INC.REID,SECKMANSMITH

ENGINEERING | TECHNOLOGY + EQUIPMENT PLANNING COMMISSIONING | SUSTAINABILITY | BUILDING ENCLOSURE

GET TO KNOW
WE ESTABLISHED PHYSICAL PRESENCE IN FLORIDA IN 1991 AND HAVE BEEN PROUD TO SERVE MANY OF THE SAME CLIENTS EVER SINCE. SSR HAS PROVIDED ENGINEERING, COMMISSIONING AND TECHNOLOGY PLANNING SERVICES ACROSS THE STATE, AS WELL AS ACROSS THE COUNTRY. US Smith Seckman Reid, Inc. is a 100% employeeowned engineering and consulting firm that believes in putting people first. You are the driving force behind our dedication to providing engineering, commissioning, sustainability, and technology solutions. Leveraging our more than 50 years of expertise, we’re focused on providing exceptional client experiences. We know that your successes are our successes — and we intend to succeed. Since entering the Florida market in 1991, SSR has become a leader among engineering firms in designing, consulting, and commissioning projects for public and private clients across the state. Our professionals offer a full range of engineering system designs and consulting services required by today’s complex facilities. Our team focuses on providing system solutions that are operationally flexible, efficient, and sustainable. Whether it’s new construction or modernizing existing spaces, we have the depth of experience required to respond to client needs. WE ARE SMITH SECKMAN REID & WE’RE IN THE BUSINESS OF PROVIDING EXCEPTIONAL CLIENT EXPERIENCES.

DENVER MEMPHIS HOUSTON ATLANTA CRESTVIEW TAMPASARASOTACLEVELANDOAKDALE WASHINGTON DC FT. MYERS WORTHFORTDESDALLASNEWMOINESORLEANS NASHVILLE SSR CHICAGOHEADQUARTERSHUNTSVILLESSR OFFICE ADDITIONALLOCATIONFIRMRESOURCES CHARLOTTE AUBURN/OPELIKA AUSTIN PHOENIX
BUILDING ENCLOSURE Building Enclosure Commissioning Roof FacilityEnclosureConsultingTestingCondition Assessments & DesignInvestigations&Design Consulting SiteCIVILPlanning & Development Grading & Drainage Erosion & Sediment Control Stormwater Management Surveying & Mapping DataMachineWirelessSCADAProcessCONTROLSComplianceFacilityDayEnvironmentContinuousMANAGEMENTCOMPLIANCEContinuousRetro-CommissioningTotalCOMMISSIONINGHydrologyBuildingCommissioningCommissioning®ANDFACILITYComplianceReadinessofCareReviews2ComplianceManagementConsultingEducation/TrainingANDINTEGRATIONControlCommunicationsControl&GuardingCollection

WHAT WE DO TrainingLocationSolutionsMobileDataManagementInfrastructureSystemSYSTEMSGEOGRAPHICHydraulicFoamCleanWetFIREProgramFinancialIntegratedWaterCollectionWastewaterWaterENVIRONMENTALCoordinationPowerUninterruptibleStandbyDaylightingInteriorPowerELECTRICALDistribution&ExteriorLightingPowerFacilitiesPowerConditioningStudiesTreatment&DistributionTreatment&Reclamation/ReuseWaterPlanningAnalysisManagementPROTECTION&DrySprinklerSystemsAgentSystemsSystemsModelingINFORMATION(GIS)Design&ImplementationMapping&AssetMigration&Web-basedGeospatialAnalytics CentralMECHANICALEnergy Plants Building Automation Systems Energy Management CFD CampusGeo-ExchangeAnalysisDistribution Systems High Performance HVAC BuildingPLUMBINGCogenerationWater Supply & Sewer Gas WaterSystemsUseAudits & Management Greywater & Rainwater Systems Process Pure Water Solar Water Foundations,STRUCTURALHeatingDeep& Shallow Reinforced, Pre-Stressed, & PostTensioned Concrete Steel SeismicFailureFabricationAnalysisEvaluations & Retrofit BuildingSustainabilityConsultingGreenSUSTAINABILITYBuildingCertificationConsultingPerformanceConsulting TECHNOLOGY + EQUIPMENT HealthcarePLANNING Technology + Equipment Planning Healthcare Consulting Equipment CommunicationPlanningSystems Design Security RoadwayPortAirportsSignalizationRoadwaysTRANSPORTATIONMoveTransitionProcurementAssetAudiovisualConsultingDesignManagementPlanningManagement&BridgesFacilitiesPlanning& Safety IntelligentAudits Transportation ConstructionSystems Engineering Inspection Continuous Commissioning®, CC® and PCC® are registered trademarks of the Texas A&M Engineering Experiment Station, a member of the Texas A&M University System, an agency of the State of Texas.
THE FLORIDA TEAM 30 YEARS IN FLORIDA 4 LOCATIONSFLORIDA 19 EXPERIENCEYEARSAVERAGEOF






















Registrations
Hank is responsible for managing our operations and staff of project managers, engineers, and engineering technicians in Florida. His experience as a Senior Project Manager and Senior Mechanical Engineer has contributed to many successful projects and is a vast resource for our associates. As Principal in Charge, Hank will have ultimate responsibility for SSR’s project work, and will serve to provide the resources needed to successfully complete each project on schedule and within budget. Bachelor of Science, Mechanical Engineering, Tennessee Technological University and Certifications professional engineer in the states of Florida, New York, South Carolina, Tennessee, West Virginia Nirider PE, AP Summary
LEED
Roger brings more than 36 years of experience in consulting engineering business development and operations. His background includes experience in multi-family, sports and entertainment, student housing, senior living, high-rise/office, K-12, and higher education. Roger is well versed in sustainable design programs such as LEED, Earth Craft, EnergyStar, Title 24, and NAHB (certified through gold). His project management involvement has been in short and long-term mechanical projects, but he is also experienced in plumbing, fire sprinkler, fire alarm, and electrical disciplines and codes.
Summary
Education & Certifications
AutoDesk –
–
–
LEED Green
Thermodynamics BRE III & IV Metallurgy & Tensile BRE VI AutoCADD AFSA Fire Sprinkler Design 102Basics of the NAHB Course I Build Seminar Bio Mass ASME Bio-Processing Procedures Years Experience Roger Perkins Principal
Principal
36
Registered
Education
and
LEED AP Years Experience 14 Hank
–


15
Paul Gammons Senior Project Manager
THE FLORIDA TEAM
Bachelor of Engineering Technology, Electrical Engineering, University of Toledo Certifications
Summary
Kevin is a Senior Project Manager and Senior Electrical Designer. As project manager his primary responsibilities are to work closely with the owner to successfully complete every project on schedule and within budget. Kevin’s expertise includes power distribution, lighting design, and life safety systems for institutional, commercial, and industrial buildings. He is very experienced at AHJ inspections with an exceptional pass rate after more than 200 AHJ inspections.
Education Bachelor of Science, Engineering Graphics and Design, Murray State University Years Experience
Summary
Paul’s technical background includes expertise in power distribution, lighting design and life safety systems for healthcare, commercial, institutional, and industrial buildings.
Education Master of Business Administration, University of Toledo
Certified building contractor in the state of Florida Years Experience 28 Kevin Graff Senior Project Manager
As Project Manager, Paul’s primary responsibilities are to work closely with the owner to successfully complete every project on schedule and within budget.


LEED AP Years Experience 42 David Simmons, PE Senior Mechanical Engineer
Summary
Robert has 14 years of experience in electrical engineering and 6 years of field experience as an electrician. Areas of engineering expertise include project design and management, lighting control and design, power system design, emergency power system design, surge suppression, short circuit calculations, arc flash hazard analysis, construction administration, and technical assistance to field personnel.
Education University of Central Florida, Bachelor of Science in Electrical Engineering, 2005 University of Central Florida, Master of Science in Engineering Management, 2018 Certifications Registered professional engineer in the state of Florida Years Experience 20 Robert Hugo, PE Project Manager
Summary David is a Senior Mechanical Engineer at our Sarasota office in Florida. He has over 42 years of experience in a variety of industries, specifically the industrial and healthcare markets. David has managed and designed many large and complex projects, including many in Colorado, Florida, and Georgia. Education Master of Science, Mechanical Engineering, University of Texas at Arlington, 1988 Bachelor of Science, Mechanical Engineering, University of South Alabama, 1980 Certifications Registered professional engineer in the states of Alabama, Colorado, Florida, Georgia, and Texas


Summary Colleen is a Senior Project Manager for commissioning projects. Her responsibilities include project team coordination and scheduling through all phases of the commissioning process. Colleen is responsible for development of the commissioning plan, including development of systems installation checklists and functional testing procedures; execution of commissioning activities including functional testing; conducting commissioning kick-off meetings, status meetings, and lessons learned meetings; and assisting the design and construction teams. Master of Science, Mechanical Engineering, University of New Orleans of Science, Electrical Engineering Technology, Nicholls State University Certifications professional engineer in the states of Florida, Georgia, Louisiana, and Maryland Experience Colleen Smith, PE, LEED AP, CPMP Senior Project Manager
34
Bachelor
THE FLORIDA TEAM
Registrations and
Education
Summary Ken is a Senior Commissioning Authority who holds the overall responsibility for personnel training, oversight, and standardization of SSR’s mechanical field commissioning team. He has over 44 years of experience in the maintenance, service, troubleshooting, and commissioning of complex mechanical and plumbing systems. As a 19-year veteran with SSR, Ken has extensive experience executing all of the services we offer and oversees the commissioning documentation review process for mechanical and plumbing systems.
Registered
Education Gateway Technical Institute Certifications
LEED CertifiedAP Commissioning Technician (CxT) Certified Commissioning Authority (CxA) Quality Commissioning Process Provider (QCxP) Certified Commissioning Professional (CCP) Energy Management Professional (EMP) Years Experience 44 Ken Urick, LEED AP, CxA, EMP, QCxP, CCP Commissioning Discipline Leader
Years
Commissioning


John has 25 years of engineering experience. serves of Administrator as of
in the role
John is a regional manager with over 25 years of experience John W.
Hunt, CRC Building Enclosure Regional Manager
Senior Mechanical Design Engineer for healthcare, institutional, commercial, and industrial projects. His area
Construction
expertise includes mechanical systems design. Education Bachelor of Science, University of South Florida Registrations and Certifications Construction Specifications InstituteConstruction Documents Technologist (CSI-CDT) Years Experience 25 John Miller III Senior Construction Administrator Summary
as well
building enclosure
Summary
He
in the industry. He offers expertise in roofing and waterproofing consulting, forensic investigation, legal support, training, and project management for new and existing construction. Education Business Administration, Pima Community College Certifications CILB, Certified Roofing Contractor (FL) OHSA 10 Hour Hazard Recognition Training Tile Roofing Institute, High Wind Installation Certified Wind Mitigation Inspector 2009 (FL) Years Experience 25



HEALTHCARE

The expansion and renovation of the existing Orlando Regional Medical Center involved construction of a 10-story patient bed tower and a four-story expansion on the south and east sides of the existing hospital. The 350,000 SF, 245-bed tower houses several units, including cardiac care, neurology, trauma intensive care, and inpatient rehabilitation. The 100,000 SF expansion increased the side of the emergency department, creating a four-story structure for the clinical departments. SSR provided mechanical, electrical, plumbing, and technology design services. The project utilized the Integrated Project Delivery (IPD) method.
ORLANDO, FL
ORLANDO REGIONAL MEDICAL CENTER

The project consists of a new 200,000 SF hospital where SSR provided mechanical, electrical, plumbing, and technology services. The hospital was opened to patients in 2012 and is located in Wesley Chapel, Florida. It is a full service facility providing inpatient care, an emergency department, five operating rooms, catheterization procedures, C-section delivery suite, and diagnostic imaging among other services.
The central plant was designed with 100% MEP redundancy. During a power outage the entire hospital continues to operate on bi-fuel generators. Cooling is provided by an efficient variable primary chilled water system controlled by the Building Automation System (BAS).
SSR led the MEP consulting industry by delivering this project using Building Information Modeling (BIM) well before it became commonplace. This allowed very accurate internal and external coordination in addition to providing a 3-D model which is continually updated as future projects occur.
WESLEY CHAPEL, FL
ADVENTHEALTH WESLEY CHAPEL HOSPITAL

FORT MYERS, FL
Lee Health’s project history serves as reference to our ability to partner with an organization in a continuing service environment. MEP design firms behave much differently for single projects. For continuous service, the key for SSR has been relationships, understanding expectations, and the ability to track wide-spread facility knowledge.
LEE HEALTH SYSTEM
SSR and Lee Health have enjoyed an over 20-year history of working together at many of Lee Health’s facilities. During this ongoing relationship, our team has completed over 330 projects, including more than 120 AHCA Fromprojects.this history, SSR has been afforded the opportunity to work on multiple facilities at all four Lee Health campuses including both acute and non-acute facilities, as noted below. The longevity of our relationship and the extensive project experience have made us a valued partner.

Domestic Hot Water Study Phases 1 -3 Dinex Panel ERCP Owner Changes CoolerOBS Replacement Retail Pharmacy Waiting CEP Roof Replacement Fuel Oil PharmacyTankHVAC Air Change CT RadiologyScan Nuclear Med Kitchen Coolers IDF 102 UPS Toilets Room Motor Control Centers Golf Cart Canopy Lab AHU-16,UniformAutomationShop18,19,25, 26, 38, 39, 40 AHU 38 Glycol Chiller Modification Radiology Room #1 MRI Renovation ED Secure Holding Courtyard Renovation Cancer Center Expansion ROI Office 7th Floor Bed Reoccupancy Data Center Living Document Rad MOCRoom8thFloor Sleep Rooms MOC 4th Floor Offices 5th Floor Ceiling DWP EmergencySkilledGeneratorGeneratorChillerPharmacyReplacement#2ReplacementReplacementATSStudyNursingApheresisDepartmentNurse Call Gift PharmacyShop Owner Changes 6th Floor Panel Replacement Legal Services Security Renovation OR Study & Electrical Modifications Transfer Center Donor AHUX-RayAmbitransPhysiatryWall133-1&3-2 Surgery ER EmergencyRooms Department Triage Pathology Hood Exhaust Modifications Nuclear Medicine Expansion AHUPharmacy8,17, 23, 25 CEP Roof Replacement Nurse Station OR 2ndRenovationFloorToilet Rooms Birthing Suites Lab Automation Lab Blood Irradiator IR Procedure Room Glycol Chiller Replacement Hot Water Pumps Temperature Fix Elevators 1-6 OB Triage Rooms Suite 456 Employee Health Post & Pre-Op Chiller #3 Third Floor Pathology Offices Clinical Lab Restroom Medical Library EP Lab Booms Cath Lab 3 First Floor Observation Unit 7-bed Patient Rooms Body HeartDialysisHoldCentral Command Center IDFPharmacy101&102 Upgrades Cath Lab Holding Bays Data Center Additional Data Racks SPD Mechanical Room Admin Conference Room Medical Library CT Renovation OR #9 DaVinci Study
SARASOTA MEMORIAL HOSPITAL SSR has served Sarasota Memorial since 1993 on well over 200 projects. We are extremely proud of this long-standing relationship and attribute our success to understanding expectations, quality designs, and Weresponsiveness.creditmuchof our successful relationship over the years to our thorough understanding of Sarasota Memorial’s facilities. Many have been designed by SSR, and we continue to upgrade our facility knowledge with each project. This is exemplified by maintaining building-wide electrical one-line diagrams and mechanical duct and piping CAD files and facility chilled water study. There are few areas on campus that we have not been involved in. Our project history at Sarasota Memorial Hospital includes: SARASOTA, FL Hybrid OR 21 Kitchen Expansion Project Emergency Department Radiology Exp Rehabilitation Wing Renovation CCTV Childcare 1 & 2 Imaging Medical Records Telecom Spec East Tower InfrastructureInfrastructureRangeExh System Lobby Coffee Bar Doctors Garden 3rd Fl Study 1st Floor Cafe Revisions C- Pod Ecc Univ Care Center Phase 1 & 2 Central Monitoring ECC Expansion 2nd Fl Storage To Offices Wald Plaza-Interior Upgrade 7Th Fl AHU-7-01 Replacement Fire Suppression Upgrade 4000 Bee Ridge/HVAC Study CEP Hurricane Hardening Ambulatory Care Ctr Un Pkwy Ambulatory Care Ctr Mid Cty Retter Physician Resource Ctr University Pkwy Tenants University Pkway 1st Flr Psi Univ Pkway 1st Fl Express Univ Pkway 2nd Flr Rev Univ Pkway Construction Blackburn Pt Express Blackburn Pt 1st Fl Express Blackburn Construction Phases Phys Resource Ctr-Retter Bldg ECC Sprink & Elec Upg Amb Dishwasher Due Diligence Himm Lobby Renovation Dishwasher Renovation Is Electrical Upgrade Hurricane Hardening Proj #1 Hurricane Hardening Proj #3 Hurricane Hardening Proj #5 Hurricane Hardening Proj #6 Ecc Phase Ii Infrastructure Documentation Ct Scan Waiting Area & Renov Cs/Cr Elevator Upgrade Pat Twr Neighborhood Coord Mep Coord/W Struct Elevator Constr Pricing Pkg Cashier Waiting Room 6Th Retter AHU Upgrade Lab Renovation - DD Bayside Generator Replacement Lab Additions Elect SD Docs Is Rm Crac Replacement HVI Office Renovations Rand Blvd Facility Gen DD Bayside East Gen Due Dil Lasula Phys Parking New Gulf Gate Walk In Clinic 208V Vault Due Diligence AHU 405,406,407, Replacements 2nd Storage Renovation Univ Parkway Walk In Clinic Univ Pkwy Walkway Lighting
HVI AHU Upgrade 1St Floor 505C UniversityAHUPark Lobby AHU - 116 Replacement Elevator A Upgrade 1St Floor Storage Room Valve Location Plans Ats Wald Garage Due Diligence CCT Fire Pump Due Diligence Electrical Prints Update AHU 2-13 & 2-14 Change Out Design Build Logistics System Cape Surgery Sterilizer Replacement Utility & Valve Plans Helipad Foam System Replacement HVI Fire Alarm Panel Replacement Swbd A & B DataFileEAir1743IT1900ElevElevFacilitySwitchboardRenovationA&BPhs2OnelineUpdateCEquipmentReplacementCEquipmentReplacementS.TamiamiTrailAsGeneratorStudyMainSt.OfficeReplacementHandlerReplacementTowerHeatExch'rDueDilRmDehumidificationRoomFanCoil Cct F/A Unit Repl AHU-2-21 & AHU-2-22 Replace AHU-1-09 Replacement Bayside West AHU CA Meetings Add Service Bayside West Water Heater AHU 3-01 Replacement Replace AHU 4--05,4-06.,4-07 AHU 6-02 Replacement AHU 3-23 Replacement AHU 405,406,407 Replacement

The cardiac surgical expansion included a new central clean supply unit, and six new “smart” cardiac operating rooms, and recovery unit. The tower included a completely redesigned hospital entrance and connects the new cardiac surgical unit, NICU/ICU, and labor and delivery units to their counterparts in the existing hospital which implements the facility “platform of care” initiative.
The project included 10 new “smart” operating rooms that are utilized for the state-of-the-art heart and vascular procedures, along with a variety of other surgical procedures. The project utilized the Integrated Project Delivery (IPD) method.
SARASOTA MEMORIAL HOSPITAL BED TOWER
SARASOTA, FL
The expansion of the existing Sarasota Memorial Hospital included the new patient tower and cardiac surgical tower. The 225,000 SF, nine-story patient tower included the addition of one labor and delivery surgical suite floor, one intensive care nursery floor, two state-of-the-art cardiac observation and med/surg bed floors, and two orthopedic/med/surg floors.

SSR provided mechanical, electrical, and plumbing design services, as well as, technology planning, commissioning, and building enclosure commissioning services for Lee Memorial’s Golisano Children’s Hospital of Southwest Florida. The project consisted of 300,000 SF of new construction and a 47,206 SF renovation in the existing HealthPark Medical Center.
The project was comprised of four principal components consisting of the Children’s Pavilion (293,505 SF), expansion for the central energy plant (8,004 SF) to support the Children’s Pavilion, various renovation and enabling projects to the existing HealthPark Medical Center (88,508 SF), and the addition of a parking garage (109,155 SF).
GOLISANO CHILDREN’S HOSPITAL
FORT MYERS, FL

This project was awarded LEED Gold® certification.
JOE HOLLYWOOD,CHILDREN’SDIMAGGIOHOSPITALFL
This new four-story, 160,000 SF, 46-bed children’s hospital, with a 40,000 SF standalone central energy plant, combines advanced technology and the expertise of the largest diversity of board-certified specialists in the region all in a caring, compassionate setting designed specifically for children. The project included seven ORs, outpatient services, auditorium, play areas, and food service.
BAYCARE ST. JOSEPH’S HOSPITAL SOUTH RIVERVIEW, FL SSR provided mechanical, electrical, plumbing, and fire protection design services for St. Joseph’s Hospital South new acute care hospital and physicians’ office building complex. The four-story, 335,000 SF, full-service hospital offers outpatient services, intensive care, a 14bed maternity unit, imaging, lab, surgical services, and more. An attached 85,000 SF, three-story medical office building was also designed adjacent to the hospital to provide integration to outpatient services for both staff and patients.


For this project, SSR is providing mechanical, electrical, plumbing, and fire protection for the renovation of existing facilities to transform the spaces into state-of-the-art urgent care facilities. This scope includes new HVAC with standalone DX RTUs, IT infrastructure, security and access controls, and structured cabling systems for voice and data services.
GUIDEWELL EMERGENCY CLINICS
Guidewell Emergency Clinics is expanding there presence in the Tampa Bay region with seven new clinic locations to serve the growing demand for urgent care. Each facility will be approximately 7,500 SF and provide medical exam rooms, CT scan, X-ray, ultrasound, and lab spaces. The innovative medical practice, operated by Crucial Care, will treat both urgent and emergency medical needs to patients of all ages and provide an alternative to overcrowded, high-cost emergency rooms by combining the convenience and low-cost of an urgent care clinic with the technology and medical personnel associated with a hospital ER.
TAMPA, FL

H. LEE MOFFITT CANCER CENTER
Additionally, our success at Moffitt exemplifies what our approach to Sarasota Memorial would be: clarity of expectations for all stakeholders, trust-based relationships with facilities staff, and deep-rooted facility knowledge only years of service can provide. FL
We attribute maintaining our long-standing relationship with Moffitt to responsive communication and leadership. It is impossible to have such an incredible resume of projects without a glitch here and there, but our proactive relationships with facility staff and contractors enable us to respond quickly and directly to generate vetted, constructible solutions for the owner to then evaluate.
SSR has served Moffitt Cancer Center for over 20 years completing over 400 projects, the majority of which have been outside the acute care environment.
TAMPA,

MRC ResearchVivariumOffice Buildout Research Clinic Buildout MRC Lab Reno Ph 1 Anesthesiology Office Reno Clinic Admin & PFS Renovation West Canopy Revision Essential Sys Electric Metering East Connector Corridor Storage Unit Expansion Energy Recovery Study West Clinic Expansion Generator Study M2gen Second Level Office B/O AHU 2-1 Glycol Chiller Office Exam Rm International Speech Nutrition Rehab Renovation Aya AHULoungeBt-1Equip. Replacement MRC Chem Lab Renov Ph3 Gift Shop Reno - 1st Floor AHU 3-1 Equip Repl/Relocate M2Gen 3rd Flr Office Build-Out MCB 4th Floor Lobby Renovation MRC Medical Library Renovation Srb Auditorium Projector MCB Ground Floor Fac Office GME Lounge 5136 1st Floor Risk Management SRB Quality & Safety MCB Facility Conf Rm & Office Srb Facilities Shop Office 1204 Renovation MRC NMR Spectrometer SRB 4 Office Renovation Radiation Oncology Office MCB Security Call Center Temp Chiller DAS Upgrade MCB Business Office 11222 MCB Registration 12231 2nd Floor Lab Admin Office MKE Office Reno-Phs 1 & 2A SRB NrMR Relocation Security Office MIP Mobile Pharmacy 3,4,5 Coffee Stations MCB Office 12256 SRB Catering 3rd Floor PathologyWaitingOffice Renovation MRC Eye Institute Renovation M2gen Cell Therapy Renovation M2gen 2nd Flr Work Room 243 Data Center Elect Power Design Women's Program Offices -3 AHU -0-1 Replacement M2gen Data Rm Fcu+Elec Design MRC 4th Fl Chem Lab #4029 Renov MRC 4th Fl Chem Lab #4035 Reno D-I Water System Modifications Hw Gen Equip Repl Cep AHU -2-1 Equipment Replacement Office Renovation FOB 2nd Fl Office Renov 2dd Floor MRC Vivarium Renovation 1st Fl Linacc Vault #1214 Feasibility Spine Lab Renovation at SRB Ground Fl AHU -Bt-1 Feasibility Study SPD Ultrasonic Cleaner Replace Siemens Angtio & CT Breaker SPD Dumwaiter Replacement X-Ray 13227 Replacement CT 13268 MicrobiologyMicrobiologyReplacementRenovationRenovation CA AHU Bt 1 Equipment Replacement Equipment Branch Electrical Upg West Clinic 5th Fl Ma Station Peer Review Apg Hot Water 1st Floor Observation Unit 2nd Floor New Grossing Station 5th Floor Transfusion Renovation MCB Endo Procedure Rm 12343 Tomo Vault 1210 Feasibility BMT 4th Fl Subwait & Consult MCB IV Start Room 13623 MCB CT 13262 Replacement MRC Vivarium MRI OR Steris Power CEP Swgr Imsb3 Replacement MIP Cytology Exhaust MCB Ct 13524 Replacement MCB 13252 Selenia Mammo M2gen Cryo Storage Cafeteria & Dining Renovation MRC Chem Lab Feasibility Study MRI 1200 Reno SRB Tissue Culture Rooms Nurse Call Upgrade Nurse Call Upgrade Inspections SRB 2nd Fl Vidir Bed Lift Linac Vault 1208 Spd Clean Storage MCB Nuclear Camera 13581 M2gen Molecular Lab M2gen Molecular Lab Cd Phs M2gen Molecular Lab Phs 2 CT Angio MCB 13531
SSR provided comprehensive communication planning, technology systems design, and commissioning services for the 201,000 SF medical center. Cleveland Clinic Tradition Medical Center includes 60 medical/surgical beds, 10 intensive care unit beds, 12 post-partum unit beds, six neonatal intensive care unit beds, five operating rooms (one shelled), two endoscopy/minor procedure rooms, two c-section operating rooms, an emergency department with 28 treatment bays, and an imaging department including space for the following major equipment: one CT room; one MRI room; two ultrasound rooms; one nuclear medicine room; two general R&F rooms; one interventional radiology room. Also included is surface parking for 488 cars. The project utilized the Integrated Project Delivery method. SSR designed and commissioned an ICU telemedicine monitoring system. The facility is LEED Gold® certified.
CLEVELAND CLINIC TRADITION MEDICAL CENTER
PORT ST. LUCIE, FL

When reviewing the total estimated energy cost savings for May 2015 through the end of January 2020 for electric and natural gas, the savings come to $1,123,245. In total, approximately 37% of the cumulative savings comes from electricity and 63% comes from natural gas. Total GHG savings during the entire Continuous Commissioning process have been 9,948 Mt CO2e. This cumulative total reduction in greenhouse gas emissions is equivalent to removing 2,094 cars from the road for a year, or powering 907 fewer homes for a year, or sending 53 fewer railcars of coal to a power plant.
BAYCARE ST. JOSEPH’S HOSPITAL NORTH
SSR was contracted by BayCare Health Systems to conduct a Continuous Commissioning® (CC®) assessment of St. Joseph’s Hospital-North. The purpose of the assessment was to evaluate the operational efficiency of the existing HVAC and lighting systems, identify deferred maintenance items that may be impacting overall operational efficiency, identify cost-effective energy savings opportunities designed to resolve operating problems, improve comfort, reduce energy use, and identify potential retrofits or capital-intensive projects for future consideration.
LUTZ, FL

Holmes Regional Medical Center MRI Changeout | Melbourne, FL
VARIOUS LOCATIONS, FL
HEALTH FIRST
The facility was fitted with a new MRI and associated equipment. The room replaced an existing CT room on the first floor of the building. This changeout required everything in the existing space to be stripped and re-fitted with upgraded infrastructure, including new RF shielding, dedicated MRI chiller on the roof, and full UPS power backup.
Since 2019, SSR has held a close working relationship with Health First, a fully integrated delivery network in central Florida. Many of our projects involve the revitalization of existing spaces into new service areas, such as radiology and nuclear medicine. Recent projects with the healthcare provider include:
Palm Bay Hospital | Palm Bay, FL SSR provided mechanical and electrical consulting services at the hospital. The project team replaced the MRI equipment on the first floor of the facility. Scope of work also included associated room upgrades to HVAC, lighting, plumbing, and medical gas systems.

Since 1993, SSR has focused on providing engineering and consulting services to Orlando Health Bayfront. As the only trauma center and St. Petersburg’s longest-standing hospital, SSR is proud to have provided many of our services for nearly three decades including work on the facility master plan, medical center review, and Joint Commission review.
ORLANDO HEALTH BAYFRONT
ST. PETERSBURG, FL
Healthcare presents a demanding business environment as one of the most regulated industries in the nation. SSR understands challenges facing healthcare leaders, with increased demand for successful patient outcome and quality of care at a lower cost. We are attuned to the need for flexibility and innovation in all stages of facility life cycles. As Bayfront Health St. Petersburg grows to create new opportunities providing the community with enhanced health care, SSR is here and ready to build on our existing partnership in the community.

MEDICAL OFFICE BUILDING EXPERIENCE (MOB) PROJECT CITY STATE St. Joseph’s Hospital South New Facility & MOB Complex Riverview Florida Delray Medical Center Canyon MOB Delray Beach Florida Alter + Care Wiregrass MOB Wesley Chapel Florida Morton Plant Hospital Axelrod MOB Clearwater Florida Lakewood Ranch Spine Center & MOB Sarasota Florida Bascom Palmer Eye Institute Palm Beach Garden’s Florida Dr. Morrish Dental Clinic Bradenton Florida Cape Coral Gastroenterology MOB Cape Coral Florida Oak Hill Hospital MOB Spring Hill Florida Blake Medical Center Medical Arts Building Bradenton Florida Lee Memorial Santa Barbara Claims Management Office Fort Myers Florida Northside Medical Plaza St. Petersburg Florida St. Mark’s Surgery Center Fort Myers Florida Riverwalk Endoscopy Center Fort Myers Florida Osceola Regional Medical Center Wound Care Center Kissimmee Florida Dr. Trotman MOB & Ambulatory Surgery Center Bradenton Florida Sarasota Memorial Hospital Dr. Switlyk Office Renovation Sarasota Florida Northside Hospital MOB St. Petersburg Florida Carillon Health & Wellness Center St. Petersburg Florida Cleveland Clinic 3rd Floor Weston Florida Oak Hill Hospital Modular Office Space Spring Hill Florida H. Lee Moffitt Cancer Center West Clinic MOB Tampa Florida Weston Regional Health Park MOB & Ambulatory Surgery Center Weston Florida Sarasota Memorial Hospital Bee Ridge MOB Sarasota Florida Bayfront Medical Center MOB St. Petersburg Florida St. Vincent’s Medical Center Clinical Services Building Jacksonville Florida Sarasota Memorial Hospital Gulf Gate MOB Sarasota Florida
MORTON PLANT HOSPITAL AXELROD MOB


TECHNOLOGY&SCIENCE

The new headquarters for NeoGenomics opened in 2021. The site is a short drive from the previous NeoGenomics footprint and remains in the vicinity of the Southwest Florida International Airport.
FORT MYERS, FL
The 150,000 SF laboratory and headquarters facility (with space for additional expansion if needed) incorporates innovative technology to deliver comprehensive oncology testing for physicians and their patients spanning all available testing modalities including a state-of-the-art molecular lab with next generation sequencing capabilities.
NEOGENOMICS LABORATORY & WORLDWIDE HEADQUARTERS

TAMPA, FL
The project consisted of the interior buildout and new expansion of the Molecular Laboratory at the M2Gen Building including all new lab space and equipment. The project also involved HVAC and plumbing equipment infrastructure including a new outdoor cooling tower and condenser water pump, rotary screw water chiller with primary and secondary pumps, heating hot water boiler with primary and secondary pumps, two custom air handling units with 100% outside air, redundant high plume lab exhaust fans, precision air valves, room pressurization monitors, and a central DI water distribution system.
MOFFITT CANCER CENTER ADVANCED DIAGNOSTICS LAB
The overall project was divided into three phases. First the HVAC infrastructure, then the interior work on the new third floor molecular lab, followed by the renovation work in the fourth floor lab. The phasing was scheduled consecutively and strategically planned to maintain existing lab operations throughout construction.


LIVINGSENIOR

INSPIRED LIVING AT SUMMERFIELD
The project required special attention to finish details, elimination of door and shower thresholds, lighting levels, and finish colors. Residents afflicted by Alzheimer’s disease and similar ailments view and process their surroundings in a different manner than the average adult. SSR is providing mechanical, electrical, plumbing, and fire protection services.
Inspired Living at Summerfield is a 36,055 SF assisted living memory care facility including 58 resident rooms, dining rooms, activity areas, a full-service commercial kitchen, administrative offices, and memory garden walk paths. The design is based upon 100% of the residents who are dependent upon assisted living care due to varying degrees of memory ailments.
SUMMERFIELD, FL

Set in a captivating environment, surrounded by the blue waters of the Gulf Coast, Plymouth Harbor at Sarasota Bay is a Senior Living Community who strives to place wellness at the heart of their resident culture. The campus was ingeniously designed to offer a wide variety of customized residential apartments - large spacious one bedrooms to penthouse suites - featuring 18 different floor plans to suit the evolving lifestyles of our residents. The three-story building over parking includes 31 assisted-living units, 30 memory-care residences, and 12 independent-living apartments.
PLYMOUTH HARBOR
SARASOTA, FL

THE VILLAGES, FL
The Villages Independent Living facility is a 251-bed, 350,000 SF independent living facility in The Villages, Florida. The facility was designed to provide totally independent living in a unique condominium atmosphere with the benefits of a continuing care retirement community when needed. The scope include mechanical, electrical, and plumbing design. Construction was completed in 2009 at a cost of $70 million.
FREEDOM POINTE

THE VILLAGES PHASE 2
THE VILLAGES,
This project consisted of a 100-bed skilled nursing building, 60-bed memory care building, 40-bed assisted living building, and a common shared service building housing all ancillary support spaces for the three primary buildings. The project was over 150,000 SF of total construction. SSR provided mechanical, electrical, plumbing, technology, and low voltage design. FL

ASSISTED LIVING / MEMORY CARE FACILITIES PROJECT CITY STATE Villages Skilled Nursing Facility The Villages Florida Villages Memory Care The Villages Florida Villages Assisted Living Renovations The Villages Florida Freedom Pointe at The Villages Phase II The Villages Florida Villages Physical Therapy Renovations The Villages Florida Plymouth Harbor Retirement Community/Assisted Living Facility Fire Alarm System Upgrades Sarasota Florida Plymouth Harbor Retirement Community/Assisted Living Facility Electrical Upgrades Sarasota Florida Plymouth Harbor Retirement Community/Assisted Living Facility Apartment Renovations Sarasota Florida Plymouth Harbor Retirement Community/Assisted Living Facility Smith Care Center Spa Room Sarasota Florida Plymouth Harbor Retirement Community/Assisted Living Facility Smith Care Center Domestic Water Upgrades Sarasota Florida HealthSouth Long Term Acute Care Hospital Sarasota Florida HealthSouth Rehabilitation Hospital Sarasota Florida Palms of Pasadena Hospital Rehab Unit St. Petersburg Florida Carillon Health and Wellness Center St. Petersburg Florida Carillon Health & Wellness Center St. Petersburg Florida Bayfront Medical Wellness Center St. Petersburg Florida Carriage Club of Jacksonville Jacksonville Florida Jacksonville Memory Care Jacksonville Florida Cape Coral Wellness Center Cape Coral Florida Carlton Shores Daytona Florida Lehigh Acres Rehab Facility Lehigh Florida Brookdale Memory Enhancement Nursing Home Jacksonville / Ocala Florida Brighton Gardens Venice Florida Ocala Memory Care Ocala Florida
FREEDOM POINTE AT THE VILLAGES


ENTERTAINMENT&SPORTS

Since the early 2000’s SSR has worked closely with Disney Worldwide Services to provide engineering support throughout the famous resort. These behind-the-scenes projects include electrical upgrades, chiller and air handling unit replacements, assessments, and design services which ultimately contribute to the enjoyment of visitors in each theme park, attraction, resort, and experience.
WALT DISNEY WORLD
SSR is currently working on a number of park and resort projects throughout the property. These include backof-house administration areas such as the distribution center warehouse and textile services plant, and lighting and electrical replacements on attractions such as Space Mountain at Magic Kingdom® park Tomorrowland® and Toy Story Land at Disney’s Hollywood Studios®. Other projects under construction include: Fantasmic! at Disney’s Hollywood Studios®, Theater in the Wild at Disney’s Animal Kingdom®, and Mickey’s PhilharMagic at Magic Kingdom®.
ORLANDO, FL

EPCOT® The Land – Kitchen Hoods Engineering design services were provided by SSR in the conversion of two solid fuel exhaust fans and one hood controller in the kitchen at the earththemed pavilion.
EPCOT® Test Track® – Control Panels
The project team provided design documents for the removal and replacement of two existing rooftop chilled water air handling units that serve the east and west ticket booths at the entrance to the EPCOT® Theme Park.
All Star® Resort – Air System Electrical Modifications
SSR worked with the Walt Disney World Textile Services Team to replace the compressed air equipment in the textile services plant in the Cast Services Building at the resort.
EPCOT® Theme Park – Ticket Booth Rooftop AHU Units
The control panels to the high-speed slot car ride were relocated to more accessible locations. SSR provided electrical engineering design services for the relocation.

DISNEY’S BAY LAKE
BOCACLUBRATON, FL Boca Beach Club, now a Waldorf Astoria Resort is situated adjacent to the 356-acre Boca Raton Resort in South Florida. This exclusive, private village offers the best of both worlds: an awardwinning spa, championship golf and tennis, expansive beach, and luxury marina.
TOWER RESORT LAKE BUENA VISTA, FL SSR provided mechanical, electrical, and plumbing engineering design services to this new, 16-story hotel with 296 Disney Vacation Club suites totaling 454 keys and approximately 500,000 SF of total space.
BOCA RATON BEACH
The beach club provides spacious guest rooms, dazzling ocean views, and full access to exclusive activities and dining. The project included the renovation of guest rooms and suites, common areas, commercial spaces, an amenity deck that features three pools and newly constructed cabanas as well as a new four story parking garage with a member arrival deck.


SSR provided engineering design services for the expansion building at Disney Vacation Club’s Grand Floridian Resort. The project featured multiple timeshare unit designs, a pools side grill, retail, and support services space. The project also included the design of a closed loop lake geo-exchange. This design relayed on the Seven Seas Lagoon to provide a cool water supply, eliminating the need for a cooling tower. Prior to construction, it was determined that lake cooling would have little to no environmental impact on the lagoon.
DISNEY’S SARATOGA SPRINGS RESORT LAKE BUENA VISTA, FL
DISNEY’S LAKEFLORIDIANGRANDRESORTBUENAVISTA,FL
Disney’s Saratoga Springs Resort & Spa is the largest Disney Vacation Club resort. The 65-acre resort is a total of 18 villa buildings providing 828 vacation home units. The project was completed in three phases. Phase I: four villa buildings in one section called Congress Park opened with 184 vacation home units in 2004. Phase II: eight villa buildings in two sections called The Springs and The Paddock started opening in Spring 2005 eventually adding an additional 378 vacation home units. Phase III: six villa buildings in two sections called The Carousel and The Grandstand opened in Winter 2006/2007 adding an additional 276 vacation home units. The resort also includes four pools and pool buildings as well as restaurant and retail space in the renovated former Disney Institute.


AMALIE ARENA
SSR completed renovations at Amalie Arena (formerly Tampa Bay Times Forum), home of the Tampa Bay Lightning. The renovations intended to give the arena a complete facelift while addressing several issues identified with the existing facility. The renovations included HVAC modifications to provide a higher level of ice performance, a complete LED sports lighting replacement, and the redesign and expansion of existing concessions to provide enhanced efficiency and new locally sourced options for fans. TAMPA, FL

ORLANDO, FL
AMWAY CENTER
The Amway Center is the home of the Orlando Magic of the National Basketball Association and the Orlando Predators of the Arena Football League. This 750,000 SF, 40-suite, 18,500-seat arena is a full service entertainment facility. The building was designed to provide the highest quality atmosphere for any event, including basketball, football, hockey, concerts, and other cultural events. The building also includes restaurant and retail space. The project had a construction cost of $295 million. The project was designed with energy conservation in mind and received LEED Gold® certification from the U.S Green Building Council (USGBC).


EDUCATION

In 2020, SSR was selected for the continuing MEP services for New College of Florida. Projects under this contract will also include low voltage design. This contract supports The Office of Facilities, Planning and Construction with the maintenance and development of the campus buildings and associated infrastructure. Works include renovations, remodels, and small additions up $4 million dollar construction value.
NEW COLLEGE OF FLORIDA
New College’s 144-acre bayfront campus is situated between Sarasota Bay and the Sarasota-Bradenton International Airport. The college lies within a public educational, cultural, and historic district. The campus’s most remarkable structures are its three Florida 1920s boom time, grand-scale residences: College Hall was the home of Edith and Charles Ringling; Cook Hall was the home of Hester Ringling Lancaster Sanford; and Caples Hall was the home of Ellen and Ralph Caples. The well-appointed structures date from the early to mid-1920s, are listed on the National Register of Historic Places. Today, these buildings are used as classrooms, meeting rooms, and offices and their expansive properties provide sites for the modern developments on the bayfront campus.
SARASOTA, FL

This sate-of-the-art building was designed for humanities studies at Palm Beach State College. The four-story building encompasses 47,000 SF. Housing fine arts classes for painting, drawing, graphic design, ceramics, photography music, theater, and architecture The renovation of the Humanities Building was complete overhaul of the 1963 building. The new facility featured current technology while implementing the latest techniques in teaching and learning. The facility houses an exhibition hall for display of student and faculty art work, and multimedia classrooms with wireless internet access, surround sound systems studio, and computer labs.
HUMANITIES BUILDING BOCA RATON, FL

BEN HILL GRIFFIN STADIUM GAINESVILLE, FL
UNIVERSITY OF CENTRAL FLORIDA ARENA ORLANDO, FL
This project included a 93,000 SF expansion and 57,000 SF renovation of the Ben Hill Griffin stadium. The facility serves as the home of the Division I football team for the University of Florida Gators, a member of the Southeastern Conference. A pressbox/skybox tower was added that provided for 2,900 new luxury club seats as well as 34 additional suites. The project also included the expansion of the President’s suite and the expansion and renovation of the Bull Gator Deck.
The project was an expansion and renovation of an existing 5,100-seat arena. The arena is now 330,000 SF and holds just over 10,000 patrons. Seating includes 16 luxury suites, 500 club seats, and 64 loge level seats. The facility serves as the home of the basketball programs of the University of Central Florida Knights, a member of the American Athletic Conference. The arena is part of a larger athletic village development on the UCF campus known as Knight’s Plaza. The facility has the capability to host commencements, concerts, and other sporting and cultural events. SSR was responsible for full mechanical, electrical, fire protection, plumbing, and technology design.
UNIVERSITY OF FLORIDA


FLORIDA BOCAUNIVERSITYATLANTICSTADIUMRATON,FL
TAMPA, FL University of South Florida Center for Advanced Medical Learning and Simulation (CAMLS) is a stateof-the art healthcare simulation and training center housed in an impressive three-story 90,000 SF facility.
SSR provided commissioning services for this robotic surgery learning facility including labs, vivarium, and medical offices.
CAMLS provides world-class health education and professional development by combining cuttingedge simulation, training, research, education, and Theinnovation.CAMLS facility houses surgical skills labs, operating suites, lecture halls, exhibition halls, robotics lab, virtual simulation center, research and innovations labs, and office. This project is LEED Silver® certified.
USF CENTER FOR ADVANCED MEDICAL LEARNING AND SIMULATION (CAMLS)
SSR provided mechanical, electrical, plumbing, and fire protection engineering design services for the construction of a new football stadium for Florida Atlantic University. The stadium has a 30,000-seat capacity, expandable to 60,000. Seating includes 24,400 general admission, 3,860 priority club seats, 1,000 premier club seats, 136 loge seats, and 312 seats in suites. The project included approximately 160,000 SF of new construction. The new stadium serves as the center piece of Florida Atlantic’s Innovation Village, which has been designed to bring more residential, recreation, and retail facilities to campus.


CONTACTS Hank Nirider, PE, LEED AP D: 941.554.1160 | C: 615.892.9902 E: hnirider@ssr-inc.com Roger Perkins D: 941.554.1157 | C: 571.420.0481 E: rperkins@ssr-inc.com