S HAIMAA GENIDY
ARCHITECTURAL PORTFOLIO
A RC H I T E C T
A SP E LRE CI TLE D 2W0O 2R K3
APRIL 2021 - NOV 2023
S HAIMAA GENIDY
ARCHITECTURAL PORTFOLIO
P R OJ E C T A RC H I T E C T
A SP E LRE CI TLE D 2W0O 2R K3
APRIL 2021 - APRIL 2023
EXPERIENCE II
CURRICULUM VITAE
TA B L E O F C O N T E N T SN T S VIEW MY PORTFOLIO
EDUCATION EDUCATION
(CONTINUED)
EXPERIENCE EXPERIENCE III
1 . AZIZI TOWER, SHEIKH ZAYED ROAD, DUBAI
A competent architect with five years of experience in the Conceptual Design and Detailing of HighRise Towers, Mixed-use Buildings, Seven-star Hospitality, Residential Buildings, and Luxurious
Townhouses and Villas. I have been a key team member in attending and preparing for meetings with prestigious clients like Azizi Group, Dubai Investment Real Estate, Emaar and Al Dar. I have also
POSITION:
2 . DANAH BAY DEVELOPMENT, RAS AL KHAIMAH
worked directly with Project and Design Directors along with various Subconsultants and Engineers.
ARCHITECT
Been on Various Project Design Phases: Pre-concept, Concept, Schematic and Detailed Design. On a different note, I have supervised the execution of Architectural/ Interior/ Structural and MEP Works on Site as well as handling Bill of Quantities for Residential Villa Projects
3 . DAMAC LAGOONS, CENTRAL HUB, DUBAILAND
April 2022 | PMP Certificate - Project Management Professional DIGITAL
-
Diagramming Conceptual Ideas, Programmatic Diagrams and Creating Vignettes
EXPERIENCE IV
CRAFT
-
Performing Site Analysis, Masterplan Diagrams, Plan Configuration Studies & Developmental Statistics
-
Iterating and Detailing the Building Façades through 3D Modelling
MG Building Contracting, Dubai (Dec 2019 Till Jan 2021 | Jun 2018 till Aug 2019 | Summer 2017) Key Responsibilities include the following: -
Attending Regular Meetings with the Engineers in the Ministry of Infrastructure Development
-
Working on the Tender Submission, Mobilization Documents and Calculating Interim Payments
-
Applying for Informational and Construction NOCs and Following Up with RTA for Approvals
-
Preparing the Documents and Applying for Maintenance Permits on the Dubai Municipality Website
-
Supervising Architectural/ Interior/ MEP Works on Site and Meeting the Municipality Engineer through the various phases until Receiving the Completion Certificate
Patron General Contracting, Abu Dhabi - Al Ain (Feb 2020 Till Mar 2021) Key Responsibilities include the following:
Sketching 4. TAKAYA BY UNION PROPERTIES, MOTOR CITY POSITION:DUBAI SketchUp Model-Making
SKILLS
Autodesk Revit - AutoCAD
EXPERIENCE I
Rhinoceros - Grasshopper
Woodwork - Metalwork - Welding
InDesign - Illustrator - Photoshop
Laser Cutting - 3D Printing
GRADUATE ARCHITECT
AE7, Dubai (Apr 2021 - Now) Key Responsibilities include the following:
-
Quantity Surveying and Pricing Quotations for Architectural/ Structural/ MEP Items including Plaster, Paint, Indoor Tiles, Glass / Wooden Partitions, Exterior Pavements in Abu Dhabi and Al Ain
-
Interacting with Civil Engineers, MEP Engineers and Project Managers on Site as well as Reviewing the Quotations/Profiles of Suppliers and Subcontractors
-
Preparing the FAB Bank Documents for the Projects with Clients’ Bank Loans
-
Selecting Finishing/ Material Samples (like Flooring Tiles, Wall Tiles, Lightings, Paint Colors/Textures, Exterior Interlock and Curbstones) as per the Specifications
Azizi Tower, Sheikh Zayed Road - Dubai, UAE (Set to be Second Highest Tower in Dubai)
POSITION: PROJECT ARCHITECT
-
Worked closely with the Design Director on the Design and Zoning of the Hospitality Component of the Tower during the Pre-concept, Concept and Schematic Phases.
-
Handled along with other team members the 3D Revit BIM Model as well as, the Postproduction work on the Sheet Files with all the necessary Annotations, Schedules and Area Plans including BUA, GFA and Leasable Areas.
-
Attended client meetings as well as co-ordination meetings with MEP, Structural, VT, FLS, TIS, Interior and Kitchen Consultants.
-
Reviewed the Client Program Criteria, Dubai Tourism Five Star Hotel Checklist and Dubai Municipality Code making sure the Hospitality Component meets all the Requirements.
Danah Bay Development, Al Marjan Island - Ras Al Khaimah, UAE
POSITION: JUNIOR ARCHITECT
EXPERIENCE II
-
Worked on Developing the Earlier Design that included Three Residential Towers focusing on the Unit Mix, Core Configuration, Interior Apartment Unit Layouts, Ground/ Podium and Basement during Preconcept and Concept Phases.
-
Incorporated MEP Services on the Residential Tower Plans
-
Worked on Various Options for the Residential Tower’s Basement Parking Layout with all the MEP Services, to reach the most efficient Layout.
-
Worked on the Hospitality Component Podium Levels Ground, First and Basement Plans
-
Worked on the Townhouses and Villas during the Concept and Schematic Design Phase
Whitespace Architects, Dubai (Aug 2019 - Dec 2019) Key Responsibilities include the following:
POSITION: ARCH. INTERN
Performing Design Iterations on the Townhouse Plans, Massing, Elevations & Calculating GFAs
Dubai Hills PA21 Buildings - Dubai, UAE
2008 - 2013 | The Oxford School, Dubai, United Arab Emirates - (A-Levels & IGCSE)
CERTIFICATION
-
SHAIMAA GENIDY SHAIMAA | PROJECT GENIDY | ARCHITECT
2013 - 2018 | Bachelor of Architecture, American University of Sharjah - 3.47 CGPA
ABOUT ME
EDEN - The Valley by EMAAR - Townhouses, Community Center, Sales Center - Dubai, UAE
Marassi Development (PHASE II) by EMAAR - Residential Buildings - North Coast, Egypt
K e y
-
Creating Marketing Plans and Elevations by adding Material Textures/ Furniture on Photoshop
EXPERIENCE V
Emkaan Architecture + Engineering Consultancy (Summer 2016) Key Responsibilities include the following:
POSITION:
-
Producing Life Safety Plans for G+4 Buildings as per the Local Codes and Standards
ARCH. INTERN
-
Filling Co-ordination Checklists for Villas and Buildings after revising Architectural, Structural and MEP Drawings and Working on Cloud Revisions then Submitting Revised Drawings
WORKSHOPS
Project Management Professional Course & Parametric Design Courses
RESEARCH RESEARCH
Architecture and the Human Behavior: Sociopetal and Sociofugal Spaces
PART-TIME / POSITIONS SKILLS
Marketing: Starbucks Promoter in Nestle Group | Communication Skills: Highly Rated Translator
LANGUAGES
English - Arabic
PORTFOLIO PORTFOLIO
Professional | https://issuu.com/shaimaa.genidy/docs/professional_portfolio_-_shaimaa_genidy
CONTACT CONTACT
The Farm: A Haptic Space within an In-Process Context
Community/ Social Skills: Mubadala World Tennis Championship Volunteer
Undergraduate | https://issuu.com/shaimaa.genidy/docs/200529_portfolio2020-shaimaagenidy-issuu E-mail | shaimaa.genidy@gmail.com - Mobile | 055-3324969
S HAIMAA GENIDY
ARCHITECTURAL PORTFOLIO
P R OJ E C T A RC H I T E C T
A SP E LRE CI TLE D 2W0O 2R K3
APRIL 2021 - APRIL 2023
TA B L E O F C O N T E N T S 1 . AZIZI TOWER, SHEIKH ZAYED ROAD, DUBAI 2 . DANAH BAY DEVELOPMENT, RAS AL KHAIMAH 3 . DAMAC LAGOONS, CENTRAL HUB, DUBAILAND 4. TAKAYA BY UNION PROPERTIES, MOTOR CITY DUBAI
1. Azizi Tower - Sheikh Zayed Road, Dubai B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
T
U
V
W
N
PROJECT BRIEF:
A
16
1
PLOT LIMIT
2 4400
3
4
4300
5
4300
6
4570
3
1
1
7
48800
4570
A32000
A30000
A20020
Azizi Tower is a super tall mixed-use skyscrapprer located in the only freehold Plot in Sheikh Zayed Road and set to be the second highest tower in Dubai. Initially, the Tower was named Entissar and the plot was owned by Meydan Group with the Tower’s Foundations constructed. Azizi Developments bought this plot from Meydan Group and is currently re-designing the Project with AE7. The Iconic “Azizi Tower” is comprised of the following:
8
4570
X
DUBAI MUNICIPALITY STAMP:
9
4570
10
4570
11
4300
12
4300
PLOT LIMIT
4350
N
KEY PLAN
15
CARPARK
A
TOWER
14
6150
LIBRARY
General Notes: 1. DO NOT SCALE FROM THIS DRAWING.
13
WC
Qibla
RETAIL
NC-PL01A
3375
NC-PL02A
BOH CORRIDOR
7025
H-SL03 3000
7225
2500
HV RISER
7225
NC-PL03A 3375
1975 1200
3375
4500
3025
IT/GSM ROOM 1800
3400
2300
BOH CORRIDOR
CH.W.S.
500
1540 1500
WATER METER
2975
BOH CORRIDOR
LPG
300
2000
3600
RETAIL F. TOILETS
H-SL02
2725 A43012
2375
FHC 1275
6550
950
__ ___ _2__
A45051 BOH CORRIDOR
STORAGE
5525 5725
4425
1100 3000
LOBBY
3000
A45003
3000
/ FIRE __ ___ _1__ SERVICE FIGHTING
800
1000
1000 STAIR PRESS.
__ ___ _8__
1275
BOH CORRIDOR
VIP LOUNGE
2530
T-FL01
4250
1525
E
3050
UP
1400
2525
2100
4687
2975
FIRE ALARM CABINET
5500
3175
2000 2000
STAIR-1
ELEC.RM
TETRA RM./STORAGE
500
4687
BOH
11150 1495
3700
1500 1500
D
11
MAIN DRAIN RISER
3750
3000
STAIR-3
3550
3000
H-GL06
H-GL02
H-GL05
H-GL03
H-GL04
3000 2500
3000
A30000
5750
GARBAGE RM. 3200
5500
H-SH03
3000
4575
H-SH02
3000
PANTRY
BOH
BOH
2450
J + 479.300 FFL + 479.240 SSL
6
5300
Phases. This has been successful through numerous design workshops
FB-PL04
K
involving hand-sketches, tracing paper iterations, and digital forms of sketches
FB-PL03
FB-PL02
DOWN
FB-PL01
5150
PURPOSE OF ISSUE
16450
OPEN TO BELOW
5200
16
D
F
G
H
J
K
L
1
M
N
P
Q
R
S
T
U
B+G+132 FLOORS
W MIXED USE TOWER
V
PLOT NO.: 3350151
A20035
LEVEL 111 FLOOR PLAN (+479.300) SCALE
Project Description:
Note: Interior Design is work in progress, shown for information only
1 : 100
LEVEL 111 FLOOR PLAN (+479.300)
3
1
1
1
PLOT LIMIT
2 4400
3
4
4300
5
4300
6
4570
A32000
A30000
7
48800
4570
8
4570
9
4570
10
4570
11
4300
12
4300
PLOT LIMIT
4350
Drawn AE7
1 : 100
Checked MI
30.10.2023
- Handling along with other team members the BIM model working on the
Sheet originating file: Autodesk Docs://22772800/AT-TO-00-AE7-AR-SHT-HV.rvt
A
TOWER 13240
9850
3. DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE.
4650
__ ___ _6__
H-SL03
__ ___ _3__ A45076
TOILETRIES BULK STORAGE
2725
8987
1500
4587
3000
1000
5525
4450
4250
1525
8875 1475
600
9500
9500
14400
1400
3200
GARBAGE RM.
H-SH03
3000
FRESH LINEN STORAGE
SOILED LINEN (SORTING) 300
16804
H-SH02
3000
4575
20550
7130
3100
3100
6750
UP
3100
825 5150
6250
825
H-SH04
BOH CORRIDOR
+ 390.500 FFL + 390.440 SSL
SOILED LINEN STORAGE
6000
5300
A43022
5950
3300
J
11275
7700
5300
6150
LAU. CHUTE GARB. CHUTE GARBAGE EA.
H-SH01
BMU
__ ___ _3__
1
A20030
6150
H-GL04
H-GL03
STAIR-2
DN
CLEANING SUPPLY STORAGE
H-SL04 3000
3000
4130
15170
H-SL01
H-GL05
400
H
6
TROLLIES STORAGE
H-GL06
SOILED LINEN STORAGE
3900
3500
2780
3200
3000
H-GL02
3650
4687
500 15170
2000
3750
1080
5500
A45002
3000
A30000
7
2200 1295
BOH CORRIDOR
__ ___ _4__
IT/GSM ROOM
6475
POOL PUMP RM.
2
3550
H-GL01
9175
350
8
A45050
5525
UP 4630
2450
__ ___ _4__
A43032 FM STORAGE
5470
3000
STAIR-3
2600
2275
2700 4687
54850
G
SERVICE / FIRE FIGHTING LOBBY
4425
2100
3750
5270
1
9700
T-TL01
800
MAIN DRAIN RISER
4200
F
A20025
3725
1450
700 2000
LPG
1000
4187
BOH CORRIDOR
2000
__ ___ _8__ 4250
3700
FEMALE TOILET
4250
12350
FM STORAGE
H-SL02
A43012
T-FL01
1400
500
E
__ ___ _5__
3600
1630
UP
2375
1475
3175
6900
4200 2300
BOH CORRIDOR
STAIR-1
4900
2000
POOL ABOVE
4200
4962
ELEC.RM
MALE TOILET
2975
2775
11150 1495
3700
4250
and Dubai Municipality Code making sure the Hospitality Component meets
6150
500
3000 5500
14400
POOL
STAIR PRESS.
all the Client Requirements, by leading the Hospitality Team under the
NC-PL01A
FM STORAGE
D
9900
- Reviewing the Client Program Criteria, Dubai Tourism Five Star Hotel Checklist
HV RISER
2100
NC-PL02A
CH.W.S.
2550
1000
meetings with VT (Vertical Transportation), FLS (Fire and Life Safety), Interior
7225
NC-PL03A
3400
7025
WM. ROOM
CH.W.S.
2450
2000 4450
3375
ADMINSTRATIVE OFFICE
9700
3175
ADMINSTRATIVE OFFICE
6150
A45020
5475
5325 4500
3
A30000
4687
10
4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, CIVIL DRAWINGS AND RELEVANT SECTIONS OF THE SPECIFICATION.
CORRIDOR
C
- Attending client meetings and major stakeholders as well as co-ordination
7750
3750
2100
3200
2000
K 2000
5
5150
PURPOSE OF ISSUE
abu dhabi . amman . bratislava . dubai . karbala . oberhausen . pittsburgh www.ae7.com Hassanicor Building, 6th Floor, Al Barsha 1 PO Box 54115 Dubai, UAE P: +971 4 3997758 F: +971 4 3997759
Project Name:
M
AZIZI SHK ZAYED ROAD TOWER PLOT LIMIT
1
PLOT LIMIT
LEVEL 090 FLOOR PLAN (+390.500) SCALE
1 : 100
1
A20035
Project Description:
B+G+132 FLOORS MIXED USE TOWER PLOT NO.: 3350151
Perspectice of the Tower from SZR Side Drawing Title:
LEVEL 090 FLOOR PLAN (+390.500)
Scale
1
1 : 100
Drawn AE7
30.10.2023
Drawing Number
S.GENIDY - ARCHITECT p. 4
APPROVED
Principal Consultant:
9733
9300
GENERAL STORAGE
5200
BMU
BOH Floor
2
JK
DATE
M: +971 50 456 8658 T: +971 4 523 1000 EXT:4455 P.O. BOX: 121385, CONRAD HOTEL, SUITE NO. 1506, 15th FLOOR SHEIK ZAYED ROAD, DUBAI, UAE AZIZIDEVELOPMENTS.COM
L
3
30.10.2023
Client: 14150
4
and InDesign. Working in close proximity with the Senior Graphic Designer
B REV
DETAILED DESIGN PROGRESS SUBMISSION
11600
- Handling the Overall Presentations for the Client Meetings using Powerpoint for color schemes and layout enhancements.
1. DO NOT SCALE FROM THIS DRAWING. 2. DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. DIMENSIONS ARE TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
9
Supervision of the Design Director
General Notes:
BMU 11410
10060
FOOD STORAGE
8640
6150
8610
ADMINSTRATIVE OFFICES
B 2350
in coordination with Continuous Facade Updates that are triggered by the
Design and Kitchen Consultants
4700
ADMINSTRATIVE OFFICE
9540
6967
ADMINSTRATIVE OFFICE
9650
11
Tower Massing, Wind and Facade Consultant Updates
6733
ADMINSTRATIVE OFFICE
4500
meet the Vertical Transportation (VT), Fire and Life Safety (FLS) Requirements,
Checked MI
30.10.2023
Approved JK
30.10.2023
22772800-TO-HT-A11090
Sheet originating file: Autodesk Docs://22772800/AT-TO-00-AE7-AR-SHT-HV.rvt
B
CARPARK
4687
- Iterating different options for the Core Configurations & Space Planning to
A0 Rev.
N
All rights reserved. No part of this drawing may be reproduced or transmitted in any forms by any means without written permission of the copyright holder. © AE7
11895
12
Size
30.10.2023
22772800-TO-HT-A11111
14
Area Plans including BUA, GFA and Leasable Areas.
Approved JK
30.10.2023
Drawing Number
KEY PLAN
15
13
X
DUBAI MUNICIPALITY STAMP: Drawing Title:
Scale
work on the Sheet Files with all the necessary Annotations, Schedules and
JK
AZIZI SHK ZAYED ROAD TOWER PLOT LIMIT
A20020
Revit Model with various Design Options, as well as, doing the Post Production
JK
abu dhabi . amman . bratislava . dubai . karbala . oberhausen . pittsburgh www.ae7.com Hassanicor Building, 6th Floor, Al Barsha 1 PO Box 54115 Dubai, UAE P: +971 4 3997758 F: +971 4 3997759
E
1
JK
Project Name:
Hotel Lobby Level 1
APPROVED
Principal Consultant:
N
Structure, Mechanical, Electrical, Plumbing, Fire and Life Stafety, assisted by
C
JK
DATE
M: +971 50 456 8658 T: +971 4 523 1000 EXT:4455 P.O. BOX: 121385, CONRAD HOTEL, SUITE NO. 1506, 15th FLOOR SHEIK ZAYED ROAD, DUBAI, UAE AZIZIDEVELOPMENTS.COM
PLOT LIMIT B
28.02.2023
Client:
M
2
26.05.2023
CONCEPT DESIGN SUBMISSION
L
3
18.08.2023
A
SCHEMATIC PROGRESS SUBMISSION
EVENING TEA LOUNGE
4
leading the Retail, Car Park, and Residential Components of the project,
30.10.2023
A.1
100% SCHEMATIC DESIGN SUBMISSION
A45085
- Coordinating the Hospitality Component with the Architectural Teams
B A.2
REV
DETAILED DESIGN PROGRESS SUBMISSION
__ ___ _2__
5
A
A30000
3200
2100
3103
3103 5300
1900
CORR. FA.CORR. EA. STAIR PRESS.
Hospitality Component of the Tower during the Pre-concept & Concept
as well as coordinating with other disciplines including but not limited to
2500
H-SH04 HOTEL LIFT LOBBY
STAIR-2
7
2
LAU. CHUTE GARB. CHUTE GARBAGE EA.
2100
H-SH01
H
1
A20030
RETAIL H-SL04 3000
2500
2
14150
8
3000
14150
9500
G
H-SL01 M. TOILETS
A43032
1400
A20025
9500
4687
6150
H-GL01
UP
__ ___ _7__
1
1400
1470
F 9
825
DRAIN
- Working closely with the Design Director on the design and zoning of the
Revizto Clash Reports, and consistent Coordination Meetings
4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, CIVIL DRAWINGS AND RELEVANT SECTIONS OF THE SPECIFICATION.
PRAYER ROOM
4500
C
5950
Concept, 50% Schematic, 100% Schematic Design & Detailed Design
PRAYER ROOM
A45020
12
54850
- Working on the following Design Stages: Pre-Concept,
WC
__ ___ _6__
10
Roles and Responsibilities:
3. DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE.
Qibla
- Residential - apartments and penthouses with their own amenities - Hospitality - a seven-star hotel at the peak of the Tower
2. DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. DIMENSIONS ARE TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
WC
BOH
4687
- Retail & F&Bs - a seven-story Mall at the base of the Tower
B
Size
A0 Rev.
B
All rights reserved. No part of this drawing may be reproduced or transmitted in any forms by any means without written permission of the copyright holder. © AE7
Q
R
S
T
U
V
W
1. Azizi Tower - Sheikh Zayed Road, Dubai
X
DUBAI MUNICIPALITY STAMP:
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
T
U
V
W
X
DUBAI MUNICIPALITY STAMP:
N
KEY PLAN
Amenities Level
CARPARK
CHEF'S OFFICE
N
KEY PLAN
SUPPORT
COOLER
TOWER
HOT
COOKING SUITE
SERVICE
DISH ROOM COLD
CARPARK
PREP
C H D
Hotel Lobby Level
General Notes:
COOLER
TOWER FREEZER
1. DO NOT SCALE FROM THIS DRAWING.
CLEAN
2. DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. DIMENSIONS ARE TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
JANITOR
SOILED DRY STORAGE
3. DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE.
Q
R
S
T
U
V
WASHROOM
WASHROOM
General Notes:
4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, CIVIL DRAWINGS AND RELEVANT SECTIONS OF THE SPECIFICATION.
W
1. DO NOT SCALE FROM THIS DRAWING.
X
2. DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. DIMENSIONS ARE TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
DINING ROOM
DUBAI MUNICIPALITY STAMP:
Hospitality GFA Area Plan
3. DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE.
BIM Schedule with Client vs Proposed Programmatic Areas - Automatically highlights Proposed Areas on the Arch. Plans that do not fit the Area Criteria by the Client
4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, CIVIL DRAWINGS AND RELEVANT SECTIONS OF THE SPECIFICATION.
HOTEL LOBBY LEVEL 3
LEVEL 110 AREA PLAN - ALL DAY DINING SCALE
1 : 300
CHEF'S OFFICE
N
KEY PLAN
SUPPORT
COOLER
HOT
COOKING SUITE
SERVICE
DISH ROOM COLD
CARPARK
PREP
C H D
A
1
LEVEL 125 AREA PLAN - MEP SCALE
: 300 TOTAL1FLOOR AREA SQM SQFT
1954.87
226495.01
DM-LEVEL 110
DEDUCTION FROM FLOOR PLAN (NON-GFA) SQM SQFT
573.55
LEVEL 125M AREA PLAN - MEP
3
COOLER
BALANCE FLOOR PLAN GFA SQM SQFT
SCALE
141019.04
CLEAN
6173.66
1381.32
1 : 300
14868.42
JANITOR
DM-LEVEL 125 M
DRY STORAGE
DEDUCTION FROM FLOOR PLAN (NON-GFA) SQM SQFT 1217.13
SCALE
TOWER
SOILED
1217.13
LEVELS 126-128 AREA PLAN - RESTAURANT
FREEZER
DM-LEVEL 125 TOTAL FLOOR AREA SQM SQFT
4
1 : 300
BALANCE FLOOR PLAN GFA SQM SQFT WASHROOM
13101.10
0.00
TOTAL FLOOR AREA SQM SQFT
WASHROOM
General Notes: 1. DO NOT SCALE FROM THIS DRAWING.
0.00
1259.67
145947.22
DEDUCTION FROM FLOOR PLAN (NON-GFA) SQM SQFT 1259.67
13558.94
DM-LEVEL 126 -128 BALANCE FLOOR PLAN GFA SQM SQFT 0.00
Level
0.00
Level 126 Level 127 Level 128
2. DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. DIMENSIONS ARE TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
DINING ROOM
3. DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE.
DEDUCTION FROM FLOOR PLAN (NON-GFA) SQM SQFT
TOTAL FLOOR AREA SQM SQFT 1284.83 1284.83 1284.83 3854.48
148862.40 148862.40 148862.40 446587.19
189.60 189.60 189.60 568.80
2040.85 2040.85 2040.85 6122.54
BALANCE FLOOR PLAN GFA SQM SQFT 1155.11 1155.11 1155.11 3465.33
12433.52 12433.52 12433.52 37300.55
4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, CIVIL DRAWINGS AND RELEVANT SECTIONS OF THE SPECIFICATION.
GFA COLOR LEGEND RETAIL
F&B GFA Area Plan
RESIDENTIAL
GFA COLOR LEGEND
HOSPITALITY BANQUET-CONFERENCE
RETAIL
NIGHT CLUB-RESTAURANT
4
LEVELS 126-128 AREA PLAN - RESTAURANT SCALE
RESIDENTIAL
ADRENALINE
HOSPITALITY BANQUET-CONFERENCE
1 : 300
VOID / MEP / AMENITIES
NIGHT CLUB-RESTAURANT ?
ADRENALINE
DM-LEVEL 126 -128 TOTAL FLOOR AREA SQM SQFT
Level
Level 126 Level 127 Level 128
1284.83 1284.83 1284.83 3854.48
148862.40 148862.40 148862.40 446587.19
DEDUCTION FROM FLOOR PLAN (NON-GFA) SQM SQFT 189.60 189.60 189.60 568.80
2040.85 2040.85 2040.85 6122.54
BALANCE FLOOR PLAN GFA SQM SQFT 1155.11 1155.11 1155.11 3465.33
12433.52 12433.52 12433.52 37300.55
VOID / MEP / AMENITIES DINING AREA / INDOOR SEATING
100% SCHEMATIC DESIGN SUBMISSION
A.1
18.08.2023
JK
SCHEMATIC PROGRESS SUBMISSION
A
26.05.2023
JK
REV
DATE
APPROVED
PURPOSE OF ISSUE
DINING AREA / INDOOR SEATING
Client:
? M: +971 50 456 8658 T: +971 4 523 1000 EXT:4455 P.O. BOX: 121385, CONRAD HOTEL, SUITE NO. 1506, 15th FLOOR SHEIK ZAYED ROAD, DUBAI, UAE AZIZIDEVELOPMENTS.COM
100% SCHEMATIC DESIGN SUBMISSION SCHEMATIC PROGRESS SUBMISSION PURPOSE OF ISSUE
GFA COLOR LEGEND
abu dhabi . amman . bratislava . dubai . karbala . oberhausen . pittsburgh www.ae7.com Hassanicor Building, 6th Floor, Al Barsha 1 PO Box 54115 Dubai, UAE RETAIL P: +971 4 3997758 F: +971 4 3997759
1 : 300
DM-LEVEL 129
APPROVED
JK
abu dhabi . amman . bratislava . dubai . karbala . oberhausen . pittsburgh www.ae7.com Hassanicor Building, 6th Floor, Al Barsha 1 PO Box 54115 Dubai, UAE P: +971 4 3997758 F: +971 4 3997759
Project Name:
PROPOSED B+G+134 FLOORS ADRENALINE MIXED USE TOWER PLOT NO.: 3350151 Drawing Title:
JK
DATE
Principal Consultant:
RESIDENTIAL
Project Description: NIGHT CLUB-RESTAURANT
SCALE
26.05.2023
M: +971 50 456 8658 T: +971 4 523 1000 EXT:4455 P.O. BOX: 121385, CONRAD HOTEL, SUITE NO. 1506, 15th FLOOR SHEIK ZAYED ROAD, DUBAI, UAE AZIZIDEVELOPMENTS.COM
Adrenaline Zone AZIZI SHK ZAYED HOSPITALITY ROAD TOWER Area Plan Chairman Presentation - Hotel Guest Arrival Sequence BANQUET-CONFERENCE
S.GENIDY - ARCHITECT LEVEL 129 AREA PLAN - ADRENALINE ZONE 2 p. 5
18.08.2023
A
Client:
Principal Consultant:
Project Name:
A.1 REV
AZIZI SHK ZAYED ROAD TOWER
LEVEL 130 AREA PLAN - SKY RESTAURANT
VOID /5 MEP / AMENITIES SCALE
AREA CALCULATIONS
1 : 300
DM-LEVEL 130
6
LEVEL 131 AREA PLAN - OBSERVATION SCALE
1 : 300
DM-LEVEL 131
Project Description:
PROPOSED B+G+134 FLOORS MIXED USE TOWER PLOT NO.: 3350151
2. Danah Bay Development, Ras Al Khaima PROJECT BRIEF:
Danah Bay is an 86,000 sqm premium beach community in Al Marjan Island, Ras Al Khaimah. A resort-style retreat away from the hectic city, equipped with amenities that include community retail, water sports outlets and F&Bs. Danah Bay is a mixed use development by Dubai Investment Real Estate, which envisions attracting different types of investotors and tourists.
“Danah Bay” is comprised of the following: - Luxurious Beach-front Villas - Luxurious Townhouses with Different Typologies - Four-star Hotel with a Beach Club
Overall Island Render
- Residential Tower with Premium Amenities
2.3
Danah Bay Development Hospitality
Aerial View of the Development
Sections
100% Concept Design Report December 2022 - p. 29
3
2
H-1
H-1
H-2
H-2
H-3
H-3
H-4
H-4
H-5
H-6
H-5
H-6
H-7
H-7
H-8
H-8
H-9
H-9
H-10
H-10
3 3
2
H-11
H-11
79700
FOH CIRCULATION
SPECIALITY SUITE (PRESIDENTIAL)
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
- Prepared the Architectural Concept Design Report & Marjan Authority Submissions
- Incorporated the MEP Requirements on the Architectural Plans for the Hotel
STANDARD SUITE
FOH CIRCULATION
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
12.00 m
30-12-2022
DIRTY LINEN
ELEC. RM
ELEC. RM
LOBBY
ELEC. RM
FOH CORRIDOR
HOTEL
ELEC. RM
ELEVATOR LOBBY
FAMILY ROOM
FAMILY ROOM
FAMILY ROOM
FAMILY ROOM FAMILY ROOM
FAMILY ROOM FAMILY ROOM
FAMILY ROOM
FAMILY ROOM
ELEVATOR LOBBY
8.20 m
SEATING AREA
LOBBY
FOH CORRIDOR
12.00 m
FAMILY ROOM
FOH CIRCULATION
FOH CIRCULATION
Danah Bay Development BEVERAGE STORAGE ATTIC / SPARE STORE
FOH CIRCULATION
FOH CIRCULATION
DIRTY LINEN
FAMILY ROOM
FAMILY ROOM
FOH CIRCULATION
ELEC. RM
BEVERAGE STORAGE HOUSE KEEPING & ATTIC / SPARE STORE CLEAN LINEN
ADMINISTRATION
FOH CIRCULATION
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
ELEC. RM
FAMILY ROOM
FAMILY ROOM
FOH CIRCULATION
Longitudinal Section 1 - 1 Longitudinal Section of Danah Bay 5-Star Hotel
Sheets and Revit Schedules
FOH CIRCULATION
FAMILY ROOM
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
12.00 m
FAMILY ROOM
FOH CIRCULATION
FOH CIRCULATION
ADMINISTRATION
the Suite Types, Areas of F&Bs, Offices, Retail and populating the Data in Excel
FAMILY ROOM
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
- Revised the DM code for the Required Car Parking, taking into consideration
STANDARD SUITE FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
and Podium Level 1
FAMILY ROOM
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
- Space Planning and Zoning of the Hospitality Requirements on the Ground
FAMILY ROOM
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
and the Residential Tower
STANDARD SUITE
STANDARD SUITE
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
STANDARD SUITE
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
STANDARD SUITE
STANDARD SUITE
STANDARD SUITE
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
BALCONY
STANDARD SUITE
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
the Hotel Operator (Millennium)
STANDARD SUITE
FOH CIRCULATION
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
- Attended the meetings/ workshops with the Client (Dubai Investments) and
STANDARD SUITE
FOH CIRCULATION
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
FOH CIRCULATION
BALCONY
BALCONY
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
and the Client’s Marketting Research
STANDARD SUITE
FOH CIRCULATION
FOH CIRCULATION
HOTEL LOBBY
FRONT OFFICE
FAMILY ROOM
FAMILY ROOM
8.20 m
FRONT OFFICE
HOTEL LOBBY
PARKING SECTION 01
RETAIL 1
RETAIL 1
BEACH CLUB
12.00 m
PARKING
SEATING AREA
A300
BAR
FAMILY ROOM
BEACH CLUB BOH AREA
BAR
4500 2800 4500
+88.60FFL TOP OF ROOF +85.80FFL +88.60FFL LOWER ROOF
TOP OF ROOF +85.80FFL +81.30FFL LOWER LEVEL ROOF 21 +76.80FFL +81.30FFL LEVEL 20 LEVEL 21 +73.20FFL LEVEL 19
+76.80FFL +69.60FFL LEVEL 20
LEVEL 18
+73.20FFL +66.00FFL LEVEL 19 17 LEVEL +69.60FFL +62.40FFL LEVEL 18 16 LEVEL +58.80FFL +66.00FFL LEVEL LEVEL 17 15 +55.20FFL +62.40FFL LEVEL 14 LEVEL 16 +51.60FFL
LEVEL 13 +58.80FFL LEVEL 15 +48.00FFL LEVEL 12 +55.20FFL LEVEL 14 +44.40FFL 92100
FOH CIRCULATION
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
BALCONY
3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600
Number of Floors taking into consideration the Basement Level Parking Count
SPECIALITY SUITE (PRESIDENTIAL)
TERRACE
ROOF TOP BAR/PUB
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
TERRACE
TERRACE
ROOF TOP BAR/PUB
FOH CIRCULATION
PANTRY
4500 2800
PANTRY
CIGAR LOUNGE
4500
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
HOUSE KEEPING & CLEAN LINEN
- Worked on Different Options for the Residential Tower’s Unit Mix and Total
8400
5000
HOUSE KEEPING & CLEAN LINEN
Layout with all the MEP Services, to reach the most efficient Layout
8400
TERRACE
CIGAR LOUNGE
HOUSE KEEPING & CLEAN LINEN
- Worked on Various Options for the Residential Tower’s Basement Parking
8400
1
4
8400
3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600
HOUSE KEEPING & FOH CIRCULATION CLEAN LINEN
HOUSE KEEPING & FOH CIRCULATION CLEAN LINEN
Podium and Basement Level Planning - Pre-concept and Concept Phases
7400
8400
5000
8400
8400
LEVEL 11
+51.60FFL +40.80FFL LEVEL 13
LEVEL 10
+48.00FFL +37.20FFL LEVEL 12 09 LEVEL +44.40FFL +33.60FFL LEVEL LEVEL 11 08 +30.00FFL +40.80FFL LEVEL LEVEL 10 07 +26.40FFL
+37.20FFL LEVEL 06 LEVEL 09 +22.80FFL
LEVEL 05 +33.60FFL LEVEL 08 +19.20FFL LEVEL 04 +30.00FFL +15.60FFL LEVEL 07 LEVEL 03
+26.40FFL +12.00FFL LEVEL 06 LEVEL 02 +22.80FFL LEVEL 05 +7.00FFL
LEVEL 01
6000
8400
7400
+19.20FFL LEVEL 04
+1.00FFL +15.60FFL GROUND LEVEL 03 -3.50FFL +12.00FFL BASEMENT LEVEL 02
+7.00FFL LEVEL 01
6000
ELEVATOR LOBBY
Unit Mix, Core Configuration, Interior Apartment Unit Layouts, Ground/
8400
8400
ELEVATOR LOBBY
88.60 m
- Worked on Developing the Earlier Component of Three Residential Towers:
S.GENIDY - ARCHITECT p. 6
4200 88.60 m
8400
BEACH CLUB
BEACH CLUB BOH AREA
4500
Roles and Responsibilities:
8400
79700 8400
4200
4500
9300
8400
92100
9300
2 2
1
+1.00FFL GROUND -3.50FFL BASEMENT
4 4
1
2
1 1
2. Danah Bay Development, Ras Al Khaima
A
B
C
D
E
F
G
H
J
K
L
M
N
P
RAK MUN
N
11
1
A2001
A-2
1
A3002
A-3
8400
A-4
A-5
8400
8400
8400
1 BR UNIT- TYPE 1.A
1 BR UNIT- TYPE 2.A
STUDIO-TYPE 1.E
STUDIO-TYPE 1.D
1 BR UNIT-TYPE 3
3 BR CORNER-TYPE 1.A
REFER TO SHEET A4005
REFER TO SHEET A4003
REFER TO SHEET A4004
REFER TO SHEET A4002
REFER TO SHEET A4002
REFER TO SHEET A4004
REFER TO SHEET A4006
2050
1850
6120
4506
W13
BEDROOM A X 05 04
BALCONY A X 04 08
2348
1560
3351
3729
1560
5100
5500
W11
WIC
1375
1850
W8
W1
WIC
1875
1450
650
LIVING/BED SPACE A X 08 02
LIVING/BED SPACE A X 07 02
W1
3925
DR
PURPOSE OF ISSUE
Client:
1
4500
A3001 MASTER BEDROOM 1 A X 09 04
W3
3825 4130
Principal Consultant
1
W1
A2002
abu dhabi . amman
W1
T2-TF-6RAKEZ Amenity Ce
Project Name:
LIVING/DINING A X 05 02
BALCONY A X 08 04
DEV MA
FROSTED GLASS PARTITION
BALCONY A X 07 04
FROSTED GLASS PARTITION
BALCONY A X 05 07
RAS
FROSTED GLASS PARTITION
FROSTED GLASS PARTITION
Project Description:
RESID
FROSTED GLASS PARTITION
FROSTED GLASS PARTITION
2BR CORNER - TYPE 1.B
1 BR UNIT- TYPE 1.B
1 BR UNIT- TYPE 2.B
STUDIO-TYPE 1.C
STUDIO-TYPE 1.B
STUDIO-TYPE 1.A
3 BR CORNER-TYPE 1.A
REFER TO SHEET A4005
REFER TO SHEET A4003
REFER TO SHEET A4004
REFER TO SHEET A4001
REFER TO SHEET A4001
REFER TO SHEET A4001
REFER TO SHEET A4006
Residential Tower Typical Plan
50% Schematic Design
W4
BEDROOM 2 A X 09 05 BEDROOM 3 A X 09 06
100% Schematic Design
FAD
1850
W1
3975
D04 W3
TERRACE A X 09 14
3150 MASTER BATHROOM A X 09 07
1350
3017
1925
2200
1200 1875
D02
4117
W3
D02
1900
DR
2400
W14
W1
CORRIDOR A X 09 13
2000
D02
3200
3250
2355
W1
5440
EAD W1
8451
2000
3200 W5
W6
W6
1450
LIVING/BED SPACE A X 06 02
3200
1600
2555
W13 W1
4025
D02
FAD KED TED
4686 650
W1
W6
ENTRANCE/KITCHEN A X 08 01
W6
2025 3925
IEC
BATHROOM A X 09 08
DB
BALCONY A X 06 04
3
2100
3800
3800
BALCONY A X 03 10
1500
3250
2550
1900
1575 D04
W8
DB
1800
600 W1
DB
1450
IEC
W1
D04
ENTRANCE A X 09 01
D04
DB
IEC
KITCHEN A X 05 03
3386
6817
6539
2550
3250 1300
W1
W3
1750 W4
ENTRANCE/KITCHEN A X 07 01
BATHROOM A X 08 03
KITCHEN A X 09 03
720
W1 W10
1975
1575
W1
BEDROOM A X 04 04
4250
W3
D04
2100
DR
2100
2200
D01
DR
BATHROOM A X 07 03
W3
W13 W4
W4
POWDER ROOM A X 05 06
IEC
2175
D04
W6
5147
W1
D04
1700
4473
3750 2750
W8
WIC
1650
W1
1775 D04
2175
2250
2525 1300
750
FAD KED TED
1825
W3
3250
3814 2600
2150
2400
5447
2650 W3
BATHROOM A X 05 05
W1
5447
A-D
WIC
DR
BATHROOM A X 04 05
D02
LIVING/DINING A X 04 02
W1 MASTER BEDROOM A X 03 04
1950 D04
W1
W12
1950
DR
W3
1700 W8
W5
3800
LIVING/DINING A X 03 02
2800
1800
W3
KITCHEN A X 04 03
W5
D01
W6
5197
DR
FAD KED TED
2750
W1 W6
IEC
1500 D01
LIVING/DINING A X 09 02
W4
2975
BATHROOM A X 10 05
POWDER ROOM A X 09 09
W4
1560
D07
1900
2000
W1 W6
MAID BATH A X 09 12
1700
D04
W6
ENTRANCE A X 10 01
D04
D01
ENTRANCE/KITCHEN A X 06 01
2050
DB
W3
W6
W3 BATHROOM A X 06 03
IEC
W1
DR FAD TED
SM
D01
W1 WIC
W9
POWDER ROOM A X 10 06
2100
W3
D02
KITCHEN A X 10 03
2300
W1
2810 LAUNDRY A X 09 10
4200
W3
KED
IEC
CORRIDOR A X 20 03
D01
DR
W8
ENTRANCE/KITCHEN A X 11 01
D04
BATHROOM A X 11 03
DR W6
D01
ENTRANCE A X 05 01
UP
5250
PL-04
1500
W1
9100
PL-03
2750
D04
1550
D05 W3
2600
2150
LAUNDRY A X 04 07
DR
MASTER BATHROOM A X 03 06
WIC
2525
3100 1650 2150 1000
875
ENTRANCE W4 A X 04 01
1900
D02
1625
W1 2100
D01
DB
1625
BATHROOM A X 12 03
DR
MAID ROOM A X 09 11
6683
W1
1300
2100
D01
DB
STAIR 01 A X 20 04
IEC
1850
W3
W1
1625
D04
17550
W6
FHC A X 30 05
DB
4681
W3
GED
1100
W2
W1
D01
3810
W9
LAUNDRY A X 03 09
1525
D22
9150
ENTRANCE/KITCHEN A X 12 01
D06 ENTRANCE A X 13 01
W6
DB
W1
LAUNDRY A X 13 07
W1
W1
DB
BEDROOM A X 10 04
W8
D03
3850
W5
W3
LIFT LOBBY A X 20 01
3975
4. ALL DRAWINGS SHO RELEVANT ARCHITECT CIVIL DRAWINGS AND R
W6
4225
4025
IEC
POWDER ROOM A X 13 06 D04
D18
IEC
1350
MEP SHAFT (DUCTS AND CHW PIPES)
W9
A4202
W3
1350
D01 2
3. DISCREPANCIES BET SERVICES SHALL BE B EXECUTION OF WORK
FROSTED GLASS PARTITION
W1
LIVING/DINING A X 10 02
A3003
1750
MEP SHAFT
LIVING/BED SPACE A X 11 02
1
KITCHEN A X 13 03
2850
W3
3810
D05
W8 W3
1850
TED
W3
PL-02
4021
DB
KED
FAD
W3
1700
1825
W9
1225
W8
W3
5916
1750
DB
POWDER ROOM D04 A X 04 06
GARBAGE A X 30 01
2500
3650
IEC
8075 W6
DR
W6
WIC
W1
D05
LAUNDRY A X 01 07
1825
W3
D04
SERVICE LIFT
2000
W5 W5
ENTRANCE A X 03 01
IEC
5425
4
SM
A X 01 05
W8
FAD KED TED
2525
D02
DR W4
1280 1950
D04
2025
1725
9000
WIC
W8
950 W3
D19
W5
W1
1900 D04
W8
D19
5300
W1
3540 BATHROOM 1 A X 03 07
ENTRANCE A X 01 01
W1
LIVING/BED SPACE A X 12 02
W1
W4 BATHROOM A X 13 05
2. DIMENSIONS ARE IN UNLESS NOTED OTHER & APPROVED BY THE E BALCONY A X 10 07
4200 D02
D04 BATHROOM
PL-01
3050
1800
2300
POWDER ROOM A X 03 08
1200
3500
5
D20
ELECTRICAL ROOM A X 30 02
2050
A3001 W1
D04
D21 D01 W3
1560
BEDROOM 1 A X 03 05
W8
CORRIDOR A X 20 02
D18 1400
DR
4340
W3
IDF A X 30 04
W3
W1
3964
5450
1475
W5
D23
STAIR 02 A X 20 05
A-C 1
W6
1300
A4101
2500
FHC A X 30 06
UP
2500
3300
A2002
5
POWDER ROOM A X 01 06
1900
WATER METER A X 30 03
D01
W3 W5
W3
21300
6
W1
1560
DR
W6 2725
3300
A-B
D07
FAD TED DR
2050
W4
ENTRANCE A X 02 01
1700
POWDER ROOM D04 A X 02 08
1800
3500
BEDROOM 1 A X 02 05
4340
2
6380 W1
1700
2750
W1
W2
LAUNDRY/STORE A X 02 09
WIC
1. DO NOT SCALE FROM
BALCONY A X 11 04
W13
W13
W1
W1 KITCHEN A X 01 03
W6 1500
2670
W1
W9
W5
MASTER BATHROOM A X 02 06
D04
2555
900
1200
W1 D02
W1
FROSTED GLASS PARTITION
LIVING/DINING A X 13 02
3750
W4
W3
DR
W1
General Not
FROSTED GLASS PARTITION BALCONY A X 12 04
BEDROOM A X 13 04
3800 D02
W12
W1
W1
1550
2125
1875
9000
W1
DB
BEDROOM A X 01 04
4250
W4
WIC
IEC
D04 WIC 2050
3540
D02
W3
3850
3814
4840 W1
KED
W3
LIVING/DINING A X 01 02
3800 W10
W8
DR BATHROOM 1 A X 02 07
7
1525 W1
W3
W8
BALCONY A X 13 08
3850
W1
2050
5425 W4
BALCONY A X 01 08
FROSTED GLASS PARTITION
2550
BALCONY A X 02 10
MASTER BEDROOM A X 02 04
8400
A3003
FROSTED GLASS PARTITION
3950
LIVING/DINING A X 02 02
8400
1
FROSTED GLASS PARTITION
8
A-7
2BR CORNER - TYPE 1.A
9
A-A
A-6
2050
A-1
10
Drawing Title:
TYPICA
1
A3002
WALL TYPE SCHEDULE
1
BEDROOM 4 3975
1900
4475
2700
10580
2059 2650
7457
LOBBY
POWDER
TERRACE 34 m²
16350
4500
37 98
BATH 1775
LIVING/DINING
1800 2141
2150
1250 2300
ENTRANCE
1850
3550
MAID 9 m²
3 BR3UNIT_OPT BR UNIT_OPT B B 1 : 100 1 : 100
2 175.31 m 175.31 m2
2 57.27 m57.27 m2
5 1130
Area (Excluding Area (Excluding Balcony) Balcony) Area (Balcony) Area (Balcony) Area (Total) Area (Total)
2 232.58 m 232.58 m2
Total Number Total Number of Unitsof Units
36
19-12-2021 19-12-2021
ENLARGED ENLARGED APARTMENT APARTMENT LAYOUTS LAYOUTS / / 3 BR UNIT 3 BR UNIT
Al Marjan Al Marjan Island Island Development Development
A154 A154
RESIDENTIAL RESIDENTIAL TOWERS TOWERS
As indicated@ As indicated@ A3 A3
Area (Excluding Balcony)
4 BR SIMPLEX TYPE A 1 : 150 2 178.02 m 178.02 m2 2 56.91 m56.91 m2 2 234.93 m 234.93 m2
36
36
Al Marjan Island Development
A156
RESIDENTIAL TOWERS
As indicated@ A3
ENLARGED / 4 BR UNIT
495.55 m2
Area (Balcony)
89.66 m2
Area (Total)
585.21 m2
Total Number of Units
19-12-2021
Area
AL MARJAN
Case ID.
1860530
Sec No. Block No. Bldg. No. Scale
1 : 100
Drawn AE
07/07
Drawing Number
210111
All rights reserved. No part of this drawing may be reproduced or transmitted in any forms by any mean
SHOW KITCHEN
ENTRANCE
3225
KITCHEN
WIC
2100
4125 Pantry 16775
MASTERMASTER BEDROOM BEDROOM
37 98
4917
5665
6170
3000
3380
4050
3950
STORE 4300
BEDROOM 3
CORRIDOR
1650
4450
WIC
1950
3750
BATH
FAMILY ROOM
2750
6272 BATH
3850 5023
1850
3900 1800
1800
4500
1950
2750
8272
7881
7881 2500
2500
3462 4500
1500
WIC
5025
1700
WIC
9018
TERRACE TERRACE
1950
5147
5147
4379
37 98
37 98
1600
BEDROOM BEDROOM
5 1130
36
BATH
3850
1700
1700 1600
BATH
2850
WIC
4373
4373
1700
2800
BATH
WIC
DESCRIPTION 100 MM AAC BLOCK 150 MM AAC BLOCK 150 MM SOLID BLOCK 150 MM SOLID BLOCK UP TO 1200 MM - 150 MM HOLLOW BLOCK ABOVE 1200 MM 200 MM SOLID BLOCK 200 MM HOLLOW BLOCK 100 MM DRY WALL PARTITION 100 MM SOLID BLOCK 250 MM SOLID BLOCK 200 MM AAC BLOCK 300 MM AAC BLOCK 250 MM HOLLOW BLOCK 300 MM HOLLOW BLOCK 300 MM SOLID BLOCK
952
952
Area (Excluding Area (Excluding Balcony) Balcony)
8817
2000 8817
2000 1200
WIC
WIC
3850
Zoomed in Apartment Plans 3 BR3UNIT_ BR UNIT_ OPT OPT A A Total Number Total Number of Unitsof Units
2200
BEDROOM 2
MASTER BEDROOM 1
2800
BATH
1950
5023
4225
2200 1600
4225
CORRIDOR CORRIDOR
BEDROOM BEDROOM
5 1130
Area (Balcony) Area (Balcony)
1200 WIC
5550
5600
5600
1600
1200
1200 2200
WIC
1925
2200
2200
BEDROOM BEDROOM
Area (Total) Area (Total)
S.GENIDY - ARCHITECT p. 7
BATH
2200
1900
4500
BEDROOM BEDROOM
5 1130
2678
2678 1400
1400 2300
7881
7881
2300
7541 1800
1800 4500
4379
4379
5550
BATH
5147
5147
1925
1925
BEDROOM BEDROOM
1 : 100 1 : 100
1925
2400
1600
WIC
KITCHENKITCHEN
1900
3850
2800 BATH
BALCONY
LIVING/DINING LIVING/DINING 6225 6225
ENTRANCE ENTRANCE
3200
3850
WIC
1700 1600
2800 BATH
2100
2300 2300 1575 1575 STORE STORE POWDER POWDER LAUN. LAUN.
3200
1700 1600
WIC
WIC
1200
1200
4225
2200
2400
12875
1600
1800
1800 WIC
2200 1600
2150
WIC
4225
2200
2200
12875
CORRIDOR CORRIDOR
1600
1925
1200
BATH
TERRACE TERRACE
1 : 100
2150
1925
1200
BATH
7541
LIVING/DINING LIVING/DINING
2300 3200
3200
KITCHENKITCHEN
SCALE 4025 4025
1100
2100
3500
2701
2701
1400
1400 2300
ENTRANCE ENTRANCE
1
POW.
1100
4379
2000
2000
2000 1775
5475
TYPICAL FLOOR PLAN (2-18)
POW.
98 37
3500 1775
2100
98 37
5475
1
MAID
2100 1600
LAUN. LAUN. BATH
MAID
7056
98 37
98 37
2850
11501600
BATH
952
MAID
2850
2000
MAID
1150
6893
952
2678
2678
6893
Basement, Ground and Podium Plans of the Hotel
WALL TYPE W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14
A2003 7056
4350
2
3
3. Damac Lagoons, Central Hub - Dubai PROJECT BRIEF:
DAMAC Lagoons is the latest community development by DAMAC Properties. It is a water-inspired villa community bringing the essence of Mediterranean destinations to Dubai. Located near the iconic DAMAC Hills community, Lagoons is located in the Dubailand area. As the name suggests, the community is surrounded by crystalline lagoons and scenic waterfalls. It provides a Riviera vacation vibe. Aligning to the visionary approach of providing breath taking beach vibes, DAMAC Lagoons is set to be equipped with the state of the art infrastructure and services in its such as: Exclusive clubhouse, Retail Shops, Waterside restaurants and cafes, Retail shops , Crystal lagoons, Inland white beach, Wave pool , Lagoon Zipline, Snorkelling , Floating amphitheatre , Venice-style gondola rides, Water cinema, Waterpark , Waterfalls, Green Meadows and Fitness centres
Aerial Central Hub Renders
A
B
C
A
B
C
D
E
F
G
H
J
K
A A
B B
C C
D D
E E
F F
G G
H H
J J
K K
8200
B17 B17
B16 B16
8200 8200
7140 11490
+0.15 1370
7140
+0.15
1660
680
1660 UP TO GROUND FLOOR
680
1010
1000
1250
2
SCALE
SCALE
2
1
Garbage Room Details
1 1
8200
ELEV. LOBBY FB3 00 08
1010
1 : 50
SCALE
1 : 50
-5.00 SSL
4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, CIVIL DRAWINGS AND RELEVANT SECTIONS OF THE SPECIFICATION.
8
COOLED WATER PUMP RM 00 B1 36
COOLED WATER GRP TANK FINALIZED DRAWINGS ARE SUBJECT TO FINAL INPUTS 00 B1 36 AND COORDINATION WITH THE FOLLOWING ADDITIONAL
NOTE:
2
PACKAGES: INFRASTRUCTURE, KITCHEN, LIGHTING, INTERIOR DESIGN, GYM & SPA, ACOUSTICS, CAPACITY = 60 m 3 PREFABRICATED BLOCKS. FINALIZED DRAWINGS ARE SUBJECT TO FINAL AUTHORITY APPROVALS.
A4903
7
+1.00 M = +34.6 DMD HEAVY-DUTY EPOXY-BASED FLOOR COATING ON CEMENT-SAND SCREED WITH 100MM SKIRTING; REFER TO FINISHES SCHEDULE AND SPECS
B16
1200
CONNECTION AS PER MANUFACTURER'S RECOMMENDATION
1200 1200
1.30 FFL
TEMPERED GLASS RAILING AS PER ID DRAWINGS
SCHEMATIC DESIGN SUBMISSION STAGE 4 - TECHNICAL PURPOSE OF ISSUE DESIGN SUBMISSION (MAIN WORKS) STAGE 4 - TECHNICAL DESIGN SUBMISSION Client: SCHEMATIC DESIGN SUBMISSION (MAIN WORKS) PURPOSE OF ISSUE SCHEMATIC DESIGN SUBMISSION
Client: PURPOSE OF ISSUE
4700
4950 -6.05 SSL
-6.05 SSL
5000
15000
-4.85 FFL
A
17.07.2022
JK
REV B
DATE 09.09.2022
APPROVED JK
A B REV A
17.07.2022 09.09.2022 DATE 17.07.2022
JK APPROVED JK
DATE
APPROVED
5
TEMPERED GLASS RAILING AS PER ID DRAWINGS
www.damacproperties.com P: +971 4 3731739 PO Box 2195 Dubai, UAE P: +971 4 3731739
1
FLOOR FINISH AS PER ID DRAWINGS FLOOR FINISH AS PER ID DRAWINGS PIT DEPTH PIT DEPTH
FINISH THE STEEL PLATE HERE
-5.00SSL BASEMENT FLOOR
0.10 FFL
WATERPROOFING & PROTECTION AS PER SPECS & STRUCTURE DRAWINGS
ESCALATOR PIT TO VENDOR SHOP DRAWINGS
WATERPROOFING & PROTECTION AS PER SPECS & STRUCTURE DRAWINGS WATERPROOFING & PROTECTION AS PER SPECS & STRUCTURE DRAWINGS
FLEXIBLE SHEET INFILL ESCALATOR PIT TO VENDOR SHOP DRAWINGS ESCALATOR PIT TO FLEXIBLESHOP SHEET INFILL VENDOR DRAWINGS
2 2
JK
17.07.2022
JK
SCALE
1 : 50
Client:
C
+1.00FFL GROUND FLOOR (CL)
abu dhabi . amman . bratislava . dubai . karbala . oberhausen . pittsburgh www.ae7.com Hassanicor Building, 6th Floor, Al Barsha 1 PO Box 54115 Dubai, UAE P: +971 4 3997758 F: +971 4 3997759
DUBAI, UAE
3
13500
DUBAI, UAE
CENTRAL HUB
CENTRAL HUB
ELEV. LOBBY 00 B1 52
HEAVY-DUTY EPOXY-BASED FLOOR COATING ON CEMENT-SAND SCREED WITH 100MM SKIRTING; REFER TO FINISHES SCHEDULE AND SPECS
Drawing Title:
2
-4.85 FFL
-5.00SSL BASEMENT FLOOR
5000
COOLED WATER PUMP RM 00 B1 36
CLUBHOUSE, HOTEL, F&B, RETAIL, OUTDOOR CINEMA, & ADVENTURE ZONE
FLOOR FINISH AS PER ID DRAWINGS
ESCALATOR CONCRETE BLINDING ASSECTION PER SPECS & SCALE
STRUCTURE DRAWINGS 1 : 50
ESCALATOR SECTION ESCALATOR SECTION SCALE 1 : 50
FLEXIBLE SHEET INFILL
Escalator Details
SCALE
AE7
AE7
JK
Size
09.09.2022 Drawn
09.09.2022 Checked AE7 Checked AE7 09.09.2022
09.09.2022 Approved JK Approved JK 09.09.2022
A1 Size
WATERPROOFING & PROTECTION AS AE7 Scale Drawn PER SPECS & STRUCTUREDrawing DRAWINGS 1 : 50 Number
AE7 09.09.2022 1 : 50 Drawing Number09.09.2022
21010700-CH-FB-A4150 09.09.2022 09.09.2022 21010700-CH-FB-A4150 21010700-CH-FB-A4150
B A1 Rev.
ESCALATOR PIT TO VENDOR SHOP DRAWINGS FLEXIBLE SHEET INFILL
2
ESCALATOR SECTION SCALE
1
1 : 50
2
1 : 50
Drawn AE7
09.09.2022
Checked AE7
Approved JK
09.09.2022
Drawing Number
09.09.2022
BA -COOLED WATER TANK - SECTION 1 21010700-CH-FB-A4150
Size
A1 Rev.
B
SCALE 1 : 50 All rights reserved. No part of this drawing may be reproduced or transmitted in any forms by any means without written permission of the copyright holder. © AE7
Number Rev. All rights reserved. No part of this drawing may be reproduced or transmittedDrawing in any forms by any means without written permission of the copyright holder. ©B AE7 1 : 50
B
All rights reserved. No part of this drawing may be reproduced or transmitted in any forms by any means without written permission of the copyright holder. © AE7 All rights reserved. No part of this drawing may be reproduced or transmitted in any forms by any means without written permission of the copyright holder. © AE7
RC WALL; FOR DETAILS, REFER TO STRUCTURE DRAWINGS
-4.85 FFL
Scale
Size Rev. A1
IRRIGATION TANK 00 B1 36
ESCALATOR DETAILS
PIT DEPTH
-6.05 SSL
ESCALATOR DETAILS ESCALATOR DETAILS Drawn Checked Approved
RC SLAB; REFER TO STRUCTURE PACKAGE
COOLED WATER GRP TANK 00 B1 36
Project Description:
CLUBHOUSE, HOTEL, F&B, RETAIL, CENTRAL HUB OUTDOOR CINEMA, & ADVENTURE ZONE CENTRAL CLUBHOUSE, HOTEL,HUB F&B, RETAIL, Drawing Title: CLUBHOUSE, HOTEL, F&B, RETAIL, OUTDOOR CINEMA, & ADVENTURE ZONE OUTDOOR CINEMA, & ADVENTURE ZONE Drawing Title:
1 : 50 Scale
COMPOSITE WOOD DECKING; FOR LANDSCAPE FINISHES & BUILDUP, REFER TO LANDSCAPE DRAWINGS
9000
4
+0.10FFL GROUND FLOOR
Project Description:
Scale
WATERPROOFING & PROTECTION AS PER SPECS
DAMAC LAGOONS
ESCALATOR DETAILS
PIT DEPTH
2
09.09.2022
A
Project Name:
DUBAI, UAE DAMAC LAGOONS DAMAC LAGOONS DUBAI, UAE
Drawing Title:
-5.00SSL BASEMENT FLOOR -5.00SSL BASEMENT FLOOR
-6.05 SSL
35.00°
FINISH AS PER ID DRAWINGS
CAR PARKING B1
B
SCHEMATIC DESIGN SUBMISSION
DAMAC Properties Co. LLC www.damacproperties.com B Box 2195 Dubai, UAE PO P: +971 4 3731739
DAMAC LAGOONS
Project Description:
STAGE 4 - TECHNICAL DESIGN SUBMISSION (MAIN WORKS)
PURPOSE OF ISSUE DATE APPROVED COOLED WATER GRP TANK & PUMP ROOMREV- BASEMENT
Principal Consultant:
www.ae7.com Hassanicor Building, 6th Floor, Al Barsha 1 PO Box 54115 UAE abu dhabi . amman . bratislava . dubaiDubai, . karbala . oberhausen . pittsburgh P: +971 4 3997758 F: +971 4 3997759 www.ae7.com abu dhabi . amman . bratislava . dubai karbalaAl. Barsha oberhausen . pittsburgh Building, 6th. Floor, 1 Project Name: Hassanicor PO Boxwww.ae7.com 54115 Dubai, UAE Hassanicor Floor,4Al Barsha 1 P: +971 4 Building, 39977586th F: +971 3997759 PO Box 54115 Dubai, UAE Project Name: P: +971 4 3997758 F: +971 4 3997759
4950 4950 5000
1 : 50
Project Description:
FLOOR FINISH AS PER ID DRAWINGS
-4.85 FFL ELEV. LOBBY 00 B1 52 ELEV. LOBBY 00 B1FFL 52 -4.85
FINISH THE STEEL PLATE HERE
SCALE
abu dhabi . amman . bratislava . dubai . karbala . oberhausen . pittsburgh Principal Consultant:
Project Name:
ELEV. LOBBY 00 B1 52
8200 JK
REV 1.30 FFL DAMAC Properties Co. LLC www.damacproperties.com PO Box 2195 Dubai, UAE P: +971 4 3731739 DAMAC Properties Co. LLC
Principal Consultant:
STAINLESS STEEL CLADDING; FINISH TO BE APPROVED
2
09.09.2022
www.damacproperties.com
+0.10FFL GROUND FLOOR +0.10FFL GROUND FLOOR
0.10 FFL
B
Principal Consultant: DAMAC Co.UAE LLC PO BoxProperties 2195 Dubai, +0.10FFL GROUND FLOOR
3
RC WALL; REFER TO STRUCTURE PACKAGE
GROUND FLOOR PLAN - ESCALATOR 6
B15
Client:
4
1.30 FFL
3
STAGE 4 - TECHNICAL DESIGN SUBMISSION (MAIN WORKS)
8200
ELEV. LOBBY FB3 00 08
TEMPERED GLASS 0.10 FFL RAILING AS PER ID TEMPERED DRAWINGS GLASS RAILING AS PER ID DRAWINGS 0.10 FFL
CONCRETE BLINDING AS PER SPECS & STRUCTURE DRAWINGS CONCRETE BLINDING AS PER SPECS & STRUCTURE DRAWINGS
S.GENIDY - ARCHITECT p. 8
SCALE
1.30 FFL
ELEV. LOBBY FB3 00 08 ELEV. LOBBY FB3 00 08
CONCRETE BLINDING AS PER SPECS & STRUCTURE DRAWINGS
IRRIGATION TANK 00 B1 36
-4.85 FFL
3. DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE.
4500
8200
8200
FINISH AS PER ID DRAWINGS
2. DIMENSIONS B16ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED DIMENSIONS ARE TO BE VERIFIED ON SITE 1. DO NOT SCALEOTHERWISE. FROM THIS DRAWING. & APPROVED BY THE ENGINEER. 1. DIMENSIONS DO NOT SCALE FROM THIS DRAWING. 2. ARE IN MILLIMETERS AND LEVELS ARE IN METERS 3. DISCREPANCIES BETWEEN DIMENSIONS ARCHITECTURAL, STRUCTURAL & ON SITE UNLESS NOTED OTHERWISE. ARE TO BE VERIFIED SERVICES SHALL BEIN BROUGHT TO ARCHITECTS TO 2. DIMENSIONS MILLIMETERS AND LEVELSNOTICE ARE INPRIOR METERS & APPROVED BYARE THE ENGINEER. EXECUTION OF WORK AT SITE. UNLESS NOTED OTHERWISE. DIMENSIONS ARE TO BE VERIFIED ON SITE & BY THE ENGINEER. 3. APPROVED DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & 4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, 3. DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & EXECUTION OF WORK AT SITE. CIVIL DRAWINGS RELEVANT SECTIONS OF THE SPECIFICATION. SERVICES SHALL AND BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, 4. ALLDRAWINGS DRAWINGSAND SHOULD BE READ IN CONJUNCTION WITH OTHER CIVIL RELEVANT SECTIONS OF THE SPECIFICATION. RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, NOTE: CIVIL DRAWINGS AND RELEVANT SECTIONS OF THE SPECIFICATION. FINALIZED DRAWINGS ARE SUBJECT TO FINAL INPUTS AND COORDINATION WITH THE FOLLOWING ADDITIONAL NOTE: PACKAGES: INFRASTRUCTURE, KITCHEN, LIGHTING, INTERIOR GYMARE & SPA, ACOUSTICS, NOTE: FINALIZEDDESIGN, DRAWINGS SUBJECT TO FINAL INPUTS PREFABRICATED BLOCKS. AND COORDINATION WITH THE FOLLOWING ADDITIONAL FINALIZED ARE TO AUTHORITY FINALIZED DRAWINGS ARE SUBJECT SUBJECT TO FINAL FINAL INPUTS PACKAGES:DRAWINGS INFRASTRUCTURE, KITCHEN, LIGHTING, APPROVALS. AND COORDINATION WITH THE ACOUSTICS, FOLLOWING ADDITIONAL INTERIOR DESIGN, GYM & SPA, PACKAGES: INFRASTRUCTURE, KITCHEN, LIGHTING, PREFABRICATED BLOCKS. INTERIOR GYMARE & SPA, ACOUSTICS, FINALIZEDDESIGN, DRAWINGS SUBJECT TO FINAL AUTHORITY PREFABRICATED BLOCKS. APPROVALS. +1.00 M = +34.6 DMD FINALIZED DRAWINGS ARE SUBJECT TO FINAL AUTHORITY APPROVALS.
1200
8200
FINISH THE STEEL PLATE HERE FINISH AS PER ID DRAWINGS FINISHTHE AS PER ID FINISH STEEL DRAWINGS PLATE HERE
DRAIN PITS, REFER TO PLUMBING PACKAGE
General Notes: 2. DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. DIMENSIONS ARE TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
4950
8200
1000
CAR PARKING B1 CAR PARKING B1
1 : 50
1. DO NOT SCALE FROM THIS DRAWING.
1200
•
CAR PARKING B1
SCALE
520
2930
GROUND FLOOR PLAN - ESCALATOR GROUND FLOOR SCALE 1 : 50 PLAN - ESCALATOR
3 3
B15 B15
STAINLESS STEEL CLADDING; FINISH TO BE APPROVED
Escalator Details
BASEMENT FLOOR PLAN - ESCALATOR 9
1800 9000
13500
1000
2550
•
D112
11180
B15
1200
2 2
8200
5
Cooled Water GRP Tank and Pump Room Substation Details
CAR PARKING
K
2 FLAT STEPS AS PER VENDOR RECOMMENDATION
GROUND FLOOR PLAN - ESCALATOR
3
BS
1200 1200
2
•
B16 B16
CONNECTION AS PER MANUFACTURER'S CONNECTION AS PER RECOMMENDATION MANUFACTURER'S RECOMMENDATION
ESCALATOR PIT TO VENDOR SHOP DRAWINGS
2 FLAT STEPS AS PER VENDOR RECOMMENDATION
B17 B16
Irrigation Water Tank Details
K
PIT COVER PLATE
2550
6
B17 B17
CONNECTION AS PER MANUFACTURER'S RECOMMENDATION
-4.85 FFL -5.00 SSL
10
+1.00 M = +34.6 DMD
B17
Domestic Water Tank Details
STAINLESS STEEL CLADDING; FINISH TO BE APPROVED STAINLESS STEEL CLADDING; FINISH TO BE APPROVED
J
PIT COVER PLATE
+1.00 M = +34.6 DMD
35.00°35.00° 35.00°
3 3
•
250 130
FB-A4150
1000 1000
3
•
+0.15
1000
+0.15 1370
4000
4 4
7430
1370
7
4000 4000
4
•
Basement Partial Plans
4700
5 5
•
H
N
SS-14
General Notes: General Notes:
8200
1370
7430
1370
4700 4700
5
BS BS
1 : 50
130
7430
1000
1250
9440
1370 +0.15
2 FLAT STEPS AS PIT PLATE PERCOVER VENDOR RECOMMENDATION PIT COVER PLATE 2 FLAT STEPS AS PER VENDOR 2 FLAT STEPS AS RECOMMENDATION PER VENDOR RECOMMENDATION
BS
G
OS-03
1. DO NOT SCALE FROM THIS DRAWING.
9440
- Worked on the 100% Detailed Design Submission for the Central Hub: 6 6
11
General Notes:
1 : 50
BASEMENT FLOOR PLAN - ESCALATOR BASEMENT FLOOR PLAN - ESCALATOR SCALE 1 : 50
1 1
640
2500
1010 1010
9440
KEY PLAN
-4.85 FFL -5.00 SSL
1
BASEMENT FLOOR PLAN - ESCALATOR
1
7430
PIT COVER PLATE
2550 2550
6
F
C
1570
8
- Worked on Sheet and Model Files simultaniously FB-A4150
N N
OS-03
OS-03
1250
1370 +0.15 1370
1010
130 130 1301000 1000 130 2501000 250 1000250 1000130 1000 130
1250
2500
9440
8200
1250 1250 1250
2500 2500
2 2
FB-A4150
E
SS-14
B16 B16
8200
1370
640
KEY PLAN KEY PLAN
SS-14
B16
640
N
SS-14
2 FLAT STEPS AS PIT COVER PLATE PER VENDOR RECOMMENDATION PIT COVER PLATE 2 FLAT STEPS AS PER VENDOR 2 FLAT STEPS AS RECOMMENDATION PER VENDOR RECOMMENDATION
ESCALATOR PIT TO VENDOR SHOP 9 DRAWINGS ESCALATOR PIT TO VENDOR SHOP DRAWINGS
640
1250 1250
2
FB-A4150
Q
C DUBAI DEVELOPMENT AUTHORITY DSTAMP:
LOBBY
KEY PLAN
PIT COVER PLATE
ESCALATOR PIT TO VENDOR SHOP DRAWINGS
B17 B17
7 7
P B
B
OS-03
- Worked on Implementing the Sketchup Massing and Renders onto the Revit Detailed Design
N
11
680
UP TO GROUND FLOOR
DN TO BASEMENT
FB-A4150
B17
7
M
9300
DN TO BASEMENT DN TO BASEMENT
8200
Model for the F&B Component
1660
+0.15
250
LOBBY -4.85 FFL -5.00 SSL -4.85 FFL -5.00 SSL
1000
UP TO GROUND FLOOR
2500
10 UP TO GROUND FLOOR
DN TO BASEMENT
B17
8 8
L
9000
130
+0.15
-4.85 FFL LOBBY -5.00 SSL
BS
8
K
A
LOBBY
BS BS BS
J
DUBAI DEVELOPMENT AUTHORITY STAMP: DUBAI DEVELOPMENT AUTHORITY STAMP:
7140
4000
Concept Design
1370
640
680
1250
130 1250
9 9
640
1660
1370
H Q
P Q DUBAI DEVELOPMENT AUTHORITY P Q STAMP:
11490 640
2550 2550
9
7140
8200
G P B16
11
2550
FB-A4150
N N
11490
130 1301000 1000 130 2501000 250 1000250 1000130 1000 130
2 FB-A4150 2
Roles and Responsibilities:
1250 1250 1250
2500
FB-A4150
2500 2500
2
10 10
1250 1250
10
1370
1010
640
N
M M
11490
1010 1010
11 11
F
M
L L
2550
11
B16
E
L
130
B17
D
B17
Cooled Water GRP Tank Details
-5.00SSL BASEMENT FLOOR RAFT FOUNDATION; REFER TO STRUCTURE PACKAGE REFER TO STRUCTUE DRAWINGS & SPECS FOR WATERPROOFING & PROTECTION FOR CONCRETE BLINDING DETAILS; REFER TO STRUCTURE PACKAGE
K
L
4. Takaya by Union Properties, Motor City PROJECT BRIEF:
Being developed over a land area of approximately 35,338,575 square feet, MotorCity is a development based on creating a unique destination in Dubai, that includes residential, business, sports and leisure opportunities. MotorCity is in fact ‘a city within a city’ that compromises of six sectors with unique destinations such as Avenue District, Dubai Autodrome, Union District Mall, OIA Residence, UPTOWN, Green Community MotorCity, and First Avenue Mall & Hotel. Within the heart of MotorCity a new Development, called Takaya, has 788 units across three towers including 39 townhouses, five villas, 744 apartments and 55,000 square feet of retail space. 37
Design Development
Overlooking Dubai Autodrome, it will include a 450m podium level sky garden that will connect the townhouses, villas and apartments, plus electric vehicle charging stations and state-of-the art sound insulation.
Typical Floor Plan - Tower B (G+34) 67.5 1 BR
1 BR
2 BR
STUDIO
2 BR
775 SQ.FT
775 SQ.FT
1130 SQ.FT
505 SQ.FT
1550 SQ.FT
WIC
BATHROOM MASTER BEDROOM WIC
LAU.
BEDROOM 01
MASTER BATHROOM
MAIDS ROOM
LIVING/ DINING
KITCHEN
POWDER
KITCHEN
POWDER
LIVING/ DINING
LIFT LOBBY
WIC
WIC
STORE/ LAU.
KITCHEN FIRE LIFT LOBBY
WATER METER ROOM
M.BATHROOM 01
M.BATHROOM POWDER 02
ELECTRICAL ROOM
MAID ROOM
MAIDS BATHROOM
POWDER
Retail & Parking Podium
M.BATHROOM 01
STORAGE
M.BATHROOM 02
POWDER
KITCHEN
M.BATHROOM 01
Worked on the Design of the 5 Bedroom Townhouse Plans supervised
WIC
LIVING/ DINING
WIC
WIC
LIVING/ DINING
M.BEDROOM 01
M.BEDROOM 02
2152 SQ.FT
21
1237 SQ.FT
1237 SQ.FT
2 BR
2 BR
3 BR
Total Units Unit Area Balcony Area Circulation Area Services Area Floor Plate Area
Residential Units Towers
Design Development
WIC
WIC
KITCHEN
POWDER
KITCHEN
STORAGE
WIC
WIC
M.BATHROOM 01
WIC
LIVING/ DINING
LIVING/ DINING
M.BEDROOM 01
M.BEDROOM 02
M.BEDROOM 02
LIVING/ DINING
M.BEDROOM 02
M.BEDROOM
2 BR
M.BEDROOM 01
1237 SQ.FT
828 SQ.FT
1237 SQ.FT
2 BR
1 BR
2 BR
11 per Floor 1177 sq.m 136 sq.m 175 sq.m 32 sq.m 1520 sq.m
5BR Podium Townhouse - Type 1 Tower B Typical Plan 2.90
Updated the Townhouse Layouts on the three podium levels &
8.60
the new layouts
5.45
8.60
4.15
1.90
3.00
TERRACE
3.40
8.60
8.60
8.60
3.90
4.15
BEDROOM 02
5.35
BATH
1.90
3.40
4.15 2.90
GUEST BEDROOM
6.30
BEDROOM 03 3.90
BEDROOM 3.80 01
8.60
2.90
GUEST BEDROOM
2.35
6.30 2.65
BEDROOM 3.80 01
2.65
PANTRY / STORE
3.05
Calculated the BUAs and GFAs of the Townhouses Layouts
MAID
LAU 1.30 4.60
POW. 1.40
3.60
DN
DINING
LIVING
Massing Diagrams
5-BR P1 Townhouse BUA: 147 SQM GFA: 80 SQM
48
WIC
5.35
1.50
MASTER BEDROOM
DN
3.80
MASTER 2.20 BATH
5.80 1.50
WIC 2.90
MASTER BEDROOM
8.70 1.85
3.80
TERRACE
MASTER 2.20 BATH
5.80
3.25
GARDEN
BUA: 147 SQM GFA: 80 SQM
17.20
FAMILY LIVING
2.90
3.25
8.70
Worked on Laying out the 5-Bedroom Villas Cluster, taking into P1
FAMILY LIVING
DN
4.60
5.35
2.55
1.80
DN
LIVING
GARDEN
consideration the Ramp, Roundabout and Roads Leading to the
4.60
4.80
3.60
2.20
4.80
PARKING
DINING
2.20
2.55 KITCHEN14.80
PARKING
KITCHEN
2.70
BATH 03
3.25 14.80
POW. 1.40
1.50
2.25 1.50
Terracing Towers/ Special Units
1.80
LAU 1.30 4.60
2.70
BATH 02
1.85
1.85
ENTRY FOYER
3.25
1.80 UP
2.25 1.80 UP
1.90
BATH
11.40
2.85
4.20
1.60
3.50
ENTRY FOYER
BATH 03
1.80
1.90
BATH
1.60
UP
4.20
LOBBY 4.60
2.70
BATH 02
WIC
3.50
WIC
11.40
2.85
UP
MAID UP
3.05 1.50
LOBBY 4.60
3.05 2.35
BEDROOM 03 3.90 2.70
6.40
BATH 01 UP
PANTRY / STORE
BEDROOM 02 3.90
3.05 1.50
5.35
WIC 2.75
6.40
4.15
BATH 01
3.00
TERRACE
WIC 2.75
5.35
Podium Villas/ Community Facilities/ Towers Refinement
Details from Sketchup onto the Plans
Level 01
8.60
5.35 5.45
TERRACE
Co-ordinated with the Massing Team to reflect the Various Townhouse
Worked on the Postproduction of the Colored Plans of Podium
BATH
2.90
modified the Road, Parking, and Landscape elements to work with
S.GENIDY - ARCHITECT p. 9
POWDER
LAU.
8.60
20
TERRACE
Villas as well as the Treatment to the Corner Units
M.BATHROOM
LAU.
67.5
Worked on the Overall Plans of the Podium Level, Ground and
•
POWDER
KITCHEN
M.BATHROOM 02
WIC
•
•
STORAGE
M.BATHROOM 02
MASTER BEDROOM
Developed the Preconcept Diagrams of the Overall Podium Massing
•
M.BATHROOM 01
LAU/STORE
•
•
POWDER
KITCHEN
M.BATHROOM 02
LAU.
WIC
M.BEDROOM 01
by the Design Directors
•
STORAGE
LAU.
PreConcept Design
Parking Levels
22.0
M.BATHROOM 01
CORRIDOR
LIBRARY
MASTER BATHROOM
•
M.BEDROOM 01
FHC
CORRIDOR
LIVING/ DINING
Roles and Responsibilities:
LIVING/ DINING
POWDER
IT ROOM
STORE
22.0 3 BR
2 BR
LAU.
BATHROOM GARBAGE ROOM
KITCHEN
MAID BATHROOM
LIVING/ DINING
WIC
MASTER BATHROOM
M.BEDROOM 02
M.BEDROOM 01
M.BEDROOM 02
MASTER BEDROOM LIVING/ DINING
M.BATHROOM 02
KITCHEN
BED SPACE
BEDROOM 02
KITCHEN
Plot Boundary
3 BR 2152 SQ.FT
L1
1.85
4.00
TERRACE
L2
4.00
BUA: 147 SQM GFA: 144 SQM
BUA: 147 SQM GFA: 128 SQM
L1
L2
BUA: 147 SQM GFA: 144 SQM
BUA: 147 SQM GFA: 128 SQM
5 BR TOWNHOUSE TOTAL BUA: 441 TOTAL GFA: 355
5 BR TOWNHOUSE - TYPE 1 TOTAL BUA: 441 SQM TOTAL GFA: 355 SQM
TH A NK YOU