republic) RFS Year:

2006

Est. End of Service Date:

2031

Total Length (kms):

2,438

Initial Capacity:

40 Gb/s

Design Capacity:

320 Gb/s per fiber pair

Fiber Information:

2 Fiber Pairs

Owners:

Colombus Networks

System Supplier:

Alcatel

System Installer:

International Telecom

Cableship:

IT Intrepid

Region:

Caribbean


FIBRE ATLANTIC [Planned]

New York

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


London Paris

System Name:

Fibre Atlantic

Landing Points: Paris (France), London (UK), New York (USA) RFS Year:

2017

Est. End of Service Date:

2042

Est. System Cost (US$):

250,000,000

Total Length (kms):

6,250

Design Capacity:

60 Tb/s

Fiber Information:

6-8 Fiber Pairs, 100 wavelengths per fiber pair, 100 Gb per wavelength

Owners:

SemanticNet BV

Region:

Atlantic


FLAG EUROPE-ASIA

Porthcurno

Said Alexandria Port Aqaba

Su

ez

Estepona

Palermo Fujairah

Jeddah

System Name:

FLAG Europe-Asia

Landing Points: Alexandria (Egypt), Aqaba (Jordan), Ben Pak Para (Thailand), Estepona (Spain), Fujairah (United Arab Emirates), Hong Kong (China), Jeddah (Saudi Arabia), Keoje (South Korea), Miura (Japan), Mumbai (India), Nanhui District (China), Ninomiya (Japan), Palermo (Italy), Penang (Malaysia), Porthcurno (United Kingdom), Satun (Thailand), Songkhla (Thailand), Suez (Egypt) RFS Year:

1997

Est. End of Service Date:

2022

Total Length (kms):

27,433

Initial Capacity:

20 Gb/s

Design Capacity:

80 Gb/s

Owners:

Global Cloud Xchange (née Reliance Globalcom)

Upgrader:

Ciena

Upgrade Year:

2012

Upgraded Capacity: Region:

100 Gb/s Atlantic, Mediterranean, Pacific


N M ino iu mi ra ya

Keoje Nanhui Hong Kong

tu

So

Sa

ng

kh

la

Mumbai

n

Penang Ban Pak Para


FLAG/REACH NORTH ASIA LOOP

T o u c h e n g T o n g F u k


P u s a n

W a d a

System Name:

Flag/Reach North Asia Loop

Landing Points: Pusan (South Korea), Tong Fuk (Hong Kong), Toucheng (Taiwan), Wada (Japan) RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$):

900,000,000

Total Length (kms): Initial Capacity: Fiber Information: Owners: Upgrader: Upgrade Year: Upgraded Capacity: Region:

9,792 80 Gb/s 6 Fiber pairs FLAG Telecom, Level 3 Communications Ciena, Infinera 2011, 2014 40 Gb/s, 100 Gb/s Pacific


FLORES - CORVO

Corvo Flores

Graciosa Faial


System Name:

Flores - Corvo

Landing Points: Flores; Corvo (Azores) RFS Year:

2013

Est. End of Service Date:

2038

Total Length (kms):

685

Initial Capacity:

10 Gb/s

Design Capacity:

.96 Tb/s

Owners: System Supplier: Region:

Viatel (Azores) Huawei Marine Networks Atlantic


FOG

K u w a i t C i t y

M a n a m a D o h a


System Name:

FOG

Landing Points: Doha (Qatar), Dubai (UAE), Kuwait City (Kuwait), Manama (Bahrain) RFS Year:

1998

Est. End of Service Date:

2023

Est. System Cost (US$):

80,000,000

Total Length (kms):

1,286

Design Capacity:

5 Gb/s per fiber pair

Fiber Information:

Upgradeable to 10 Gb/s per fiber pair

Owners:

Bahrain Telephone Co., Kuwait Ministry of Communications, Qatar Telecommunication Company, UAE Telecommunications Company

System Supplier:

Fujitsu Ltd

Region:

Middle East

D u b a i


G-P

B a t a n g a s


T a n g u i s s o n

System Name:

G-P

Landing Points: Batangas (Philippines), Tanguisson (Guam) RFS Year:

1999

Est. End of Service Date:

2024

Total Length (kms):

3,600

Initial Capacity:

52.5 Gb/s

Fiber Information:

1 Fiber Pair

Owners: System Supplier: Region:

AT&T Tyco Telecommunications Pacific


GBI

ra n fa

Landing Points: Alexandria (Egypt), Al Hidd (Bahrain), Al-Khobar (Saudi Arabia), Al Seeb (Oman), Bushehr (Iran), Doha (Qatar), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Kuwait City (Kuwait), Mazara (Italy), Mumbai (India), Zafarana (Egypt) RFS Year:

2011

Est. End of Service Date:

2036

Est. System Cost (US$): 445,000,000 Total Length (kms):

4,674

Design Capacity:

2.5 Tb/s

Fiber Information:

4 Fiber Pairs express route, 2 Fiber Pairs other landings, 128 x 10 Gb/s wavelengths per fiber pair

Owners: Gulf Bridge International System Supplier:

TE SubCom

Upgrader:

Xtera

Upgrade Year:

2012

Upgraded Capacity:

100 Gb/s

Region: Mediterranean, Middle East, Indian Ocean

ah dd

GBI

Je

System Name:

Za

Al e

xa

nd

ria

a

Mazara


i

ba

um

M

Al eb

Se

h

ira

ja

Fu

Al K Al ho H b D idd ar oh a

h

Al Fa w Bu sh eh r

Kuwait City


GCN (GLOBAL CARIBBEAN NETWORK)

System Name:

GCN (Global Caribbean Network)

Landing Points: Baie-Mahault (Guadeloupe), Baliff (Guadeloupe), Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Canefield (Dominica), Dickenson Bay (Antigua), Galisbay (St Martin), Hams Bluff (Virgin Islands), Kingstown (St. Vincent), Le Lamentin (Martinique), Macqueripe (Trinidad), Port Castries (St Lucia), Port Salines (Grenada) RFS Year:

2007

Est. End of Service Date:

2032

Est. System Cost (US$):

17,520,000

Total Length (kms): Initial Capacity: Owners: System Supplier:

1,926 1.2 Tb/s Global Caribbean Network Alcatel Submarine Networks

Upgrader:

Ciena

Upgrade Year:

2013

Upgraded Capacity: Region:

40 Gb/s Caribbean


Hams Bluff

Galisbay Gustavia

Basseterre Dickenson Bay Baie-Mahault Baliff Canefield Le Lamentin Port Castries

Kingstown Port Salines

Macqueripe

Bridgetown


GEMINI BERMUDA

Bermuda


System Name:

Gemini Bermuda

Landing Points: Manasquan, NJ (USA), Bermuda RFS Year:

2007

Est. End of Service Date:

2032

Total Length (kms):

1,500

Owners:

C&W, Verizon

Region:

Atlantic


GEORGIA-RUSSIA

N o v o r o s s i y s k


System Name:

Georgia-Russia

Landing Points: Novorossiysk (Russia), Poti (Georgia), Sochi (Russia) RFS Year:

2000

Est. End of Service Date:

2025

Total Length (kms):

280

Initial Capacity: Fiber Information:

2.5 Gb/s 4 Fiber Pairs

Owners:

DanTelco, FOPTNET, Rostelecom

Region:

Black Sea

S o c h i

P o t i


GLO-1 System Name:

GLO-1

Landing Points: Accra (Ghana), Bude (United Kingdom), Casablanca (Morocco), Dakar (Senegal), Lagos (Nigeria), Nouakchott (Mauritania), Sesimbra (Portugal), Vigo (Spain) RFS Year:

2010

Est. End of Service Date:

2034

Est. System Cost (US$):

800,000,000

Total Length (kms):

8,717

Initial Capacity:

640 Gb/s

Design Capacity:

2.5 Tb/s

Fiber Information:

2 Fiber Pairs

Owners:

Globacom Ltd.

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Cableship: Marine Surveyor: Region:

Ile de Batz, IT Intrepid Alcatel Submarine Networks Atlantic


Bude

Vigo Sesimbra Casablanca

Nouakchott Dakar

Accra

Lagos


GLOBAL NEXUS

System Name:

Global Nexus

Landing Points: Freeport (Bahamas), Halifax (Canada) RFS Year:

2013

Est. End of Service Date:

2038

Est. System Cost (US$):

115,000,000

Total Length (kms):

2,500

Initial Capacity:

40 Gb/s

Design Capacity:

100 Gb/s

Owners: System Supplier: Region:

Global Nexus Telecommunications Ltd TE SubCom Atlantic

Freeport


Halifax


GLOBENET Tuckerton

Bermuda

Boca Raton

Punta Gorda

Fortalez

Rio de Janeiro


za

System Name:

GlobeNet

Landing Points: Bermuda (Bermuda), Boca Raton (USA), Fortaleza (Brazil), Maiquetia (Venezuela), Rio de Janeiro (Brazil), Tuckerton (USA) RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$):

970,000,000

Total Length (kms):

22,690

Initial Capacity:

40 Gb/s

Design Capacity:

1.28 Tb/s

Owners:

Globenet

Upgrader:

Xtera

Upgrade Year:

2010

Upgraded Capacity: Region:

100 Gb/s Atlantic, Caribbean


GO-1

M a z a r a

S t . P a B a


System Name:

GO-1

Landing Points: Cantina (Sicily), Mazara (Italy), St George’s Bay (Malta), St Paul’s Bay (Malta) RFS Year:

1995

Est. End of Service Date:

2020

Total Length (kms):

290

Initial Capacity: Owners:

20 Gb/s GO

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Elettra

Cableship:

Teliri

Region:

C a t a n i a

. a u l ’ s S t . a y G e o r g e ’ s B a y

Mediterranean


GOKI

Incheon

Kita-Kyushu

Okinawa


System Name:

GOKI

Landing Points: Incheon (Korea), Kita-Kyushu (Japan), Okinawa Prefecture (Japan), Tumon (Guam) RFS Year:

2013

Est. End of Service Date:

2038

Total Length (kms):

4,200

Design Capacity:

80 Gb/s

Owners:

AT&T

System Supplier:

Xtera Communications

System Installer:

Kokusai Cable Ship

Region:

Tumon

Pacific


GONDWANA-1

System Name:

Gondwana-1

Landing Points: Lifou (New Caledonia), Mouli Island (New Caledonia), Noum’ea (New Caledonia), Poindimie (New Caledonia), Sydney (Australia) RFS Year:

2008

Est. End of Service Date:

2033

Est. System Cost (US$):

57,500,000

Total Length (kms): Initial Capacity: Owners:

2,152 640 Gb/s Post and Telecommunications Office of New Caledonia Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Region:

Pacific

dn

Ile de Re

Sy

Cableship:

ey

System Supplier:


Poindimie

Mouli Island Lifou

Noum’ea


GREENLAND CONNECT

N u u k

Q a q o r t o q

M i l t o n


L a n d e y j a r s a n d u r

System Name:

Greenland Connect

Landing Points: Landeyjarsandur (Iceland), Milton (Canada), Nuuk (Greenland), Qaqortoq (Greenland) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

126,000,000

Total Length (kms):

4,733

Initial Capacity:

20 Gb/s

Design Capacity:

960 Gb/s

Fiber Information:

2 Fiber Pairs

Owners:

Tele Greenland

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Cableship:

Maersk Responder, Blue Castor, Ile de Sein

Marine Surveyor:

Elettra

Region:

Atlantic


GWEN

B a r i


System Name:

GWEN

Landing Points: Bari (Italy), Corfu (Greece) RFS Year:

2004

Est. End of Service Date:

2029

Total Length (kms):

647

Fiber Information:

4 Fiber pairs

Owners:

OTE

Region:

Mediterranean

C o r f u


HANNIBAL

K e l i b i a


System Name:

Hannibal

Landing Points: Kelibia (Tunisia), Trapini (Italy) RFS Year:

2009

Est. End of Service Date:

2034

Total Length (kms):

180

Initial Capacity:

40 Gb/s

Design Capacity:

3.2 Tb/s

Owners:

Tunisie Telecom (Tunisia)

System Supplier:

Huawei Marine

System Installer:

Global Marine Systems Limited

Cableship: Region:

T r a p i n i

Sovereign Mediterranean


HANTRU-1

T u m o n

P o h n


n p e i

System Name:

Hantru-1

Landing Points: Ebeye (Kwajalein), Majuro (Marshall Islands), Pohnpei (Micronesia), Reagan Test Site (Kwajalein), Tumon (Guam) RFS Year:

2010

Est. End of Service Date:

2035

Total Length (kms):

2,908

Owners:

Hannon Armstrong

System Supplier:

TE SubCom

System Installer:

TE SubCom

Region:

Pacific

E b e y e

R e a g a n T e s t S i t e M a j u r o


HAWAIKI [Planned] Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance

Wallis Vanuatu Fiji New Caledonia Sydney

S

Norfolk Isla

Whanga


Oregon

Hawaii

Samoa American Samoa

and

arei

System Name:

Hawaiki

Landing Points: Oregon (USA), Sydney (Australia), Hawaii (USA), Norfolk Island, New Caledonia, Vanuatu, Fiji, Wallis, Samoa, American Samoa, Whangarei (New Zealand) RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$): 400,000,000 Total Length (kms): 14,000 Initial Capacity: 100 Gb/s Design Capacity: 10 Tb/s Fiber Information: Owners: System Supplier:

2 Fiber Pairs Hawaiki Cable Ltd. TE SubCom

System Installer: TE SubCom Region:

Pacific


HAWK

M a r s e i l l e


System Name:

Hawk

Landing Points: Alexandria (Egypt), Anatoliko (Cyprus), Marseille (France) RFS Year:

2011

Est. End of Service Date:

2035

Est. System Cost (US$):

249,371,314

Total Length (kms):

3,181

Initial Capacity:

100 Gb/s

Design Capacity:

2.7 Tb/s

Owners:

Global Cloud Xchange (née Reliance Globalcom)

Region:

Mediterranean

Y e r o s k i p o u

A l e x a n d r i a


n

L y n H e r r i n C o g v e

HIBERNIA ATLANTIC


D u b l i n

System Name:

S o u t h p o r t

C o l e r a i n e

Hibernia Atlantic

Landing Points: Coleraine (Ireland), Dublin (Ireland), Herring Cove (Canada), Lynn (USA), Southport (United Kingdom) RFS Year:

2001

Est. End of Service Date:

2026

Total Length (kms):

12,111

Initial Capacity: Owners:

10.16 Tb/s Columbia Ventures Corporation

System Supplier:

Tyco Telecommunications SSI

System Installer:

FCR

Cableship:

Vercors, Iberus, Nordic King, Teneo, Dock Express 20, Global Mariner, Atlantida

Upgrader:

Huawei Marine Networks

Upgrade Year:

2011

Upgraded Capacity:

100 Gb/s

Region:

Atlantic


HONOTUA

pe

et e

ua H

re a Pa

M

oo

U tu

ro a

Vaitape

hi

ne

Spencer Beach


System Name:

Honotua

Landing Points: Huahine (French Polynesia), Moorea (French Polynesia), Papeete (French Polynesia), Spencer Beach (USA), Uturoa (Raiatea, French Polynesia), Vaitape (Bora Bora, French Polynesia) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

122,000,000

Total Length (kms): Initial Capacity: Owners: System Supplier: Region:

4,634 640 Gb/s OPT French Polynesia Alcatel-Lucent Submarine Networks Pacific


HSCS

N e v e

I s h i k a r i


e l s k

System Name:

HSCS

Landing Points: Ishikari (Japan), Nevelsk (Russia) RFS Year:

2008

Est. End of Service Date:

2033

Total Length (kms):

559

Design Capacity: Owners:

640 Gb/s NTT Communications, TTK

System Supplier:

NEC

System Installer:

KDD

Cableship:

Subaru

Region:

Pacific


HUGO

P o r t h c u r n o


System Name:

Hugo

Landing Points: Guernsey (Guernsey), Lannion (France), Porthcurno (United Kingdom) RFS Year:

2006

Est. End of Service Date:

2031

Est. System Cost (US$):

11,960,000

Total Length (kms): Initial Capacity: Owners:

426 3.3 Tb/s C&W

System Supplier:

Alcatel Submarine Networks

System Installer:

Tyco SSI

Cableship: Region:

Tycom Reliance Atlantic

G u e r n s e y L a n n i o n


I-ME-WE

Marseille

Catania

Tripo Alexandria Suez


System Name:

I-ME-WE

Landing Points: Alexandria (Egypt), Catania (Italy), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Karachi (Pakistan), Marseille (France), Mumbai (India), Suez (Egypt), Tripoli (Lebanon) RFS Year:

2010

Est. End of Service Date:

2035

Total Length (kms):

13,000

Initial Capacity:

520 Gb/s

Design Capacity:

3.84 Tb/s

Owners:

System Supplier: Cableship: Marine Surveyor: Upgrader: Upgrade Year: Upgraded Capacity: Region:

Bharti Airtel, Etisalat, France Telecom, Ogero (Lebanon), PTCL (Pakistan), STC (Saudi Arabia), Tata Communications, Telecom Egypt, Telecom Italia Sparkle Alcatel-Lucent Submarine Networks Cable Innovator Fugro Mitsubishi 2012 40 Gb/s Indian Ocean, Mediterranean, Middle East

oli

Fujairah

Karachi

Jeddah Mumbai


I2I

C h e n n a i

System Name:

i2i

Landing Points: Chennai (India), Tuas (Singapore) RFS Year:

2002

Est. End of Service Date:

2027

Total Length (kms):

3,100

Initial Capacity:

160 Gb/s

Design Capacity:

84 Tb/s

Fiber Information:

8 Fiber Pairs, 105 wl, 100 Gb/s per wavelength

Owners: Marine Surveyor:

Bharti Airtel C&C Technologies

Upgrader:

Ciena

Upgrade Year:

2014

Upgraded Capacity: Region:

100 Gb/s Pacific


T u a s


ITALY - ALBANIA

System Name:

Italy - Albania

Landing Points: Bari (Italy), Durres (Albania) RFS Year:

1998

Est. End of Service Date:

2023

Total Length (kms):

236

Initial Capacity:

2.5 Gb/s

Fiber Information:

1 Fiber Pair

Owners:

Telecom Italia Sparkle

Region:

Mediterranean


Bari

Durres


ITALY - GREECE

System Name:

Italy - Greece

Landing Points: Corfu (Greece), Otranto (Italy) RFS Year:

1995

Est. End of Service Date:

2020

Total Length (kms):

161

Initial Capacity:

1.69 Gb/s

Fiber Information:

4 Fiber Pairs

Owners:

Telecom Italia

Region:

Mediterranean


Otranto Corfu


ITALY - LIBYA

M

Tri


System Name:

Landing Points: Mazara (Italy), Tripoli (Libya) RFS Year:

2000

Est. End of Service Date:

2025

Total Length (kms):

570

Mazara

ipoli

Italy - Libya

Initial Capacity:

2.5 Gb/s

Design Capacity:

40 Gb/s

Fiber Information:

2 Fiber Pairs

Owners:

Telecom Italia

Upgrade Year: Upgraded Capacity: Region:

2011 40 Gb/s Mediterranean


ITALY - MONACO

Savona Monaco


System Name:

Italy - Monaco

Landing Points: Monaco (Monaco), Savona (Italy) RFS Year:

1995

Est. End of Service Date:

2020

Total Length (kms):

162

Initial Capacity:

565 Mb/s

Fiber Information:

1 Fiber Pair

Owners:

Telecom Italia

Region:

Mediterranean


ITUR

P a l e r m o


O d e s a N o v o r o s s i y s k

I s t a n b u l

System Name:

ITUR

Landing Points: Istanbul (Turkey), Novorossiysk (Russia), Odesa (Ukraine), Palermo (Italy) RFS Year:

1996

Est. End of Service Date:

2021

Total Length (kms):

3,466

Initial Capacity: Owners:

1.6 Tb/s Telecom Italia

System Supplier:

Pirelli, AT&T SSI

System Installer:

FCR

Cableship:

Vercors, Dock Express 20

Region:

Black Sea, Mediterranean


JAKA2DELEMA

P o n t i a n a k

K e t a p a n g

P a n g k a l a n b

System Name:

JaKa2DeLeMa

Landing Points: Bandjermasin (Indonesia), Benculuk (Indonesia), Jember (Indonesia), Ketapang (Indonesia), Mataram (Indonesia), Pangkalanbun (Indonesia), Pontianak (Indonesia), Sangata (Indonesia), Toweli (Indonesia) RFS Year:

2010

Est. End of Service Date:

2035

Est. System Cost (US$):

116,000,000

Total Length (kms): Design Capacity: Owners:

1,800 490 Gb/s PT Telekomunikasi Indonesia

System Supplier:

NSW, Fujitsu

System Installer:

Fujitsu

Upgrader:

Fujitsu

Upgrade Year: Upgraded Capacity: Region:

2013 100 Gb/s Pacific


S a n g a t t a

T o w e l i

b u n B a n d j e r m a s i n

J e m b e r B e n c u l u k

M a t a r a m


JAKABARE

T u a s

B a t a m

J a k a r t a


a

System Name:

JAKABARE

Landing Points: Batam (Indonesia), Jakarta (Indonesia), Pontianak (Indonesia), Tuas (Singapore) RFS Year:

2009

Est. End of Service Date:

2034

Total Length (kms):

1,330

Initial Capacity:

160 Gb/s

Design Capacity:

1.28 Tb/s

Owners:

Indosat

System Supplier:

NEC

System Installer:

NEC

Cableship: Region:

Cable Innovator Pacific

P o n t i a n a k


JAPAN-US

i a k a a r m i b y a t a r u K i M a S h i m a


P o i n t A r e n a M o r r o B a y M a k a h a

System Name:

Japan-US

Landing Points: Kitaibaraki (Japan), Makaha (Hawaii), Maruyama (Japan), Morro Bay (USA), Point Arena (USA), Shima (Japan) RFS Year:

2001

Est. End of Service Date:

2026

Total Length (kms):

21,880

Initial Capacity:

160 Gb/s

Fiber Information:

8 Fiber Pairs

Owners:

AT&T, Japan Telecom, KDDI, MCI-WorldCom, NTTWN

System Supplier:

Alcatel Submarine Networks, Ocean Cable Company

System Installer:

Global Marine Systems Limited

Cableship:

Subaru, Cable Innovator

Upgrader:

Ciena

Upgrade Year:

2012

Upgraded Capacity: Region:

100 Gb/s Pacific


JASUKA

B a t a m

T P

J a k a r t a


T a n j u n g P a n d a n

P o n t i a n a k System Name: Jasuka Landing Points: Batam (Indonesia), Jakarta (Indonesia), Pontianak (Indonesia), Tanjung Pandan (Indonesia) RFS Year:

2006

Est. End of Service Date:

2031

Total Length (kms): 354 Initial Capacity: 20 Gb/s Design Capacity:

320 Gb/s

Owners: PT Telekom System Supplier: Nokia Siemens Networks System Installer: Nokia Siemens Networks Marine Surveyor:

Nokia Siemens Networks

Upgrader:

Nokia Siemens Networks

Upgrade Year: Upgraded Capacity: Region:

2011 40 Gb/s Pacific


JIH System Name:

JIH

Landing Points: Chikura (Japan), Fukuoka (Japan), Hamada (Japan), Ibaraki (Japan), Ishikari (Japan), Kochi (Japan), Kumihama (Japan), Matsutou (Japan), Miyazaki (Japan), Naoetsu (Japan), Niigata (Japan), Ninomiya (Japan), Okinawa Prefecture (Japan), Sendai (Japan), Shima (Japan), Toyohashi (Japan) RFS Year:

1998

Est. End of Service Date:

2023

Total Length (kms): Owners:

10,300 KDDI, Telstra (Australia)

System Supplier:

Ocean Cable Company, Hitachi Cable Ltd

System Installer:

C&W (Marine)

Cableship:

Cable Innovator, Nexus, Pacific Link, Oceanic Link

Upgrader:

Infinera

Upgrade Year: Upgraded Capacity: Region:

2013 100 Gb/s Pacific

O


Okinawa

Ishikari

Akita

M

iy az

ak

i

Sendai Niigata Naoetsu Matsutou Ibaraki Ninomiya Kumihama Chikura Hamada Toyohashi Kochi Shima Fukuoka


KAFOS

M a n g a l i a

V a r n a

I s t a n b u l


System Name:

KAFOS

Landing Points: Istanbul (Turkey), Mangalia (Romania), Varna (Bulgaria) RFS Year:

1997

Est. End of Service Date:

2022

Total Length (kms):

4,640

Initial Capacity: Owners:

1.2 Gb/s BTC, Turk Telecom

System Supplier:

Alcatel Submarine Networks

System Installer:

FCR

Cableship:

Vercors

Region:

Black Sea


KATTEGAT-1

J u t l a n d


System Name:

Kattegat-1

Landing Points: Gothenburg (Sweden), Jutland (Denmark) RFS Year:

1995

Est. End of Service Date:

2020

Total Length (kms):

180

Initial Capacity: Fiber Information:

20 Gb/s 6 Fiber Pairs

Owners:

TDC

Region:

Baltic

G o t h e n b u r g


KELTRA-2

K e l i b i a


System Name:

Keltra-2

Landing Points: Kelibia (Tunisia), Trapini (Italy) RFS Year:

2007

Est. End of Service Date:

2032

Total Length (kms):

209

Design Capacity:

20 Gb/s

Fiber Information:

6 Fiber Pairs

Owners:

Telecom Italia, Tunisie Telecom (Tunisia)

System Supplier:

Alcatel-Lucent

System Installer:

Alcatel-Lucent

Region:

Mediterranean

T r a p i n i


KHULNA - CHENNAI

C h e n n a i


K h u l n a

System Name:

Khulna - Chennai

Landing Points: Chennai (India), Khulna (Bangladesh) RFS Year:

2010

Est. End of Service Date:

2035

Est. System Cost (US$):

48,000,000

Total Length (kms):

115

Owners:

Bangladesh Submarine Cable Company

Region:

Indian Ocean


KJCN

P u s a n

F


System Name:

KJCN

Landing Points: Fukuoka (Japan), Kita-Kyushu (Japan), Pusan (South Korea) RFS Year:

2002

Est. End of Service Date:

2027

Total Length (kms):

500

Initial Capacity:

50 Gb/s

Design Capacity:

2.88 Tb/s

Fiber Information:

12 Fiber Pairs, 10 Gbps x 24 wavelength over each fiber pair

F u k u o k a

Owners:

KEPCO, KT Coropration, NTT Communications, SOFTBANK Telecom Corp

System Supplier:

Fujitsu

System Installer:

Fujitsu

Cableship: Region:

Maersk Recorder Pacific

K i t a k y u s h u


KODIAK KENAI

A n K e n a i

S e w H o m e r

K o d i a k

N a r r o w C a p e


n c h o r a g e

w a r d

System Name:

Kodiak Kenai

Landing Points: Anchorage (USA), Homer (USA), Kenai (USA), Kodiak (USA), Narrow Cape (USA), Seward (USA) RFS Year:

2006

Est. End of Service Date:

2031

Total Length (kms):

971

Initial Capacity:

2.5 Gb/s

Design Capacity:

10 Gb/s

Fiber Information:

4 Fiber Pairs

Owners: Upgrader: Upgrade Year: Upgraded Capacity: Region:

Kodiak Kenai Cable Company Infinera 2010 10 Gb/s Pacific


KUWAIT-IRAN

Failaka

So


System Name:

Kuwait-Iran

Landing Points: Kharg (Iran), Soroosh (Iran), Failaka (Kuwait) RFS Year:

2006

Est. End of Service Date:

2031

Total Length (kms):

334

oroosh

Initial Capacity: Fiber Information: Owners: System Installer: Region:

Kharg

2.5 Gb/s 6 Fiber Pairs Ministry of Communication, Kuwait and Telecommunication Infrastructure Company, Iran e-Marine Middle East


LEV

M a z a r a


Y e r o s k i p o u

T e l A v i v

System Name:

LEV

Landing Points: Mazara (Italy), Tel Aviv (Israel), Yeroskipos (Cyprus) RFS Year:

1999

Est. End of Service Date:

2024

Est. System Cost (US$):

177,658,000

Total Length (kms): Initial Capacity: Fiber Information: Owners: System Supplier: Region:

2,600 2.5 Gb/s 2 Fiber Pairs, 8 wavelengths of 1550 nm Telecom Italia Sparkle Alcatel Submarine Networks, Tyco Telecommunications Mediterranean


LION

Mombasa

Mayotte

T


System Name:

LION

Landing Points: Sainte Marie (Reunion Island), Terre Rouge (Mauritius), Toamasina (Madagascar) RFS Year:

2009

Est. End of Service Date:

2034

Total Length (kms):

1,091

Initial Capacity: Fiber Information: Owners: System Installer: Cableship: Region:

20 Gb/s 2 Fiber Pairs France Telecom, Mauritius Telecom, Orange Madagascar FCR Chamarel Indian Ocean

Tomasina Terre Rouge Sainte Marie


LION-2

Mombasa

Mayotte

T


System Name:

LION-2

Landing Points: Mombasa (Kenya), Mayotte (Mayotte), Toamasina (Madagascar), Ile Saint-Marie (Madagascar), Terre Rouge (Madagascar) RFS Year:

2012

Est. End of Service Date:

2037

Est. System Cost (US$):

76,000,000

Total Length (kms): Design Capacity: Owners: System Installer: Region:

3,000 1.28 Tb/s France Telecom-Orange, Mauritius Telecom, Orange Madagascar, Telkom Kenya, Emtel Ltd Alpha Logistics Indian Ocean

Tomasina Terre Rouge Sainte Marie


M-T

P h e t c h a b u r i

S o n g k h l a

K u a n t a n


System Name:

M-T

Landing Points: Kuantan New Port (Malaysia), Phetchaburi (Thailand), Songkhla (Thailand) RFS Year:

1994

Est. End of Service Date:

2017

Total Length (kms):

1,276

Initial Capacity: Region:

560 Mbs Pacific


MAC

System Name:

MAC

Landing Points: Brookhaven (USA), Hollywood (USA), St Croix (US Virgin Islands) RFS Year:

2000

Est. End of Service Date:

2025

Total Length (kms):

7,461

Initial Capacity: Fiber Information: Owners:

20 Gb/s 2 Fiber Pairs Global Crossing

System Supplier:

Alcatel Submarine Networks

System Installer:

FCR

Cableship:

Fresnel

Upgrader:

Infinera

Upgrade Year: Upgraded Capacity: Region:

2010, 2011 10 Gb/s, 40 Gb/s Atlantic, Caribbean

Hollywood


Brookhaven

St. Croix


MAIN ONE

S e i x a l

C a s a b l a n c T e n e r i f e

D a k a r

j a n c r a d i A b A c


c a

System Name:

Main One

Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Casablanca (Morocco), Dakar (Senegal), Lagos (Nigeria), Port Harcourt (Nigeria), Seixal (Portugal), Tenerife (Spain) RFS Year:

2010

Est. End of Service Date:

2035

Est. System Cost (US$):

240,000,000

Total Length (kms):

g o s a a L

Initial Capacity: Owners:

7,000 1.92 Tb/s Mainstreet Technologies

System Supplier:

TE SubCom

System Installer:

TE SubCom

Cableship:

Resolute

Region:

Atlantic

P o r t o u r t H a r c


MALAYSIA DOMESTIC

Kuantan Mersing Changi

Ku

ch

Kota Kinaba La b MiTung uan ri ku

ing


alu

System Name:

Malaysia Domestic

Landing Points: Kota Kinabalu (Malaysia), Kuantan New Port (Malaysia), Kuantan New Port (Malaysia), Kuching (Malaysia), Labuan (Indonesia), Mersing (Malaysia), Miri (Malaysia) RFS Year:

1995

Est. End of Service Date:

2020

Total Length (kms):

2,342

Initial Capacity:

Gb/s

Owners:

Telekom Malaysia

Region:

Pacific


MATARAM-KUPANG

R a b a M a t a r a m

S u b m a w a B e s a r

W

System Name:

Mataram-Kupang

Landing Points: Kupang (Indonesia), Mataram (Indonesia), Raba (Indonesia), Sumbawa Besar (Indonesia), Waingapu (Indonesia) RFS Year:

2011

Est. End of Service Date:

2036

Est. System Cost (US$):

94,000,000

Total Length (kms): Owners:

1,200 PT Telkom

System Supplier:

Huawei Marine, Nexans

System Installer:

Huawei Marine

Region:

Pacific


W a i n g a p u K u p a n g


MATRIX

B a t a m C h a n g i

J a k a r t a

System Name:

Matrix

Landing Points: Batam (Indonesia), Changi (Singapore), Jakarta (Indonesia) RFS Year:

2008

Est. End of Service Date:

2032

Total Length (kms):

1,438

Initial Capacity:

60 Gb/s

Design Capacity:

2.56 Tb/s

Fiber Information:

4 Fiber Pairs

Owners:

Matrix Networks and NAP Info

System Supplier:

TE Subcom

System Installer:

Global Marine Systems Limited

Cableship: Region:

Wave Mercury, Cable Networker (barge) Pacific


MAURITIUS-RODRIGUES ISLAND [Planned]

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


System Name:

Mauritius-Rodrigues Island

Landing Points: Mauritius, Rodrigues Island RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):

32,000,000

Total Length (kms):

550

Owners:

Ministry of Information and Communication Technology (Mauritius)

Region:

Indian Ocean

Mauritius

Rodrigues Island


MAYA-1

Hollywo

Cancun

Puerto Limon

Maria Ch


ood

hiquita

System Name:

Maya-1

Landing Points: Cancun (Mexico), Hollywood (USA), Maria Chiquita (Panama), Puerto Limon (Costa Rica), Tolu (Colombia) RFS Year:

2000

Est. End of Service Date:

2025

Total Length (kms): 4,506 Initial Capacity: 10 Gb/s Owners:

MAYA-1 Consortium

System Supplier:

Alcatel Submarine Networks, Tyco Telecommunications

Marine Surveyor:

C&C Technologies

Upgrader: Upgrade Year: Upgraded Capacity: Region:

Tolu

Alcatel-Lucent Submarine Networks 2012 40 Gb/s Caribbean


MBDC

Dumai

Batam


System Name:

MBDC

Landing Points: Batam (Indonesia), Dumai (Indonesia) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

40,000,000

Total Length (kms): Initial Capacity:

330 10 Gb/s

Owners:

Moratelindo

Region:

Pacific


MED CABLE NETWORK

M a r s e i l l e

A l g i e r s


System Name:

Med Cable Network

Landing Points: Algiers (Algeria), Annaba (Algeria), Marseille (France) RFS Year:

2005

Est. End of Service Date:

2030

Total Length (kms):

1,300

Initial Capacity:

A n n a b a

20 Gb/s

Owners:

Med Cable

Region:

Mediterranean


MEDNAUTILUS

C a

t a

n i

a

K o r o p i

C h a n i a

System Name:

MedNautilus

Landing Points: Catania (Italy), Chania (Greece), Haifa (Israel), Istanbul (Turkey), Koropi (Greece), Tel Aviv (Israel) RFS Year:

2001

Est. End of Service Date:

2026

Total Length (kms):

5,729

Initial Capacity: Fiber Information: Owners: System Supplier: Upgrader: Upgrade Year: Upgraded Capacity: Region:

3.84 Tb/s 6 Fiber Pairs, 64 wave lengths, 10 gbps Telecom Italia Sparkle Alcatel Submarine Networks Infinera 2011, 2012, 2013 10 Gb/s, 40 Gb/s, 100 Gb/s Mediterranean


I s t a n b u l

H a i f a

T e l A v i v


MELITA-1

System Name:

MELITA-1

Landing Points: Pozallo (Italy), St Paul’s Bay (Malta) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

14,000,000

Total Length (kms): Initial Capacity:

100 50 Mb/s

Owners:

Melita Infrastructure Ltd.

Region:

Mediterranean

P o z

S t . P B a y


z a l l o

P a u l ’ s


MENA

Mazara

Alexandria Suez Zafarana

J

System Name:

MENA

Landing Points: Abu Talat (Egypt), Al Seeb (Oman), Jeddah (Saudi Arabia), Mazara (Italy), Mumbai (India), Zafarana (Egypt) RFS Year:

2011

Est. End of Service Date:

2035

Est. System Cost (US$):

350,000,000

Total Length (kms): Initial Capacity: Owners:

8,000 5.76 Tb/s Orascom Telecom

System Supplier:

Alcatel Submarine Networks, TE SubCom

System Installer:

Alcatel Submarine Networks, TE SubCom, e-Marine

Cableship: Marine Surveyor: Region:

Maersk Responder, Ile de Sein, Niwa, Decisive EGS, Blue Star, Elettra Mediterranean, Middle East, Indian Ocean


i ba um M

Jeddah

Al Seeb


MIC-1

C h a n g

B a t


g i

t a m

System Name:

MIC-1

Landing Points: Batam (Indonesia), Changi (Singapore) RFS Year:

2008

Est. End of Service Date:

2033

Est. System Cost (US$):

12,000,000

Total Length (kms): Initial Capacity: Owners: System Installer: Region:

70 10 Gb/s Moratelindo Global Marine Systems Limited Pacific


MICRONESIA CABLE SYSTEM


System Name:

Micronesia Cable System

Landing Points: Majuro (Marshall Islands), Kwajalein (Marshall Islands), Pohnpei (Micronesia), Guam RFS Year:

2011

Est. End of Service Date:

2036

Total Length (kms):

174

Owners:

Federals States of Micronesia Telecommunications Authority, Marshall Island National Telecommunications Authority

System Supplier:

TE SubCom

System Installer:

TE SubCom

Region:

Pacific


MINERVA

M a z a r a

C a t a n i a


Y e r o s k i p o u

System Name:

Minerva

Landing Points: Catania (Italy), Mazara (Italy), Yeroskipos (Cyprus) RFS Year:

2007

Est. End of Service Date:

2032

Initial Capacity:

10 Gb/s

Fiber Information:

DWDM wavelengths

Owners:

Telecom Italia Sparkle

System Supplier: Region:

Alcatel-Lucent Submarine Systems Mediterranean


MKCS

Sum B Mataram esa bawaRaba r Waingapu


System Name:

MKCS

Landing Points: Kupang (Indonesia), Mataram (Indonesia), Raba (Indonesia), Sumbawa Besar (Indonesia), Waingapu (Indonesia) RFS Year:

2011

Est. End of Service Date:

2036

Est. System Cost (US$):

94,072,800

Total Length (kms): Design Capacity: Region:

1,200 300 Gb/s Pacific

Kupang


NCP (NEW CROSS PACIFIC) [Planned]

Busan Shanghai

Japan

Taiwan

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


USA

USA

System Name:

NCP (New Cross Pacific)

Landing Points: Shanghai (China), Busan (Korea), Taiwan, Japan, 2 Western sites (USA) RFS Year:

2016

Est. End of Service Date:

2040

Est. System Cost (US$):

200,000,000

Total Length (kms):

15,000

Owners:

Korea Telecom, China Telecom, China Unicom, China Mobile, Chunghwa Telecom (Taiwan)

Region:

Pacific


NEPTUNE CANADA

System Name:

Neptune Canada

Landing Points: Port Alberni (Canada) RFS Year:

2007

Est. End of Service Date:

2032

Est. System Cost (US$):

62,000,000

Total Length (kms): Owners:

800 University of Victoria

System Supplier:

Alcatel Submarine Networks

System Installer:

Alcatel Submarine Networks

Cableship: Marine Surveyor: Region:

Ile de Sein NEPTUNE Canada Pacific


P o r t A l b e r n i


NORSEA COM-1

T y s v a e r

L o w e s t o f t


System Name:

Norsea Com-1

Landing Points: Lowestoft (United Kingdom), Tysvær (Norway) RFS Year:

1999

Est. End of Service Date:

2024

Total Length (kms):

800

Initial Capacity: Owners: System Supplier: Region:

160 Gb/s North Sea Communications AS Alcatel AKN Atlantic


NORTHSTAR

V a l d e z

W h i t t i e r

System Name:

Northstar

Landing Points: Juneau (USA), Nedonna Beach (USA), Valdez (USA), Whittier (USA) RFS Year:

1999

Est. End of Service Date:

2024

Total Length (kms):

3,385

Initial Capacity: Owners:

10 Gb/s Alaska Communications Systems

System Supplier:

Alcatel Submarine Networks

System Installer:

C&W (Marine)

Cableship: Region:

Maersk Fighter, Fu Lai Pacific


J u n e a u

N e d o n n a B e a c h


PAC

G r o v e r B e a c h T i j u a n a

M a z a t l á n

System Name:

PAC

Landing Points: Colon (Panama), Fort Amadour (Panama), Grover Beach (USA), Mazatlán (Mexico), Puerto Viejo (Venezuela), St Croix (US Virgin Islands), Tijuana (Mexico) RFS Year:

2001

Est. End of Service Date:

2026

Est. System Cost (US$):

350,000,000

Total Length (kms): Initial Capacity: Owners: System Supplier: Cableship: Marine Surveyor: Upgrader: Region:

9,451 10 Gb/s Global Crossing Tyco Telecommunications Agile C&C Technologies Xtera Communications Caribbean, Pacific


S t . C r o i x

C o l o n F o r t A m a d o u r

P u e r t o V i e j o


PALAU - GUAM [Planned]

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


System Name:

Palau - Guam

Landing Points: Palau; Guam RFS Year:

2015

Est. End of Service Date:

2040

Owners:

Palau Telecom

System Supplier:

Xtera Communications

System Installer:

Xtera Communications Pacific

Guam

Region:

Palau


PANAM Magens Bay Butler’s Bay

Baby Beach Battery Pratt

Barranquilla Punto Fijo Panama City

Lurin

Arica


System Name:

PanAm

Landing Points: Arica (Chile), Baby Beach (Aruba), Barranquilla (Colombia), Battery Pratt (Panama), Butler’s Bay (St. Croix), Lurin (Peru), Magens Bay (Virgin Islands), Panama City (Panama), Punto Fijo (Venezuela), Salinas (Ecuador) RFS Year:

1999

Est. End of Service Date:

2024

Total Length (kms):

6,867

Initial Capacity: Owners:

>10 Gb/s Antel (El Salvador), AT&T, Cable Andino, CANTV (Venezuela), CNT, C&W, Embratel, Entel (Chile), Setar, Telecom Colombia, Telmex

Marine Surveyor:

C&C Technologies

Region:

Caribbean, Pacific


PANGEA

R e d c a r

L o w e s t o f t


M å d e F a n ø

B e v e r w i j k

System Name:

Pangea

Landing Points: Beverwijk (Netherlands), Fanø (Denmark), Lowestoft (United Kingdom), Måde (Denmark), Redcar (United Kingdom) RFS Year:

2000

Est. End of Service Date:

2025

Total Length (kms):

511

Initial Capacity:

7.03125 Tb/s

Owners:

Pangea Ltd

System Supplier:

Alcatel Submarine Networks

System Installer:

Nexans

Cableship:

Pleijel

Marine Surveyor:

Fugro

Region:

Atlantic


PC-1

S h i m a

A j i g a u r a


H a r b o r P o i n t e G r o v e r B e a c h

System Name:

PC-1

Landing Points: Grover Beach (USA), Harbor Pointe (USA), Shima (Japan), Shima (Japan) RFS Year:

2000

Est. End of Service Date:

2025

Est. System Cost (US$):

1,000,000,000

Total Length (kms):

20,910

Initial Capacity:

1.8 Tb/s

Design Capacity:

3 Tb/s

Owners:

NTT Communications

System Supplier:

Tyco Telecommunications

Marine Surveyor:

C&C Technologies

Upgrader: Upgrade Year: Upgraded Capacity: Region:

Infinera 2013 40 Gb/s, 100 Gb/s Pacific


Jac

PCCS [Planned] System Name:

PCCS (Pacific Caribbean Cable System)

Landing Points: Jacksonville, Florida (USA), Manta (Ecuador), Tortola, Puerto Rico, Aruba, Curacao, Cartagena (Colombia), Maria Chiquita and Balboa (Panama) RFS Year:

2014

Est. End of Service Date:

2039

Total Length (kms):

6,000

Initial Capacity:

100 Gb/s

Design Capacity:

80 Tb/s

Owners:

System Supplier: Region:

Cable & Wireless Communications, Setar, Telconet, Telefónica Global Solutions, United Telecommunication Services Alcatel-Lucent Submarine Networks Caribbean

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


cksonville

an

Ju San

a

Arub

M

ar

ia

Ch

iq

ui

ta

Cartagena

Manta

Balboa

Willemstad

Tortola


PCX [Planned]

Tokyo

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


California

System Name:

Pacific Cloud Xchange (PCX)

Landing Points: Tokyo (Japan), California (USA) RFS Year:

2015

Est. End of Service Date:

2040

Total Length (kms):

8,300

Design Capacity:

40 Tb/s

Fiber Information:

4 Fiber pairs, 100G, 100 wavelengths

Owners:

Global Cloud Xchange (née Reliance Globalcom)

Region:

Pacific


PEC

B r o a S e a f o r d

V e u l e s - l e s - R


System Name:

PEC

Landing Points: Bredene (Belguim), Broadstairs (United Kingdom), Seaford (United Kingdom), Veules-les-Roses (France) RFS Year:

1999

Est. End of Service Date:

2024

Total Length (kms):

170

Initial Capacity: Owners:

Global Crossing

Region:

Atlantic

a d s t a i r s

R o s e s

10 Gb/s

B r e d e n e


PPC-1

System Name:

PPC-1

Landing Points: Madang (Papua New Guinea), Piti (Guam), Sydney (Australia) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

200,000,000

Total Length (kms):

7,185

Initial Capacity:

40 Gb/s

Design Capacity:

2.56 Tb/s

Owners:

PIPE Networks Ltd.

System Supplier:

Tyco Telecommunications

System Installer:

Tyco Telecommunications

Cableship:

Durable, Decisive

Upgrader:

Infinera

Upgrade Year: Upgraded Capacity: Region:

2012 100 Gb/s Pacific


Piti

Madang

Sydney


QATAR-UAE

Halu


System Name:

Qatar-UAE

Landing Points: Das Island (UAE), Halul (Qatar) RFS Year:

2004

Est. End of Service Date:

2029

Total Length (kms):

208

Initial Capacity:

20 Gb/s

System Installer:

e-Marine

Cableship: Region:

ul Das

Etisalat Middle East


RJCN

N a k h o d k a

System Name:

RJCN

Landing Points: Nakhodka (Russia), Naoetsu (Japan) RFS Year:

2006

Est. End of Service Date:

2031

Total Length (kms):

1,795

Initial Capacity:

640 Gb/s

Owners:

Rostelecom

Region:

Pacific


N a o e t s u


RJK System Name:

RJK

Landing Points: Nakhodka (Russia), Naoetsu (Japan), Pusan (South Korea) RFS Year:

1994

Est. End of Service Date:

2019

Est. System Cost (US$):

93,000,000

Total Length (kms): Initial Capacity: Owners:

1,762 1 Gb/s Rostelecom

System Supplier:

Alcatel Submarine Networks, Ocean Cable Company Segments B2-3

System Installer:

KDD

Cableship: Region:

Kuroshio Maru, Maersk Recorder (473 km) Pacific

P u s a n

N a k h o d k


k a

N a o e t s u


SAC St. Croix

Puerto Viejo

Fort Amadour

Lurin

Rio de Jan Santos

Valparaiso Las Toninas


Fortaleza

neiro

System Name:

SAC

Landing Points: Fortaleza (Brazil), Fort Amadour (Panama), Las Toninas (Argentina), Lurin (Peru), Puerto Viejo (Venezuela), Rio de Janeiro (Brazil), Santos (Brazil), St Croix (US Virgin Islands), Valparaiso (Chile) RFS Year:

2001

Est. End of Service Date: 2026 Total Length (kms): 15,983 Initial Capacity: 100 Gb/s Design Capacity: Owners: System Supplier: Upgrader: Upgrade Year: Upgraded Capacity: Region:

1.2 Tb/s Global Crossing Alcatel Submarine Networks Infinera 2010, 2011 10 Gb/s, 40 Gb/s Atlantic, Caribbean, Pacific


SACS [Planned]

F o r t a l e z a

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


System Name:

SACS (South Atlantic Cable System)

Landing Points: Luanda (Angola), Fortaleza (Brazil) RFS Year:

2016

Est. End of Service Date:

2041

Est. System Cost (US$):

160,000,000

Total Length (kms): Initial Capacity: Fiber Information: Owners: System Supplier: Region:

6,000 100 Gb/s 4 Fiber Pairs, 100 channels, 100G per channel Angola Cables Alcatel-Lucent Submarine Networks Atlantic

L u a n d a


SAFE

B a i e d u J a c o t e t

S a i n t - P

D u r b a n C a p e T o w n


C o c h i n P e n a n g

P a u l

System Name:

SAFE

Landing Points: Baie du Jacotet (Mauritius), Cape Town (South Africa), Cochin (India), Durban (South Africa), Penang (Malaysia), Saint-Paul (Reunion) RFS Year:

2002

Est. End of Service Date:

2027

Total Length (kms): Initial Capacity: Owners:

13,669 440 Gb/s France Telecom, Tata Communications, Telekom SA

System Supplier:

Tyco Telecommunications

System Installer:

FCR

Cableship: Region:

Vercors Indian Ocean, Pacific


SAM-1

Boca Raton

San Juan

Puerto Barrios

Puerto San Jose

Barranquilla

Salinas Mancora

Lurin

Salvad Arica Santos

Valparaiso Las Toninas

Rio d


System Name:

SAM-1

Landing Points: Arica (Chile), Barranquilla (Colombia), Boca Raton (USA), Fortaleza (Brazil), Las Toninas (Argentina), Lurin (Peru), Mancora (Peru), Puerto Barrios (Guatemala), Puerto San Jose (Guatemala), Rio de Janeiro (Brazil), Salinas (Ecuador), Salvador (Brazil), San Juan (Puerto Rico), Santos (Brazil), Valparaiso (Chile) RFS Year:

2001

Est. End of Service Date:

2026

Total Length (kms): Initial Capacity:

160 Gb/s

Design Capacity:

1.92 Tb/s

Owners:

Telefonica

System Supplier:

Tyco Telecommunications

Marine Surveyor:

C&C Technologies

Upgrader: Upgrade Year:

de Janeiro

Infinera 2009, 2010, 2011, 2012

Upgraded Capacity:

10 Gb/s, 40 Gb/s, 100 Gb/s

Region:

Atlantic, Caribbean, Pacific

Fortaleza

dor

24,140


SAPL [Planned]

Hawaii

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


System Name:

South America Pacific Link (SAPL)

Landing Points: Oahu, Hawaii (USA), Manta (Ecuador) RFS Year:

2016

Est. End of Service Date:

2041

Total Length (kms):

9,400

Design Capacity:

30 Tb/s

Fiber Information:

3 Fiber Pairs, 10 Tb/s per pair

Owners:

Ocean Networks

System Supplier:

Xtera Communications

System Installer:

Xtera Communications

Region:

Pacific

Manta


SAS-1

P o r t S u d a n


System Name:

SAS-1

Landing Points: Jeddah (Saudi Arabia), Port Sudan (Sudan) RFS Year:

2003

Est. End of Service Date:

2028

Total Length (kms):

333

Initial Capacity:

1.28 Tb/s

Fiber Information:

4 Fiber Pairs

Owners:

STC (Saudi Arabia)

Region:

Middle East

J e d d a h


SAT-2 Funchal El Medana


System Name:

SAT-2

Landing Points: El Medano (Spain), Funchal (Portugal), Melkbosstrand (South Africa) RFS Year:

1993

Est. End of Service Date:

2018

Est. System Cost (US$):

270,000,000

Total Length (kms): Initial Capacity: Owners:

9,500 560 Mb/s Consortium

System Supplier:

Standard Telephones & Cables Ltd, Alcatel Submarine Networks

System Installer:

BT Marine, FCR

Cableship: Region:

Melkbosstrand

Vercors, Sovereign Atlantic


SAT-3 Sesimbra Chipiona

Alta Vista

Ab i Ac dja cr n a Co La to go no s u

Dakar

Douala Libreville

Luanda

Melkbosstran


nd

System Name:

SAT-3

Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Alta Vista (Spain), Chipiona (Spain), Cotonou (Benin), Dakar (Senegal), Douala (Cameroon), Lagos (Nigeria), Libreville (Gabon), Luanda (Angola), Melkbosstrand (South Africa), Sesimbra (Portugal) RFS Year:

2002

Est. End of Service Date:

2027

Total Length (kms):

14,350

Initial Capacity:

340 Gb/s

Fiber Information:

2 Fiber Pairs

Owners:

System Supplier: Region:

Angola Telecom, AT&T, British Telecom, Camtel of Cameroon, CIT, Cote dIvoire Telecom, CPRM, C&W, France Telecom (12.08%), Ghana Telecom, Maroc Telecom of Morocco, Mauritius Telecom, Nigerian Telecommunications Ltd, Nitel (8.39%), OPT Benin, OPT Gabon, PT Comunicações, PT Comunicações, Sonatel, Tata Communications (8.93%), TCI (12.42%), Telecom Namibia, Telefonica, Telekom SA, Togo Telecom Alcatel Submarine Networks Atlantic


SCAN Hong Kong

Jakarta


System Name:

SCAN

Landing Points: Hong Kong, Indonesia RFS Year:

2011

Est. End of Service Date:

2036

Est. System Cost (US$):

337,094,200

Total Length (kms):

4,300

Initial Capacity:

40 Gb/s

Design Capacity:

1.92 Tb/s

Owners: System Supplier: Region:

PT. Fangbian Iskan Corporindo, Telemedia Pacific Inc. NEC Pacific


SCF-CN

B a s s e t e r r e

M a r t i n i q u e P o r t C a s t r i e s

K i n g s t o w n B P o r t S a l i n e s R e d c a r


System Name:

SCF-CN

Landing Points: Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Kingstown (St. Vincent), Martinique (Martinique), Port Castries (St Lucia), Port Salines (Grenada), Redcar (Trinidad and Tobago) RFS Year:

2007

Est. End of Service Date:

2032

Total Length (kms):

1,186

Initial Capacity:

B r i d g e t o w n

1.28 Tb/s

Owners:

SCF (Group Loret)

Region:

Caribbean


SEA-ME-WE 3

Se

sim

br

a

G oo nh ill y

Norden Oostende Penmarch

Teutan

Mazara Marmaris Yeroskipou Chania Alexandria Suez

Fuja Jeddah Djibouti

System Name:

SEA-ME-WE 3

Landing Points: Alexandria (Egypt), Al Seeb (Oman), Batangas (Philippines), Chania (Greece), Cochin (India), Da Nang (Vietnam), Deep Water Bay (Hong Kong), DehiwalaMount Lavinia (Sri Lanka), Djibouti (Republic of Djibouti), Fangshan (Taiwan), Fujairah (United Arab Emirates), Goonhilly (United Kingdom), Jeddah (Saudi Arabia), Karachi (Pakistan), Keoje (South Korea), Marmaris (Turkey), Mazara (Italy), Medan (Indonesia), Mersing (Malaysia), Mumbai (India), Nanhui District (China), Norden (Germany), Okinawa Prefecture (Japan), Oostende (Belguim), Penang (Malaysia), Penmarch (France), Perth (Australia), Pyapon (Myanmar), Satun (Thailand), Sesimbra (Portugal), Shantou (China), Suez (Egypt), Taipa (Macau), Tetouan (Morocco), Toucheng (Taiwan), Tuas (Singapore), Tungku (Brunei), Yeroskipos (Cyprus) RFS Year:

1999

Est. End of Service Date:

2024

Est. System Cost (US$):

1,500,000,000

Total Length (kms): Initial Capacity:

39,622 70 Gb/s


nh

Na

Keoje

ui

Deep Water Bay

g

Okinawa Toucheng Fangshan

Pe Sat na un D ng a N

Pyapon

an

ou

Mumbai

nt

Karachi

Co D chi La ehi n vi wa ni la a -M

eb Se

Al

u to a an ip Sh Ta

airah

Medan

Tuas

Batangas

Tungku Mersing

Perth Owners: System Supplier: Cableship:

SEA-ME-WE 3 Consortium Alcatel Submarine Networks, Pirelli, KDD-SCS, Tyco Telecommunications Agile, Maersk Defender, Maersk Fighter, Fresnel, Fu Lai, Nexus, Leon Thevinin, Vercors, Raymond Croze, Etisalat, Umm Al Anber

Marine Surveyor: C&C Technologies Region: Atlantic, Indian Ocean, Mediterranean, Middle East, Pacific


SEA-ME-WE 4

Marseille

An n Bi aba ze rte

Palermo Alexandria Suez

Fujaira Jeddah

System Name:

SEA-ME-WE 4

Landing Points: Alexandria (Egypt), Annaba (Algeria), Bizerte (Tunisia), Chennai (India), Colombo (Sri Lanka), Cox’s Bazaar (Bangladesh), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Karachi (Pakistan), Marseille (France), Melaka (Malaysia), Mumbai (India), Mumbai (India), Palermo (Italy), Satun (Thailand), Suez (Egypt), Tuas (Singapore) RFS Year:

2005

Est. End of Service Date:

2030

Est. System Cost (US$):

500,000,000

Total Length (kms): Initial Capacity: Fiber Information:

18,846 40 Gb/s 2 Fiber Pairs


ah

Owners:

System Supplier:

Algerie Telecom, Algeria, Bangladesh Submarine Cable Company Limited (BSCCL), Bangladesh, Bharti Airtel, CAT Telecom (Thailand), Du, France Telecom, Pakistan Telecommunication Company Limited, Pakistan, Saudi Telecom Company (STC), Saudi Arabia, Sri Lanka Telecom Limited (SLT), Sri Lanka, Tata Communications (Network Administrator), Telecom Egypt, Telecom Italia Sparkle , Telekom Malaysia, Tunisie Telecom (Tunisia), Verizon Alcatel Submarine Networks, Fujitsu

Cableship:

Niwa, Descartes

Upgrader:

Alcatel-Lucent Submarine Networks, Ciena

Upgrade Year: Upgraded Capacity:

2011 40 Gb/s

Region: Indian Ocean, Mediterranean, Middle East

Karachi

Cox’s Bazaar Mumbai Chennai

M

Colombo

Satun

ak el a

Tuas


SEA-ME-WE 5 [Planned]

Marseille

An n Bi aba ze rte

Palermo Alexandria Suez Fujairah Jeddah

System Name:

SEA-ME-WE 5

Landing Points: Marseille (France), Annaba (Algeria), Palermo (Italy), Bizerte (Tunisia), Alexandria (Egypt), Suez (Egypt), Jedda (Saudi Arabia), Fujairah (UAE), Karachi (Pakistan), Mumbai (India), Chennai (India), Colombo (Sri Lanka), Cox’s Bazar (Bangladesh), Satun (Thailand), Singapore (Singapore), Malacca (Malacca) RFS Year:

2016

Est. End of Service Date:

2040

Est. System Cost (US$):

1,000,000,000

Total Length (kms):

16,000

Initial Capacity:

100 Gb/s

Design Capacity:

24 Tb/s


Owners:

Bangladesh Submarine Cable Company Ltd, China Mobile International Ltd, China Global Telecommunications Limited, China Network Communications Group Co Ltd, Emirates Integrated Telecommunications Co, Orange, Myanmar Post and Telecom, PT Telekomunikasi Indonesia International, Saudi Telecom Company, Singapore Telecommunications Ltd, Sri Lanka Telecom Plc, Telecom Italy Sparkle, Telekom Malaysia Bhd (TM), TOT Public Co Ltd, Yemen International Telecommunications Co.

System Supplier:

Alcatel-Lucent, NEC

System Installer:

Alcatel-Lucent, NEC

Region: Mediterranean, Indian Ocean, Pacific

Karachi

Cox’s Bazaar Mumbai Chennai Satun

M Sin alac ga ca po re

Colombo

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


SEABRAS-1 [Planned]

M i a m i

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


System Name:

Seabras-1

Landing Points: Miami (USA), Fortaleza (Brazil), Sao Paolo (Brazil) RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):

700,000,000

Total Length (kms):

10,750

Initial Capacity:

100 Gb/s

Design Capacity:

32 Tb/s

Fiber Information:

4 Fiber Pairs

Owners: System Supplier: Region:

Seaborn Networks Alcatel-Lucent Submarine Networks Atlantic

F o r t a l e z a

S a o P a u l o


SEACOM

Djibouti

Mombasa

M

tu nz

in i

M

ap ut o

Dar es Salaam


Mumbai

System Name:

Seacom

Landing Points: Abu Talat (Egypt), Dar es Salaam (Tanzania), Djibouti (Republic of Djibouti), Maputo (Mozambique), Mombasa (Kenya), Mtunzini (South Africa), Mumbai (India), Zafarana (Egypt) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

600,000,000

Total Length (kms):

13,601

Initial Capacity:

110 Gb/s

Design Capacity:

1.28 Tb/s

Owners:

Convergence Partners (12.50%), Herakles Telecom LLC (25%), Industrial Promotion Services (25%), Shanduka Group (12.50%), VenFin Limited (25%)

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

Cableship:

Durable, Decisive, Dependable, Resolute, Responder

Upgrader:

Ciena

Upgrade Year:

2013

Upgraded Capacity: Region:

100 Gb/s Indian Ocean


SEAK

J u n e a u H a w k I n l e t A n g o o n S i t k a

P e t e r s b


System Name:

SEAK

Landing Points: Angoon (USA), Hawk Inlet (USA), Juneau (USA), Ketchikan (USA), Petersburg (USA), Sitka (USA), Wrangell (USA) RFS Year:

2008

Est. End of Service Date:

2033

Initial Capacity:

10 Gb/s

Owners:

GCI

Region:

Pacific

b u r g W r a n g e l l

K e t c h i k a n


SF-S 4

M a r i e h a m N o r r t ä l j e


m n

System Name:

SF-S 4

Landing Points: Mariehamn (Finland), Norrtälje (Sweden), Turku (Finland) RFS Year:

1993

Est. End of Service Date:

2018

Total Length (kms): Initial Capacity: Owners:

85 40 Gb/s Teliasonera

System Supplier:

Standard Telephones & Cables Ltd

System Installer:

AKN

Cableship: Region:

Pleijel, Telepaatti Baltic

T u r k u


SFL

V a d d o


System Name:

SFL

Landing Points: Mariehamn (Finland), Vaddo (Sweden) RFS Year:

1994

Est. End of Service Date:

2029

Total Length (kms): Initial Capacity:

62 2.5 Gb/s

Owners:

Teliasonera

Region:

Baltic

M a r i e h a m n


SG - SCS

C h a g u a r a m a s

G e o r g e t o w n


System Name:

SG - SCS

Landing Points: Chaguaramas (Trinidad), Georgetown (Guyana), Totness (Suriname) RFS Year:

2010

Est. End of Service Date:

2035

Est. System Cost (US$):

54,000,000

Total Length (kms):

1,193

Initial Capacity:

10 Gb/s

Design Capacity:

40 Gb/s

Owners:

Guyana Telephone and Telegraph Co. Ltd, Telesur of Suriname

System Supplier:

Huawei Marine Networks

System Installer:

Global Marine Systems Limited

Cableship:

Sovereign

Region:

Caribbean

T o t n e s s


SHEFA 2

T ó r s h a v n


System Name:

Shefa 2

Landing Points: Ayre of Cara (UK), Banff (UK), Maywick (UK), Sandwick (Scotland), Tórshavn (Faroe Islands) RFS Year:

2008

Est. End of Service Date:

2033

Est. System Cost (US$):

27,000,000

Total Length (kms):

828

Initial Capacity:

20 Gb/s

Design Capacity:

570 Gb/s

Owners:

Faroese Telecom

System Supplier:

NSW

System Installer:

International Telecom

Cableship: Marine Surveyor: Upgrader: Region:

M a y w i c k

Fugro Xtera Communications Atlantic

S a n d w i c k

A y r e o f C a r a

B a n f f

IT Intrepid


SILPHIUM

C h a n i a

D a r n a h


a

System Name:

Silphium

Landing Points: Chania (Greece), Darnah (Libya) RFS Year:

2012

Est. End of Service Date:

2037

Total Length (kms):

400

Initial Capacity:

70 Gb/s

Design Capacity:

1.2 Tb/s

Owners: System Supplier: Region:

Libyan Post, Telecom, and Information Technology Company Huawei Marine Networks Mediterranean


SJC

Lantau

Nasugbu

Tuas


Chikura

System Name:

SJC (South-East Asia Japan Cable)

Landing Points: Chikura (Japan), Lantau (Hong Kong), Nasugbu (Philippines), Shantou (China), Telisai (Brunei), Tuas (Singapore) RFS Year:

2013

Est. End of Service Date:

2038

Est. System Cost (US$):

400,000,000

Total Length (kms): Initial Capacity: Fiber Information: Owners:

System Supplier: Region:

8,900 17 Tb/s 6 Fiber Pairs SJC Consortium (Brunei International Gateway Sendirian Berhad, China Mobile, China Telecom, China Telecom (Hong Kong) International Ltd., Donghwa Telecom Co., Ltd., Globe Telecom, Inc., Google SJC Bermuda Ltd., KDDI Corporation, Singapore Telecom, Telin, Telemedia Pacific Inc., and TOT Public Co., Ltd.) TE SubCom, NEC Pacific


SKKL-JS

J a k a r t a


System Name:

SKKL-JS

Landing Points: Jakarta (Indonesia), Surabaja (Indonesia) RFS Year:

1996

Est. End of Service Date:

2021

Total Length (kms):

713

Initial Capacity:

5 Gb/s

Owners:

Indosat

Region:

Pacific

S u r a b a j a


SMPR-1

S a n J u a n


System Name:

SMPR-1

Landing Points: San Juan (Puerto Rico), St Martin (Netherlands Antilles) RFS Year:

2004

Est. End of Service Date:

2029

Est. System Cost (US$):

15,000,000

Total Length (kms):

382

Initial Capacity:

2.5 Gb/s

Owners:

Smitcoms

Region:

Caribbean

S t . M a r t i n


SOLAS

K i l m o r e Q u a y


System Name:

Solas

Landing Points: Kilmore Quay (Ireland), Oxwich Bay (UK) RFS Year:

2012

Est. End of Service Date:

2037

Est. System Cost (US$):

6,000,000

Total Length (kms):

140

Initial Capacity:

5 Gb/s

Owners:

Eircom

System Installer: Cableship: Region:

Global Marine Systems Limited Wave Sentinel Atlantic

O x w i c h B a y


SOLOMON ISLAND TO THE WORLD [Planned]

Piti

Madang

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


System Name:

Solomon Island to the World

Landing Points: Piti, Madong, Noro, Honiara, Auki RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):

60,000,000

Total Length (kms): Owners: System Supplier: Region:

Noro

Auki Honiara

827 Solomons Oceanic Cable Company TE SubCom Pacific


SOUTHERN CROSS CABLE NETWORK System Name:

Southern Cross Cable Network

Landing Points: Alexandria (Australia), Brookvale (Australia), Kahe Point (Hawaii), Morro Bay (USA), Nedonna Beach (USA), Spencer Beach (USA), Suva (Fiji), Takapuna (New Zealand), Whenuapai (New Zealand) RFS Year:

2000

Est. End of Service Date:

2025

Est. System Cost (US$):

1,300,000,000

Total Length (kms): Initial Capacity: Fiber Information: Owners:

30,000 1.24 Tb/s OALC4 17mm - 3 Fiber Pairs Segments A,C,G1,G2,I. 4 Fiber Pairs Segments D and F Southern Cross Cable Network

System Supplier:

Alcatel Submarine Networks, Fujitsu

System Installer:

Alcatel Submarine Networks

Cableship:

Cable Innovator laid 13761 km, Nexus laid 3306 km, Vercors laid 10007 km. Fresnel laid 800 km

Upgrader:

Ciena

Upgrade Year: Upgraded Capacity: Region:

2012, 2013 40 Gb/s, 100 Gb/s Pacific

S u v a B r o o k v a l e A l e x a n d r i a

T W h e n u a p a


N e d o n n a B e a c h M o r r o B a y K a h e P o i n t

a

T a k a p u n a a i

S p e n c e r B e a c h


SUB

B a n d j e r m a s i n

S u r a b a j a


System Name:

Sub

Landing Points: Bandjermasin (Indonesia), Makassar (Indonesia), Surabaja (Indonesia) RFS Year:

1998

Est. End of Service Date:

2023

Total Length (kms):

2,100

Initial Capacity:

50 Gb/s

Fiber Information:

2 Fiber Pairs

Owners:

PT Telekom

Region:

Pacific

M a k a s s a r


SVALBARD

Hotellneset

Andøy

Harstad


System Name:

Svalbard

Landing Points: Andøy (Norway), Harstad (Norway), Hotellneset (Norway) RFS Year:

2004

Est. End of Service Date:

2029

Total Length (kms):

2,800

Initial Capacity:

4.8 Tb/s

Owners:

Telenor

System Supplier: Region:

Tyco Telecommunications Polar


T-V-H

Sri Racha

Vung Tau


Deep Water Bay

System Name:

T-V-H

Landing Points: Deep Water Bay (Hong Kong), Sri Racha (Thailand), Vung Tau (Vietnam) RFS Year:

1996

Est. End of Service Date:

2021

Est. System Cost (US$):

155,600,000

Total Length (kms): Initial Capacity: Owners: System Supplier: Region:

3,367 565 Mb/s Vietnam Telecom International Tyco Telecommunications Pacific


TAINO CARIB

S a n J u a n

M


System Name:

Taino Carib

Landing Points: Magens Bay (Virgin Islands), San Juan (Puerto Rico), Tortola (British Virgin Islands) RFS Year:

1992

Est. End of Service Date:

2017

Est. System Cost (US$):

17,000,000

Total Length (kms): Initial Capacity: Owners:

186 560 Mb/s Trans-Caribbean Cable Company

System Supplier:

AT&T SSI

System Installer:

C&W (Marine)

Cableship:

Mercury

Region:

Caribbean

T o r t o l a M a g e n s B a y


TANGERINE

B r o a d s t a i r s


System Name:

Tangerine

Landing Points: Broadstairs (United Kingdom), Oostende (Belguim) RFS Year:

2000

Est. End of Service Date:

2025

Total Length (kms):

121

Initial Capacity: Fiber Information:

240 Gb/s 96 Fiber Pairs

Owners:

Level 3 Communications

Region:

Atlantic

O o s t e n d e


TASMAN GLOBAL ACCESS [Planned]

Aus

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


System Name:

Tasman Global Access

Landing Points: Australia, New Zealand RFS Year:

2015

Est. End of Service Date:

2040

Est. System Cost (US$):

71,000,000

Total Length (kms):

2,300

Design Capacity:

30 Tb/s

Owners:

Telecom New Zealand, Vodafone, Telstra

Region:

Pacific

stralia

New Zealand


TASMAN-2

S y d n e y

System Name:

Tasman-2

Landing Points: Sydney (Australia), Whenuapai (New Zealand) RFS Year:

1992

Est. End of Service Date:

2017

Est. System Cost (US$):

100,000,000

Total Length (kms): Initial Capacity: Owners:

2,249 3 x 560 Mb/s Telecom New Zealand

System Supplier:

Standard Telephones & Cables Ltd

System Installer:

FCR

Cableship:

Vercors

Region:

Pacific


W h e n u a p a i


M

a n

a s

q u

a n

TAT 14

T u c k e r t o n


B l a a b j e r g

o r d e n t h N u o i j k e m W i d B a y K a t w C a u x n e l e r y a V t n S a i

System Name:

TAT 14

Landing Points: Blaabjerg (Denmark), Katwijk (Netherlands), Manasquan (USA), Norden (Germany), Saint-Valery-en-Caux (France), Tuckerton (USA), Widemouth (UK) RFS Year:

2001

Est. End of Service Date:

2026

Total Length (kms):

15,453

Initial Capacity:

160 Gb/s

Design Capacity:

1.87 Tb/s

Owners:

TAT-14 Consortium

System Supplier:

Mitsubishi Electric Corporation

System Installer:

Global Marine Systems Limited

Cableship:

Marine Surveyor:

Cable Innovator, Cable Endeavour, Bold Endurance, Wave Sentinel, Subaru, Maersk Recorder, Maersk Forwarder, Sir Eric Sharp, Agile, Teliri, Fresnel, Vercors Fugro

Upgrader:

Mitsubishi

Region:

Atlantic


TE NORTH

M a r s e i l l e


System Name:

TE North

Landing Points: Abu Talat (Egypt), Pentaskinos (Republic of Cyprus), Marseille (France) RFS Year:

2011

Est. End of Service Date:

2036

Est. System Cost (US$):

150,000,000

Total Length (kms):

2,938

Initial Capacity:

10 Tb/s

Design Capacity:

20 Tb/s

Fiber Information:

8 Fiber Pairs

Owners: System Supplier: Upgrader: Upgrade Year: Upgraded Capacity: Region:

Telecom Egypt Alcatel-Lucent Submarine Networks Infinera 2012 100 Gb/s Middle East

C y p r u s

A l e x a n d r i a


TEAMS

M om

ba

sa

Fujairah


System Name:

TEAMS

Landing Points: Fujairah (United Arab Emirates), Mombasa (Kenya) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

130,000,000

Total Length (kms):

4,500

Initial Capacity:

120 Gb/s

Design Capacity:

1.28 Tb/s

Owners:

Etisalat (15%), TEAMS Ltd. (85%)

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

e-Marine

Cableship: Region:

Niwa Indian Ocean


TGN EURASIA

Marseille

Alexandria Ras Sidr

Dj


System Name:

TGN Eurasia

Landing Points: Abu Talat (Egypt), Djibouti (Republic of Djibouti), Jeddah (Saudi Arabia), Marseille (France), Mtunzini (South Africa), Mumbai (India), Zafarana (Egypt) RFS Year:

2009

Est. End of Service Date:

2034

Est. System Cost (US$):

250,000,000

Total Length (kms):

9,240

Initial Capacity:

160 Gb/s

Design Capacity:

1.28 Tb/s

Owners:

SEACOM, Tata Communications, Telecom Egypt

Region:

Indian Ocean, Mediterranean, Middle East

jibouti

M

um

ba

i

Jeddah


TGN GULF

Kuwait City

M

an

am

a

Al-Khobar Sumaisma

Dubai

e

Conn


System Name:

TGN Gulf

Landing Points: Al-Khobar (Saudi Arabia), Dubai (UAE), Kuwait City (Kuwait), Manama (Bahrain), Sumaisma (Qatar) RFS Year:

2011

Est. End of Service Date:

2036

Est. System Cost (US$):

200,000,000

to ection

Total Length (kms):

2,306

Design Capacity:

1.28 Tb/s

Fiber Information:

2 Fiber Pairs

Owners:

Tata Communications

System Supplier:

TE SubCom

Region:

Middle East

m

Seaco


TGN IA

Deep Water Bay

Si

ng ap or e

Vung Tau


Toyohashi

Ballesteros

Piti System Name:

TGN Intra-Asia (IA)

Landing Points: Ballesteros (Philippines), Deep Water Bay (Hong Kong), Piti (Guam), Singapore (Singapore), Toyohashi (Japan), Vung Tau (Vietnam) RFS Year:

2009

Est. End of Service Date:

2034

Total Length (kms):

6,485

Initial Capacity: Owners: System Supplier: Region:

3.84 Tb/s Tata Communications Tyco Telecommunications Pacific


H

u m

a n

b y

TGN NORTHERN EUROPE


System Name:

TGN Northern Europe

Landing Points: De Marne (Netherlands), Humanby (UK) RFS Year:

2002

Est. End of Service Date:

2027

Total Length (kms):

551

Initial Capacity:

3.84 Tb/s

Fiber Information:

4 Fiber Pairs

Owners:

Tata Communications

Region:

Atlantic

D e M a r n e


TGN TRANSATLANTIC

W a l l T o w n s h i p


H i g h b r i d g e S a u n t o n S a n d s

System Name:

TGN Transatlantic

Landing Points: Highbridge (UK), Saunton Sands (UK), Wall Township (USA) RFS Year:

2001

Est. End of Service Date:

2026

Total Length (kms): Initial Capacity: Owners: System Supplier:

12,670 2.56 Tb/s Tata Communications Tyco Telecommunications

Upgrader:

Ciena

Upgrade Year:

2013

Upgraded Capacity:

100 Gb/s

Region:

Atlantic


TGN TRANSPACIFIC

E m i T o y o h a s h i


N e d o n n a B e a c h H e r m o s a B e a c h

System Name:

TGN Transpacific

Landing Points: Emi (Japan), Hermosa Beach (USA), Nedonna Beach (USA), Toyohashi (Japan) RFS Year:

2002

Est. End of Service Date:

2027

Total Length (kms): Initial Capacity: Owners: System Supplier:

21,424 5.12 Tb/s Tata Communications Tyco Telecommunications

Upgrader:

Ciena

Upgrade Year:

2014

Upgraded Capacity: Region:

100 Gb/s Pacific


TGN WESTERN EUROPE

Highbridge

Bilbao

Seixal


System Name:

TGN Western Europe

Landing Points: Bilbao (Spain), Highbridge (UK), Seixal (Portugal) RFS Year:

2002

Est. End of Service Date:

2027

Total Length (kms):

3,487

Initial Capacity: Owners: System Supplier: Region:

3.84 Tb/s Tata Communications Tyco Telecommunications Atlantic


TGN-TIC

C h e n n a i


System Name:

TGN-TIC

Landing Points: Chennai (India), Tuas (Singapore) RFS Year:

2005

Est. End of Service Date:

2030

Total Length (kms):

3,175

Initial Capacity:

5.12 Tb/s

Owners:

Tata Communications

Region:

Indian Ocean, Pacific

T u a s


TIERRA DEL FUEGO

P D


System Name:

Tierra del Fuego

Landing Points: Punta Dungeness (Argentina), Espiritu Santo (Argentina) RFS Year:

2012

Est. End of Service Date:

2037

Est. System Cost (US$):

5,000,000

Total Length (kms): Owners:

27 AR-SAT

System Supplier:

Boskalis, Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Punta Dungeness Espiritu Santo

Cableship:

Ile de Batz

Region:

Atlantic


TIS

S o n g k h l a


System Name:

TIS

Landing Points: Batam (Indonesia), Songkhla (Thailand) RFS Year:

2006

Est. End of Service Date:

2031

Est. System Cost (US$):

36,000,000

Total Length (kms): Initial Capacity: Owners: System Supplier: Region:

B a t a m

1,003 30 Gb/s CAT Telecom (Thailand), PT Telekom, Singtel Tyco Telecommunications Pacific


TISICS

C h e n n a i

System Name:

TISICS

Landing Points: Chennai (India), Changi (Singapore) RFS Year:

2004

Est. End of Service Date:

2029

Total Length (kms):

3,175

Initial Capacity:

640 Gb/s

Fiber Information:

8 Fiber Pairs

Owners:

Tata Communications

Region:

Indian Ocean


C h a n g i


TONGA-FIJI


System Name:

Tonga-Fiji

Landing Points: Nuku’alofa (Tonga), Suva (Fiji) RFS Year:

2012

Est. End of Service Date:

2037

Est. System Cost (US$):

18,900,000

Total Length (kms): Owners:

827 Tonga Cable Limited

System Supplier:

Alcatel-Lucent Submarine Network

System Installer:

Alcatel-Lucent Submarine Network

Region:

Pacific


TPC-5

M i y a z a k i

N i n o m i y a

T u m o n


B a n d o n S a n L u i s O b i s p o K e a w a u l a

System Name:

TPC-5

Landing Points: Bandon (USA), Keawaula (Hawaii), Miyazaki (Japan), Ninomiya (Japan), San Luis Obispo (USA), Tumon (Guam) RFS Year:

1996

Est. End of Service Date:

2021

Est. System Cost (US$):

171,000,000

Total Length (kms): Initial Capacity: Owners:

24,441 10 Gb/s AT&T, KDDI

System Supplier:

Tyco Telecommunications SSI

System Installer:

Tyco Telecommunications SSI

Cableship:

Durable

Region:

Pacific


TPE

Q i n g d a o K e o j e C h o n g m i n g F u z h o u T a n s h u i


N e d o n n a B e a c h

System Name:

TPE

Landing Points: Chongming (China), Shin-Maruyama (China), Keoje (South Korea), Nedonna Beach (USA), Qingdao (China), Tanshui (Taiwan) RFS Year:

2008

Est. End of Service Date:

2033

Est. System Cost (US$):

500,000,000

Total Length (kms):

17,772

Initial Capacity:

1.28 Tb/s

Design Capacity:

5.12 Tb/s

Owners:

AT&T, China Telecom, China Unicom, Chunghwa Telecom International, KT Coropration, Verizon, NTT Com

System Supplier:

Tyco Telecommunications

System Installer:

Global Marine Systems Limited

Cableship:

Cable Innovator

Upgrader:

TE SubCom

Upgrade Year: Upgraded Capacity: Region:

2013 10 Gb/s Pacific


TRIDENT [Planned]

Jakarta

Onslow

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance

Perth


System Name:

Trident

Landing Points: Perth, Onslow (Australia), Jakarta (Indonesia) RFS Year:

2016

Est. End of Service Date:

2041

Est. System Cost (US$):

400,000,000

Design Capacity: Owners: System Supplier: Region:

100 Gb/s Trident Subsea Cable TE SubCom Pacific


C u

r a

c a

o

TRINIDAD - CURACAO

System Name:

Trinidad - Curacao

Landing Points: Curacao (Curacao), Trinidad (Trinidad) RFS Year:

2007

Est. End of Service Date:

2032

Total Length (kms):

1,240

Initial Capacity:

1.875 Tb/s

Owners:

Colombus Networks, New World Network

System Supplier:

Tyco Telecommunications SSI, Alcatel, NEC

System Installer:

Tyco SSI

Cableship: Region:

Tyco Durable, Ile de Sein, Ile de Batz, Fu Hai, Segero, Cable Innovator Caribbean


T r i n i d a d


TRIPOLI-BENGHAZI CABLE [Planned]

Tripoli

Bengha


azi

System Name:

Tripoli-Benghazi Cable

Landing Points: Benghazi (Libya), Tripoli (Libya) RFS Year:

2015

Est. End of Service Date:

2040

Total Length (kms):

1,000

Fiber Information:

10 Tb/s per pair

Owners:

Libyan International Telecommunication Company

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer:

Alcatel-Lucent Submarine Networks

Region:

Mediterranean

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


TWA-1

F u j a i r a h

A l S e e b


K a r a c h i

System Name:

TWA-1

Landing Points: Al Seeb (Oman), Fujairah (United Arab Emirates), Karachi (Pakistan) RFS Year:

2006

Est. End of Service Date:

2031

Total Length (kms):

1,300

Initial Capacity: Owners:

1.28 Tb/s Trans-World Associates

System Supplier:

Tyco Telecommunications

System Installer:

Tyco Telecommunications

Region:

Middle East


P e n t a

n o

h i

s k

s

UGARIT


System Name:

Ugarit

Landing Points: Pentaskhinos (Cyprus), Tartus (Syria) RFS Year:

1995

Est. End of Service Date:

2020

Est. System Cost (US$):

16,000,000

Total Length (kms): Initial Capacity: Owners: System Supplier: Region:

T a r t u s

240 622 Mb/s Cypress Telecommunications Authority Tyco Telecommunications Mediterranean


UNISUR

M a l d o n a d o

L a s T o n i n a s


F l o r i a n o p o l i s

System Name:

Unisur

Landing Points: Florianopolis (Brazil), Las Toninas (Argentina), Maldonado (Uruguay) RFS Year:

1994

Est. End of Service Date:

2019

Est. System Cost (US$):

74,000,000

Total Length (kms): Initial Capacity:

1,720 560 Mb/s

Owners:

Antel (Uruguay), Embratel, Telecom Argentina, Telefonica de Argentina

Region:

Atlantic


UNITY

Chikura


Hermosa Beach

System Name:

Unity

Landing Points: Chikura (Japan), Los Angeles (USA) RFS Year:

2010

Est. End of Service Date:

2035

Est. System Cost (US$):

300,000,000

Total Length (kms):

9,978

Initial Capacity:

1.92 Tb/s

Design Capacity:

4.8 Tb/s

Fiber Information:

5 Fiber Pairs

Owners: System Supplier:

Bharti Airtel, Global Transit, Google, KDDI, PACNET, Singtel Tyco Telecommunications

Upgrader:

Ciena

Upgrade Year:

2013

Upgraded Capacity: Region:

100 Gb/s Pacific


VANUATU - FIJI


System Name:

Vanuatu - Fiji

Landing Points: Port Vila (Vanuatu), Suva (Fiji) RFS Year:

2014

Est. End of Service Date:

2039

Est. System Cost (US$):

30,000,000

Total Length (kms):

1,259

Initial Capacity:

20 Gb/s

Design Capacity:

320 Gb/s

Owners: System Supplier: Region:

Interchange Limited TE SubCom Pacific


VANUATU - PAPUA NEW GUINEA [Planned]

Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance


System Name:

Vanuatu - Papua New Guinea

Landing Points: Port Vila (Vanuatu); Port Moresby (Papua New Guinea) RFS Year:

2015

Est. End of Service Date:

2040

Total Length (kms):

3,000

Initial Capacity:

40 Gb/s

Design Capacity:

1.2 Tb/s

Owners: System Supplier: Region:

Interchange (Vanuatu) Alcatel-Lucent Submarine Networks Pacific

Port Moresby Port Vila


VENTSPILS-GOTLAND


System Name:

Ventspils-Gotland

Landing Points: Fårösund (Sweden), Stockholm (Sweden), Ventspils (Latvia) RFS Year:

2004

Est. End of Service Date:

2029

Total Length (kms):

175

Initial Capacity: Fiber Information: Owners: System Supplier: Region:

2.5 Gb/s 34 Fiber Pairs Baltcom TE SubCom Baltic


VMSCS

C a t a n

S t . G e o r g e ’ s B a y


n i a

System Name:

VMSCS

Landing Points: Balluta (Malta), Catania (Italy) RFS Year:

2004

Est. End of Service Date:

2029

Total Length (kms):

250

Initial Capacity:

10 Gb/s

Owners:

Vodafone Malta

Region:

Mediterranean


WACS System Name:

WACS

Landing Points: Accra (Ghana), Alta Vista (Spain), Cape Verde (Cape Verde), Douala (Cameroon), Lagos (Nigeria), Lome (Togo), Luanda (Angola), Muanda (DRC), Pointe Noire (Congo), Sesimbra (Portugal), Walvis Bay (Namibia), Whitesands Bay (UK) RFS Year:

2012

Est. End of Service Date:

2037

Est. System Cost (US$):

600,000,000

Total Length (kms):

Alta Vista

11,378

Initial Capacity:

500 Gb/s

Design Capacity:

5.1 Tb/s

Owners:

Angola Cables, Broadband Infraco, Congo Telecom, C&W, MTN Group, Office Congolais de Poste et Telecommunication, PT Comunicações, Tata Communications, Telecom Namibia, Telekom SA, Togo Telecom, Vodacom

Region:

Atlantic

Cape Verde


Whitesand Bay

Ac

cr

a Lo

m La e go s

Sesimbra

Douala

Pointe Noire Muanda Luanda

Walvis Bay


WARF

C

Hulhumalé


Cochin

System Name:

WARF

Landing Points: Cochin (India), Hulhumalé (India) RFS Year:

2007

Est. End of Service Date:

2032

Total Length (kms):

680

Owners:

WARF Telecom International

System Supplier:

Alcatel Submarine Networks

Marine Surveyor:

Fugro

Region:

Indian Ocean


e-Sales

ost-Sales

erformance-Sales Pre-Sales

Post-Sales Performance-Sales


Contact Us Web: www.aptelecom.com Phone: +1 (908) 547-7868 info@aptelecom.com


WESTERN VISAYAS - PALAWAN

Taytay


System Name:

Western Visayas - Palawan

Landing Points: Taytay, Palawan; San Jose de Buenavista, Iloilo (Philippines) RFS Year:

2014

Est. End of Service Date:

2039

Est. System Cost (US$):

20,000,000

Total Length (kms):

300

Owners:

PLDT (Philippines)

Region:

Pacific

San Jose de Buenavista Iloilo


Turn static files into dynamic content formats.

Create a flipbook