Skip to main content

Sherif Soliman - Portfolio 2023

Page 1

Portfolio

01

Sherif Soliman

architecture portfolio.

selected works

architecture

2023

2023 selected works 01


Projects

01

2

02

03

04

05

06

07


Contents

08

09

10

11

01

DAR AL-BONIAN - 2

04

02

ALMUSA PRIVATE RESIDENCE

08

03

DAR BIN MAHFOUZ

16

04

DAR SALAH

18

05

DYAR GYM

20

06

STARBUCKS DRIVE-THROUHJ

22

07

ALJABR FAMILY RESIDENCE

24

08

VILLA IN RIYADH

26

09

AL-KHAWAJA RESIDENCE

28

10

PRIVATE VILLA IN AL-TAIF

29

11

EXTERIOR DESIGNS

30

12

MASTERS IN GLOBAL BIM MANAGEMENT - FINAL MASTERS PROJECT

32

12

3


01. DAR AL BONIAN - 2 Project Details: Firm: Mohamed. Bin Mahfouz Consulting Engineering, 2014 Location: Mecca, Saudi Arabia

The Project is located in Mecca city, Saudi Arabia. Mecca, located in a desert valley in western Saudi Arabia, holds immense significance as the most sacred city in Islam. Every year, millions of people make their way to Mecca to participate in the annual Hajj pilgrimage. With a history dating back to the 7th century, the central Masjid al-Haram (Sacred Mosque) is a place of great significance. It encompasses the Kaaba, a cloth-covered cubic structure that holds immense importance in the Islamic faith. The project is a hotel located just a short drive away from Masjid al-Haram, making it an ideal choice for pilgrims visiting the sacred sites and fulfilling their religious obligations. Its proximity to the mosque adds great significance to the project, as it provides a convenient and comfortable place for pilgrims to stay during their visit. The plot area measures 2100 square meters, while the total buildable area is 15693 square meters. The municipality has approved a building factor of 10.25. The building is comprised of a basement and parking floors, along with 5 service floors. These service floors offer various amenities such as a dining area, prayer areas, and electrotechnical services. In addition, there are 20 typical floors in the building. Each floor has an area of 800 SQ.M and could accommodate 22 en-suites, resulting in a total of 440 en-suites. The building features a central Atrium with 4 Panoramic lifts and two emergency staircases. The landlord, the project contractor, and the consultant office are all part of Bin Mahfouz group of companies. The communication with the project stakeholders to gather and coordinate the project requirements went smoothly and effortlessly. The firm was assigned with providing comprehensive architectural and engineering services for the building, overseeing the project from its initial stages to its final completion. We began the Kick-off meeting with the client representative to gain a thorough understanding of the project requirements. The client emphasized the need to prioritize the architectural form of the building before proceeding with the design of the floor plans. We provided various design solutions and then proceeded to develop isometrics zoning to ensure that all client requirements were met. This was then translated into floor plans, which underwent multiple iterations. I was responsible for offering a range of architectural forms and potential solutions for the project’s architectural aspects. Designing the floor plan and creating a concept for the layout. Creating detailed 3D visuals to showcase the architectural exterior. Providing guidance to the drafting team to produce accurate architectural and interior design drawings. Collaborating with the project manager, site engineer, and engineers from different disciplines to ensure coordination.

4

Exterior design 3D Visual Exterior Perpective from the main road

4


Isometric Zoning was developed to visually analyze the project requirements.

A concept study has been created to showcase the intricate geometrical and form creation achieved through the manipulation of a simple rectangle shape. The design explores the use of additions and subtractions to transform the form into something visually captivating.

5


Cross Section X-X

6

Front Elevation drawing

Side Elevation drawing


7


Exterior Architecture design 3D Visual Perspective shows how the Main Building and Family Building are planned

02.ALMUSA PRIVATE RESIDENCE Project Details: Firm: ABEER AKBARI & ASSOCIATES W.L.L - 2023 Location: Al-Ahsa, Saudi Arabia

The Project is situated in Al-Ahsa city, which is located on the western side of Saudi Arabia. Al-Ahsa is renowned for being the biggest self-contained oasis in the world. It encompasses several national historic sites and several of the most ancient documented human settlements, dating back millennia. The date-palm oasis in question holds the distinction of being the largest palm oasis in the world that is completely encircled by sand. The client has requested an opulent architectural and Interior designs for a central Building that will accommodate VIP guests during special events and family gatherings. This design should include a Majlis (sitting hall) and a dining hall capable of seating 60 people, along with additional services and amenities to ensure optimal comfort and a hotel-like atmosphere for the occupants. Aside from the primary building, the customer has requested a separate building for the family, which includes bedroom suites, a living and dining space, and an open kitchen with along with well equipped gym and a spacious swimming pool. Every building is meticulously planned to seamlessly blend into an agricultural environment and farm. The design of the landscape will be overseen by a specialized consultant, and the farm will be conveniently accessible by a main road connected to the main gate. Additionally, there will be designated parking areas for guests. The plot size is roughly 19000 square meters, while the built-up area occupies around 2650 square meters, which accounts for 15% of the overall land area. At first, we had a the introduction session with the client to talk about the project’s needs. After that, we started making bubble zones and diagrams to set the project’s idea and show how circulation would flow and where people could access the project. After that, we started making floor plans and design ideas for the client. Next, we showed them different architectural styles that would work with the project’s style and architecture. I made sure that the design work went smoothly between the client and the engineers office. As part of my job, I designed and draft the architectural design from the idea stage to the schematic stage, as well as prepare the architecture presentation, which included three-dimensional visuals. I was also in charge of the interior design team and made sure that all of their work met the needs of the project. Another of my roles was to keep track of the project’s scope and timeline from the time it began to the time it ended. I also had to make progress reports and time charts. The client was happy with the project results, and the project led to new engagement with the client.

8


9


Project Management We had a kick-off meeting with the client after client signed the agreement and the scope of work was written down. A timeline and list of milestones were made and sent to the client. The time chart was updated and a progress report was made after each stage that showed any differences between actual dates and the dates that were planned. Reports and progress updates were generated with MS Project and other applications.

10


Architectural concept The diagrams serve as an intricate visual narrative that encapsulates the meticulous design process employed to meet the exacting demands of the architectural project. They vividly illustrate the collaborative journey undertaken, where client engagement played a pivotal role at every stage. From the project’s inception, encompassing site planning and preliminary zoning considerations, to the fine-grained delineation of the buildings’ external architectural style, these diagrams provide a window into the client’s active involvement and unwavering commitment to project success. At the outset, during site planning, the client’s insights and requirements were thoughtfully incorporated, ensuring that the project was rooted in their vision. This client-centric approach continued throughout the design process, where their feedback and aspirations were continually integrated into the evolving plans. From the precise zoning of the structures to the selection of architectural styles, the client’s preferences and objectives were not only respected but celebrated, as the project advanced. Ultimately, the diagrams culminate in the final presentation of the project, reflecting the collective efforts of the design team and the client. They stand as a testament to the harmonious synergy between the client’s vision and the expertise of the design professionals, resulting in a project that not only meets but exceeds the established criteria, a true embodiment of the power of collaboration and shared dedication to architectural excellence.

SITE PLAN WAS DONE AT THE EARLY STAGE

ZONING DIAGRAM FOR THE MAIN BUILDING HAD BEEN PRODUCED BASED ON CLIENT REQUIREMENTS

ZONING DIAGRAM FOR THE FAMILY BUILDING HAD BEEN PRODUCED BASED ON CLIENT REQUIREMENTS

MAIN BUILDING ZONING DIAGRAM SITE PLANNING SKETCH SHOW THE BUILDING ZONES AND CIRCULATION FLOW WITH MAIN ACCESS POINTS

Project Master plan The Project Master Plan serves as an in-depth blueprint that meticulously outlines the architectural design and construction details of the buildings, providing a comprehensive guide for their realization. It delves into the structural elements, materials, and layout, ensuring a cohesive and aesthetically pleasing structure. In addition to the architectural aspects, the plan also acknowledges the vital role that the surrounding landscape plays in the overall project. To bring the outdoor spaces to life and create an inviting environment, the responsibility for landscaping has been thoughtfully delegated to a dedicated and experienced landscape consultant. This expert will infuse the project with their creative vision, harmonizing the natural elements with the architectural design, thus contributing to the project’s overall success and beauty. Together, the architectural and landscaping components will combine to create a holistic and visually stunning project.

MAIN BUILDING THE INITIAL LAYOUT WAS DEVELOPED BY TRANSLATING THE BUBBLE ZONE IN ACCORDANCE WITH THE PROJECT REQUIREMENTS.

FAMILY BUILDING THE INITIAL LAYOUT WAS DEVELOPED BY TRANSLATING THE BUBBLE ZONE IN ACCORDANCE WITH THE PROJECT REQUIREMENTS.

11


Ground floor Plan Layout of the Family buildings

12


Ground floor Plan Layout of the Main building

13


Interior design of the main Entrance in the Main Building

Interior design of the Majlis (Sitting hall) in the Main Building

14

Interior design of the dining hall in the Main Building


Exterior Architecture design 3D Visual Perspective shows the architecture style of the front facade of the main Building.

15


03. DAR BIN MAHFOUZ Project Details: Firm: Mohamed. Bin Mahfouz Consulting Engineering, 2013 Location: Mecca, Saudi Arabia The Project is strategically situated in Mecca city, Saudi Arabia, a place of profound spiritual significance in Islam. Nestled within a desert valley in western Saudi Arabia, Mecca draws millions of devout pilgrims every year for the annual Hajj pilgrimage. With a history dating back to the 7th century, its epicenter, the Masjid al-Haram (Sacred Mosque), is a place of unparalleled importance. This iconic mosque houses the revered Kaaba, a cloth-covered cubic structure of immense significance in Islamic faith. Our project, a hotel, is strategically positioned a short drive away from the Masjid al-Haram, in close proximity to the Koday public car parking area. This location makes it an ideal choice for pilgrims visiting these sacred sites and fulfilling their religious obligations. Its close proximity to the mosque adds exceptional value to the project, as it offers a convenient and comfortable place for pilgrims to stay during their visit, contributing to their overall spiritual experience. The project encompasses a plot area of 4136 square meters, with a total buildable area of 14647 square meters. The municipality has approved a building factor of 3.75, allowing construction on 60% of the total plot area. The building itself is structured with a Ground floor, Mezzanine, and basement floors, along with an additional 5 service floors. These service floors are designed to provide a range of amenities, including dining areas, prayer spaces, and electrotechnical services. Furthermore, there are 8 typical floors in the building, with each of the first 6 floors spanning an area of 1950 square meters, and the remaining 2 floors covering 850 square meters. Each floor is configured to accommodate a total of 48 en-suite rooms, resulting in a grand total of 320 en-suite accommodations. Architecturally, the project is divided into three separate buildings, inspired by the Islamic architectural style, with an emphasis on the use of glass and Fiber Glass Reinforced Concrete (GRC). This design aesthetic harmonizes seamlessly with the cultural and spiritual surroundings. In this project, my involvement began at an early stage, collaborating with fellow designers to develop the floor plans. I primary contributed to the design and development of the exterior elevations, played an important role in producing the exterior and interior design drawings, and actively engaged in coordinating with various project stakeholders. Site study

16

Exterior design 3D Visual Exterior Perpective from the main road


The provided architectural style was inspired by the arabian architecture featuring the use of glass and fiber Glass reinforced concrete (GRC).

Site Plan

Typical floor Plan

Front Elevation drawing

17


Exterior design - 3D Visual A view from the main road

04. DAR SALAH Project Details: Firm: Mohamed. Bin Mahfouz Consulting Engineering, 2014 Location: Mecca, Saudi Arabia

The project is situated in the vibrant city of Mecca, Saudi Arabia, specifically in the Al-Azzizya District. Mecca, situated in a desert valley in western Saudi Arabia, is of great importance as the holiest city in Islam. Every year, countless individuals embark on a journey to Mecca to take part in the revered Hajj pilgrimage. Having a rich history that spans centuries, the central Masjid al-Haram (Sacred Mosque) holds immense importance. The Kaaba is a cloth-covered cubic structure that holds immense significance in the Islamic faith. The project is a hotel conveniently situated near Masjid al-Haram, providing a perfect option for pilgrims seeking to visit the sacred sites and fulfill their religious duties. The project gains immense value due to its close proximity to the mosque, offering a convenient and comfortable accommodation option for pilgrims during their visit. The plot area is 746 square meters, with a total buildable area of 6556 square meters. The municipality has granted approval for a building factor of 8.5 and an 80% buildable area based on the total plot area. The building consists of a lower level and multiple levels dedicated to parking and services. These service floors provide a range of amenities, including a dining area, prayer areas, and electrotechnical services. Furthermore, the building consists of 14 standard floors. Every floor has an adequate area of 440 SQ.M and can comfortably fit 8 en-suites, giving a grand total of 112 en-suites. The building features a two emergency staircases and 3 elevators. The landlord, the project contractor, and the consultant office are all affiliated with Bin Mahfouz group of companies. The communication with the project stakeholders to gather and coordinate the project requirements was seamless and efficient. The firm was tasked with providing comprehensive architectural and engineering services for the building, overseeing the project from its initial stages to its final completion. We initiated the Kick-off meeting with the client representative to acquire a comprehensive grasp of the project requirements. We provided various design solutions and then proceeded to develop the architectural plans according to the requirements along with proposals for the external facades. I played a key role in the development of architectural plans alongside fellow designers. Additionally, I took charge of developing the exterior facades, 3D visuals, and presentations. In addition, I was involved in creating the architectural and interior design drawings during the concept and pre-execution phases.

18

18


Typical floor plan

Mezzanine floor plan

Front Elevation

Cross Section

Ground floor plan

19


05. DYAR GYM Project Details: Firm: ABEER AKBARI & ASSOCIATES W.L.L., 2022 Location: Al-Muharraq, Kingdom of Bahrain The Diyar/Green Gym, nestled in the captivating Kingdom of Bahrain’s Diyar Al-Muharraq, is part of a serene oasis within a cluster of seven man-made islands in the Bahraini archipelago. Located approximately 10.5 kilometers to the northeast of the vibrant capital, Manama, this gym benefits from the seamless fusion of natural beauty and modern amenities. Covering a plot area of 1600 square meters, with a usable space of 1175 square meters, this dynamic facility caters to both men and women, offering distinct areas for various fitness preferences. The gym’s well-thought-out layout features a ground floor housing training and gym facilities, with a special highlight being a clear view of the swimming pool, enhancing the experience for women attending training classes. Positioned at the front of the building, a coffee shop serves both gym members and external guests, adding a pleasant touch to the space and fostering a welcoming social environment. Architecturally, the building prioritizes an unobstructed design to maximize space utilization. Terracotta breeze blocks in unique triangle shapes adorn the front facade, while sleek metal sandwich panels provide a striking contrast for the remaining exteriors. In this project, my pivotal role involved comprehensive architectural design, CAD drawings, presentations, and 3D visualizations. I also played a key role in coordinating with the client, gym suppliers, and operators during the crucial conceptual design phase. This collaborative effort aimed to make the Green Gym a testament to innovative design and functionality, offering a vibrant and inviting space for individuals to focus on their health and wellness in Diyar Al-Muharraq.

Exterior design - 3D Visual A view showing the back side of the building. Curtain wall and metal sandwich panels are designed to be both visually appealing and cost-effective, while still serving their intended purpose..

20

Ground floor Plan

First floor Plan


Exterior design - 3D Visual A view to show the front side of the building. The coffee shop features a sleek glass box design, with the other walls made of Terra cotta breeze blocks. This combination adds a unique and eye-catching appeal to the building.

21


06. STARBUCKS DRIVE-THROUGH Project Details: Firm: ABEER AKBARI & ASSOCIATES W.L.L., 2019 Location: Kingdom of Bahrain The project is located in the Kingdom of Bahrain, integrated within an existing commercial development. In response to the client’s request, we are tasked with transforming a 400-square-meter open area into a Starbucks drive-through coffee shop. Our firm’s engagement revolves around presenting a range of design options to the client, providing them with creative choices to consider. Our design approach is two-fold. Firstly, we aim to harmonize the unique architectural style of the area with a modern twist, thus accentuating the local architectural identity. Secondly, we explore the creation of a sleek and contemporary style that infuses a sense of modernity into the existing context. In my role on this project, I bear the responsibility of crafting diverse design options and conducting initial assessments. These assessments are crucial for the client’s evaluation of the project’s feasibility. I’m actively involved in preparing multiple alternative studies, generating 3D visuals, and creating presentations that illuminate the potential directions for this exciting Starbucks drive-through coffee shop venture.

Exterior design - 3D Visual Option - one Option - 2 Visual studi 1

Visual study and final render

Option - 2 Visual studi 2

22

Option - 2 Visual studi 3

Exterior design - 3D Visual Option - Two

22


Exterior design - 3D Visual Option - one Bird’s eye view

An imaginative design option that seamlessly blends modern and metal frames with traditional local design patterns, creating a unique and captivating aesthetic.

Project Location

An innovative design proposal for a coffee shop that includes a convenient drive-through service, as well as an outdoor seating area and a rooftop seating area for customers to enjoy.

23


07. ALJABR FAMILY RESIDENCE Project Details: Firm: ABEER AKBARI & ASSOCIATES W.L.L - 2022 Location: Al-Ahsa, Saudi Arabia The project is situated in the western region of Saudi Arabia, specifically in the city of Al-Ahsa. The land parcel spans 3640 square meters, and the total enclosed space within the building amounts to 4186 square meters, spread across four floors, including the basement, ground floor, first floor, and second floor. Notably, the client expressed a strong desire for a cutting-edge, contemporary aesthetic, both inside and outside the building, signaling a preference for modern architectural styles. Our firm was entrusted with the task of enhancing the architectural plans, conceptualizing the external facades of the structure, and crafting a comprehensive interior design scheme. Additionally, our responsibilities extended to the landscaping aspects of the project. My specific role in this endeavor encompassed the design of the exterior elements, generating detailed 3D renderings of the exteriors, creating architectural presentations, and collaborating closely with the team to adapt the building plans to align with the project’s requirements and the client’s vision. I also assumed the leadership of a team of draftsmen who meticulously crafted the technical drawings, encompassing architectural plans and elevations, in strict accordance with the approved design and material specifications. hroughout the project, we explored a variety of architectural designs, presenting the client with several options, each exemplifying a different architectural style. The selected style was further refined to ensure that it not only met but exceeded the client’s expectations. The chosen materials included natural stone in a soft beige hue, combined with a blend of elegantly curved slates and custom-cut tiles. To add depth and character, we incorporated a fine-textured paint finish in a sophisticated charcoal color, and curtainwall sections that would enhance the building’s overall appeal. This harmonious blend of materials and architectural finesse aimed to create a truly distinctive and modern building that would stand as a testament to our client’s vision and our design expertise.

Exterior design 3D Visual Exterior Perpective from the inner landscape

24


Exterior design night 3D Visual Main Facade

Ground floor plan

Exterior design 3D Visual Perspective shows the architecture style of the buildings and the boundary wall.

25


08. VILLA IN RIYADH, SAUDI ARABIA Project Details: Firm: ABEER AKBARI & ASSOCIATES W.L.L - 2020 Location: Al-Malqa, Riyadh, Saudi Arabia The Project is situated in North Riyadh city; the capital of Saudi Arabia. The plot size is 1560 SQ.M., and the total built-up area is 2480 SQ.M. There are 3 floors in the building: the basement, the ground floor and the first floor. The client wanted functional, practical, modern styles , and aesthetically pleasing for both the inside and outside of the building. The idea for the ground floor is to split the space into two parts that are linked by a path that leads to a nice outdoor space with a water feature and a sunk-in seating area. The main hall, dining area, services, and major entrance are all in the first part, which has a separate entrance for guests. The second part is for the family and has its own entry. The idea was to give each area as much privacy as possible while also making a nice mass that fits in well with the outside scenery. The idea for the ground floor is to split the space into two parts that are linked by a path that leads to a nice outdoor space with a water feature and a sunk-in seating area. The main hall, dining area, services, and major entrance are all in the first part, which has a separate entrance for guests. The second part is for the family and has its own entry. The idea was to give each area as much privacy as possible while also making a nice mass that fits in well with the outside scenery. We started by having a kickoff meeting with the customer to go through their expectations for the project. Once we had established the project’s concept, zones, needs, and circulation and access points, we began developing bubble zones and diagrams. Then, we began conceptualizing layouts and layout options for the customer. We then showed them a variety of contemporary designs that would function well with the project’s intended aesthetic.

We started by having a kickoff meeting with the customer to go through their expectations for the project. Once we had established the project’s concept, zones, needs, and circulation and access points, we began developing bubble zones and diagrams. Then, we began conceptualizing layouts and layout options for the customer. We then showed them a variety of contemporary designs that would function well with the project’s intended aesthetic. The firm scope of work included the design concept of the architecture as well as the interior design till the schematic stage. My rols was to start the architecture concept, design and drafting of the floor plans, and exterior design including the 3D visuals and renders.

SUN DIRECITION

BUBBLE ZONES WERE ESTABLISHED IN THE INITIAL PHASE TO FACILITATE A MORE IN-DEPTH EXPLORATION OF THE PROJECT REQUIREMENTS.

Basement floor plan Exterior design 3D Visual Exterior Perspective from the inner landscape

26

Ground floor plan

26


Exterior design 3D Visual Exterior Perpective from the Main road

27


09. AL-KHAWAJA RESIDENCE Project Details: Firm: ABEER AKBARI & ASSOCIATES W.L.L - 2021 Location: AL-Sehla, Kingdom of Bahrain The project, situated in Bahrain’s northern Sehla region, presented a picturesque canvas for our architectural work. With a plot area of 430 square meters and an expansive buildable area of 609 square meters, the project’s potential was significant. Our firm’s comprehensive scope of work encompassed multiple facets of the project. We undertook a thorough transformation of the exterior facades, infusing new vitality into the building’s aesthetics. This transformation carefully blended classical and modern design elements, achieving the specific post-modern architectural style desired by the client. My role primarily involved enhancing the building’s exteriors, with a particular focus on creating compelling 3D visual representations that brought our designs to life. These visuals bridged the gap between concept and reality, helping clients envision the final outcome.

Beyond the creative aspects, my responsibilities extended to project management and client interactions. I played a key role in coordinating with the consultant office and project contractor, ensuring the seamless translation of our vision into tangible results. This required regular meetings and discussions with various project stakeholders to maintain alignment with project goals and timelines. Additionally, I took charge of site supervision, demanding meticulous attention to detail and precision. I oversaw the implementation of our designs on the construction site, reviewing shop drawings, and ensuring faithful execution of our carefully crafted plans. Throughout the project, our design process was marked by continuous refinement and adjustments to not only meet but exceed the client’s expectations and project goals. The outcome was a harmonious fusion of classical and modern architectural elements, culminating in a post-modern masterpiece that seamlessly blended into its surroundings while making a bold and unique statement.

Ground floor plan

Exterior design 3D Visual Exterior Perpective from the main road

28


10. PRIVATE VILLA IN AL-TAIF Project Details: Firm: FREELANCE PROJECT - 2019 Location: Al-Taif, Kingdom of Saudi Arabia The project is nestled in the vibrant city of Al Taif, situated in the western region of Saudi Arabia. This region’s unique charm and cultural richness offer a captivating backdrop for our architectural endeavor. The property boasts a generous plot area spanning 445 square meters, with a buildable area extending to a spacious 615 square meters. This generous space serves as a canvas for our architectural vision. Our design encompasses three meticulously planned floors: the ground, first, and second. The ground floor is ingeniously divided into two distinct sections, each catering to different aspects of modern living. The first section is thoughtfully designed for the convenience of guests and features a distinct entrance, providing them with a warm and welcoming experience. The second part of the ground floor is dedicated to fulfilling the diverse needs of the family. It is intelligently connected to a well-equipped kitchen, ensuring that meals and snacks can be served with utmost convenience. Additionally, this section incorporates a connected maid room and storage space, ensuring that the daily functioning of the household is as seamless as possible.

Moving to the first floor, our design presents luxurious bedroom suites, where opulence meets comfort. Each suite is meticulously planned to offer essential services and amenities, creating a sanctuary for the residents. In addition to the lavish suites, this floor also accommodates offices and study rooms, providing a productive space for work and learning. The spacious family living hall offers a welcoming and relaxing area for quality time spent together. As the project’s lead architect and interior designer, I was entrusted with the responsibility of delivering a comprehensive design that seamlessly blends both architectural and interior elements. My role also involved guiding and supervising my talented team throughout the design process, ensuring that our vision is brought to life with precision and attention to detail. During the project’s initial phase, I had the privilege of meeting the client in person. This meeting was a crucial step in gaining a visual understanding of their unique requirements and desired style. Armed with this valuable insight, I proceeded to translate these requirements into zoning diagrams and embarked on the creative design process. With dedication and expertise, we are committed to crafting a living space that not only meets but exceeds our client’s expectations, creating a place that truly feels like home.

Ground floor plan

Exterior design 3D Visual Exterior Perpective from the main road

29


11. EXTERIOR DESIGNS In my professional journey, I was privileged to be an integral part of the development of captivating exterior designs for a diverse portfolio of private villas nestled in the picturesque landscapes of Bahrain and Saudi Arabia. This unique experience was marked by a comprehensive involvement in several key aspects of the architectural design process.

Mrs Maysa Al Moubarak, Saudi Arabia

Mrs Maysa Al Moubarak, Saudi Arabia

Project Details:

Project Details:

Firm: ABEER AKBARI & ASSOCIATES W.L.L - 2021 Location: Al Ahsa, Saudi Arabia

Firm: ABEER AKBARI & ASSOCIATES W.L.L - 2020 Location: Moahmdya, Kingdom of Bahrain

3D Visual from the Main road. created using 3DS MAX, V-Ray, Adobe Photoshop

3D Visual from the Main road. created using 3DS MAX, V-Ray, Adobe Photoshop

30


Ibrahim Al-Refai, Jeddah, Saudi Arabia

Mohamed Bahjet Jeddah, Saudi Arabia

Project Details:

Project Details:

Firm: ZODIAC ARCHITECTURE AND INTERIOR DESIGN - 2016 Location: Jeddah, Kingdom of Saudi Arabia

Firm: ZBEER AKBARI & ASSOCIATES W.L.L - 20219 Location: Mohamdya, Kingdom of Bahrain

3D Visual from the Main road. created using 3DS MAX, V-Ray, Adobe Photoshop

3D Visual from the inner landscape. created using 3DS MAX, V-Ray, Adobe Photoshop

31


12. MASTERS IN GLOBAL BIM MANAGEMENT Project Details: Institute/University: Zigurat Global institute of technology, Barcelona, SpainAccredited by: University of Barcelona, 2023 The Final Master Project Report can be viewed via this link https://rb.gy/phgtr The Master Project is a real project simulaexchanging information and feedback at every tion-based exercise to be developed using the Project cycle. The Master’s project, called openBIM approach, from the very beginning “WeZig Building” is a hypothetical office buildof the Master, that we’d been allowed to input ing to be modelled by the participants simulatall the knowledge acquired during the sessions. ing an IPD project. As a team work group we practiced how an Description of the Building:openBIM workflow can develop an integrated project producing all deliverables of a real It is a modern design building, set up by an enBuilding Project and how it enhances the provelope made of an interesting curtain-wall in ject development compared with traditional combination with a core tower, which has 9 methods.The project is a scenario to simulate above-ground stories and 1 basement and a an integrated project delivery throughout the total gross area of approx. 2600 sqm. The 1stlife cycle of the project, allowing the role of the floor level includes an extreme cantilever beowner, in our case carried by the mentor (Jesus coming the protection to the main entrance Alcade), to interact with us as a team from the and also generating a shading public area. beginning,

Exchange Information Requirements (EIR) mandated us to follow ISO19650 and openBIM. We created a real-time BIM Execution Plan (BEP) using Plannerly utilizing Uniclass 2015 for classification . We followed the CDE workflow: Work in Progress, Shared, Published, and Archived. BIM Sync was used as the Common Data Environment. Google Drive was our CDE, allowing the team to use writing software locally.

to facilitate the workflow, we used the BIMsync platform as the single source of truth.

32

The project was initiated by team members who embraced a collaborative working environment throughout the whole project life cycle. We are a collective of designers and engineers hailing from diverse geographical regions and operating across various time zones.

The Building Execution Plan (BEP) was prepared using Plannerly to follow the EIR. The content was divided into Introduction, Project Information, Management, and Technical. The team followed the Business Execution Plan (BEP) and updated it as the project progressed. The Master Information Delivery Plan (MIDP) was followed for complete information.

we embraced the integrated project delivery method to reduce waste and maximize efficiency while delivering high-outcome results to the stakeholders.

For high-quality designs, we chose the right BIM software.To overcome the geographical dispersion of team members across several time zones, we used several communication mechanisms to improve coordination and cooperation. Agile Project Management Tools like Trello let us track project design progress. We used Scrum methodology and Trello for the project. Scrum typically lasted 14 days. After each Scrum, a Sprint Retrospective happened.

In order to facilitate the exchange of model and project information between various software applications, the IFC 2x3 formats were employed. Additionally, the BCF format was utilized to monitor and address issues that arise across different disciplines.

BIM authoring software like Revit was used to create Architectural & Structural models and Archicad for MEP.


BIM authoring software like Revit was used to create Architectural & Structural models and Archicad for MEP. IFC 2x3, format used for coordination, with the help of BIM Collab Zoom for quality check.

Each Ifc model was checked for quality using BIM Collab zoom. Visualization, pdf ’s, dwgs, and native models were stored in our CDE. Other BIM uses were introduced in this Stage such as Clash Detection, 4D Planning, 5D Quantity Takeoff and Field BIM all of which were stored in our CDE.

The conversion of construction models into As-built models involved the addition of necessary information for the operational phase.

Modeling MEP elements in ArchiCAD was particularly time-consuming and labor-intensive. This resulted in MEP modeling taking longer than other models.

We acquired render pictures by utilizing visualization software like Twinmotion and Enscape, which significantly contributed to the process.

In a BIM-based project management system, derived BIM apps are essential for client satisfaction. Solibri and Excel were used to model-estimate cost. Model-based scheduling used Synchro for 4D planning. We used Navisworks to find conflicts in our model to reduce rework during construction. To simplify operation and maintenance, we supplied an excel COBie schedule and all As-built models and drawings at Handover.

Clash detection was performed on all three discipline models, focusing solely on resolving hard clashes. The clash report was uploaded to Bimsync, our Common Data Environment (CDE), and issues were generated in BCF format. These issues were then assigned to the appropriate individual for resolution.

For precise quantity estimations and cost forecasts. The process of performing 5D QTO (Quantity Takeoff) and cost estimation involved the use of both Solibri and Excel.

Revit with BIM interoperability interface was used to create COBie data.

33


portfolio architecture 01 Sherif Soliman

selected projects

2023


Turn static files into dynamic content formats.

Create a flipbook
Sherif Soliman - Portfolio 2023 by sherif eid - Issuu