Skip to main content

INTERIOR DESIGN FOR AN INVESTMENT ADVISORY OFFICE

Page 1

COMMERCIAL INTERIOR DESIGN PORTFOLIO RIA INVESTMENT ADVISORY OFFICE

SHREYASH LAXMIKANT SONI FOURTH YEAR (A)


WASHBASIN

GENTS TOILET

MEETING ROOM

1.2 M WIDE PASSAGE

SINK

MANAGERS CABIN

MEETING ROOM

MICROWAVE

TEA/COFFEE WATER VENDING DISPENSER MACHINE

FRIDGE

CORRIDOR

FULL HT.STORAGE

1.0 M WIDE PASSAGE

PROVISION LED SCREEN

WASHBASIN

WASHBASIN

URINAL

WASHBASIN

URINAL

WASHBASIN

LADIES TOILET

WASHBASIN

URINAL

KEY PLAN:

PANTRY

1.2 M WIDE PASSAGE

DISCUSSION AREA

CONFERENCE ROOM

1.2 M WIDE PASSAGE

1.0 M WIDE PASSAGE

SIDE TABLE

PROVISION LED SCREEN

1.5 M WIDE PASSAGE

WAITING AREA

SIDE TABLE

PROVISION LED SCREEN

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

RECEPTION AREA

PROVISION LED SCREEN

MAIN ENTRANCE

WASHBASIN WASHBASIN

URINAL

WASHBASIN

KITCHEN SINK CERA KITCHEN SINK

MICROWAVE

TEA/COFFEE WATER VENDING DISPENSER MACHINE

KITCHEN COUNTER TOP 30 MM THICK BLACK GRANITE TOP FRIDGE

FULL HT.STORAGE

COUNTER TABLE 30 MM THICK PINE WOOD COUNTER

PANTRY

1.2 M WIDE PASSAGE

DISCUSSION AREA

CONFERENCE ROOM 30MM PLYWOOD PANELING WITH WHITE MATTE LAMINATE

1.2 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.5 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

WORKING DESKS 30 MM PLYWOOD WITH WHITE WOOD VENEER AND MELAMINE POLISH

TABLE TOP FINISHED IN BACK PAINTED GLASS

LEGEND :

30MM PLYWOOD PANELING WITH WHITE MATTE LAMINATE

RECEPTION TABLE 20MM PLYWOOD WITH MATTE LAMINATE AND A GLASS TOP

RECEPTION AREA 1.0 M WIDE PASSAGE

COUSHIONED SOFA WITH 19 MM PLYWOOD FRAME WAITING AREA

PROVISION LED SCREEN

PROVISION LED SCREEN

PROVISION LED SCREEN

SIDE TABLE

GLASS PARTITION SATORI CLEAR GLASS PANEL 10 MM THICK SIDE TABLE

OFFICE CHAIR MESH BACK OFFICE CHAIR

MANAGERS CABIN

MEETING ROOM

OFFICE CHAIR MESH BACK OFFICE CHAIR

1.2 M WIDE PASSAGE

SINK

MEETING ROOM

GENTS TOILET

1.0 M WIDE PASSAGE

PROVISION LED SCREEN

STORAGE RACK 18MM PLYWOOD AND 25 X 25 MM M.S. BOX SECTION SUPPORT

SEATING AND STORAGE BELOW 30 MM THICK PLYWOOD MATTE LAMINATE FINISH

GLASS WALL TOUGHENED GLASS OFFICE PARTITION PANEL 10 MM THICK

SOLID PARTITION WHITE BOARD PARTITION WALL

WASHBASIN

URINAL

WORK DESK 30MM PLYWOOD WITH WHITE MATTE LAMINATE

WASHBASIN

CORRIDOR

FULL HT.STORAGE

WOODEN TABLE 30 MM THICK CHERRY WOOD TOP WITH PU POLISH 18MM THICK PLYWOOD PARTITION WITH WHITE MATTE LAMINATE

LADIES TOILET

WASHBASIN

TELEVISION DISPLAY SONY BRAVIA 43 INCHES LED TV SCREEN

URINAL

CORRIDOR

B. V. D. U. COLLEGE OF ARCHITECTURE, PUNE. PROJECT :

MAIN ENTRANCE

CORRIDOR TELEVISION DISPLAY SONY BRAVIA 43 INCHES LED TV SCREEN

TELEVISION DISPLAY SONY BRAVIA 43 INCHES LED TV SCREEN

TELEVISION DISPLAY SONY BRAVIA 43 INCHES LED TV SCREEN

WOODEN TABLE METAL LEG FRAME WITH 30MM THICK PLYWOOD, MATTE LAMINATE TABLE TOP

NAME : SHREYASH LAXMIKANT SONI CLASS : FO.Y.B.ARCH 2019-2020 DIV : A ROLL NO. : 30 SIDE TABLE 20MM PLYWOOD WITH MATTE LAMINATE

TITLE : FURNITURE LAYOUT

SHEET NO. :

: SCALE : 1:50 JOB NO. : DRAWN BY : CHECK BY :

NORTH

DRAWING NO :

REVISION NO :

DATE

FURNITURE LAYOUT

N


WASHBASIN

GENTS TOILET

MEETING ROOM

1.2 M WIDE PASSAGE

SINK

MANAGERS CABIN

MEETING ROOM

MICROWAVE

TEA/COFFEE WATER VENDING DISPENSER MACHINE

FRIDGE

CORRIDOR

FULL HT.STORAGE

1.0 M WIDE PASSAGE

PROVISION LED SCREEN

WASHBASIN

WASHBASIN

URINAL

WASHBASIN

URINAL

WASHBASIN

LADIES TOILET

WASHBASIN

URINAL

KEY PLAN:

PANTRY

1.2 M WIDE PASSAGE

DISCUSSION AREA

CONFERENCE ROOM

1.2 M WIDE PASSAGE

1.0 M WIDE PASSAGE

SIDE TABLE

PROVISION LED SCREEN

1.5 M WIDE PASSAGE

WAITING AREA

SIDE TABLE

PROVISION LED SCREEN

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

RECEPTION AREA

PROVISION LED SCREEN

MAIN ENTRANCE

CORRIDOR

9.50 0.49

0.66 0.75

0.75

0.72

0.75

0.72

0.75

0.72

0.75

2.44

1.32

1.35

2.01 1.08

0.73

1.2 M WIDE PASSAGE

5.83

0.97

5.26 1.50 0.41

WAITING AREA

2.03 0.33

0.75

SIDE TABLE

2.58

0.66

SIDE TABLE

PROVISION LED SCREEN

0.60

2.00 0.99 2.78

PROVISION LED SCREEN

1.80

2.15

1.68

2.39

1.23

1.05

2.81

0.66

3.00

1.5 M WIDE PASSAGE

1.05

1.05

1.0 M WIDE PASSAGE

1.05

1.05

1.0 M WIDE PASSAGE

2.43

RECEPTION AREA

1.80

LEGEND :

0.90

2.39

17.53

3.00

1.00

0.46

4.80

1.67

CORRIDOR

1.30

0.60

0.74

FULL HT.STORAGE

4.20

1.2 M WIDE PASSAGE

1.20

0.90

6.36

WASHBASIN WASHBASIN WASHBASIN

0.75 0.60

FRIDGE

0.90

2.10

1.05

1.07 1.0 M WIDE PASSAGE

PROVISION LED SCREEN

TEA/COFFEE WATER VENDING DISPENSER MACHINE

1.2 M WIDE PASSAGE

1.00 0.61

GENTS TOILET

1.00

0.90

4.86

1.05

2.50

MICROWAVE

PANTRY

1.96

1.90

MANAGERS CABIN

MEETING ROOM

1.0 M WIDE PASSAGE

1.03 2.50

8.65

3.44

2.00

0.90

1.93

1.00

DISCUSSION AREA

1.74

0.45

3.08

0.75

3.40

1.00

2.10 1.38

0.90

0.74

CONFERENCE ROOM

1.00

0.29

MEETING ROOM

2.10

1.89

0.75

0.45

SINK

3.00 0.95

0.95

0.77

0.72

1.20

5.32

2.00

3.00

1.05 2.87

1.00 3.40

0.75

0.72 1.00

0.66

2.39

0.77

1.00

1.00

0.75

2.50 0.75

0.78

2.00

1.79

1.00

1.79

1.53

PROVISION LED SCREEN

2.83

FULL HT.STORAGE

0.75

4.40

1.32

2.80 0.75 0.75

0.93

URINAL

WASHBASIN

1.0 M WIDE PASSAGE

2.57

URINAL

1.20

WASHBASIN

0.58 0.57 0.59

0.75

URINAL

0.33

0.72

LADIES TOILET 0.75 0.75

WASHBASIN

4.71

0.75

0.57

1.00 3.20

1.32

0.57

0.75

2.27

1.50

1.32

1.50

1.20

1.50

1.50

1.50

1.90

B. V. D. U. COLLEGE OF ARCHITECTURE, PUNE. PROJECT :

2.20

15.76

CORRIDOR 19.65

MAIN ENTRANCE

2.39

1.50 21.55

NAME : SHREYASH LAXMIKANT SONI CLASS : FO.Y.B.ARCH 2019-2020 DIV : A ROLL NO. : 30 TITLE : DIMENSION LAYOUT

SHEET NO. :

: SCALE : 1:50 JOB NO. : DRAWN BY : CHECK BY :

NORTH

DRAWING NO :

REVISION NO :

DATE

DIMENTION LAYOUT

N


WASHBASIN

GENTS TOILET

MEETING ROOM

1.2 M WIDE PASSAGE

SINK

MANAGERS CABIN

MEETING ROOM

MICROWAVE

TEA/COFFEE WATER VENDING DISPENSER MACHINE

FRIDGE

CORRIDOR

FULL HT.STORAGE

1.0 M WIDE PASSAGE

PROVISION LED SCREEN

WASHBASIN

WASHBASIN

URINAL

WASHBASIN

URINAL

WASHBASIN

LADIES TOILET

WASHBASIN

URINAL

KEY PLAN:

PANTRY

1.2 M WIDE PASSAGE

DISCUSSION AREA

CONFERENCE ROOM

1.2 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.5 M WIDE PASSAGE PROVISION LED SCREEN

SIDE TABLE

PROVISION LED SCREEN

WAITING AREA

SIDE TABLE

PROVISION LED SCREEN

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

RECEPTION AREA

MAIN ENTRANCE

CORRIDOR

REFLECTED CEILING PLAN SERVICES NOMENCLATURE

QUANTITY

1.

SPRINKLER

22

2.

CCTV

9

3.

SMOKE DETACTOR

22

4.

AIR CONDITIONER

-

5.

SPRINKLER RANGE

-

6.

SPRINKLER LINE

-

2.00

SYMBOL

2.00

SR.NO.

A.H.U

2.00

3.44

3.00

3.00

3.00

3.00

LEGEND :

3.00

SPRINKLER SYSTEM ATTACHED TO CEILING

CORRIDOR

3.65

3.00

3.65

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

AC DUCT 700MM FROM SLAB

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

B. V. D. U. COLLEGE OF ARCHITECTURE, PUNE. PROJECT :

MAIN ENTRANCE

CORRIDOR NAME : SHREYASH LAXMIKANT SONI CLASS : FO.Y.B.ARCH 2019-2020 DIV : A ROLL NO. : 30 TITLE :

REFLECTED CEILING PLAN SERVICES

SHEET NO. :

: SCALE : 1:50 JOB NO. : DRAWN BY : CHECK BY :

NORTH

DRAWING NO :

REVISION NO :

DATE

REFLECTED CEILING PLAN - SERVICES

N


WASHBASIN

GENTS TOILET

MEETING ROOM

1.2 M WIDE PASSAGE

SINK

MANAGERS CABIN

MEETING ROOM

MICROWAVE

TEA/COFFEE WATER VENDING DISPENSER MACHINE

FRIDGE

CORRIDOR

FULL HT.STORAGE

1.0 M WIDE PASSAGE

PROVISION LED SCREEN

WASHBASIN

WASHBASIN

URINAL

WASHBASIN

URINAL

WASHBASIN

LADIES TOILET

WASHBASIN

URINAL

KEY PLAN:

PANTRY

1.2 M WIDE PASSAGE

DISCUSSION AREA

CONFERENCE ROOM

1.2 M WIDE PASSAGE

1.0 M WIDE PASSAGE

SIDE TABLE

PROVISION LED SCREEN

1.5 M WIDE PASSAGE

WAITING AREA

SIDE TABLE

PROVISION LED SCREEN

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

RECEPTION AREA

PROVISION LED SCREEN

MAIN ENTRANCE

CORRIDOR

7

6

5

4

FLOORING SR.N0.

TYPE OF TILE

MAKE

SIZE

QUANTITY

1.

BLACK CARPET TILE

SIDDHIVINAYAK

1200X1200 MM

160 TILES

2.

MATT FLOOR TILE

GARG TRADING CO.

600X300 MM

216 TILES

3

0.30

1.20

0.57

18

17

16

15

14

13

12

11 10

9

8

7

6

5

4

3

2 1 START POINT

0.95

0.53

1.20

1.20

19

0.60

2

8

6

5

CORRIDOR

7

LEGEND :

4

3

1.20

1.20

2

1.13

1.20 15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

START POINT

B. V. D. U. COLLEGE OF ARCHITECTURE, PUNE. PROJECT :

MAIN ENTRANCE

CORRIDOR NAME : SHREYASH LAXMIKANT SONI CLASS : FO.Y.B.ARCH 2019-2020 DIV : A ROLL NO. : 30 TITLE :

FLOORING LAYOUT

SHEET NO. :

: SCALE : 1:50 JOB NO. : DRAWN BY : CHECK BY :

NORTH

DRAWING NO :

REVISION NO :

DATE

FLOORING LAYOUT

N


WASHBASIN

GENTS TOILET

MEETING ROOM

1.2 M WIDE PASSAGE

SINK

MANAGERS CABIN

MEETING ROOM

MICROWAVE

TEA/COFFEE WATER VENDING DISPENSER MACHINE

FRIDGE

CORRIDOR

FULL HT.STORAGE

1.0 M WIDE PASSAGE

PROVISION LED SCREEN

WASHBASIN

WASHBASIN

URINAL

WASHBASIN

URINAL

WASHBASIN

LADIES TOILET

WASHBASIN

URINAL

KEY PLAN:

PANTRY

1.2 M WIDE PASSAGE

DISCUSSION AREA

CONFERENCE ROOM

1.2 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.5 M WIDE PASSAGE PROVISION LED SCREEN

SIDE TABLE

PROVISION LED SCREEN

WAITING AREA

SIDE TABLE

PROVISION LED SCREEN

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

RECEPTION AREA

MAIN ENTRANCE

0.75

CORRIDOR

REFLECTED CEILING PLAN - ELECTRICAL DONWLIGHT

KOLOURFUL

2.

CS

12

200 MM DIA

CIRCULAR SUSPENDED

WIPRO

3.

LS

18

-

LINEAR SUSPENDED

WIPRO

4.

TS

12

1200 MM

TUBULAR SUSPENDED

KOLOURFUL

0.75 1.40

1.40

1.40

1.70

0.60 1.50

1.75

1.50

1.70

0.68

0.60 0.60

3.64

1.75

2.68

0.96

1.20 3.20 2.61

1.05

2.61

3.01

1.46

1.80

1.80 0.96

3.98 0.96

1.57

2.84

3.01 1.57

3.63 3.64

0.96

1.57

3.67 0.96

1.16

3.66

LEGEND :

2.91

1.46 3.01

2.66

2.61

3.76

3.98

3.63 1.05

2.61

3.66 1.05

2.61

2.73

3.01

1.05

3.64 1.05

3.67

0.53

2.61 3.63

0.53

2.61 3.66

1.05

1.16

1.59

1.69

3.01

0.68

3.99 0.65

0.76

0.96

2.64

0.96

2.66

1.37

2.00

1.50

1.70

1.50

1.70

1.50

1.75

2.66 1.50

2.00

1.40

1.25

1.39

0.50

1.40

0.60

1.70

1.40

2.62

1.70

1.40

CORRIDOR

80 MM DIA

2.27

5

1.75

CL

0.70

1.

0.60 0.60

BRAND/ COMPANY

1.40

TYPE

0.70

DIAMETER/ LENGTH

0.70

QUANTITY

SYMBOL

0.95

NOMENCLATURE

S.N.

B. V. D. U. COLLEGE OF ARCHITECTURE, PUNE. PROJECT :

MAIN ENTRANCE

CORRIDOR NAME : SHREYASH LAXMIKANT SONI CLASS : FO.Y.B.ARCH 2019-2020 DIV : A ROLL NO. : 30 TITLE :

REFLECTED CEILING PLAN ELECTRICAL

SHEET NO. :

REFLECTED CEILING PLAN - ELECTRICAL

: SCALE : 1:50 JOB NO. : DRAWN BY : CHECK BY :

NORTH

DRAWING NO :

REVISION NO :

DATE

N


WASHBASIN

GENTS TOILET

MEETING ROOM

1.2 M WIDE PASSAGE

SINK

MANAGERS CABIN

MEETING ROOM

MICROWAVE

TEA/COFFEE WATER VENDING DISPENSER MACHINE

FRIDGE

CORRIDOR

FULL HT.STORAGE

1.0 M WIDE PASSAGE

PROVISION LED SCREEN

WASHBASIN

WASHBASIN

URINAL

WASHBASIN

URINAL

WASHBASIN

LADIES TOILET

WASHBASIN

URINAL

KEY PLAN:

PANTRY

1.2 M WIDE PASSAGE

DISCUSSION AREA

CONFERENCE ROOM

1.2 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.5 M WIDE PASSAGE PROVISION LED SCREEN

SIDE TABLE

PROVISION LED SCREEN

WAITING AREA

SIDE TABLE

PROVISION LED SCREEN

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

RECEPTION AREA

MAIN ENTRANCE

CORRIDOR

REFLECTED CEILING PLAN - ELECTRICAL NOMENCLATURE

QUANTITY

DIAMETER/ LENGTH

TYPE

1.

CL

5

80 MM DIA

DONWLIGHT

KOLOURFUL

2.

CS

12

200 MM DIA

CIRCULAR SUSPENDED

WIPRO

3.

LS

18

-

LINEAR SUSPENDED

WIPRO

4.

TS

12

1200 MM

TUBULAR SUSPENDED

KOLOURFUL

5.

WIRE

-

-

-

SB

10

-

SWITCH BOARD

S.N.

SYMBOL

SB

7.

SC

8.

PP

SC

25

-

PP

4

-

CL5

CL4

CL3

SB5

6.

BRAND/ COMPANY CL2

CL1

CS11

CS10

CS12

SOCKET (6 AMPERE) WITH SWITCH POWER PLUG SOCKET (15 AMPERE) WITH SWITCH

CS9 CS8 SB6 SB4 PP1

SC22

PP2

PP3

PP4

SC25

SC24

SC23

TS3 CS7 CS3

LS16

LS17

LS18 TS2

LS15

CS6 CS4 TS1

CS1 SB10

LS14

LS13

LS12 CS5

SB3 SB1

CORRIDOR

SB7

SB8

SB9

CS2

LEGEND :

SC1

SC7

SC8

SC14

SC15

SC21

LS3 LS8

TS10

LS9

TS9

SC2 SB2

SC3

SC5

SC10

SC12

SC17

SC19

LS2

LS1

TS6

LS5

SC11

LS11

TS5

TS7

LS6

SC18

SC6

TS8

TS12

LS7

TS4

SC9

SC13

SC16

SC20

TS11

LS10

B. V. D. U. COLLEGE OF ARCHITECTURE, PUNE.

LS4

SC4

PROJECT : MAIN ENTRANCE

CORRIDOR NAME : SHREYASH LAXMIKANT SONI CLASS : FO.Y.B.ARCH 2019-2020 DIV : A ROLL NO. : 30 TITLE :

ELECTRICAL LAYOUT

SHEET NO. :

: SCALE : 1:50 JOB NO. : DRAWN BY : CHECK BY :

NORTH

DRAWING NO :

REVISION NO :

DATE

ELECTRICAL LAYOUT

N


KEY PLAN:

1.193 LADIES TOILET WASHBASIN

GENTS TOILET

WASHBASIN

URINAL FULL HT.STORAGE

PROVISION LED SCREEN

SINK

MEETING ROOM

1.2 M WIDE PASSAGE

0.594

1.0 M WIDE PASSAGE

MANAGERS CABIN

MEETING ROOM

MICROWAVE

TEA/COFFEE WATER VENDING DISPENSER MACHINE

FRIDGE

CORRIDOR

WASHBASIN

WASHBASIN

URINAL

0.631

URINAL

1.028

WASHBASIN

0.285

WASHBASIN

0.312

PANTRY

1.2 M WIDE PASSAGE

DISCUSSION AREA

CONFERENCE ROOM

0.620

1.5 M WIDE PASSAGE

SIDE TABLE

SIDE TABLE

PROVISION LED SCREEN

MAIN ENTRANCE

CORRIDOR

1.193

50

0 0.

0.050MM CONCEALED LIGHTING

0

1.121

0.050

1.0 M WIDE PASSAGE

0.324 1.003

0.050MM CONCEALED LIGHTING

PROVISION LED SCREEN

WAITING AREA

0.594

0.309

05 0.

50

1.535

0

05

0.0 1.521

PROVISION LED SCREEN

1.636

0.

0.050

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

RECEPTION AREA

1.121

1.729

0.050MM CONCEALED LIGHTING

1.2 M WIDE PASSAGE

1.0 M WIDE PASSAGE

0.558

1.367

0.767

0.691

1.193

0.797

RECEPTION AND DISCUSSION AREA WALL PARTITION DETAIL RECEPTION CEILING DETAIL

0.050

0.531

0.535

0.993

0.614

0.050

0.050MM CONCEALED LIGHTING

LEGEND :

B. V. D. U. COLLEGE OF ARCHITECTURE, PUNE. PROJECT :

NAME : SHREYASH LAXMIKANT SONI CLASS : FO.Y.B.ARCH 2019-2020 DIV : A ROLL NO. : 30 TITLE RECEPTION : AND DISCUSSION AREA

WALL PARTITION DETAILS

RECEPTION AND DISCUSSION AREA WALL PARTITION DETAIL RECEPTION CEILING DETAIL

SHEET NO. :

: SCALE : 1:20 JOB NO. : DRAWN BY : CHECK BY :

NORTH

DRAWING NO :

REVISION NO :

DATE

N


WASHBASIN

GENTS TOILET

MEETING ROOM

1.2 M WIDE PASSAGE

SINK

MANAGERS CABIN

MEETING ROOM

MICROWAVE

TEA/COFFEE WATER VENDING DISPENSER MACHINE

FRIDGE

CORRIDOR

FULL HT.STORAGE

1.0 M WIDE PASSAGE

PROVISION LED SCREEN

WASHBASIN

WASHBASIN

URINAL

WASHBASIN

URINAL

WASHBASIN

LADIES TOILET

WASHBASIN

URINAL

KEY PLAN:

PANTRY

1.2 M WIDE PASSAGE

DISCUSSION AREA

CONFERENCE ROOM

1.2 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.5 M WIDE PASSAGE PROVISION LED SCREEN

SIDE TABLE

PROVISION LED SCREEN

WAITING AREA

SIDE TABLE

PROVISION LED SCREEN

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

RECEPTION AREA 1.0 M WIDE PASSAGE

SLAB LEVEL

MAIN ENTRANCE

CORRIDOR

0.

51

1

EQ

STORAGE SHUTTER FINISHED IN LAMINATE AS PER SELECTION

EQ

2.025

EQ

FINISHED IN LAMINATE PATTERN AS PER SELECTION

5 0.

WINDOW

FRONT ELEVATION

0.450

LEGEND :

SIDE ELEVATION

FRONT ELEVATION

0.075

2.100

0.053 0.300 0.697

1.050

0.038 0.300

PLANTERS BOX

SHELF FINISHED IN LAMINATE AS PER SELECTION

EQ

EQ

11

TABLE TOP FINISHED IN BACK PAINTED GLASS AS PER SELECTION

FINISHED IN LAMINATE PATTERN AS PER SELECTION

FULL HT.STORAGE

EQ

EQ

EQ

3.075 PLAN

DISCUSSION TABLE

1.125

0.744

0.2490.225

CENTURY LAMINATE FROSTY WHITE - 111

1.350

PLAN

CENTURY LAMINATE BLUE - 111

CENTURY LAMINATE SLATE GREY - 236

B. V. D. U. COLLEGE OF ARCHITECTURE, PUNE. PROJECT :

NAME : SHREYASH LAXMIKANT SONI CLASS : FO.Y.B.ARCH 2019-2020 DIV : A ROLL NO. : 30 TITLE : DISCUSSION TABLE IN PANTRY AND

FULL HEIGHT STORAGE DETAILS SHEET NO. :

: SCALE : 1:20 JOB NO. : DRAWN BY : CHECK BY :

NORTH

DRAWING NO :

REVISION NO :

DATE

N


WASHBASIN

1.0 M WIDE PASSAGE

PROVISION LED SCREEN

1.2 M WIDE PASSAGE

SINK

A MEETING ROOM

MANAGERS CABIN

MEETING ROOM

MICROWAVE

TEA/COFFEE WATER VENDING DISPENSER MACHINE

FRIDGE

A'

CORRIDOR

FULL HT.STORAGE

B

GENTS TOILET

WASHBASIN

WASHBASIN

URINAL

WASHBASIN

URINAL

WASHBASIN

LADIES TOILET

WASHBASIN

URINAL

KEY PLAN:

PANTRY

1.2 M WIDE PASSAGE

DISCUSSION AREA

CONFERENCE ROOM

1.2 M WIDE PASSAGE

1.0 M WIDE PASSAGE

B'

SOLID PARTITION WHITE BOARD PARTITION WALL

1.5 M WIDE PASSAGE PROVISION LED SCREEN

SIDE TABLE

PROVISION LED SCREEN

WAITING AREA

SIDE TABLE

PROVISION LED SCREEN

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

1.0 M WIDE PASSAGE

RECEPTION AREA

MAIN ENTRANCE

CORRIDOR

GLASS WALL TOUGHENED GLASS OFFICE PARTITION PANEL 10 MM THICK

FINISH WITH PAINT AS PER SELECTION TELEVISION DISPLAY SONY BRAVIA 43 INCHES LED TV SCREEN

FINISHED IN LAMINATE AS PER SELECTION

PROVISION 43" LED SCREEN

18MM THICK PLYWOOD PARTITION WITH WHITE MATTE LAMINATE

FRIDGE

SHUTTER FINISHED IN LAMINATE AS PER SELECTION LEDGE FINISHED IN LAMINATE AS PER SELECTION

WOODEN TABLE 30 MM THICK CHERRY WOOD TOP WITH PU POLISH

SECTION AA' LEGEND :

SOLID PARTITION WHITE BOARD PARTITION WALL

OFFICE CHAIR MESH BACK OFFICE CHAIR

OFFICE CHAIR MESH BACK OFFICE CHAIR

WOODEN TABLE 30 MM THICK CHERRY WOOD TOP WITH PU POLISH

WORKING DESKS 30 MM PLYWOOD WITH WHITE WOOD VENEER AND MELAMINE POLISH

B. V. D. U. COLLEGE OF ARCHITECTURE, PUNE. PROJECT :

SECTION BB'

NAME : SHREYASH LAXMIKANT SONI CLASS : FO.Y.B.ARCH 2019-2020 DIV : A ROLL NO. : 30 TITLE : SECTIONS

SHEET NO. :

: SCALE : 1:50 JOB NO. : DRAWN BY : CHECK BY :

NORTH

DRAWING NO :

REVISION NO :

DATE

N


KEY PLAN:

COSTING FURNITURE SR. NO

ITEM

SANITARY

QUANTITY

MATERIAL COST

LABOUR COST

TOTAL COST

SR. NO

ITEM

QUANTITY

MATERIAL COST

LABOUR COST

TOTAL COST

1.

RECEPTION CHAIRS AND DISCUSSION AREA CHAIRS

08

3000 / PIECE

INCLUDED

24,000

1.

WATER CLOSET

05

7000 / PIECE

INCLUDED

35,000

2.

STAFF CHAIRS AND VISITORS FOR MEETING CHAIRS

24

3500 / PIECE

INCLUDED

84,000

2.

URINALS

03

6000 / PIECE

INCLUDED

18,000

3.

CONFERENCE CHAIRS

08

4000 / PIECE

INCLUDED

32,000

3.

WASHBASINS

09

3000 / PIECE

INCLUDED

27,000

4.

MANAGER AND MEETING ROOM CHAIRS

03

6200 / PIECE

INCLUDED

18,600

4.

NAHNI TRAP

07

100 / PIECE

INCLUDED

700

5.

CAFE CHAIRS

12

1500 / PIECE

INCLUDED

18,000

5.

MIRROR

03

1200 / PIECE

INCLUDED

3600

6.

RECEPTION TABLE

01

8000 / PIECE

INCLUDED

8000

TOTAL

84,300

7.

CONFERENCE TABLE

01

10200 / PIECE

INCLUDED

10,200

8.

MANAGER CABIN AND MEETING ROOM TABLES

03

8000 / PIECE

INCLUDED

24,000

9.

COUCH WITH CENTER TABLE AND SIDE TABLE

02

15000 / PIECE

INCLUDED

30,000

10.

PANTRY TABLES

02

2000 / PIECE

INCLUDED

4000

11.

DISCUSSION AREA CENTER TABLES

02

3300 / PIECE

INCLUDED

6600

SR. NO

TOTAL

2,59,400

1.

FLOORING SR. NO

ITEM

QUANTITY

MATERIAL COST

LABOUR COST

TOTAL COST

1.

BLACK CARPET TILE

2220 SQ.FT

60 / SQ. FT

30 / SQ. FT

1,99,800

2.

MATT FLOOR TILE

350 SQ.FT

40 / SQ. M

30 / SQ. M

24,500

TOTAL

LIGHTING ITEM

QUANTITY

MATERIAL COST

LABOUR COST

TOTAL COST

SUSPENDED TUBE LIGHT

12

600 / PIECE

INCLUDED

7,200

2.

CIRCULAR SUSPENDED LIGHT

12

1200 / PIECE

INCLUDED

14,400

3.

CEILING LIGHTS

05

450 / PIECE

INCLUDED

2250

4.

LINEAR SUSPENDED TUBE LIGHT

18

1800 / PIECE

INCLUDED

32,400

5.

CONDUIT PIPE

300 M

50 / M

INCLUDED

15,000

TOTAL

71,250

LEGEND :

1,55, 535

SERVICES ELECTRICAL SR. NO

ITEM

SR. NO

ITEM

QUANTITY

MATERIAL COST

LABOUR COST

TOTAL COST

QUANTITY

MATERIAL COST

LABOUR COST

TOTAL COST

1.

SPRINKLERS

22

700

1200

16,600

1.

SWITCHES

10

40 / PIECE

30 / PIECE

700

2.

C.C.T.V

09

1500

INCLUDED

13,500

2.

6 AMP

25

75 / PIECE

50 / PIECE

3125

3.

SMOKE DETECTOR

22

500

INCLUDED

11,000

3.

15 AMP

04

400 / PIECE

50 / PIECE

1800

4.

A.C DUCT

20 SQ.M

7000 / SQ.M

INCLUDED

1,40,000

TOTAL

5625

TOTAL

1,81,100

B. V. D. U. COLLEGE OF ARCHITECTURE, PUNE. PROJECT :

TOTAL = RS. 7,57,210 (APPROXIMATE COST REQUIRE FOR THE PROJECT IS 8 TO 9 LAKH RS.) NAME : SHREYASH LAXMIKANT SONI CLASS : FO.Y.B.ARCH 2019-2020 DIV : A ROLL NO. : 30 TITLE : COSTING

SHEET NO. :

: SCALE : JOB NO. : DRAWN BY : CHECK BY :

NORTH

DRAWING NO :

REVISION NO :

DATE

N


Turn static files into dynamic content formats.

Create a flipbook
INTERIOR DESIGN FOR AN INVESTMENT ADVISORY OFFICE by SHREYASH SONI - Issuu