SELECTED WORKS 2018 - 2023 ARCHITECTURAL PORTFOLIO
B.SHIVANI
bshivani13@gmail.com
+919901455384
Buildings are more than structures; they embody history, shaping our present and future. Architects craft these narratives, sparking my intellectual curiosity.
I’m fascinated by how diverse designs weave together in a cityscape, creating environments that enrich communities and integrate with nature for sustainable living.
EDUCATION
2018 - 2023 Bangalore CMRU School Of Architecture
2016 - 2018 Bangalore Mount Carmel PU College
2010 - 2016 Bangalore Sacred Heart Girls’ High School
WORKSHOPS
GRIHA workshop
Oneistox - Decode
Oneistox - Lumion & Revit Workshop
Full Scale 105 - Paper Mache Installation
Full Scale 106 - Woodcut Printing
Full Scale 107 - Post Pandemic Pod Design
Full Scale 108 - Anamorphic Illusion
Full Scale 109 - Shelter Design
Full Scale 110 - Ferrocement Workshop
Full Scale 112 - Dhokra Casting
SOFTWARE SKILLS
Drafting
3D Modelling
3D Rendering
Adobe suites
Microsoft suites
AutoCAD, REVIT
Sketchup , Rhinoceros 3D
Lumion, Twinmotion
Photoshop, Indesign, Illustrator, Premiere Pro
PowerPoint, Excel, Word
EXPERIENCE
Studio XS , Bangalore Internship (Aug 2021 - Dec 2021)
Worked on 1 major Interior project & Architectural detailing of 2 other projects.
Worked on technical drawings , modelling & 3D rendering.
Designed a pavilion , that was part of the the Interior design project
LANGUAGE
English
Hindi Kannada INTERESTS
Exploring diverse art forms including painting, wood cut print, sketching, charcoal art & photography.
Bangalore
B.SHIVANI
COE
Center of Excellence
Ahmedabad
LIBRARY
Bangalore
Bangalore
INTERNSHIP WORKS
MISCELLANEOUS HOUSING
CONTENT
04 05
01 02 03
COE - ADAPTIVE REUSE
Center of Excellence
Ahmedabad Semester lX
01
The Millowners association building (ATMA) was designed by the renowned Swiss French architect Le Corbusier in Ahmdebad. Initially inspired by the Council of Excellence competition organized by the Council of Architecture.
The project aims to adaptively reuse the Millowners Association building by integrating the COA competition’s design for the Centre of Excellence. The objective is to preserve the building’s original context and respect its surroundings while meticulously integrating its distinctive design elements. The vision is to create a modern yet timeless design honoring various historical periods.
The Council of Excellence serves as a platform fostering interaction and collaboration across diverse branches of architecture. It provides a comprehensive array of resources and activities, such as workshops, seminars, archives containing architectural drawings and models, a training center & exhibitions all housed within a single facility. Its aim is to promote collaboration, research, and learning within the architectural community , while also disseminating knowledge through this comprehensive facility.
The site, spanning 3 acres, features the Ahmedabad Textile Mill Owners Association building(MOA), in Ahmedebad. Its topography slopes down from west to east, offering views of the Sabarmati River towards the East of MOA.
FORM
The Atma Building, designed by Le Corbusier, was constructed based on five modern architectural principles: open floor plan, free facade, pilotis, long windows and roof garden. The aim is to integrate the open floor plan concept while challenging the rigid exterior form of the existing structure. Embracing a similar grid pattern, the new design fosters fluid movement through curved walls between spaces, contrasting the existing building’s rigid cubical form.
HEAT REDUCTION
Instead of large openings, the design incorporates long & narrower slits as openings. These slits serve to allow air to cool down gradually through the Venturi effect as it enters the building. This approach helps regulate the temperature inside while maintaining a cohesive aesthetic with the brick facade.
CONTRAST
To address the site’s context and climate, thick external walls are erected on the South West side to mitigate heat and block direct sunlight penetration. Utilizing exposed red brick not only aids in cooling the interior but also serves to create a visual contrast with the concrete construction of the MOA building (existing), especially accentuated by the free facade at its West entrance.
APPROACH
The design emphasizes a contrast with the existing ATMA building at the West entrance, while guiding users through an experiential transition towards discovering the Sabarmati River.
Meanwhile, the East entrance embraces the riverfront opposite by adopting a more open approach to accommodate various activities while leading the users to seek out the existing ATMA building.
CONNECTING
The concept involves extending the current pedestrian ramp from the West entrance, guiding users seamlessly to the next level as they enjoy views of the Sabarmati River towards the East. This extension incorporates roof gardens and bridges that interconnect various spaces, all converging to a central OAT. Introducing a pedestrian ramp towards the East entrance serves to entice users to experience elevated views of the river, drawing them towards the ATMA building as they ascend. This design not only provides a unique perspective of the river from a height but also encourages exploration and discovery of the architectural elements along the way.
BRIEF CONCEPT
riverfront east entrance west entrance west
east entrance
sabarmathi River
entrance
MASTER PLAN 1 2 4 12 6 3 1. WEST ENTRANCE 2. SURFACE PARKING 3. RAMP TO BASEMENT PARKING 4. ENTRANCE FOYER 5. LOBBY 6. RECEPTION (general) 7. ADMINISTRATION OFFICE 8. DIRECTOR’S OFFICE 9. ACCOUNT’S OFFICE 10. REGISTRATION OFFICE 11. CONFERENCE ROOM (extendable) 12. EXHIBITION SPACE 13. ASSEMBLY HALL 14. RECEPTION (archival zone) 15. LOUNGE 16. MANAGER’S OFFICE 17. ASSITANT CURATOR’S STUDIO 18. MEETING ROOM 19. REFERENCE ROOM 20. DOCUMENTAION STUDIO 21. ARCHIVAL RECORD’S 22. STORAGE SPACE 23. OAT
OPEN SHELF & READING AREA
EDITOR’S STUDIO
DWG RECORD REFERENCE ROOM 27. AUDIO VISUAL ROOM 28. DIGITAL RECORD 29. STUDY ROOM 30. EAST ENTRANCE SABARMATI RIVERFRONT ROAD ASHRAM ROAD 7 13 8 11 23 14 12 12 28 29 30 0m lvl 0m lvl +0.5 m lvl +0.5 m lvl 0m lvl -4 m lvl 0m lvl 0m lvl -3.50 m lvl -3.00 m lvl -3.50 m lvl -4.00 m lvl -3.75 m lvl -4 m lvl -4.00 m lvl -3.25 m lvl 2 5 9 10 11 18 16 17 18 15 22 21 20 19 24 25 26 27 15 22 16 18 N
24.
25.
26.
PLANS 2 1. Book store 2. Cloakroom 3. Lobby 4. Reception 5. Open stack & reading area 6. Lounge 7. Librarian’s office 8. Assitant librarian’s ofiice 9. Storage 10. OAT 11. Exhibition 12. Canteen with seating area 1 2 4 5 5 9 7 8 3 10 11 12 13 1. Entrance foyer 2. Lobby 3. Reception (general) 4. Reception (training centre) 5. Lounge 6. Director’s office 7. Account’s office 8. Admin office 9. Registration office 10. Pantry 11. Assembly hall 12. Exhibition space 13. Conference room (extendable) 14. Reception (archive) 15. Represtation room 16. Documentation studio 17. Archival record’s 18. Storage 19. Meeting room 20. Assistant curator’s office 21. Manager’s office 22. Temperature control room 23. OAT 24. Open shelf & reading area 25. Editor’s studio 26. AV Room 27. Digital record 28. Study room 2 3 12 12 21 5 7 12 13 13 15 17 16 20 19 14 5 22 28 27 26 16 16 25 24 23 19 18 2 7 3 1 4 6 1 2 4 1 1. Breakout space 2. GIS 3. Climatology 4. Robotics 5. Meeting room 6. Materials & archive (with extendable workshop) Basement Floor Ground Floor First Floor 7 Second Floor 1. Auditorium 2. Green room 3. Breakout space 4. Theatre Mezzanine Floor 1. Auditorium 2. Breakout space 6 6 8 9 10 4 1 11 5 18 6 5 1 1 3 2
EXPLODED ISOMETRIC
SECTIONAL VIEW +15750 mm
BB’
Section
AA’ Open shelf Record’s room Lounge Exhibition space Auditorium Basement parking Assembly hall Reference room Lounge Reception GIS Documentation studio Exhibition space +8800 mm +4400 mm +500 mm 0 mm -4000 mm -3600 mm -3800 mm -4000 mm -3000 mm 0 mm +500 mm +4400 mm +8800 mm +18000 mm Breakout space Stage OAT Roof garden Roof garden B A B’ A’
Section
Front view
Framing views
Terrace roofs ingeniously connect the ramp from West to East, directing toward the Sabarmati River, facilitating pedestrian movement and offering elevated scenic views.
Thick towering walls provide effective shading, reducing heat gain, ensuring cooler indoor spaces. Contrasts with the existing MOA building, which features a free facade.
LIBRARY
State Public Library
Cubbon Park , Bangalore Semester V
02
CONCEPT
The concept revolves around seamlessly transitioning from the verdant ambiance of the Rose Garden into the library, while also integrating green spaces within the library itself. This is achieved through the design of diverse courtyard sizes, tailored to accommodate different types of gatherings. These courtyards are positioned between various functions or spaces, forming pockets of greenery throughout the library.
The site, situated in Cubbon Park at the existing State Library and near the Sheshadri Iyer Memorial Statue, encompasses an 8500 sqm area, including an existing Rose Garden. In conceptualizing the space, I aimed to seamlessly integrate the Rose Garden with the library, allowing users to transition from the garden to the library’s southern entrance. Furthermore, the space between the garden and the library’s built mass presents opportunities for hosting various gathering events.
To extend this concept to the next level, some of the built masses consist of single-level structures with stepped roof terraces. These terraces are positioned around the gathering space to provide visual perspectives from multiple levels.
CONTEXT
SITE
1 VEHICULAR PARKING 2 BICYCLE PARKING 3 MAIN ENTRANCE (North) 4 NON - FICTION SECTION 5 PERIODICAL SECTION 6 FICTION SECTION 7 AMPHITHEATRE 8 CHILDREN’S LIBRARY 9 ENTRANCE (South) 10 EXHIBITION SPACE 11 ROSE GARDEN 12 STATUE ( Sri
Iyer Memorial ) 1 2 4 6 8 9 3 5 10 7 12 11 MASTER PLAN
Sheshadri
1 ENTRANCE (North) 2 STAFF SPACE 3 LOUNGE 4 LIBRARIAN OFFICE 5 VOLUNTEERS OFFICE 6 PATIO (with a courtyard) 7 LOBBY 8 PUBLIC CATALOGUE 9 NON FICTION SECTION 10 READING SPACE 11 WASHROOM 12 PERIODIC SECTION 13 BOOK CAFE 14 FICTION SECTION 15 NOVEL SECTION 16 COMIC SECTION 17 WASHROOM 18 CHILDREN’S LIBRARY 19 AMPHITHEATRE 20 LOBBY (South Entry) 1 DISCUSSION SPACE 2 STUDY SPACE 3 E - LIBRARY 4 ARCHIVES 5 FICTION SECTION 6 TERRACE ROOF 2 9 13 20 20 19 18 17 16 15 14 12 11 10 8 7 6 5 4 3 1 1 2 3 4 5 6 6 6 6 GROUND FLOOR PLAN FIRST FLOOR PLAN
OUTDOOR EXHIBITION
Double height lobby with angular roof skylight to create a sense of Entry
LOBBY (from North)
NON FICTION SECTION
FICTION SECTION
LOBBY (from South)
Stepped roof terrace garden facing towards the amphitheatre & Exhibition space
ROSE GARDEN
OFF
DROP
HOUSING
Community Housing of Multi- units
03
Sompura , Bangalore
Semester lV
Situated in Sompura, within Bangalore Urban District, the site resides in a developing area, particularly in residential projects in recent years.
Positioned amidst a Mango grove and Eucalyptus plantation, with a stormwater drain running alongside, the aim was to create residential units comprising 1BHK, 2BHK, and 3BHK configurations.
Each floor was staggered to introduce voids, facilitating the integration of green spaces. Emphasizing natural light and ventilation, significant openings were placed on the Northern and Southern facades, capitalizing on the presence of the Mango and Eucalyptus plantations.
All balconies of each unit were consolidated on one side, thereby generating voids within the structure to accommodate green spaces. This arrangement was complemented by staggering each unit, optimizing the utilization of available space and fostering a harmonious integration of nature within the development.
BRIEF
3
1 BHK 2 BHK TYPE
STORM WATER DRAIN
UNIT PLANS TYPE A
BHK
B MANGO GROOVE PLANTATION EUCALYPTUS PLANTATION
Stacking 1BHK (type A & B) , 2BHK & 3BHK on top of eachother creating voids that open towards the South, overlooking the Mango grove Plantation and the adjacent stormwater drain. It optimizes space usage while embracing the natural surroundings, providing residents with picturesque views and ensuring excellent ventilation and natural light.
1
MODULE 2
Stacking 2BHK & 3BHK on top of eachother vertically, creating voids that accommodate semi-open spaces such as balconies. These balconies were oriented towards the North, offering panoramic views of the Eucalyptus Plantation. Which not only maximizes the use of available space but also allows residents to enjoy the serene ambiance and natural beauty of the surrounding plantation.
MODULE
1 BHK 2 BHK 3 BHK
2 BHK 3 BHK 3 BHK 2 BHK
MASTER PLAN
The modules were positioned on the site, staggered to delineate zones for diverse community activities.
1BHK of Module 1 were situated towards the southern region on the ground floor, staggered to form communal gathering areas tailored for both bachelor residents and families within Module 1 units, with orientations towards the Mango Plantation.
Additionally, the primary community gathering spaces, including the amphitheater and clubhouse, were placed between Module 1 and Module 2, fostering interaction and cohesion among residents from both modules.
8 MODULE 1
9 MODULE 2
10 STORM WATER DRAIN
Plantation beside it) 11 EUCALYPTUS PLANTATION
ENTRANCE
SECURITY
AMPHITHEATRE
DEPARTMENT
CLUBHOUSE
SWIMMPING
1
GATE 2
3
4
STORE 5
6
POOL
7 TENNIS COURT
1 2 8 3 9 8 4 5 6 7 9 8 11 10
(Mango
A wall section cutting through the voidsgenerated by staggering each unit showcases their function as semi-open spaces for balconies. Within these voids, vertical gardens adorn each floor, enriching the living environment with greenery and contributing to a harmonious integration of nature within the architectural design.
SECTION
A sectional view through Module 2 reveals the placement of openings for light and ventilation, all oriented towards the North, facing the Eucalyptus Plantation. This arrangement ensures optimal access to natural light and fresh air for the 2BHK and 3BHK units within Module 2, creating views of the lush plantation.
WALL SECTION DETAIL
INTERNSHIP
PAVILION PLAN 1:75 200 x 200mm solid wood columns with metal support in the center. Refer to image for detail. 25 x 50mm MS Purlin to support shingles 50 x 125mm Wooden Rafter Roof Shingles as per spec + 4.1m Below GL - 0.39 m + 2.5 m GL 0 m 75 200mm Wooden Tie beam 50 x 175mm Ridge Board & Hip Rafter Below GL - 1.1 m Below GL - 0.28 m SCHEMATIC SECTION OF FOOTING PP 1:75 01 02 03 04 A B C 1235 2630 6000 9000 3000 3000 3000 3000 3000 SECTION SECTION SECTION SECTION ROOF DETAIL 1:75 200 x 200mm solid wood columns with metal support in the center. Refer to image for support detail. 23° 175 50 175 200 WATER BODY 630 630 630 630 750 750 630 630 630 630 630 630 760 760 50 x 175mm Ridge Board & Hip Rafter 50 x 125mm Wooden Rafter 75 200mm Wooden Tie beam 550 630 725 630 630 10670 725 N Issue Date Contract No. Checked By Drawn By Consultants: Notes: unless mentioned. All measurements are mm Issued Drawing Log Scale 1:100 SUCHETH NAINIKA I0400618 23NOV2021 I1 Plan Sobha Lifestyle- Villa 135 Client Joseph & Jolly Devanahalli Pavilion Drawing Roof detail WATER BODY 75 SECTIONAL DETAIL 1:25 200x200mm solid wood column 20mm thk Stone grouted over Concrete Slab Water body per detail 450 200 20 75 8 200x200mm solid wood column 20mm thk MS bolt 8x50mm thk MS flat to be inserted into the column for support and fastened with screw going through the column 8mm thk MS plate 12mm dia tor steel 450x450mm RCC Pedestal Floating Column Detail 1:10 20mm thk Stone grouted over 75mm thk Concrete Slab 85 20 70 20 35 675 350 75 200 1100 75 200x200mm solid wood column 12mm dia tor steel 8-12mm dia MS stirrups 75mm PCC bed 900x900mm Footing FOUNDATION DETAIL SECTION 1:20 20mm thk Stone grouted over 75mm thk Concrete Slab Y8@200cc 450x450mm RCC Pedestal 50 SECTIONAL DETAIL 1:25 600 75 200x200mm solid wood column Water Body as per detail 20mm thk Stone grouted over 75mm thk WATER BODY SECTIONAL DETAIL 1:25 Water body as per detail 200x200mm solid wood column 75 Water curtain wall 20mm thk Stone grouted over 75mm thk SECTIONAL DETAIL 1:25 Water body per detail column grouted over 75mm thk Concrete Slab Issue Date Contract No. STUDIO Checked By Drawn By Consultants: Notes: unless mentioned. All measurements are mm SUCHETH NAINIKA I0400618 19NOV2021 I1 Column & Pavilion Drawing Slab detail PAVILION PLAN 1:75 25 x 50mm MS Purlin to support shingles + 4.1m 50 x 175mm Ridge Board & Hip Rafter A B C 2630 SECTION SECTION SECTION ROOF DETAIL 1:75 630 760 630 725 PAVILION PLAN 1:75 50 x 175mm Ridge Board & Hip Rafter A B C 2630 SECTION SECTION ROOF DETAIL 1:75 630 760 630 630 630 725 PAVILION PLAN 1:75 A B C 2630 SECTION C SECTION D SECTION P SECTION P 630 630 630 630 750 750 630 630 630 630 630 630 760 760 630 630 10670 725 PAVILION PLAN 1:75 A B C 2630 SECTION C SECTION D SECTION SECTION P 10670 PRIMARY SUITE 21' 3" 22' 6" STEP OUT WALK-IN CLOSET 24' 14' 7" BATHROOM (13' 2391 [7'-10"] (14' 1695 [5'-7"] BATHROOM (13' 11") WALK CLOSET 11") BATHROOM 11" 11' BAR LIBRARY NOOK STUDY 11" 10' SUITE (23' 16' HANG OUT DECK 11") (16' 9") POOL TABLE PWD TOI 11") LIFT LIFT (18' 0") 1495 [4'-11"] D06 D03 900 [2'-11"] D04 1200 [3'-11"] D07 750 [2'-6"] 1800 [5'-11"] 1800 [5'-11"] 1800 [5'-11"] D05 900 [2'-12"] D04 900 [2'-11"] 900 [2'-11"] SD07 W01 2085 [6'-10"] 2135 [7'] 2125 [6'-12"] 5515 [18'-1"] 1400 [4'-7"] W02 1370 [4'-6"] 610 460 [1'-6"] 1830 [6'] W09 W09 1525 [5'] 1525 W20 W20 995 [3'-3"] W21 2240 [7'-4"] W22 W23 1475 [4'-10"] SD05 1000 [3'-3"] FIRST FLOOR PLAN 2405 [7'-11"] 1395 [4'-7"] 2595 [8'-6"] 1420 [4'-8"] 4100 [13'-6"] 2635 [8'-8"] 2430 [7'-12"] 1355 [4'-5"] 3570 [11'-9"] 6800 [22'-4"] 5085 [16'-8"] 7245 [23'-9"] 5110 [16'-9"] 1450 [4'-9"] 2045 [6'-9"] 990 [3'-3"] 2240 [7'-4"] 1070 [3'-6"] 2350 [7'-9"] 2460 [8'-1"] 1415 [4'-8"] 2100 [6'-11"] 590[1'-11"] 2160 [7'-1"] 7295 [23'-11"] 9225 [30'-3"] 1115 [3'-8"] 7325 [24'-1"] 1720 [5'-8"] 1815 [5'-12"] 900 [2'-12"] 1125 [3'-8"] 2035 [6'-8"] 4395 [14'-5"] 4075 [13'-5"] 2830 [9'-4"]1420 [4'-8"] 9475 [31'-1"] 5760 [18'-11"] 2425 [7'-12"] 3520 [11'-7"] 2980 [9'-9"] 5100 [16'-9"] 6520 [21'-5"] W17 765 [2'-6"] 2340 [7'-8"] 2590 [8'-6"] Contract No. 64 Defence Colony, 6th main Indiranagar, Bangalore 38 Ph: 080-42036490 N Checked By Drawn By architecture interiors urban design STUDIO Notes All measurements are mm Client MEP Consultants Address Scale 1:125 Demolition Plan PROJECT SUCHETH NATASHA PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION 2635 [8'-8"] 2265 [7'-5"] 2595 [8'-6"] 1395 [4'-7"] 2425 [7'-12"] 3300 [10'-10"] 5820 [19'-1"] 6760 [22'-2"] PARKING UP DN PWD TOI (4' 6") 5100 [16'-9"] 3250 [10'-8"] 4185 [13'-9"] 6635 [21'-9"] 6485 [21'-3"] LIFT (21' 18' 5475 [17'-12"] 8105 [26'-7"] 2120 [6'-12"] 2980 [9'-9"] 5785 [18'-12"] 3120 [10'-3"] 2265 [7'-5"] 1385 [4'-7"] 2030 [6'-8"] 1655 [5'-5"] 1800 [5'-11"] 5580 [18'-4"] 6560 [21'-6"] 1245 [4'-1"] 2100 [6'-11"] 2155 [7'-1"] 3460 [11'-4"] BATHROOM (13' 11") WALK CLOSET (8' SHOWER BATHROOM 11' 3") 2550 [8'-4"] (18' KITCHEN (19' 11") KITCHEN (10' 13' 4") STORAGE ASHA'S TOILET 1685 [5'-6"] DRESSER 2200 [7'-3"] R1220 [R4'] ALCOVE 900 [2'-12"] D01 900 [2'-11"] 2050 [6'-9"] 2135 [7'] 2085 [6'-10"] D03 750 [2'-6"] D04 900 [2'-11"] 850 [2'-10"] 915 [3'] 750 [2'-6"] SD03 940 [3'-1"] W02 5110 [16'-9"] 2190 [7'-2"] SF01 SF02 1305 [4'-3"] D02 D04 D04 D05 1370 [4'-6"] 610 [2'] W09 W09 W10 W11 2390 [7'-10"] W13 W14 W15 GROUND FLOOR PLAN 1385 [4'-7"] 1385 [4'-7"] 90 [4"] 90 [4"] 1650 [5'-5"] +0.15 +0.30 +0.60 +0.45 W08 5780 [19'] Contract No. 64 Defence Colony, 6th main Indiranagar, Bangalore 38 Ph: 080-42036490 N Checked By Drawn By architecture interiors urban design STUDIO Notes Client MEP Consultants Address Scale 1:125 Demolition Plan PROJECT SUCHETH NATASHA PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION WATER BODY 75 1:25 200x200mm solid wood column 20mm thk Stone grouted over Concrete Slab Water body per detail 450 200 20 75 8 200x200mm solid wood column 20mm thk MS bolt 8x50mm thk MS flat to be inserted into the column for support and fastened with screw going through the column 8mm thk MS plate 12mm dia tor steel 450x450mm RCC Pedestal Floating Column Detail 1:10 20mm thk Stone grouted over 75mm thk Concrete Slab 85 20 70 20 35 675 350 75 200 1100 75 200x200mm solid wood column 12mm dia tor steel 8-12mm dia MS stirrups 75mm PCC bed 900x900mm Footing FOUNDATION DETAIL SECTION 1:20 20mm thk Stone grouted over 75mm thk Concrete Slab Y8@200cc 450x450mm RCC Pedestal 50 1:25 600 75 200x200mm solid wood column Water Body as per detail 20mm thk Stone grouted over 75mm thk WATER BODY SECTIONAL DETAIL 1:25 Water body as per detail 200x200mm solid wood column 75 Water curtain wall 20mm thk Stone grouted over thk SECTIONAL DETAIL 1:25 Water body per detail 200x200mm solid wood column grouted over 75mm thk Concrete Slab N Issue Date Contract No. #64, 6th main Defence Colony Indiranagar, Bangalore 38 Ph: 080-40917609 architecture interiors urban design STUDIO Checked By Drawn By Consultants: Notes: unless mentioned. www.studioxs.in All measurements are mm Issued Drawing Log Scale 1:40 SUCHETH NAINIKA I0400618 19NOV2021 I1 Column & Sobha Lifestyle- Villa 135 Client Joseph & Jolly Devanahalli Pavilion Drawing Slab detail
04
Base Plan
Bedi Residence
Drawings
Sobha Villa Pavillion Drawings & Renders
PLAN Home Theater Bar Cabinet ST7 False ceiling 19mm plywood finished in veneer V4 ELEVATION Home Theater Bar Cabinet ST7 1:20 FFL Shelf Shelf Shelf Shelf Shelf Shelf Space for Waste bin Space for Mini Fridge 900 1000 2205 50 900 380 1080 380 1000 450 450 2205 480 380 1080 380 180 25 Shutter made with 19mm thk plywood finished in veneer V4 finished in antique brass paint per spec Ceiling mounted loft shelving unit, as per specs available in the market antique brass 180 60 Two bay hanging shelving unit, as per specs available in the market antique brass Wine glass rack, per specs available in the market antique brass 10mm thk thoughened glass as shelves Drawer front made with 19mm thk plywood 8" handle per reference image Jali front have 50mm plywood finished veneer V4 70mm skirting recessed by 50mm finished veneer V4 Space for Mini Fridge Internal surface of the mini fridge space be finished in veneer V4 Shutter made with 19mm thk plywood finished in veneer V4 Counter top made edges to have 50mm double lipping detail 20mm solid rod finished in antique brass PU paint as per False ceiling @2695mm from FFL 19mm thk plywood laminate L4 Shelf partition made with 19mm plywood, finished in laminate L4 19mm plywood internal surface 70mm skirting recessed by 50mm finished Shelf partition made with 19mm plywood, internal surface finished in laminate L4 mini fridge space be finished in veneer V4 Counter top made edges to have 50mm double lipping detail 10mm thk thoughened glass as shelves TALL STORAGE FLOATING BAR COUNTER rows of Wine glass 1000 2205 SECTIONAL PLAN D- Home Theater Bar Cabinet ST7 550 Drawer Shelf Shelf Shelf Space for Mini Fridge Jali edge have 50mm plywood finished veneer V4 Jali pattern made of veneer V4. CNC cut on both sides as per pattern 19mm thk plywood backing finished in laminate Drawer Shelf partition made with 19mm plywood, internal surface Internal 19mm plywood framework Shutter made with 19mm thk plywood finished in veneer V4 50mm thk elevation plywood finished V4. 200 200 #64, 6th main Defence Colony Indiranagar, Bangalore 38 architecture interiors urban design STUDIO Issued Drawing Log N Checked By Scale Varies Structural Consultants Landscape Consultants www.studioxs.in unless mentioned. Devanahalli Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Jolly Furniture Detail 29NOV2021 Home theater Second Floor Bar Cabinet -ST7
Bar
Sobha Villa Sobha Villa
Lounge Drawings Home Theatre Drawings
Section 1982 DETAIL 75mm thk high density foam 12mm plywood backing finished fabric FP2 per selection plywood framework around the headboard finished veneer V7. wood beading match made with 19mm commercial plywood padding side 19mm thk commercial 19mm plywood backing to the panel wall 65 1:20 commercial plywood with upholstered padding plywood backing 19mm commercial plywood framework Edges finished solid wood beading match veneer V7. Front surface and cove lacquer paint LP5 DETAIL 75mm thk high density foam on 12mm plywood backing finished fabric supply from wall light point lacquer paint LP5 plywood framework around headboard wood beading match veneer V7. 120 120 120 120 19mm commercial plywood support Elevation Headboard plywood framework around the headboard finished veneer V7. wood beading match lacquer paint LP5 75mm thk high density foam on 12mm plywood FP2 per selection Elevation Bed box 1300mm from Mattress Edge padding be rounded. 15mm high backing finished fabric FP3 mounted 19mm thk plywood bed each padding per reference Edge of padding to be rounded as per Detail 1:10 75mm thk high density foam on 12mm plywood backing finished fabric FP2 per selection. Edge of headboard rounded per 19mm plywood backing for LED strip light finished matt PU lacquer paint LP5 19mm thk plywood backing matt PU lacquer paint LP5 65 Bed sides to be upholstered. 15mm high density foam to have 12mm thk plywood backing finished fabric FP3 to Issue Date architecture interiors urban design STUDIO Issued Drawing Log N Checked Notes Landscape Consultants Devanahalli Sobha Lifestyle - Villa 135 Client Joseph Jolly SUCHETH Furniture detail MBR bed Mater Bedroom FF headboard BD3 Section 1:20 1982 175 450 DETAIL 75mm thk high density foam on 12mm plywood backing finished in fabric FP2 per selection plywood framework finished in veneer V7. Edges to finished solid wood beading to match made with 19mm commercial plywood with upholstered padding on all side finished with fabric FP3 19mm thk commercial plywood support mattress 19mm plywood backing the panel wall Sectional Plan Bedroom 04 1:20 SECTION made with 19mm commercial plywood with upholstered padding fabric FP3 19mm thk commercial plywood framework finished in veneer V7. Edges to finished solid wood beading match Front surface and cove be finished in matt lacquer paint LP5 DETAIL 75mm thk high density foam on 12mm plywood backing finished fabric FP2 per selection Cove light to get power supply from wall light point be finished in matt PU lacquer paint LP5 19mm thk commercial around the headboard Edges to finished solid wood beading match veneer V7. STANDARD MATTRESS SIZE 2040 120 1880 120 120 120 19mm thk commercial plywood support 175 3450 Elevation Headboard Top of headboard 1075 1075 19mm thk commercial plywood framework around the headboard Edges finished solid wood beading match veneer V7. Front surface and cove to be finished matt PU lacquer paint LP5 75mm thk high density foam on 12mm plywood backing finished fabric FP2 as per selection FFL Elevation Bed box 1:20 Top 1300mm from FFL Edge padding be rounded. 15mm high density foam have 12mm thk bent plywood backing finished fabric FP3 to be mounted on 19mm thk plywood bed base 7mm spacer between each padding as per Edge padding be rounded as per 1:10 75mm thk high density foam on 12mm plywood backing finished fabric FP2 as per selection. Edge headboard be rounded as per reference 19mm plywood backing for LED strip light finished matt PU lacquer paint LP5 19mm thk plywood backing surface and cove finished matt PU lacquer paint LP5 150 7mm spacer between each padding per reference Edge padding to be rounded. 15mm high density foam have 12mm thk bent plywood Bed sides to be upholstered. 15mm high density foam have 12mm thk plywood backing finished fabric FP3 to be mounted on 19mm thk plywood bed base Issue Date Contract No. Indiranagar, Bangalore 38 Ph: 080-40917609 architecture interiors urban design STUDIO Issued Drawing Log N Checked Drawn By Scale 1:20 measurements are mm Landscape Consultants unless mentioned. Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Jolly SUCHETH NAINIKA I0400618 08DEC2021 Furniture detail MBR bed & Mater Bedroom FF headboard BD3 Section 1982 2045 75mm thk high density foam on 12mm plywood around the headboard Edges finished solid wood beading match Bed base framework made with 19mm with upholstered padding on side finished with fabric FP3 plywood support for 19mm plywood backing mount headbaord Sectional Plan Bedroom 04 made with 19mm commercial plywood 19mm thk commercial plywood backing 19mm thk commercial Edges finished solid lacquer paint LP5 DETAIL 75mm thk high density foam 12mm plywood FP2 per selection Cove light get power supply from wall light point Front surface and cove finished matt PU 19mm thk commercial plywood framework Edges finished solid wood beading match veneer V7. 1830mm 1982mm 2040 1880 120 120 120 120 19mm thk commercial 3450 Elevation Headboard 1075 Elevation Bed box Top headboard 1300mm from FFL 8'' thk Mattress as Edge padding to density foam to have 12mm thk bent plywood backing finished fabric 7mm spacer between each padding per reference Edge padding Detail 75mm thk high density foam on 12mm plywood backing selection. Edge headboard reference 19mm plywood backing LED strip light finished matt lacquer paint LP5 1:10 150 7mm spacer between each padding as per reference Edge padding to be rounded. 15mm high density foam have 12mm thk bent plywood backing finished in fabric FP3 plywood bed base Bed sides upholstered. 15mm high density foam have 12mm thk plywood backing finished in fabric FP3 be mounted on 19mm thk plywood bed base 1:10 7mm spacer between each padding as per reference Bed sides upholstered. 15mm high density foam have 12mm thk plywood backing finished in fabric FP3 plywood bed base rounded as per reference and fabric turn around plywood backing Edge padding rounded as per reference Indiranagar, Bangalore STUDIO N Checked By Drawn Scale 1:20 MEP Consultants Sobha Lifestyle - Villa 135 Mater Bedroom Reference image Headboard Bed Finishes and details per drawing Section 1982 DETAIL 75mm thk high density foam 12mm plywood backing finished fabric plywood framework around the headboard Edges finished solid wood beading match veneer V7. Bed base framework made with 19mm padding on all side finished with fabric FP3 plywood support for 19mm plywood backing mount headbaord the panel wall Sectional Plan Bedroom 04 1:20 commercial plywood 19mm thk commercial plywood backing 19mm thk commercial Edges to finished solid wood beading match lacquer paint LP5 DETAIL Q 75mm thk high density foam 12mm plywood FP2 per selection Cove light get power supply from wall light point to be finished matt PU lacquer paint LP5 plywood framework Edges to finished solid wood beading match veneer V7. 1830mm 1982mm 2040 1880 120 120 120 120 19mm thk commercial 3450 Elevation Headboard Top headboard 1300mm from FFL 1075 1075 plywood framework around the headboard Edges finished solid wood beading to match veneer lacquer paint LP5 75mm thk high density backing finished fabric FP2 as per selection Elevation Bed box Top of headboard 1300mm from FFL thk Mattress as Edge padding to be 12mm thk bent plywood backing finished fabric FP3 be mounted on 7mm spacer between each padding per reference Edge padding Detail 75mm thk high density foam on 12mm plywood backing selection. Edge headboard to be rounded as per 19mm plywood backing LED strip light finished matt PU 19mm thk plywood backing matt PU lacquer paint LP5 1:10 150 7mm spacer between each padding per reference Edge padding to be rounded. 15mm foam backing finished fabric FP3 be mounted on 19mm thk plywood bed base Bed sides be upholstered. 15mm high density foam have 12mm thk plywood backing finished fabric FP3 mounted on 19mm thk plywood bed base Detail 7mm spacer between each padding per reference Bed sides be upholstered. 15mm high density foam have 12mm thk plywood backing finished fabric FP3 plywood bed base Edge of padding be rounded per reference and fabric turn around plywood backing Edge of padding be rounded per reference STUDIO N Checked Drawn Scale 1:20 Sobha Lifestyle - Villa 135 Client Joseph & Jolly Furniture detail MBR bed Mater Bedroom FF headboard BD3 Reference image Headboard Bed Finishes and details per drawing 1:20 175 75mm thk high density backing finished fabric FP2 per selection 19mm commercial Edges finished solid wood beading match Bed base framework commercial plywood with upholstered padding on all side plywood support for mattress 19mm plywood backing Sectional Plan Bedroom 04 Bed base framework made with 19mm with upholstered padding fabric FP3 plywood framework around the headboard finished veneer V7. wood beading match to be finished matt PU lacquer paint LP5 backing finished fabric FP2 per selection Cove light get power supply from wall light DETAIL Front surface and cove lacquer paint LP5 19mm thk commercial Edges finished solid STANDARD MATTRESS SIZE 120 1880 120 120 plywood support 175 85 1:20 Top of 1120 1120 580 580 25 19mm thk commercial Edges finished solid wood beading match Front surface and cove be finished matt 75mm thk high density foam on 12mm plywood backing finished fabric FP2 as per selection 1:20 1725 Top of per spec rounded. 15mm high density foam to have 12mm thk bent plywood 19mm thk plywood bed base 7mm spacer between be rounded per reference 1:10 75mm thk high density foam on 12mm plywood backing finished fabric FP2 per selection. Edge headboard to be rounded as per reference 19mm plywood backing LED strip light finished matt lacquer paint LP5 19mm thk plywood backing surface and cove finished Detail 150 7mm spacer between each padding as per reference Edge padding to be rounded. 15mm high density foam have 12mm bent plywood backing finished in fabric FP3 plywood bed base Bed sides upholstered. 15mm high density foam have 12mm thk plywood backing finished fabric FP3 plywood bed base 1:10 7mm spacer between each padding as per reference Bed sides upholstered. 15mm high density foam have 12mm thk plywood backing finished fabric FP3 be mounted on 19mm thk Edge padding rounded as per reference plywood backing Edge padding rounded as per reference Contract No. #64, main Defence Indiranagar, Bangalore Ph: 080-40917609 architecture interiors STUDIO Issued Drawing N Drawn Structural Consultants Landscape Consultants www.studioxs.in Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Furniture detail MBR bed & Mater Bedroom headboard Reference image Headboard Bed Finishes and details per drawing---Wall Panelling Details Sobha Villa Toilet Drawings Bed Headboard Details
Glass front drawer 990 1610 941 25 940 60 610 2620 460 460 Open Shelf Open Shelf Hanger Space Hanger Space Drawer Drawer Open Shelf Open Shelf Open Shelf Loft space 610 Edge finished REHAU edge banding Inside surfaces finished with Laminate per spec Inside surfaces Laminate as per spec L2 Wardrobe backing made with 19mm plywood finished laminate as per spec Drawer front be made with glass full profile handles Skirting finished laminate as per spec finished laminate & full profile Aluminium profile shutter with glass powder coated matte black as per Glass front drawer Glass front drawer Glass front drawer Guest room SF WALK-IN-WARDROBE W12 & DR4 990 1610 60 Open Shelf Island Chest Of Drawer 610 2300 25 940 610 940 60 2600 2600 460 860 860 1650 950 Drawer Open Shelf Open Shelf Drawer Shoe Rack Shoe Rack Shoe Rack Hanger Space Open Shelf Loft Space Open Shelf Loft Space Mirror All Edge finished in REHAU edge banding Inside surfaces finished with Laminate per spec L2 finished with Laminate per spec L2 Drawer front finished with Laminate per spec L2 Skirting finished laminate as per spec L2 Partition made plywood finished in laminate as per spec L2 Framework plywood finished in laminate as per spec L2 Hanger rod as All Edge finished in REHAU edge banding 200 240 240 Hanger Space Loft space Guest room SF WALK-IN-WARDROBE W12 DR4 Open Shelf Loft space Open Shelf Open Shelf Open Shelf Hanger Space Open Shelf 320 430 Shoe Rack Shoe Rack Shoe Rack All Edge finished in REHAU edge banding Inside surfaces Laminate per spec L2 Inside surfaces Laminate per spec L2 Partition made plywood finished per spec L2 Framework plywood finished per spec L2 Hanger rod as Skirting finished laminate as per spec L2 All Edge finished in REHAU edge banding Storage made with 19mm plywood as per spec L2 2700 Elevation Sliding shutter Sliding shutter Fixed glass panel Fixed glass panel Shutters with Fluted glass metal framework finished anitque brass paint FFL Shutter handle as per reference 2300 650 500 500 650 #64, 6th main Defence Colony Indiranagar, Bangalore 38 architecture interiors urban design STUDIO Issued Drawing Log N Checked By Drawn By Scale 1:20 Notes All measurements are mm MEP Consultants Structural Consultants Landscape Consultants www.studioxs.in unless mentioned. Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Jolly SUCHETH NAINIKA 12OCT2021 Wardrobe Sliding W12/DR4 ELEVATION Rendered image ELEVATION C Rendered image door elevation Bedroom 05 SF Reference image for glass front drawers Reference image for glass front drawer profile handle BENCH WITH TV PANEL 2400 2300 Guest room WARDROBE W11,BN11 SD6 STUDY TABLE 1200 WARDROBES Drawer Drawer Drawer Drawer 1200 2400 2300 Loft space Loft space Drawer Open shelf Open shelf 530 530 Drawer Open shelf Open shelf Open shelf Open shelf 550 530 Guest room WARDROBE W11,BN11 SD6 All Edge finished REHAU edge Laminate L1 finished with Laminate L1 Hanger rod as per spec plywood finished laminate as per spec finished with veneer per with 19+12mm as per spec 1195 2400 595 Openable shutter Openable shutter Openable shutter Openable shutter 595 Drawer Drawer Drawer Drawer 1200 2400 2300 Guest room WARDROBE W11,BN11 SD6 Shutters finished per spec per reference. be @925mm from FFL double plywood finished veneer made with 19mm spec per spec with veneer per with 19mm plywood finished per spec Drawer front spec Artwork inlay to be inline with the veneer inlay inline with the veneer V1 X Y eq 600 eq eq high density foam finished fabric as 19mm commercial backing finished 75mm skirting recessed by 50mm veneer per inlay to be inline 600 High density foam per specs 600 19mm commercial laminate be finished 40x20mm solid wood beading DETAIL Section Guest room WARDROBE W11,BN11 SD6 Guest room SF WARDROBE W11,BN11 SD6 Section 40x20mm solid wood beading wood beading polished match veneer V1 wood beading polished match veneer V1 per spec with 19mm plywood finished per spec wood beading polished match veneer V1 40x20mm solid polished match 60" Television with 19+12mm per spec 60" Television Detail 1:5 10mm router groove 10 Detail 1:5 20x35mm solid wood 10mm router groove for pull out Detail 65 20 4x4mm box groove 20mm solid rod 8mm rod to be Handle detail Supporting knobs per detail powder coated finished matte Indiranagar, Bangalore 38 STUDIO Issued Drawing Log N Checked Scale 1:20 measurements are mm Structural Consultants Landscape Consultants unless mentioned. Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Jolly Wardrobe elevation details W11/L2/SD6 Reference image for Wardrobe handle drawer handle Bedroom 05 SF Elevation Headboard Top headboard bed box edge both sides 3700 160 160 160 160 160 1870 75mm thk high density backing finished fabric FP1 per selection between tufting Sectional Plan Guest Bedroom 1982 Bedbox edges bent plywood. 19mm thk commercial foam on plywood backing finished fabric FP1 per selection 2020 STANDARD MATTRESS SIZE commercial plywood finished PU matte lacquer LP4 Elevation Bed box Mattress as per Top headboard 1250mm from FFL made with 19mm lacquer LP4 Bedbox edges to be rounded made with bent plywood. 1870 Section FFL made with 19mm lacquer LP4. Bed base box be 250mm from per approval 19mm thk commercial plywood support for mattress foam on 12mm plywood backing finished fabric FP1 as per selection Wall be finished Upholstered edges be rounded as Contract No. Indiranagar, Bangalore STUDIO N Drawn Notes MEP Consultants Structural Consultants Landscape Consultants Sobha Lifestyle - Villa 135 Client Joseph & Jolly Furniture detail Guest bed & Guest Bedroom- GF headboard BD1 Reference image for Headboard Bed Finishes and details as per drawing 4mm veneer as per specs mounted onto the commercial plywood Fabric as per selection Individual panels mounted Panel edges be rounded 5mm to form groove betwwen each panel 4mm thk veneer as per False ceiling @3000mm 885 915 915 885 A C D 75mm high density match with headboard 400 Fabric Panel Type 1:10 Fabric Panel Type 1:10 4mm veneer per specs finished on commercial plywood N Checked Drawn Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Jolly Wall Panelling with Bedroom 05 False ceiling @3000mm 885 915 915 885 A 75mm thk high density match with headboard unless mentioned. Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Jolly 5100 600 GYPSUM CEILING 3.0m LVL GYPSUM CEILING 2.7m LVL 2.7m LVL Symbol RCP Legend Gypsum board height specified 100 Electrical Legend WALL BRACKET COVE LIGHT (LED STRIP) LIGHT 1325 1325 SECTION HH FFL Gypsum false ceiling at 3000 mm Space for the main sheer curtain to be mounted 19mm plywood boxing the cove support 150 5600 2400 150 19mm plywood boxing the cove as support for blind Space for the main & sheer curtain be mounted 1:50 SECTION HH' FFL 5100 4200 Gypsum false ceiling at 2700 mm from FFL Gypsum false ceiling 3000 mm from FFL Gypsum false ceiling at 2360 mm from FFL 240 19mm plywood boxing in the cove as support for LED strip light 1:50 ELEVATION A 1:50 ELEVATION 1:50 ELEVATION 1:50 ELEVATION Gypsum false ceiling at 3000mm 3000 150 150 5600 150 600 150 575 Wall panel Refer drawing 1200 345 100 Fixed panel wall study table Refer to drawing Controls for 6A box 01 to be moved near box Gypsum false ceiling at Gypsum false ceiling at 3000mm Space for the LED strip light to be mounted Wardrobe Refer to drawing false ceiling under beam bottom @2360mm from FFL Bench, study table Bed with headboard Refer to drawing 150 550 300 150 Gypsum false ceiling at Gypsum false ceiling at 3000mm Sliding door Refer to drawing Boxing under the beam support false ceiling @ 2360mm from FFL Wardrobe Refer to drawing Wardrobe Refer to drawing Bench with storage - Refer to drawing Gypsum false ceiling at 3000mm Refer to drawing Refer to drawing Gypsum false ceiling Sliding door Refer to drawing 2300 Gypsum false ceiling 6A Socket with switch point to be moved on to the dresser wall 1:50 ELEVATION FFL wall light point to be moved on to the dresser wall 6A point be moved from elevation Bed headboard wall light be moved from elevation Space for the main sheer curtain to be mounted Space for the main be mounted Space for the main sheer curtain to be mounted 2495 #64, 6th main Defence Colony Indiranagar, Bangalore 38 Ph: 080-40917609 architecture interiors urban design STUDIO Issued Drawing Log N Checked Drawn Scale Varies Notes All measurements are mm MEP Consultants Landscape Consultants Devanahalli Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Jolly Elevation, False Ceiling & Lighting Layout I0400618 12OCT2021 Bedroom 05 SF SUCHETH NAINIKA 1:40 ELEVATION FFL 1:40 ELEVATION FFL 1:40 ELEVATION D 1:40 ELEVATION FFL 60" Television 180 290 575 345 1895 100 Fixed panel wall current location 150 1250 150 515 150 2350 1135 1:40 ELEVATION FFL FFL 2495 Fixed panel wall Bed headboard 2300 2130 MOD BOX SWITCH NO. TELEPHONE POINT NO. SOCKET MOD BOX WITH SWITCH No. TV POINT No. RJ 45 SOCKET POINT (23) NOS. SWITCHES (20-25) NO. REGULATOR(22) MOD BOX SWITCH NO.TELEPHONE POINT MOD BOX NO. WAY SWITCH (19) SWITCH 1NO.20A SWITCH(AC) NOTE Switch control Nos socket to MOD BOX NO. WAY SWITCH (19) MOD BOX FOOT LAMP (22) NO. SWITCH (26) NOS. SP SWITCHES (28-30) 1NO.20A DP SWITCH(GYSER) NO. SWITCHES (23) POINT (32a) WALL LIGHT NO. 6A SOCKET (32a) and no. 6A mirror/dresser Issue Date Contract No. #64, 6th main Defence Colony Indiranagar, Bangalore 38 Ph: 080-40917609 architecture interiors urban design STUDIO Issued Drawing Log N Checked By Drawn By Scale 1:40 Notes MEP Consultants Structural Consultants Landscape Consultants www.studioxs.in unless mentioned. Devanahalli Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Jolly Electrical layout & Switch point location 12OCT2021 Bedroom 05 SF NAINIKA Elevation Headboard Top headboard bed box edge on both sides 3700 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 1870 backing finished in fabric FP1 as per selection Self stitch detail between tufting as 1:20 1982 Bedbox edges be rounded made with bent plywood. plywood backing foam on plywood backing finished fabric FP1 per selection commercial plywood finished PU matte Elevation Bed box Top headboard 1250mm from FFL Bed base framework made with 19mm lacquer LP4 Bedbox edges be rounded made with 1870 1:20 2030 Bed base framework made with 19mm lacquer LP4. Bed base box 250mm from per approval 19mm thk plywood backing for headboard plywood support for mattress 75mm thk high density foam on 12mm plywood backing finished fabric FP1 per selection Upholstered edges per reference Contract No. #64, 6th main Defence Colony Indiranagar, Bangalore 38 Ph: 080-40917609 STUDIO N Checked By Landscape Consultants www.studioxs.in Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Jolly I0400618 10DEC2021 Furniture detail Guest bed Guest Bedroom- GF headboard BD1 Reference image for Headboard Bed Finishes and details per drawing 1:20 Top headboard 1250mm from FFL Channel tufting be inline with the 75mm thk high density foam on plywood backing finished fabric between tufting per reference FFL Sectional Plan Guest Bedroom 1:20 thk Mattress per commercial plywood finished PU matte bent plywood. Section 1:20 1982 100 commercial plywood finished PU matte thk Mattress plywood backing 19mm thk commercial 75mm thk high density foam 12mm plywood FP1 as per selection wallpaper WP2 Upholstered edges per reference Issue Date #64, 6th main Defence Colony architecture interiors urban design STUDIO Issued Drawing Log N Checked Drawn By Scale 1:20 measurements are mm unless mentioned. Devanahalli Bangalore Sobha Lifestyle - Villa 135 Client Joseph Jolly Furniture detail Guest bed Guest Bedroom- GF headboard BD1 Reference image for Headboard Bed Finishes and details as per drawing Wardrobe details & render TV PANEL Plan Guest room SF WARDROBE W11,BN11 SD6 WARDROBES Drawer Drawer Drawer Drawer 1200 2400 2300 Guest room WARDROBE W11,BN11 SD6 Drawer front made with 19mm veneer per spec Skirting with veneer as per eq 600 eq eq FFL 19mm plywood backing surfaces be 75mm skirting recessed 50mm finished veneer V1 per inlay inline with the veneer 600 per specs 600 plywood backing be finished laminate L1 external surfaces specs 40x20mm solid polished match Section Section 40x20mm solid polished match Framework V1 Detail Detail Q 10mm router groove pull out 4x4mm box groove antique brass paint support knob 19 Supporting knobs powder coated paint as per spec Reference image for Wardrobe handle drawer handle TV PANEL Guest room SF WARDROBE W11,BN11 SD6 WARDROBES Drawer Drawer Drawer Drawer 1200 2400 2300 Open shelf Open shelf Open shelf Open shelf eq 570 eq Guest room WARDROBE W11,BN11 SD6 plywood finished in laminate as per spec Inside surfaces finished with Openable Openable Openable Openable Drawer Drawer Drawer Drawer 1200 2400 2300 Guest room WARDROBE W11,BN11 SD6 per spec per reference. Handle bottom to be @925mm double plywood finished veneer Drawer front made with 19mm veneer per spec Skirting finished with veneer per Panel wall made with 19mm per spec spec inlay be inline with the veneer X eq 600 eq eq Cushion made with high density foam FFL FFL 19mm plywood backing surfaces be 75mm skirting recessed by 50mm finished veneer V1 per inlay be inline with the veneer 600 per specs 600 plywood backing to be finished laminate L1 All external surfaces to be finished specs 40x20mm solid polished match Section Section 40x20mm solid polished match V1 per spec wood beading polished to match veneer wood beading polished to match veneer Framework made V1 per spec Detail 10 10 Detail 10mm router groove for pull out 4x4mm box groove 20mm solid rod antique brass paint support knob Supporting knobs powder coated finished matte paint as per spec Contract No. #64, main Defence Colony Indiranagar, Bangalore 38 Ph: 080-40917609 STUDIO N Drawn Notes Landscape Consultants www.studioxs.in unless mentioned. NAINIKA Wardrobe elevation details W11/L2/SD6 Reference image for Wardrobe handle drawer handle Bedroom 05 SF TV PANEL Guest room SF WARDROBE W11,BN11 SD6 WARDROBES Drawer Drawer Drawer Drawer 1200 2400 2300 Loft space Loft space Drawer Hanger space Open shelf Open shelf Open shelf 530 530 Drawer Hanger space Open shelf Open shelf Open shelf Open shelf Open shelf 550 530 570 eq eq Guest room WARDROBE W11,BN11 SD6 Edge finished REHAU edge Laminate Laminate finished with Laminate Hanger rod per spec plywood finished laminate per spec finished with Framework made with 19+12mm per spec Openable Openable Openable Openable Drawer Drawer Drawer Drawer 1200 2400 2300 Guest room WARDROBE W11,BN11 SD6 per spec per reference. be @925mm double plywood finished veneer Drawer front made with 19mm veneer per spec with veneer as per with 19mm per spec Drawer front veneer V1 as per spec inlay be inline with the veneer inlay to be inline eq 600 eq eq high density foam finished fabric 19mm plywood backing surfaces be finished 75mm skirting recessed 50mm finished veneer V1 per inlay inline with the veneer 600 per specs 600 19mm commercial be finished laminate L1 external surfaces be finished 40x20mm solid Section Guest room SF WARDROBE W11,BN11 SD6 Guest room WARDROBE W11,BN11 SD6 Section 40x20mm solid wood beading polished to match veneer V1 as per spec Panel wall made with 19mm per spec wood beading polished to match veneer wood beading polished to match veneer 60" Television Framework made with 19+12mm V1 per spec Detail 10mm router groove Detail 1:5 20x35mm solid wood 10mm router groove pull out 4x4mm box groove on 20mm solid rod antique brass paint 8mm rod be support knob 19 Supporting knobs as per detail powder coated finished matte paint as per spec Contract No. Indiranagar, Bangalore STUDIO N Checked Drawn By Scale 1:20 measurements are mm Structural Consultants Landscape Consultants unless mentioned. Bangalore Sobha Lifestyle - Villa 135 Joseph Jolly Wardrobe elevation details W11/L2/SD6 Reference image for Wardrobe handle drawer handle Bedroom 05 SF TV PANEL Plan Guest room SF WARDROBE W11,BN11 SD6 WARDROBES Open shelf Open shelf Open shelf Open shelf 1100 1100 eq 570 eq Guest room WARDROBE W11,BN11 SD6 per spec Skirting finished plywood finished Skirting finished Inside surfaces spec Drawer Drawer Drawer Drawer 1200 2400 2300 Guest room WARDROBE W11,BN11 SD6 per spec per reference. Handle bottom with 19+12mm double plywood Drawer front plywood finished in veneer per Skirting finished with Veneer Bench box finished with veneer per Panel wall made with 19mm per spec veneer V1 per 10x10mm brass inlay be inline X eq 600 Cushion made with high density foam spec FFL FFL plywood backing All internal surfaces be 75mm skirting finished inlay be inline with the veneer 600 per specs 600 plywood backing All internal surfaces to be finished All external surfaces specs polished match veneer V1 Section Section polished match veneer V1 finished with veneer V1 per spec wood beading polished to match wood beading polished to match veneer Framework made double plywood V1 per spec Detail for pull out 10 10 Detail beading as stopper 10mm router groove 10 50 4x4mm box groove antique brass paint support knob Supporting knobs 8mm MS rod powder coated Antique brass paint as per spec Contract No. #64, 6th main Defence Colony Indiranagar, Bangalore 080-40917609 architecture interiors urban design STUDIO N Drawn Notes Landscape Consultants www.studioxs.in NAINIKA I0400618 12OCT2021 Wardrobe elevation details W11/L2/SD6 Reference image for Wardrobe handle drawer handle Bedroom 05 SF 1:20 specs be mounted onto commercial plywood Edges chamfered Fabric selection 12mm thk plywood backing the high density foam. Individual panels mounted 12mm plywood 5mm form groove betwwen each panel 4mm veneer specs be mounted onto False ceiling @3000mm 12mm plywood Headboard made with 75mm thk high density 885 1830 885 line indicated 750 135 885 335 550 915 Fabric Panel Type Fabric Panel Type 1:10 Fabric Panel Type Plaster Edges be chamfered 4mm commercial plywood Contract Indiranagar, Bangalore STUDIO Issued Drawing Log N Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Jolly Wall Panelling with Bedroom 05 SF Bed Headboard Section 1:20 the commercial plywood 75mm high density foam Edges to chamfered 4mm form groove Fabric per selection 12mm thk plywood backing high density foam. DETAIL Individual panels mounted 12mm thk plywood backing. betwwen each panel Veneer panel wall with 4mm thk veneer per specs mounted onto the commercial plywood False ceiling @3000mm C D Head board have 12mm plywood backing. 75mm high density 135 600 715 200 Fabric Panel Type 1:10 Fabric Panel Type 1:10 Edges chamfered 4mm form groove between architecture interiors urban design STUDIO Issued Drawing Log N Notes MEP Consultants Landscape Consultants Sobha Lifestyle - Villa 135 Client Joseph Jolly Wall Panelling with Bedroom 05 I0400618 Bed Headboard 4mm thk veneer V1 per specs mounted onto the commercial plywood panel Fabric per selection Panel edges rounded by 5mm form groove False ceiling @3000mm 885 915 915 75mm thk high density match with headboard 400 515 Fabric Panel Type 1:10 Fabric Panel Type 1:10 Fabric Panel Type Fabric Panel Type 4mm thk veneer per specs finished commercial plywood BENCH WITH Plan STUDY TABLE Hanger space Open shelf Open shelf Hanger space Open shelf Open shelf Open shelf Open shelf 1100 1100 eq 570 Guest room WARDROBE W11,BN11 SD6 finished with Laminate as Drawer front per spec Skirting finished with Veneer V1 with 19mm plywood finished per spec Skirting finished with Veneer Inside surfaces veneer V1 per spec double plywood finished veneer 550 550 550 550 Guest room WARDROBE W11,BN11 SD6 per reference. Handle bottom with 19+12mm as per spec plywood finished veneer per Skirting finished with Veneer Bench box finished Panel wall made plywood finished 40 veneer V1 per Artwork 10x10mm brass 600 600 40 X eq 600 Cushion made with spec plywood backing All internal 75mm skirting surfaces be finished inlay be inline High density foam plywood backing All internal surfaces to be finished All external surfaces veneer V1 per specs wood beading polished match veneer V1 wood beading polished match veneer V1 Drawer Drawer Drawer front finished with veneer plywood finished veneer wood beading polished match wood beading polished match 150 double plywood finished veneer per spec for pull out 10 beading as stopper for the drawer 10mm router groove 10 50 antique brass paint support knob 8mm MS rod Antique brass paint as per spec #64, main Defence Colony Indiranagar, Bangalore 38 architecture interiors urban design STUDIO Issued Drawing Log N Drawn Landscape Consultants www.studioxs.in Devanahalli I0400618 12OCT2021 Wardrobe elevation details W11/L2/SD6 Reference image for Wardrobe handle drawer handle Bedroom 05 SF BENCH WITH Plan STUDY TABLE BN11 SD6 FFL Open shelf Open shelf Open shelf Open shelf 1100 1100 eq 570 Inside Elevation Guest room WARDROBE W11,BN11 SD6 Skirting finished with Veneer V1 with 19mm per spec Skirting finished with Veneer veneer V1 per spec Drawer 550 550 550 550 Outside Elevation Guest room WARDROBE W11,BN11 SD6 with Veneer as Shutter handle per reference. Framework made with 19+12mm as per spec plywood finished veneer per Skirting finished with Veneer Bench box finished spec plywood finished veneer 40 veneer V1 per Drawer Artwork 10x10mm brass X eq 600 Cushion made with spec plywood backing All internal surfaces be specs 10x10mm brass inlay be inline High density foam finished in fabric plywood backing All internal surfaces veneer V1 per wood beading polished match veneer V1 DETAIL Guest room SF WARDROBE W11,BN11 SD6 Guest room SF WARDROBE W11,BN11 SD6 wood beading polished match veneer V1 Drawer Drawer Drawer front finished with veneer 40x20mm solid wood beading wood beading polished match 150 double plywood finished veneer 10mm router groove for pull out 20 beading as stopper for the drawer 1:5 10 50 antique brass paint support knob 1:20 per detail 8mm MS rod Antique brass paint as per spec #64, main Defence Colony Indiranagar, Bangalore 38 architecture interiors urban design STUDIO Issued Drawing Log N Drawn I0400618 12OCT2021 Wardrobe elevation details W11/L2/SD6 Reference image for Wardrobe handle drawer handle Bedroom 05 SF Bedroom 05 Set
ceiling Guest Bedroom
Electrical layout & False
Bed headboard details & render Wardrobe details & render
Bed headboard details
PLAN Home Theater Bar Cabinet ST7 1:20 False ceiling @2695mm from FFL 19mm plywood FFL SECTION C Home Theater Bar Cabinet ST7 1:20 Drawer Shelf Shelf Shelf Shelf Shelf Shelf Space for Waste bin Space for Mini Fridge 40 900 50 540 525 525 525 190 600 380 1080 380 320 330 330 85 1000 450 450 550 550 550 500 50 85 85 25 19mm thk plywood 20mm solid rod finished antique brass paint as per spec Ceiling mounted loft shelving unit, as per specs available the market antique brass 180 60 30 Two bay hanging shelving unit, as per specs available the market antique brass Wine glass rack, as per specs available the market antique brass 10mm thk thoughened glass as shelves Drawer front made with 19mm thk plywood finished veneer V4 8" handle per reference image plywood finished 70mm skirting recessed by 50mm finished veneer V4 Space for Mini Fridge mini fridge space to be finished in veneer 19mm thk plywood Counter top made edges to have 50mm double lipping detail finished antique brass PU paint as per False ceiling 19mm thk plywood framework internal laminate L4 Shelf partition made with 19mm plywood, internal surface 19mm plywood internal surface 70mm skirting recessed by 50mm finished veneer V4 Shelf partition made with 19mm plywood, internal surface Internal surface the mini fridge space to be Counter top made with Marble M4 with edges to have 50mm double lipping detail 10mm thk thoughened glass as shelves rows of Wine glass 1000 2205 SECTIONAL PLAN D- Home Theater Bar Cabinet ST7 1:20 550 550 550 Drawer Shelf Shelf Shelf Space for Mini Fridge 50 500 Jali edge have 50mm plywood finished Jali pattern made veneer V4. CNC cut on both sides as per pattern 19mm thk plywood backing finished laminate Drawer Shelf partition made with 19mm plywood, internal surface finished laminate 50mm thk elevation. Internal 19mm plywood framework finished in laminate Shutter made with 19mm thk plywood finished veneer V4 50 plywood finished V4. #64, 6th main Defence Colony Indiranagar, Bangalore architecture interiors urban design STUDIO Issued Drawing Log N Checked By All measurements are in mm MEP Consultants www.studioxs.in Bangalore Sobha Lifestyle - Villa 135 Client Joseph & Jolly Furniture Detail I0400618 29NOV2021 Home theater Second Floor Bar Cabinet -ST7 PT02 Glass partition as Toilet Partition as per spec CODE DESCRIPTION 900 D02 D03 D07 door with vision panel finished laminate L1 LOCATION door with vision panel BACK OFFICE TOILET CUBICLE D08 2100 2100 900 D06 900 2100 750 2100 finished laminate L1 NOs 5Nos 1No 6Nos mm Flush door with 750 2100 D04 MULTI-PURPOSE HALL mm Flush door vent MALE FEMALE TOILET ENTRY, GYM CRECHE TOILET 1050 PRE FUNCTION 1No 1No mm Flush door finished laminate L1 2100 GYMNASIUM, BOARD CRECHE, INDOOR GAMES POOL TABLE 6No D09 1500 2200 D10 D11 1900 Fixed glass 2200 Glass Double door INSTRUCTOR'S ROOM 1No 1000 Glass door AEROBICS NOTE: FOR ALL EXTERNAL WALLS, DOORS AND GLAZING REFER THE LATEST ARCHITECTURAL DRAWINGS TOILET LADIES CHANGE mm Flush door with IN OUT SS hinges as per spec Mortice Handle and Lock as per specs 1050 Raised threshold in line with the skirting to have 20mm Granite top G1 105 105 200 450 100 45 75 beechwood door frame polished to match the laminate L1 35 mm thk flush door,finished on both sides with laminate L1 Aluminum louvers, louver size 450 200 mm 45 75 mm beechwood door frame polished to match the laminate L1 35 mm thk flush door with laminate L1 on both sides PLAN -D02 -Flush door 1:20 Janitor's room ELEVATION -D02 -Flush door 1:20 1050 LINTEL 2100 mm LINTEL 2100 mm 255 255 Aluminum louvers, louver size 450 200 mm 200 450 100 IN OUT PLAN -D03 -Flush door 1:20 PC Toilet Entry ELEVATION -D03 -Flush door 1:20 750 45 75 beechwood door frame polished to match the laminate L1 35 mm thk flush door,finished on both sides with laminate L1 FFL FFL SS hinges as per spec Mortice Handle and Lock as per specs 45 75 mm beechwood door frame polished to match the laminate L1 35 mm thk flush door with laminate L1 on both sides 1050 50x12mm beech wood architrave frame as per elevation polished to match door laminate 50x12mm beech wood architrave frame as per elevation polished to match door laminate 1050 600 Grab bar @ 850mm Robe hook as per spec Grab bar @ 850mm Robe hook @1050mm as per spec 50 Notes All measurements are mm MEP Consultants Structural Consultants GODREJ AZURE Clubhouse Padur, Chennai 5.22 Door Details Client GODREJ PROPERTIES #64, 6th main Defence Colony Indiranagar, Bangalore 38 architecture interiors urban design STUDIO Issued Drawing Log SUCHETH 1800 350 350 150 600 1200 50 50 PLAN -D04 -Flush door with vision panel 1:20 Pre Function FFL SS hinges as per spec Hafele Handle and Lock as per specs 45 75 mm beechwood door frame polished to match the laminate L1 Vision panel with 8mm thk toughened glass 42 mm thk flush door with laminate L1 on both sides 1800 LINTEL 2200 mm 150 150 45 75 beechwood door frame polished to match the laminate L1 Vision panel with 8mm thk toughened glass 42 mm thk flush door,finished on both sides with laminate L1 ELEVATION -D04 -Flush door with vision panel 1:20 50x12mm beech wood architrave frame as per elevation polished to match door laminate IN OUT 50x12mm beech wood architrave frame polished to match door laminate 50 Concealed Door closer as per specs 1800 350 350 SS hinges as per spec Hafele Handle and Lock as per specs 45 75 mm beechwood door frame polished to match the laminate L1 150 Vision panel with 8mm thk toughened glass 1050 50 50 400 42 mm thk flush door with laminate L1 on both sides PLAN -D05 -Flush door with vision panel 1:20 Multipurpose Hall FFL 1800 LINTEL 2200 mm 150 150 45 75 beechwood door frame polished to match the laminate L1 Vision panel with 8mm thk toughened glass 42 mm thk flush door,finished on both sides with laminate L1 ELEVATION -D05 -Flush door with vision panel 1:20 50x12mm beech wood architrave frame as per elevation polished to match door laminate IN OUT 50x12mm beech wood architrave frame polished to match door laminate 50 Concealed Door closer as per specs LINTEL 2200 mm 750 750 Hydraulic Patch fitting as per specs LINTEL 2200 mm PLAN D10 Glass door with fixed glass 1:20 Instructor's Room 950 1050 50 400 100 950 ELEVATION D10 -Glass door with fixed glass 1:20 OPENABLE GLASS DOOR FIXED GLASS FFL IN OUT Lock as per specs 8mm thk toughened glass for fixed panel Handle as per specs 12mm thk toughened glass for the door Hydraulic Patch fitting as per specs Aluminum profile as per specs 12 mm thk clear toughened glass as per specs Hafele Aluminum profile as per specs mm thk clear toughened glass as per specs LINTEL 2200 mm PLAN D11 Glass door 1:20 Aerobics 1000 1050 50 400 ELEVATION D11- Glass door 1:20 OPENABLE GLASS DOOR 12 mm thk clear toughened glass as per specs FFL IN OUT Lock as per specs Handle as per specs 12mm thk toughened glass for the door Hydraulic Patch fitting as per specs GODREJ AZURE Clubhouse Padur, Chennai 5.25 Door Details Client GODREJ PROPERTIES All measurements are mm unless mentioned. IN OUT PLAN D06 Flush door 1:20 Storage Room FFL SS hinges as per spec Mortice Handle and Lock as per specs 1050 45 75 mm beechwood door frame polished to match the laminate L1 35mm flush door with laminate L1 on both sides 900 45 75 beechwood door frame polished to match the laminate L1 35 mm thk flush door,finished on both sides with laminate L1 Surface mounted Door closer as per specs LINTEL 2100 mm ELEVATION -D06 -Flush door 1:20 50x12mm beech wood architrave frame polished to match door laminate 50 50x12mm beech wood architrave frame as per elevation polished to match door laminate 50 PLAN D07 Flush door 1:20 Back Office IN OUT 45 75 beechwood door frame polished to match the laminate L1 35 mm thk flush door,finished on both sides with laminate L1 FFL SS hinges as per spec Mortice Handle and Lock as per specs 1050 45 75 mm beechwood door frame polished to match the laminate L1 35mm flush door with laminate L1 on both sides 900 Surface mounted Door closer as per specs LINTEL 2100 mm ELEVATION -D07 -Flush door 1:20 50x12mm beech wood architrave frame as per elevation polished to match door laminate 50x12mm beech wood architrave frame polished to match door laminate PLAN -D08-Flush door & louvered panel 1:20 Male & Female Toilet Cubicle Mortice Handle and Lock as per specs 45 75 mm beechwood door frame polished to match the laminate L1 35 mm flush door with laminate L1 on both sides 105 105 Aluminum louvers, louver size 450 200 mm 200 450 90 750 IN OUT FFL SS hinges as per spec LINTEL 2100 mm 45 75 beechwood door frame polished to match the laminate L1 35 mm thk flush door,finished on both sides with laminate L1 ELEVATION -D08 -Flush door & louvered panel 1:20 50x12mm beech wood architrave frame as per elevation polished to match door laminate 50x12mm beech wood architrave frame polished to match door laminate 50 CODE DESCRIPTION D05 D07 mm Flush Double door with vision panel mm Flush door LOCATION STORAGE ROOM PC TOILET ENTRY mm Flush Double door with vision panel TOILET CUBICLE D08 1800 2200 D06 900 2100 finished laminate L1 NOs 6Nos mm Flush door with 750 JANITOR'S ROOM 2100 1No 1No 1800 2200 finished laminate MALE FEMALE TOILET ENTRY finished in laminate vent finished laminate L1 CODE LOCATION DESCRIPTION Glass partition per spec per spec GAMES ROOM, BADMINTON COURT, POOL TABLE 6No D09 1500 2200 D11 1900 Fixed glass 2200 INSTRUCTOR'S ROOM 1No 1000 Glass door AEROBICS NOTE: FOR ALL EXTERNAL WALLS, DOORS AND GLAZING REFER TO THE LATEST ARCHITECTURAL DRAWINGS TOILET ROOM Notes measurements are mm GODREJ AZURE Clubhouse Padur, Chennai 5.24 Door Details Client GODREJ PROPERTIES #64, 6th main Defence Colony Indiranagar, Bangalore 38 architecture interiors urban design STUDIO Issued Drawing Log SUCHETH 26/11/2021 1800 350 350 150 1050 50 50 400 PLAN -D04 -Flush door with vision panel 1:20 Pre Function FFL SS hinges as per spec Hafele Handle and Lock as per specs 45 75 mm beechwood door frame polished to match the laminate L1 Vision panel with 8mm thk toughened glass 42 mm thk flush door with laminate L1 on both sides 1800 LINTEL 2200 mm 150 150 45 75 beechwood door frame polished to match the laminate L1 Vision panel with 8mm thk toughened glass 42 mm thk flush door,finished on both sides with laminate L1 ELEVATION -D04 -Flush door with vision panel 1:20 50x12mm beech wood architrave frame as per elevation polished to match door laminate IN OUT 50x12mm beech wood architrave frame polished to match door laminate 50 Concealed Door closer as per specs 1800 350 350 SS hinges as per spec Hafele Handle and Lock as per specs 45 75 mm beechwood door frame polished to match the laminate L1 150 600 Vision panel with 8mm thk toughened glass 1200 1050 50 50 400 42 mm thk flush door with laminate L1 on both sides PLAN -D05 -Flush door with vision panel 1:20 Multipurpose Hall FFL 1800 LINTEL 2200 mm 150 150 45 75 beechwood door frame polished to match the laminate L1 Vision panel with 8mm thk toughened glass 42 mm thk flush door,finished on both sides with laminate L1 ELEVATION -D05 -Flush door with vision panel 1:20 50x12mm beech wood architrave frame as per elevation polished to match door laminate IN OUT 50x12mm beech wood architrave frame polished to match door laminate Concealed Door closer as per specs MEP Consultants Structural Consultants unless mentioned. 5.23 Door Details #64, 6th main Defence Colony Indiranagar, Bangalore 38 architecture interiors urban design STUDIO Issued Drawing Log SUCHETH NAINIKA GODREJ AZURE Clubhouse Padur, Chennai GODREJ PROPERTIES Client IN OUT PLAN D06 Flush door 1:20 Storage Room FFL SS hinges as per spec Mortice Handle and Lock as per specs 1050 45 75 mm beechwood door frame polished to match the laminate L1 35mm flush door with laminate L1 on both sides 900 45 75 beechwood door frame polished to match the laminate L1 35 mm thk flush door,finished on both sides with laminate L1 Surface mounted Door closer as per specs LINTEL 2100 mm ELEVATION -D06 -Flush door 1:20 50x12mm beech wood architrave frame polished to match door laminate 50 50x12mm beech wood architrave frame as per elevation polished to match door laminate 50 PLAN D07 Flush door 1:20 Back Office IN OUT 45 75 beechwood door frame polished to match the laminate L1 35 mm thk flush door,finished on both sides with laminate L1 FFL SS hinges as per spec Mortice Handle and Lock as per specs 1050 45 75 mm beechwood door frame polished to match the laminate L1 35mm flush door with laminate L1 on both sides 900 Surface mounted Door closer as per specs LINTEL 2100 mm ELEVATION -D07 -Flush door 1:20 50x12mm beech wood architrave frame as per elevation polished to match door laminate 50x12mm beech wood architrave frame polished to match door laminate 50 PLAN -D08-Flush door & louvered panel 1:20 Male & Female Toilet Cubicle Mortice Handle and Lock as per specs 45 75 mm beechwood door frame polished to match the laminate L1 35 mm flush door with laminate L1 on both sides 105 105 Aluminum louvers, louver size 450 200 mm 200 450 90 750 IN OUT FFL SS hinges as per spec LINTEL 2100 mm 45 75 beechwood door frame polished to match the laminate L1 35 mm thk flush door,finished on both sides with laminate L1 ELEVATION -D08 -Flush door & louvered panel 1:20 50x12mm beech wood architrave frame as per elevation polished to match door laminate 50x12mm beech wood architrave frame polished to match door laminate 50 DOOR SCHEDULE DESCRIPTION D01 D02 D03 D07 door with vision panel finished laminate LOCATION PC TOILET ENTRY door with vision panel BACK OFFICE MALE FEMALE TOILET CUBICLE D08 2100 900 D06 900 2100 750 2100 mm Flush door with vent NOs 1No 1No 6Nos vent finished laminate L1 JANITOR'S ROOM 1No 1No D04 MULTI-PURPOSE HALL finished laminate TOILET ENTRY, GYM TOILET ENTRY CRECHE TOILET 1050 PRE FUNCTION 1No 1No mm Flush door finished laminate 2100 vent finished laminate L1 PARTITION SCHEDULE CODE LOCATION DESCRIPTION 01 PT02 Glass partition Toilet Partition GYMNASIUM, BOARD CRECHE, INDOOR GAMES & D09 1500 D10 1900 Glass door with Fixed glass Glass Double door 1000 2200 Glass door FOR ALL EXTERNAL WALLS, DOORS AND GLAZING REFER TO THE LATEST ARCHITECTURAL DRAWINGS 1No MENS LADIES LADIES CHANGE MEP Consultants Structural Consultants unless mentioned. GODREJ AZURE Clubhouse Padur, Chennai 5.24 Door Details Client GODREJ PROPERTIES #64, 6th main Defence Colony Indiranagar, Bangalore 38 architecture interiors urban design STUDIO Issued Drawing Log SUCHETH NAINIKA
Sobha Villa
Bar lounge Furniture details Azure Door details Furniture details
Furniture design & details
FFL ELEVATION 1:20 3mm thk dark grey Acrylic sheet on 19mm thk plywood 25mm thk marble slab 600 1145 480 125 20 565 565 370 370 370 FRONT ELEVATION 1:20 8mm wide groove to pull out 1290 1080 SECTION Y SECTION Y 1:20 FFL Metal framework attached to the 19mm thk plywood with 3mm thk acrylic sheet drawer 25mm thk marble slab Metal framework fixed to the 19mm thk plywood framework Angular drawer 25 50 230 1145 125 20 1290 1635 230 520 455 1000 PLAN 1:20 SHOE RACK NAME - B.SHIVANI REG NO - 18ABARC009 CRMUSOA All dimensions are in mm Sheet No. - BUILDING CONSTRUCTION MATERIAL - IX SHOE RACK DRAWINGS - PLAN ELEVATION & SECTION 8 FFL ELEVATION 1:20 3mm thk dark grey Acrylic sheet on 19mm thk plywood 25mm thk marble slab 4 x15mm black metal stand for the shoe rack 600 1145 480 125 20 565 565 370 370 370 FRONT ELEVATION 1:20 FFL 8mm wide groove to pull out 1290 1080 SECTION SECTION - Y 1:20 FFL Metal framework attached to the 19mm thk plywood with 3mm thk acrylic sheet drawer 25mm thk marble slab Metal framework fixed to the 19mm thk plywood framework Angular drawer 25 50 230 1145 125 20 1290 1635 230 520 455 1000 PLAN 1:20 SHOE RACK BUILDING
MATERIAL - IX SHOE RACK DRAWINGS - PLAN ELEVATION & SECTION MISCELLANEOUS 05 Furniture details
CONSTRUCTION
GRANITE LAMINATE TILE LEGEND SYMBOL MATERIAL A C 750 2080 1180 1200 700 1100 500 3000mm x 2650mm 570 Shutter unit Granite counter Granite counter Undermounted sink Granite counter OTG Gas stove with fixed underground outlet Temporary copper vessel for drinking water Mixer BUILDING CONSTRUCTION AND MATERIAL VIII KITCHEN CASE STUDY DRAWINGS - PLAN NAME B.SHIVANI REG NO - 18ABARC009 SEM 9 'A' CMRUSOA 2 all measurements in mm SCALE 1:20 COUNTER LEVEL PLAN KITCHEN Kitchen FFL 100 1mm thk matte laminate 660 40 800 120 820 135 660 260 85 570 170 170 320 Partition made with 19mm plywood finished in white laminate 40mm thk granite slab 15mm thick tiles 300mm×600mm Openable shutter for undermount sink Cutlery Drawer Drawer Pan Drawer Pull out drawer for spices 2900mm 100mm granite skirting with 30mm being recessed 610 170 510 Dummy 300 600 B 2650 400 400 Handles as per specs Ceiling height GRANITE LAMINATE TILE LEGEND SYMBOL MATERIAL A 3000mm 2650mm BUILDING CONSTRUCTION AND MATERIAL VIII KITCHEN CASE STUDY DRAWINGS - ELEVATION NAME B.SHIVANI REG NO 18ABARC009 SEM 9 'A' CMRUSOA 4 all measurements in mm SCALE - 1:20 ELEVATION A KITCHEN Key Plan 1:100 Kitchen FFL Openable shutter Openable shutter Pan Drawer Pan Drawer Openable Shutter 1mm thk matte laminate 40mm thk granite slab 15mm thk tiles 300mm×600mm 500 2900mm 750 180 545 170 250 570 A B C Dummy Shelves for Crockery Shelves for Crockery Shelves for Crockery Shelves for Crockery Shelves for Crockery Shelves for Crockery Loft Space Open shelf for spices 3000 1mm thk matte laminate Partition made with 19mm plywood finished in white laminate 875 875 500 520 500 500 100mm granite skirting with 30mm being recessed Openable shutter with 1mm thk laminate Handles as per specs Handles as per specs Ceiling height GRANITE LAMINATE TILE LEGEND SYMBOL MATERIAL 3000mm 2650mm BUILDING CONSTRUCTION AND MATERIAL VIII KITCHEN CASE STUDY DRAWINGS - ELEVATION NAME - B.SHIVANI REG NO 18ABARC009 SEM 9 'A' CMRUSOA all measurements in SCALE - 1:20 Key Plan 1:100 ELEVATION B KITCHEN A C B 875 800 910 910 875 Loft Space Loft Space Loft Space 500 400 3000mm x 2650mm GRANITE LAMINATE TILE LEGEND SYMBOL MATERIAL BUILDING NAME B.SHIVANI 3 all measurements in mm SCALE 1:20 LOFT LEVEL PLAN KITCHEN Kitchen FFL A C 1mm thk matte laminate 40mm thk granite slab 100mm granite skirting with 30mm being recessed 100 660 100 2900mm Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter 40 600 170 540 790 Open shelf for cups 700 700 200 920 2620 2900 1mm thk matte laminate 1mm thk matte laminate 785 785 910 910 800 790 1240 770 15mm thk tiles 300mm×600mm 1mm thk matte laminate 19mm thk plywood with 1mm thk laminate for open shelves Handles as per specs Ceiling height GRANITE LAMINATE TILE LEGEND SYMBOL MATERIAL C 3000mm x 2650mm ELEVATION - C KITCHEN 1100 1100 1150 1150 Wardrobe FFL Handles as per specs Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter 19mm thk plywood for shutters with laminate as per specs 20mm×100mm granite skirting 19mm thk plywood for shutters with laminate as per specs 900 930 780 120 2000 100 4500 3000 GRANITE LAMINATE LEGEND SYMBOL MATERIAL SCALE - 1:20 OUTSIDE ELEVATION WARDROBE 1100 1100 A 100 440 880 880 4500 550 430 400 BUILDING CONSTRUCTION AND MATERIAL VIII WARDROBE DRAWINGS - PLAN NAME - B.SHIVANI REG NO - 18ABARC009 SEM 9 'A' CMRUSOA 1 all measurements in mm SCALE - 1:20 PLAN WARDROBE 100 340 340 340 170 350 350 520 520 520 520 300 300 300 300 410 840 300 300 300 300 1060 1080 340 340 340 170 350 350 1060 1080 310 310 310 310 FFL Open shelf Open shelf Open shelf Open shelf Open shelf Open shelf Hanger space Loft Space Loft Space Drawer Drawer Open shelf Open shelf Open shelf Open shelf Open shelf Open shelf Hanger space Drawer Drawer Open shelf Open shelf Open shelf Open shelf Open shelf Open shelf Open shelf Open shelf Open shelf Open shelf Open shelf Open shelf Drawer front finished with Laminate as per spec Hanger rod as per spec Framework and partition made with 19mm plywood finished in laminate as per spec Inside surfaces finished with white laminate as per spec 20mm×100mm granite skirting 700 120 100 4500 Framework and partition made with 19mm plywood finished in laminate as per spec No backing, wall painted white only for Loft Space 19mm plywood backing 920 1980 100 4500 3000 Framework and partition made with 19mm plywood finished in white laminate Inside surfaces finished with white laminate as per spec Framework and partition made with 19mm plywood finished in laminate as per spec 19mm plywood backing BUILDING CONSTRUCTION AND MATERIAL VIII WARDROBE DRAWINGS - ELEVATION NAME B.SHIVANI REG NO - 18ABARC009 SEM 9 'A' CMRUSOA 3 all measurements in mm SCALE - 1:20 INSIDE ELEVATION WARDROBE 1100 1100 1150 1150 Wardrobe FFL Handles as per specs Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter Openable shutter 19mm thk plywood for shutters with laminate as per specs 20mm×100mm granite skirting 19mm thk plywood for shutters with laminate as per specs 900 930 780 120 2000 100 4500 3000 GRANITE LAMINATE LEGEND SYMBOL MATERIAL NAME B.SHIVANI all measurements in mm SCALE - 1:20 OUTSIDE ELEVATION WARDROBE 1100 1100 A 100 440 880 880 4500 550 430 400 BUILDING CONSTRUCTION AND MATERIAL VIII WARDROBE DRAWINGS - PLAN NAME - B.SHIVANI REG NO - 18ABARC009 SEM 9 'A' CMRUSOA 1 all measurements in mm SCALE - 1:20 PLAN WARDROBE GRANITE LAMINATE TILE LEGEND SYMBOL MATERIAL A C B Undermount sink unit Shutter unit Dummy Storage unit Storage unit Dummy Dummy Storage unit Shutter unit Dummy Dummy Shutter unit Shutter unit Dummy 180 545 170 250 955 570 530 Dummy 100 700 700 200 920 460 3000mm x 2650mm BUILDING CONSTRUCTION AND MATERIAL VIII KITCHEN CASE STUDY DRAWINGS - PLAN NAME - B.SHIVANI REG NO 18ABARC009 SEM 9 'A' CMRUSOA 1 all measurements in mm SCALE - 1:20 BASE LEVEL PLAN KITCHEN Kitchen FFL 1mm thk matte laminate 120 820 135 660 260 85 570 170 170 320 Partition made with 19mm plywood finished in white laminate 40mm thk granite slab 15mm thick tiles 300mm×600mm Openable shutter for undermount sink Cutlery Drawer Drawer Pan Drawer Pull out drawer for spices 2900mm 100mm granite skirting with 30mm being recessed Dummy 300 600 A B C 2650 2900 400 400 Handles as per specs Ceiling height GRANITE LAMINATE TILE LEGEND SYMBOL MATERIAL A 3000mm x 2650mm BUILDING CONSTRUCTION AND MATERIAL VIII KITCHEN CASE STUDY DRAWINGS - ELEVATION NAME B.SHIVANI REG NO - 18ABARC009 SEM 9 'A' CMRUSOA 4 all measurements in mm SCALE 1:20 ELEVATION - A KITCHEN Key Plan 1:100
Working
Academic Kitchen
Wardobe details
Drawings -
drawings
NORTH ELEVATION 1 A/201 WEST ELEVATION 2 A/202 A - 003 SCALE :50 All measurements in mm. ELEVATIONS NOTES: CABIN DESIGN REG NO. 18ABARC009 SEMESTER SEM LIVING KITCHEN WASHROOM GROUND FLOOR PLAN 1 A/101 14 15 16 FIRST FLOOR PLAN 2 A/102 A - 001 SCALE 1 :50 All measurements in mm. FLOOR PLANS NOTES: CABIN DESIGN STUDENT NAME B.SHIVANI REG NO. 18ABARC009 SEMESTER SEM DOOR WINDOW SCHEDULE NAME DIMENSION NO. DT-01-A DT-02-A SD-01-A WA-01-A WA-02-A WA-03-A WA-04-A 800×2000 750×2000 2600×2200 600×400 1400×600 1600×1000 2800×2200 SECTION AA' 1 A/301 SECTION BB' 2 A/302 A - 002 SCALE :50 All measurements in mm. SECTIONS NOTES: CABIN DESIGN STUDENT NAME B.SHIVANI REG NO. 18ABARC009 SEMESTER SEM 6 DOOR & WINDOW SCHEDULE NAME DIMENSION NO. DT-01-A DT-02-A SD-01-A WA-01-A WA-02-A WA-03-A WA-04-A 800×2000 750×2000 2600×2200 600×400 1400×600 1600×1000 2800×2200 370 410 410 600 150 1455 575 700 770 150 2440 NAME B.SHIVANI REG NO 18ABARC009 CRMUSOA 12 12 - 2022 All dimensions are in mm Sheet No. - BUILDING CONSTRUCTION MATERIAL - IX TOILET DRAWINGS - PLANS 12 B A 480 510 eq eq 510 460 20 320 1030 1030 930 NAME B.SHIVANI REG NO 18ABARC009 CRMUSOA 12 - 12 2022 All dimensions are in mm Sheet No. BUILDING CONSTRUCTION MATERIAL - IX KITCHEN DRAWINGS - PLANS Plan Base unit LEGEND Plywood in Cut section Wooden laminate Marble Grey Laminate 1 480 510 eq eq 510 460 20 410 520 520 520 460 Openable Shutter Unit Pull Out Unit Pull Out Unit Pull Out Unit +3000MM FFL Bottom of Slab +2900MM FFL Loft unit Level +2250MM FFL Bottom of Loft unit +1550MM FFL Bottom of Wall unit +945MM FFL Countertop Level +0.00MM FFL FFL 19mm plywood with 3mm grey acrylic sheet as per specs 45mm thk marble slab for countertop 19mm plywood backing with 1mm veneer laminate as per specs 100mm skirting 100mm skirting Openable Openable Openable Shutter Openable Shutter Openable Shutter Soft Push Drawer Soft Push Drawer Soft Push Drawer Soft Push Drawer Soft Push Drawer Soft Push Drawer Soft Push Drawer Soft Push Drawer Soft Push Drawer All cabinets have soft push and open mechanic system 610 320 545 20 1200 1200 600 130 155 315 300 3510 15mm thk marble tile as per specs for backsplash NAME - B.SHIVANI REG NO - 18ABARC009 CRMUSOA 12 12 2022 All dimensions are in mm Sheet No. BUILDING CONSTRUCTION MATERIAL IX KITCHEN DRAWINGS - ELEVATION Elevation A External Key Plan LEGEND Plywood in Cut section Wooden laminate Marble Grey Laminate 4 C 610 320 2540 NAME B.SHIVANI REG NO 18ABARC009 CRMUSOA 12 12 - 2022 All dimensions are Sheet BUILDING CONSTRUCTION MATERIAL IX KITCHEN DRAWINGS - PLANS LEGEND Plywood in Cut section Wooden laminate Marble Grey Laminate Plan Wall Unit 2 FFL Shelves for Crockery Loft Unit Shelves for glasses Shutter Unit for Ductless Chimney Pull out unit for Storage Shelf for Microwave Shelf for OTG Oven Pull out unit for Storage Cutlery Bowls & Cups Pull out unit for Spices Plates Cutlery Bowls Cups Plates Pull out unit for Storage Shutter unit for Utensils Crockery Shelves for Crockery Crockery Shelves for Glasses/Spices Shelves for glasses Shelves for Glasses/Spices Cutlery Bowls Cups Plates 1020 eq 920 300 1020 1040 490 330 330 680 495 595 595 595 595 310 760 475 700 650 100 605 845 100 19mm plywood for framework 45mm thk marble slab for countertop 19mm plywood backing with 1mm thk white laminate inside +3000MM FFL Bottom of Slab +2900MM FFL Loft unit Level +2250MM FFL Bottom of Loft unit +1550MM FFL Bottom of Wall unit +945MM FFL Countertop Level +0.00MM FFL 100mm skirting 100mm skirting 3510 NAME B.SHIVANI REG NO 18ABARC009 CRMUSOA 12 - 12 - 2022 All dimensions are Sheet BUILDING CONSTRUCTION MATERIAL - IX KITCHEN DRAWINGS - ELEVATION Elevation A Internal Key Plan LEGEND Plywood Cut section Wooden laminate Marble Grey Laminate 5 C Loft unit 480 510 510 460 20 460 1030 1030 930 1205 395 880 2500 3510 NAME B.SHIVANI REG NO - 18ABARC009 CRMUSOA 12 12 2022 All dimensions are in mm Sheet No. BUILDING CONSTRUCTION MATERIAL IX KITCHEN DRAWINGS - PLANS Plan Loft Unit LEGEND Plywood in Cut section Wooden laminate Marble Grey Laminate Glass 3 920 980 575 FFL +3000MM FFL Bottom of Slab +2900MM FFL Loft unit Level +2250MM FFL Bottom of Loft unit +1550MM FFL Bottom of Wall unit +945MM FFL Countertop Level +0.00MM FFL Openable Shutter Openable Shutter Openable Shutter Pull out unit Openable Shutter Openable Shutter Glass unit Openable Shutter Open shelf machine NAME - B.SHIVANI REG NO 18ABARC009 CRMUSOA 12 12 2022 All dimensions are in mm Sheet No. BUILDING CONSTRUCTION MATERIAL - IX KITCHEN DRAWINGS - ELEVATION Elevation B External Key Plan LEGEND Plywood in Cut section Wooden laminate Marble Grey Laminate Glass 6 FFL Shelves for Bar unit Shelves for Shelves for Shelves for Bar unit Shelves for Bar unit Refrigerator Coffee machine Pull out Unit Shutter unit for Sink Shelves for Crockery RO purifier Shelves for Crockery +3000MM FFL Bottom of Slab +2900MM FFL Loft unit Level +2250MM FFL Bottom of Loft unit +1550MM FFL Bottom of Wall unit +945MM FFL Countertop Level +0.00MM FFL 880 880 880 880 350 350 350 350 295 725 295 725 680 760 610 NAME - B.SHIVANI REG NO 18ABARC009 CRMUSOA 12 12 2022 All dimensions are in mm Sheet No. BUILDING CONSTRUCTION MATERIAL - IX KITCHEN DRAWINGS - ELEVATION Elevation B Internal Key Plan LEGEND Plywood in Cut section Wooden laminate Marble Grey Laminate Glass 7 -15MM FFL Bathroom Floor Level +0.00MM FFL +2650MM FFL False ceiling Level +3000MM FFL Slab Level +1200MM FFL WC Ledge Level NAME - B.SHIVANI REG NO - 18ABARC009 All dimensions are in mm Sheet No. - BUILDING CONSTRUCTION TOILET DRAWINGS - PLAN &ELEVATION 13 LIVING KITCHEN WASHROOM GROUND FLOOR PLAN 1 A/101 13 FIRST FLOOR PLAN 2 A/102 - 001 SCALE :50 All measurements mm. FLOOR PLANS NOTES: CABIN DESIGN STUDENT NAME B.SHIVANI REG NO. 18ABARC009 SEMESTER SEM DOOR WINDOW SCHEDULE NAME DIMENSION NO. DT-01-A DT-02-A SD-01-A WA-01-A WA-02-A WA-03-A WA-04-A 800×2000 750×2000 2600×2200 600×400 1400×600 1600×1000 2800×2200 SECTION AA' 1 A/301 SECTION BB' 2 A/302 A - 002 SCALE :50 All measurements mm. SECTIONS NOTES: CABIN DESIGN STUDENT NAME B.SHIVANI REG NO. 18ABARC009 SEMESTER SEM DOOR WINDOW SCHEDULE NAME DIMENSION NO. DT-01-A DT-02-A SD-01-A WA-01-A WA-02-A WA-03-A WA-04-A 800×2000 750×2000 2600×2200 600×400 1400×600 1600×1000 2800×2200 NORTH ELEVATION 1 A/201 WEST ELEVATION 2 A/202 A - 003 SCALE :50 All measurements mm. ELEVATIONS NOTES: CABIN DESIGN REG NO. 18ABARC009 SEMESTER SEM 600 400 -15MM FFL Bathroom Floor Level +0.00MM FFL +1200MM FFL WC Ledge Level +2650MM FFL False ceiling Level +3000MM FFL Slab Level NAME B.SHIVANI REG NO 18ABARC009 CRMUSOA 12 12 2022 All dimensions are in mm Sheet No. BUILDING CONSTRUCTION MATERIAL IX TOILET DRAWINGS - ELEVATION 14 820 410 410 600 150 800 740 1455 575 700 770 150 2440 NAME - B.SHIVANI REG NO 18ABARC009 CRMUSOA 12 12 - 2022 All dimensions are in mm Sheet No. - BUILDING CONSTRUCTION MATERIAL - IX TOILET DRAWINGS - PLANS 12
Kitchen
Cabin design & drawings Toilet design & drawings
design & drawings
The given brief was to design a shelter responding to post natural disasters. Since Nepal being an earthquake prone region we designed a collapsible & modular rescue shelters. Where the user can easily put together or dismantle it. To make it more convenient for the users we gave a material pallete of choice , hence depending on locally available materials they can asssemble the parts together.
Seismic Shield Basic
Group work
Design
Documentation Sketches
Halebidu Temple , Exploded axonometric view hand drafted Group work
Sketches Truss column detail section Column Top Chord Steel plate welded to the chords Bottom chord Web members of pratt truss to give extra support to the top and bottom chords Bolts screwed in between the plate welded to the chords to the I-section column Footing detail - section Column Cleats used to give extra strength at the base Screw and washer to fasten the bolts to the base plate Base plate Bearing plate Z Purlin detail L Shaped steel plates used to screw the the Z purlin to the Top Chord of the truss L plate Anti sag rods to restrain purlins against twist under wind uplift conditions and contribute support during sheeting Z purlins are horizontal beams that sit between the roofing sheets and top chord on the truss, acting as a sheet support to ensure that it is firmly attached & secure in place Top chord Z purlins Top chord Two purlins being secured by a steel plate being screwed to the ends of the two purlins Top chord STUDY OF PORTAL FRAME IN MALUR Bracing detail section Column L shaped steel plate is further screwed to the Bracing members Bracing system is essential to stabilize the main girders during construction, to contribute to the distribution of load effects & to provide restraint to compression of the chords Bracing Member Holes to screw the L shaped steel plate to the section RIDGE DETAIL Roof flashing panel Ridge anti sag rod Connection End Plate is used to connect the two section Beams at the ridge Web stiffener Roof Rafter Beam / section Beam Sleeve support for the C purlins C purlins L shaped steel plate to support the purlins and to secure them to the Beam Roof Sheeting Beam to truss detail Top chord Tie Beam Web members of the Pratt truss L shaped steel plate used to screw the Tie beam to the Top chord of the truss Tie Beam in a section L shaped steel plate used on both side of the tie beam to secure and attach them firmly to the Top Chord of the Truss Bottom chord PURLIN DETAIL (On Roof) shaped are used to screw the the C purlin to the Top Chord of the truss C Purlins are horizontal beams that sit between the roofing sheets and top chord on the truss, acting as sheet support to ensure that it is firmly attached & secure in place Connection End Plate section Beam STUDY OF PORTAL FRAME IN MALUR RIDGE DETAIL Roof flashing panel Ridge anti sag rod Connection End Plate is used to connect the two section Beams at the ridge Web stiffener Roof Rafter Beam section Beam Sleeve support for the C purlins C purlins shaped steel plate to support the purlins and to secure them to the Beam Roof Sheeting Footing detail section Column Cleats used to give extra strength at the base Screw and washer to fasten the bolts to the base plate Base plate Bearing plate
Study of Portal Frames
& Trusses
B.SHIVANI bshivani13@gmail.com +919901455384
hereby declare that this document contains my original academic & personal work.
I,