BIM PORTFOLIO BY SK SANIUL HODA

Page 1

PORTFOLIO

INDEX

• PROJECT INFORMATION

• RIBA PLAN OF WORK

• CONCEPTUAL MASSING

• SITE PLAN & LOCATION

• FLOOR PLANS

• DETAILED DRAWINGS

• REFLECTED CEILING PLAN

• ELEVATION VIEW

• SECTIONAL DETAILS

• CO-ORDINATION MODELS

• STR FRAMING PLAN & SCHEDULES

• EDGE OF SLAB PLAN

• REINFORCEMENT DETAILS

• CLASH DETECTION

• 4D SIMULATION

• QUANTIFICATION

• PARAMETRIC FAMILY CREATION

ENZYME TOWERS, HONG KONG

PROJECT OVERVIEW

Location Client Project Type

Mixed Used Type (Office and Service Apartments)

Hong Kong China

PROJECT BRIEF

Enzyme APD LTD.

To redevelop an existing high-rise building that was built back in the 70s which is located at the Intersection between Wellington Street and Queen's Road Central in the Central District of Hong Kong. However, the building doesn't maximize the currently allowed GM for the plot. Despite the underutilized GFA, it could be set to study the possibility of another building that could give a better return on Investment, also making it a landmark in the critical urban point. So it is to extend the existing building to 21 stories with mixed-use offices and service apartments.

Details of the Project

Building Area: 203.7 Sqm

Maximum Floor Area: 162.7 Sqm

Height Requirement: 21 Storey

FAR: 13.8

Software Used

Goal: Identify the client's requirements and project objectives. This stage involves understanding the project's purpose, feasibility, and initial budget considerations. Key decisions on the project's viability are made during this phase.

RIBA PLAN OF WORK

Goal: Assemble the project team and define the project's structure, team roles, and responsibilities. The client's brief is developed further, and a more detailed project plan is established. Preliminary cost estimates and timelines are discussed.

Goal: Begin working on the concept design of the project. Design ideas are explored, and initial sketches and 3D representations are created. The focus is on generating creative solutions that align with the client's vision.

Goal: Develop the chosen concept design further into more detailed drawings and plans. Technical aspects, materials, and systems are explored in greater depth. The design is refined to meet the client's requirements and building regulations.

Goal: Create construction drawings and technical details necessary for the actual construction phase. Detailed specifications and documentation are prepared for tendering and construction purposes.

Goal: Construction begins on-site based on the approved technical designs and drawings. Contractors and suppliers are engaged, and the building is constructed according to the specifications and schedule.

Goal: The completed building is handed over to the client. Any final adjustments or snagging issues are addressed. All necessary documentation, operation manuals, and as-built information are provided to the client.

Goal: Develop the chosen concept design further into more detailed drawings and plans. Technical aspects, materials, and systems are explored in greater depth. The design is refined to meet the client's requirements and building regulations.

Enzyme Towers, Hong Kong | BIM Portfolio 03
Conceptual Massing 1 Conceptual Massing 2 CONCEPTUAL MASSING

SITE LOCATION

04 Enzyme Towers, Hong Kong | BIM Portfolio
SITE PLAN AND LOCATION

FLOOR PLANS

Typical Floor Plan

Scale 1:100

Atypical Floor Plan

Scal1 1:100

Enzyme Towers, Hong Kong | BIM Portfolio 05

FURNITURE PLAN

Enzyme Towers, Hong Kong | BIM Portfolio 06
TYPICAL FLOOR PLAN DETAILS
Enzyme Towers, Hong Kong | BIM Portfolio 07 DETAILED DRAWINGS
FLOOR F1 FLOOR F2 FLOOR F3 FLOOR F4, F5,F6
75 MM THICKNESS WALL 100 MM THICKNESS WALL
FIRE DOOR ELEVATION FIRE DOOR SECTION FIRE DOOR PLAN

REFLECTED CEILING PLAN

Enzyme Towers, Hong Kong | BIM Portfolio 08
RCP PLAN
09 Enzyme Towers, Hong Kong | BIM Portfolio NORTH VIEW SOUTH VIEW EAST VIEW WEST VIEW
ELEVATION VIEW

PART SECTION 1

PART SECTION 2

Enzyme Towers, Hong Kong | BIM Portfolio 10
SECTION VIEW
SECTIONAL DETAILS

CO-ORDINATION MODELS

11 Enzyme Towers, Hong Kong | BIM Portfolio
ACR MODEL STR MODEL MEP MODEL CO-ORDINATION MODEL

TYPICAL STRUCTURAL FRAMING

12 Enzyme Towers, Hong Kong | BIM Portfolio
STR FRAMING PLAN
13 Enzyme Towers, Hong Kong | BIM Portfolio
STR FRAMING PLAN STR FRAMING PLAN
ATYPICAL STRUCTURAL FRAMING
Enzyme Towers, Hong Kong | BIM Portfolio 14
STRUCTURAL SCHEDULES
15 Enzyme Towers, Hong Kong | BIM Portfolio
OF SLAB PLAN
BEAM SLAB JUNCTION (DETAIL 2.1)
EDGE

SLAB REINFORCEMENT TOP VIEW

Enzyme Towers, Hong Kong | BIM Portfolio 16
REBAR DETAILS
REBAR DETAILS
BEAM
COLUMN
REINFORCEMENT DETAILS
BEAM REBAR SLAB REBAR

SETS AND CLASH TESTS BASED ON CLASH DETECTION MATRIX

CLASH DETECTION

3D VIEW OF PROPOSED ZONE CLASH DETECTION

DETECTED CLASHES

PREPARATION FOR CLASH TEST

RESOLVED CLASHES CLASHES

Enzyme Towers, Hong Kong | BIM Portfolio 17

SIMULATION PROCESS

IN PROGRESS CLICK HERE TO VIEW THE SIMULATION MOVIE Enzyme Towers, Hong Kong | BIM Portfolio 18
PROJECT PARAMETER CREATION IN FOR 4D SIMULATON
SIMULATION

EXTRACTED QUANTIFICATION DATA

Enzyme Towers, Hong Kong | BIM Portfolio 19
QUANTIFICATION
FIRE EXIT DOOR INTERIOR DOOR Enzyme Towers, Hong Kong | BIM Portfolio 20 PARAMETRIC FAMILY CREATION

HOSTEL BED

ADAPTIVE

BIM Portfolio 21
FAMILY
MULLIONS FAMILY
PARAMETRIC
CREATION
ADAPTIVE CURTAIN PANEL FAMILY

STRUCTURALTRUSS FAMILY

BIM Portfolio 22
FAMILY
PARAMETRIC
CREATION
TRAPEZOIDAL FOOTING L-SHAPE COLUMN PILE AND PILE CAP FOUNDATION
SANIULHODA95@GMAIL.COM +91 7019556585 SK SANIUL HODA