STERCHELEGROUP LIGHTWEIGHT BATHROOM PODS

Page 1

Lightweight Bathroom Pod

The lightweight bathroom pods (CBL) is composed of a reinforced concrete base, of varying thickness, made of a galvanized steel frame, and of walls and ceiling constituted by structural S320 steel profiles framework thickness 8/10, duly designed to lodge ducts, conduits, electrical cables and pipes for electrical and water installations, boarded with panels of various materials according to the specific requirements. The steel profiles are customized components, produced by a rollforming plant, in application of the specific project. The cladding panels are made with performing materials such as plasterboard or fiber board. Base, walls and ceiling are then fixed together by means of self-tapping steel screws. During the manufacturing process the pod is continuously checked both for structural and installation aspects.

Projects THE MADISON, LONDON 487 bathroom pods

DOLLAR BAY, LONDON 160 bathroom pods

MORELLO II, CROYDON 530 bathroom pods

CHERRY PARK, STRATFORD 792 bathroom pods

VICTORIA SQUARE HILTON HOTEL, WOKING 165 bathroom pods

VICTORIA SQUARE RESIDENTIAL TOWERS, WOKING 755 bathroom pods

CENTRAL DECK ARENA, TAMPERE (FI) 274 bathroom pods


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.