3 minute read
ZONING HEARING
The Zoning Commission of the City of Boston hereby gives notice, in accordance with Chapter 665 of the Acts of 1956, as amended, that a virtual public hearing will be held on March 29, 2023, at 9:45 A.M., in connection with a petition for approval of the Development Plan for Phase 1 within Planned Development Area No. 128, L Street Station Redevelopment (“The Plan”), filed by the Boston Redevelopment Authority d/b/a the Boston Planning & Development Agency.
The Plan will allow for The Proposed Project proposes the rehabilitation of the Edison Turbine Halls and the construction of two new buildings on Block D and Block F, each of which new buildings are expected to include office, research and development, and retail uses. The Edison Turbine Halls and the new buildings on Block D and Block F are collectively expected to include approximately 754,500 square feet of Gross Floor Area, including approximately 669,800 square feet of office, research, and development space and 84,700 square of retail, civic, cultural, and other such uses, all as more particularly set forth in the Phase 1 Development Plan. The Proposed Project will include up to 650 parking spaces and the delivery of significant public open space along the waterfront, improved pedestrian connectivity to and through the Phase 1 Project Site, and substantial landscape improvements around the Phase 1 Project Site, including the creation of the M Street Plaza.
This meeting will only be held virtually and not in person. You can participate in this meeting by going to https://bit.ly/BZC_Mar2023_1. Copies of the petition, the Plan, and a map of the area involved may be obtained from the Zoning Commission electronically, and you may also submit written comments or questions to zoningcommission@boston.gov.
Interpreting services are available to communicate information at this hearing. If you require interpreting services, please contact the following: zoningcommission@ boston.gov or 617-918-4308. The meeting is scheduled for March 29, 2023. Please request interpreting services no later than March 24, 2023.
For the Commission
Jeffrey M. Hampton Executive Secretary
Zoom Link: bit.ly/3xlcjNk
Toll Free: (833) 568 - 8864
Meeting ID: 160 508 0921
The proposed project consists of a new six-story 74-room hotel, with a ground-floor restaurant, situated at 330 C Street in South Boston. The lot size is approximately 8,202 square feet and is currently occupied by a vacant single-story concrete block building which formerly housed a repair garage.
mail to: Stephen Harvey
Boston Planning & Development Agency
One City Hall Square, 9th Floor Boston, MA 02201 phone: 617.918.4418 email: stephen.j.harvey@boston.gov
BostonPlans.org
@BostonPlans
Teresa Polhemus, Executive Director/Secretary
Zoning Hearing
The Zoning Commission of the City of Boston hereby gives notice, in accordance with Chapter 665 of the Acts of 1956, as amended, that a virtual public hearing will be held on March 29, 2023, at 9:30 A.M., in connection with a petition for approval of the First Amendment to Amended and Restated Development Plan for Planned Development Area No. 53 (“PDA No. 53”), Channel Center Project (“First Amendment”), filed by the Boston Redevelopment Authority d/b/a the Boston Planning & Development Agency.
Said First Amendment would amend the PDA No. 53 solely as to Project Component No. 8 to prohibit any laboratory classified by the U.S. Centers for Disease Control as Biosafety Level 3 (“BSL-3”), Biosafety Level 4 (“BSL-4”), Animal Biosafety Level 3 (“ABSL-3”), or Animal Biosafety Level 4 (“ABSL-4”).
This meeting will only be held virtually and not in person. You can participate in this meeting by going to https://bit.ly/BZC_Mar2023_1. Copies of the petition, the First Amendment, and a map of the area involved may be obtained from the Zoning Commission electronically, and you may also submit written comments or questions to zoningcommission@boston.gov.
Interpreting services are available to communicate information at this hearing. If you require interpreting services, please contact the following: zoningcommission@boston.gov or 617-918-4308. The meeting is scheduled for March 29, 2023. Please request interpreting services no later than March 24, 2023.
For the Commission
Jeffrey M. Hampton Executive Secretary
La Autoridad de Reurbanización de Boston, que opera bajo el nombre de Agencia de Planificación y Desarrollo de Boston (“BPDA”), de acuerdo con las Leyes Generales de Massachusetts, Capítulo 121A y Capítulo 652 de las leyes de 1960, y sus enmiendas, por la presente, notifica que se celebrará una audiencia pública virtual el jueves 16 de marzo de 2023 a las 5:50 p. m., que se televisará por Boston City TV (Xfinity Canal 24, RCN Canal 13 y Verizon Fios Canal 962) y se transmitirá en directo por boston.gov, sobre la solicitud realizada por Old Colony 6 Bond Sociedad Limitada a la Autoridad de Reurbanización de Boston para la autorización y aprobación de un proyecto en virtud de las Leyes Generales de Massachusetts, Capítulo 121A y las leyes de 1960, Capítulo 652 y sus respectivas enmiendas, en relación con el Aviso de Cambio de Proyecto de la Fase 6 del Proyecto de Old Colony (el “Proyecto Propuesto”) presentado a la BPDA por Beacon Communities LLC y la Autoridad de Vivienda de Boston (los “Solicitantes”) el 13 de enero de 2023 para el desarrollo de aproximadamente 89 departamentos de entre 1 y 5 dormitorios para individuos, familias y adultos mayores, ubicados en 331 E. 6th Street en el barrio de South Boston. Además, el Proyecto Propuesto incluirá aproximadamente 6,662 pies cuadrados totales de espacio comunitario accesorio que podrá ser rentado por aquellas organizaciones de servicio comunitario que mejoren la calidad de vida de los residentes de la comunidad. Para participar de esta audiencia pública, los miembros del público pueden registrarse en https://bit.ly/MarchBPDABoard. El Proyecto propuesto se puede consultar en el siguiente enlace: http://www. bostonplans.org/projects/development-projects/old-colony-phase-6








Teresa Polhemus, directora ejecutiva/secretaria