PLANNING PROJECT 1
Design of Housing & Related Infrastructures At Siliguri, West Bengal
Department of Architecture, Town & Regional Planning IIEST, Shibpur
Master of Urban & Regional Planning Year – 2020-21 1st Semester
Assignment 2.2
Guided By: Prof. S. Saha Dr. S. Mitra Ms. S. Sarkar Submitted on: 06.12.2020
Shriyanshu Kumar 2020APM003
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
Contents 1.
2.
3.
4.
INTRODUCTION .......................................................................................................................... 4 1.1
Introduction ............................................................................................................................. 4
1.2
Aim ......................................................................................................................................... 4
1.3
Objective ................................................................................................................................. 4
1.4
Scope ....................................................................................................................................... 4
1.5
Limitations .............................................................................................................................. 4
1.6
Methodology ........................................................................................................................... 4
SITE ANALYSIS ........................................................................................................................... 6 2.1
Site .......................................................................................................................................... 6
2.2
Location and Connectivity ...................................................................................................... 7
2.3
City Profile .............................................................................................................................. 7
2.3.1
Introduction ..................................................................................................................... 7
2.3.2
Location .......................................................................................................................... 8
2.3.3
Connectivity .................................................................................................................... 8
2.3.4
Topography and Geology................................................................................................ 8
2.3.5
Climate ............................................................................................................................ 8
2.3.6
Water ............................................................................................................................... 8
2.3.7
Demographics ................................................................................................................. 9
2.3.8
Economy ....................................................................................................................... 10
2.3.9
Infrastructure ................................................................................................................. 10
2.3.10
Housing Scenario of City .............................................................................................. 12
AREA & SERVICES CALCULATIONS (Based On Standards) ................................................ 13 3.1
Area Distribution .................................................................................................................. 13
3.2
FAR ....................................................................................................................................... 13
3.3
Setback Around Building ...................................................................................................... 14
3.4
Joint Open Space................................................................................................................... 15
3.5
Parking .................................................................................................................................. 15
3.6
Staircase Requirement........................................................................................................... 16
3.7
Water Calculation ................................................................................................................. 16
3.8
Septic Tank Calculation ........................................................................................................ 17
3.9
Solid Waste Calculation ........................................................................................................ 17
3.10
Storm Water Calculation ....................................................................................................... 17
3.11
Area Summary ...................................................................................................................... 17
Design ........................................................................................................................................... 18
2020APM003 | Shriyanshu Kumar | 1
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21 5.
Conclusion .................................................................................................................................... 18
Works Cited .......................................................................................................................................... 19 Annexure ............................................................................................................................................... 19
Table of Charts Chart 1Population Growth trend (Source: Census 2011) ........................................................................ 9 Chart 2 Area and Density Increment (Source: Census 2011) ................................................................. 9 Chart 3 Projected Water Demand (Source: CDP, Siliguri) ................................................................... 10 Chart 4 Water Supply demand MLD (Source: CDP, Siliguri) .............................................................. 11 Chart 5 Projected Solid waste generation (Source: CDP, Siliguri) ....................................................... 12 Chart 6 Housing demand & Gap (in Lakhs) Source: CDP, Siliguri ..................................................... 12 Chart 7 FAR (Source: WB Bye-laws, 2007)......................................................................................... 13 Chart 8 Mandatory open space between two buildings (Source: WB Bye-laws, 2007) ....................... 14 Chart 9Joint open space requirement (Source: WB Bye-laws, 2007) ................................................... 15 Chart 10 Parking (Source: WB Bye-laws, 2007) .................................................................................. 15 Chart 11 Joint Open Space (Source: WB Bye-laws, 2007) .................................................................. 15 Chart 12 Staircase requirement (Source: WB Bye-laws, 2007) ............................................................ 16
Table of Figures Figure 1-1 Methodology ......................................................................................................................... 5 Figure 2-1 Site Location (Source: Project Proposal) .............................................................................. 6 Figure 2-2 Proposed Site (Source: Project Proposal) .............................................................................. 6 Figure 2-3Showing the proximity of civic services, view and vistas from site. ..................................... 7 Figure 2-4 water from source to end user (source: CDP, Siliguri) ....................................................... 10 Figure 2-5 Sewage Generation to Disposal (Source: CDP, Siliguri) .................................................... 11
2020APM003 | Shriyanshu Kumar | 2
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
ACKNOWLEDGEMENT
The satisfaction and euphoria that accompanies the successful completion of any task would be incomplete without the mention of the people who made it possible. If there is a driving force that kept me going in doing this project, it is the constant support of our Planning Project faculties Prof. Swati Saha, Dr. Soumen Mitra and Ar.-Pl. Sarbani Sarkar. I present my sincere and heartiest thanks to them, for giving us a patient hearing and clearing my doubts. I place my gratitude to my parents who always encourages me to pursue my interests, who have led me onto the right path. I’m undoubted for all the love and affection they bestowed upon me. Many are responsible for the knowledge and experience I have gained during my project and throughout course. With profound sense of gratitude and regards I acknowledge for support extended by my friends for their support in completion of this project. Finally, I would also like to thank all those who knowingly or unknowingly helped to me all throughout my project.
2020APM003 | Shriyanshu Kumar | 3
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
1. INTRODUCTION 1.1 Introduction Housing varies from palaces of Maharajas to modern apartment buildings in big cities to tiny huts in villages. The place to house is next only to food and clothing among the primary necessities of life. Housing in general sense, is the layout and development of residential unit in which people can live safely, pleasantly, peacefully and healthy with different social, cultural and recreational facilities. People are social creature, hence they love to live in a society or community, so housing is also a social unit planned on neighbourhood and community principles.
1.2 Aim To prepare an affordable residential development scheme with infrastructure layout, services, roads and other network for economically underprivileged families.
1.3 Objective
Design housing clusters for EWS, LIG and LMIG. Provision of access and basic facilities such as drinking water, electricity, toilet, parking etc. Green/open area, healthcare facility, educational facility, daily needs store and community area can also be provided.
1.4 Scope With the fast growing urbanization, demand for affordable housing is rapidly increasing for economically underprivileged families. So there is great lack of dwelling units for such particular group.
1.5 Limitations My project will be limited to preparation of schematic layout of housing, infrastructure network and services only, it will not cover the surrounding impact and design and environmental aspects.
1.6 Methodology
A mixed methods approach to research will be used, gathering both quantitative and qualitative data. These data will be compiled digitally periodically to show progress. Quantitative data will be gathered from local sources or from an archival search, or from different document study. Qualitative data will be collected through archival searches, local records and local surveys, CDPs etc.
2020APM003 | Shriyanshu Kumar | 4
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
Figure 1-1 Methodology
2020APM003 | Shriyanshu Kumar | 5
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
2. SITE ANALYSIS 2.1 Site
Figure 2-1 Site Location (Project Proposal, 2020-21)
Proposed Site is located near Asian Highway-2 also called Burdwan Road, in Fulbari and Karmangaguri region of Siliguri. Mahananda River passes within 1km radius of the site to the West and Ambari Canal to the South.
Figure 2-2 Proposed Site (Project Proposal, 2020-21)
Proposed site has an area of 24,168.06 m2 (2, 60,142.8 ft2)/ 5.97 Acres approx. It shares it’s boundary with residential area in North and West, Park and Lake in south and Asian Highway 2 in front (East).
2020APM003 | Shriyanshu Kumar | 6
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
2.2 Location and Connectivity
Site is located on Asian Highway 2. It has access from East on AH-2. New Jalpaiguri Station – 4.5 km (approx.). Bagdogra Airport – 18 km (approx.). Siliguri Railway Station – 7 km (approx.). Amberi Canal 600m. Mahananda River – 850 m (approx.) Electrical substation – 1.7 km. School (2 schools) within 800m. Hospital – 2 km (approx.). (Google, 2020)
Figure 2-3Showing the proximity of civic services, view and vistas from site. (Google, 2020)
2.3 City Profile 2.3.1
Introduction Siliguri is signified by four T’s – Tea, Timber, Transport and Tourism. It is of the most rapidly developing metropolises of state. World famous Darjeeling tea grows within 100 km radius around siliguri. Siliguri is popularly known as the gateway or chicken-neck of northeast India as its corridor establishes a connection between the rest of India and NE states. Situated 392 feet above MSL.
2020APM003 | Shriyanshu Kumar | 7
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
2.3.2
Location Siliguri is located in proximity of 3 international boarders Bangladesh, China and Nepal. Located at 26.710 N and 88.30 E in the foothills of Himalaya. (Siliguri - wikipedia, 2020)
2.3.3
Connectivity a) Road It is connected to Kolkata by NH-31 and to the other cities of WB, Assam and Bihar state by road; it lies on Asian Highway 2. The Royal Government of Bhutan also operates buses from its border town Phuentsholing to Siliguri. Air-conditioned sleeper coaches from Kolkata, Patna and Assam is also available. b) Rail Has 3 railway stations Siliguri Town, Siliguri Junction and New Jalpaiguri. Siiliguri town is oldest and opened in 1880 during British Raj. Siliguri Jn was opened in 1949 and is only junction in India with all three gauges (broad, meter and narrow) used in India. Bagdogra and Naxalbari are also in this agglomeration. c) Air Nearest airport is Bagdogra International Airport about 15 km away is the only airport in the region.
2.3.4
Topography and Geology The North part of WB is mostly made up of glacial and fluvio-glacial deposits of Quaternary period, while South consists of Pleistocene to flood plain deposits. Siliguri occupy an Urban area of 117.54 km2 and metropolitan area of 2222.59 km2 (SJDA) (Siliguri - wikipedia, 2020). It is located in Terai (foothills) of Himalaya. Teesta, Jaldhaka, Rangit and Mahananda together with their tributaries, drain Siliguri.
2.3.5
Climate Siliguri has humid subtropical climate i.e. it has hot, humid summers and generally mild winters. As it lies in foothills of Himalayas, it is cooler than the Southern WB. Average temperature in summer rarely increases more than 350 C. hottest months are from May to mid-June with average temp of 280 C. Cold months are December to February where temp varies between 30C to 150C. Form mid-December to mid-January temp drops to 8-100C. Winters are foggy with light rain which favours tea, timber and tourists. Rainfall – Monsoon starts from mid-June to September with large variations (ranging from 1800 mm to 4000 mm). Siliguri’s annual railfall is higher than WB average. Intense Rains upto 200 mm/day in July and August has been recorded. Humidity – maximum RH in Siliguri ranges from 47-53% and minimum RH 29-31%. It is higher in May to mid-June. Wind – The city experiences winds predominantly from the east and the NE directions. (Siliguri - wikipedia, 2020)
2.3.6
Water A) Surface water Siliguri is situated on the banks of River Mahananda and River Balason. Their confluence is located at SW border of city. Mahananda river is main source of water. To the East, 25 km away stands the Gajol Doba reservoir, which was formed by the first Teesta Barrage. B) Ground Water It is the second major source of water for the city. With a spurt in the city’s population, this resource is exploited. But there is arsenic contamination in ground water and is
2020APM003 | Shriyanshu Kumar | 8
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21 common problem in WB. According to Geological Survey of India (2008), arsenic is present in Siliguri Jalpaiguri area.
2.3.7
Demographics
Population According to census 2011 (Census, 2011), city had population of 5.13 lakhs. Out of 47 wards, 14 wards fall in the Jalpaiguri district and remaining 33 in Darjeeling. The SMC population which falls into Darjeeling is 0.32% and Jalpaiguri is 0.24% of state population. 15.93% of Darjeeling and 5.53% of Jalpaiguri population falls into SMC.
Population Growth Trend 600000
1.4
500000
1.2 1
400000
0.8 300000 0.6
200000
0.4
100000
0.2
0
0 1971
1981 population
1991
2001
Decal Change
2011 Rate
Chart 1Population Growth trend (Census, 2011)
Density Density has grown from 6331 persons/km2 in 1971 to 14088 persons/km2. In 2011 it decreased to 11,274 person/km2 due to expansion of city to 41.9 km2.
16000
45
14000
40
12000
35 30
10000
25
8000
20
6000
15
4000
10
2000
5
0
0 1971
1981
1991
Area ( Sq. Km)
density (persons/ sq. km)
Chart 2 Area and Density Increment (Census, 2011)
2001
Literacy
2020APM003 | Shriyanshu Kumar | 9
2011
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21 As per census 2011 (Census, 2011), the literacy rate of urban area stands for 79%; male are about 88.82% whereas female is about 81.94% of total population is literate which is higher than state and national level. Sex Ratio As per census 2011 (Census, 2011), the sex ratio in Siliguri is 946 females per 1000 males, whereas state has 963. While average national ratio is 940.
2.3.8
Economy
Primary Secondary Tertiary Non prominent Timber/woods Trade and commerce agricultural activities products. Tourism within city. Engineering, Real estate, hotels Few tea estates are chemicals, electronics, Local markets located north and MSME units. IT/ITES North West parts of city. The prominent markets are Hong Kong Market (7.6 km from site) and The Seth Srilal market.
2.3.9
Infrastructure
2.3.9.1
Water Supply Water supply in SMC was first introduced in the year 1968. The per capita water supplied in city is 95 lpcd as against the CPHEEO norms of 155 lpcd (including the fire demand and unaccounted water). There is a gap of 22 MLD in current demand and supply.
Figure 2-4 water from source to end user (City Development Plan, Siliguri, 2041)
water demand 200 150 100 50 0 2013
2021 Demand
2031 Total Demand
Chart 3 Projected Water Demand (City Development Plan, Siliguri, 2041)
2020APM003 | Shriyanshu Kumar | 10
2041 Loss (%)
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
166
205
253
Water Supply demand (MLD)
2021
2031
2041
Chart 4 Water Supply demand MLD (City Development Plan, Siliguri, 2041)
2.3.9.2
Sewerage and Sanitation The city doesn’t have 100% coverage of sewer lines. Majority of households lack connectivity to the network and dispose the sewage into septic tanks/cesspools within their premises. City has open drains which is being disposed into Mahananda, Fuleshwari and jorapani without treatment. 1. Solid Waste Management Households and commercial establishments are charged monthly for door to door collection.
Figure 2-5 Sewage Generation to Disposal (City Development Plan, Siliguri, 2041)
2020APM003 | Shriyanshu Kumar | 11
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21 1200
250000
1000
200000
800
150000
600 100000
400
50000
200 0
0 2013
2021
2031
2041
Population (L)
Per capita waste generation (g)
Avg./Day Generation (MT)
Annual SW generation (MT)
Chart 5 Projected Solid waste generation (City Development Plan, Siliguri, 2041)
2.3.9.3
Storm Water Drain The highest elevation in city is 644 m and lowest being 122 m. City topography divides the land area into two parts. One part of the city drains into the Mahananda River and other half into Jorapani and Fuleshwari rivers. Out of total drainage only 2% is closed. Drainage network covers almost 83% of total road length. Most of drains are open so it often blocked due to garbage disposal in drains.
2.3.10 Housing Scenario of City Siliguri has medium-rise and high density housing in core and low-rise moderate density in periphery. As per Census 2011, city had 1.69 lakh census houses. Residence accounts for 66%, office/shops 19%, factories/workshop 1% and remaining 14% of total house. From 2001 to 2011 there is increase in 42% for houses. 2.5 2.1
2 1.65 1.5 1.22
1.26
1
0.96
0.5
0
0.5
0.06
0.1
2011
2021
2031
Housing demand
Housing Gap
Chart 6 Housing demand & Gap (in Lakhs) (City Development Plan, Siliguri, 2041)
2020APM003 | Shriyanshu Kumar | 12
2041
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
3. AREA & SERVICES CALCULATIONS (Based On Standards) 65 DU per acre was given. According to which: Particulars Remarks 5.96 Acre (24,168.06 m2) Approx. Site Area 5.96 x 65 = 387.4 (Assumed 392 DU in total) Number of DU
3.1 Area Distribution Category Share No. of DU Area per DU (M²) Area (M²) Built-up area
Area Distribution MLIG LIG EWS 35% 30% 35% 136 120 136 60 47 29 8148 5640 3938.2 8323.2 6165 4746.4
Total 100% 392 136 17726.2 19234.6
Remarks
Total BUP area for DU
No. of floors req. Ground coverage per apartment (G+3) buildings (G+4) buildings Ground coverage
34 244.8
30 205.5
34 139.6
97.9 589.9
(@4 DU per floor) (@4 DU per floor)
6.0 2.0 2938
0.00 6.00 1233
6.0 2.0 1675
12 10 5846
(@29% of total area)
Population (fixed)
679
600
679
1958
(@ 5 person/DU)
Population (floating)
68
60
68
196
(@10% of total)
Total Population
747
660
747
2154
3.2 FAR
Chart 7 FAR (Source: WB Bye-laws, 2007) Table 3-1 FAR (The West Bengal Municipal (Building) Laws, 2007)
Site Area = 24,168.06 m2
Total Built-up area permitted = 24,168.06 m2 x 2.75 = 66,462.165 m2. Built-up area of DU = 19234.6 m2; Clinic = 120 m2; Pre-primary School = 420 m2; Community Hall = 420 m2; Daily needs store = 600 m2. Total Built-up area = (19234.6+120+420+420+600) m2 = 20794.6 m2.
2020APM003 | Shriyanshu Kumar | 13
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21 FAR Achieved = 0.32 (Since this project is low density low rise).
3.3 Setback Around Building
Chart 8 Mandatory open space between two buildings (The West Bengal Municipal (Building) Laws, 2007)
One floor height 2.8 m (approx.), so for G+4 building total height = 2.8 x5 m = 14 m. So I have left 5 m of mandatory open space between two buildings. I have also provided minimum 5 m of side setback around the site
2020APM003 | Shriyanshu Kumar | 14
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
3.4 Joint Open Space JOINT OPEN SPACE Subject to the provisions contained in this rule, the joint open space shall be provided in between two buildings, if the height of one of such building exceeds the height of 14.50 M whether belongs to the same owner or not, as follows: — I.
7.00 M - if height of both the buildings exceeds 14.50 M,
II.
If one of the buildings exceeds 14.50 M in height— a. 4.50 M - if height of the other building is above 11.0 M but does not exceed 14.5 M, b. 3.50 M - if height of the other building is above 8.0 M but does not exceed 11.0 M, c. 3.00 M - if height of the other building does not exceed 8.0 M. Note. —If any of the buildings has basement, the minimum Joint Open Space against the basement line shall be kept as 7.0 m. The rule of Joint Open Space shall not be applicable in case the adjoining structure is not exceeding 5.0 M in height. The Joint Open Space between two buildings may vary at places considering the variation
of requirement height of any of the or both the Chart 9Joint open space (Source: WBbuildings Bye-laws, 2007)
buildings.
Chart 11 Joint Open Space (The West Bengal Municipal (Building) Laws, 2007)
3.5 Parking PARKING REQUIREMENT RESIDENTIAL (a) One car parking space to be provided for every 150 m2 of floor area up to a total floor area of 600 m2. (b) One car parking space to be provided for every 140 m2 of floor area above a total floor area of 600 m2 up to 5000 m2. (c) One Car parking space to be provided for every 130 m2 of floor area above a total floor area of 5000 m2. Note. I.
However, for building or buildings having individual tenements size not exceeding 60 m2 in the entire building, one car parking space to be provided for every 250 m2 of floor area;
II.
For the purpose of calculation of number of car park nearest whole number is to be considered.
Chart 10 Parking (The West Bengal Municipal (Building) Laws, 2007)
Particular Area (area of tenement * number) Number of ECS EWS (29 x 136) = 3944 m2 16 2 LIG (47 x 120) = 5640 m 23 MLIG (60 x 136) = 8160 m2 33 Total number of minimum equivalent car parking should be 72.
2020APM003 | Shriyanshu Kumar | 15
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
Parking provided = 51 car and 131 two wheeler (Considering more number of two wheeler for EWS, LIG and MLIG).
3.6 Staircase Requirement The following provisions for minimum width of stairways shall be made: Category of Building Residential
Height of the Building (in meters).
Width of the Stairway (in meters). 1.00
Up to 8.00 Above 8.00 & Up to 11.00 Above 11.00 & Up to 14.50 Above 14.50 & Up to 18.00 Above 18.00 & Up to 24.00 Above 24.00 & Up to 36.00 Above 36.00
No. of Staircase 1
1.2
1
1.25
1
1.25
2
1.25
2
1.25
2
1.25
2
Chart 12 Staircase requirement (Source: WB Bye-laws, 2007)
For residential buildings of height above 14.5 m and up to a height of 24.00 m with not more than three tenements or 500 sqm. per floor (whichever is less), one staircase of 1.50 m. of width may be permitted. (The West Bengal Municipal (Building) Laws, 2007)
I have provided 1.25 m wide stairway and 1 in each building.
3.7 Water Calculation Particulars DU 392 Visitor Green Area Total
Population
Water Calculation LPCD Fresh Recycled water water
1960 95+40 195 40+40 6513.3 M² 3 2155
186200 7800 194
78400 7800 19540 105.7h
Total (KLD) 264.6 15.6 19.54 299.74
95 lpcd is being provided by SMC and rest 40 litres will be fulfilled by recycled water. According to CPHEEO (Central Public Health and Environmental Engineering Organisation, 1999), 135 lpcd of water consumption also includes need of firefighting. Recycled water will be used for flushing and watering green area. 4 tanks of 108 KL each is provided on site which will store grey water, recycled water and water from roof-runoff. These tank will also be used as fire tanks in case of emergency. Each building have their roof top water tank of capacity 13,000 litres and common pump station for whole site. Water will be pumped via common pumping station.
2020APM003 | Shriyanshu Kumar | 16
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
3.8 Septic Tank Calculation Septic Tank
Population 2155 Detention 2 days Water req LPCD 45 Waste accumulation LPCY 40 Volume of septic tank (M³) 624.95 Area Req (1.2m depth) M² 520.7916667 Since Siliguri doesn’t have sewer lines, we have to provide septic tanks within site boundary.
3.9 Solid Waste Calculation
solid waste generation population 1958 floating population 195.8 Total population 2153.8 waste generated 1076.9 (Kg/day) According to CDP (City Development Plan, Siliguri, 2041), Siliguri average waste generation in Siliguri is around 0.4 grams/capita/day. But I have considered 0.5 g/capita/day. In Siliguri, there is door to door waste collection facility.
3.10 Storm Water Calculation Rainwater Harvesting area Total runoff m³/hr 6686 2406.888 7290.5 196.84 6513 43.96 20489.6 2647.70 882.57
particular rooftop road & parking green area total Volume in retention time (20min) Collection from roof-tops will be stored in reservoirs and will be used for gardening and flushing along with recycled water. Water from open area run-off (parking, green area, roads, pavements etc.) will be left in city drains.
3.11 Area Summary Particulars Site Area DU Clinic Pre-primary school Community Hall Daily need store TOTAL Green area Road Pavement Parking
Ground Percentage coverage(m2) 24168.06 100 5846 24.2 120 0.5 420 1.74 0 0 300 1.24 27.66 6686 6513.3 26.95 3607.4 14.93 1864.1 7.71 1819 7.53
2020APM003 | Shriyanshu Kumar | 17
Built-up area 0 19234.6 120 420 420 600 20794.6
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
4. Design
This project comprises of economically underprivileged group. We have considered EWS, LIG and MLIG group. I have allotted 35%, 35 % and 30% to EWS, MLIG and LIG respectively. According to need of project this housing is low rise (height up to 15 m), low density (65 DU/acre). I have tried to provide green and open areas more than 25%, to maintain good micro-climate. I have provided green area in front to create a buffer zone. I have provided more 2 wheeler parking to EWS and LIG group. In front area there are dwelling units for MLIG, in mid LIG and in EWS in western part of site. I have divided site into 3 density zone and given space accordingly. There’s public private zone in site too; and I have tried to separate and restrict their movement to certain point. It helps in making premises secure and private. For services part o I have provided street light on every 25 m (max). o There is water tank on every building, which will be filled periodically using a common pumping station. o SMC is already providing 95 lpcd which is 40 litres less according to standard (Central Public Health and Environmental Engineering Organisation, 1999), so for that 40 litres recycled water will be used. o There’s reservoirs in service area which will be used to store storm water from roof runoff and will be used for gardening and flushing. o There reservoirs can also be used as fire tanks in case of fire. o There’s central electrical room, from there electricity will be distributed to every building which will house transformer and control station. o There’s water treatment plant for recycling the water adjacent to pump house.
5. Conclusion o o o o o o
Housing is widely acknowledged as human right. At the same time, it is a major driving force of economy and often an individual’s biggest assets. There is big gap between demand and supply of housing for economically underprivileged families in India. We need to focus on quality housing instead of quantity housing. Housing should be accessible, affordable, with 24x7 water, electricity, toilet and basic infrastructure. Government should implement more affordable policies and spread awareness among people. There should be equity, protection and education, low interest loans, preservation of lowerincome housing stock. Promotion of efficient and effective development is needed. Such as reviewing building codes, coordinating the permit process better between agencies, reducing or eliminating some mandates which are needed for making a house affordable.
2020APM003 | Shriyanshu Kumar | 18
Assignment 2.2 | Planning Project I | AP6171 | 2020-‘21
Works Cited Census. (2011). New Delhi: Ministry of Home Affairs, Government of India. Central Public Health and Environmental Engineering Organisation. (1999). Manual on Water Supply and Treatment. New Delhi: Government of India. City Development Plan, Siliguri. (2041). Siliguri: Siliguri Municipal Corporation, Ministry of Urban Development. Google. (2020, December 05). Retrieved from Google Maps: http://maps.google.com/maps?ll=26.66089,88.43902&z=11&t=h (2020-21). Project Proposal. Siliguri - wikipedia. (2020, December 4). Retrieved from Wikipedia: https://en.wikipedia.org/wiki/Siliguri The West Bengal Municipal (Building) Laws. (2007). Kolkata: Government of West Bengal.
Annexure Drawings:I. II. III. IV. V. VI. VII.
Zoning Unit plan Site plan Water supply line plan Electrical supply plan Storm water line plan Grey water line
2020APM003 | Shriyanshu Kumar | 19
N 207.951 3
EXIT
0
GREEN/OPEN
MLIG HOUSING
M
83.100
W
LIG HOUSING GREEN/OPEN
GREEN/OPEN
I
PARKING
D
APE
E
245
DAILY NEEDS STORE PARKING
R
EWS HOUSING
120.
DSC LAN
LANDSCAPE
MLIG HOUSING
O
ENTRANCE/ EXIT COMMUNITY HALL
A
PRIMARY SCHOOL (G.FLOOR)
82.000
D
EWS
5 M WIDE ROAD
CLINIC GREEN/OPEN PARKING
MLIG
45.634
LIG
SERVICE AREA
GREEN/OPEN
3 M WIDE PAVEMENT GREEN/OPEN AREA PUBLIC/SEMI PUBLIC ZONE
0
25
Project: HOUSING AT SILIGURI
50
154.217
100 Title:
150 Submitted By:
ZONING
SHRIYANSHU KUMAR 2020APM003
EWS UNIT 29 M. SQ.
MLIG UNIT 60 M. SQ.
LIG UNIT 47 M. SQ.
wash B.Room 3.2 x 3.2 Kitchen 1.6 x 2.5
B.Room 2.75 x 3.0
B.Room 3.2 x 3.2
Toilet Kitchen 1.3 x 2.2 1.8 x 2.25
Toilet Kitchen 1.3 x 2.2 1.8 x 2.25
Balcony
Toilet Bath 1.2 x 1 1.2 x 1
B.Room 3.0 x 3.3
Hall 2.8 x 2.8
B.Room 3.2 x 3.3
Hall 4.6 x 3.2
T 1.3 x 2.1
Hall 4.6 x 3.2
wash B.Room
B.Room T
Kitchen
B.Room
B.Room
Kitchen
Kitchen
Hall
Toilet
Bath
Hall
Hall
Hall
Hall
Balcony
Kitchen
Hall
Kitchen
T
B.Room
B.Room
B.Room
B.Room
Hall
T
T
B.Room
Bath Toilet B.Room
Hall
B.Room T
B.Room Bath
B.Room
T
Kitchen
B
Toilet
wash
T
Bath Toilet Hall
B.Room
T
Hall
Hall
Hall
Balcony
T Kitchen
B.Room
B.Room
B.Room
Kitchen
Kitchen
Kitchen
T
T B.Room
HOUSING AT SILIGURI
Title: UNIT PLAN
Kitchen
T B.Room
wash
Project:
Kitchen
B.Room
Submitted By: SHRIYANSHU KUMAR 2020APM003
wash
N 207.951 3
EXIT
LIG
MLIG
PAVEMENT 3M WIDE
PAVEMENT 3M WIDE
W
EWS
MLIG
MLIG
2 WHEELER PARKING
EWS
EWS
DAILY NEEDS STORE
R
M
W
I
D
E
R
O
A
D
82.000
COMMUNITY HALL
A
PUMP ROOM
O
ENTRANCE/ EXIT 5
E
MLIG
D
LIG
LANDSCAPE
LIG
PAVEMENT 3M WIDE
245
G RKIN
R PA
PAVEMENT 3M WIDE
EWS
120.
APE
EELE 4 WH
EWS
DSC LAN
ING PARK
MLIG
I
LIG
ELER
LANDSCAPE
LANDSCAPE
GREEN/OPEN LIG
2 WHE
GREEN/OPEN
4 WHEELER PARKING
83.100
MLIG
M
LIG
MLIG
0
MLIG
EWS
GREEN/OPEN
EWS
EWS
PRIMARY SCHOOL (G.FLOOR)
WTP
D
RESERVOIR 9X6X2M 108 KL
EWS
RESERVOIR 9X6X2M 108 KL
GREEN/OPEN
RESERVOIR 9X6X2M 108 KL
3 M WIDE PAVEMENT
LANDSCAPE
2 WHEELER PARKING
5 M WIDE ROAD
CLINIC RESERVOIR 9X6X2M 108 KL
4 WHEELER PARKING
MLIG
45.634
LIG
GREEN/OPEN AREA TRANSFORMER & CENTRAL CONTROL ROOM
154.217
Site area : 24117.3 sq.m 0
25
Project: HOUSING AT SILIGURI
50
100 Title:
150 Submitted By:
SITE PLAN
SHRIYANSHU KUMAR 2020APM003
N 207.951 M
W
I
D
E
R
O
A
3
5
EXIT
D
0
MLIG
EWS LIG
MLIG
PAVEMENT 3M WIDE
PAVEMENT 3M WIDE
W
EWS
RKIN G
LIG MLIG
MLIG
MLIG
EWS
EWS
E
LIG
EWS
D
R PA
PAVEMENT 3M WIDE
LANDSCAPE
PAVEMENT 3M WIDE
G RKIN R PA EELE 4 WH
EELE
EWS
245 120.
2 WHEELER PARKING
APE
4 WH
LANDSCAPE
I
DSC LAN
ING
MLIG
PARK
LIG
ELER
LANDSCAPE
LIG
2 WHE
GREEN/OPEN GREEN/OPEN
GREEN/OPEN
4 WHEELER PARKING
83.100
MLIG
M
LIG
MLIG
GREEN/OPEN
EWS
EWS
DAILY NEEDS STORE
R
M
W
I
D
E
R
O
A
D
O
5
ENTRANCE/ EXIT
82.000
A
PUMP ROOM
COMMUNITY HALL PRIMARY SCHOOL (G.FLOOR)
WTP
D
WATER SUPPLY
MLIG
GRAY WATER
5 M WIDE ROAD
STORM WATER
3 M WIDE PAVEMENT
LAMP POST
RESERVOIR 9X6X2M 108 KL
RESERVOIR 9X6X2M 108 KL
RESERVOIR 9X6X2M 108 KL
LANDSCAPE 4 WHEELER PARKING
LIG
RESERVOIR 9X6X2M 108 KL
CLINIC GREEN/OPEN 2 WHEELER PARKING
ELECTRIC LINE
45.634
EWS
MUNICIPAL WATER
5
PARKING
M
W
I
D
E
R
O
A
D
TRANSFORMER & CENTRAL CONTROL ROOM
GREEN/OPEN AREA
0
25
Project: HOUSING AT SILIGURI
154.217
50
100 Title: WATER SUPPLY LINE
150 Submitted By: SHRIYANSHU KUMAR 2020APM003
N 207.951 M
W
I
D
E
R
O
A
3
5
EXIT
D
0
MLIG
EWS LIG
MLIG
PAVEMENT 3M WIDE
PAVEMENT 3M WIDE
W
EWS
RKIN G
LIG MLIG
MLIG
MLIG
EWS
EWS
E
LIG
EWS
D
R PA
PAVEMENT 3M WIDE
LANDSCAPE
PAVEMENT 3M WIDE
G RKIN R PA EELE 4 WH
EELE
EWS
245 120.
2 WHEELER PARKING
APE
4 WH
LANDSCAPE
I
DSC LAN
ING
MLIG
PARK
LIG
ELER
LANDSCAPE
LIG
2 WHE
GREEN/OPEN GREEN/OPEN
GREEN/OPEN
4 WHEELER PARKING
83.100
MLIG
M
LIG
MLIG
GREEN/OPEN
EWS
EWS
DAILY NEEDS STORE
R
M
W
I
D
E
R
O
A
D
ENTRANCE/ EXIT
82.000
COMMUNITY HALL
A
PUMP ROOM
O
5
PRIMARY SCHOOL (G.FLOOR)
WTP
D
WATER SUPPLY
MLIG
GRAY WATER
5 M WIDE ROAD
STORM WATER
3 M WIDE PAVEMENT
LAMP POST
RESERVOIR 9X6X2M 108 KL
RESERVOIR 9X6X2M 108 KL
RESERVOIR 9X6X2M 108 KL
LANDSCAPE 4 WHEELER PARKING
LIG
RESERVOIR 9X6X2M 108 KL
CLINIC GREEN/OPEN 2 WHEELER PARKING
ELECTRIC LINE
45.634
EWS
FROM TRANSMISSION LINE
5
PARKING
M
W
I
D
E
R
O
A
D
TRANSFORMER & CENTRAL CONTROL ROOM
GREEN/OPEN AREA
0
25
Project: HOUSING AT SILIGURI
154.217
50
100
150
Title: ELECTRICAL LINE & LAMP POST
Submitted By: SHRIYANSHU KUMAR 2020APM003
N 207.951 5
M
W
I
D
E
R
O
A
3
TO MUNICIPAL DRAIN
EXIT
D
0
MLIG
EWS LIG
MLIG
PAVEMENT 3M WIDE
PAVEMENT 3M WIDE
W
EWS
RKIN G
LIG MLIG
MLIG
MLIG
EWS
EWS
E
LIG
EWS
D
R PA
PAVEMENT 3M WIDE
LANDSCAPE
PAVEMENT 3M WIDE
G RKIN R PA EELE 4 WH
EELE
EWS
245 120.
2 WHEELER PARKING
APE
4 WH
LANDSCAPE
I
DSC LAN
ING
MLIG
PARK
LIG
ELER
LANDSCAPE
LIG
2 WHE
GREEN/OPEN GREEN/OPEN
GREEN/OPEN
4 WHEELER PARKING
83.100
MLIG
M
LIG
MLIG
GREEN/OPEN
EWS
EWS
DAILY NEEDS STORE
R
M
W
I
D
E
R
O
A
D
O
5
ENTRANCE/ EXIT
82.000
A
PUMP ROOM
COMMUNITY HALL PRIMARY SCHOOL (G.FLOOR)
WTP
D
WATER SUPPLY
MLIG
GRAY WATER
5 M WIDE ROAD
STORM WATER
3 M WIDE PAVEMENT
LAMP POST
RESERVOIR 9X6X2M 108 KL
LANDSCAPE 4 WHEELER PARKING
LIG
RESERVOIR 9X6X2M 108 KL
RESERVOIR 9X6X2M 108 KL
RESERVOIR 9X6X2M 108 KL
CLINIC GREEN/OPEN 2 WHEELER PARKING
ELECTRIC LINE
45.634
EWS
TO MUNICIPAL DRAIN
5
PARKING
M
W
I
D
E
R
O
A
D
TRANSFORMER & CENTRAL CONTROL ROOM
GREEN/OPEN AREA
0
25
Project: HOUSING AT SILIGURI
154.217
50
100 Title: STORM WATER LINE
150 Submitted By: SHRIYANSHU KUMAR 2020APM003
N 207.951 M
W
I
D
E
R
O
A
3
5
EXIT
D
0
MLIG
EWS LIG
MLIG
PAVEMENT 3M WIDE
PAVEMENT 3M WIDE
W
EWS
RKIN G
LIG MLIG
MLIG
MLIG
EWS
EWS
E
LIG
EWS
D
R PA
PAVEMENT 3M WIDE
LANDSCAPE
PAVEMENT 3M WIDE
G RKIN R PA EELE 4 WH
EELE
EWS
245 120.
2 WHEELER PARKING
APE
4 WH
LANDSCAPE
I
DSC LAN
ING
MLIG
PARK
LIG
ELER
LANDSCAPE
LIG
2 WHE
GREEN/OPEN GREEN/OPEN
GREEN/OPEN
4 WHEELER PARKING
83.100
MLIG
M
LIG
MLIG
GREEN/OPEN
EWS
EWS
DAILY NEEDS STORE
R
M
W
I
D
E
R
O
A
D
ENTRANCE/ EXIT
82.000
COMMUNITY HALL
A
PUMP ROOM
O
5
PRIMARY SCHOOL (G.FLOOR)
WTP
D
WATER SUPPLY
MLIG
GRAY WATER
5 M WIDE ROAD
STORM WATER
3 M WIDE PAVEMENT
LAMP POST
RESERVOIR 9X6X2M 108 KL
LANDSCAPE 4 WHEELER PARKING
LIG
RESERVOIR 9X6X2M 108 KL
RESERVOIR 9X6X2M 108 KL
RESERVOIR 9X6X2M 108 KL
CLINIC GREEN/OPEN 2 WHEELER PARKING
ELECTRIC LINE
45.634
EWS
5
PARKING
M
W
I
D
E
R
O
A
D
TRANSFORMER & CENTRAL CONTROL ROOM
GREEN/OPEN AREA
0
25
Project: HOUSING AT SILIGURI
154.217
50
100 Title: GRAY WATER LINE
150 Submitted By: SHRIYANSHU KUMAR 2020APM003