Skip to main content

ATAC Head Quarters, Roma Eur (IT)

Page 1


ATACHeadQuarters

Roma Eur(IT)

THEPROJECT

For the new ATAC Head Quartersin Rome'sEUR district, built for Client: EuroparcoSrl, 63Monolithic BathPods were supplied and installed, developed in 4differentmodelstomeetthecomplex's diverse functionalneeds.

The solutionsadopted include podswith anti-bathandtwoWCenvironments, ensuringhigh standards of quality, practicality and architecturalintegration within the directional spaces.

MODEL1

Concrete Bathroom Pod with dressing room

Concrete Bathroom Pod with dressing room MODEL2
Concrete Bathroom Pod with dressing room MODEL3
Concrete Bathroom Pod for disabled MODEL4

MATERIALSANDTECNOLOGIESFORMODELS12AND4

• Structure:base, walls and ceiling made in concrete

• Floorfinishing: single-fired and slip resistant tiles R10 20 x 20 cm Vogue / Flooring

• Wallfinishing: single-fired tiles 20 x 20 cm – Vogue / Interni

• Washbasin: ceramic console with double sink - Laufen / Flora Due

• Sanitaryfittings: Laufen / Pro

• Taps: time-controlled mixer– Grohe / Eurosmart Cosmopolitan

• Plumbinginstallation:in parallel with manifolds; sheathed and removable cross linked polyethylene pipes– Uponor / Quick& Easy Angle wall box for water piping connection

• Electricalinstallation:presence detector Finder; switches VIMAR / Plana

• Ventilation:air inlet valve – MP3

MATERIALSANDTECNOLOGIESFORMODEL3

• Structure:base, walls and ceiling in concrete

• Floorfinishing: single-fired and slip resistant tiles R10 20 x 20 cm Vogue / Flooring

• Wallfinishing: single-fired tiles 20 x 20 cm – Vogue / Interni

• Washbasin: Goman / Open

• Sanitaryfittings: egonomic for disabled persons – Goman / Open e Olymp

• Safetyhandlebarsgrips:in steel with an antibacterical coating system– Goman / Classic

• Taps: clinic lever mixer Grohe / Eureco

• Plumbinginstallation:in parallel with manifolds; sheathed and removable cross linked polyethylene pipes– Uponor / Quick& Easy Angle wall box for water piping connection

• Electricalinstallation:presence detector Finder; switches VIMAR / Plana

• Ventilation:air inlet valve – MP3

The laying of the bathroom pods is inserted during the assembly phases

Turn static files into dynamic content formats.

Create a flipbook
ATAC Head Quarters, Roma Eur (IT) by StercheleGroup® - Issuu