SBOL 09-13-2018

Page 1

THE PRINT EDITION

THURSDAY, SEPTEMBER 13, 2018

VOLUME XIX- ISSUE 66

The 37th Vietnam Memorial Rededication

Tom Lyons calls for the colors to open the ceremony.

by Rick Winterson It was a solemn occasion, which was only right, proper, and fitting. After a Memorial Mass in St. Brigid Church last Sunday morning, September 9, South Boston’s Vietnam veterans, along with their families, friends, and invited guests, assembled around the Vietnam Memorial in Medal of Honor Park at M Street and East Broadway. The solemn occasion was the 37th Annual Rededication of South Boston’s Vietnam Memorial – the first such Memorial in America. Tom Lyons called for the Colors to be presented. The National Anthem

was rendered by the 215th Army Band from Fall River. The Boston Fire Department’s Pipes and Drums escorted the Colors. The Rededication’s Keynote Speaker, General (4-Star) Joseph L. Lengyel USAF, received the appropriate 17-gun salute. Other speakers included Congressman Steve Lynch, Gov. Charlie Baker, Mayor Marty Walsh, State Sen. Nick Collins, District 2 City Councilor Ed Flynn, City Councilor-at-Large Michael Flaherty, and Medal of Honor recipient Tom Kelley. Bob Morris closed out the program by reciting a memorial poem. The dominant (and heartfelt) theme in this year’s Vietnam Ceremony was its dedication to the memory of U.S. Senator John McCain, who had recently died. McCain was perhaps the quintessential surviving Vietnam veteran, having suffered wounds, torture, and six years of imprisonment in the so-called “Hanoi Hilton”. While there, he heroically refused repatriation in order that more seriously wounded prisoners of war could be returned to America instead. General Lengyel’s remarks were Continued on Page 3

Gene Vaillancourt emplaces the first flower at the Memorial.

General (4-Star) Joseph L. Lengyel keynotes the Rededication.

FACE IT. It’s Time For a Lift! Home Face-Lift Kitchens, Baths & More

Financial Face-Lift Debt Consolidation & Bills

HOME EQUITY LINE OF CREDIT USE FOR ANY PURPOSE

1.75%

APR*

4.25%

APR*

Current fully indexed rate

1st 6 months then prime minus .75% for life

Apply EASY at massbaycu.org or call 617-269-2700 or in person at our West 4th Street office. 147 West 4th Street South Boston

Easy!

409 D Street, Seaport massbaycu.org

(617) 269-2700

*1.75% Annual Percentage Rate (APR) is an introductory rate for the first six months. After the introductory period, rate on the outstanding balances will revert to Prime Rate as published in the Wall Street Journal on the first day of the calendar month minus (-) 0.75%. Prime rate as of 8/21/2018 is 5.00%. The APR may vary monthly. Minimum rate 2.50% and maximum rate 18.00%. 10-year draw period. 15-year repayment period. Minimum $10,000 draw at closing and $1,000 advances thereafter. 80% combined LTV to $200,000 (</=70% LTV $300,000). Proof of adequate property insurance required and Flood Insurance may also be required. Subject to credit approval. Other terms and restrictions apply including 620 minimum credit score. Offer subject to change without notice. MBCU NMLS ID #615913

Federally insured by NCUA

EQUAL HOUSING

OPPORTUNITY


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.