News - Pakenham Officer Star News - 22nd December 2022

Page 1

PAKENHAM OFFICER

pakenhamnews.starcommunity.com.au

Thursday, 22 December, 2022

/pakenhamstarnews

@StarNews_SE

40¢ Inc. GST

Free recycling drop-off

Diocese leader to retire

Battin bumped to CBD office

Dazzling depth on display

PAGE 2

PAGE 5

PAGE 7

SPORT to all our valued readers...

12583329-KJ51-22

Santa’s coming to town! In the days leading up to Christmas, once all the presents are sorted, it’s well worth going for a drive around Pakenham and seeing all the stunning decorations. Photos page 3

Santa taking his friends for a ride on Balmoral Way, Pakenham. 313635 Picture: MATT MALE

Major pothole blitz WE ARE NOW LOCATED AT SHOP 10, 1 HUNT WAY, PAKENHAM OPEN FOR BUSINESS ! Now in office consultations Online Consults still available Pakenham Drouin, Narre Warren and Yarra Junction Offices | P 5941 5166

way at Healesville-Kooweerup and McGregor Roads, and reducing bottlenecks for vehicles travelling on Healesville-Kooweerup Road between Peet Street and Southeast Boulevard/ Livestock Way. The project will reduce congestion and improve traffic flow and connectivity. Stage 1 of the Pakenham Roads Upgrade includes: Upgrading the freeway interchanges at Healesville-Kooweerup Road, replacing both roundabouts with traffic lights, building an extra bridge over the Princes Freeway at Healesville-Kooweerup Road to provide two

·

Low Dose CT, Digital X-ray, Comprehensive Ultrasound, Dental X-ray, Dexa or Bone Densitometry, Echocardiogram

lanes in each direction.

· Upgrading the Princes Freeway interchange

·

at McGregor Road to a full diamond interchange – as well as adding an extra lane in each direction on the freeway between McGregor and Healesville-Kooweerup Roads to connect the entry and exit ramps between these interchanges. Adding extra lanes on Healesville-Kooweerup Road between Peet Street and Southeast Boulevard/Livestock Way, so that it is two lanes in each direction. Continued page 5

BULK BILLING OPEN 7 DAYS

(03) 5922 2072 U2, 1 Stephenson Street PAKENHAM

12550522-AI20-22

areas on sections of both the Princes Freeway, Racecourse Road, and Healesville-Kooweerup Road as part of the scope of the project. To complete works safely, there will be traffic management, lane closures and speed reductions to 40km/h. Disruptions will be in place on weekdays between 9am and 3pm and 8pm to 5am on McGregor Road, Healesville-Kooweerup Road and the Princes Freeway, including the Healesville-Kooweerup Road freeway ramps. Pakenham Roads Upgrade Stage 1 will focus on improving access on and off the Princes Free12552371-AI23-22

The Pakenham Roads Upgrade project will see three major roads in Pakenham upgraded, including Racecourse Road, McGregor Road and the Princes Freeway. The project will be delivered in three stages, with upgrades to the Princes Freeway the first to get underway. Early works for Stage 1 to upgrade the Princes Freeway started in November, with pothole restoration works scheduled to start in early January. In January, 300 tonnes of asphalt will be spread to repair potholes within the project


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
News - Pakenham Officer Star News - 22nd December 2022 by Star News Group - Issuu