SHRUTI AJABE-Architectural Internship Portfolio

Page 1

SHRUTI AJABE SELECTED ACADEMIC WORKS | 2019-2022 P
R L I T F

DESIGN IS NOT JUST WHAT IT LOOKS LIKE BUT ALSO HOW IT WORKS.

2 S H R U T I A J A B E

Product Design Using Rhino and Grasshopper Software

Including Institutional building ,Staircase detail, Reflected ceiling details and Toilet details

Double Basement services and hand drafted sheets

Architectural and Live sketching ,creative works and photography

3 C O N T E N T S 01 HOTEL DESIGN 02 HOUSING 03 TEMPLE DESIGN 04 PARAMETRIC DESIGN 05 WORKING DRAWINGS 06 BUILDING SERVICES 07 MISCELLANEOUS WORK Jejuri, Pune A Boutique Hotel
Dandekar Bridge
Residencial Housing and SRA Housing Project
Road ,Pune A Temple Design adjacent to
bungalow
Near
,Pune
Pashan
a private

HOUSING DESIGN 01BOUTIQUE HOTEL DESIGN

Theboutiquehotelproject in Jejuri.Punewasdesignedwiththe objective of creatingapersonalizedthemeandauniquehotel.The projectwasapproachedfromaservice-orientedperspective,withthe goal of achievingnet-zeroenergyusagethroughtheuse of edgetools Thedesignincorporatedtraditionalarchitecturalelementsandplanning principles of Jejuri to createacontextualsolutionthatalluded to thelocal

01 BOUTIQUE HOTEL DESIGN LANDSCAPE PLAN SITE PLAN GROUND FLOOR PLAN DELUXE ROOM 30SQM DELUXE PREMIUM 35 SQM SUITE LUXURY SUITE 70 SQM FIRST FLOOR PLAN SECOND FLOOR PLAN THIRD FLOOR PLAN FOURTH FLOOR PLAN 50 SQM
01 BOUTIQUE HOTEL DESIGN

HOUSING DESIGN

Theprojectwasahousingdevelopmentdesignedforslumrehabilitation andsale in Pune.Theprimaryobjective of theprojectwas to achievenetzeroenergyconsumptionand to avoidusingrightangles in the design. Thenet-zeroenergytargetwasachievedthroughintegrationwithedge tools.Theform of thebuildingwasintentionallydesigned to avoidright angles in boththeplansandthefacadetreatment.Overall,thedesign prioritizedsustainabilityandusercomfortwhileaddressingtheunique challenges of the site

Housing Project Sem VII 2022-23

Site-Pune, Maharashtra

Site Area-17000 SOM

7 02
02 HOUSING DESIGN SECTION A-A’

MASTERPLAN

LANDSCAPE SECTION P-P’

FLOOR PLAN (FOR 14 FLOORS)

LANDSCAPE SECTION Q-Q’

02 HOUSING DESIGN
SECTION B-B’ SECTION C-C’ SECTION D-D’ SECTION E-E

HOUSING DESIGN 03

TEMPLE DESIGN

Theprojectwasatempledesignedforpeople of residential colony on pashanroad, in Pune.Theprimaryobjective of the projectwas to achievenet-zeroenergyconsumptionand to avoidusingrightangles in thedesign.Thenet-zeroenergy targetwasachievedthroughusingnaturalmaterialsand vernaculararchitecturalplanning.

Temple design l Project Sem III 2021-22

Site-Pashan road,Pune, Maharashtra

Site Area-1200 SQM

10
03 TEMPLE DESIGN
SITE PLAN GROUND FLOOR PLAN
ROOF PLAN
TEMPLE VIEWS ROADSIDE ELEVATION
FRONT ELEVATION
12
04
PARAMETRIC DESIGN HABIN OPERA HOUSE NONTONG URBAN ARCHITECTURAL PARK TOURIST SERVICE CENTRE,CHINA TOWER WITH PLATES PROTOTYPE (GRASSHOPPER)
13 04 PARAMETRIC
DESIGN TABLE
VASE DESIGN EARING DESIGN
DESIGN CHAIR
DESIGN
A A A MID LANDING MID LANDING MID LANDING C6 C7 C6 C7 C6 C7 15MM THK INTERNAL 15MM THK INTERNAL PLASTER PLASTER UP C10 HANDRAIL STAIRCASE- WIDTH -1500 TREAD- 300 RISER 150 C11 C10 STAIRCASE- WIDTH -1500 TREAD- 300 RISER 150 STAIRCASE- WIDTH -1500 TREAD- 300 RISER 150 UP C11 C10 DN C11 LANDING C18 C19 A A A A A-400 GROUND FLOOR PLAN SCALE 1:25 A FIRST FLOOR PLAN A-400 SCALE 1:25 A ROOF PLAN A-400 SCALE 1:25 WATERPROOFING PCC COPING 600MM WIDE CHAJJA WALL DETAIL 1100MM THK STAIRCASE ST-02 M.S.BALUSTER 20MM THK EXTERNAL CHEMICAL GROUT NOSING TREAD 300MM FLOORING AS PER DETAIL 20MM PCC GROUT FIXING PLATE 10MM THK TILE 5MM THK A RAILING FIXING DETAIL A-401 STAIRCASE ST-01 SILL LOBBY G-01 SCALE 1:5 40MM SCREED 10MM TILE 230 THK DRY RUBBER PACKING A STAIRCASE SECTION AA SCALE 1:25 D UNDER COUNTER WASH BASIN C FLOOR DRAIN A A 15MM THK INTERNAL PLASTER 230MM THK BRICK WALL THRESHOLD DOOR FRAME B B LINTEL 15MM THK INTERNAL 230MM THK BRICK MALE TOILET 3800 2900 DUCT DUCT COVERING MIRROR D C A TOILET PLAN SCALE 1:25 D C 200 MM SUNK FLOOR DRAIN SP A INTERNAL PLASTER BRICK WALL THRESHOLD DOOR FRAME B B B D C KEY PLAN D A TILE LAYOUT PLAN SCALE 1:25 C B MALE TOILET 3800 2900 A DUCT DUCT COVERING A A A SECTION AA SCALE 1:25 D C 15MM THK INTERNAL PLASTER WALL TILE LOUVERD WINDOW CILL D DUCT 230MM THK BRICK WALL A A DOOR C B D A SECTION BB SCALE 1:25 C KEY PLAN WALL TILE UNDER COUNTER WASH BASIN 200 MM SUNK 200 MM SUNK A SECTION CC SCALE 1:25 A SECTION DD SCALE 1:25

C7,C11,C19,C27C1,C9,C13,C21,C29C1+23235

C4,C16 123456789 1011 12 +115 C1,C2,C3,C4 C1 C5,C6,C7,C9 C5,C6,C7,C8,C9 +1725 C5C6C7C8C9 C2C3C4 +5255 C10,C11,C12,C13,C14,C15,C16 C10,C11,C13,C14 +5365 C10C11C12C13C14C15C16 C17,C18,C19,C21,C22,C23,C24 C17,C18,C19,C20,C21,C22,C23,C24 +7705 G C17C18C19C21C22C23C24 +10730 C26,C27,C28,C30 C26,C27,C29,C30 +10840 +12030 C31,C32,C33,C34,C35 C26,C32C30,C33 H A CENTRELINE PLAN SCALE 1:100 B A-300 C1C2 52001900 C3 C5 DIRECTORS OFFICE 32005750 G-02 C10 17 19 C11 C17 C4 CONFERENCE ROOM 32005000 MALE TOILET 38002900 G-06 A 66003000 OFFICE 32003000 VIP LOUNGE G-01 G-10G-09 STORAGE 24004300 G-08 C31 C33C35 B A GROUND FLOOR PLAN SCALE 1:100 1800 1800 1800 300 600 300 FULLY GLAZED FIXED WINDOW FULLY GLAZED FIXED WINDOW FULLY GLAZED FIXED WINDOW 32006500 G-07 B 2 A-300 C1C2C3 52001900 F-05 C5 STAFF ROOM F-01 UP C10 17 C11 C17 TECHNICAL MAINTENANCE OFFICE 32004320 F-02 F-10 RECORD ROOM 32003000 SERVER ROOM F-08 C31 600MM WIDE CHAJJA ABOVE C33 DOOR SCHEDULE No. Width Height Lintel B A FIRST FLOOR PLAN SCALE 1:50 2675 1800 WINDOW SCHEDULE 300 FULLY GLAZED FIXED WINDOW 33806775 F-07 EXHIBITION OFFICE COLLECTION, RESTORATION AND HOLDING OFFICE 66003600 F-03 F-04 MALE TOILET F-06 A C4 -4.50M M.S RAILING -1.30M A ELEVATION SCALE 1:100 3 -3.40M 4 1 A ELEVATION SCALE 1:100 KEY PLAN A ELEVATION SCALE 1:50 -16.30M +/-0.0M A ELEVATION SCALE 1:50 KEY PLAN B 2 C6 3 C10 20 22 24 C7 C11TERRACE R-01 LANDING C18C19 600MM WIDE CHAJJA BELOW CHAJJA ABOVE TERRACE BELOW CHAJJA BELOW B A-301 A ROOF PLAN SCALE 1:100
4 3 4 STORAGE +1050 +750 ENTRY +750 +150 TICKET COUNTER +600 +1200 +1500 +1800 +1950 +150 +600 +600 2.3193 1.4 1.5000 1.1000 2.0000 A' MALE TOILET FEMALE TOILET STAGE ORCHESTRA GANGWAY GROUNDFLOORPLAN +4500 1 4 +750 +600 ENTRY ENTRY +750 +900 FIRSTFLOORPLAN A STORAGEBACKSTAGE STAGEORCHESTRA PIT GANGWAY STAGE TOWER BALCONY CRY LOBBYTICKET COUNTER FOYERENTRANCE 2.1 2.85 2.85 7.0 1.48 9.0 M 2.8 3.45 M 3.3 M 3.3 M FALSE CEILING PANEL SECTION-VISIONLINES STORAGEBACKSTAGE STAGEORCHESTRA GANGWAY STAGE CRY LOBBYTICKET FOYERENTRANCE 2.85 2.35 M 2.85 9.0 M 2.8 3.45 M 4.35 SECTION-SOUNDLINES INCIDENT REFLECTED RAY AUDITORIUM
DUCT WIDE UPPER BASEMENT RAMP B' LIFTS HVAC ROOM PUMP ROOM COLD STORAGE ROOM ELECTRICAL ROOM UNDERWATER TANK FAN ROOM DG ROOM EXIT RAMP 6 M 8.5M WIDE DRIVEWAY 6.3 M 6.5 M A' A A 8M WIDE DRIVEWAY A' 6.3M WIDE 6.35 M WIDE ENTRY RAMP 7.5M WIDE DRIVEWAY B B (UPPER BASEMENT PLAN ) (LOWER BASEMENT PLAN ) B' 10M WIDE DRIVEWAY FAN ROOM DG ROOM INDEX DRAINAGE LAYOUT LOWER BASEMENT PLAN) EXIT RAMP INDEX DRAINAGE LAYOUT UPPER BASEMENT PLAN) EXIT RAMP INDEX ELECTRICAL LAYOUT ( UPPER BASEMENT PLAN) SECTION A-A' SECTION -B-B' INDEX VENTILATION LAYOUT LOWER BASEMENT PLAN) FAN ROOM DG ROOM INDEX ELECTRICAL LAYOUT ( LOWER BASEMENT PLAN) ELECTRICAL EXIT RAMP INDEX ENTRY RAMP VENTILATION LAYOUT UPPER BASEMENT PLAN) ELECTRICAL EXIT RAMP INDEX ENTRY RAMP SPRINKLER LAYOUT (UPPER BASEMENT PLAN INDEX SPRINKLER LAYOUT LOWER BASEMENT PLAN DOUBLE BASEMENT

MISCELLANEOUS WORK

EXTRA-DISCIPLINARY

This Section Of Portfolio Holds A Collection Of Selected Work Done Outside Of Academics .I Am Quite Passionate About Sketching And Photography.

18
S K E T C H I N G ARCHITECTURAL AND LIVE SKETCHING 07
19 07 MISCELLANEOUS WORK C R E A T I V E W O R K S CERAMIC ART P H O T O R A P H Y CAMERA-DSLR-CANON 200D HYDERABAD AURANGABAD-BIBIKA MAKBARA

PUNE AND OUTSKIRTS

19 07 MISCELLANEOUS WORK
BHUTAN
P H O T O R A P H Y CAMERA-DSLR-CANON 200D
LOVE TO HEAR FROM YOU
WOULD

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.