Shweta Kakade
Architecture Portfolio (2020 -2025)
SHWETA KAKADE
+1 (716)279-5185 shwetakakade1625@gmail.com 87 Englewood, Buffalo, NY www.linkedin.com/in/shweta-kakade
Architectural Designer
Profile
Detail-oriented Architectural Designer with a strong foundation in design, art, and creativity. Skilled in developing innovative, user-centered spaces that enhance human experience and environment. Committed to creating functional, aesthetic, and meaningful design solutions and driven to expand technical and creative skills through new design technologies.
Education Fall 2024 - Spring 2026
Master of Architecture - State University of New York at Buffalo (SUNY), USA GPA - 3.8
Fall 2015 - Spring 2020
Bachelors of Architecture - Savitribai Phule Pune University, India GPA - 3.72
Work Experience University at Buffalo School of Architecture & Planning Aug 2024 - Dec 2025 Buffalo, NY
Graduate Teaching Assistant : • Assisted the course instructor in conducting practical sessions on environmental systems, focusing on site selection, lighting, and acoustics. • Graded assignments and provided feedback to support student’s understanding of sustainable design
Dar Al-Handasah May 2023 - July 2024 Pune, India
Architect : • Produced detailed Revit models and coordinated comprehensive design development drawings for various large-scale architectural projects. • Supported early-stage conceptual design development and effectively translated the overall design intent into technical Revit deliverables. • Collaborated with diverse international teams and coordinated with structural, MEP, and interior design consultants throughout the project timeline. • Ensured BIM standards, drawing quality, and project files were maintained across all design phases.
Amit Bhat Architects March 2022 - Dec 2023 Pune, India
Junior Architect : • Contributed to diverse projects, including residential townships, luxury bungalows, commercial spaces, and institutional buildings. • Developed client-focused design concepts and produced drawings, 3D models, and renderings. • Studied local codes and assisted with site coordination, visits, and on-site execution.
Avinash Nawathe Architects May 2019 - Oct 2019 Pune, India
Architecture Intern : • Assisted Senior Architect with presentations, construction drawings, and conceptual design. • Created detailed 3D models, renderings, and illustrations to convey design intent • Adapted quickly and contributed effectively in a fast-paced, collaborative environment.
Software Skills
Revit
Autocad
Rhinoceros
SketchUp
Indesign
Photoshop
Illustrator
Lumion
Enscape
Twinmotion
Grasshopper
BlueBeam
Navisworks
MS Office
• •
Celebration of Academic Excellence, University at Buffalo - 2025 : Structures III: Mechanical Object and Spatial Generator Scholarship - The Prestigious Dean’s Award - 2024 Academic Excellence Award - Bachelors of Architecture, Pune University & SKNCOA - 2020
Licenses & Certifications
• •
BIM & Revit Professional Course by Autodesk [November 2022 - April 2023] Licensed Architect with Council of Architecture, India
Goals
•
Aiming to grow as an architectural designer through professional experience in the U.S. while exploring emerging design technologies. Committed to continuous learning, professional development, and pursuing architectural licensure after gaining practical experience.
Achievements
•
CONTENT
01 02 03 04 05 06
ARTIUM City Arts Museum | Spring 2025 | Buffalo, NY
VOIDSCAPE Multi-Generational Day Center & Care Residences | Fall 2024 | Buffalo, NY
KALA-VAN Institute of Fine Art & Design | Spring 2020 | Pune, India
MATERIAL EXPLORATION Explorations in Form and Structure | Fall 2024 | Buffalo, NY
Suspended Reality Mixed-Reality Fabrication Workflow | Fall 2025 | Buffalo, NY
PROFESSIONAL WORK Office Work | 2022-2024
02
01 Artium A fusion of Art & Atrium
Spring 2025 - City Arts Museum Academic : Integrated Graduate Studio Team : Shweta Kakade, Saurav Shetty Instructor : Miguel Guitart ARTIUM - weaves creative expression and spatial experience around a luminous atrium that encourages movement, connection, and the appreciation of art. A central void acts as the heart of the museum, continuously evolving with curated art installations, suspended sculptures, and interactive pieces that engage visitors throughout their journey. As one moves through the museum, the atrium remains a visual anchor offering glimpses into various galleries, public spaces, and forums, fostering moments of connection and curiosity. The atrium showcases art pieces and vibrant civic spaces, serving as both a creative hub and a gathering place within the museum.
ARTIUM | M.Arch Academic Project
04
Concept
Site Surrounding
(1)
(2)
A central void forms a luminous atrium, while subtracted volumes create double-height galleries and spatial variety.
1
2
4
3
5
City Arts Museum in downtown Buffalo, surrounded by landmarks like (1) Sahlen Field, (2) Ellicott Square, and lively streets with cafes and offices.
7
6
8
9
10
11
12
13
Drop Off
Bicycle Parking
A Vestibule
Back Office
James Turrell Gallery
B
Coat Room
Ticket Area
C
DW
UP
DW
Foyer
D E
Vestibule
F
Atrium
G H Public Forum
I Staff Locker
Restaurant
Gallery Support
J Building Support
K Shop
L
DW
M
UP
Kitchen
Cafe Art Ele.
N 6' Wide Sidewalk
20' Wide Ramp
Ground Floor Plan The ground floor features public amenities such as a restaurant, gift shop, forum, and an atrium exhibition space ARTIUM | M.Arch Academic Project
1
2
4
3
5
6
7
8
9
10
11
12
13
DW
Gallery UP
DW
Gallery
Dw
Atrium
DW
UP
Gallery
Art Ele.
Open to below
Gallery Level Plan - 4th Floor The gallery spaces embrace the concept of openness, framing continuous visual connections with the luminous atrium. Double-height galleries allow for the display of large-scale installations and suspended artworks, while also providing vertical connections that link multiple floors. 06
Section
The atrium displays art and vibrant civic spaces, acting as both a creative hub and gathering place with visual connections across all levels. ARTIUM | M.Arch Academic Project
The atrium is the museum’s central hub, hosting exhibitions & art festivals.
Elevation
The elevation takes inspiration from Buffalo’s historic grain silos, echoing the city’s industrial heritage. Precast concrete panels shape the future with a bold presence. Glass openings at the atrium voids add lightness, balancing solidity with transparency.
Model Photo 08
02 Voidscape
Filling Absence with Architecture, Memory, and Connection
Fall 2024 - RE : GEN Academic : Architecture Design Studio Team : Shweta Kakade, Chetan Sampat Instructor : Albert Chao The studio explored the theme “Re: GEN”, centered on regeneration, adaptive reuse, and architecture of care focusing on how design can respond to aging populations through environmental and social renewal. Multi-generational day center and care residences for elderly foster social inclusion, support seniors, ease family burdens, and strengthen community bonds while promoting active aging and local growth. We were expected to design a Day Center and Residential Care facility responding to the needs of older adults in Buffalo’s Black Rock neighbourhood - an area historically shaped by industrialization and demographic change.
RE : GEN | M.Arch Academic Project
10
Concept
In 1935, an interconnected rail line once passed through the site, leaving behind a strong historical imprint.
Site Plan RE : GEN | M.Arch Academic Project
We envisioned a void tracing the former tracks, preserving the railway’s memory and offering a reflective link to the past.
Integrating voids with surrounding landscape elements to support diverse public activities.
The jigsaw puzzle serves as a guiding metaphor for this day center and care residence - where elderly individuals, each with their own memories, emotions, and life stories, come together to form a unified community. The architecture reflects this by interlocking private and communal spaces, fostering both personal reflection and shared connection in an environment that values individuality and togetherness.
Ground Floor Plan 12
The daycare includes spaces for various activities like art and craft workshops, yoga and meditation sessions, a gift shop if any visitor wants to buy a gift for the resident, community kitchen for cooking activities, a library, and a crèche for older adults visiting with their grandkids. Dining /Cooking Activity
Intergenerational Activity
Workshops/Crafts
Meditation/Therapy Room
Enjoying Outdoor Spaces
Movie/Yoga - Outdoor Space
The former track alignment is reinterpreted as a void, serving as a deliberate gesture that preserves the railway’s memory while engaging the site’s layered history. RE : GEN | M.Arch Academic Project
East Elevation
Model Photo 14
RE : GEN | M.Arch Academic Project
16
03 Kala-Van
A creative sanctuary where art and nature come together in harmony
Spring 2020 - Institute of Fine Art & Design Academic : Architecture Thesis Individual Work: Shweta Kakade Instructor : Sudhir Chavan KalaVan – Derived from Sanskrit, where “Kala” means art and “Van” means forest, this name evokes a serene, immersive space where creativity flourishes in harmony with nature. The thesis aims to design an institute that will be part of society as an inclusive space by creating an integrated life within educational social entity of school and urban life. There is a growing demand for innovative thinking, and the creative revolution is opening new opportunities everyday. To design a campus with integration of various design fields under one roof. There are various design and technology related programs offered by the institute such as Fine arts and Product design etc.
Kala-Van | B.Arch Thesis Project
18
Concept :
The KalaVan site plan is inspired by tree growth rings, symbolizing organic connection between nature and architecture. The pond and plaza form the ecological and social cores, with buildings radiating outward like natural layers, creating fluid, biophilic spaces that foster interaction and creativity.
17
9
10
16
6
5
4
13 15
14
7 3
8
11 18
12
17 1
Site Plan Legend : 01. Pedestrian Entry 02. Vehicular Entry 03. Admin 04. Central Activity Court 05. Art Gallery/Information Centre 06. Semi-Open Exhibition Area Kala-Van | B.Arch Thesis Project
07. Amphitheater 08. Auditorium 09. Product Design Block 10. Canteen/Library 11. Fine Art Block 12. Hobby Block
13. Deck 14. Artist Retreat 15. Staff Quarters 16. Hostels 17. Parking 18. Cycle Stand
2
Academic Zone
Public Zone
Residential Zone
Recreational
Zoning :
Site Organization :
Zoning aligns along a central axis connecting the plaza and pond, organizing academic, social, and residential zones with clear hierarchy and spatial relationships.
Public zone is placed in the centre of the campus as visitors can visit the admin, art gallery, auditorium without disturbing the Academic zone.
Built
Open
Pedestrian path
Semi - open
Parking
Cycle stands
7m internal road
Built & Open Spaces :
Pedestrian & Vehicular Circulation :
An attempt has been made to maximize the net open usable space at ground level to promote greater interaction. People consistently value green environment more positively than environments without greenery.
The design maximizes open, usable ground space to encourage interaction, recognizing that people respond more positively to green environments than to those without greenery.
Artist Retreat
Fine Arts
Canteen & Library
Art Gallery & Product Design Central Exhibition Area Activity Plaza
Recreational Hostel Zone
Auditorium
20
Fine Art Block
Product Design - Section
Product Design - Plan Kala-Van | B.Arch Thesis Project
Furniture Design Studio
AV Room
Colorful & Pleasant Passages
Graphic Design Studio
Outdoor Activity Area for Studio
Library
Jewellery Design Workshop
Outdoor Stepped Seating
Exploded View - Product Design Block
22
Kala-Van | B.Arch Thesis Project
24
04 Twin Arch
Material experimentation meets structural elegance
Fall 2024 Academic : Structures Team : Shweta Kakade, Yerlene Torres, Faith Vale, Jasmin Ferreiras, Joey Glatz, Ian Simmons,Sandra Zarub,Melanie Wu,Ursula Ramos Instructor : Randy Fernando The Twin Arch is a research-driven prototype exploring innovative concrete fabrication techniques. Inspired by Calatrava’s works, it emphasizes elegance, structural precision, and material efficiency. Using material studies, 3D modeling, and Karamba 3D analysis, the design minimizes weight and waste while ensuring structural integrity.
Twin Arch | M.Arch Academic Project
26
Weight reduction and efficiency
Design Development
Full Scale Application : Assembly Process Diagram
3/8” Wooden Dowels
Rebar Rebar
2X4 Scaffolding 1. Foam Formwork stacked vertically connected through 3/8” dowels
2. Scaffolding built to reinforce structure rebar welded incrementally
3. Scaffolding and formwork completed final pieces of rebar inserted
4. Concrete mixed, poured as one form checked through weep holes in each leg
5. Concrete cures over several days scaffolding removed prior to demolding
6. Foam framework removed through demolding final form completed
Twin Arch | M.Arch Academic Project
Axonometric
Dowels 3/8” Wooden Hold Formwork in Place
1. Platform/ Pallet Building For Base
Top CNC and Waterjet Formwork
2. Cutting the rebar pieces as per the design Leg 2 Waterjet and 3D Print Formwork Leg 1 Waterjet and 3D Print Formwork 3. Coating the foam with paint layers
Dowels 3/8” Wooden Hold Formwork in Place 4. Scaffolding to support the formwork
5. Pouring the concrete mixture
Pallet
28
Twin Arch | M.Arch Academic Project
30
05 Suspended Reality Mixed - Reality Fabrication Workflow
Fall 2025 - Situated Technology Academic : Graduate Research Studio Team : Shweta Kakade, Shruti Kunadia, Gargie Deore Instructor : Nicholas Bruscia This research introduces an integrated mixed-reality workflow for generating site-specific catenary structures through real-time spatial interaction. Leveraging the Fologram mixed-reality lens and digital modeling software, the system scans the physical environment, identifies spatial features, and calibrates data for fabrication. Building on precedents in gesture-recognition research, the workflow enables users to select anchor points directly within the augmented environment using hand gestures detected by the headset. The project identifies three distinct gesture-based mixed-reality workflows: (1) Environment identification, (2) Anchor point location, and (3) Catenary calibration. Within this framework, user-defined anchor points are digitally registered onto the spatial scan and used to generate sets of catenary curves, each containing an arbitrary number (n) of curves responsive to local site conditions. The resulting catenary forms are subsequently fabricated using string, which is shaped to match the digitally generated geometry.
Suspended Reality | M. Arch Academic Project
32
Form Finding
Mixed Reality Workflow
Start Point
Environment Scan
Set Anchor Points
Anchor Points
Suspended Reality | M. Arch Academic Project
End Point
Clear Anchor Points
The Mixed Reality workflow begins with scanning the physical environment to generate an accurate digital spatial model. Users define start and end anchor points through hand-tracked gestures directly within the mixed-reality space. A primary span is computed between these anchors, subdivided into nodes, and used to generate inverted catenary curves through parametric algorithms.
Environment Scan - Digital Mesh
Environment Scan
Anchor Point Placement
On Site Fabrication
The digitally generated catenary forms are fabricated as a full-scale suspended string installation, translating mixed-reality geometry into a lightweight installation 34
06 Professional Work
My professional experience spans across various project types and scales, allowing me to develop a comprehensive understanding of the architectural process from concept to construction. I have honed my ability to translate ideas into thoughtful, context-responsive designs while maintaining a balance between creativity and technical precision. Through continuous learning and collaboration, I’ve built a strong foundation in design thinking, communication, and project execution.
Professional experience featured in my portfolio includes work with : - Dar Al-Handasah (Shair and Partners) – Pune, India (Regional office) - Amit Bhat Architects – Pune, India Project 01 - Vancouver Art Gallery, Vancouver Project 02 - Coop Bank of Oromia, Ethiopia Project 03 - Tribeca, London Project 04 - Bansal Bungalow, Pune
Professional Work
36
Project 01 : Vancouver Art Gallery Project Brief : The proposed Vancouver Art Gallery is a purpose-built cultural landmark located at Larwill Park in downtown Vancouver. Designed to energize the surrounding precinct, it introduces new density and public activity to the site. The building’s vertical, symmetrical form expresses its stacked program, with galleries rising above a central courtyard. At street level, the open courtyard connects to surrounding streets, creating a lively public space. The elevated gallery above provides shade and shelter while allowing sunlight to fill the plaza below. Design Architect : Herzog & de Meuron Project Architect : Perkins & Will, Vancouver Dar Al- Handasah Scope of Work : - Architecture support for Revit modeling and production of drawings set for Perkins & Will, Vancouver. - BIM & Revit Support for Tower, Courtyard, & Perimeter. Model Management & Documentation : - Cleaned and corrected Revit model errors to improve model quality and documentation clarity. - Created custom Revit families based on project requirements. - Identified and flagged coordination errors between trade drawings that could affect documentation views. - Implemented cartoon sets in Revit and addressed redlines for modeling and detailing updates.
The diagram highlights the project’s structural system - timber for the courtyard, concrete cores for stability, and steel trusses with metal decks forming the tower’s framework.
Professional Work
C07010
23 m²
23 m²
GALLERY 06
GALLERY 06
GALLERY 07
GALLERY 07
NAVE
06002
06002
06001
06001
C06000
47240
47240
09 54 26.A1 LINEAR WOOD SLAT NON STRUCTURAL METAL CEILING FRAMING
NAVE
NAVE
05000A
05000A
- ALIGN TO U/S OF PAINTED TO
R6.1
R6.1
R3.1
2300
2300
VESTIBULE
VESTIBULE
C04006
C04006
F5.1A E5-A.1 P15.4
S2.1 3000 ABL
GALLERY
GALLERY
03002
03002
FL6.1
FL6.1
S2.1 3000 ABL TC08 TC08
F3.1C
C10.3
E3-A.1
E3-A.1
C2.1 4500 ABL
P15.4
C2.1 4500 ABL
P20.2
P20.2
03001
03001
FL6.1
FL6.1
C10.3
HEAVY GAGE 4347 METAL 4347 ABL ABL FRAMING UTILITY ANGLE OPEN OFFICE OPEN OFFICE
SM OFFICE
SM OFFICE
02808
02808
02800
MUDDABLE METAL J TERMINATION
C1.1 C1.1 3000 ABL 3000 ABL MEETING MEETING
BEAD TYPICAL NAVE CEILING-WALL DETAIL
13
02501
RECEPTION
02501
02001
C2.1 4500 ABL
C2.1 4500 ABL
C7.1 4500 ABL P18.3
P18.3
S2.1 11000ABL
TC04
TC04
GYP CEILING; COVE TO BE PAINTED TO MATCH GYP CEILING
10
43964
CONFERENCE
03007
03007
FL6.1
FL6.1
F3.1C
F3.1C
E3-A.1
E3-A.1
S2.1 SCHEDULED PARTITION
C2.2 6500 ABL
S2.1 11000ABL
11000ABL
COURTYARD
COURTYARD
C01000
01001
01001
R2.1B
FL10.2
FL10.2
C9.1 5050 ABL
R9.1
PARKING
PARKING
CB1100
CB1100
F2.1 E1-B.1
F2.1
R9.1
E1-B.1 2 FL3.1
READING ROOM &READING ROOM & STACKS STACKS B1004
2
CB1000
CB1000
FL3.1
FL3.1
FL3.1
W452-B.3
G1-A.1
G1-A.1 COOL VAULT
COOL VAULT
B2111
B2111
E4-A.1 2
2
FL5.1
FL5.1
PREFUNCTION SPACE PREFUNCTION SPACE W453.4 CB1000 2 CB1000
120 25 5 50
300
55
75 130
75 130
BEATTY
120
120 120
850
50
65
TYPICAL GALLERY CEILING CL7.1 - SPRINKLER
2 xxA44-21
1:5 PROJECT
1
2 xxA44-21
Developed detailed wall, floor, and ceiling construction drawings that demonstrated material assemblies, connection details.
W453.4
P9.3
411421
REVISIONS REVISIONS
C9.1 4220 ABL G1-A.1
1 2
P9.3
FL3.1
FL3.1 W452-B.3
FUTURE PARTITION BY OTHERS
1:5
LEVEL B1 14680
LEVEL B1 14680
W452-B.3
1 30% CD ISSUED FOR 30% CD ISSUED FOR 2023/11/17 BID GROUP2024/04/05 2 & PRICING BID GROUP2 2 & PRICING ADDENDUM 04 ADDENDUM 04
2023/11/17 2024/04/05
W452-B.3
E4-A.1 CORRIDOR CORRIDOR CB2200
CB2200
137 m²
137 m²
FL2.1
FL2.1
P11.6 B2 STACKS
B2 STACKS
B2311
B2311
P11.6
? ?
ABL
? ?
ABL ?
?
? ?
ABL
? ?
ABL
P9.2
P11.7 P9.2 AV RECORDING AV RECORDING B2310
CORRIDOR
CORRIDOR
CB2303
CB2303
VESTIBULE
W453.4 VESTIBULE
CB2300
CB2300
CORRIDOR W453.4 CB2301
B2310
P11.7 AV STORAGE
AV STORAGE
G1-A.1
G1-A.1
B2210B
B2210B
64 m²
64 m²
CORRIDOR
TITLE
CB2301
FL2.1
FL2.1
LEVEL B2 7650
LEVEL B2 7650
TITLE
BUILDING BUILDING SECTIONSSECTIONS
SHEET NUMBER SHEET NUMBER 1
1 A11-13
Section
BUILDING BUILDING SECTIONSECTION B TOWERB TOWER 1 1 A11-13
1 : 100
1 : 100
1. FOR ADDITIONAL GENER REFERAND TO RCPS FOR ARCHITECTURAL AB DATUM ABF TO SHEET G00-01 2. KEYNOTE NUMBERING IS GALVANIZED THREADED STEEL ONLY. SEE INDIVIDUAL S ANCHOR POINT FITTING SECTIONS FOR SCOPE O THAT SECTION.
KEYPLAN
PROJECT
411421
LEVEL 01 20180
VOID
G1-A.1 2
FL3.1
GALVANIZED STEEL ANCHOR POINT BUSHING GENERAL
PROJECT NUMBER PROJECT NUMBER LEVEL 01 20180
B1004
FL3.1
C7.1
120
VANCOUVER ART VANCOUVER ART GALLERY GALLERY
R2.1C
R2.1C
VOID C9.1 4220 ABL
C7.1
120
181 WEST GEORGIA STREET, 181 WEST GEORGIA STREET, VANCOUVERVANCOUVER
R2.1B
FL10.2
FL10.2
12 12 A32-41 A32-41 C9.1 5050 ABL
PREFUNCTION SPACE PREFUNCTION SPACE
G1-A.1
5
LEVEL 01 MEZZ. LEVEL 01 MEZZ. 24680 24680
R6.1
7100 01416B
LOBBY
C01000
5500
01416B
LOBBY
C01000
7030
R2.1B
R2.1B
VOID
120
325
FL7.1
LOBBY
C01000
05 50 00.S2 CUSTOM ALUMINUM EXTRUSION
TYPICAL GALLERY CEILING CL7.1 - MOVABLE PARTITION
2 xxA44-21
1M102
R6.1
G1-A.1
1
LEVEL 02 32780
1:5
LOBBY
SYMBOL 00 00 S36.A5 STEEL CHANNEL & BRACING, REFER TO STRUCTUR
GALVANIZED THREADED STEEL 00 00 M41 SPRINKLER, REFER ANCHOR POINT FITTING TO FIRE SUPPRESSION
MEMBERS LOUNGE MEMBERS LOUNGE FL7.1
VOID
LEVEL 03 37460
KEYPLAN
TYPICAL NAVE CEILING-WALL DETAIL
13
GALVANIZED STEEL ANCHOR POINT BUSHING
ROOF PERIMETER ROOF PERIMETER 27280 27280
OUTDOOR GALLERY OUTDOOR GALLERY G1-A.1
6550
LEVEL 02 32780
1:5
TC02
TC02
1M102
G1-A.1
5760
5760
TYPICAL GALLERY CEILING CL7.1 - SPRINKLER
5
2 xxA44-21
LEVEL 04 43940
REFER TO RCPS FOR DATUM ABF
S2.1 3000 ABL
C02000
1:5
LEVEL 04 43940
LEVEL 03 37460
S2.1 TC06 3000 ABL
TC06
FOYER
1:5
00 00 S32 STRUCTURAL STEE FRAMING, REFER TO STRUCTUR
05 50 00.S2 CUSTOM ALUMINUM EXTRUSION
25
00 00 M41 SPRINKLER, REFER TO FIRE SUPPRESSION
CONFERENCE
C03000
TYPICAL OP
3 xxA44-22
05 50 00.S2 CUSTOM ALUMINUM SUPPORT & SEISMIC RESTRAINT AT EXTRUSION CEILING CHANNELS. REFER TO S.E ENGINEERS DRAWINGS
LEVEL 05 50060
120
C7.1
E5-A.1
E5-A.1
2
1:5
1:5
43964
06 10 00.C1 13mm F5.1A PLYWOOD F5.1A
C7.1 4500 ABL
FOYER
C2.2 6500 ABL
TYPICAL LIGHTING COVE AT WASHROOMS
325
1030 2400 8230 6110
850 6550
TERRACE
C03000
FOYER 51RECEPTION PER LIGHTING 02001 C02000 DESIGNER
LEVEL 05 50060
09 21 16.A1 GYPSUM BOARD TYPE X - 16mm (5/8")
FOYER
WALL FINISH - ALIGN TO U/S OF 1SCHEDULED :5
S2.1 11000ABL
R6.1
P15.4P15.4
P15.4
SCULPTURE HALLSCULPTURE HALL
02800
F3.1C
FL6.1
TYPICAL OPEN CEILING GALLERY - SPEAKER
00 00 CHANNEL & 07 S36.A5 81 16.A STEEL CEMENT AGGREGATE BRACING, REFER TO STRUCTURAL FIREPROOFING
BLACK ACOUSTIC DUCT LINER BACKING
TC22
TERRACE FL6.1
6
07 81 16.A CEMENT AGGREGATE FIREPROOFING 00 00 S32 STRUCTURAL STEEL FRAMING, REFER TO STRUCTURAL
LEVEL 06 56180
04007
04007
25
FL6.1
7 A32-52
09 544500 26.A1 4500 ABLWOOD SLAT ABL LINEAR CEILING
INDIGENOUS TC22 TEAHOUSE
INDIGENOUS TEAHOUSE
TYPICAL GAL
2023/11/17 2024/03/15
TYPICAL OPEN CEILING GALLERY - TRACK LIGHT
S2.1
S2.1
1
00200xxA44-21 E09 1LIGHT : 5 FIXTURE, REFER TO ELECTRICAL
2023/07/21 2023/08/18 2023/08/17
00 00 S32 STRUCTURAL STEEL FRAMING, REFER TO STRUCTURAL
5 A32-52
5 A32-52
2023/01/13
12023/05/05 :5
07 81 16.A CEMENT AGGREGA FIREPROOFING
05 50 00.S2 CUSTOM ALUMINUM EXTRUSION
C10.1 6147 ABL
SCHEDULED CEILING
P15.4
SCHEDULED PARTITION
R3.1R6.1
FL6.1
04001
LEVEL 06 56180
SUPPORT & SEISMIC RESTRAINT AT CEILING CHANNELS. REFER TO S.E 7 ENGINEERS DRAWINGS A32-52
C2.1 4500 ABL
C2.1 4500 ABL
06 10 00.C1 13mm PLYWOOD C10.1 6147 ABL
F5.1A
E5-A.1
3/3/2024 9:55:20 AM
IGHTING COVE AT WASHROOMS
04000
S2222
F5.1B E5-A.1
7100
PER LIGHTING DESIGNER
TERRACE
04000
STAIR 16
S2222
F5.1B E5-A.1
GALVANIZED THREADED STEEL ANCHOR POINT FITTING
05 50 00.S2 CUSTOM ALUMINUM EXTRUSION
2
3 xxA44-22
LEVEL 07 63020
5500
51
INATION
S2.1 TERRACE 2300 ABL
STAIR 16
C2.1 4800 ABL
PRICING PRICING ISSUED FOR DD ISSUED FOR DD 2023/01/13 CONSOLIDATION CONSOLIDATION 2 xxA44-21 ISSUED FOR VE ISSUED FOR VE 2023/05/05 RECONCILIATION RECONCILIATION ISSUED FOR REVIEW ISSUED FOR REVIEW 2023/07/21 GROUP 1 ISSUED FOR BID - ISSUED GROUP 1FOR BID - 2023/08/18 ISSUED FOR VE ISSUED FOR VE 2023/08/17 RECONCILIATION RECONCILIATION ISSUED FOR 30% CD ISSUED FOR 30% CD 2023/11/17 ISSUED2 FOR 2& ISSUED FOR BID GROUP & BID GROUP 2024/03/15 PRICING PRICING
REFER TO RCPS FOR DATUM ABF
REFER TO RCPS FOR DATUM AFF
7030
PER LIGHTING DESIGNER
MING
Autodesk Docs://Vancouver Art Gallery/A-VAG-TOWER.rvt
S2.1 2300 ABL
C2.1 5000 ABL
LEVEL 07 63020
REFER TO RCPS FOR DATUM AFF
TYPICAL GALLERY CEILING CL7.1 - SPRINKLER
5
LEVEL 08 69140
63044
63044
1:5
00 00 M41 SPRINKLER, REFER GALVANIZED STEEL ANCHOR TO FIRE SUPPRESSION POINT BUSHING
120
00 00 E00 ISSUED REFER TO ISSUED ISSUED FOR PROGRESS 2022/11/14 ISSUED FOR PROGRESS 2022/11/14 ELECTRICAL
3 xxA44-22
07 81 16.A CEMENT AGGREGATE FIREPROOFING
W453.4
NAVE
P15.4
00 00 M41 SPRINKLER, REFER TO FIRE SUPPRESSION 05 50 00.S2 CUSTOM ALUMINUM EXTRUSION 05 50 00.S2 CUSTOM ALUMINUM
120
00 00 E09 LIGHT FIXTURE, REFER TO ELECTRICAL
LEVEL 09 74900
6 A32-52
00C2.100 S32 STRUCTURAL STEEL TC30 TC30 5000 ABL FRAMING, REFER TO STRUCTURAL
BLACK ACOUSTIC DUCT LINER BACKING
04001
S2.1 4500 ABL
S2.1 4500 ABL
TT ARFAF R DD
TYPICAL SIDE WALL CONDITION AT OPEN CEILING GALLERY
14
1 ST240123.3
FL6.1
FL6.1
NAVE
6 A32-52
R2.1A
NAVE
LIGHTING
09 21 16.A1 GYPSUM BOARD W453.4 TYPE X - 16mm (5/8")
FL6.1
FL6.1
FL6.1
2
50
S2105015
07012
R2.1A
C06000
PER LIGHTING DESIGNER
STAIR 15
1:5
CUSTOM EXTRUDED ALUMINUM CEILING CHANNEL TERRACE
TERRACE 07012
C2.1 5000 ABL
C2.1 5000 ABL
P15.4 STRUCTURAL SLAB
TC31
S2105015
TC33
TC33 2
C2.1 4800 ABL
STAIR 15
C07000
FL8.1
FL6.1
TC31
FOYER
C07000
120
C7.1
DATE TBC CEILING CHANNELS. REFER TO S.E ENGINEERS DRAWINGS
DATE TBC
EXTRUSION
TYPICAL OPEN CEILING GALLERY - SPEAKER
3 xxA44-22
FOYER
ISSUED FOR ISSUED FOR STAGE 2 STAGE 2 PERMITRESTRAINT AT BUILDING BUILDING PERMIT CABLE SEISMIC
ROOF 81450
1:5
6
C2.1 4500 ABL
PER MFR
TYPICAL OVERHEAD COILING DOOR FL8.1
TYPICAL NAVE CEILING-WALL DETAIL
13
00.S2 CEMENT CUSTOM ALUMINU 0705815016.A AGGREGA EXTRUSION FIREPROOFING
00 00 M41 SPRINKLER, REFER TO FIRE SUPPRESSION
6120
CORRIDOR
C07010
F3.1C E3-A.1
00000000S32 STEE& S36.A5STRUCTURAL STEEL CHANNEL FRAMING, BRACING,REFER REFERTOTOSTRUCTUR STRUCTU
A11-17
45
P15.4 P15.4
CORRIDOR 2
2
1:5
P15.4
LEVEL 09 74900
1:5
20
07004
F3.1C E3-A.1
S2.1 4005 ABL
LEVEL 08 69140
C2.1 4500 ABL
11
P15.4
P15.4
P15.4
S2.1 4005 ABL
TYPICAL NAV
00 00 S32 STRUCTURAL STE 3 FRAMING, REFER TO STRUCTU
07 81 16.A CEMENT AGGREG FIREPROOFING
05 50 00.S2 CUSTOM ALUMINUM © 2024 Perkins&Will EXTRUSION
REFER TO RCPS FOR DATUM AFF
00 00 E00 REFER TO ELECTRICAL
FL8.2
FL8.2
BOOKABLE GALLERY 1 BOOKABLE GALLERY 1
R2.1A
09013
1:5
133
1:5
6840
2
08000
1:5 07004
GALLERY 13
09013
TYPICAL OP
2
20
130
TYPICAL NAVE CEILING CL2.1 - SMALL LIGHT
7
6120
R2.1A
MECHANICAL
08000
TYPICAL SIDE WALL CONDITION AT OPEN CEILING GALLERY
TC34
E5-A.1
23
1:5
6120
2
MECHANICAL
1:5
07012
GALLERY 13
SCHEDULED PARTITION
TYPICAL LIGHTING COVE AT WASHROOMS
CUSTOM EXTRUDED ALUMINUM CEILING CHANNEL
TERRACETC34
E5-A.1
P1.4
SCHEDULED CEILING
10
P15.4
ROOF 81450
130 3 xxA44-22
TYPICAL NAVE CEILING CL2.1- AIR RETURN
3
50
F3.1C E3-A.1
F5.1C
23
TYPICAL OPEN CEILING GALLERY - SPEAKER
6480
F3.1C E3-A.1
C7.1 4500 ABLP15.4
C7.1 4500P15.4 ABL
PER LIGHTING DESIGNER
FL8.1
FL8.1
F5.1C
120 25
05 50 00.S2 CUSTOM ALUMINUM EXTRUSION
P1.4
51
82545
SEISMIC RESTRAINED CHANNELS 05 50 00.S2 CUSTOM ALUMINU EXTRUSION CUSTOM EXTRUDED ALUMINUM CEILING CHANNEL 00 00 E09 LIGHT FIXTURE, REFER ACOUSTIC TO ELECTRICAL BLACK BACKING
09 54 26.A1 LINEAR WOOD SLA CEILING
4680
09001
82545
PROJECT
1:5
5500
GALLERY 01
09001
8835
8835
F4.1
F4.1
P15.4
SCHEDULED WALL FINISH - ALIGN TO U/S OF GYP CEILING; COVE TO BE PAINTED TO MATCH GYP CEILING
14
E5-A.1
GALLERY 01
MUDDABLE METAL OVERHEAD DOOR AS J TERMINATION BEAD SCHEDULED
1 ST240123.3
E5-A.1
GALLERY 06
HEAVY GAGE 09006 METAL FRAMING 09006 UTILITY ANGLE
425
REFER TO RCPS FOR DATUM AFF
LINEAR WOOD SLAT REFER TO
1. FIREPROOF STRUCTURAL STEEL TO HAVE A FIRE RATING EQUAL TO OR GREATER THAN THAT OF BLACK ACOUSTIC BACKING THE ASSEMBLIES SUPPORTED PROJECT NUMBER 2. GYP BD WALLS AT INTERIOR SPACES SHALL 411421 26.B1 ?09 54 RECEIVE RUBBER BASE "RB01" & "PT04" PAINT FINISH, UNLESS OTHERWISE NOTED. CMU WALLS AT INTERIOR SPACES SHALL BE UNPAINTED, 3 xxA44-22 UNLESS OTHERWISE NOTED. CIP CONCRETE AT REVISIONS INTERIOR SPACES SHALL HAVE "CO02" STANDARD ARCHITECTURALLY EXPOSED CONCRETE LEVEL OF FINISH, UNLESS OTHERWISE NOTED. 1 BID GROUP 2 & PRICING 2024/04/02 3. 09 54 26.A1 LINEAR WOOD SLAT ADDENDUM 02 FLOORS AT ALL INTERIOR SPACES SHALL RECEIVE SEALED CONCRETE FINISH, UNLESSCEILING OTHERWISE NOTED 4. 00 00 E09 LIGHT FIXTURE, FLOOR FINISH TRANSITIONS SHALL BE CENTRED ON THE DOOR PANEL, UNLESS OTHERWISE REFERNOTED. TO ELECTRICAL 5. LOCATE DOOR FRAME JAMB OPENINGS 100mm FROM WALL INSIDE CORNERS, UNLESS 00 00 S32 STRUCTURAL STEEL OTHERWISE NOTED 6. FRAMING, REFER TO STRUCTURAL DIMENSIONS, FLOOR LEVEL TAGS & SPOT ELEVATIONS REFERENCE FACE OF FINISH, UNLESS OTHERWISE NOTED. 7. FLOOR GRILLES ARE REQUIRED TO BE HOUSED 00 S32FIRE STRUCTURAL STEEL WITHIN FIRE RATED ENCLOSURE 00 TO MAINTAIN RATING CONTINUITY BETWEEN FLOORS. FRAMING, REFER TO STRUCTURAL 8. 07 81 CEMENT AGGREGATE PROVIDE ACOUSTICALLY RATED PUTTY PADS AT 16.A DEVICES RECESS MOUNTED TO ACOUSTICALLY TITLE FIREPROOFING RATED GYP BD PARTITIONS. PROVIDE FIRE RATED 81 16.A CEMENT AGGREGATE PUTTY PADS AT DEVICES RECESS07 MOUNTED TO PLAN - LEVEL 06 FIRE RATED GYP BD PARTITIONS.FIREPROOFING 9. SUPPORT & SEISMIC RESTRAINT AT UNLESS OTHERWISE NOTED, RECESS MOUNT CEILING CHANNELS. REFER TO S.E DEVICES AT ARCHITECTURALLY EXPOSED CONCRETE TYPE "CO01" SURFACES & PROVIDE ENGINEERS DRAWINGS CONCEALED CONDUIT. UNLESS OTHERWISE NOTED, SURFACE MOUNT DEVICES AT CMU SHEET NUMBER SURFACES & AT ARCHITECTURALLY EXPOSED CONCRETE TYPE "CO02" SURFACES. PROVIDE SURFACE MOUNTED STRAIGHT, VERTICAL CONDUIT RUNS.
6
F6.1
C2.1 4500 ABL
C2.1 4500 ABL
P15.4
3175
425
6120
GALLERY 06
P15.4P15.4
P15.4
3175
09 21 16.A1 GYPSUM BOARD TYPE X - 16mm (5/8") CABLE SEISMIC RESTRAINT AT CEILING CHANNELS. REFER TO S.E ENGINEERS 06 10 00.C1 DRAWINGS 13mm PLYWOOD
6840
E5-A.1
7720
7720
11
6120
E5-A.1
5950
F6.1
R1.1
R1.1
09 54 81 26.A1 29 LINEAR SPRAYED 09 WOOD SLAT
ACOUSTIC INSULATION 9 10 9 CEILING 1110
8
8
6120
F5.1C
133
MAX.SPAN 11'-8" /W 20 GA. STUDS(*)
6480
Autodesk Docs://Vancouver Art Gallery/A-VAG-TOWER.rvt
F5.1C
07012
F5.1B
1 A30-01
1 A30-01
F6.1
PARTITION WITH FIRE, SMOKE & ACOUSTIC RATING MATCHING DOOR- EXTEND TO SLAB ABOVE- PROVIDE CONTINUOUS, RATED ACOUSTIC SEALANT AT C7.1 C7.1 4500 ABL 4500 ABL PERIMETER
TERRACE
F5.1B
5950
THREADED ROD SUPPORTS SCHEDULED CEILING
F6.1
3/3/2024 9:55:20 AM
VERHEAD COILING DOOR
13650
13650
NON STRUCTURAL METAL FRAMING
PER MFR
7
7
10950
10950
1030
1:5
07 81 16.A CEMENT AGGREG FIREPROOFING
WEST GEORGIA
CUSTOM EXTRUDED ALUMINUM
TYPICAL FIRE RATED CEILING, SOFFIT & FASCIA
15
120
TYPE C - ARTISTS BAR/MEMBERS LOUNGE BAR: 05 50 00.S2 CUSTOM ALUMINUM COPPER METAL FINISH ON PLYWOOD CORE, CHANNEL CEILING KEYPLAN FULL OVERLAY DOORS, CUSTOM FORMED EXTRUSION METAL COUNTERTOP - BRUSHED STAINLESS BLACK ACOUSTIC BACKING STEEL WITH COPPER FINISH
LEVEL 03 W1 PW_Floor Box Type W1 (@Wood finish) (0.3) - 1250MM X 525MM & S3 (Conc) 17 W2 PW_Floor Box Type W2 (@Wood finish)(0.4) - 1325MM X665MM & S4 (Conc) 9 W5 PW_Floor Box Type W5 (@Wood finish @ Tall gall & l07 south )(0.475) - 1325MM X 785MM 9 W7 PW_Floor Box Type W7 (0.32) - 1510MM X 485MM 16 LEVEL 04 W2 PW_Floor Box Type W2 (@Wood finish)(0.4) - 1325MM X665MM & S4 (Conc) 9 W3 PW_Floor Box Type W3 (@Wood finish + L06 Gal 2 conc) (0.35) - 1250MM X 665MM 6 W5 PW_Floor Box Type W5 (@Wood finish @ Tall gall & l07 south )(0.475) - 1325MM X 785MM 4 W8 PW_Floor Box Type W8 (0.33) - 1760MM X 428MM 10 LEVEL 05 W2 PW_Floor Box Type W2 (@Wood finish)(0.4) - 1325MM X665MM & S4 (Conc) 22 W4 PW_Floor Box Type W4 (@Wood finish @ Tall gall) (0.66) - 1250MM X 1165MM 5 W5 PW_Floor Box Type W5 (@Wood finish @ Tall gall & l07 south )(0.475) - 1325MM X 785MM 6 W6 PW_Floor Box Type W6 (@Wood finish) (0.4) - 1250MM X 725MM 18 W8 PW_Floor Box Type W8 (0.33) - 1760MM X 428MM 12 WX PW_Floor Box Type WX (@Wood finish @ Tall gall & L05 & L06 south )(0.5) - 1325MM X 825MM 3 LEVEL 06 W1 PW_Floor Box Type W1 (@Wood finish) (0.3) - 1250MM X 525MM & S3 (Conc) 14 W2 PW_Floor Box Type W2 (@Wood finish)(0.4) - 1325MM X665MM & S4 (Conc) 21 W6 PW_Floor Box Type W6 (@Wood finish) (0.4) - 1250MM X 725MM 19 WX PW_Floor Box Type WX (@Wood finish @ Tall gall & L05 & L06 south )(0.5) - 1325MM X 825MM 3 LEVEL 07 TAG NOTE TAG NOTE BLACK ACOUSTIC DUCT W2 PW_Floor Box Type W2 (@Wood finish)(0.4) - 1325MM X665MM & S4 (Conc) 13 12 12 LINERXBACKING W5 PW_Floor Box Type W5 (@Wood finish @ Tall gall & l07 south )(0.475) - 1325MM 785MM 6 222 222
4680
7670
7670
20
METAL DECK
4
SEISMIC RESTRAINED
TYPE B - CLASSROOM/GALLERY PROGRAM: CHANNELS WHITE LACQUER SHOP PAINTED PLYWOOD MILLWORK, FULL OVERLAY DOORS, BRUSHED STAINLESS STEEL COUNTER AND BACKSPLASH
TYPICAL NAVE CEILING CL2.1 - SMALL LIGHT
72260
72260
UNDERSIDE OF CEILING CHANN 00 00 S32 STRUCTURAL STEE FRAMING, REFER TO STRUCTUR
VANCOUVER ART GALLERY 00 00 E09 LIGHT FIXTURE, 181 WEST GEORGIA STREET, VANCOUVER REFER TO ELECTRICAL
C
TYPICAL NA 1:5
GENERAL NOTES
5500
3600
6
6
1:5
3
00 00 S32 STRUCTURAL STE 00 00 M41 REFER SPRINKLER, REFER FRAMING, TO STRUCTU TO FIRE SUPPRESSION
TYPE A2 - FOOD SERVICE WET BAR: CEILING CHANNELS. REFER TO COPPER METAL FINISH ON PLYWOOD CORE, S.E ENGINEERS DRAWINGS FULL OVERLAY DOORS, BRUSHED STAINLESS STEEL COUNTERTOP WITH COPPER FINISH
P15.4
130
CLT GUARD A
1
LANE
TYPE A1 - FOOD SERVICE: SOLID WOOD, FULL OVERLAY DOORS, BRUSHED STAINLESS STEEL COUNTERTOP WITH COPPER FINISH CABLE SEISMIC RESTRAINT AT
TYPE E - ADMIN/STAFF SPACES: ELECTRICAL PLAM OR VENEER ON MDF CORE, BASE & OVERHEAD CABINETS, FULL OVERLAY DOORS, SEISMIC RESTRAINED PLAM COUNTERTOPS - MILLWORK AND CHANNELS COUNTER COLOUR TBD TYPE F - ADMIN/STAFF SPACES: DOUGLAS FIR PLYWOOD MILLWORK CABINETRY/STORAGE - MATTE, NATURAL FINISH
120
5
ROSY GOLD METALLIC PAINT FINISH OVER INTUMESCENT COATING CUSTOM COLOR
133
CEMENT AGGREGATE
TYPE D - TICKETING/GALLERY SHOP: BESPOKE FITTED JOINERY SOLID WOOD 09 54 26.A1 MILLWORK WITH INTEGRATED SERVICES MATTE, NATURAL FINISH, DOUGLASCEILING FIR 00 00 E00
65
1025 3600
1025
4
4
FLOOR GRILLE SCHEDULE
7 00.A 07 84 FIRESTOPPING 1:5
1 A21-11
PER LIGHTING DESIGNER
9260
9260
3
DEFLECTION20
130
FLOORING LAYOUT
8'-11"GALLERY /W 25 GA. STUDS(*) TYPICAL SIDE WALL CONDITION AT OPENMAX.SPAN CEILING
ACOUSTIC OR REGULAR TRANSFER DUCT. REFER TO MECHANCIAL
32
2
23
CORNER REINFORCEMENT 00 00 E09 14 LIGHT FIXTURE, REFER TO ELECTRICALTC26 1 ST240123.3 1 :TYPE 5 C GYP. BOARD 2 LAYER 1/2" (PROVIDE SINGLE LAYER FOR 1HOUR RATED ASSEMBLY)
TYPICAL FIRE RATED CEILING, SOFFIT & FASCIA
STEEL BRIDGING AS LIGHTING REQUIRED FOR OVERHEAD DOOR SUPPORT. SPAN 5 BETWEEN ADJACENT BEAMS
07 81 23.A EXPOSED INTUMESCENT MASTIC FIRE RESISTIVE COATING
07 81 16.A 1CEMENT : 10 AGGREGA FIREPROOFING
MILLWORK
D
09 21 19.A2 SHAFT WALL STUD FRAMING W6 CUSTOM EXTRUDED CEILING 09 54 26.A1 LINEAR WOODALUMINUM SLAT CHANNEL CEILING
W6
PER MFR
09 81 29 SPRAYED ACOUSTIC INSULATION
23
MIN 450MM 65
W6
TYPICAL OVERHEAD COILING DOOR
1:5 SUPPORTING CONSTRUCTION TO MATCH FIRE RATING OF CEILING ASSEMBLY STRUCTURAL SLAB
SFRM
CELLULOSE SPRAY
FLOOR AV OUTLET FIREPROOFING
09 26.B1 21 19.A2 SHAFT WALL ?09 54 STUD FRAMING
3/A44-41
W6
2400
W6
S.E TO CONFIRM ELEC/DATA
METAL DECK CONCRETE AT LEVEL 07 SLAB WITH CRANK BEAM
FLOOR P&D OUTLET07 81 16.A
P1.4
P15.4 00 00 E09 LIGHT FIXTURE, 09 21TO 19.A1 GYPSUM REFER ELECTRICAL BOARD - SHAFT LINER 25MM (1") BLACK ACOUSTIC BACKING
PT01/BS01/FF01
P15.4
E
900
2/A44-41
4/A44-41
6/A44-41 W2
P15.4
P15.4
MAX.SPAN 8'-11" /W 25 GA. STUDS(*) MAX.SPAN 11'-8" /W 20 GA. STUDS(*)
NON STRUCTURAL METAL FRAMING
1
7280 7280
P15.4
09 21 19.A2 SHAFT WALL SEISMIC RESTRAINED STUD FRAMING CHANNELS P12
W6
1:5
1
28
6110 P15.4
1/A44-41
9
1 : 100
170
16/A44-40
TYP FIRE RATED CEILING/SOFFIT Level 06 : Gallery layout Plan 1
55
REFER TO MECHANICAL
06008
1:5
PLAN - LEVEL 06
50 WX
W1.4
SHAFT
GALLERY 10
P12
F-P ZONE
1 : 10
8230
W452-B.2
1
W6
SW
00 00 S32 STRUCTURAL STEEL FRAMING, REFER TO STRUCTURAL
W6
W1 W1
07 84 00.A FIRESTOPPING
W452-B.2
06302
06302A*
11/A44-42
W6
WX
15/A44-40
17/A44-40
10/A44-42
ELEC.
PT01/BS01/FF01
P12
A M ZONE P15.4 MANTEL 2.5m W x 4.5m H P15.4
07 84 00.A07 84 00.A FIRESTOPPING FIRESTOPPING
15
5 50
2/A44-38
6/A44-38
75
MF
W452-B.2
MF
950
F
GALLERY 06 CLOSURE TO DECK FLUTES 06006
W1.4
06302
900
8/A44-41
WASHROOMS
MF
SHAFT
P15.4
09 21 16.A1 GYPSUM BOARD X -BOARD 16mm 2 LAYER 1/2" TYPE- TYPE C GYP. 7/A44-41 (5/8") (PROVIDE SINGLE LAYER FOR 1W2 W2 HOUR RATED ASSEMBLY)
11
4 A32-52
19 A40-13
UP 06012
OVERHEAD DOOR AS SCHEDULED
RATED CEILING/SOFFIT
STAIR 3 S306301
WD06/BS01/FF01
09 21 1 19.A2 07 SHAFT 211900.CW2WALL GLASS 5/A44-41 A40-14 STUD FRAMING FIBRE BLANKET INSULATION 09 21 19.A2 SHAFT WALL SCHEDULED CEILING STUD FRAMING GALLERY 09 2 LAYER 1/2" TYPE C GYP. BOARD 06009 (PROVIDE SINGLE LAYER FOR 1PT01/BS01/FF01 HOUR RATED ASSEMBLY) CORNER REINFORCEMENT
E5-A.1
W452-B.3
06303
06007
OPEN TO BELOW
STAIR 4 STUD FRAMING 09 21 19.A1 GYPSUM P9.3 S406401 BOARD - SHAFT LINER 25MM (1")
F5.1B
P15.4
FP01/RB01/FF06
P15.4
W2
W2
ACOUSTIC SEALANT AT PERIMETER 09 21 19.A2 SHAFT WALL
TC27
LC
06006B
JANITOR
MF
06303
C06304
06301
12/A44-42
PT01/BS01/FF01
W1.4
06401
P15.4
PE7
VESTIBULE
PF
06304
1 : 10
8
G
WX
W1 GALLERY 08
PF
MF FIRE, SMOKE PARTITION WITH
& ACOUSTIC RATING MF PREACTION CAB. 09 21 19.A2 SHAFT WALL 06400A UP MATCHING DOOREXTEND TO06400A STUD FRAMING 09 21 19.A1 GYPSUM SLAB ABOVE- PROVIDE BOARD - SHAFT LINER CONTINUOUS, RATED CORRIDOR R04 25MM (1") C06012H
W2
ELEV
PE6
DN
09 81 29 1 : 10SPRAYED ACOUSTIC INSULATION
14/A44-40
6 A43-01
W1 P15.4
2024 TBD
METAL DECK CONCRETE AT LEVEL 07 SLAB
FLOOR GRILLE WOOD AT WOOD FLOORING; STAINLESS STEEL AT POLISHED CONCRETE FLOORING - SEE TYP DETAILS
W1
06401B
P15.4
REFER TO 09MECHANICAL 21 19.A2 SHAFT WALL STUD FRAMING
W2
ELEV NAVE
W2
9/A44-42
3/A44-42
2023/11/17 2024/03/15
UNDERSIDE OF CEILING CHANNEL
METAL DECK CONCRETE @ L04 SLAB - EXTERNAL DECK
16
C06000
W1
W2
W2
A52-10
2023/07/21 2023/08/18 2023/08/17
CAMBIE
LC
06007
2023/01/13 2023/05/05
11/A42-21 PT01
P15.4
1 A21-12
S2222
UP
ACOUSTIC OR REGULAR TRANSFER DUCT. REFER TO MECHANCIAL
W2
W1
W1
2/A44-42
A M ZONE 3m W x 4.5m H
1 : 10
1 A30-02 10 A42-22
PT01
W2
NON STRUCTURAL METAL
THREADED ROD SUPPORTS
P15.4
56180
2022/11/14
TYPICAL NAVE CEILING CL2.1 - SMALL LIGHT
7
4
UNDERSIDE OF CHANNEL STAIR 16
P10 NAVE C06000 PS01/BS01/FF01
1:5
INDICATE EXTENT
1:5
METAL DECK CONCRETE AT LEVEL 07 SLAB WITH CRANK BEAM
8
REFER TO TERRACE BUILD UP
ISSUED
FINISH OVER 00 00 E00INTUMESCENT REFER TO E COATING CUSTOM COLOR STE 00 00 00S32 00 E09STRUCTURAL LIGHT FIXTU FRAMING, STRUCTU 00 00 S43 REFER WOOD TO ELECTRICA STRUCTURAL 00 00 M41 PANEL, SPRINKLER 07 81 16.A CEMENT AGGREG REFER TO STRUCTURAL SUPPRESSI FIREPROOFING 00 00 S20 STEEL 00 00 S32 STRUCTURA 01M REFER TO S 00 00 S36.A5 STEEL CHA TO STRUCT 05 50 00.S2 CUSTOM AL 06 10 00.C1 13mm PLYW 07 21RESTRAINED 00.C GLASS FIBR SEISMIC 07 81 16.A CEMENT AG CHANNELS 07 84 00.A FIRESTOPP 00 0009S43 WOOD GYPSUM CUSTOM ALUMINUM 21EXTRUDED 16.A1 BO STRUCTURAL PANEL, CEILING CHANNEL (5/8") REFER TO19.A1 STRUCTURAL 09 21 GYPSUM BO BLACK ACOUSTIC BACKING 25MM (1") 21 19.A2 SHAFT 09 540926.A1 LINEAR WOODWAL SLA 54 26.A1 LINEAR WO ?05 050919.A1 CEILING 09LEVEL 54 26.B1 AESS 3 HANGER 09 81 29 SPRAYED A
ART MOVEMENT 'A M ZONE' FREE UNDERSIDE OF CEILING CHANNEL OF SERVICES TO PERMIT FUTURE OPENING IN FRAMED WALL FOR ART MOVEMENT. STUD HEADER REQUIRED. SIZE DENOTED INDICATES TOTAL SIZE INCLUDING EXISTING DOOR.
H
7500
FL6.1
4/A44-40
PT01/BS01/FF01
CLOSURE TO DECK FLUTES
P15.4
11/A42-21
2/A44-40
5/A44-40
PT01
TYP GYP BD CLG HEIGHT TRANSITION
4/A44-42
W2
2 A42-03
FF01
ROSY GOLD METALLIC PAINT
CLT FLOOR TO CONCRETE WALL
4
7 A40-21
TYPICAL FIRE RATED CEILING, SOFFIT & FASCIA 330
W2
1/A44-40
PT01
18 A42-22
600
CLT SOFFIT SERVICE CHASE AT MEMBER'S LOUNGE 1:5
SFRM
15
LS
06002A A M ZONE MANTEL 2.5m W x 4.5m H
P15.4
UNDERSIDE OF CEILING CHANNEL W452-B.3 DEFLECTION 1 : 5 DN
P10
PT01
SERVICE CAVITY
MAX.SPAN 8'-11" /W 25 GA. STUDS(*) J MAX.SPAN 11'-8" /W 20 GA. STUDS(*)
70
PE5
450
ELEV
PE4
S17 PS01/-/-
P15.4
SIM FRAMING 07 84 00.A FIRESTOPPING 10
11/A44-41
325
ELEV
ESC8
28
130
MF
ESC 8
STAIR 17
8
7/A44-38
LC
06005
P15.4
01M FFL ALUM/GLAZED/DOUBLE ALUM/GLAZED/SINGLE CURTAINWALL/SINGLE CURTAINWALL/DOUBLE CURTAINWALL/TALL GLAZED/WOOD/DOUBLE ISSUED FOR PROGRESS GLAZED/FRAMELESS PRICING GLAZED/WOOD HINGED W/PANEL ISSUED FOR DD GLAZED/WOOD W/PANEL CONSOLIDATION GLAZED/ALUM/SLIDINGOUTSIDE FACE ISSUED FOR VE OF CORE HIGH LUSTER PAINT/FLUSH RECONCILIATION WALL HIGH LUSTER PAINT/CURVED ISSUED FOR REVIEW LACQUER/SLIDING ISSUED FOR BID - GROUP 1 LACQUER/CASED/SLIDING ISSUED FOR VE RECONCILIATION STEEL/DOUBLE/CONCEALED ISSUED FOR 30% CD STEEL/DOUBLE 00 00 S43 WOOD STRUCTURAL ISSUED FOR BID GROUP 2 & STEEL/FLUSH PRICING PANEL, REFER TO STRUCTURAL RESTRAINED STEEL/FLUSH/VISIONSEISMIC PANEL ISSUED FOR STAGE 2 BUILDING STEEL/DOUBLE/HINGED OVER CHANNELS PERMIT PANEL MV STEEL/DOUBLE/VISION PANEL REFER TERRACE EMBED REFER TO OE OVERHEAD EXTERIOR COIL TOPLATE. DOOR BUILD UP STRUCTURAL OH OVERHEAD COIL DOOR OI INSULATED OVERHEAD 00COIL 00 E09 LIGHT FIXTURE, DOOR REFER TO ELECTRICAL PD PLASTER/DOUBLE/CONCEALED PE PLASTER CLT CLOSER ELEVATOR/DOUBLE/CONCEALED PF PAINTED/FLUSH/CONCEALED BLACK ACOUSTIC BACKING PT PAINTED+METAL CLAD/FLUSH/CONCEALED TD TIMBER/DOUBLE ?09 54 26.B1 TG TIMBER/GLAZED/DOUBLE 09 21 16.B5 DEFLECTION HEAD TF TIMBER EXTERIOR CLADDING/FLUSH TS TIMBER/SINGLE ROOM NAMETIMBER/VISION PANEL CLT CLOSER PANEL AT ENDS TP ROOM NUMBER TV 3096A TIMBER EXTERIOR CRANKED BEAM PTXX/BSXX/FFXXCLADDING/VENEER INTERIOR CLADDING 09 54 26.A1 LINEAR WOOD SLAT TYPICAL FLOOR FINISH SFRM VD VENEER/DOUBLE TYPICAL BASE FINISHCEILING VF VENEER/FLUSH TYPICAL WALL FINISH VH VENEER/HINGED OVER PANEL CELLULOSE SPRAY NOTE: FINISHES APPLY TO ENTIRE VR TYPICALVENEER/FLUSH/CONCEALED LIGHT FIXTURE, ROOM, OTHERWISE NOTED00 ON 00 E09 WD UNLESSWOOD/DOUBLE PLANS REFER TO ELECTRICAL WG OR ELEVATIONS WOOD/GLAZED WF WOOD/FLUSH DEFLECTION WH WOOD/HINGED OVER PANEL FINISH OTHER THAN PS01 WP WOOD/DOUBLE TYPICAL FINISH W/PANEL - ARROWS
120
06201
W1
7/A44-42
W2
W1
1 : 10
P12
8/A44-38
W1
8/A44-42 W1
UP S206201
70
06100
W1
P15.4
06001
P15.4
18 A40-12
STAIR 2
A M ZONE 3m W x 4.5m H
1/A44-42
STEEL12 BRIDGING AS REQUIRED FOR OVERHEAD P15.4 DOOR SUPPORT. 1 : 5SPAN BETWEEN ADJACENT BEAMS
900
SE6
T AF
DR
DOOR / FRAME TYPE LEGEND AD AS CS CD CT GD GF GH GP GS HF HC LC LS MC MD MF MG MH
K
CLT CLOSURE. WOOD GRAIN TO CELLULOSE SPRAY E5-A.1 OPEN TO MATCH BELOW CLT UNDERSIDE CORNER REINFORCEMENT F5.1B L.E.D SURFACE MOUNTED DEFLECTION LIGHTING 2 GALLERY LAYER C GYP. BOARD RECESSED BRASS 04 1/2" TYPE 05004 (PROVIDE SINGLEHEADS LAYER FOR 1SPRINKLER PT01/BS01/FF02 HOUR RATED ASSEMBLY) 09 21 16.A1 GYPSUM BOARD 07 84 TYPE 00.A X - 16mm (5/8") FIRESTOPPING
ELEV
W453.4
GALLERY 07
OARD OR 1-
4/A44-38 W1.4
P15.4
TYP FIRE RATED CEILING/SOFFIT
PD
12/A42-21
W1 3 A40-22
330
450
P15.4
GYP BD CEILING
10/A44-41
13/A44-42
06005 PT01/BS01/FF01
50
MF
W2
W2
5/29/2024 6:07:53 PM
W2
16
P15.4 ELEV SE5
GALLERY 05 5 A42-24
CRANKED BEAM 09 21 SKYLIGHT 19.A2 SHAFT WALL P15.4 ABOVE STUD FRAMING SFRM
ELEV LOBBY
METAL DECK CONCRETE @ L04 SLAB - EXTERNAL DECK
A M ZONE 5m W x 3.2m H
1 A21-14
MD
06200
W453.4
10/A42-21
W2
W2
06101
PE
06005A
09 21 19.A2 SHAFT WALL STUD 5/A44-38FRAMING
P15.4
06200
PT01/BS01/FF01
1P8.4: 10
P9.4
1:5
06002
P15.4
C06202
TYPICAL STEP & SERVICE PENETRATION AT VOID FORM - LO1 PERIMETER BUILDINGS
C06100
PT04/BS01/FF01
GYP BD CEILINGP15.4
GALLERY 06
VESTIBULE
PT01/BS01/FF01
06102
11CHANNEL UNDERSIDE OF
PT01/BS01/FF01
1
PT01/BS01/FF01
STORAGE
VESTIBULE
9
PD
06202
5/A44-42
SUPPORTING SFRMSEE TYP SUSPENSION CONSTRUCTION TO MATCH MD DETAILS FIRE RATING 06102OF CEILING DEFLECTION ASSEMBLY GALLERY PREP.
P15.4
3/A44-38
P15.4
S106101 STRUCTURAL SLAB 09 21 16.A1 GYPSUM BOARD - TYPE X - 16mm NON STRUCTURAL (5/8") METAL FRAMING BRACING TO UP FIRE STOPPING AT TOP AND STRUCTURAL 07 84 00.A SLAB AT 48" OCBOTTOM OF OPENING FIRESTOPPING
18 A40-11
SHALLOW P-TRAP TO CONCEAL WITHIN CHASE 09 21 19.A1 GYPSUM BOARD - SHAFT LINER 25MM (1")
W452-B.3
W6
P12
STAIR 1
9/A44-41
11/A44-40 P15.4
12/A44-40 W6
P15.4
E5-A.1
REFER TO STRUCTURAL
A M ZONE MANTEL 2.5m W x 4.5m H
DATE TBC
06 10 00.C3 16mm PLYWOOD
DOOR NUMBER
COLLARED SERVICE PENETRATIONS
51
190 P15.4
DN
Autodesk Docs://Vancouver Art Gallery/A-VAG-TOWER.rvt
P15.4
P15.4
1 : 10
07 81 23.A EXPOSEDKEYNOTE INTUMESCENT MASTIC FIRE RESISTIVE COATING TAG
ISSUED STAGE 2 09 21 16.A1 GYPSUM BOARDFOR - TYPE BUILDING PERMIT X - 16mm (5/8") DOOR / FRAME TYPE HOSE BIB
M
L
09 21 19.A2 SHAFT WALL STUD REFER TOFRAMING TERRACE BUILD UP
ø 56
P15.4
OPEN TO BELOW
METAL DEC
?05 05 19.A1 AESS LEVEL 3 HANGER
07 21 00.C GLASS FIBRE BLANKET INSULATION
P15.4
1 25MM ACOUSTIC MATT W6 NON STRUCTURAL METAL ABOVE 2 LAYER 1/2"AUDITORIUM TYPE C GYP. BOARD FRAMING (PROVIDE SINGLE LAYER FOR 1-
P15.4
BD CLG HEIGHT TRANSITION
PT01/BS01/FF01
HOUR RATED ASSEMBLY)
900
F5.1B
13/A44-40
7/A44-40
9/A44-40
VOID FORM
PT01/BS01/FF01
06004
1:2
4
SERVICE CAVITY
SYMBOL LEGEND
PF
01M FFL
GALLERY 02
2
1 : 10
2301A
REFER TO MECHANICAL
1/A44-38
STRUCTURAL SLAB 07 21PENETRATING 00.C GLASS ITEM FIBRE BLANKET INSULATION 8/A44-40 W6
P15.4
W6
TYPICAL GAL
UNDERSIDE OF CEILING CHAN
1:2
METAL DECK CONCRETE AT LEVEL 07 SLAB WITH CRANK BEAM
8
TC29
09 60 13.D ACOUSTIC UNDERLAY 07 845MM 00.A FIRESTOPPING
150
06003
P15.4
FLOOR FINISH
10/A44-40
GALLERY 01
P12
W6
R04
HB
CLOSURE TO DECK FLUTES 50mm CONCRETE
P15.4
FIRE/ SMOKE SHUTTER 3200MM TALL WHITE OAK PLYWOOD & SOLID WOODWORK CASED OPENING METAL BAR GRATING FLOOR
GUARDS, HANDRAILS, DOORS, STUD WALLS ARE INDICATED FOR REFERENCE BUT WILL NOT BE BUILT AS PART OF STAGE 2 BP.
FIRESTOPPED FLOOR BOX BEYOND. BRASS
1 A30-01
P12
6/A44-40
P10 P12
1455 BAR DRAIN TO 3175 ALIGN WITH SERVICE CHASE
7720
E5-A.1
F5.1B
09 21 19.A1 GYPSUM BOARD - W6 SHAFT LINER W6 25MM (1") ALL PENETRATIONS 09 21ENCASE 19.A2 SHAFT WALL STUDTHROUGH FRAMINGVOID FORM WITH CONCRETE WALLS
W6
5950
1 A21-13
SCHEDULED FLOOR ASSEMBLY
09 21 19.A2 SHAFT WALL STUD FRAMING
P15.4
W6
11
ACOUSTIC SEALANT/ FIRESTOPPING - SEE SCHEDULE PARTITION
TYPICAL FLOOR TRANSITION - POLISHED CONCRETE TO WOOD
UNDERSIDE OF CEILING CHANNEL 5
120
13650
LEVEL 01
P15.4
10
NOTE
57600
10950
E5-A.1
9
55200
7670
TC28
8
ACOUSTIC OR REGULAR TRANSFER DUCT. REFER TO MECHANCIAL
PLENUM
7
UP
3600
6
3/A44-40
1030
ALL INDICATED SCOPE EXCEPT STRUCTURAL CONCRETE IS EXCLUDED FROM STAGE 2 BP AND WILL BE INCLUDED IN STAGE 3 BP
1 : 10
CURBS AT PENETRATIONS
5
330
1:5 METAL DECK CONCRETE @ L04 SLAB - EXTERNAL DECK
16
6/A44-42
4
AREA NOT INCLUDED IN STAGE 2 BP
3 A21-11
:5 TYP1 GYP BD CLG HEIGHT TRANSITION
1:5
3
TAG
TYPICAL HVAC GRILL AT POLISHED CONCRETE FLOOR
9
3 A21-11
12
SCHEDULED FLOOR ASSEMBLY SHEET NOTE LEGEND
LEGEND
70
TYPICAL HVAC GRILL AT WOOD FLOOR
12
130
HVAC DUCTWORK- PROVIDE DUCT LINER UNDERSIDE OF CHANNEL FIRST 5M OF DUCT, OR UNTIL REACHING SHARED DUCT PLENUM. REFER TO MECHANICAL DRAWINGS
325
DEFLECTION UNDER FLOOR GRILLE TO BE BLACK INTERIOR FINISH
HVAC DUCTWORK- PROVIDE DUCT LINER GYP BD CEILING FIRST 5M OF DUCT, OR UNTIL REACHING SHARED DUCT PLENUM. REFER TO MECHANICAL DRAWINGS
450
UNDER FLOOR GRILLE GYP BD CEILING TO BE BLACK INTERIOR FINISH
A30-02 A30-02 © 2024 Perkins&Will © 2024 Perkins&Will
38
TYPICAL GALL 1:5
Project 02 : Coop Bank of Oromia, Ethiopia Project Brief : The new headquarters for the Cooperative Bank of Oromia is a visually striking high-rise tower designed to enhance workplace efficiency and provide a serene environment. It integrates modern office spaces with incubation centers, a commercial plaza, restaurants, and recreational areas - creating a dynamic and functional hub at the heart of the city’s financial core. 5
4
3
2
1
D
WS-03
5
5
4
B2
B
4
3
2
409
409
WS-01 WS-02
7
7
409
409
2
WS-01
ACO
WS-06
ACO
WS-02
WS-07
2
556
556
ACO
A
ACO
28.60 28.60 Level 2_FFLLevel 2_FFL
28.60 28.60 Level 2_FFLLevel 2_FFL
9
WS-08
9
B WS-13
WS-04
WS-03
2
3
4
5
WS-01
6
7
8
9
6
6
409
409
4500
-05 WS
D
D
E
4500
C 1 D
F WS-02
G
24.10 24.10 Level 1_FFLLevel 1_FFL
24.10 24.10 Level 1_FFLLevel 1_FFL
H
C
J K
FLP-02
WS-03
FLP-02
FLP-02
L
03
6000
M WS-10
KEY PLAN
5
5
409
409
6000
FLP-02
GENERATOR GENERATOR FOR FOR BUILDING BUILDING RM 01 RM 01
1 : 500
WS-0 WS-10
C
18.10 18.10 P3-Podium3-FFL P3-Podium3-FFL
18.10 18.10 P3-Podium3-FFL P3-Podium3-FFL
WS-04
WS-0
3
3
556
556
WS-0
C
WS-05 WS-04 4
4
409
409
B
OUTSIDE OUTSIDE
INSIDE
WS-0
4500
4500
RETAILRETAIL INSIDE
RETAILRETAIL
WS-08
13.60 13.60 P2-Podium2-FFL P2-Podium2-FFL
13.60 13.60 P2-Podium2-FFL P2-Podium2-FFL 4
4
556
556
9
9
2
3
4
5
6
7
8
WS-10
9
WS-06
4500
RETAILRETAIL WS-07 1
4500
WS-13
A
9.10 9.10 P1-Podium1-FFL P1-Podium1-FFL
3
3
556
556
9.10 9.10 P1-Podium1-FFL P1-Podium1-FFL
B
KEY VIEW-NORTH-WEST
02
FLP-02
FLP-02
KEY VIEW-SOUTH- EAST
01
FLP-02
FLP-02
C
A
B
B
D
3
4
5
6
7
8
9
A
9000
2
9000
1
E
B
5 Media
4
3
SERVICES SERVICES 1
2
F
SERVICE SERVICE
Display Training Lobby
Media
Gallery
C
3
3
409
409
G
0.10 0.10 UG-Upperground-FFL UG-Upperground-FFL
Library
Wet Areas Reception
Prefunction Lobby
0.10 0.10 UG-Upperground-FFL UG-Upperground-FFL
Wet Areas Media
D Store Common Area
1
1
555
555
H Elevator
Lobby
Lobby
Elevator
RN-P
E
Elevator
Lobby
Wet Areas
RN-P
3800
Wet Areas
3800
Elevator
Wet Areas
9
9
J Staircase
Staircase
SHAFT
SHAFT Elevator
Media
RN-P
MEP Shaft
Shaft Shaft
Elevator
F Lobby
Circulation
A
RN-P
A
-3.70 -3.70 MZ-Mezzanine-FFL MZ-Mezzanine-FFL
Circulation Display Elevator
MEP
Lobby
-3.70 -3.70 MZ-Mezzanine-FFL MZ-Mezzanine-FFL
K
Training Lobby
Media
Gallery
MEP
MEP
L G Library
Wet Areas Reception
Prefunction Lobby Wet Areas
Media Store
M
Common Area
Area Plans
H Elevator
Elevator
Wet Areas
Wet Areas
1
WS -08_PART WS -08_PART ELEVATION ELEVATION 1 1 : 50 1 : 50
2
Lobby
Professional Work Lobby
Elevator
Elevator
Lobby
Wet Areas
J
Staircase
Staircase
SHAFT
SHAFT
Elevator
MEP
Shaft
Shaft Shaft
Elevator
Lobby
Circulation
Circulation MEP
WS -08_PART WS -08_PART SECTION SECTION 2 1 : 50 1 : 50
Elevator Lobby
K
MEP
5
5
4
4
3
875
875
875
875
CL
CL
200
200
CL
200
CL CL
200
CL
LF01
LF01
Drawing indicates design intenttoonly. datum levels aredimensions subject detailed All information, areas, and survey, detailed design and datum levels are subject to detailed D All information, areas, dimensions and investigative work. All information, areas, dimensions and survey, detailed design datum levels are and subject to detailed
WL01
RISER
RISER
investigative work. Do not scale from the drawing. This drawing is the property of Do not scale from theNo drawing. Perkins&Will UKdrawing. Ltd. Do not scaleis from This drawing the the property of disclosure or copy ofUK it may be made without Perkins&Will Ltd.isNo or the This drawing thedisclosure property of written of Perkins&Will UK Thisof drawing is property ofthe copy it may permission bethe made Perkins&Will UK without Ltd. No disclosure or Ltd. Perkins&Will UK Ltd. No disclosure or written permission of be Perkins&Will UK copy of it may made without the copy of it may be made without the Ltd. written permission of Perkins&Will UK written permission of Perkins&Will UK Ltd. Ltd.
2700
RISER
LIFT LOBBY LIFT LOBBY
2700
RISER
LIFT LOBBY RISER
2700
RISER
2700
2700
WL01
TOILET WL01 LOBBY TOILET TOILET LOBBY LOBBY WL01
RISER
2700
2500
LT01, WALL LIGHT LT01, WALL LIGHT LOBBY
LIFT LOBBY
2700
WL01. TIMBER PANELS WL01. TIMBER PANELS
2500
WL01. TIMBER PANELS
2500
WL01. TIMBER PANELS
2500
WL01. TIMBER PANELS
TOILET
ENTRANCE DOOR TO GOODS LIFT ENTRANCE DOOR TO GOODS LIFT ENTRANCE DOOR TO ENTRANCE DOOR TO GOODS LIFT GOODS LIFT
LT01, WALL LIGHT LT01, WALL LIGHT
datum levelswork. are subject to detailed investigative survey, detailed design and detailed design and Dsurvey, Do not scale from investigative work.the drawing.
D RISER
LT01, WALL LIGHT
840 150
AFFL
150
AFFL
AFFL
AFFL
200
875
C
875
C
CL
CL
C
C
CL
CL
200
200
LT01, WALL LIGHT
2700
LIFT LOBBY LIFT LOBBY LIFT LOBBY
2700
PGR LIFT 2 PGR LIFT 2
LIFT LOBBY
GOODS LIFT GOODS LIFT
PLOT B - THE REFLECTOR PLOT B - THE REFLECTOR PLOT B - THE REFLECTOR PLOT B - THE REFLECTOR
2700
GOODS LIFT
2700
2700
LOBBY
2700
TENANT FLOOR TENANT TENANT FLOOR FLOOR
TO EAST FF LOBBY ENTRANCE DOOR ENTRANCE DOOR TO EAST FF TO EAST FFLOBBY
PGR LIFT 2
GOODS LIFT
2700
TENANT FLOOR
2700
2500
2500
ENTRANCE DOOR TO FF LIFT 1 ENTRANCE DOOR ENTRANCE TO DOOR FF LIFT 1 TO FF LIFT 1
ENTRANCE DOOR TO EAST FF LOBBY ENTRANCE DOOR
840
150
LIFTS MAIN LOBBY - TYPICAL ELEVATION LOOKING EAST 2 CORE 1 : 25LIFTS MAIN LOBBY - TYPICAL ELEVATION LOOKING EAST 2 CORE 1 : 25 CORE LIFTS MAIN LOBBY - TYPICAL ELEVATION LOOKING EAST LIFTS MAIN LOBBY - TYPICAL ELEVATION LOOKING EAST 2 2 CORE 1 : 251 : 25
KEYPLA
AFFL
N KEYPLA N KEYPLA KEYPLA N N
AFFL
150
AFFL
150
150 150
AFFL
150
150
AFFL AFFL
150
840 850840 850
150 150
150
150
850
850
840
LIFT LOBBY LIFT LOBBY
LT01, WALL LIGHT LT01, WALL LIGHT
2500
2350
WL01. TIMBER PANELS LIFT LOBBY WL01. TIMBER PANELS
ENTRANCE DOOR TO FF LIFT 1
T PROJEC T PROJEC PROJEC T T
PGR LIFT 2
LT01, WALL LIGHT
LT01, WALL LIGHT LT01, WALL LIGHT LIFT LOBBY
2500
2350
WL01. TIMBER PANELS
ENTRANCE DOOR TO PGR LIFT 1 ENTRANCE DOOR ENTRANCETO DOOR PGR LIFT 1 TO PGR LIFT 1
2350
WL01. TIMBER PANELS WL01. TIMBER PANELS
2350
WL01. TIMBER PANELS
ENTRANCE DOOR TO PGR LIFT 2 ENTRANCE DOOR ENTRANCETO DOOR PGR LIFT 2 TO PGR LIFT 2
CL01, ACOUSTIC CEILING PANELS CL01, ACOUSTIC CEILING PANELS CL01, ACOUSTIC CEILING CL01, ACOUSTIC PANELSCEILING PANELS
875
875 875 875
875
CL
TOILET LOBBY TOILET TOILET LOBBY LOBBY
LT01, WALL LIGHT LT01, WALL LIGHT WL01. TIMBER PANELS ENTRANCE DOOR TO PGR LIFT 1
LT01, WALL LIGHT LT01, WALL LIGHT
PT01, FLUSH PLASTERBOARD PAINTED PT01, FLUSH PLASTERBOARD PAINTED PT01, FLUSH PLASTERBOARD PT01, FLUSH PLASTERBOARD PAINTED PAINTED
PROJEC
LT01, WALL LIGHT LT01, WALL LIGHT WL01. TIMBER PANELS ENTRANCE DOOR TO PGR LIFT 2
LT01, WALL LIGHT LT01, WALL LIGHT
CL
CL
CL
200
CL
CL
LT01, WALL LIGHT LT01, WALL LIGHT
TOILET LOBBY
CL
CL
CL01, ACOUSTIC CEILING PANELS CL01, ACOUSTIC CEILING PANELS CL01, ACOUSTIC CEILING CL01, ACOUSTIC PANELSCEILING PANELS
C
CL
C
CL
C C
AFFL
LIFT LOBBY - ELEVATION LOOKING SOUTH 4 CORE 1 : 25LIFT LOBBY - ELEVATION LOOKING SOUTH 4 CORE 1 : 25 CORE LIFT LOBBY - ELEVATION LOOKING SOUTH LIFT LOBBY - ELEVATION LOOKING SOUTH 4 4 CORE 1 : 251 : 25
1 : 25
1 : 251 : 25
875
850
850
150
150
1 : 25
AFFL
AFFL AFFL
CL
Project Brief : I was involved in the interior development of the project, focusing on detailed design and documentation. My responsibilities included producing interior LIFTS MAIN LOBBY - TYPICAL ELEVATION LOOKING WEST 3 CORE CORE LIFTS MAIN LOBBY - TYPICAL ELEVATION LOOKING WEST 3 drawings for areas such asWEST the LIFTS MAIN LOBBY - TYPICAL ELEVATION LOOKING WEST reception and lift lobby, as well as developing millwork LIFTS MAIN LOBBY - TYPICAL ELEVATION LOOKING 3 CORE 3 CORE details and custom Revit families to support the documentation phase.
CL
840 850840 850
840
LIFT LOBBY LIFT LOBBY
2350
Project 03 : Tribeca, London LIFT LOBBY
LIFT LOBBY
ENTRANCE DOOR TO PGR ENTRANCELIFT 2 DOOR TO PGR ENTRANCE LIFT 2 ENTRANCE DOOR TO PGR DOOR TO PGR LIFT 2 LIFT 2
2350
ENTRANCE DOOR TO LT01, WALL LIGHT LT01, WALL LIGHT FF LIFT 2 ENTRANCE DOOR TO WL01. TIMBER PANELS FF LIFT 2 ENTRANCE DOOR TO WL01. TIMBER PANELS ENTRANCE DOOR TO FF LIFT 2 FF LIFT 2 WL01. TIMBER PANELS
D LT01, WALL LIGHT
LT01, WALL LIGHT
2350
TENANT FLOOR TENANT FLOOR TENANT TENANT FLOOR FLOOR
LF01
LT01, WALL LIGHT
LT01, WALL LIGHT LT01, WALL LIGHT
2700
D
2350
ScaleScale 1: 25 1: 25
London t +44.20.7466.1000 EC1N 2NS www.perkinswill.com EC1N 2NS f +44.20.7466.1050 t +44.20.7466.1000 t +44.20.7466.1000 www.perkinswill.com NOTE f +44.20.7466.1050 f +44.20.7466.1050 www.perkinswill.com S www.perkinswill.com NOTE Drawing indicates design intent only. S NOTE NOTE Drawing indicates design intent only. S S and All information, areas, dimensions Drawing indicates design intent only.
CL
CL
CL
Scale 1: 25 Scale 1: 25
CL01, ACOUSTIC CEILING PANELS CL01, ACOUSTIC CEILING PANELS CL01, ACOUSTIC CEILING CL01, ACOUSTIC PANELSCEILING PANELS
CL
PT01, FLUSH PLASTERBOARD PAINTED PT01, FLUSH PLASTERBOARD PAINTED PT01, FLUSH PLASTERBOARD PT01, FLUSH PLASTERBOARD PAINTED PAINTED
CL
CL
CL
LF01
D D D
CL
CL
CL
CL01, ACOUSTIC CEILING PANELS CL01, ACOUSTIC CEILING PANELS CL01, ACOUSTIC CEILING CL01, ACOUSTIC PANELSCEILING PANELS
AFFL
AFFL
LIFTS LOBBY - ELEVATION LOOKING NORTH 5 CORE 1 : 25LIFTS LOBBY - ELEVATION LOOKING NORTH 5 CORE 1 : 25 CORE LIFTS LOBBY - ELEVATION LOOKING NORTH LIFTS LOBBY - ELEVATION LOOKING NORTH 5 5 CORE 1 : 251 : 25
ISSUE
ISSUECHART CHART ISSUE ISSUE CHART CHART
B
B B
B B
B
PGR LIFT 1 / EVAC LIFT PGR LIFT 1 / EVAC LIFT PGR LIFT 1 / PGR LIFT 1 / EVAC LIFT EVAC LIFT
PGR LIFT 2 PGR LIFT 2 PGR LIFT 2 PGR LIFT 2
B
B
FF LIFT 1 FF LIFT 1 FF LIFT 1 FF LIFT 1 RISER RISER
45000 45000
2000
500
500 500
CL01, ACOUSTIC CEILING PANELS CL01, ACOUSTIC CEILING PANELS CL01, ACOUSTIC CEILING CL01, ACOUSTIC PANELSCEILING PANELS
REFERENCE IMAGE - TYPICAL UPPER FLOOR LIFT LOBBY REFERENCE IMAGE - TYPICAL UPPER FLOOR LIFT LOBBY REFERENCE IMAGE - TYPICAL UPPER FLOOR LOBBY REFERENCE IMAGE - TYPICAL UPPER FLOOR LIFTLIFT LOBBY
2000
45000
LIFT LOBBY LIFT LOBBY 45000
2000
LIFT LOBBY LIFT LOBBY
2000
TOILET LOBBY TOILET LOBBY TOILET TOILET LOBBY LOBBY
RISER
500
RISER
PT01, FLUSH PLASTERBOARD PAINTED PT01, FLUSH PLASTERBOARD PAINTED PT01, FLUSH PLASTERBOARD PT01, FLUSH PLASTERBOARD PAINTED PAINTED
MARK
Date
MARK Number Job ISSUE
500 500
500
500
RISER RISER
2
1
2
1
RISER
3
2
WOOD CARCASS STEEL CLADDING B - L00 FFL 22.525
550
550
B - L00 FFL 22.525
150 Ho Lo EC1N t +44.20.7466 f +44.20.7466 SHEET NUMBER www.perkinswil
155 15 30
200 750
LAMINATED WOOD STEEL COLUMN CARCASS
2
200
2
750
750
3
TITL E
N TRI PWA SHEET NUMBER A 3514 150 Ho SHEET NUMBER SHEETA NUMBER Lo TRI PWA 3514 PROJEC AUTHOR VOLUM LEVE TYPE indicates ROLE NUMBER Drawing design intent o EC1N T E L TRI A 3514 t +44.20.7466 PROJEC VOLUM LEVE TYPE ROLE TRI AUTHOR PWAPWA A NUMBER 3514 T
105
2
155 15 30
4
STAGE 04
1 1 1
CDE STATUS CODE
E L PROJEC AUTHOR VOLUM PROJEC T AUTHOR VOLUM ELEVE T E L
STEEL COLUMN WOOD CARCASS
B - L00 FFL 22.525
105
This drawing is the property of Perkins&Will UK Ltd. No disclosu copy of it may be made without th written permission of Perkins&Wi Ltd.
B - L00 FFL 22.525
- RECEPTION DESK - ELEVATION 3 JOI-001 1 : 10 Referencing View: 1/ A3500
- RECEPTION DESK - ELEVATION 4 JOI-001 1 : 10 Referencing View: 1/ A3500
- RECEPTION DESK - SECTION 5 JOI-001 1 : 10 Referencing View: 4/ A3010
- RECEPTION DESK - ELEVATION 4 JOI-001 1 : 10 Referencing View: 1/ A3500
- RECEPTION DESK - SECTION 5 JOI-001 1 : 10 Referencing View: 4/ A3010
B - L00 FFL 22.525
LEVE TYPE ROLE NUMBER TYPE ROLE NUMBER L
Copyright © 2022 Perkins+Will Copyright © 2022 Perkins+Will All areas, dimensions Thisinformation, drawing is the property of datum levels are subject to detaile Perkins&Will UK Ltd. No disclosu survey, and copy of detailed it may bedesign made without th D investigative work. of Perkins&Wi written permission Ltd. Do not scale from the drawing.
1
STEEL CLADDING
- RECEPTION DESK - ELEVATION 3 JOI-001 1 : 10 Referencing View: 1/ A3500
REVISION All information, areas, dimensions f +44.20.7466
CDE STATUS CODE REVISION www.perkinswil datum levels are subject to detaile D2 CDE STATUS CODE survey, detailed REVISION CDE STATUS CODED REVISION design and N D2 work. Copyrightinvestigative © 2022 Perkins+Will Perkins+Will D2 D2 Copyright © 2022Drawing indicates design intent o Do not scale from the drawing.
750
750
3 4
200
4 5
5
155 15 30
3
550
5
200
750
4
550
200
155 15 30
200
LAMINATED WOOD WHITE LAMINATED CARCASS WORK TOP
D
D
A
REFERENCE IMAGE- RECESSED REFERENCE IMAGE- LT01, WALL REFERENCE IMAGERECESSED REFERENCE IMAGE- LT01, WALL COPPER CAN DOWNLIGHT LIGHT REFERENCE IMAGERECESSED LIGHT REFERENCE IMAGELT01, WALL REFERENCE RECESSED REFERENCE IMAGELT01, WALL COPPER CAN IMAGEDOWNLIGHT WHITE LAMINATED COPPER DOWNLIGHT LIGHT WORK TOP COPPER CANCAN DOWNLIGHT LIGHT
5
STAGE 04
STAGE 04 A
3
06/26/23
322406 1 : 25 06/26/23 1 : 25322406 Author 322406 1 : 25 Author Checker 1 : 25 Author Checker Approver Author Checker Approver CDE STATUS Checker Approver CDE STATUS Approver CDE STATUS CDE STATUS
STAGE 04 TITL ENLARGED TYPICAL E TITL A ENLARGED TYPICAL E CORE MAINTITL LIFT E ENLARGED TYPICAL ENLARGED TYPICAL CORE MAIN LIFT LOBBY CORE MAIN LIFT CORE MAIN LIFT LOBBY LOBBY LOBBY
A
FF LIFT 2 FF LIFT 2
4
UPPER LEVEL REFLECTED CEILING PLAN 1 TYPICAL 1 : 25 UPPER LEVEL REFLECTED CEILING PLAN 1 TYPICAL 1 : 25 TYPICAL UPPER LEVEL REFLECTED CEILING PLAN UPPER LEVEL REFLECTED CEILING PLAN 1 1 TYPICAL 1 : 251 : 25
550
Scale 1: 200 Scale 1: 200 100 500 50 1000 20 25 10 5 2 100 500 50 1000 20 25 10 5 2
GOODS LIFT GOODS LIFT
RISER
3
FF LIFT 2
550
2500 2000 1000 100 200 500 20 50 10 5mm m 2500 2000 1000 100 200 500 20 50 10 5mm m
1000 800 400 200 20 40 80 8 4 2
B - L00 FFL 22.525
---
--5 5408
C
C 5 5408
C
-
C
PRO 1000
500
-
6
AXO
7
AXO
PRO 1000
500
4750
6 AXO
PLOT B - THE REFLECTO
7 AXO
500
PLOT B - THE REFLECTO
5250 ---
3
4
-
KEY
5408
---
4750
500
5250 ---
3
-
2 JOI-001 - RECEPTION DESK - PLAN
---
4
---
KEY
5408
---
2 JOI-001 - RECEPTION DESK - PLAN 1 : 10
IS CH
1 : 10
B
B
600
155
600
950
795 795
1300
1300
950
795 795
950
1000
600
600
1000
950
105
IS CH
155
B
105
B
00
13 950
100
950
950 00
13
505
1300
1300
MARK
950
950 950
100
ISSUE
06/2
Job Number
322
1
Au
505
Checke Date d Approved Job Number
330
1220
1220
330
A
1220
820
400
1220
STEEL COLUMN 820 WOOD CARCASS
LINE OF TABLE TOP ABOVE 400 BLACK TARRAZZO
4480
330 BLACK TARRAZZO FLOOR LINE 330
1220
1220
40
440
5 5408 4480
STEEL CLADDING
A
FLOOR LINE
BLACK TARRAZZO FLOOR LINE
WOOD CARCASS
5 5408
STEEL CLADDING
1 JOI-001 - RECEPTION DESK - PLAN
40
440
Au
Che
Checke d Approved
Appr
A
ENLARGED DETAI - RECEPTION DES
LINE OF TABLE TOP ABOVE BLACK TARRAZZO FLOOR LINE
SHEET NUM
TRI PWA
REFERNCE : RECEPTION DESK
1 : 10
DA
Che 06/2 Appr 322 CDE STA 1
ENLARGED DETAI CDE STA - RECEPTION DES
5250 STEEL COLUMN
ISSUE
Scal e Drawn
5250
A
DA
Date Scal e Drawn MARK
6/30/2023 7:41:06 PM 6/30/2023 7:41:06Autodesk PM Docs://TRIBECA/TRI-PWA-PB-ZZ-M3-A-0001.rvt Autodesk Docs://TRIBECA/TRI-PWA-PB-ZZ-M3-A-0001.rvt
AutodeskAutodesk Docs://TRIBECA/TRI-PWA-PB-ZZ-M3-A-0001.rvt Docs://TRIBECA/TRI-PWA-PB-ZZ-M3-A-0001.rvt
Autodesk Docs://TRIBECA/TRI-PWA-PB-ZZ-M3-A-0001.rvt Autodesk Docs://TRIBECA/TRI-PWA-PB-ZZ-M3-A-0001.rvt
5
DATE
DATE 06/26/23322406 DATE 06/26/23
ISSUE
e Job Number Scal Drawn Job Number e Scal Drawn Scal Checke e d e Drawn Checke DrawnApproved d Checke Approved Checke d d Approved Approved
FF LIFT 2
DATE
ISSUE
Date Job Number Scal Date
4
PGR LIFT 3 / EVAC LIFT PGR LIFT 3 / EVAC LIFT PGR LIFT 3 / PGR LIFT 3 / EVAC LIFT EVAC LIFT
GOODS LIFT GOODS LIFT
A
0m 1000 500 400 200 100 10 20 40 4 2 1 0mm 800 400 200 20 40 80 8 4 2 500 400 200 100 10 20 40 4 2 1
7/7/20237/7/2023 4:10:00 PM 4:10:00 PM
A
0mm 0m
7/7/2023 4:10:00 PM 7/7/2023 4:10:00 PM
5
A
A
ISSUE
MARK
Date
MARK
PT01, FLUSH PLASTERBOARD PAINTED PT01, FLUSH PLASTERBOARD PAINTED PT01, FLUSH PLASTERBOARD PT01, FLUSH PLASTERBOARD PAINTED PAINTED
PROJEC T
AUTHOR
A 5 VOLUM E
CDE STATUS CODE
LEVE L
TYPE
ROLE
REV
SHEET NUM
1
JOI-001 - RECEPTION DESK - PLAN 1 : 10
5
4
3
5
4
3
REFERNCE : RECEPTION DESK
TRI PWACopyright © 2022 Perkin A 5 2
1
2
1
40
PROJEC T
AUTHOR
VOLUM E
CDE STATUS CODE
LEVE L
TYPE
ROLE
REV
Copyright © 2022 Perkin
Project 04 : Bansal Bungalow, Pune Project Brief : The project is a G+2 residential bungalow located in Sindh Society, Pune, designed to balance functionality and comfort. The ground floor accommodates guests and social gatherings with a party area and pantry, while the servant quarters are placed at the rear for privacy. The first floor includes family living spaces, and the second floor houses private bedrooms.
Ground Floor Plan
Section AA’
Professional Work
First Floor Plan
1. Entrance Lobby 2. Formal Living 3. Music Room 4. Store 5. Pantry 6. Office 7. Servants Room 8. Toilet 9. Powder Toilet 10. Lawn 11.Parking 12. Lobby 13. Dining 14. Living 15. Terrace 16. Kitchen 17. Dry Balcony 18. TV Room 19. Bedroom 20. Walk-In-Wadrobe
Construction Drawing I have worked on construction drawings for residential bungalows, townships, and commercial projects. This experience helped me understand the importance of coordination between architectural, structural, and MEP teams to ensure accuracy and buildability in design. It also enhanced my technical detailing and understanding of on-site execution.
WORKING DRAWING OF BUNGALOW 1280
900
3500
2100
P.TOILET 2100 X 1450 SUNK 300MM
C6 1200X300
C5 300X1200 3270
2800
WALKIN 3500 X 2800
COLUMN FACE LINE
4700 4830
TOILET 3500 X 2480 SUNK 300MM 2000
GUEST BEDROOM 01 4700 X 5500
C7 1200X300
3500
01
300
10550
C
DRY CLADDING AS PER SELECTION
750
02
03
04
05
06
07
UP
SW1 2200X200
08
09
10
11 12
13
SW2 200X2200
LIFT 1800 X 2000
C8 300X1800
14
TREAD=300 MM RISER =168 MM NO OF STEPS=25
4500
PARENT'S BEDROOM 5000 X 5500
C4 300X1200 TOILET 2100 X 2480 SUNK 300MM
5500
LOUVERS AS PER DETAIL
600
1350
12
1570
300
5000 4230
07
C3 1200X300
16910
1570
C1 300X1200
D
C
C2 1200X300
600
150
11
1450
10
LOUVERS AS PER DETAIL
A
2480
B
2480
09
5500
08
C
280
SETTING-OUT PLAN FOR BUNGALOW
15
PARTITION IN FURNITURE
UP
5250
TV ROOM 5450 X 5250
16
LOBBY 5100X5250
C'
17
SW3 200X2200
18 19 20 21 22
DINING 7150X2550
DUMB WAITER 900X900
23
C11 1800X300
POOJA 3200 X 2500
C12 400X1600
D
2500
7150
1350
1600
C10 300X2400
STORE 4980 X 2500
B
1600
4980
C9 400X1600
24
2500
24185
1500 WIDE PASSAGE
PLOT EXTERNAL FACE LINE
25
LVL+103.325
24260
5100
1500
5450
D 1700
1700
3250
1130
PARTITION IN FURNITURE
B
13
A
300
5500
LIVING 10400 X 5500
D/H LIVING
3280
06
KITCHEN 5180X 6400
C13 300X1200
10400 5180
DRY CLADDING AS PER SELECTION
2500 2025
05
C14 400X1200
UTILITY 5250 X 2500
SIT-OUT 10400 X 3600
C15 750X750
C16 600X1800
5250
01 04
03
<<<< 9.00 M. W. ROAD >>>>
02
5000
SUNK 300MM
MARGIN LINE
D/H
3600
500
300
LOUVERS AS PER DETAIL
300
5905
10330
600
16835
START POINT
B'
D'
A'
LEG NOTES
IMPORTANT DISCLAIMER FOR USE OF THIS DRAWING ON SITE :
SCHEDULE OF DOORS TYPE SIZE SILL
LINTEL REMARK
LINTEL REMARK
CLIENT
PROJECT TITLE
E
Shweta ---Amit Bhat
30.03.2022 ARCHITECTS . LANDSCAPE . INTERIORS . M.E.P SERVICES
ABA/PUNE/177/01
300MM THK WALL
A
PROJECT CONSULTANT
SETTING OUT PLAN
SE
PROPOSED RESIDENTIAL BUNGALOW PROJECT AT SINDH SOCIETY, PUNE
GOOD FOR CONSTRUCTION
DRAWING TITLE
NORTH
MR.RAJIV BANSAL S
Section
SCHEDULE OF WINDOWS TYPE SIZE SILL
N NE
Setting Out Plan 01. THIS DRAWING IS A COPYRIGHT OF AMIT BHAT ARCHITECTS AND SHOULD NOT BE RETAINED, COPIED OR USED WITHOUT THEIR AUTHORITY. 02. DO NOT SCALE THE DRAWING 03. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN MILLIMETRES. ALL DIMENSIONS TO BE VERIFIED ON SITE AND APPROVED BY THE ENGINEER. 04. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE SPECIFICATIONS. 05. SITE FORMATION LEVEL TO BE FIXED AS PER FINAL MASTER PLAN 06. PLEASE REFER RCC DRAWING FOR COLUMN SIZE & COLUMN REDUCTION 07. TAKE NOTCH BEAM WHEREVER THERE IS BEAM OFFSET IN THE TOILET 08. ALL AC SLEEVES & SERVICES CUT OUT AS PER MEP CONSULTANTS
NW W SW
STANDARD DETAILS : 01. WALL DETAIL-REFER LEGEND 02. SUNK DETAIL-REFER LEGEND 03. BEAM DETAIL ALL EXTERNAL & INTERNAL BEAM TO BE READ IN CONJUNCTION WITH STRUCTURAL DRAWING. 04 KITCHEN OTTA - COOKING OTTA 650 MM WIDE & SERVICE OTTA 600 MM WIDE 05 ALL DIMENSION FROM FINISHED TO FINISHED SURFACE PROVIDED 07 ALL PARAPET HEIGHTS ARE MIN 1200 MM FROM FINISHED LEVELS.
230MM THK WALL
FIRSTDrawing FLOOR PLAN First Floor Plan - Working
150 MM THK WALL
100 MM THK WALL
OFFICE: #601, 6th floor, AnP One, Opp. My world society, Above Kapil's salon, Balewadi high street, Balewadi, Pune - 411045, Email:- info@abarchitects.in, Website:- www.abarchitects.in, Ph. : +91 8657609512 ; + 91 9607087979
Elevation 42
Get In Touch Shweta Kakade Email : shwetakakade1625@gmail.com Phone : +1 (716)279-5185 L i n k e d I n : www.linkedin.com/in/shweta-kakade