Skipping MEP Clash Detection Can Cost You More Than You Think

Page 1


The Risk of Skipping MEP Clash Detection

What is MEP Clash Detection?

Clash detection identifies conflicts between Mechanical, Electrical, and Plumbing systems before construction begins.

It ensures all elements work together seamlessly in a 3D BIM environment.

Cost Overruns

Unidentified clashes lead to rework on-site, which increases material wastage, labor costs, and project delays.

Fixing a clash post-construction costs 5x more than during design.

Project Delays

On-site conflicts halt construction until issues are resolved. This disrupts schedules and affects project timelines.

Safety Hazards

Improperly placed systems can create safety risks—like blocked access to fire exits, overloaded electrical routes, or HVAC duct interference.

Poor System Performance

Without coordination, systems may not operate efficiently.

Examples: HVAC ducts clashing with structural beams or plumbing lines intersecting with electrical conduits.

The Smart Move – BIM Coordination

With BIM clash detection, all MEP systems are checked in a virtual model.

Conflicts are resolved before construction, ensuring faster execution, reduced cost, and safer buildings.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Skipping MEP Clash Detection Can Cost You More Than You Think by Ryan Stein - Issuu