Skip to main content

Project Plans - Retaining Wall

Page 1

for SLS

July 18, 2022


2

L = 1 1 5 . 8 5 ’ R STO NEB N/F RI AR PLA T O D B 227 NE 858 6 S TRU 9 P TON STE G 1 EBR 393 ES LOC I AR R NO. I D G E D 21 T63 RI VE 072 6

KE HR S VA MI R LL I R= AB 95 RO LE 5. 00 WI AD ’L DT = 53 20 H + 00 3. 2

FEDERAL PROJECT NO. T MEN ASE E E 2 P A PG DSC 291 LAN PB

MSD:

TY LI UTI

K DEWAL CONCRETE SI

9 0 . 3 0 ’ R 9 0 . 3 8 ’ S

C

PB RO S 22 S I 7 N PG G 62 P

SCALE: 1" = 20’

E TRE 8"

E TRE 8"

GUY

E TRE 0" 1

E TRE 2" 1

29 3 PG PB 16

RE WI

NE LI SH BRU

E TRE 8" 1

T EM EN 5’EAS

CL AR KS ON

SCALE IN FEET

E TRE 35"

N 75 45

281.01’ R

E TRE 6"

NG PI SLO OF 2" 1 NG/ SE I O D P A S UR GR T P Y EN E RAR R TH VEM PO RO O M P F E M I T NT 29 NG EME UCTI PG EAS 63 STR B 1 N P CO E TRE

E TRE 30"

UND RO G N MMO O C

ES STE N/F 1TRU T 201 PLA 1 RT G LL I OU P H 9 1 D N C 8 E 6 UN E O 4 R GR DB C 027 NI T63 1 SCE 2 1 . NO 579 1 LOC

NT SEM E 10’EA

5’ EASEMENT PB 227 PG 62 FO 4 UN NE LI 3 D SH 4 R BRU 7 I O ’ 3 4 N " P E I P E TRE E 2" 1 E 0 . TRE 0 8 35" ’

62

S

1 5’ WI DENI NG PB 1 63 PG 29

K DEWAL CONCRETE SI

5’ EASEMENT PB 1 63 PG 29

PG

6 2 2 5 ’B U I LD I N G

LE PO

29 PG 63 B 1 P NT EME EAS 5’

LA T

C H AR LE S L OT 1 W 5 90 4 N 0 DB & 3 / EA 1 LA F U LO G 1 0 R A C LE 72 K N S P O G L B . AN O 2 8 Y 1 7 T DI C 1 N 63 E, G 0 H C 2 /W O 8 5 U R T

’ 58" W

D A N IEL A . H O W ELL

P G

25’ BUI L DI NG L I NE

60

TY LI UTI

15’ WIDENING PB 227 PG 62

29

2 2 7

N

40

ALL EW TI OD O W

B

LI N E

20

VE VAL TER A W NT DRA ALL HY EW RE TI FI OD O W

163 PG

SI DEW ALK

RE WI

PB

CO NC RET E

23+00

5’EASEMENT

GUY

PT 22+73.60

29

St a Of 2 0 f 06 74 + 42 92 . 89 . . 0 5 0’ F ’E T R A S E 41 M . E 92 N T ’S P

2 2 + 0 0

LE PO

27 PB 2

G P 10 ’ E 2 AS 18 E 5 ’ M E P EN A G S T E 8 M 4 E N T P B 2 2 7 B

P

AD RO ALT H P AS

660. 1 3’

M ER OF SCLAI DI TY LI BI RESPONSI he hatt yt f eby speci Iher o be ended t nt si docum ent e zed by m y sealar i hor aut ,and I s sheet hi ot ed t t mi i l m any ai scl eby di her her lot oral yf t i l bi esponsi r ons, i cat i f ngs,Speci awi Dr her s orot t es,Repor m at i Est s um ent r nst s ori docum ent o be ended t nt o ori ng t i at el r he toft orany par used f vey ectorsur oj ng pr i neer engi

FO U 1 94 ND 2 I R O ’ 1 N 3 " E PI P 0 E . 4 2 ’

6 2

S

ONS SI REVI

21 + 0 0

N U M BER PE-2011015754

1 5 3 90 DB & JE N/ 5 F 1 N 8 LO EA 6 NI G 73 FE C L R N E P S O G . CH M 2 5 A C 1 7 S T K 0 E 5 I EL 4 C 0 , O 0 H U 5 /W R 2 T

0

0 6 3. 7 22+ FT a t S 0 0 . 1 f4 f O

MSD BASE MAP:

OD N R RO I CAP T Y SE UNT O C W/

ON PTI DESCRI

VARI ABL E WI DTH WI DENI NG DB 8547 PG 336

OAD T R HAL ASP

LO T

W

E-W GATEWAY TIP NO.

4 6 . 2 7 ’R

2’

C H AR LE S

AR-1836

APP.

1 80 . 06 ’R

COUNTY PROJECT NO.

BY

1 P 5’ B W D 2 I 1 8 EN N P I G G 8 4

S

PE I N P . 4’ RO I 02 D N W FOU 6’ 43" 3 25

PG

5 ’ B EA 2 SE 5 18 M ’ P E B EA N P T 2 SE G 18 M 8 E 4 N P T G 8 4

1 9+ 00

P

291 PG

R= 91 4. 00 ’L = 51 0. 33 ’

W

4 0 9 . 6 2 ’

PB

NT ME 96 SE G EA 10’ 84 P 2 PB

4 7 ’ 3 4 "

REV.DATE

ME NT

S

163

4 3

FO 8 UN 2 D S I D I 2 E 6’ RO W 2 1 A 0 N 0 LK " P ’E P P B E I A E E 0 2 SE A . 1 S 1 8 M 4 E E ’ 2 M P N 0 E G T ’B N T 8 U 4 I LD P B I N 2 G 1 8 LI N P E G 8 4 A N D

5’EASEM ENT PB

C E

TW O DATE: DATE:

6/4/2022

9 2

ON I AT PORT TRANS TRA N SPO RTA TI O N

655.00 1"=20’

Existing Wall Section 650.00

EL A.HOW ELL DANI NEER ONAL ENGI PROFESSI CENSE NO.2011015754 LI

1"=5’

ORKS WO CW I PUBL PU BLI C RK S

PREPARED BY:

660.00

8543 314)615(

B P T N E M E S A ’E 5

ON SI VI GN DI DESI NDBERGH BLVD. 1050 N.LI 1ST FLOOR SSOURI 63132 S,M I ST.LOUI

G P 3 16

Profile Grade 635.00

Existing Top of Sidewalk

PLAN AND PROFI LE

640.00

LL ROAD KEHRS M I NG W ALL NI RETAI REPLACEM ENT

645.00

630.00 DESIGNED: DESIGNED:

W. A. STEVENS DRAWN: DRAWN:

625.00

W. A. STEVENS CHECKED: CHECKED:

D. A. HOWELL SHEET SEQUENCE:

3 OF 4

18+00

19+00

20+00

21+00

22+00

23+00


Turn static files into dynamic content formats.

Create a flipbook