Skip to main content

20220420_Public Meeting #2 Final External

Page 1

PUBLIC MEETING #2 April 20, 2022

LONGWOOD PLACE 305 BROOKLINE

1


kanska | Sasaki

LONGWOOD PLACE


THE LMA IS AN URBAN CORE

A MIXED USE DISTRICT

PUBLIC OPEN SPACE

Imagine Boston 2030 calls for mixed use

A Site at the Intersection of Area Uses

Limited Open Space within the LMA

SITE

Skanska | Sasaki

LONGWOOD PLACE


A PLACE TO GATHER

kanska | Sasaki

A PLACE TO WORK

A PLACE TO LIVE

LONGWOOD PLACE


GUIDING PRINCIPLES Let’s Make This A Place

1

A PUBLIC HEART FOR THE LMA

Skanska | Sasaki

2

A PERMEABLE AND CONNECTED PLACE

3

RESPONSIBLY BUILD OUT THE URBAN FABRIC

LONGWOOD PLACE


kanska | Sasaki

Where We Were & What We’ve Heard Initial PDA Submission

LONGWOOD PLACE


INITIAL PDA

1.75M GFA

FENWA

Life Science & Research Commercial Office Retail Residential

10% Resi

BOSTON UNIV.

200 Units

2.3 Acres 42% of Site is Exterior Public Open Space

170’-350’+

EMMANUEL COLLEGE

Variety of Building Heights and Building Sizes

7-15 Years

WINSOR SCHOOL

BETH ISRAEL

Phased Build Out Skanska | Sasaki

LONGWOOD PLACE


A PLACE TO CONNECT Mixed-use program

Skanska | Sasaki

LONGWOOD PLACE


WHAT WE’VE HEARD

RESIDENTIAL

OPEN SPACE

● Look at increasing residential use/number of units on site

● Examine the variety and balance of open space typologies, i.e. active vs passive and their users

● Consider the distribution of residential use on site

kanska | Sasaki

● Consider the distribution of open space on site

HEIGHT + MASS ● More study around building heights and footprints ● Evaluate massing options for the buildings next to existing condos and Winsor School

TRANSPORTATION ● Consider restricting pick-up/drop-off activities on Pilgrim Rd

● Minimize impacts to existing resident parking

● Pay close attention to shadow impacts on the EN and neighbors

LONGWOOD PLACE


kanska | Sasaki

How We’ve Responded Revised Design Proposal

LONGWOOD PLACE


Project Improvements

kanska | Sasaki

PDA

REVISED PROPOSAL

167,000 SF (10%)

340,000 SF (20%)

200 Units

388 Units

INCREASE AFFORDABLE HOUSING

15%

20%

REDUCE OVERALL SF BY 50,000SF

1.75M SF GFA

1.70M SF GFA

42%

48%

BTW. BUILDINGS

13,000 SF DEDICATED

12,000 SF

15,000 SF

1,039 SPACES

897 SPACES

DOUBLE THE RESIDENTIAL ALMOST DOUBLE RESIDENTIAL UNITS

INCREASE ON-SITE OPEN SPACE BY 19,000 SF

CREATE DEDICATED QUIET GREEN SPACE INCREASED COMMUNITY SPACE REDUCE PARKING

LONGWOOD PLACE


DESIGN EVOLUTION

PDA

REVISED DESIGN FENWAY

FENWAY

4 3

BOSTON UNIV.

2a

WINSOR SCHOOL

3

1.75M GFA Delivered in phases over 7-15 yrs

kanska | Sasaki

10% Consolidated To The Northern End Of The Site (in yellow)

42% of the Site

2.3 Acres Public Exterior Open Space

Variety of

Heights Total height including penthouses

EMMANUEL COLLEGE

1

WINSOR SCHOOL

From 170 ft to 342 ft

4

2

EMMANUEL COLLEGE

BETH ISRAEL

200 Residential Units

5

BOSTON UNIV.

2b

1

Life Science & Research, Comm Office, Retail, Residential

6

Life Science & Research, Comm Office, Retail, Residential

1.7M GFA

Delivered in phases over 7-15 yrs

BETH ISRAEL

388 Residential Units

20% Dispersed Throughout The Site (in yellow)

48% of the Site

2.8 Acres Public Exterior Open Space

From 150 ft to 333 ft

Variety of

Heights Total height including penthouses

LONGWOOD PLACE


CONCEPTUAL DESIGN APPROACH The Heart Of The LMA

1

2

3

4

5

DRAW FROM NEARBY CHARACTER

CONNECT THROUGH THE SITE

EMPHASIZE ACCESS POINTS & GATEWAYS

DEFINE A CENTRAL SPINE

INTEGRATE INTERIOR AND EXTERIOR SPACES

Skanska | Sasaki

LONGWOOD PLACE


CONCEPTUAL DESIGN APPROACH Creating Robust Public Realm

ACTIVE EDGES & GATEWAYS

ENGAGING HUBS

CONNECTORS

PASSIVE RETREATS

Skanska | Sasaki

LONGWOOD PLACE


GROUND FLOOR PROGRAM | Revised Proposal

Skanska | Sasaki

LONGWOOD PLACE


OPEN SPACE | Revised Proposal

MAIN HEART + PASSIVE SPACE PDA: 27K SF NEW PROPOSAL: 35.5K SF

PDA: THIS SPACE WAS LOCATED BETWEEN BUILDINGS

Skanska | Sasaki

LONGWOOD PLACE


DESIGN EVOLUTION

1.75M SF GFA

Skanska | Sasaki

PDA

REVISED DESIGN

1.70M SF GFA

LONGWOOD PLACE


BUILDING HEIGHTS IN CONTEXT Neighborhood View

Skanska | Sasaki

LONGWOOD PLACE


AERIAL | Revised Proposal

kanska | Sasaki

LONGWOOD PLACE


CAPITALIZING ON CONTEXT Forging Connections to Transit, Riverway, Emerald Necklace, & Neighbors

Skanska | Sasaki

LONGWOOD PLACE


SITE ACCESS Planning For Safe Multimodal Circulation

Skanska | Sasaki

LONGWOOD PLACE


Skanska | Sasaki

LONGWOOD PLACE


kanska | Sasaki

LONGWOOD PLACE


kanska | Sasaki

LONGWOOD PLACE


PROJECT PHASING | Revised Proposal Projected Construction over Time

7-15 YEARS DELIVERY

Skanska | Sasaki

LONGWOOD PLACE


kanska | Sasaki

Publicly Accessible Open Space

LONGWOOD PLACE


INTEGRATED PUBLIC REALM Rooms Within Rooms

ACTIVE

Skanska | Sasaki

ENGAGING HUBS

PASSIVE CONNECTOR

CONNECTOR

GATEWAY

ACTIVE EDGES & GATEWAYS

CONNECTORS

GATEWAY

PASSIVE RETREATS

LONGWOOD PLACE


OPEN SPACE Tapestry Of Characters

Skanska | Sasaki

LONGWOOD PLACE


A PUBLIC HEART FOR THE LMA

6

5

3

4

2 1

Skanska | Sasaki

LONGWOOD PLACE


GROUND FLOOR PLAN GATEWAY

CONNECTOR

2

QUIET SPACE

33

11

FORUM

Skanska | Sasaki

5

5

4

CENTRAL HEART

66

LIVING ROOM

GATHERING

GATEWAY

LONGWOOD PLACE


GATEWAYS An Inviting Landscape

Skanska | Sasaki

LONGWOOD PLACE


kanska | Sasaki

LONGWOOD PLACE


kanska | Sasaki

LONGWOOD PLACE


CENTRAL HEART Active Edges With Flexible Central Open Space

Skanska | Sasaki

LONGWOOD PLACE


kanska | Sasaki

LONGWOOD PLACE


FORUM Interior Programmable Public Realm

Skanska | Sasaki

LONGWOOD PLACE


LIVING ROOM Residential & Community Amenity

Skanska | Sasaki

LONGWOOD PLACE


kanska | Sasaki

LONGWOOD PLACE


CONNECTOR A Green Pedestrian Link

Skanska | Sasaki

LONGWOOD PLACE


kanska | Sasaki

LONGWOOD PLACE


PASSIVE QUIET SPACE A Framed Landscape

Skanska | Sasaki

LONGWOOD PLACE


kanska | Sasaki

LONGWOOD PLACE


kanska | Sasaki

Benefits Recap

LONGWOOD PLACE


PUBLIC BENEFITS SUMMARY Community/Social

Public Realm Enhancements

Community space: 15,000 SF on ground floor.

Public Realm: ± $6 million commitment to

Opportunity for Training Hub.

transportation and public realm improvements

Economic Linkage:

± $17 million housing ± $3 million jobs/workforce

along site frontage. Job Creation: ± 5,000 permanent jobs

Housing Creation: ± 388 new rental units (20% affordable units).

Short Street: 28 ft. wide multi-use landscaped

± 5,000 construction jobs

path for bikes and pedestrians. Diverse Retail/Amenities: 44,000 SF of

diverse on-site retail offerings.

Open Space: 2.8 acres of publicly accessible

Transportation: $5/SF Lab Space

on-site open space. Daycare Study: Market and demand study to understand feasibility on site.

Off Site: Construct new sidewalk on Park Dr.

Temporary Uses: Collaboration with MASCO

Emerald Necklace: Construct an accessible

for continuous activation for 10-15yr buildout

ramp to Riverway; Lighting Design Study; Wayfinding/Signage Design and Implementation

Public Art Opportunities: Partner with local

study/Roundhouse improvements.

organizations and schools Skanska | Sasaki

LONGWOOD PLACE


THANK YOU

Skanska | Sasaki

LONGWOOD PLACE


Turn static files into dynamic content formats.

Create a flipbook
20220420_Public Meeting #2 Final External by SkanskaCD - Issuu