DESIGN OF A BORDER BRIDGE BETWEN THE REPUBLIC OF ZAMBIA AND THE DEMOCRATIC REPUBLIC OF CONGO
MAY 2026
ABOUT
A 362-metre cable-stayed crossing of the Luapula River — designed without intermediate supports in the riverbed — that links the Democratic Republic of the Congo and the Republic of Zambia and forms the centrepiece of one of the largest private infrastructure investments currently underway in Central Africa.
SPECIÁLTERV was commissioned with the structural design of a twin-pylon, cable-stayed bridge that spans the Luapula River in a single 184-metre main span, free of any intermediate pier within the watercourse. The clean profile of the structure responds to a complex set of constraints — deep water, demanding hydrology, a fragile river ecosystem and a remote site at roughly 1,000 m above sea level — while delivering an architecturally distinctive landmark for the Zambia–DRC border.
The steel superstructure of the bridge is a continuous multi-support orthotropic deck, single-cell box girder steel bridge stiffened with two A-shaped pylons and stay cables. Placing the main girder elements along the bridge axis allowed us to gain significant structural and operational advantages: a more efficient distribution of forces, improved torsional stiffness, and a layout that simplifies inspection and future maintenance.
Construction is in progress on both banks; commissioning is scheduled for 2027. The new bridge is more than a transport link — it is an engineering response to a demanding site, and a symbol of cooperation between the two countries it connects.
PROJECT BACKGROUND
The project established for the development of a 184-kilometer road and related infrastructure between the Democratic Republic of the Congo and the Republic of Zambia is currently one of the highest-value individual private infrastructure investments (PPP) originating from Europe, with Duna Aszfalt Co. acting as a professional and investment partner. Its most significant part is the new border bridge spanning the Luapula River on the road network between Kasenga in the DRC and Kashiba in Zambia.
The programme links Haut-Katanga Province in the DRC with Luapula Province in Zambia. It comprises three principal components:
• the upgrade and partial reconstruction of the 184 km road corridor between Kasomeno (DRC) and Mwenda (Zambia);
• a modern one-stop border-post complex straddling the river crossing;
• and the new Luapula border bridge between Kasenga (DRC) and Kashiba (Zambia) — the subject of this document.
The project is part of a 184-kilometre long investment
SITE CONDITIONS
The bridge site lies in the African interior, at an elevation of approximately 1,000 meters above sea level. The bed of the Luapula River has been carved into a rocky plateau, and forms the natural border between the two countries along nearly its entire length.
Geotechnical investigations identified a continuous rock surface at a depth of 4.00–6.00 m. The high-strength breccia conglomerate found in the deeper layers offered excellent bearing characteristics, which allowed the use of shallow foundations. A disadvantage resulting from the strength of the subsoil was that the excavation of the foundation pits required the use of blasting technology.
Bathymetric surveys revealed depths in excess of 30 m at the proposed crossing — a striking figure when compared with roughly 5 m for the Danube at Budapest. The combination of deep water, steep riverbed and a sensitive aquatic ecosystem made the placement of any intermediate pier within the river both impractical and undesirable. This single constraint dictated the minimum feasible main span, and made the cable-stayed configuration the natural structural answer. Democratic Republic of the Congo.
the
Depth of the Luapula river at the proposed crossingcca.30 m
Depth of
Danube at Budapest - cca. 5 m The excavation of the construction pits required the use of blasting technology.
3D model of the temporary cofferdams
ARCHITECTURAL CONCEPT AND SYMBOLISM
The A-shape of the pylons carries a symbolic meaning for the joint development of the two countries — clasped hands raised in prayer, or an arrow directed towards the horizon. In developing the bridge’s architectural language, the design team’s primary objective was clarity. A cable-stayed bridge is, at its best, a structure in which the load path is legible from a distance — and we wanted the Luapula crossing to read as a single, calm gesture across the river. The twin A-pylons, the perfectly symmetrical fan of cables, and the slender single box girder along the centreline together produce a silhouette that is at once contemporary and timeless.
The A-shape of the pylons is deliberately chosen for its symbolic resonance. Seen from the deck, the two legs
The ‘A’ shape of the pylons carry symbolic meaning for the joint development of the two countries
converge upwards — a quiet evocation of clasped hands, of upward aspiration, of unity. For two nations meeting at a river crossing, the gesture is not incidental. The bridge is an architectural statement of partnership, set against a landscape of forest, water and sky.
Structural logic and aesthetic intention are aligned. The two-pylon scheme ensures the global stiffness and stability required for a 184-metre main span; positioning the main girder along the bridge axis improves access for inspection, maintenance and the eventual replacement of components. The clean structural diagram supports a refined architectural expression that harmonises with — rather than competes against — the surrounding landscape.
GENERAL ARRANGEMENT
The bridge crosses the Luapula River as a three-span, cable-stayed structure with an orthotropic steel deck and a total length of 362.00 m. The two A-shaped pylons rise 50.00 m above deck level.
The box girder is suspended by a two plane cable system at intervals of 24.00–4×11.00–2×10.00–8.00–2×10.00–4×11.00–24.00 m in the main span, and 24.00–4×11.00–2×10.00 m in the back spans.
As the river does not support navigation, no navigational clearance is required. The design does, however, allow for the expected rise in water level due to the establishment of a planned hydroelectric power station. A minimum clearance of 3.60 m has been provided for maintenance navigation of the dammed reservoir. In accordance with the longitudinal profile, with a clearance increasing toward the main span.
The location and span configuration were selected with one overriding objective: to minimise the structure’s footprint within the river ecosystem. The 184-metre main span eliminates the need for a pier in the watercourse, and the back spans are kept short enough to land cleanly on the rocky banks.
Span
Total bridge length
Total deck width
Pylon height (above deck)
Substructures concrete
Steel structure ...................
Stay cables - total length
Foundation type
Design standards
Status
m
m 50.00 m (total: 70.00 m)
10 000 m3
4 400 t (S 355 J2/K2/ML, S 460 M/ML)
3 700 m
Shallow, on high-strength breccia-conglomerate
Eurocode, SATCC
Under constructionCompletion scheduled for 2027
SUBSTRUCTURES
The substructure consists of four monolithic reinforced concrete supports - two intermediate piers and two abutments - founded on shallow foundations due to geotechnical conditions. The spill-through abutments incorporate a structural beam positioned on tapered columns and connected to a backwall and 70 cm thick parallel wing walls. Column dimensions are 2.50 m (width) × 11.00 m / 14.00 m (height) × 3.50–6.00 m (depth). The structural beam cross section is 2.50 m (h) × 3.50 m (d). Pier wall thickness varies between 4.60 m and 3.00 m along the 16.20 m height. The rounded pier fronts range from 15.54 m to 13.84 m in width.
Foundation dimensions:
• Abutments: 12.00 m (width) × 2.50 m (height) × 20.00 m (length)
• Piers: 15.00 m (width) × 3.75 m (height) × 18.00 m (length)
Excavation of the foundation pits required controlled blasting through the breccia conglomerate, supported by an earthfill cofferdam with injection grouting (see Construction Technology, below). Pier protection is provided by riprap embedded in concrete, laid over a partially demolished cofferdam footprint.
SUPERSTRUCTURE
The steel structure was modularised into container-transportable elements at the design stage, enabling efficient international shipment from the fabrication shop to the African site, and rapid on-site assembly. The superstructure comprises four principal components:
• stiffening girder,
• pylons,
• stay cables,
• and the bridge accessories (railings, drainage, lighting, expansion joints, maintenance access).
STIFFENING GIRDER
The stiffening girder is an upper deck, closed box section steel girder supported at four points and rigidly connected to the pylon legs, which are also closed sections. A central enclosed box forms the main girder, and its upper flanges extend outward to form the orthotropic steel deck. The box cross section at midspan measures 3560 mm in height and 3900 mm in width. Cross-girders, spaced at 4000 mm, are inverted T sections with a depth of 1060 mm from the deck slab. The orthotropic steel deck is supported by trapezoidal ribs (height = 300 mm) spaced at 580 mm. The cantilever struts have an I section with a height of 796 mm. The lower flange of the girder is concreted up to 1.25 m for 36 m from the end cross girder axes to reduce tensile forces in the tie bearings.
Cross-girders have an open configuration. Every second cross girder is supported by a D419 mm tubular stiffening truss, which significantly increases torsional rigidity. Longitudinal open section beams tie into the cross girder flanges. The deck is stiffened with trapezoidal ribs (height = 300 mm)
TEKLA model of bridge and modularised elements
Stiffening girder - Pylon connection area
Typical bridge cross-section
PYLONS
The pylons begin in the same vertical plane as the stiffening girder, continuing the girder web geometry upward. Initially, they follow the taper of the box girder. In elevation, the feet of the ’A’ shaped pylons start from the 4.00 m cross girder grid and narrow linearly to 2.30 m. Curved transitions are formed in the pylon side plates up to the adjacent cross girders. The pylons have a total height of 50.00 m, with the legs meeting at approximately 21.00 m. Cable anchorages are distributed evenly at this height. The pylons are closed box sections widening radially toward the base, transitioning from a single leg form at the top to a double leg form near the bottom. Pylon feet curve with radius of R = 3830 mm inward and R = 6380 mm outward. The chamfers above the reinforced concrete curb are airtight curved plate assemblies. Cable connections at the pylon head are attached to locally thickened plates aligned with the pylon webs
STAY CABLES
The cable system is symmetrical, with 7–7 cable pairs per side on each pylon. Cables are adjustable at the bottom with fork heads at both ends. Each cable consists of 150 mm² strands with a tensile strength of Fpk = 1860 MPa. Strand numbers from the top downward are: 37/37/37/31/31/31/27/27. The inward 1.5° inclination of the stiffening girder webs matches the plane of the cables and pylon webs, ensuring that all cable head connections lie within a single plane.
BEARINGS
The bearings on the inner piers are fixed longitudinally to allow both piers to jointly resist seismic loads in the longitudinal direction. This significantly reduces earthquake induced bearing forces but introduces additional horizontal loads by restraining thermal movement. The resulting configuration creates a frame type effect in the stiffening girder.
TOTAL MASS DAMPERS (TMD)
To mitigate wind-induced vibrations, the design incorporates two families of tuned mass dampers: vertical TMDs at the ends of the launched superstructure segments, and lateral TMDs at the top of each pylon. These are calibrated to the dominant bending and torsional eigenfrequencies of the bridge (see Structural analysis) and are sized to suppress vortex-induced oscillations under the wind regime expected at the site.
MAINTENANCE, DESIGNED LIFETIME
Inspection and maintenance access were not an afterthought; they were a design driver. The deck and every associated component — pavement, railings, safety barriers, drainage, lighting, kerbs and cable anchorages — can be visually inspected without specialist equipment. Walkways along both edges and dedicated central inspection zones provide full access for cleaning and routine repair, which can be carried out on a predetermined schedule.
Pylon and cable inspections may be performed using pre installed ladders for industrial climbers or using mobile elevating platforms that access the central maintenance zone. The interiors of both the box girder and the pylons are designed to be fully accessible for internal inspection, with permanent lighting and ventilation provisions.
This embedded maintenance strategy is the practical counterpart of a long-life design philosophy: the structure has been detailed for a service life consistent with current Eurocode requirements for major bridges, with a clear path for the replacement of replaceable components (cables, bearings, expansion joints, surfacing) without affecting the primary load-bearing system.
STRUCTURAL
ANALYSIS
The design follows Eurocode and SATCC standards. A detailed global numerical model was developed in parallel with the shop drawings, incorporating every load-bearing element of the superstructure, the cables and the pylons. The same model serves multiple analysis tasks:
• assessment of global behaviour under all design load combinations;
• local analysis of all steel details;
• fatigue verification of the main girder and the deck;
• seismic analysis at component and system level;
• verification of every intermediate construction stage. Maximum internal forces and stresses in the superstructure are extracted from geometrically nonlinear analyses to account for the structural geometry’s nonlinear response. In addition to the global model, focused local models are also developed to investigate stability-critical zones. These local models employ sub-modelling together with the Direct Design Method (DDM). Within the DDM direct resistance
check is applied to determine the load carrying capacity of the structure by using geometrically and materially nonlinear analysis (GMNIA). The outcome of the calculation is the load-deformation path, which characterizes the structural behavior and defines the characteristic and design values of the ultimate load. One specific failure mode during bridge launching is shown in Figure 8.a), which is a result of the DDM.
Alongside the static calculations, advanced dynamic analyses are performed to evaluate the structure’s response to wind-induced vibrations (flutter, galloping, vortex shedding, divergence) and seismic actions. The dynamic analyses are carried out for the final and for each construction stage, since long cantilevers can make intermediate stages critical. Two representative eigenmodes — the first bending and first torsional frequencies — characterize the bridge’s dynamic behaviour. Tuned mass dampers are installed on the main girder and at the pylon top to reduce amplitudes from vortexinduced vibrations.
First bending (0,63 Hz) and torsional (1,82 Hz) eigenfrequencies
Stresses of the pylon and ultimate failure
BIM & PARAMETRIC MODELLING
The bridge was developed in a fully digital workflow combining Tekla Structures and Rhino / Grasshopper. The integration of these two platforms allowed the team to build a single, geometrically precise digital representation of the bridge that supported every design discipline — from concept geometry through to fabrication drawings.
Parametric design proved particularly valuable for the curved geometry of the pylon feet, the cable anchorage zones, and the transitions of the box girder. Parameters could be adjusted in response to analysis feedback without manually reworking the model, and the configuration of individual components could be optimised against weight, fabrication cost and visual quality simultaneously.
Automation extended into deliverable production: fabrication drawings, quantity take-offs and clash-detection reports were generated directly from the parametric model. The result was a significant reduction in the time required to move from a stable design assumption to a fully detailed deliverable — without compromising on accuracy at the early design stages.
COSNTRUCTION TECHNOLOGY
CONSTRUCTION TECHNOLOGY OF SUPERSTRUCTURE
The two half-length deck segments and the pylons are assembled on mounting platforms behind each bridge end, positioned 1.20 m above their final level. The structure is then launched across the Luapula River by sliding along tracks beneath the box-girder webs.Side guide brackets ensure straight-line movement throughout the launch, and counterweights are placed at the rear end of the cantilevered structure as required to maintain global stability during each launching phase.
The launching strategy was selected over alternative erection methods (segmental construction on temporary towers, cable-supported cantilever erection) precisely because it eliminates any temporary works within the river itself — preserving the design intent of a clear waterway throughout construction.
COFFERDAM
Foundation construction relies on an earth-fill cofferdam with injection grouting, designed to withstand the substantial water heads and high flow velocities of the Luapula. Complete watertightness is not required: limited controlled seepage into the excavation pit is acceptable and is managed by site dewatering, which is more economical than a fully sealed cofferdam at this scale and depth.
CONSTRUCTION STATUS
Construction of the Luapula Bridge began in 2025. As of the publication of this document, the reinforced-concrete substructures are being built on both banks, while in parallel the fabrication of the steel superstructure elements is in progress at the shop. The launching of the two half-superstructures is scheduled for 2026. Full completion and commissioning of the bridge are planned for 2027.