Architecture is a key tool for life, buildings bond between the people and the built environment. For me, every design, through a progressive process of recording, reflecting, and communicating with the substantial space, is guiding and innovating the way of life. Through my studies at ITESM, I have learned that it is important to take a broad range of issues into consideration in the proccess of design to produce profoundly impressive, intelligent, and functional work. The ability to assemble and to take advantage of important elements from every phase creatively is the key towards an innovative end. It is a willingness to welcome the visitor or the reader who will investigate the infinite layers of meanings behind a project which is the final moment of a complex system. As Glenn Murcutt said,“Most architects who build strange buildings assure that they do it because technology makes it possible. That seems absurd to me. Being able to do something does not legitimize doing it ”. Architecture is not created, it is discovered – the hand will find solutions before the mind can even comprehend them.
Contents
Competitions 01
02
03
04
05
CIDS: Infonavit
06
Premio Felix Candela
14
Juarez community center
22
Density: transformation of the constructed city, enormus growth where the peripheral zones domain and its urban center loses, Mexico.
The National Museum of Mexican Architecture project takes these echoes of traditional architecture and brings them to great expressive simplicity by translating them through the language of modernity. Exploring Juarez municipality, placing a building which conceptualizes as a multifunctional container, stimulating the community life, Mexico.
Temporary Pavilions 36 The constructive pragmatism of the proposal is based on the delimitation of the space, identifying within it the existing structure, furniture and vegetation that will be used for the development of the pavilion. Clouthier Park
This compositional axis also aims to be a specific visual quality, easily recognizable and easily grouped into the overall pattern of the park.
42
Professional projects 06
07
Colonia, mixed-use complex
46
Sikara, mixed-use complex
62
Each space has been designed to form a community evolving the Colón area.
A unique proposal of Fashion Park with exclusive avant-garde design of more than 126 thousand square meters of construction. 0
Colonia Showroom
Generated through containers for the Colonias project exhibition.
Other works: Row house
Unifamiliar housing
Nazas Community center Community center
Guggenheim Helsinki museum Design competition
New York sky condo
Competition in Chelsea district,NY.
La Victoria hostel
Ancient building intervention
Juarez Market
Building intervention
Buenos Aires complex
Collective housing
76
Sergio Flores Campos sergiohflorescampos@gmail.com
Education Instituto Tecnologico y de estudios superiores de Monterrey,Monterrey Mexico Bachelor of Architecture, 2012.08 - 2017.12
The Evergreen State College, Olympia,Washington. Summer session, 2014.06 -2014.08
Professional experience Paramétrico, Monterrey, N.L.
Project Leader| 2021.11.- Present
Gtu arquitectos , Monterrey, N.L. Project Leader| 2018.- 2021.07
Dietmar-Feichtinger architectes, Paris, France. First year architect | 2018.03 - 2018.07
RDLP arquitectos, Monterrey, N.L.
Full-time architect | 2016.12 - 2017.05
OFICIO taller arquitectura, Monterrey, N. L.
Intern architect | 2016.06 - 2016.08
WAM arquitectos, Monterrey, N. L. Intern architect | 2015.06 - 2015.08
EMI edificaciones Monterrey, N. L.
Intern architect 2014.08-2015.06
Design Competitions and awards 1st Prize 1st Prize Best 50 Finalist 1st Prize 1st Prize 1st Prize 2nd Prize 2nd Prize H. Mention Selected Finalist Diploma
Temporary Pavilions, 2021, CANL, regional competition. Temporary Pavilions, 2019, CANL, regional competition. Premio Felix Candela, 2019, “Museo Nacional de Arquitectura en Mexico”, national competition. Clouthier Park Design competition, 2019, SPGG, regional competition. Special group of design 2017 edition, regional competition. Student´s Biennale colective housing, regional competition. Catedra Blanca CEMEX-ITESM 2015 and 2016 edition. Special group of design 2016 edition, regional competition. Orange investments, real state project competition. Student´s Biennale urban planning, regional competition. Best 15 end of career projects in Mexico, national competition. CIDS infonavit,National competition. Student counseil and sports leadership
Publications and exhibitions Mario Pani: arquitectura en proceso
At MARCO (Museum of Contemporary Art), Monterrey, Mexico.
Rio nazas regeneration
At Nave Generadores, Fundidora Park, Monterrey Mexico.
PROYECTA exhibition 2013-2014-2015-2016 and 2017 edition
A semestral exhibition displaying the best design projects at Itesm Architecture School, Monterrey Mexico.
Best 15 end of career projects in Mexico By Arch Daily, Design competition.
CIDS infonavit
By Arch Daily, Design competition.
Student´s Biennale exhibition By Arch Daily, Design competition.
Extracurricular activities Manifiesto: Espacio de arquitectura 2016 (Architecture Symposium, 464 participants) Finances Director
Manifiesto: Espacio de arquitectura 2013 (Architecture Symposium, 434 participants) General Director
Diseño Punto MX (Architecture Symposium, 1235 participants) Sponsorship Coordinator
Architecture student council 2014 Vicepresident
Skills Revit/MEP
AutoCad Adobe creative suite
Languages Spanish (Native) English (Proficient)
SketchUp
Rhino
Lumion
Sketching
Photograp: Sergio Flores Campos
Guided tour by the Architect Agustín Landa Vértiz (1951-2015) in 2014 Multifamiliar Presidente Miguel Alemán, designed by Arch. Mario Pani Darqui 1947-1949.
Acknowledgement I would like to thank. Mr. Agustín Landa Vertíz (1951-2015), Mr. Silverio Sierra and Mauricio Huerta (1993-2014) for sharing their passion for life and architecture with me and for everything they taught me.They are my instructors and my friends who have been helping and encouraging me all along. This portfolio could’nt have been done without their sincere suggestions.
North facade
05
01 CIDS, Infonavit Monterrey, Nuevo León.
1st prize in students biennale, finalist Infonavit national competition Work: Conceptual design, all drawings and photos
It is known that in many Mexican cities, in this case Monterrey, during the last 20 years have experienced an enormus growth where the peripheral zones grow and its urban center population loses. Ancient neighborhoods are the most affected zones as for population density since its physical and conceptual limits still are without defining. Because of this, Municipal Planification Institute and Monterrey’s Conviviality (IMPLANC) have undertaken the task of regenerating the zone with urban long-term strategies; but in the last years, few interventions have been realized since Ancient Neighborhood is nowadays an acquaintance as a scene enclave of entertainment and night leisure of weekend tied to the drug trafficking and organized crime. Due to these facts, besides other reasons, inhabitants prefer living in the outskirts of town more than in the downtown.
06
Site Urban issue
Urban sprawl
Solution
Causes 1997 One-family housing preference
2007
Noise-induced
Insecurity
hearing
Overvalued housings
Effects
Monterrey
2017
Downtown Monterrey
Barrio Antiguo
The periphery growth with an average annual rate of 6.0 %. Where the economic housings do not possess the sufficient infrastructure
Viviendas particulares totales: 259 Particulares habitadas 94 Deshabitadas: 165
Center densificationt implementing vertical housing
Barrio Antiguo, Centro de Monterrey. Density problems Barrio Antiguo
Polygon: 28 Ha Population: 224 hab. Density: 11 people / Ha 28
18 min 8 min
10 27
32
16 min 7 min
39
11 min 5 min
500 mts
Vivienda
13
30 10 min 5 min
17
9 min 4 min
35
14
Comercio
37
20
29 11 min 4 min
Comercio
15
7 min 3 min Centro Cultural
50 mts
12 min 5 min
23
550 mts
Parque Urbano
22
1 Futura Macroplaza
18
12 min 7 min
19
9 min 3 min
3
33
26
800 m
34
4 min 2 min
Vivienda
Vivienda
600 m
21
6
Parque Urbano
4 8 min 3 min 12 min 5 min
5
6 min 2 min
31
Vivienda
38
400 m 36
2 min 1 min
25
200 m
2
Caso 2
100 m
9
7
6 min 4 min
8
Caso 4
9 min 3 min
12
4 min 3 min
11
2 min 1 min
Comercio
24
Caso 3
20 mts Caso 1 16
Parking spaces
Site
Barrio antiguo
Secundary sites
Selected sites
Crosswalk corridor
landmarks
Área Cajones
24,576 1985
Ocupación
76%
Resident services
m
2
Future use
E
Public parks
1- Central library Fraycervando Teresa de Mier 2- Morelos commerce avenue 3- Dulces Nombres chapel 4- Monterrey casino 5- Nuestra Señora de Monterrey Cathedral 6- Monterrey Merchant circle 7- Antonio Paduas chool 8- Condominios Constitución 9- Art corridor 10- Mexico corridor 11- Normal Superior Profr. Moisés Sáenz Garza school 12- Profra. Julia Garza Almaguer school 13- Explanada de los Héroes 14- Santa Lucía esplanade 15- Santa Lucía forum 16- Gas station Pemex 17- Nuevo Leon state congress 18- Regional Delegation of Infonavit 19- La Capital 20- Macroplaza
2030
Estimated time
21- Barrio Antiguo market 22- Mexican history museum 23- Noreste museum 24- Culturas Populares state museum 25- MARCO museum 26- Monterrey metropolitan museum 27- Government palace 28- Sagrado Corazón de Jesús cathedral 29- Hidalgo square 30- Poder Judicial del Estado de Nuevo León 31- Monterrey city hall 32- Nuevo León civil registration 33- Santa Lucia river 34- Sedesol 35- National Union of Education Workers Section 21 36- Super Leal 37- City theater 38- Divina Providencia temple 39- High Court of Justice
07
Mobility
Design concept 1- Modulation
2- Urban Voids
“Barrio Antiguo” is mostly known as the first block of Monterrey, and it is a part of the Historical Center of the city. From the start, the urban planing for these first blocks, the streets were organized in a reticular pattern that follows the noth-south orientation.
Due to the high violence ratings of the last years and due to the high number of residents moving outside the center of the city, Barrio Antiguo, has become an underused area and has been undergoing a stage of degradation in its population density, which generates a deficient organization of uses of land, abandoned housing and urban voids of various dimensions.
3- Distribution
4- Minimal housing module 1.15
Frente Variable Housing
Fixed back
Communal Area
Housing Green area Housing Housing
The solution to the project takes advantage os the block’s arrangement with its fixed back, defining the inhabitable spaces to each 10 meters, where the housing bloacks and green areas can be developed.
2 Modules
3.30
Service Area
3.30
Flexible
3.30
Communal
Living Room
Bedroom
Bathroom / Bathroom
Dining Room
Studio
Kitchen / Bathroom
Living / Dining
Living / Dining Room + Terraza
Terrace / Future expansion Expansión
Kitchen
Terrace / Future Expansion
Bathroom
Stairs
6- Adaptability
1 Modules
5- Replicability and Flexibility
3 Modules
Flexible
Service Areas
Once the spaces are distributed, a minimum housing type was designed based on a module of 3.30 meters wide, where the dwelling can be inhabited with the minimum necessary spaces in relation to the established architectural program. Also, thanks to the flexibility of the module, it is possible to adapt several cases where the housing responds to the economic, social and / or personal needs of the resident. The communal module when expanded can become a flexible module.
*When the back is irregular, the green areas adapt to the dimensions.
Variable facade
Flexible
3.30
Given that “Barrio Antiguo” has blocks that vary in its front, the type of housing adapts to grow the module or completely replicating the house. Consequently, different typologies of housing are born and can be adapted to fronts of 1, 2 and 3 modules and thus, significantly increase the density per unit of housing.
Once the modules are established, the complex can develop through the diverse urban voids and empty lands providing users with high quality space and an environment worthy of its context. In the same way, this type of housing can be replicated in the different states of Mexico with similar situations adapting with its architecture, materiality and surrounding environment.
08
Typologies Void sections Void sections
Housing typologies
1 Void C1-01 38 m2 $ 433, 333 MXN
Ground [ha]= 0.00776223 Apartments [viv]= 6 Inhabitants [hab]= 28 Density [viv/ha]= 772.973 Density [hab/ha]= 3601.21
2 Dorms Kitchen Bathroom Dining room Living room Terrace 6 m2
E C1-01 First floor
C1-01 E
C1-02 60m2 $ 523, 330 MXN
C1-02 First floor
2 dorms Kitchen 2 1/2 Bathrooms Living room Dining room 2 Terraces 6 m2 2 Terraces 6 m2 c/u c/u
C1- 1 Void
C1-02
C1-First level (flats) -First level (flats)
Ground [ha]= 0.015552446 Apartments [viv]= 8 Inhabitants[hab]= 36 Density [viv/ha]= 515.3158 Density [hab/ha]= 2318.92
E C1-02 Second floor
C2-01 48 m2 $ 483, 333 MXN 2 dorms Kitchen Bathroom Living room Dining room Terrace 6 m2
E
C2-01 First floor
C2-01
C2-02 75 m2 $ 633, 333 MXN $ 633, 333 MXN 3 dorms Kitchen 2 1/2 Bathrooms Living room 2 1/2 Bathrooms Dining room Terrace 11 m2 Terrace 11 m2 -Second level flats C2-Second level flats
E
C2-C22 Voids 2 Voids
C2-02 First floor
C2-02
C2-02 Second floor
E
C3-01 65 m2 $ 613, 333 MXN 3 dorms Kitchen 2 Bathrooms Living room Dining room Terrace17 m2
Ground [ha]= 0.02328669 Apartments [viv]= 8 Inhabitants[hab]= 56 Density [viv/ha]= 343.54 Density [hab/ha]= 240.81
C3-01
C3-01 First floor
E
C3-02 75 m2 $ 633, 333 MXN 4 dorms Kitchen 2 Bathrooms Living room Dining room Terrrace 6 m2
C3-02 C3-02 Second floor
C3-03 75 m2 $ 623, 333 MXN 2 dorms Kitchen Bathroom Living room Dining room Terrace 6 m2
C3-03
C3-Second levellevel flatsflats -Second
E
C3 - C3 3 Voids - 3 Voids
C3-03 First floor
C3-03 Second floor
09
C2
2 Voids
2 Voids
Void solution
First floor
C1- 2 vertical voids
C2-2 vertical voids joined
vertical voids
-2 vertical voids joined
C1- 2 horizontal voids
Caso 1- 2 vertical voids joined in a corner
Caso 2- 2 vertical voids
C2- 2 horizontal voids
-01 First floor
-02 Second floor
-03 First floor
-03 Second floor
C3- 2 vertical voids
C3- 2 horizontal voids
Caso 3- 1 horizontal void in a corner
10
Site Case #4 Horizontal void
After analyzing the diverse chosen lands, 4 were chosen for the Case as the area selected for his architectural development as a building of high density of three you were squeaking of a lot in horizontally. This selection was based on its different advantages as: dimensions (10 x 23 mts), location opposite to a principal artery (Padre Mier) and to 50 mts a pedestrian commercial street (Morelos), need demolitions to initiate his construction, its location in a land of low value, his nearness to stops of autobus and meter, and sufficient hassock (8 meters) to improve the urban conditions of the inhabitant. After adapting the minimal housing module, there were formed 8 housings with three typologies of housing inside the set which, in this case, look for the major possible densification of this development habitational as the first step to an urban environment recovery strategy . In the same way, the set seeks for one to generate a collective environment on having proposed a terrace of conviviality apergolada for different uses. Finally, the building is ruled in red brick as a universal and amicable material with any proposed environment.
Site
Commerce
Services
Unifamiliar housing
Education buildings
Urban voids
Green areas
Urban trace
High value
Average value
Low value
Set of plans
S
Ground floor
Before and after 0
1
2
3
Level 1-2 0
1
2
0
Level 3
3
1
0
2
1
2
3
Level 4
Level 5 0
0
1
2
1
2
0
3
Before
3
3
1
2
3
After
11
S
Common 0
1
2
3
0
1
2
3
0
1
2
3
0 0
1
2
1
2
3
3
Set of plans
0
1
2
0
3
North elevation
1
2
Longitudinal section
Dining and living room
12
3
South Facade
13
02 Felix Candela Prize CDMX, Mexico.
Selected as one of the top 50 out of 1600 participants in a FAE National competition Work: Conceptual design, all drawings and photos
The history of Mexican architecture starts from and is characterized, as is the history of the country itself, by the miscegenation product of the synthesis of two cultures: the Spanish and the native Mexican.This mixture, however, not only combines peculiarities of each civilization, but also finds several points in common that are strengthened in order to lay the foundations of what we know today as Mexican architecture. The National Museum of Mexican Architecture project takes these echoes of traditional architecture and brings them to great expressive simplicity by translating them through the language of modernity. Its configuration is based on the superposition of elements such as the patio and the porticoes, as well as a structural and material proposal that allows the tectonic and program distinction between each of the bodies that make up the project. The building is located in the Historic Center of Mexico City, an urban context characterized by the diversity of architectural monuments, and steeped in the idiosyncrasy of the capital. The Palacio de Bellas Artes, its most notable neighbor, serves as a starting point to establish the first design gestures of the project, always seeking to generate a dialogue that allows the building to settle in the best possible way on the site. The museum brings together in its design premises the generation of spaces for both a museum collection and spaces for social, commercial, artistic and economic exchange, developed in a central body and 2 lateral wings respectively.
14
Design Process
Fine arts building Fine Arts, starting point for planting the project. Symbol of cultural enhancement, the project seeks to dialogue with its architectural and cultural disposition to locate and develop in the best possible way on the site.
Site
For the wings, a compositional scheme is proposed that consists of rectangular plants with simple front arches, which achieve a compartmentalized spatial regulation that gives rise to spaces linked to the outside, but which are modulated according to the human scale. This composition is complemented by the appearance of an interior patio in each wing, spaces for contemplation with atmospheres of peace and tranquility, achieved thanks to the deliberate unevenness that occurs in these areas.On the other hand, the central building consists of a suspended element that develops around a central core of reinforced concrete from which a series of steel trusses and tensioners emerge. This core functions as the guiding axis of the building, since it encompasses the vertical circulations in its interior and supports the slabs on which the architectural program is developed. A double façade made up of a first glass skin prior to the structural “layer” allows regulating the entry of natural light into the exhibition rooms, as well as providing an effect of lightness to the volume. Under the central body and between both wings there is a square that serves as a connecting element with the street and with each building in the project. This square is partially protected by the projection of the central building, and invites through a set of levels and transitions to access the different components of the project.Finally, the apparent concrete materiality of the wings emphasizes the solidity in the periphery against the ethereal mass in the center, achieving a whole that, despite its compositional differences, manages to be harmonious and balanced.
The Historic Center of Mexico City is an architectural mosaic within which all its parts coexist in perfect harmony at the same time that they converse with the passerby. Representing different historical and stylistic periods, buildings such as the colonial Templo de la Santa Veracruz and the postmodernist Conjunto Juárez symbolize the spirit of the proposal presented: the expressive and grounded synesthesia of elements from yesterday and today in a contemporary and perennial language result.
15
Ground Floor A central body and two lateral wings are located on the ground in such a way that a permeable project is achieved, with a direct connection to the street, and with two patios and a central plaza as contained exterior spaces that reinforce the idea of relationship with the context and its actors.
Structure A suspended body, with a light appearance, and a protector of the space in the central square, thus stands at the core of the project. A central core is organized from a radial structure that allows suspending the building slabs and incorporating a double skin that protects the interior of the work exhibited in rooms.
Access The incorporation of a series of game levels and transitions invites the visitor to access and discover in an organic way the different components of the project.
Portico In the wings, 2 arcaded levels with simple arches allow the project to open onto the street and invite pedestrians to walk through its squares and explore its rooms and galleries.
Tectonics The articulation between two bodies with great tectonic presence and a lighter one emphasizes the play of contrasts, expressive simplicity and synthesis between the elements.
Longitudinal section
16
Program
Central body For the museographic program, it was decided to support the layout of the exhibition halls in the work of the architect Enrique X. de Anda, a scholar who has devoted his career to the history of the architecture of our country and who organizes chronologically, which at the time is evolutionary, its development. Considering that this is the best way to tell and understand our architectural history, the program of the central building has been organized as follows: S1: Access, lobby and ticket office. Rooms: N2: Pre-Hispanic Architecture. N3: Architecture of the Viceroyalty. N4: Architecture of Academicism. N5: Post-revolutionary Architecture. N6: Modern and Contemporary Architecture.
L7
L6 L5 L4 L3 L2
Side wings Spaces for social, commercial, artistic and economic exchange:
L1
A S1: -Audience. -Audiovisual rooms. PB: -Temporary exhibitions. N1: -Administrative area. -Museum library. N2: -Individual study rooms. -Collaborative study rooms.
GF
B S1: -Workshops. PB: -Commercial area: cafes, museum shop, restaurants. N1: -Academic exhibitions and competitions. N2: -2 event rooms.
B1
17
Exhibition hall
East Facade
18
Floor plans
AUDITORIO
TALLERES
ALMACEN
UP
E
S
RECEPCIÓN
E
S
UP
ALMACEN
TALLERES
SALAS AUDIOVISUALES
1.0
8.0
0.0
3.0
Basement floor plan
DN
EXPOSICIONES TEMPORALES
TIENDA DEL MUSEO
EXPOSICIONES TEMPORALES
CAFETERÍA
DN
1.0 0.0
8.0 3.0
Ground Floor
SALA DE ESTUDIOS INDIVIDUAL
SALÓN DE EVENTOS
SALA: ARQUITECTURA PREHISPANÍCA
SALA DE ESTUDIOS COLABORATIVA
SALÓN DE EVENTOS
1.0 0.0
8.0 3.0
Floor plan L1
19
Exhibition room
SALA: ARQUITECTURA MODERNA Y CONTEMPORANEA
Floor plan L6
1.0 0.0
8.0 3.0
Cross section
20
West view
21
03 Juarez comunity center 2016, Juarez,Nuevo Leon (Mexico)
1st Prize, Catedra Blanca CEMEX-ITESM and Selected one of the best end of career projects in Mexico by Arch Daily and Honorable mention in students biennale Work: Conceptual design, all drawings and photos Monterrey’s Metropolitan Zone, to 20 Km from its center, this community center takes place. The building conceptualizes as a container for diverse types of activities, stimulating the community life and promoting the interaction between the community members, and at the same time, offering activities of social development and local cooperation inside a main plan of intervention for a zone of high density inside the municipality. By means of a structure consisted of girders and columns of steel like industrial ship, it is developing different spatial schemes to shelter diverse activities so that they relate between yes, and in turn, to the urban fabric and the public space that is delegated to the most public zone of the land and is kept opened for the user.
22
Site
Site
Santa catarina river
Monterrey Metropolitan zone
B
A
Polygon A Juarez municipality
Polygon B Lomas del Sol community
23
Zoning To begin, a schematic zoning identification took place to determine the necessities of the area.
Urban conection
Lackness
The diagram shows the nearby points of interest in the area and the distance between them.
After the identification of the defficiencies of the zone, the most critical points are located.
24
Design process
25
26
Master plan
5
2
4
4
5 The site is identified and divided into three sections to analyze closer.
4 2
2
2
1
1
27
Community center
Future buildings
Community center, private area
Downtown connection
Community center, public area
2. Esquemas de Movilidad
Mobility
Lineal park
28
Sections
Cross section through administration area (A)
Cross section through central courtyard (B)
Cross section through secondary access (C)
Cross section through workshops (D)
Cross section through service area (E)
Cross section through library (F)
29
A
A
Floor plans
E
D
C
F
E
D
C
B
B
F
Ground floor plan
Cross section
30
Axonometric projection
Multipurpose Space
SERVICIOS ÁREA EDUCATIVA ÁREA OFICIOS COMEDOR ÁREA CULTURAL ASISTENCIA SOCIAL
Workshops
Library Patio
31
A
A
Floor plans
E
D
C
F
E
D
C
B
B
F
Level 1 floor plan
Cross section
32
Constructive detail
Multytecho sheet: rigid polyurethane foam core with two faces of ternium pintro color white duraplus. Thickness 4”, 26 gauge.
Monten Grid: Steel profile A36 8”x3”, 10 gauge with double layer of Comex Oyster White paint.
Slab: Reinforced concrete slab 10 cm thick, electrowelded mesh 6-6 / 10-10. With preparation for polished concrete finish.
Structure: Columns and steel beams A36
Dividing walls: Walls of conventional porous brick half unit 12x24x6 cm applied with mortar ratio 1: 4. Concrete slab: Reinforced concrete 10 cm thick, electrowelded mesh 6-6 / 10-10. With preparation for polished concrete finish.
Public areas
33
Modules
Workshop I
Workshop II
Restrooms
Storage
Classroom+corridor II
Classroom + patio
Workshop I
Classroom type II
Administration
Classroom + Corridor
Open classroom
Kitchen+ dining area
Lateral Access
34
aerial view
35
04 Temporary Pavilions Monterrey, Nuevo León.
1st Prize, Temporary Pavilions, 2019, CANL, regional competition. Work: Conceptual design, all drawings and photos
The city in which we live today should not expand without restructuring, it requires finding mechanisms that allow the reuse of spaces, buildings and structures, but it also needs to find ways that reduce and compact its fabric. Starting from this premise, the FORUM-01 pavilion arises from a very clear intention: to modify the site in which it is located to the least extent. The constructive pragmatism of the proposal is based on the delimitation of the space, identifying within it the existing structure, furniture and vegetation that will be used for the development of the pavilion. With a minimum incorporation of external resources, a roof is created that starts from a proposed central nucleus and that is supported by the steel frames that rest on the forum to take its distinctive shape, the result of the perfect synthesis of the pavilion with the space in it. that rests.
36
Forum-01 Pavilion 10
9 8
4.83
7 4.83
3 4.8
6 3 4.8
4.8 3
5
11
4.8
12
4.8 3
3
4 4.83
13
4.83
14
4.83
15
3 4.83
---
0
5
10 m
3 4.8
2
1
Under the roof, an atmosphere is created that encourages meeting and exploring what takes place in it, with total flexibility to host activities of all kinds, from exhibitions to theatrical performances.
4.83 4.83
18 17
16
Design Concept
Delimitation
Adaptation
Structuring
The space on which The roof begins to The central structure is the intervention is be located, taking the located and its operation is defined. going to be defined is existing elements on the site as a guideline. defined.
Projection
Cover
Forum-01
The space to be covered begins to be specified.
The roof has been determined and is ready to be synthesized with the existing structure on the site.
Pavilion and site as one, complement each other and create a space in which the user would have multiple activities.
Forum-01, pavilion that: Accesible, It has no barriers or imposes them, it is completely permeable and invites all types of users to develop within it.
Build relationships with users, it is a space to share inside and outside of it, and exchange activities and opinions.
Carry out an adequate reading of the existing to identify the architectural figures that are presented and understand them as such.
Dialogue with what exists, does not ignore it. It incorporates the preset elements of the site and makes them stronger with its presence.
37
Program Promoting mobility, culture and recreation. The following are some of the applications that the flexibility of the project allows:
Light and shadow
Expositions
Public market
Amphitheater
Reading area
Sections
West facade
Cross section
38
Constructive detail
X140 Hook for cables welded to upper barrel of metal column to hang tension cables.
X140 22x100 closed eye bolt for fastening to existing frames on site.
X8 200 liter metal barrel with welded clamping ring and crosshead cutter. X7 Recycled metal barrel sheet-based clamping ring welded to barrel bottom end with crosshead gaps.
X140 Line of 24 linear meters of 10mm reinforced elastic cord.
X8 Profile PTR 2X2 ”cal. 12 as a crosshead joined by a 15cm and ½ ”diameter bolt with 6x6” plates to hold mesh welded to the ends.
X35.7 m2 Electrowelded mesh 6x6 / 10-10 cal. 10 in sections of 1.70m in diameter. Height 85 cm. Attached to spreaders.
X128 2 ”long ½” bolt for electro-welded mesh clamping plates.
X8 40kg sand bag for counterweight on column base.
Frame connection detail
39
Replicability
Pavilion 02: Adolfo Prieto Esplanade (Next to the Historical Archive)
Pavilion 03: Esplanade Access A1 (Next to Cintermex and Holiday Inn)
Pavilion 04: Plaza Peñoles (Next to a sculpture by Mathias Goeritz)
Pavilion 05: Fundidora Terrace (Next to the parking lot)
40
The road as a unifying element and a possible extension. The majority of green areas are concentrated in La Calzada and in the central sectors, this with the intention in addition to making their maintenance more efficient and economical.
Concept diagram
41
05 Clouthier Park Monterrey, Nuevo León.
Finalist, in Clouthier Park reactivation competition, 2019, CANL, regional. Work: Conceptual design, all drawings and photos
Located in the northwestern tip of the municipality of San Pedro, and located within a large urban development, the CLOUTHIER PARK has the vocation of linking and bringing together the inhabitants of the area to promote their recreation and coexistence, and it is precisely the exploit these characteristics the goal of the intervention proposal presented below. The first specific intervention action consists of the implementation of a clean, simple and legible plot that contributes to the experience of the park user. For this, the simplification of the circulation is proposed through the incorporation of a formal axis that serves as a unifying element of each of the sections of the park: La Calzada. This compositional axis also aims to be a specific visual quality, easily recognizable and easily grouped into the overall pattern of the park. On the other hand, nodes or strategic points are implemented at the intersections through which the park can be entered. These constitute conuences, meeting points and transversal connections that promote circulation and that will provide greater permeability to the project.Once the circulations are regenerated, the components to be conserved (sports fields, equipment, squares and existing roads) and the areas whose character will be predominantly vegetation or abundant in contrast to others. This is how recreational areas will be differentiated from those for leisure, walks and relaxation. In this way, the majority of green areas are concentrated in La Calzada and in the central sectors, this with the intention in addition to promoting and economizing their maintenance.
42
1 Concrete benches
2 Gardens
3 Flows
4 Reticula
Meeting points where various activities can be carried out. Not limiting the user is essential for the evolution of a space.
5 Water mirror
6 Threes
7
The road is an important element, since many activities can be carried out on it and it marks the user in a clear direction.
Pavilion
Oro
In sectors with a steeper slope, it is elements that serve the user, such a spaces.
1 Circular Bench
2
Transitions
1
3
Space delimitation
3
4 6
5 5
Creative activities furniture
Reading furniture 6
4
2
7
These meeting points can be delimited in many ways. Elements can be used, different flows. You can take advantage of the subsidence of the site to create different spaces.
8
Games furniture
Furniture
Games furniture
Transitions:
Flows:
1
1
2
2
3
3
4 5 6 7
Flexibility in the design of the sidewalks in relation to the street is important, as it can be adapted to the existing elements on the site.
La Calzada is protected by a strip of vegetation that isolates users from the bustle of vehicles.
It is important that sports spaces are surrounded and spaces where people can witness the events
1
Transitions: 1 2
2
3
The incorporation of elements such as benches is one more option that explores La Calzada's relationship with the street.
The existing indoor meeting spaces are redesigned to serve as children's play areas protected from the street and providing security for small users.
43
Barrier effect
Transitions
The incorporatio the diversity of a
2
1
Consider the use of elements such as gabions to create spaces that promote a sense of community for users.
Development of vegetated stairways that allow the user to interact in shady public spaces.
1
s important to design as planters and leisure
Amphitheater
The generation of uneven spaces is important for the user experience, since they evoke different sensations in it.
Graphic scale
0 km
100 km
5
6 Stage
Flower pots Table
d by vegetation s and enjoy the
on of elements that serve as a physical barrier allows activities and transitions within the project.
3
Social events 4 2 1 Expositions
Board games
A platform game allows the creation of interspersed spaces that can host a series of activities that promote exchange
44
Public market
South View
45
08 Colonia
Monterrey, Nuevo León.
Constructor: Plate,Monterrey, Nuevo León. Design: Parametrico, Monterrey, Nuevo León. Work: As a project leader, Conceptual design, construction design,engineering coordination, dealing with supliers, all drawings and photos. Status:Under construction A mixed-use project designed by experts with the aim of offering its inhabitants a balanced life in connection with the city. Each space has been designed to form a community evolving the Colón area.
46
Floor plans E-E
AB-3-02
D-D
AB-3-03
B-B
AB-3-01
2
1
LP 5.10
4
3
8.70
8.70
6
5
8.70
81.00
8.70
7
8.70
8
8.70
9
8.70
LP
8.70
6.30
AA-2-02
A
E-NTE
LP
NBQ
NBQ
536.76 (-0.61)
1.29
LP
536.68 (-0.70)1.29
NAV
13121110 9 8 7 6 5 4 3 2 1
-0.66
SUBESTACIÓN
NPT
4.35
NPT
+0.30
NAV
HERRERIA ABATIBLE
NPT
+0.30
+0.55
3
USOS MIXTOS, AV. COLÓN, MONTERREY, NUEVO LEON.
A
S
4
9
5
10
15
11
14151617181920212223242526
17
16
B
-0.82
4.35
NPT
-0.20 AUTO
ESCALERAS (PROYECCIÓN A FUTURO)
COMPACTO
NFT
NOTAS GENERALES
B
-0.10
NPT
-0.05
248.30 M2 LC-8
NPT
+0.30
NAV
NPT
+0.30
NPT
DESARROLLO: 7.30 MTS PENDIENTE 12.30%
9.30
+0.40
-0.05
N1.0
H: 1.65 MTS DESARROLLO: 26.70 MTS PENDIENTE 6.20%
S
-0.60
NSLE NPT
NPT
NAV
-0.80
9.30
0.00
+1.95
NPT
+0.30
NPT
-0.20
NPT
NFT
S
-0.10
121314151617181920 2122
s 1110 9 8 7 6 5 4 3 2 1
7.30
NPT
NPT
-0.35
12
13
14
+0.85
H: 1.00 MTS DESARROLLO: 8.50 MTS PENDIENTE 11.75%
NSLE NPT
23 22 HERRERIA ABATIBLE: ACCESO POR SOTANO 1
NSLE NPT
NPT
20
19
A-A
NFT
AUTO-0.18 COMPACTO
-0.05
N1.5
E-PTE
NSLE
+0.40
8.30
AUTO COMPACTO
131.20 M2 LC-1
127.90 M2 LC-2
131.20 M2 LC-3
+0.35
+0.35
+0.15
NPT
NPT
NPT
NSLE
F
NSLE
NPA
H: -0.225 MTS DLLO.: 3.60 MTS PENDIENTE 6.25%
+0.40
NPA
NPT
NPT
-0.12 AUTO COMPACTO
9.30
+0.375
NPT
-0.175
+0.35
N.S.L.E:
NIVEL SUPERIOR DE LOSA ENTREPISO
NFT
N.F.T:
NIVEL DE FIRME TERMINADO
-0.10
NPT
N.S.L:
NIVEL SUPERIOR DE LOSA
-0.05
N.S.L.A:
-0.05
NIVEL INDICADO EN PLANTA
NAV
0.00
57.80
NIVEL INDICADO EN CORTE/ALZADO
-0.68
CAMBIO DE NIVEL EN PISO CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
E
NFT
D-X
-0.10
XX-XX-XX
NPT
-0.05
NAV
E-X
-0.67
XX-XX-XX
8.30 C-X
XX-XX-XX
NSLE
+0.15
NPT
NSLE
+0.40
131.20 M2 LC-4
127.90 M2 LC-5
131.20 M2 LC-6
-0.05
-0.05
-0.05
NSLE
+0.20
NSLE
NPT
+0.20
0.00
NSL 0.00
NSLE
NPT
0.00
F
AUTO COMPACTO
NPT
0.00
RX
NPT
NPT
REVISIONES
-0.20
NFT
-0.10
NPT
B
+0.40
NSLE
NPT
+0.35
+0.35
+0.375
NPT
NSLE
+0.375
+0.15
NPT
NPT
NSLE
+0.175
NPT
NPT
+0.15
+.025
-0.05
+0.175
NPT
NPT
NSLE
-0.025
-0.05
NPT
DESARROLLO 4.50 MTS NBQ NPT -0.52 PENDIENTE 8.88% -0.45
NPT
-0.025
NPT
-0.175
+0.20
S 1 2 3 4 5 6 7 8 9
4.525
NSLE
FECHA
9.30
NPT
-0.05
NPT
+0.375
+0.225
18 17 16 15
23-04-2020
NAV
-0.67
09-07-2020
-0.175
17-08-2020
G
NPT
121314
NPT
ALCANTARILLA 5.33 NAV EXISTENTE -0.335
+0.25 B
28-08-2020 30-09-2020
4.525
NSC
14-10-2020
+0.24
ESCURRIMIENTO DIAGONAL
ESCURRIMIENTO DIAGONAL
+0.10
+0.13
+0.25
5.10
+0.15
NPT
NPT
+0.27
8.70
+0.11
+0.07
+0.21
+0.11
8.70
8.70
8.70
NAV
-0.35
8.70
NPT
-0.35
6
-0.40
24-11-2020
B-B
AB-3-01
NAV
NPT
NAV
-0.37
NBQ
9
NPT
NAV
-0.44
NAV
-0.47
NAV
-0.51
NAV
-0.57
-0.50
NAV
NAV
ARQUITECTONICO ESCALA: 1:125 FECHA: 18.12.2020
10mts
NAV
-0.67
Ground floor plan
-0.30
AB-3-02
E-E
4
3
8.70
8.70
6
5
8.70
PLANTA ARQUITECTÓNICA PB
D-D
AB-3-03
B-B
AB-3-01
2
1 5.10
AA-1-02
N
5
-0.665
-0.66
LP
-0.67
LP
0 1
-0.30
NAV
NAV
-0.41
NCA
ESCALA GRAFICA
-0.20
NAV
-0.32
536.92 (-0.46)
NPT
6.30
8
-0.45 -0.15
NBQ
-0.41 -0.26
8.70
7
NAV
NPT
NPT
-0.37
D-D
-0.28
NPT
AB-3-02
NAV
-0.33 -0.21
E-E
NAV
-0.13
NBQ
NPT
AB-3-03
NBQ
NPT
NPT
-0.29
-0.25 -0.24
8.70
5
NBQ
-0.11
NPT
-0.27
E-SUR
AA-2-01
81.00
4
3
-0.26
NPT
NPT
NPT
-0.21
-0.17
-0.09 -0.19
-0.11
8.70
2
1
NPT
NPT
NPT
NPT
-0.05
-0.01
-0.05
NPT
NPT
NPT
NPT
NPT
NPT
NPT
NPT
+0.25
NBQ
LP
23-10-2020
H 4.13
NDJ
LP
ESCURRIMIENTO DIAGONAL
0.00
+0.15
537.38 00.00
ESCURRIMIENTO DIAGONAL
NPT
+0.16
NPT
BDN
LP
NPT
+0.09
PENDIENTE 5.50%
FIRMA
10-03-2020
10 1112
NAV
-0.40
NIVEL SUPERIOR DE LOSA DE AZOTEA
SIMBOLOGIA
9.30
NPT
13 12 11 10 9 8 7 6 5 4 3 2 1
S
-0.465
H
NIVEL DE PISO TERMINADO
-0.20
NSLE
+0.15
NAV
G
NIVEL DE BANQUETA
N.P.T:
VESTIBULO
NAV
NAV
NIVEL DE ARROYO VEHICULAR
N.BQ:
NPT
-0.49
-0.47
NIVEL DE JARDINERA NIVEL SUPERIOR DE CALLE
N.A.V:
-0.20 14 15 16 17 18 19 20 21 22 23 24 25 26
BANCO DE NIVEL
N.D.J:
AUTO COMPACTO
H: -2.75 MTS DESARROLLO: 18.05 MTS PENDIENTE 15.25%
NAV
-0.51
99.60 M2 LC-7
H LIBRE: 2.70 MTS EXTENSION PARA LOCAL #2 49.60 M2
59.00
E
+2.95
H: 1.60 MTS DESARROLLO: 26.70 MTS PENDIENTE 6.00%
B.D.N: N.S.C:
NPT
SUBE @ N2.0
NOMENCLATURA
-0.74
-0.50 NBQ -0.59
NPT
0.00
+0.35
NPT
D
NPT
NPT
AUTO COMPACTO
-0.15
LOCKERS
ADMIN
AA-2-03
9.30
0.00
NAV
NBQ
0.00
NSLE
NPT
-2.60
-0.20
NPT
S
-0.53
7.30
NFT
-0.05
NPT
LOBBY H-OTE
18
SITE
+0.40
AB-3-02
-0.05
21
+0.35
NAV
C-C AB-3-01
s
NSLE
COMEDOR
D
AUTO COMPACTO
5 4 3 2 1
+0.35 +0.40
-0.77
-0.05
HRM
SITE
+0.85
1110 9 8 7 6 5 4 3 2 1
LOBBY H-PTE
-0.15
PQT
NPT
s
E-OTE
-0.57
8
AA-2-03
NAV
7
6
2
NPT
NAV C
NPT
121314151617181920 2122
1
PQT
AB-3-02
A-A
+0.85
HRM
C-C AB-3-01
AUTO COMPACTO
NPT
+0.20
C
ACOTACIONES Y NIVELES EN METROS ESTE PLANO DEBERÁ VERIFICARSE CON LOS CONSULTORES ESTRUCTURALES Y DE INSTALACIONES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
81.00
8.70
8
7
8.70
8.70
8.70
9
LP
8.70
6.30
AA-2-02
A
E-NTE
LP
LP
1.29
1.29
4.350
27
28
30
29
31
32
33
34
35
39
40
41
45
47
46
51
52
14151617181920212223242526
53
B
4.35
ESCALERAS (PROYECCIÓN A FUTURO)
B
NSLE
H: 2.70 MTS DESARROLLO: 43.50 MTS PENDIENTE 6.20%
S
N2.5 NPT
NOTAS GENERALE
B
276.55 M2 LC-19
SUBE @ N3.0 9.30
USOS MIXTOS, AV. COLÓN, MONTERREY, NUEVO LEON.
A
13121110 9 8 7 6 5 4 3 2
+4.55
9.30
NPT
+4.60
+5.85
NPT
NPT
+5.95 B
C
+4.70
1 2 3 4 5 6 7 1213141516171819 202122
C-C
C
121314151617181920 2122 B
36
37
42
38
43
48
44
49
54
50
55
56
B
C-C
AB-3-02
AB-3-02
s
s
1110 9 8 7 6 5 4 3 2 1
AB-3-01
A-A
71.00 M2 LC-18
1110 9 8 7 6 5 4 3 2 1
H: 1.30MTS DESARROLLO: 8.80 MTS PENDIENTE 14.75%
7.30
AB-3-01
A-A
7.30
NSLE
NSLE
26
+4.55
D
+4.55
H: 1.00 MTS DESARROLLO: 8.50 MTS PENDIENTE 11.75% 25
23
24
22
21
20
19
NOMENCLATURA
NPT
+4.60 LAVANDERIA OTE
NSLE
18
NPT
+4.55
NPT
+4.70
D
+4.70
B
NPT
+4.55
N2
E-PTE
AA-2-03
9.30
+2.95
N1.5
H: 1.60 MTS DESARROLLO: 26.70 MTS PENDIENTE 6.00%
B.D.N:
BANCO DE NIVEL
N.D.J:
NIVEL DE JARDINERA
N.S.C:
NIVEL SUPERIOR DE CALLE
N.A.V:
NIVEL DE ARROYO VEHICULAR
N.BQ:
NIVEL DE BANQUETA
N.P.T:
NIVEL DE PISO TERMINADO
N.S.L.E:
NIVEL SUPERIOR DE LOSA ENTREPISO
N.F.T:
NIVEL DE FIRME TERMINADO
N.S.L:
NIVEL SUPERIOR DE LOSA
N.S.L.A:
137.50 M2 LC-17
NSLE
E-OTE
NPT
AA-2-03
S
ACOTACIONES Y NIVELES EN METRO ESTE PLANO DEBERÁ VERIFICARSE C LOS CONSULTORES ESTRUCTURALES DE INSTALACIONES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION D OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS ESTE PLANO DEBERAN EJECUTARSE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
+4.55
NIVEL SUPERIOR DE LOSA DE AZOTEA
SIMBOLOGIA
9.30
NIVEL INDICADO EN PLANTA
NPT
NIVEL INDICADO EN CORTE/ALZADO
+4.60
CAMBIO DE NIVEL EN PISO
57.80
59.00
CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON
NSLE
CAMBIO DE MATERIAL EN MURO
+4.55
E
8.30
E
NPT
14 15 16 17 18 19 20 21 22 23 24 25 26
+4.60
12 11 10 9 8 7 6 5 4 3 2 1
D-X
XX-XX-XX
E-X
XX-XX-XX
8.30
S
B
C-X
XX-XX-XX
165.90 M2 LC-9
133.55 M2 LC-10
NSLE
F
133.55 M2 LC-11
NSLE
137.00 M2 LC-12
NSLE
137.70 M2 LC-14
75.50 M2 LC-13
NSLE
NSLE
133.55 M2 LC-15
NSLE
137.00 M2 LC-16
NSLE
+4.55
+4.55
+4.55
+4.55
+4.55
+4.55
+4.55
NPT
NPT
NPT
NPT
NPT
NPT
NPT
NPT
+4.60
+4.60
+4.60
+4.60
+4.60
+4.60
NSL 0.00
NSLE
+4.55
+4.60
F
+4.60
RX
REVISIONES 9.30
FECHA
9.30
FIRMA
10-03-2020 NSLE
23-04-2020
+4.55
NPT
09-07-2020
+4.60
G
26 25 24 23 22 21 20 19 18
2 3 4 5 6 7 8 9
4.525
B
G
17-08-2020 28-08-2020 30-09-2020
4.525
14-10-2020
1011121314151617
H
H
23-10-2020 24-11-2020
4.13
5.33
LP LP
E-SUR
AA-2-01
5.10
LP
8.70
8.70
2
1
8.70
3
8.70
81.00
4
5
8.70
8.70
6
8.70
8.70
7
8
6.20
9
LP
N
ESCALA GRAFICA D-D
AB-3-02
E-E
AB-3-03
B-B
AB-3-01
0 1
5
10mts
Level 1 floor plan
47
AA-1-03 ARQUITECTONICO ESCALA: 1:125 FECHA: 18.12.2020
PLANTA ARQUITECTÓNIC PA
South View
Lobby View
48
AB-3-02
E-E
5.10
D-D
AB-3-03
B-B
AB-3-01
2
1
LP
4
3
8.70
8.70
6
5
8.70
81.00
8.70
7
8.70
8
8.70
9
8.70
LP
8.70
6.30
AA-2-02
A
E-NTE
LP
LP
1.29
1.29
4.350
161
162
163
164
165
166
167
168
173
169
174
175
179
180
181
185
187
186
124
125
127
126
4.35
129
128
USOS MIXTOS, AV. COLÓN, MONTERREY, NUEVO LEON.
A
B
NOTAS GENERALES
B
ACOTACIONES Y NIVELES EN METROS ESTE PLANO DEBERÁ VERIFICARSE CON LOS CONSULTORES ESTRUCTURALES Y DE INSTALACIONES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
SUBE @ N5.0 NPT
+13.55
NPT
NPT
NPT
NPT
+12.50
+12.40
1 2 3 4 5 6 7 1213141516171819 202122
170
AB-3-02
172
177
176
178
182
183
184
188
189
B
190
C-C
1
AB-3-02
NPT
s
+12.40
1110 9 8 7 6 5 4 3 2 1
A-A
171
NPT
s AB-3-01
C
121314151617181920 2122 B
C-C
9.30
+12.40
NPT
+13.65 B
+13.55
C
N4.0
H: 2.70 MTS DESARROLLO: 43.50 MTS PENDIENTE 6.20%
S
N4.5
9.30
+12.40
1110 9 8 7 6 5 4 3 2 1
AB-3-01
A-A
H: 1.15 MTS DESARROLLO: 8.80 MTS PENDIENTE 13.05%
7.30
7.30 NOMENCLATURA
NSLE
151
+12.40
D
NPT
+12.40
150
149
147
145
146
144
143
141
142
140
NSLE
139
+12.40
D
NPT
NPT
+12.50
+12.50
S
B.D.N:
BANCO DE NIVEL
N.D.J:
NIVEL DE JARDINERA
N.S.C:
NIVEL SUPERIOR DE CALLE
N.A.V:
NIVEL DE ARROYO VEHICULAR
N.BQ:
NIVEL DE BANQUETA
N.P.T:
NIVEL DE PISO TERMINADO
N.S.L.E:
NIVEL SUPERIOR DE LOSA ENTREPISO
N.F.T:
NIVEL DE FIRME TERMINADO
N.S.L:
N4.0
NPT
E-PTE
AA-2-03
+12.40
E-OTE
AA-2-03
9.30
NIVEL SUPERIOR DE LOSA
N.S.L.A:
NIVEL SUPERIOR DE LOSA DE AZOTEA
SIMBOLOGIA
9.30
NIVEL INDICADO EN PLANTA NIVEL INDICADO EN CORTE/ALZADO CAMBIO DE NIVEL EN PISO
57.80
59.00
CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
E
E 159
160
158
157
155
156
154
153
12 13 14 15 16 17 18 19 20 21 22
148
152
8.30
11 10 9 8 7 6 5 4 3 2 1 B
D-X
138
137
135
136
134
132
133
131
XX-XX-XX
130
E-X
NSLE
XX-XX-XX
+12.40
S
8.30
NPT
+12.45
C-X
XX-XX-XX
VESTIBULO
NSL 0.00
F
F RX
129.78 M2 OF-12 9.30
68.66 M2 OF-14
58.27 M2 OF-13
NSLE
NSLE
NSLE
+12.40
NPT
NPT
+12.45
+12.45
+12.45
+12.45
FIRMA
10-03-2020
NPT
NPT
+12.45
REVISIONES
+12.40
+12.40
FECHA
9.30
NSLE
NSLE
+12.40
NPT
NPT
+12.45
155.78 M2 OF-22
58.27 M2 OF-21
NSLE
+12.40
+12.40
NPT
+12.45
68.67 M2 OF-20
NSLE
NSLE
+12.40
NPT
+12.45
64.85 M2 OF-19
55.37 M2 OF-18
NSLE
+12.40
NPT
+12.45
64.30 M2 OF-17
NSLE
+12.40
NPT
NPT
+12.45
64.40 M2 OF-16
NSLE
+12.40
+12.40
+12.45
64.40 M2 OF-15
23-04-2020 09-07-2020
G
17-08-2020
G 4.525
28-08-2020 30-09-2020
4.525
14-10-2020
H
23-10-2020
H
24-11-2020
4.13
5.33
LP LP
AA-1-05
E-SUR
AA-2-01
5.10
8.70
8.70
2
1
LP
8.70
8.70
81.00
4
3
8.70
8.70
8.70
6
5
8.70
7
6.20
8
9
LP
N
ESCALA GRAFICA E-E
D-D
AB-3-02
AB-3-03
B-B
AB-3-01
0 1
5
ARQUITECTONICO ESCALA: 1:125 FECHA: 18.12.2020
10mts
Level 4 floor plan
AB-3-02
E-E
5.10
D-D
AB-3-03
B-B
AB-3-01
2
1
LP
4
3
8.70
8.70
6
5
8.70
PLANTA ARQUITECTÓNICA E4/E5
81.00
8.70
7
8.70
8
8.70
9
8.70
8.70
LP 6.30
AA-2-02
A
E-NTE
LP
1.29
1.29
4.350
228
229
230
231
232
233
234
235
236
240
241
242
247
246
248
252
253
191
254
192
193
194
195
LP
USOS MIXTOS, AV. COLÓN, MONTERREY, NUEVO LEON.
A
4.35
196
B
NOTAS GENERALE
B
SUBE @ N6.0 NPT
+17.40
NPT
NPT
NPT
NPT
+16.35
+16.25
1 2 3 4 5 6 7 1213141516171819 202122
AB-3-02
s 1110 9 8 7 6 5 4 3 2 1
AB-3-01
A-A
C
121314151617181920 2122 B
C-C
9.30
+16.25
NPT
+17.50 B
+17.40
C
N5.0
H: 2.70 MTS DESARROLLO: 43.50 MTS PENDIENTE 6.20%
S
N5.5
9.30
237
238
243
239
244
249
245
250
255
251
256
B
257
NPT
C-C
+16.25
AB-3-02
NPT
s
+16.25
1110 9 8 7 6 5 4 3 2 1
AB-3-01
A-A
H: 1.15 MTS DESARROLLO: 8.80 MTS PENDIENTE 13.05%
7.30
ACOTACIONES Y NIVELES EN METRO ESTE PLANO DEBERÁ VERIFICARSE CO LOS CONSULTORES ESTRUCTURALES DE INSTALACIONES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION D OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS ESTE PLANO DEBERAN EJECUTARSE D ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
7.30 NOMENCLATURA
B.D.N:
NSLE
218
+16.25
D
NPT
+16.25
217
214
216
213
211
212
210
209
208
207
NSLE
206
+16.25
NPT
D
NPT
+16.35
+16.35
S
NIVEL DE JARDINERA NIVEL SUPERIOR DE CALLE
N.A.V:
NIVEL DE ARROYO VEHICULAR
N.BQ:
NIVEL DE BANQUETA
N.P.T:
NIVEL DE PISO TERMINADO
N.S.L.E:
NIVEL SUPERIOR DE LOSA ENTREPISO
N.F.T:
NIVEL DE FIRME TERMINADO
N.S.L:
NIVEL SUPERIOR DE LOSA
N.S.L.A:
N5.0
NPT
E-PTE
AA-2-03
+16.25
E-OTE
AA-2-03
9.30
BANCO DE NIVEL
N.D.J: N.S.C:
NIVEL SUPERIOR DE LOSA DE AZOTEA
SIMBOLOGIA
9.30
NIVEL INDICADO EN PLANTA NIVEL INDICADO EN CORTE/ALZADO CAMBIO DE NIVEL EN PISO
57.80
59.00
CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
E
E 227
226
225
224
223
222
221
220
219
12 13 14 15 16 17 18 19 20 21 22
215
8.30
11 10 9 8 7 6 5 4 3 2 1 B
D-X
XX-XX-XX
205
204
203
202
201
200
199
197
198
E-X
NSLE
XX-XX-XX
+16.25
8.30
NPT
+16.30
C-X
XX-XX-XX
VESTIBULO
NSL 0.00
F
F RX
9.30
133.42 M2 OF-23
89.50 M2 OF-24
98.75 M2 OF-25
99.25 M2 OF-26
84.82 M2 OF-27
99.25 M2 OF-28
89.50 M2 OF-29
159.42 M2 OF-30
+16.25
+16.25
+16.25
+16.25
+16.25
+16.25
+16.25
+16.25
NPT
NPT
NPT
NPT
NPT
NPT
NPT
NPT
NSLE
NSLE
+16.30
NSLE
+16.30
NSLE
+16.30
NSLE
+16.30
NSLE
+16.30
NSLE
+16.30
REVISIONES
+16.30
FECHA
9.30
NSLE
FIRMA
10-03-2020
+16.30
23-04-2020 09-07-2020
G
G 4.525
28-08-2020 30-09-2020
4.525
H
17-08-2020
14-10-2020 H
23-10-2020 24-11-2020
4.13
5.33
LP LP
E-SUR
AA-2-01
5.10
LP
8.70
8.70
2
1
8.70
3
8.70
81.00
4
5
8.70
8.70
6
8.70
8.70
7
6.20
8
9
LP
N
ESCALA GRAFICA D-D
AB-3-02
E-E
AB-3-03
B-B
AB-3-01
0 1
5
10mts
Level 3 floor plan
49
AA-1-06 ARQUITECTONICO ESCALA: 1:125 FECHA: 18.12.2020
PLANTA ARQUITECTÓNIC E5/E6
AB-3-02
E-E
5.10
D-D
AB-3-03
B-B
AB-3-01
2
1
LP
4
3
8.70
8.70
6
5
8.70
81.00
8.70
7
8.70
8
8.70
9
8.70
8.70
LP 6.30
AA-2-02
A
E-NTE
LP
1.29
1.29
4.350
232
231
233
234
235
236
240
241
242
247
246
248
252
253
254
258
259
261
260
262
LP
USOS MIXTOS, AV. COLÓN, MONTERREY, NUEVO LEON.
A
4.35
263
B
NOTAS GENERALE
B
N6.0 NPT
9.30
9.30
+20.10
NPT
NPT
+20.40
+20.40
LAVANDERIA PTE
C
NPT
NPT
+20.54
12131415161718 1920 2122 B
C-C
S
+20.20
3 2 1
C
12131415161718 1920 2122
237
238
243
239
244
249
245
250
255
251
256
B
257
C-C
AB-3-02
AB-3-02
S 10 9 8 7 6 5 4 3 2 1
AB-3-01
A-A
NPT
NPT
S
+20.10
+20.10
10 9 8 7 6 5 4 3 2 1
AB-3-01
A-A
7.30
ACOTACIONES Y NIVELES EN METR ESTE PLANO DEBERÁ VERIFICARSE C LOS CONSULTORES ESTRUCTURALE DE INSTALACIONES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN E LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPI CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS ESTE PLANO DEBERAN EJECUTARSE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
7.30 NOMENCLATURA
NSLE
+20.10
283
287
288
282
281
277
276
275
NSLE
273
274
+20.10
NPT
D
D
NPT
+20.20
+20.20
BANCO DE NIVEL
N.D.J:
NIVEL DE JARDINERA
N.S.C:
NIVEL SUPERIOR DE CALLE
N.A.V:
NIVEL DE ARROYO VEHICULAR
N.BQ:
NIVEL DE BANQUETA
N.P.T:
NIVEL DE PISO TERMINADO
N.S.L.E:
NIVEL SUPERIOR DE LOSA ENTREPISO
N.F.T:
NIVEL DE FIRME TERMINADO
N.S.L:
NIVEL SUPERIOR DE LOSA
N.S.L.A:
N6.0
NPT
E-PTE
AA-2-03
+20.10
E-OTE
AA-2-03
9.30
B.D.N:
NIVEL SUPERIOR DE LOSA DE AZOTEA
SIMBOLOGIA
9.30
NIVEL INDICADO EN PLANTA NIVEL INDICADO EN CORTE/ALZADO CAMBIO DE NIVEL EN PISO
57.80
59.00
CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
E
E 294
293
292
291
290
289
286
285
280
284
279
12 13 14 15 16 17 18 19 20 21 22
278
8.30
11 10 9 8 7 6 5 4 3 2 1
NSLE
293-A
292-A
291-A
290-A
289-A
286-A
285-A
XX-XX-XX
272
284-A
270
269
268
267
266
265
264 E-X
XX-XX-XX
8.30 C-X
XX-XX-XX
NPT
+20.15
BUSINESS CENTER
F
271
B
+20.10
294-A
D-X
272-A
271-A
270-A
269-A
268-A
266-A
267-A
265-A
NSL 0.00
264-A
F
SALA 1
RX
BUSINESS LUNCH SALA 2
REVISIONES 9.30
FECHA
9.30
FIRMA
10-03-2020 23-04-2020 09-07-2020 G
G 4.525
28-08-2020 30-09-2020
4.525
H
17-08-2020
14-10-2020 H
23-10-2020 24-11-2020
4.13
5.33
LP LP
E-SUR
AA-2-01
5.10
LP
8.70
8.70
2
1
8.70
3
8.70
81.00
4
5
8.70
8.70
6
8.70
8.70
6.20
8
7
9
LP
N
ESCALA GRAFICA D-D
AB-3-02
E-E
AB-3-03
B-B
AB-3-01
0 1
5
10mts
Level 5 floor plan
North View
50
AA-1-07 ARQUITECTONICO ESCALA: 1:125 FECHA: 18.12.2020
PLANTA ARQUITECTÓNIC E6
AB-3-02
E-E
5.10
D-D
AB-3-03
B-B
AB-3-01
2
1
LP
4
3
8.70
8.70
6
5
8.70
81.00
8.70
7
8.70
8
8.70
9
8.70
LP
8.70
6.30
AA-2-02
A
E-NTE
LP
LP
1.29
1.29
NSLA
+23.00
NPT
NPT
+23.05
4.350
A
NSLA
+23.00
+23.05
B
NPT
4.35
B
NPT
+23.25
+23.25
PET PARK
NPT
+23.05
NPT
9.30
NPT
+23.25
9.30
+23.25
BODEGA
NPT
NPT
+23.20
C
NPT
+23.20
+23.20
111213141516171819 20
B
NPT
12
AB-3-02
FIRE PIT PERGOLA 1
+23.475
A-A
7.30
NSLE
NPT
+23.25
+23.30
+23.15
LADIES LOUNGE
WC-H
WC-M
WC-M
+23.15
NPT
AB-3-01
A-A
SPORTS BAR
NSLA
NSLA
+23.15
NPT
7.30
GIMNASIO
NSLE
+23.25
WC-H
NPT
+23.30
D
NPT
+23.20
+23.20
AB-3-02
1
1110 9 8 7 6 5 4 3 2
NPT
LUDOTECA
C-C
+23.475 s
+23.10
1
COWORK
D
NPT
12
NSLA
s 1110 9 8 7 6 5 4 3 2
AB-3-01
C
111213141516171819 20
B
C-C
+23.20
NSLA
+23.15
NSLA
+23.10
1 2 3
NPT
+23.15
E-OTE
NPT
AA-2-03
E-PTE
AA-2-03
9.30
+23.80
SUITE DE VISITAS
SALA DE CINE
SALON CULINARIO 1
SALON DE EVENTOS
9.30
SALON CULINARIO 2
3 2 1
59.00
57.80 FIRE PIT PERGOLA 2
NPT
+23.30
E
NSLA
E
+23.50
NPT
NPT
+23.20
NPT
NPT
+23.20
+23.55
+23.20
NPT
NPT
+23.20
NSLA
BODEGA
NPT
+23.20
NPT
+23.20
+23.20
+24.65
8.30
8.30
F
F NSLA
NSLA
+23.05
NSLA
+23.05
NSLA
+23.05
NSLA
+23.05
+23.05
NSLA
+23.65
NPT
+23.70
9.30
9.30
G
G 4.525
4.525
H
H 4.13
5.33
LP LP
E-SUR
AA-2-01
5.10
8.70
2
1
LP
8.70
8.70
8.70
81.00
4
3
8.70
8.70
6
5
8.70
8.70
7
8
6.20
9
LP
N
ESCALA GRAFICA AB-3-02
E-E
D-D
AB-3-03
B-B
AB-3-01
0 1
5
10mts
Level 6 floor plan
AB-3-02
E-E
5.10
D-D
AB-3-03
B-B
AB-3-01
2
1
LP
8.70
4
3 8.70
8.70
6
5 81.00
8.70
8.70
8
7 8.70
8.70
9 8.70
LP 6.30
AA-2-02
A
E-NTE
LP
1.29
1.29
4.350
4.35
B
LP
A
B
9.30
9.30
C
C
C-C
NSLA
AB-3-02
C-C
NSLA
+107.60
AB-3-02
+107.60
AB-3-01
AB-3-01
A-A
A-A
7.30
7.30
NSLA
NSLA
+108.60
+108.60
D
D
E-OTE
AA-2-03
E-PTE
AA-2-03
9.30
9.30
57.80
59.00
E
E
8.30
8.30
F
F
9.30
9.30
4.525
4.525
G
G
H
H 4.13
5.33
LP LP
E-SUR
AA-2-01
E-E
D-D
AB-3-02
AB-3-03
B-B
AB-3-01
5.10
8.70
8.70
8.70
8.70
8.70
51
8.70
8.70
8.70
Level 5 floor plan 6.20
Amenities View
Amenities View
52
Amenities View
Amenities View
53
Amenities View
Amenities View
54
9.30
AB-3-02
AB-3-01
D-D
2/7
B-B
1/6
3/8
4/9
26.10 8.70
8.70
C
8.70
C
1314151617181920 2122 B
C-C
C-C
AB-3-02
AB-3-02
s 10 9 8 7 6 5 4 3 2 1
AB-3-01
A-A
7.30
AB-3-01
A-A
7.30
7.30
NSLE
+27.10
D
NPT
+27.15 (HAB-01)
D
16.60
AB-3-03
9.30
LP
E-E
B-B
AB-3-01
E-PTE
AA-2-03
9.30
16.60
2
1
5.10
8.70
9.30
4
3 8.70
5
8.70
81.00
8.70
59.00 1.29 E
E 8.70
8.70
8.70
26.10 D-D
AB-3-02
2/7
B-B
1/6
AB-3-01
4.350
3/8
4/9
8.30
5 apartmentsFloor plan type B
9.30
AB-3-02
AB-3-01
D-D
2/7
B-B
1/6
3/8
4/9
26.10 8.70
9.30
8.70
C
8.70
C
11121314151617181920 B
C-C
C-C
AB-3-02
AB-3-02
s 10 9 8 7 6 5 4 3 2 1
AB-3-01
A-A
7.30
AB-3-01
A-A
7.30
7.30
NSLE
4.525
+48.10
D
NPT
+48.15 (HAB-07)
D
16.60
E-PTE
AA-2-03
5.33 9.30
16.60
9.30
9.30
59.00
5.10
LP
E
8.70
8.70
8.70
2
1 8.70
8.70
4
3 8.70
81.0
E
5
8.70
26.10
3/8
4/9
8.30
6 apartments Floor plan type A
55
E-E
2/7
AB-3-03
D-D
AB-3-02
B-BB-B
AB-3-01 AB-3-01
1/6
Room View
Social area view
56
Sections and facades LP
A
B
D
C
E
F
LP
G
LP
F
G
E
D
59.00
1.29
4.35
9.30
7.30
B
C
A
LP
59.00
9.30
8.30
9.30
9.86
5.33
9.30
8.30
9.30
7.30
9.30
4.35
5.82
N31 AZ.T.
N31 AZ.T. 3.50
107.60 3.50
107.60
104.10 3.50
N30 AZ.
104.10 3.50
N30 AZ.
N29 DTB
N29 DTB 3.50
100.60 3.50
100.60 N28 DTB
N28 DTB 3.50
97.10 3.50
97.10 N27 DTB
N27 DTB 3.50
93.60 3.50
93.60 N26 DTB
N26 DTB 3.50
90.10 3.50
90.10 N25 DTA
N25 DTA 3.50
86.60 3.50
86.60 N24 DTA
N24 DTA 3.50
83.10 3.50
83.10 N23 DTA
N23 DTA 3.50
79.60 3.50
79.60 N22 DTA
N22 DTA 3.50
76.10 3.50
76.10 N21 DTA
N21 DTA 3.50
72.60 3.50
72.60 N20 DTA
N20 DTA 3.50
69.10 3.50
69.10 N19 DTA
N19 DTA 3.50
65.60 3.50
65.60 N18 DTA
N18 DTA 3.50
62.10 3.50
62.10 N17 DTA
N17 DTA 3.50
58.60 3.50
58.60
N16 DTA 55.10
107.25
3.50
107.25
55.10
3.50
N16 DTA
N15 DTA
N15 DTA 3.50
51.60 3.50
51.60 N14 DTA
N14 DTA 3.50
48.10 3.50
48.10 N12 DTB
N12 DTB 3.50
44.60 3.50
44.60 N11 DTB
N11 DTB
41.10 3.50
3.50
41.10
N10 DTB
N10 DTB 3.50
37.60 3.50
37.60 N9 DTB
N9 DTB 3.50
34.10 3.50
34.10 N8 DTB
N8 DTB 3.50
30.60 3.50
30.60 N7 DTB.
N7 DTB. 3.85
27.10 3.85
27.10 N6 AM.
N6 AM. 3.15
23.25 3.15
23.25 N5 A.O.
N5 A.O. 3.85
20.10 3.85
20.10
16.25 3.85
N4 O. 3.85
N4 O. 16.25 N3 O.
N3 O. 3.85
12.40 3.85
12.40 N2 O.
N2 O.
8.55
COMERCIAL
COMERCIAL
8.55
COMERCIAL 4.00
COMERCIAL
4.00
COMERCIAL
N1 C.
N1 C.
4.55
COMERCIAL
COMERCIAL
COMERCIAL
4.55
COMERCIAL
COLONIA ORIENTE
4.20
COMERCIAL
4.20
COLONIA PONIENTE
N0 PB
N:536.767 -0.61 MTS
+0.35
NPT
NPT
NPT
+0.40
+0.40
+0.35
NAV-0.57
NAV -0.60
NAV -0.66
N:537.383 0.00 BDN
NPT
+0.40
NPT
-0.15
NAV-0.53
NAV -0.47
NAV -0.49
NAV-0.51
NPT -0.05
N:536.924 -0.46 MTS
NAV-0.335
NAV -0.40
NAV -0.465
West Elevation
LP
1
2
4
3
5
7
6
8
NFT NPT -0.10 -0.20
NPT -0.05
NFT NPT -0.10 -0.20
NPT -0.05
NFT NPT -0.10 -0.20
NAV
NAV
NPT -0.15
NFT 0.00 NPT -0.05
NPT NPT -0.10 -0.20
NPT NPT -0.10 -0.20
NPT -0.05
N0 PB
N:536.68 -0.70 MTS
NAV
+0.35
East Elevation
LP
9
LP
H
F
G
E
D
B
C
A
LP
81.00
5.10
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
58.07
6.30
N31 AZ.T.
3.50
76.10 N21 DTA 3.50
72.60 N20 DTA 3.50
69.10 N19 DTA 3.50
65.60 N18 DTA 3.50
62.10 N17 DTA 3.50
58.60
55.10
107.25
3.50
N16 DTA
N15 DTA 3.50
51.60 N14 DTA 3.50
48.10 N12 DTB 3.50
44.60 N11 DTB 3.50
41.10 N10 DTB 3.50
37.60 N9 DTB 3.50
34.10 N8 DTB 3.50
30.60 N7 DTB. 27.10
3.50 3.50 3.50 3.50 3.50 3.50
90.10 N25 DTA 3.50
86.60 N24 DTA 3.50
83.10 N23 DTA 3.50
79.60 N22 DTA 76.10 3.50
N22 DTA
93.60 N26 DTB
N21 DTA 72.60 3.50
3.50
79.60
97.10 N27 DTB
N20 DTA 69.10 3.50
N23 DTA
100.60 N28 DTB
N19 DTA 65.60 3.50
3.50
83.10
N29 DTB
N18 DTA 62.10 3.50
3.50
86.60 N24 DTA
N30 AZ. 104.10
N17 DTA 58.60 3.50
N25 DTA
N31 AZ.T. 107.60
N16 DTA 55.10 N15 DTA 51.60 N14 DTA 48.10 N12 DTB 44.60 N11 DTB 41.10 N10 DTB 37.60 N9 DTB 34.10 N8 DTB 30.60 N7 DTB.
3.85
27.10
3.85
20.10
NSLE +17.40
N4 O.
NSLE +16.25
16.25 3.85
12.40 3.85
8.55 4.00
NPT +0.15
NPT +0.40 MTS
-2.80
-3.05
NPT +0.00
N:536.756 -0.50 MTS
N1 C. 4.55
4.20
+1.95
NPT +0.00
PENDIENTE 0.4%
3.85
8.55
4.55
NPT -0.35
N2 O.
N1 C.
NSLE +4.55
NAV -0.57
N3 O. 12.40
N2 O.
NSLE +5.85
H: 1.60MTS MTS DESARROLLO: 26.70 PENDIENTE 6.00%
3.85
N3 O.
NSLE +8.55
H: 2.70MTS MTS DESARROLLO: 43.50 PENDIENTE 6.00%
20.10 N4 O.
4.00
H: 2.70MTS MTS DESARROLLO: 43.50 PENDIENTE 6.00%
+23.25
16.25
NSLE +12.40
NSLE +9.70
PENDIENTE 1.0%
PENDIENTE 1.0%
N5 A.O.
N0 PB NAV -0.74
+0.35
4.20
H: 2.70MTS MTS DESARROLLO: 43.50 PENDIENTE 6.00% NSLE +13.55
EMPASTADO INVERSO A TOMA PLUVIAL
23.25 3.15
N5 A.O.
NSLE +20.10
H: 2.70MTS MTS DESARROLLO: 43.50 PENDIENTE 6.00%
N6 AM.
3.85
3.15
23.25
3.85
N6 AM. NSLE +20.40
107.25
3.50
90.10
1.29
3.50
3.50
93.60 N26 DTB
4.35
3.50
N27 DTB
9.30
3.50
3.50
97.10
7.30
3.50
N28 DTB
9.30
3.50
3.50
100.60
8.30
3.50
N29 DTB
9.30
3.50
3.50
104.10
4.53
3.50
3.50
107.60 N30 AZ.
4.40
N0 PB +0.35
-3.00
N:537.407 -0.36 MTS
-0.30
-0.025
-2.80
Section C-C
N:536.72 -0.68 MTS
-0.05
-2.90
-2.65
-2.80
-2.925
-3.05
Section D-D
57
LP
1
2
3
5
4
7
6
8
LP
9
80.99
5.10
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
6.30
N31 AZ.T. 3.50
107.60 N30 AZ. 3.50
104.10 N29 DTB 3.50
100.60 N28 DTB 3.50
97.10 N27 DTB 3.50
93.60 N26 DTB 3.50
90.10 N25 DTA 3.50
86.60 N24 DTA 3.50
83.10 N23 DTA 3.50
79.60 N22 DTA 3.50
76.10 N21 DTA 3.50
72.60 N20 DTA 3.50
69.10 N19 DTA 3.50
65.60 N18 DTA 3.50
62.10 N17 DTA 3.50
58.60
107.25
55.10
3.50
N16 DTA
N15 DTA 3.50
51.60 N14 DTA 3.50
48.10 N12 DTB 3.50
44.60 N11 DTB 3.50
41.10 N10 DTB 3.50
37.60 N9 DTB 3.50
34.10 N8 DTB 3.50
30.60 N7 DTB. 3.85
27.10 N6 AM. 3.15
23.25 N5 A.O. 3.85
20.10 N4 O. 3.85
16.25 N3 O. 3.85
12.40 N2 O. 8.55
COMERCIAL
COMERCIAL
COMERCIAL
COMERCIAL
COMERCIAL
4.00
COMERCIAL
N1 C. 4.55
ACCESO ESTACIONAMIENTO
COMERCIAL
COMERCIAL
COMERCIAL
COMERCIAL
COMERCIAL
COMERCIAL
4.20
N0 PB
N: 537.383 0.00 BDN
+0.35
NPT +0.40
NDJ +0.25
NPT +0.13
NPT +0.10
NPT +0.25
NPT NPT +0.27+0.11
NPT +0.15
-0.30
NPT +0.21
NPT +0.07
NAV
NPT +0.11
NPT -0.05
NAV -0.41
NPT -0.01
NPT -0.11
NAV
NPT -0.05
NAV
NPT -0.09 NAV
NPT -0.19
NPT -0.27
NPT -0.17
NPT -0.21
NAV
NPT -0.25
NPT -0.24
NPT -0.29
NAV -0.66
NPT -0.21
NPT -0.21
NPT -0.37
NAV -0.665
NPT -0.41
-0.025
NAV -0.67
N: 536.924 -0.41 MTS
-0.57
South Elevation
LP
9
7
8
5
6
4
3
1
2
LP
LP
A
B
D
C
E
F
H
G
LP
81.00 58.89
6.30
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
5.10 1.29
N31 AZ.T.
4.35
9.30
7.30
9.30
8.30
9.30
4.52
5.22
N31 AZ.T.
107.60 3.50
3.50
107.60
N30 AZ.
N30 AZ.
104.10 3.50
3.50
104.10
N29 DTB
N29 DTB
100.60 3.50
3.50
100.60
N28 DTB
N28 DTB
97.10 3.50
3.50
97.10
N27 DTB
N27 DTB
93.60 3.50
3.50
93.60
N26 DTB
N26 DTB
90.10 3.50
3.50
90.10
N25 DTA
N25 DTA
86.60 3.50
3.50
86.60
N24 DTA
N24 DTA
83.10 3.50
3.50
83.10
N23 DTA
N23 DTA
79.60 3.50
3.50
79.60
N22 DTA
N22 DTA
76.10 3.50
3.50
76.10
N21 DTA
N21 DTA
72.60 3.50
3.50
72.60
N20 DTA
N20 DTA
69.10 3.50
3.50
69.10
N19 DTA
N19 DTA
65.60 3.50
3.50
65.60
N18 DTA
N18 DTA
62.10 3.50
3.50
62.10
N17 DTA
N17 DTA
58.60 3.50
3.50
58.60 N16 DTA
N15 DTA
55.10
107.25
3.50
55.10
107.25
3.50
N16 DTA
N15 DTA
51.60 3.50
3.50
51.60
N14 DTA
N14 DTA
48.10 3.50
3.50
48.10
N12 DTB
N12 DTB
44.60 3.50
3.50
44.60
N11 DTB
N11 DTB
41.10 3.50
3.50
41.10
N10 DTB
N10 DTB
37.60 3.50
3.50
37.60
N9 DTB
N9 DTB
34.10 3.50
3.50
34.10
N8 DTB
N8 DTB
30.60 3.50
3.50
30.60
N7 DTB.
N7 DTB.
27.10 3.85
3.59
3.85
27.10
N6 AM.
PENDIENTE 1.0%
PENDIENTE 1.0%
23.25
N6 AM.
EMPASTADO INVERSO A TOMA PLUVIAL
N5 A.O.
N5 A.O. 20.10 3.85
H: 1.15 DESARROLLO MTS : PENDIENTE 8.80 MTS 13.05%
N4 O.
N3 O.
+13.55
H: 1.15 DESARROLLO MTS : PENDIENTE 8.80 MTS 13.05%
+9.70
H: 1.15 DESARROLLO MTS : PENDIENTE 8.80 MTS 13.05%
16.25 3.85
3.85
16.25
H: 2.70MTS DESARROLLO: 43.50 MTS PENDIENTE 6.00%
N3 O.
N2 O.
H: 2.70MTS DESARROLLO: 43.50 MTS PENDIENTE 6.00%
12.40 3.85
3.85
12.40 NSLE +9.70
NSLE +8.55
+17.40
N4 O. NSLE +13.55
NSLE +12.40
+20.40
20.10 NSLE +17.40
H: 2.70MTS DESARROLLO: 43.50 MTS PENDIENTE 6.00%
N2 O.
8.55 4.00
NSLE +5.85
+5.85
N1 C.
NSLE +4.55
8.55
H: 1.30M DESARROLLO TS PENDIENTE : 8.80 MTS 14.75%
4.00
H: 2.70MTS DESARROLLO: 43.50 MTS PENDIENTE 6.00%
NSLE +16.25
3.15
3.15
23.25
3.85
NSLE +20.10
NSLE +20.40
N1 C.
4.55
-3.05
PENDIENTE 0.4%
NPT +0.40
-0.15 MTS
NPT -0.35
4.55 4.20
H: 1.60MTS DESARROLLO: 26.70 MTS PENDIENTE 6.00%
+0.00
4.20
+1.95
+0.00 N:536.756 -0.50 MTS
N0 PB
NAV -0.57
+0.35
N:536.767 -0.61 MTS
+0.40
+0.375
+0.17
+0.20
-0.15
N0 PB -0.29
+0.35
-2.80
Section A-A
Section B-B
58
Sections and facades
LP
A
B
D
C
E
F
H
G
LP
58.42
1.29
4.35
9.30
7.30
9.30
8.30
9.30
4.52
4.76
N31 AZ.T. 3.50
107.60 N30 AZ. 3.50
104.10 N29 DTB 3.50
100.60 N28 DTB 3.50
97.10 N27 DTB 3.50
93.60 N26 DTB 3.50
90.10 N25 DTA 3.50
86.60 N24 DTA 3.50
83.10 N23 DTA 3.50
79.60 N22 DTA 3.50
76.10 N21 DTA 3.50
72.60 N20 DTA 3.50
69.10 N19 DTA 3.50
65.60 N18 DTA 3.50
62.10 N17 DTA 3.50
58.60 N16 DTA 3.50
107.25
55.10 N15 DTA
3.50
51.60 N14 DTA 3.50
48.10 N12 DTB 3.50
44.60 N11 DTB 3.50
41.10 N10 DTB 3.50
37.60 N9 DTB 3.50
34.10 N8 DTB 3.50
30.60 N7 DTB. 3.85
27.10 +23.25
PENDIENTE 1.0%
+23.55
+23.20
N6 AM.
PENDIENTE 1.0%
3.15
23.25 N5 A.O.
+20.10 +18.94 3.85
20.10 N4 O.
+16.25 +15.09 3.85
16.25 N3 O.
+12.40 +11.24 3.85
12.40 N2 O.
+8.55 +7.39 4.00
8.55 N1 C. +3.55 4.20
4.55
+1.35
N:537.408 +0.025 MTS
+0.175
+0.15
N:536.727 -0.65 MTS
N0 PB +0.35
-2.80
-2.90
Section E-E LP
9
7
8
5
6
4
3
1
2
LP
81.00
6.30
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
5.10
N31 AZ.T. 3.50
107.60 N30 AZ. 3.50
104.10 N29 DTB 3.50
100.60 N28 DTB 3.50
97.10 N27 DTB 3.50
93.60 N26 DTB 3.50
90.10 N25 DTA 3.50
86.60 N24 DTA 3.50
83.10 N23 DTA 3.50
79.60 N22 DTA 3.50
76.10 N21 DTA 3.50
72.60 N20 DTA 3.50
69.10 N19 DTA 3.50
65.60 N18 DTA 3.50
62.10 N17 DTA 3.50
58.60
107.25
3.50
N16 DTA 55.10 N15 DTA 3.50
51.60 N14 DTA 3.50
48.10 N12 DTB 3.50
44.60 N11 DTB 3.50
41.10 N10 DTB 3.50
37.60 N9 DTB 3.50
34.10 N8 DTB 3.50
30.60 N7 DTB. 3.85
27.10 N6 AM. 3.15
23.25 N5 A.O. 3.85
20.10 N4 O. 3.85
16.25 N3 O. 3.85
12.40 N2 O. 4.00
8.55 N1 C. 4.20
4.55
NAV -0.80
N: 536.682 -0.70 MTS
NPT -0.15
NPT -0.20
N0 PB
NPT +0.35
NPT -0.00
-0.15
N: 536.767 -0.61 MTS
NAV -0.66
+0.35
North Elevation
59
North View
60
Aerial view
61
09 Sikara
Monterrey, Nuevo León.
Constructor: Plate + Mach ,Monterrey, Nuevo León. Design: Parametrico, Monterrey, Nuevo León. Work: As a project leader, Conceptual design, construction design,engineering coordination, dealing with supliers, all drawings and photos. Status:Under construction A unique proposal of Fashion Park with exclusive avant-garde design of more than 126 thousand square meters of construction. It has international class luxury stores, a world class prime restaurant area, platinum cinemas, boutique hotel, corporate space, housing and an innovative fitness center; ready to bring an unparalleled entertainment, shopping and lifestyle experience to Monterrey. With 150 commercial spaces, fused with exceptional green areas, this Fashion Park located on Av. Paseo de los Leones, becomes the new west of Monterrey, offering royal families a trendy destination where every day they can live a new experience.
62
AB-3-01
Floor plans
E.N.
7.64
7.61 3
10.5
N=581.76
AV. ALEJANDRO
NBQ=581.88
1
10.5
NBQ=582.40
DE RODAS
NSC=583.02 ENTRADA SOTANO 5
4
10.5
NBQ=583.88 NBQ=584.44
NPT=583.30
SALIDA SOTANO 5 PENDIENTE 6.25%
5.00
ENTE
3.00%
E009 2.70
2.70
E006
E008
2.70
E007 5.00
5.00
5.00
IENT E DE
21
2 3
4 5
6 7
8 9
BAJA
1000
KG
E1
5
SERVICIOS
ND PE 0.1 DE
1000
KG
E7
KG
E1
1000
5.00
2.70
5.00
5.00
5.00
2.70
2.70
5.00
9.00
2.70
5.00
2.70
2.70
9.00
2.70
2.70
5.00
5.00 5.00
5.00
2.70
2.70
5.00
5.00
2.70
9.00
5.00 5.00
2.70
2.70
5.00
2.70
2.70 5.00
2.70 5.00 5.00
2.70
2.70
9.00
5.00
2.70
0.94
5.00
2.70
5.00
5.00
2.70 5.00
2.70 5.00 5.00 5.00
2.70
5.00
8.06
2.70 2.70
5.00
2.70
PENDIENTE DE 1.6%
2.70 2.70
1.40
5.00
5.00
2.70
2.70
5.00 5.00
2.70
7.60
2.70
5.00
5.00
2.70
5.00
2.70
5.00
9.00
5.00
2.70
2.70
5.00
2.70
5.00 5.00
2.70
2.70
5.00
5.00
1.31
2.70
5.00
2.70
2.70
5.00
5.00
2.70
5.00
5.00 5.00
2.70
7.69
5.00 5.00 5.00 5.00 5.00 5.00 5.00
2.70
PENDIENTE DE 1.6%
2.70 2.70
5.00
2.70
2.70
2.70
9.00
5.00
2.70
2.70
2.70
5.00 5.00
2.70
2.70
2.70
2.70
9.00
5.00 5.00 5.00
2.70
PENDIENTE DE 1.6%
5.00
2.70
5.00 5.00 5.00
9.00
5.00
5.00
5.00
OF118
OF117
5.00
2.70 2.70
2.70
OF116
5.00
2.70
2.70
2.70
2.70
OF111
OF115
NPT=587.98
2.70
2.70
OF041
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00 2.70
2.70
5.00
2.70
OF042
2.70
OF043
5.00
5.00
NPT=588.00
2.70
2.70
OF045
OF044
5.00
2.70
OF046
5.00
5.00
9.00
NPT=587.96
PENDIENTE DE 0.2%
2.70
5.00
OF114 2.70
2.70
NPT=587.94 OF039
2.70
PENDIENTE DE 1.6%
2.70
5.00
PENDIENTE DE 1.6%
NPT=587.92
5.00
NPT=587.90
KG
2.70
2.70
2.70
5.00 2.70 2.70
2.70
2.70
2.70
5.00 2.70
2.70
2.70
2.70
5.00
2.70
2.70
2.70
2.70
5.00 5.00
2.70
5.00
2.70
2.70
2.70
5.00 2.70
2.70
2.70
2.70
5.00 5.00
2.70
2.70
2.70
2.70
2.70
2.70
2.70
5.00 2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
5.00
2.70 2.70
2.70
2.70
2.70
5.00
2.70
5.00
2.70
2.70
2.70
5.00
2.70
5.00
2.70
2.70
2.70
5.00 5.00
2.70
5.00 5.00
5.00
5.00 2.70
2.70
2.70
2.70
5.00
5.00
2.70
2.70
2.70
2.70
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
2.70
2.70
2.70
5.00
5.00
5.00 5.00 5.00 5.00
5.00
2.70
2.70
5.00
OF112
OF113
5.00
2.70
2.70
5.00 5.00
2.70
PENDIENTE DE 1.6%
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
2.70
5.00
2.70
2.70
2.70
2.70
5.00
5.00 5.00 5.00 5.00 5.00 5.00
5.00
2.70
2.70
5.00
2.70
2.70
2.70
2.70
5.00 2.70
5.00
2.70
5.00
5.00
5.00 2.70
5.00
5.00
2.70
5.00
5.00
2.70
PENDIENTE DE 1.6%
2.70
E8
2.70
2.70
5.00
5.00
2.70
5.00 5.00 5.00
2.70
2.70 2.70
2.70
PENDIENTE DE 1.6%
2.70
2.70
5.00 2.70
2.70
5.00 2.70
2.70
5.00 2.70
2.70
2.70
5.00 5.00 2.70
2.70
2.70
PENDIENTE DE 1.6%
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
2.70 2.70 5.00
2.70 5.00
2.70 5.00 5.00
2.70
5.00 5.00
2.70
5.00
5.00
OF049
B-551 14.56m²
OF047 5.00
B-552 13.12m²
5.00 5.00
E.O. AB-3-01
OF121
OF120
OF119
NPT=587.70
OF050
OF036
OF040 5.00
1000
PEN DE DIE 0.8 NTE %
2.70
5.00
PENDIENTE DE 1.6%
5.00 2.70
5.00
5.00 2.70 2.70
5.00
5.00
5.00 2.70
5.00
2.70
5.00 5.00 5.00 5.00
5.00
5.00
5.00
5.00
2.70
5.00
5.00 2.70
5.00
5.00
2.70 2.70
5.00
5.00
2.70
5.00 5.00
5.00
5.00
2.70 2.70
5.00 5.00
2.70
PENDIENTE DE 1.6%
2.70
2.70 5.00
5.00 2.70
2.70
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
5.00
5.00
5.00
2.70 2.70 2.70
2.70
PENDIENTE DE 1.6%
2.70
5.00
5.00
PE DE ND 1.6 IEN % TE
2.70
2.70
5.00 5.00
2.70
5.00
2.70
2.70
2.70
2.70
2.70
2.70
2.70
5.00
2.70 2.70
2.70
2.70
5.00
2.70
2.70
PENDIENTE DE 1.6%
NPT=587.88 2.70
NPT=587.86
2.70
NPT=587.84
PENDIENTE DE 0.2%
2.70
PEN DE DIEN 1.6% TE 3.80
MAQ EST.
5.00 2.70
2.70
2.70
2.70
ELECTRICO
2.70 2.70 2.70 2.70
2.70
5.00
2.70
2.70
2.70
5.00
2.70
5.00
OF109
OF110
OF038
2.70
5.00 3.80
5.00
2.70
5.00
HIDRAULICO
2.70
REGISTRO PARA MEDIDORES HIDRAULICOS
5.00
IDF
5.00
5.00
2.70
5.00
2.70
2.70
2.70
VOZ Y
5.00
5.00
5.00
2.70
5.00
2.70
5.00
2.70
5.00
NPT=587.82
NPT=587.80 2.70
5.00
2.70
OF052
OF051
OF048
OF034
OF035
OF122
OF108
NPT=587.66
2.70 2.70 2.70 2.70
NPT=587.90
OF107
OF053
E10
2.70
OF033
OF106
KG
5.00
OF032
OF123
OF105
OF055
OF054
OF030
PENDIENTE DE 0.2%
OF124
NPT=587.400
1000
2.70
5.00
2.70
PENDIENTE DE 0.2%
NPT=587.62
OF103
OF104
E11
5.00
NPT=587.58
OF058
OF057
OF127
OF126
OF125
KG
2.70
5.00
5.00
NPT=587.54
OF128
OF100
OF101
OF102
OF056
OF029
OF031
OF131
OF130
OF129
NPT=587.100
OF099
OF061
OF028
PENDIENTE DE 0.2%
OF132
OF096
OF060
PENDIENTE DE 0.2%
OF134
OF133
OF095
OF097
OF098
OF059
NPT=587.36
OF136
OF135
NPT=586.800
1000
5.00
2.70
DATOS
2.70
2.70
2.70
5.00 2.70
2.70
5.00
2.70
5.00
5.00
PENDIENTE DE 1.6%
5.00
2.70
5.00 2.70
ES
5.00
5.00
PENDIENTE DE 1.6%
5.00
2.70
2.70
5.00 2.70
5.00
2.70
AV. HACIENDA DE LAS CUMBR
5.00
5.00
2.70
2.70
PENDIENTE DE 1.6%
2.70
2.70 2.70
2.70
OF026
OF027
OF137
OF091
OF092
OF062
OF023
OF024
OF037
NPT=587.784
NPT=587.844
5.00
2.70
2.70
5.00
5.00
5.00
2.70
5.00
PENDIENTE DE 0.2%
OF066
OF063
OF025
NPT=587.32
OF139
OF138
OF094
OF065
PENDIENTE OF064 DE 0.2%
NPT=587.096
OF140
OF093
OF067
OF018
OF020
OF021
OF142
OF141
NPT=586.500
OF090
OF070
OF069
NPT=586.796
OF017
2.70
2.70
2.70
2.70
NPT=587.393
1000 KG
NPT=587.635
NPT=587.26
OF089
OF068
2.70
5.00
5.00
5.00
5.00
2.70
2.70
5.00
NPT=587.50
E1
1150 KG
5.00
2.70
5.00
5.00 2.70
5.00
5.00 2.70
5.00
2.70
2.70
NPT=587.24
5.00
E2
INSTALACIONES 17.94m²
NPT=587.092
OF088
OF072
5.00
5.00
2.70
5.00
5.00
5.00
5.00
PENDIENTE DE 0.2%
2.70
PENDIENTE DE 0.5%
LOBBY
5.00
2.70
5.00
2.70
PENDIENTE DE 0.2%
OF073
OF071
PENDIENTE DE 0.2%
OF014
OF015
2.70
5.00
NPT=587.552
5.00
5.00 5.00
2.70
5.00
2.70
2.70
5.00
2.70
5.00
2.70
5.00
NPT=587.098
5.00
2.70
2.70
5.00
5.00
NPT=587.234
5.00
INSTAL ACION ES 15.56m ²
NPT=587.087
OF085
OF086
OF087
OF074
OF022
NPT=587.232
PENDIENTE DE 0.5%
5.00
2.70
2.70
5.00
5.00
5.00
PENDIENTE DE 1.6%
2.70
2.70
5.00
5.00
KG
2.70
1000
E3
NPT=587.00
OF012
OF084
OF076
OF075
NPT=586.496
OF143
OF083
OF077
PENDIENTE DE 0.2%
OF009
OF011
OF019
NPT=586.92
NPT=587.302
5.00
2.70
2.70
KG
NPT=586.909 PENDIENTE DE 0.5%
OF145
OF144
OF079
OF008
OF146
NPT=586.34
5.00
OF078
OF016
2.70
1500
E4
AB-3-01
5.00
5.00
14
TO AR CU ST m² IN .75 18
5.00
5.00
E.P.
5.00
2.70
5.00
2.70
5.00
2.70
TO ICO AR CU CTR m² ELE .33
8.47
NPT=586.790
2.70
5.00
OF005
OF013
PENDIENTE DE 0.2%
NPT=586.782
NPT=586.851
2.70
OF080 2.70
5.00
NPT=586.490
CUARTO ELECTRICO SOTANO 5 -LOCALES -OFICINAS 96.78 M2
2.70
OF082
5.00
2.70
8.48
2.70
5.00
5.00
LOBBY
PENDIENTE DE 0.2%
2.70
3.80
NPT=586.864 5.00
3.80
RO
IDF
NPT=586.196
OF004
OF006
5.00
.70
38
ICO
ELECTR
LICO
RES REGIST LICOS PARA MEDIDO HIDRAU
Y DATOS
NPT=586.21
OF081
OF003
OF010
PENDIENTE DE 0.5%
PENDIENTE DE 0.5%
O3
C/ HIDRAU
VOZ
2.70
2.70
105-624
800 KG
KG
KG
O4
C/
5.00
5.00
5
11.4
1600
1600
PENDIENTE DE 0.2%
104-425
NPT=586.488
MAQ EST.
E5
M1 M2
1
NPT=586.21
OF007
NPT=586.534
V1
2.70
2.70
-C S
PO UI EQ DE TO AR NPT=586.00
V2
H6
PENDIENTE DE 0.5%
5.00
CE
0
NPT=586.362
CU
H5
PENDIENTE DE 0.2%
2.70
5%
SC
I-R
SC
NPT=586.00
5.00
TE
5.00
PD
10.3
CC
29 B-5 .85m² 24
SUBE
NPT=586.190
2.70
TE
27 B-5 .66m² 33
NPT=586.00 28 ² B-5 40m 29.
2.70
IEN
35 B-5 .80m² 34
NPT=586.00 NPT=585.07 NPT=586.00
5.00
ND PE 12% DE
NTE DIE % PEN 0.8 DE
NPT=586.188
NPT=586.12
26 ² B-5 53m 21.
34 B-5 .21m² 37
3 2
S
X009
PENDIENTE DE 0.2% OF002
5.00
5.00
0%
NPT=586.00
36 B-5 .24m² 24
NSF=586.06
PENDIENTE DE 0.2%
2.70
TE
7m²
13.8
4
X008 PEN DE DIEN 0.2% TE
2.70
OF001
5.00
TE CHU URA BAS
PD
N=587.43
7
6
5
NPT=585.891
5.00
TE IEN
N=587.56
5.00
5.00
NPT=586.00
NTE PENDIE DE 2.1%
ND PE 12% DE
N=587.59
32 ² B-5 63m 25. 33 B-5.49m² 44
NTE PENDIE DE 1.8%
TE
31 ² B-5 63m 25.
37 m² B-5 .49 47
A RG ANSF=586.65 CA RG EA CA AR DES Y
N=587.58
NPT=586.00
30 ² B-5 16m 17.
IEN
ND PE 5% DE
Sistema contra incendios y Riego
NSF=585.50
NSF=587.40 N=587.22
2.70 5.00
X007
NPT=586.09
TE IEN %
N=586.92
N=587.05
5.00
X006
9.00
NPT=585.96
N=586.54
N=586.65
X005
PENDI ENTE DE 0.8%
PENDIENTE DE 1.1%
KG
E1
4
SERVICIOS
3
X004
NPT=584.15
N=586.21
2.70
2.70
5.00
N=586.31
NPT=586.01
5.00
5.00
N=586.40
5.00
E9
2.70 5.00
X003
X002
X001
KG
2.70
PENDIENTE DE 1.6%
5.00
LOBBY HOTEL/EVENTOS NPT=587.40
2.70
1000
NPT=585.99
5.00
PENDIENTE DE 1.6%
NPT=585.99
1000
2.70
2.70
2.70
5.00
N=586.11
11
NPT=587.40
10
DESARR OLLO PENDIEN
1
L-505 181.19M2
12
S
13
NPT=587.40
14
L-501 1,536.65M2
N=585.59
15
16 17
N=585.65 N=585.62
18
19
N=585.54
NSF=587.40
22
NPT=585.60
L-502 330.03M2
20
19.25 MTS TE 2.5%
NPT=587.25
L-504 83.60M2
L-503 83.05M2
NPT=584.25
N=584.73 N=585.75
9.45%
NPT=586.68
NPT=587.25 NPT=585.60
N=584.79
PEND
SUBE
PENDIENTE 12.00%
NF=584.15
N=584.94
5.00
2.70
E005 5.00
NPT=586.45
N=583.86
E010
PENDI
5.00
NPT=585.50
N=584.05
2.70
2.70
E004
2.70
2.70
5.00
5.00
2.70
E002 NC=585.37 E003
5.00
HIDROSA
2.70
E001
NPT=584.05 N=583.291
NBQ=585.94
NBQ=585.44 NPT=586.00
N=582.92
5.00
N=583.02
DESARR OLLO 6 MTS PENDIEN TE 7.5%
N=583.11
N=583.75
NITARIO
1
12.6
N=584.25
NSC=585.24
NBQ=585.06
N=582.53
5.00
N=582.53
5.00
N=582.60
166.15
.45
59
N=582.13
MAQ EST.
9.00
5.00 5.00
4.15
9.00
9.00
9.00
9.00
5.00
N
AV. LEONES 4.10
4.90 1.48
7.52
1.59
7.41
1.00
8.00
9.00
9.00
9.00
9.00
9.00
9.00
6.17
2.83
9.00
9.00
9.00
AB-3-01
126.00
E.S.
AB-3-01
Basement floor plan S5
E.N.
7.64
7.61 3
10.5
.45
59
AV. ALEJANDRO
1
10.5
DE RODAS
4
10.5
ENTRADA SOTANO 4
.61
12
SALIDA SOTANO 4
60 ² B-4 13m 17.
SUBE
5.00
BAJA
NPT=586.85
5.00 2.70
5.00
MTS
12%
MTS
RROL PEND LO IENTE 32
NITARIO HIDROSA
5 KG
E1
KG
S INA QU MA DE
2.70
5.00 2.70
5.00
1000
KG
E1 4
1000
E7
1000
3 KG
E1
1000
KG
E8
1000
E9
1000
KG
2.70
2.70 2.70
2.70
4.50
2.50
2.50
2.50
4.50 2.50
9.00
4.50 2.50
4.50
2.50
4.50
2.50
9.00 4.50
4.50
2.50
9.00
2.50
4.50
4.50
9.00 4.50
0.94
4.50
4.50
2.50
4.50
5.00
5.00
1.40 7.60
4.50
4.50
2.50
1.31
4.50
2.50
2.50
2.70
7.69
4.50
4.50
9.00
4.50
4.50
2.50 2.50 2.50
5.00
4.50
2.70
5.00 5.00
B-483 9.18m ²
B-484 12.37m²
5.00 5.00
2.70
2.70
2.70
9.00
5.00
OF311
2.70
OF310
5.00
2.70
2.70
9.00
4.50 2.50
H006
H005
H004
H003
2.50
H002
166.15
2.50
4.50
2.50 2.50
5.00 2.70
5.00
4.50
2.70
5.00
5.00
4.50
2.50 2.50
2.70
5.00 5.00
5.00
2.70
5.00
2.70
5.00
2.70 KG
1000
3.80
5.00
5.00
4.50
2.50
2.50 2.50
2.50
2.70
5.00 2.70
2.70
5.00
2.50
5.00
5.00 5.00
2.70
2.70
5.00 10 7
9
8
56
S
12
5.00
2.70
2.70 2.70
8.06
5.00
4.50
2.50 2.50
5.00
B-482 7.78m²
2.70
2.70
B-481 8.59m²
2.70
B-479 B-480 10.24m² 10.17m²
2.70
B-478 10.60m² B-477 10.68m²
2.70
B-476 10.29m²
2.70
B-475 9.61m²
2.70
B-474 12.07m² 3.80
5.00
E10
KG 1000
5.00
E11 4
3
2.70
2.70
2.70
2.70 2.70 2.70 2.70
9.00
4.50
2.50
4.50 2.50
4.50
5.00
2.70
2.50
4.50 2.50
2.70
5.00 2.70
5.00 2.70
2.70
5.00
2.70 2.70 2.70
2.70
2.70 2.70 5.00
5.00
2.70 5.00
2.70
5.00 5.00
2.70
5.00 5.00
2.70 5.00 5.00
H001 4.50
OF309
OF268
OF267
5.00
9.00
NPT=591.25
OF194
OF195
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00 2.70
2.70
5.00 2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
2.70
5.00
OF193
OF196
5.00
OF192
OF198
OF197
5.00
OF191
5.00
OF190
OF199
5.00
OF189
OF200
5.00
2.70
2.70
2.70
2.70
2.70
2.70
2.70
5.00
OF188
2.70
2.70
OF187
5.00
5.00
5.00
5.00
NPT=591.25
OF186
2.70
2.70
2.70
OF184
OF185
NPT=591.35
2.70
5.00
2.70
5.00
5.00
2.70
2.70
2.70
2.70
5.00
5.00
5.00
5.00
VIGILANCIA
5.00
2.70
5.00
2.70
2.50
4.50
2.70 2.70
5.00 5.00
2.70 5.00
2.70 5.00
2.70 5.00
2.70 5.00 5.00
2.70
5.00 5.00
2.70 2.70
5.00
2.70 5.00 5.00 5.00
2.70 5.00
5.00
5.00
2.70
2.70
2.70
2.70 2.70
2.70
5.00
2.70
2.70
5.00
2.70
5.00 5.00
2.70 5.00
2.70 5.00
5.00 5.00 5.00
5.00
2.70
2.70
2.70 2.70
2.70
2.70
2.70
2.70
5.00
2.70
5.00
2.70
2.70
2.70
2.70
2.70
2.70
2.70
5.00
5.00 5.00
5.00 5.00
5.00 5.00
2.70
2.70
5.00
5.00 5.00 5.00
2.70
2.70
2.70
2.70
5.00 2.70
2.70
5.00 2.70
2.70
5.00 5.00
2.70 2.70
5.00
5.00
5.00 2.70
2.70
5.00 2.70
2.70
5.00 5.00
2.70 2.70
5.00
5.00
5.00
5.00
5.00
5.00
9.00
2.70 2.70
5.00 2.70 2.70
2.70
2.70
2.70
5.00 2.70
2.70
5.00
2.70
2.70
2.70
2.70
5.00
2.70
2.70
2.70
2.70
5.00
2.70
5.00
2.70
2.70
2.70
2.70
2.70
2.70
2.70
5.00 2.70
2.70
5.00
2.70
5.00
2.70
2.70
2.70
5.00 5.00 5.00
2.70
2.70
2.70
5.00 2.70
2.70
5.00
2.70
2.70
5.00 5.00
2.70
2.70
2.70
2.70
2.70
5.00
2.70
2.70
5.00 5.00 5.00
5.00
5.00
5.00
2.70
2.70
2.70
2.70
2.70
5.00 2.70
2.70
5.00
2.70
2.70 5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70
5.00
5.00
5.00
2.70
5.00
2.70
2.70
5.00
5.00
2.70
5.00
2.70 5.00 5.00
2.70
2.70
5.00
5.00
2.70
5.00
5.00
2.70
2.70
2.70
5.00
5.00
2.70
2.70
2.70 5.00 5.00
2.70
5.00 5.00
5.00 5.00 5.00
5.00
5.00 5.00 5.00
5.00 5.00 5.00
5.00 5.00 5.00
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
5.00
2.70
2.70
5.00 2.70 2.70
2.70 2.70
2.70
2.70
5.00
5.00
2.70
5.00
5.00 2.70
5.00
5.00
2.70
5.00
5.00
5.00
2.70
2.70 5.00
2.70 5.00
2.70 5.00
2.70
5.00 5.00
2.70
5.00 5.00
5.00
2.70
2.70 5.00
2.70
2.70
5.00
5.00 5.00
5.00
5.00 5.00 5.00 5.00
5.00 5.00 2.70
2.70
2.70
2.70
5.00 2.70
2.70
5.00 2.70
5.00 2.70
5.00 2.70
5.00
5.00
2.70
2.70
5.00
2.70
2.70
2.70
5.00 2.70
2.70
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
2.70
2.70
5.00 5.00
5.00
5.00 2.70
2.70
2.70
5.00
5.00
5.00
5.00 5.00 5.00
2.70 2.70 2.70 2.70 2.70 2.70
2.70
5.00
2.70
5.00
2.70
5.00 5.00
2.70
5.00 5.00
2.70
5.00 5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00 2.70
5.00
OF269
NPT=591.25
2.70
5.00
2.70
2.70 2.70
5.00
4.50
5.00 5.00
2.70 2.70 2.70
2.70 2.70
2.70
5.00 2.70
5.00 2.70
5.00 2.70
5.00 2.70
5.00 2.70
5.00
2.70
5.00 2.70
5.00 5.00 5.00
OF264
2.70
2.70
5.00
2.70
2.70
5.00
H007
2.50
NPT=591.40
4.50
2.70
5.00
5.00
2.70
5.00
2.70
5.00
5.00
2.70
5.00
SUBE SOTANA O3
OF308
2.70
2.70
5.00
5.00
H008
NPT=591.25
OF307
2.70
5.00
2.70
2.70
2.70
2.70
H059
2.70
2.70
5.00
2.70
H009 H058
2.70
OF270
E.O.
AB-3-01
5.00
2.70
H010
H057
2.70
OF313
20
19
18
17
15
16
14
2.70
H056
OF273
OF272
OF271
H012
H011
5.00
OF314
OF305
OF306
NPT=591.40
13
12
11
2.70
OF304
2.70
VOZ Y DATOS
2.70
2.70
H013
H055
5.00
OF315
2.70
ELECTRICO
5.00 2.70
OF316
OF303
2.70
2.70
2.70
2.70
H054
2.70
5.00 5.00
2.70
5.00
2.70
2.70
RTO
5.00
2.70
2.70
2.70
5.00
2.70
2.70
2.70
2.70
2.70
5.00
2.70
2.70
2.70
5.00
5.00
5.00
5.00
5.00
2.70
H015
H014 OF317
OF302
MAQ EST.
5.00 2.70
5.00
2.70
5.00
2.70
5.00
5.00
CUA
2.70
2.70 5.00
5.00
5.00
5.00
2.70
5.00
2.70
2.50
5.00
12%
4.50
5.00
DESA
5.00
4.50 5.00
OF301
5.00
5.00
5.00
5.00
2.70
OF265
OF266
H016
H053
2.70
2.70
2.70
5.00
OF202
OF201
H017
H052
5.00
2.70
OF318
2.70
5.00
5.00
2.70
OF319
OF300
2.70
5.00
5.00
CU EL ARTO 59 ECTR .42 m² ICO
OF320
2.70
2.70
H051
5.00
5.00
2.70
H018 OF298
OF299
2.70
5.00
2.70 2.70
OF321
H019
H050
5.00
5.00
5.00
2.70
OF263
H020
H049
5.00
2.70 2.70
2.70
5.00
5.00
5.00
2.70
5.00
2.70 2.70
2.70
OF259
H021
H048
5.00
5.00
5.00
H047
5.00
2.70
2.70
2.70
5.00
2.70
5.00
5.00
NPT=591.25
OF312
OF274
OF260
H023
H022 2.70
5.00
2.70
5.00
2.70
OF276
OF275
VOZ Y DATOS
H046
2.70
5.00
5.00
3.80
5.00
2.70
OF277
NPT=591.25
OF297
1600 KG
CUARTO ELECTRICO
H024
H045
2.70 2.70
5.00
5.00
OF279
OF278
OF261
OF262
OF203
5.00
2.70
2.70
2.70
5.00
5.00
2.70
5.00
OF256
H044
OF322
OF296
2.70
5.00
3.80
5.00
5.00
2.70
5.00
2.70
5.00
5.00
5.00
2.70 2.70
2.70
2.70
5.00
5.00
9.00
5.00 5.00
4.15
9.00
9.00
9.00
9.00
5.00
N
AV. LEONES 4.10
4.90 1.48
7.52
1.59
7.41
1.00
8.00
9.00
9.00
9.00
9.00
9.00
9.00
6.17
2.83
9.00
9.00
9.00
126.00
AB-3-01
ELECTRICO
5.00 2.70 2.70
5.00
OF280
OF257
OF206
OF180
OF181
OF182
2.70 2.70
2.70
OF283
OF282
OF281
OF258
OF204
5.00
5.00
5.00
OF284
OF255
OF205
OF295
2.70
OF254
NPT=591.25
OF179
5.00
5.00
OF213
OF207
OF176
OF177
OF178
5.00
2.70
OF324 OF294
2.70
OF253
OF208
5.00
5.00
2.70
2.70
REGISTRO PARA MEDIDORES HIDRAULICOS
5.00
2.70
OF285
OF252
OF214
OF211
OF325
OF293
OF323
OF286
OF249
OF210
5.00
OF250
OF251
OF209
OF175
OF287
1600 KG
H025
OF326
2.70
2.70
OF171
5.00
OF217
OF216
H043
OF327
2.70
2.70
2.70
OF248
OF212
OF172
5.00
5.00
5.00
OF170
OF173
OF291
OF290
OF289
OF288
M3 M4
H027
H042
OF328
2.70
2.70
2.70
OF219
H041
H026
5.00
5.00
5.00
OF169
OF174
NPT=591.25
OF246
OF215
OF168
OF292
OF245
OF218
OF166
OF167
H029
H028
OF242
OF247
MONTACARGAS
H030
H040
OF329
OF244
OF221
OF220
H031
H039
OF330
OF241
NPT=589.40
H032 H038
OF331
OF243
OF222
OF164
2.70
OF238
OF240
OF225
NPT=591.25
NPT=591.25 H037
OF332
OF239
OF224
OF163
2.70
OF229
OF228
OF223
OF161
OF333
OF236
H033
H036
2.70
OF334 5.00
2.70
5.00
2.70
5.00
SANITARIO HIDRAULICO
RROL PEND LO IENTE 34
4.50
2.50
5.00
5.00
5.00
2.70
4.50
2.50
2.50
OF335
5.00
5.00
5.00
2.70
5.00
IDF
AREA CARGA Y DESCARGA
NPT=591.40
H035
OF237
OF226
OF157
OF158
OF160
OF165
NPT=591.25
H034
5.00
2.70
5.00
2.70
VOZ Y DATOS
.25
OF235
OF227
OF162
NPT=591.25
91
2.70 2.70
OF154
OF159
2.70
5.00
5.00
NPT=591.25
=5
5.00
5.00
ES
DESA
4.50 2.50
2.50
9
2.70
NPT=591.25
NPT=591.25 2.70 2.70
5.00
NPT=588.30
-HOTEL 61.14 M2
5.00
OF231
OF230
OF155
2.70
2.70
NPT=588.06
CUARTO ELÉCTRICO SOTANO 4 -SALÓN DE EVENTOS
OF232
NPT=591.25
OF183
2.70 2.70
.25
4.50
5.00 2.70
4.50 2.50
2.50
8
5.00
KG
5.00
NPT=591.25
NPT=591.25
2.70
90
2.70
OF233
OF151
OF152
OF156
2.70
1000
E3
5.00
NPT=591.25
1000 KG
5.00
AV. HACIENDA DE LAS CUMBR
2.50
4.50 2.50
2.50
2.50
7
5.00
KG
5.00
NPT=591.32
E1
1150 KG
2.50
6
2.70
1500
E4
TO AR CU ST m² IN .45 18
DE
CHUTE BASURA
LOBBY E2
Cuarto Inst. 17.88m²
4.50 5
5.00
DE
CHUTE BASURA
5.00
5.00
NPT=591.25
NPT=591.25
2.50
4
2.70
5.00
5.00
3.80
3.80
LOBBY
2.70
24m 13.
RO
5.00
Cuarto 15.24mInst. ²
4.50 3
5.00
2.70
RTO ICO CUA CTR ² ELE
8.47
7 42 m² B- .82 31
6 42 m² B- .05 20
25 m² B-4 .65 21
24 ² B-4 11m 21.
23 ² B-4 21m 29.
8 42 m² B- .50 27
8.48
2 B-42 2m² 38.9
B-421 ² 26.76m
2.70
2.70
AB-3-01
4.50
4.50 2.50
2.50
2.50
2.50
2.50
4.50
4.50
4.50
4.50
4.50
2
2.70
5.00 800 KG
2.70
E.P.
NPT=588.01 NPT=588.20
=5
NPT=591.25
2.70
5.00
2.70
4 B-43 m² 23.77
9 42 m² B- .09 21
30 ² B-4 40m 21.
.70
38
3 44 m² B- .12 27
1 B-43 6m² 19.3
B-432 m² 26.45
3 B-43 0m² 26.0
2 44 m² B- .25 14
5
11.4
E5
IDF
m²
.00
NPT
NPT=591.40
OF234
OF153
KG
KG
2.70
ICO ELECTR
2.70
5.00
5.00
8 B-43 0m² 17.9
41 m² B-4 .05 20
40 m² B-4 .18 17
39 ² B-4 05m 20.
35 ² B-4 5m 7.2 36 ² B-4 23m 10.
7 B-43 1m² 24.4
0
1600
1600
5.00
EXT PO RA 15 R CU .35 BO
90
NPT OF148
OF149
OF150
2.70
2.70
6 B-43 9m² 23.9
2.70
5.00
NPT=591.25
MAQ EST.
RES REGIST LICOS PARA MEDIDO HIDRAU
Y DATOS
ACCESO: CARGA Y DESCARGA
=5
5.00
5.00
5.00
35 B-4 9m² 27.2
2.70
5.00
NPT=591.40
M1 M2
ALICO
VOZ
1
2.70
2.70
5.00
5.00
5.00
HIDRU
X010
5.00
2.70
5.00
10.3 BAJA
2.50
S
5.00
2.70
5.00
CHUTE BASURA
5.00
SUBE
12
2.70
CHUTE BASURA
5.00
5.00
2.70
X037
2.70
NPT
5.00
NPT=591.25
5.00
5.00 2.70
X035
X038
5.00
13
5.00
2.70
X043
2.70
.80
CUARTO BASURA
X032
2.70
X039
89
5.00
X011
NPT=591.25
X034
2.70
5.00
=5
2.70
NPT=591.25
2.70
14
X012
NPT
OF147
2.70
X040
2.70
NPT=587.55
NPT=588.98
SERVICIOS
NPT=591.40
2.70
5.00
X024
X036
X041
SERVICIOS
OFICINAS SALON EVENTOS 2.70
X013 5.00
X033 X029
X030
NPT=587.20
2.70
X031
X042
X086
2.70
X014
5.00
5.00 5.00
5.00
X085
2.70
5.00
X015
X025
X028
2.70
X084
2.70
5.00
X016
X022
X023
5.00
NPT=587.63
NPT=588.84 15
5.00
2.70
X049
X083
2.70
X017
X027
5.00 2.70
X044
X082
5.00
5.00
X019
X020
X021
5.00
X018
X026
5.00 2.70
2.70
5.00
5.00
5.00
5.00
5.00
2.70
X081
X080
2.70
2.70
2.70
2.70
2.70
5.00
2.70
X087
16 17
5.00
2.70
X050
2.70
X088
18
5.00
2.70
X051
X045
X074 X073
53 B-4 .35m² 12
X089
19
4 44 m² B- .85 16
X052
X046
X076
X075 X072
52 B-4 m² .04 13
X079
X078
X077
X071
54 B-4 .25m² 13 57 m² 9 51 B-4 .17 45 m² B-4 m² B- .15 13 .86 13 10 50 6 B-4 m² 44 m² 58 .25 B- .79 B-4.69m² 13 11 2.70 49 12 B-4 m² 47 .92 2.70 10 B-4 .08m² 10 48 2.70 B-4 m² 5.00 .03 17
X090
B
5 ² 44 1m B- .9 13 X048
X047
NPT=591.25
X070
55 m² B-4 .60 14
56 m² B-4 .43 13
X091
20
X056 X055
X054
X053
X092
21
NPT=591.25
X052
X093
NPT=591.25
22
NPT=591.40 X062
X061 X060
X059 X058
4.50
X094
4.50
X095
4.50
X096
4.50
X097
X098
X099
X100
X101
X102
X103
X104
X105
X106
DESARROLLO 30 MTS PENDIENTE 5%
2.70
X067 X066
X065 X064
X063
X057
NPT=586.85
X069 X068
E.S.
Basement floor plan S4
63
South View
South View
South View
64
Floor plans
7.64
7.61 3
10.5
.45
59
AV. ALEJANDRO
1
10.5
DE RODAS
4
10.5 1
12.6
8 34 m² B- .18 17
SUBE
5.00 BAJA
5.00
C562
2.70
5.00
C563
2.70
5.00
C564
NITARIO HIDROSA
5 KG
E1
1000
4 KG
E1
1000
KG
E7
1000
3 KG
E1
1000
KG
4.50
2.50
4.50
2.50
4.50
2.50
4.50
2.50
9.00
4.50
2.50
5.00 2.70
4.50
2.50
2.50
4.50
2.50
9.00
2.50
2.50
4.50 2.50
4.50 2.50
9.00
4.50
2.50
4.50 2.50
4.50 2.50
4.50
9.00
2.50
4.50 2.50
4.50
4.50
2.50
4.50 4.50
9.00
2.50
4.50
2.50
4.50
2.50
4.50
9.00
2.50
4.50
2.70
2.50
5.00
4.50
5.00
0.94
2.70
2.50
4.50
8.06
2.50
2.70
5.00
4.50
1.40
2.50
2.70
4.50
4.50
2.50 5.00
2.70
5.00
7.60
2.50
2.50
2.70
4.50
1.31
5.00
4.50
5.00
2.50
4.50
2.50
5.00
7.69
2.50
2.70 2.70
9.00
2.50
166.15
2.50
5.00
4.50
4.50
2.70
4.50
4.50
3.80
2.50
10 7
9
2.50
S 5
34
2
1
5.00
6
8
B
5.00
2.70 2.70
2.70
9.00
5.00
9.00
5.00
2.70
2.70
2.70
2.70
5.00
2.70
2.70
5.00 2.70
2.70
C443 2.70
2.70
9.00
5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70
5.00 2.70
5.00
5.00
C415
C416
C442
5.00
2.70
2.70
2.70
2.70
C446
C445
C444
2.70
C405
C404
5.00
2.70
NPT=594.45
5.00
5.00 5.00 5.00
2.70
C412
C413
C414
5.00
5.00 5.00 5.00
2.70
2.70
C402
C403
5.00
2.70
C407
C406
2.70
C348
C447
2.70
2.70
5.00
C400
C347
C411
C408 2.70
5.00 5.00
4.50
2.50
5.00
2.70
5.00
2.70 5.00
5.00 5.00 5.00
9.00
5.00
2.70
5.00 5.00 5.00
5.00
2.70 2.70
C399
2.70
5.00
4.50
5.00
2.70
2.70 2.70 2.70
4.50
5.00
2.70 4.50
2.50
4.50
2.50 2.70
5.00
2.70
5.00 3.80
5.00 KG 1000
KG 1000
2.70
E11
5.00
E10
2.70
2.70 2.70
2.70 2.70 2.70 2.70 2.70 2.70
2.70 2.70 2.70
2.70
4.50
2.50
5.00
2.70 2.50
2.70
5.00
2.70
5.00 2.70
5.00 2.70
5.00
2.70
5.00
2.70
5.00
2.70
5.00
2.70
5.00
2.70
5.00
5.00 2.70
5.00
2.70 2.70 2.70 2.70
2.70
2.70 2.70 2.70 2.70 2.70 2.70 2.70
2.70 2.70
5.00 5.00
5.00
5.00
5.00
2.70
2.70
2.70 5.00
5.00
2.70
2.70
2.70
2.70
5.00
5.00
5.00
5.00
B-371 ² 17.13m
B-386 ² 17.31m
C401
C349
2.70
2.70 2.70 2.70
C410
C409
5.00
2.70
5.00 2.70
5.00
2.70
2.70 5.00
5.00
2.70
2.70 5.00
2.70
2.70
5.00
5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70 5.00
2.70
2.70
5.00
5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00 2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00 5.00
2.70
5.00
5.00
2.70 2.70
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00 2.70
5.00
5.00
2.70
5.00
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70
2.70 2.70
2.70 2.70
C397
2.70
2.70
2.70
2.70
2.70
2.70 2.70
2.70
2.70
2.70
2.70
5.00
5.00
2.70 2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70
5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
4.50
2.70
5.00 5.00
5.00
5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
5.00
5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70 5.00
2.70
5.00
2.70 5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70
5.00
5.00
5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70 2.70 5.00
5.00
5.00
5.00
2.70
2.70
2.70
2.70
2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70
5.00 5.00
5.00
2.70 2.70
2.70
2.70
2.70
5.00
5.00
2.70
2.70
2.70
2.70
5.00
5.00
5.00
5.00
5.00
5.00
5.00 2.70
NPT=594.45
NPT=594.45
C440
4.50
4.50 4.50
2.70
2.50
C426
C427
C428
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.50
2.50
4.50 4.50
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
2.70
2.70
2.70
2.70
2.70
5.00
5.00
5.00
5.00
2.70
2.70
2.70
2.70
5.00
5.00
5.00
5.00
5.00
2.70
2.70
2.70
2.70
2.70 5.00
5.00
5.00
5.00
5.00
2.70
2.70
2.70
2.70
2.70
C425
C429
5.00
C424
2.70
C423
C430
5.00
C422
2.70
C421
5.00
C420
2.70
C419
C431
C432
5.00
C418
2.70
C417
C433
5.00
C184
2.70
C183
C434
5.00
C182
2.70
4.50
4.90 1.48
C181
C435
5.00
4.10
C180
2.70
C179
C436
5.00
C178
2.70
C177
C438
C437
5.00
C176
2.70
C175
5.00
C174
2.70
C173
C439
5.00
C172
2.70
C171
5.00
B-301 26.70m²
2.70
C170
B-302 27.33m²
5.00
5.00
2.50
2.50 2.50
9.00
5.00
2.20
NPT=594.45
9.00
4.50
2.70
2.70
C441
NPT=594.45
5.00
2.70
5.00
2.70
2.70
C022
5.00
5.00
5.00
2.70
2.50
5.00
5.00
2.70
2.70
2.70
2.70
2.70
5.00
5.00
5.00
5.00
5.00 2.70
5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70 5.00
5.00
2.70 5.00
5.00
2.70
2.70 2.70
5.00
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70 5.00
5.00
5.00
5.00
5.00
2.70
2.70
2.70 5.00
5.00
2.70
2.70 2.70 2.70 2.70
3.80
5.00
5.00
2.70
4.50
2.50
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70
5.00
2.70 5.00 5.00
2.70
2.70
2.70
5.00
5.00
5.00
2.70
2.70
2.70 5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70
2.70 2.70
5.00
5.00
5.00
2.70
2.70
2.70 2.70 2.70 2.70
2.70 5.00
2.70 5.00 800 KG
E6 800 KG
E12
5.00
2.70
2.70
5.00
5.00
5.00
2.70 5.00
2.70 5.00
5.00
5.00
5.00
2.70
5.00
S
2.70
2.70 2.70
5.00
2.70
5.00
2.70
2.70
5.00
2.70
5.00
2.70
5.00
2.70
5.00
2.70
5.00
5.00
2.70 5.00
2.50
5.00
2.70
4.50
2.50
5.00 4.50
2.70
2.70 5.00
5.00
2.70
2.70
5.00
2.70
2.70 5.00
2.70
5.00
2.70
2.70
5.00 2.70
2.70
5.00
5.00
AG UA
S
2.70 2.70
5.00
2.70
2.70
5.00 5.00
5.00
2.70
5.00
5.00
2.70
5.00
3.80
5.00
2.70
5.00
5.00
2.70
5.00
2.70
2.70
5.00 2.70
2.70
5.00
5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70 5.00
2.70
2.70
5.00 2.70
2.70
5.00
5.00
2.70
2.70
2.70
2.70
2.70
5.00
2.70
2.70
2.70
2.70
5.00
2.70 2.70
5.00
5.00
5.00
5.00
5.00
5.00 2.70
5.00 2.70
5.00
1000
2.70
5.00
2.70
5.00
2.70
2.70
5.00
B-370 ² 10.17m
C451
5.00
NPT=594.45
2.70
5.00
2.70
5.00 3.80
2.70 2.70
C450 5.00
5.00
2.70
GUA
2.70
5.00
5.00
5.00 5.00
C449
2.70
5.00
2.70
2.70
5.00
5.00 2.70
2.70
2.70
2.70
2.70
5.00
2.70
2.70 5.00
2.70 5.00
5.00 2.70
2.70
E9
2.70
5.00
2.70
1000
5.00
2.70
2.70
2.70
2.70
2.70
5.00
2.70
2.70
2.70
5.00 5.00
2.70
2.70
5.00
2.70
2.70
2.70
2.70
5.00
2.70
5.00
2.70
5.00
2.70
C448 C395
C396
2.70
5.00
5.00
5.00 2.70
C350
B-369 ² 9.44m
2.70
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
C499
C498
C497
C496
C451B
5.00
2.70
2.50
PENDI DE 12% ENTE
E8
2.50
RTE
2.50
5.00
2.70
2.50
PA
KG
2.50
2.50
TEA
E.O.
AB-3-01
2.70
5.00 4.50
2.50
2.50
5.00
4.50
2.70
C450B
5.00
4.50
ACC SOT ESO ANO A 3
2.50
2.50
2.70
4.50 2.50
5.00
MAQ EST.
NPT=594.45
C449B
5.00
C017
C016
C015
C500
2.70
4.50 2.50
PAR
C501 C495
5.00
4.50
2.50
ELECTRICO
C452
2.70
REGISTRO PARA MEDIDORES HIDRAULICOS
C502 C494
5.00
SANITARIO HIDRAULICO
C453
2.70
IDF
5.00
VOZ Y DATOS
C503
C493
2.70
2.50
C454
NPT=594.45
C392
5.00
AREA ACTUAL DESCUBIERTA, COLAR LOSA PARA EVITAR ENTRADA DE AGUA E INUDACION DE CUARTOS ELECTRICOS
C505
C504
5.00
4.50
C492
2.70
2.50
5.00
2.50
C506
2.70
4.50
5.00
4.50
2.70
2.50
5.00
C490
C491
5.00
2.70
4.50 2.50
2.50
2.70
2.70
C345
C346
C508
5.00
2.50
2.70
4.50
5.00
4.50
2.70
2.50
5.00
2.50
2.70 2.70
4.50
5.00
5.00
C270
5.00
2.70 2.70
4.50
2.50 5.00
5.00
C343
C269
5.00
2.70 2.70
2.50
2.50
2.50
5.00
2.50
5.00
2.70
4.50
5.00
2.70
2.50
2.70
5.00
4.50
2.50
2.50
4.50
2.50
2.50
5.00 5.00
2.70 2.70
5.00
4.50
4.50
5.00
2.70
2.50
4.50
4.50 4.50
2.50
5.00
2.70
1.86
4.50
4.50
4.50 5.00
2.70
2.70
ES
4.50
4.50 5.00
AV. HACIENDA DE LAS CUMBR
4.50 4.50
4.50
4.50 2.50
2.50
2.50
2.50
2.50
4.50
4.50
4.50
4.50
4.50
4.50 4.50
5.00
5.00
2.70
C021
2.70
C020
2.70
C019
2.70
C018
C509 C488
C489
C390
5.00 5.00 5.00
C017B
C016B
C015B
C511
C487
C507
C456
C455
C398
C351
NPT=594.45
C512
C486
C457
C388
C389
C448B
C352
C342
C513
C485
C387
C394
C355
C354
C353
C344
C271
NPT=594.45
2.70 2.70
C356
C341
C273
2.70 2.70
C267
C268
C339
C340
C272
5.00
5.00
C186
C185
5.00
C169
5.00
2.70
C168
5.00
C097
C096
2.70
C264
C265
C458
C393
C357
C338
C276
C275
C274
C266
2.70
C188
C187
C386
2.50
C189
C166
C358
NPT=594.45
4.50
NPT=594.45
NPT=594.45
C514
C484
20
C165
C167
C337
C277
C261
C262
C263
19
C191
C190
C459
C391
18
NPT=594.45
C192
C163
C278
C336
C515
C483
NPT=594.60
17
C095
C260
C193
C162
C098
C259
16
NPT=594.45
15
C094
C359
C335
C279
14
C057
C056
5.00
C194
C280
C257
C258
13
C099
C334
12
C022B
5.00
C333
11
C160
C164
C100
C092
C093
C281
C256
C196
C161
C102
C020B
2.70
C019B
2.70
C014B
2.70
C021B
2.70
C013B
C018B
C014
IDF ² 3.89m
C360
VOZ Y DATOS
2.70
NSL=594.45
C013
C361
ELECTRICO
NSL=594.45
LOUVER FIJO DESMONTABLE CON EL 70% DE ÁREA LIBRE EFCTIVA PARA SALIDA DE AIRE (POR ARQUITECTURA).
0.80
C105
C101
C091
C058
C012B
C012
NSF=594.60
REGISTRO DE DERRAMES.
C197
C195
C460
2.70
C023
C024
C025
C026
C027
C028
C029
5.00
C011B
B-360² 8.35m
C362
NPT=594.45
2.70
2.70
2.70
C059
C010B
C011
C157
C159
C158
C103
C089
C090
C060
NPT=594.45
C009
C010
C106
C104
NPT=594.45
C088
C061
5.00
2.70
5.00
5.00
2.70
5.00
C055
B-361 ² 9.62m
2.70
C087
C063
C062
C054
2.70
CUARTO ELECTRICO
C086
C064
C052
C053
2.70
B-355
B-358
B-359
C363
C330
C331
C332
C282
C255
B-363 ² 10.66m
5.00
1 2 3 4 5 6 7 8 9
5.00
5.00
B-354
C005
C006
C284
C283
C516
C482
C510
C384
B-362 ² 10.31m
2.70
NPT=594.60
5.00
NSL=594.45
C007
C008
CUARTO ELECTRICO
C198
C366
C365
C364
C329
C285
C252
C253
C254
B-364 ² 10.60m
5.00
C004
1000 KG
NSL=594.45
C065
C156
2.70
C003
NB=594.60
E1
1150 KG
NB=594.60
NPT=594.60
NPT=594.45
2.50
NB=594.55
NSF=594.60
C108
C107
C085
S
4.50
NPT=594.60
B-321 25.34 m2
E2
N=595.963
18 17 16 15 14 13 12 11 10
C200
C199
C461
5.00
CHUTE DE BASURA
C109
C083
C084
C066
C051
C286
C251
C201
NPT=594.45
C154
C155
2.70
C082
C067
C050 C001
C002
C153
C326
C288
C287
B-365 ² 10.25m
5.00
C068
L-302 103.14M2
C111
C110
C367 2.70
2.70
C069
NPT=594.45
NSL=594.45
NPT=594.60
NB=594.50
N=594.99
C112
C080
NPT=594.45
C368
NPT=594.45
C517
C481
NPT=594.45
C385
5.00
C079
C081
C327
C328
C289
C248
C249
C250
C202
C324
C325
2.70
2.70
NB=594.45
N=594.73
21
C152
C291
C480
C462
C383
B-366 ² 10.18m
5.00
5.00
C071
C070
NSL=594.45
N=594.86
N=595.05
C113
C247
C205
C204
C203
C369 2.70
C078
C072
NPT=594.45
C051
C151
C149
C370
C323
C290
B-367 ² 8.58m
5.00
C031
C150
C292
C246
C381
C382
2.70
C073
C115
C114
C371
C322
C518
C380
B-368 ² 7.78m
5.00
B-352 ² 14.17m
NPT=594.45
C293
C465
C464
2.70
C077
C207
C372
C321
C519
C479
C463
5.00
C076
C320
C294
NPT=594.45
C245
C206
C373
1600 KG
VOZ Y DATOS
CUARTO ELECTRICO
C520
C467
C379
2.70
C076B
C077B
C032
C030
N=594.33
B-350
B-351
NPT=594.45
C319
NPT=594.45
1600 KG
C521
2
C466
C374
5.00
C033
NSL=594.45
NC=594.30
C148
C116
C075
2.70
C050
PENDI DE 2% ENTE
N=594.15
C147
C296
C295
C244
C208
C377
C376
C375
NPT=594.45
2.70
C034
NPT=594.45
5.00
N=593.75
ACCESO A SOTANO 3
C117
C241
C468
5.00
C048
C049B
2.70
N=593.68
C074
B-349
2.70
N=593.74
B-B'
C035
5.00
N=593.52
C146
C315
C316
C317
C318
M3 M4
C522
C469 C378
MONTACARGAS
C523
A BE SU TANO SO C478 5%
C477
2.70
C119
C118
C299
C297
C524
C476
C470
C298
C242
C209
C313
C471
C314
C300
NPT=594.45
C243
C525
C475
C472
NPT=594.40
5.00
C047
C049
C145 2.70
C037 C036
C051B
5.00
C046
C048B
5.00
AB-3-01
N=593.01
5.00
C038
C212
C210 2.70
C039 C045
5.00
4.15
9.00
9.00
TALUD
N
AV. LEONES 7.52
1.59
7.41
1.00
8.00
9.00
9.00
9.00
9.00
9.00
9.00
6.17
2.83
9.00
9.00
9.00
AB-3-01
126.00
E.S.
AB-3-01
Basement floor plan S3
A-A'
7.64 7.61
3
10.5
.45
59
AV. ALEJANDRO
1 10.5
DE RODAS
4
10.5 1
12.6
B-252 ² 17.09m SUBE
5.00 BAJA
5.00
C1194
2.70
5.00
C1195
2.70
5.00
C1196
NITARIO
KG
E7
1000
1000
KG
E8
KG
E9
4.50
2.50
4.50
2.50
4.50
2.50
9.00
4.50
2.50
4.50 2.50
4.50
2.50
4.50 2.50
9.00
4.50 2.50 2.50
4.50 4.50
2.50
4.50
2.50
4.50
9.00
2.50
4.50
4.50 4.50
9.00
4.50
4.50
0.94 4.50
8.06
4.50
1.40 7.60
4.50 4.50
4.50
1.31
4.50
7.69
4.50
4.50
2.70
5.00
2.50
2.50
166.15
9.00
2.50
5.00
4.50
4.50
2.50
4.50
4.50
2.50
9.00
2.50
4.50
3.80
4.50
5.00
2.70 5.00
B-262 ² 9.50m
9.00
B-264 ² 17.06m
B-265 ² 23.89m
2.70 5.00
2.70
B-272 ² 17.30m
5.00
B-273 ² 14.98m
2.70
B-270 ² 17.29m
C1059
B-274 ² 14.99m
5.00
9.00
2.70
B-271 ² 16.70m
2.70
2.70
C1066
C1054
9.00
5.00
2.70
2.70
5.00
2.70
2.70 2.70
NPT=597.65
C1055 2.70
5.00
5.00
C1062
2.70
2.70
C1056
5.00
2.70
5.00
5.00
C1063
2.70
C1061
5.00
2.70
C1064
5.00
5.00 5.00
2.70 2.70
C1060
C1065
2.70 5.00
5.00
C1007
5.00
5.00
9.60m
C1058
5.00
C1010
C1009
C1008
C1006
C1057 B-269 ²
5.00
2.70
5.00
2.70
5.00 5.00
C1067
C1040
C1041
C1042
C1043
C1044
C1045
9.00
2.70
C1046
C1047
C1048
C1050
C1049
C1051
B-275 ² 13.91m
5.00
2.70
2.70
5.00
5.00
2.70
5.00
2.70
2.70
5.00
5.00
2.70
5.00
2.70
2.70
5.00
5.00
2.70
2.70
2.70
5.00
5.00
5.00
2.70
5.00
2.70
2.70
5.00
5.00
2.70
2.70
2.70
5.00
5.00
5.00
2.70
2.70
2.70
2.70
5.00
5.00
5.00
2.70
2.70
5.00
5.00
2.70
5.00
B-276 ² 14.71m
TALUD
9.00
2.70
C1039
5.00
C1038
2.70
C1037
5.00
C1036
2.70
C1035
5.00
C1034
2.70
C1033
5.00
C1032
2.70
C862
5.00
C861
2.70
C860
5.00
C859
2.70
C858
5.00
C857
2.70
C856
5.00
C855
2.70
C854
5.00
2.70
5.00
NPT=597.65
C1052
C853
5.00
C852
2.70
B-201 ² 26.69m
C851
5.00
B-202 ² 27.34m
C850
2.70
B-204 ² 18.71m
C849
5.00
B-206 ² 39.50m
C848
2.70
B-207 ² 16.71m
C847
5.00
B-208 ² 17.67m
NPT=597.65
NPT=597.65
C846
2.70
B-210 ² 11.88m
C1053
C686
B-203 ² 12.77m
C845
B-211 ² 12.24m
5.00
B-205 ² 20.86m
2.70
NT=597.60
N=598.52
4.15
9.00
9.00
NPT=597.75
N
AV. LEONES 4.10
4.90 1.48
7.52
1.59
7.41
1.00
8.00
9.00
9.00
9.00
9.00
9.00
9.00
6.17
2.83
9.00
9.00
9.00
126.00
AB-3-01
N=598.57
9.00
2.50 2.50
2.50
2.50
2.50
2.70
2.50
5.00 2.70
5.00
2.50
2.70
5.00
2.50
2.70
2.50
5.00
2.70
2.50
5.00
2.50
5.00
2.50
2.70 2.70 1000
B 10 7
9
8 6
5
S 1
5.00 5.00
5.00 5.00 5.00 5.00 5.00 5.00
5.00
5.00
2.70 2.70
B-266 ² 25.39m
C1068
NPT=597.65
C1011
2.70
2.70 2.70
2.70
5.00
5.00
2.70
4.50 2.50
4.50
2.50
4.50
5.00 2.70
5.00
2.70
5.00
2.70
5.00 2.70
5.00 2.70
5.00
2.70
5.00
2.70
5.00 2.70
5.00 2.70
5.00
2.70
5.00 KG
E10 1000
KG
E11 34
5.00
2
5.00
2.70 2.70 2.70 2.70 2.70
2.70 2.70 2.70 2.70 2.70
2.70 2.70
2.70 2.70
2.70 2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
C1003
2.70
2.50
C1072
4.50
B-263 ² 10.13m
B-268 ² 12.82m B-267 ² 21.66m
C1014
C1012
C1004
2.70
2.70
5.00
5.00
5.00
5.00
9.00
4.50 2.50
4.50
5.00
2.70 4.50
2.50
4.50
2.50 2.70
5.00
2.70
5.00 2.70
2.70 2.70 2.70 2.70
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70
2.70 2.70 2.70
2.70 2.70 2.70 2.70 2.70 2.70
4.50
2.50
2.50
2.50
2.70
2.70 2.70 2.70 2.70 2.70 2.70 2.70
2.70
2.70 2.70 2.70
2.70
5.00
2.70
2.50
2.70
2.70 2.70 2.70 2.70
2.70 2.70
5.00 5.00 5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00 5.00
2.70
5.00
5.00 2.70
5.00
5.00
2.70
5.00
5.00
5.00
2.70
2.70
2.70 2.70
5.00
2.70
2.70
5.00
5.00
2.70
5.00
5.00
5.00 2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70
5.00
2.70
5.00
5.00
5.00
5.00
2.70
2.70
2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70
5.00
5.00
5.00
5.00
5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70
5.00
5.00
2.70 2.70 5.00
5.00
2.70 5.00
5.00
2.70 5.00
5.00
2.70
2.70
2.70 2.70 5.00
5.00
5.00
5.00
5.00
2.70
2.70
2.70 2.70 2.70
5.00
2.70
2.70 5.00
5.00
2.70
2.70
2.70
2.70
5.00
5.00
5.00
5.00
2.70
2.70
2.70 5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
5.00
5.00
2.70
2.70 2.70 2.70
3.80
5.00
2.70
5.00
2.70
2.70 2.70 2.70
800 KG
E6 800 KG
E12
2.70
5.00
2.70
5.00
2.70
5.00
2.70
2.70
2.70 2.70 2.70
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00 5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
2.70
5.00
5.00
2.70 2.70 2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
2.70 2.70 2.70 2.70
5.00
MAQ EST.
5.00
4.50
2.70
2.70
C1075
C1074
C1073
2.50
C1071 5.00
5.00
4.50
2.50
5.00
2.50
2.70
5.00 2.70
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70
2.70
2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70
2.70 2.70 2.70 2.70
2.70
2.70 2.70 2.70 2.70 2.70
2.70 2.70 2.70
2.70 2.70
2.70
5.00
4.50
2.70
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70 2.70
5.00
5.00
5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70
2.70
5.00
5.00
2.70
5.00
2.70
2.70 5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70 5.00
5.00
2.70
5.00
2.70 5.00
5.00
2.70
2.70 5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70 5.00
2.70
2.70 5.00
5.00
2.70 2.70
5.00
2.50
2.70
2.70
5.00
2.70
5.00
2.70
5.00
2.70
2.70
5.00
2.70
5.00
2.70
5.00
2.70
5.00
2.70
5.00
5.00
2.70 5.00
4.50
2.70
2.50
5.00
2.70
4.50
2.50
5.00
4.50 2.70
2.70 5.00
5.00
2.70
2.70
5.00
2.70
2.70
2.70
5.00
5.00
5.00
5.00
5.00
5.00
5.00
2.70
5.00
NPT=597.60
C1070
C1016
5.00
5.00 2.70
2.70
5.00
5.00
2.70
5.00
2.70
5.00
MAQ EST.
5.00 2.70 5.00
5.00
5.00
2.70
2.70
2.70
HIDROSA
5 KG
E1
1000
4 KG
E1
1000
3
5.00
E1
2.70
5.00
2.70
5.00
5.00 2.70
5.00
MAQ EST.
2.70
5.00
2.70
2.70 5.00
2.70
2.70
KG
2.70
2.70
1000
2.70
2.70
2.70
2.70
2.70
2.70
2.70
5.00
2.70
5.00
2.70
2.70
5.00
5.00
2.70
2.70
2.70
5.00
2.70
5.00
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70 2.70
5.00
5.00
2.70 5.00
5.00 2.70
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
B-212 ² B-209 10.59m NPT=597.7519.55m²
N=598.05
N=598.55
AB-3-01
B-B'
2.70
B-213 ² 10.91m
N=598.13
N=598.76
C1077
BAJA A SOTANO 3 C1076 5%
2.70
5.00
5.00
5.00
5.00 5.00
5.00
5.00
5.00
5.00
5.00
5.00
2.70
5.00 MAQ EST.
2.70
2.50
5.00
2.50
5.00
2.70
2.50
2.50
2.50
2.50 1000
2.50
5.00
2.50
5.00
4.50
2.50
2.50
2.50
2.50
2.50
5.00
2.70 4.50
2.70
2.50
2.50
4.50
2.70
2.50
4.50 4.50
2.50
5.00
2.50
2.70
4.50
2.50
2.70
C1078
2.70
2.70
5.00
2.70
2.70
5.00
C1079
C1142
C1143
C1013
C1005
NPT=597.65
C1080
C1141
2.70
5.00
5.00
C940
C1083
C1082
C1081
C1140
2.70
ELECTRICO
5.00
3.80
C1139
2.70
5.00
5.00
REGISTRO PARA MEDIDORES HIDRAULICOS
C1138
2.70
SANITARIO HIDRAULICO
5.00
C939
C1137
2.70
IDF
5.00
C999
C1000
C1001
C943
BAJA A C1085 SOTANO 3 5%
2.70
5.00
4.50
2.50
2.50
2.50
2.50
4.50
2.50
2.50
5.00
5.00
VOZ Y DATOS
4.50 4.50
C1086
2.70
2.70
4.50
4.50
2.50
5.00
2.70
PARTEAGUAS
4.50 5.00
C1146
C1145
C1018
C1069
C1002
C942
C941
SUBE A C1088 SOTANO 1 5% C1087
2.70 2.70
ES
4.50
4.50
5.00
5.00
AV. HACIENDA DE LAS CUMBR
4.50
4.50 2.70 2.70
C863
5.00
5.00
C844
C1147
C1015
C998
C945
C1089
C1134
C1135
C1017
C997
C944
C938
C687
5.00
C936
2.702.70
C769
C947
C946
C937
C864
5.00
C766
C866
C865
C843
5.00
2.70
C841
C842
NPT=597.65
C932
C933
C935
5.00
C770
C767
C768
C995
C996
NPT=597.65
C948
C934
NPT=597.65
2.70
C712
C870
C869
C867
5.00
C763
C764
C765
C931
C868
C839
C840
2.70
C715
C714
C713
C837
C838
C772
C771
5.00
C774
C773
2.70 2.70
C762
C1148
NPT=597.65
C1021
C1020
2.50
C711
C759
C760
C761
NPT=597.65
C871
C836
C950
C949
4.50
C688 2.70
NPT=597.60
N=597.89
C775
C951
C929
C930
C1090
C1133
20
19
18
16
C718
C716
C873
C872
C1149
NPT=597.80
17
15
5.00
N=597.86
14
C708
ACCESO SOTANO 2
N=598.35
C719
C717
C709
C710
N=597.80
N=597.84
13
12
11
2.70
N=597.16 N=597.39
C758
C928
C874
C834
C835
5.00
VOZ Y DATOS
5.00
C705
N=597.72
N=598.02
C720
C706
C707
TALUD
N=598.22
C833
NPT=597.65
5.00
ELECTRICO
C704
C691
C690
C689
PENDIE DE 1% NTE
N=597.18
N=597.74
C776
C1150
C1144
C994
NPT=597.65
C778
C777
C1091
C1132
C1023
2.70
C703
2.70
N=597.37 N=597.94
C692
B-219 ² B-218 ² 12.91m 13.28m B-217 ² 12.79m B-214 ² B-215 ² B-216 ² 13.35m 12.55m 13.06m
C755
C756
C757
C1092
C1131
C1136
5.00
C685
1 2 3 4 5 6 7 8 9
1000 KG
NPT=597.65
C721
S
5.00
E1
N=596.67
N=596.93
SALIDA DE 2 SOTANO N=596.82
N=596.93
18 B 17 16 15 14 13 12 11 10
2.70
1150 KG
C684
5.00
E2
PUERTA EMERGENCIA
N=596.52
N=596.94
2.70
N=595.86
PUERTA EMERGENCIA
C722
C1024
C1019
2.70
5.00
N=595.86
2.70
N=595.86
C723
C701
C702
C1093
C1130
C1084
B-253 ² 12.06m
5.00
5.00
NPT=597.75 N=596.05
NPT=597.65
2.70
2.70
2.70
NPT=597.65
C699
C694
C693
NPT=597.80
5.00
2.70
B-254 ² 9.62m
C993
C682
C683
C659
5.00
C990
C991
C992
C661
C660
CHUTE DE BASURA
C1151
NPT=597.65
C662
O CUART RICO ELECT
B-221 ² 21.66m
N=594.99
2.70
C954
C926
C927
B-255 ² 10.32m
5.00
2.70
C953
C952
C925
C877
C876
C875
2.70
C988
C989 2.70
C830
C831
C832
NPT=597.65
C956
C955
C1152
C1022
B-256 ² 10.66m
5.00
C781
C780
C779
C923
C924
2.70
C752
C753
C754
NPT=597.65
C1026
5.00
5.00
C724
C879
C878
B-258 ² 10.24m
B-257 ² 10.61m
C987 2.70
5.00
2.70
C725
C828
C829
C1129
C1153
NPT=597.65
C1025
5.00
C783
C782
C986 2.70
C750
C751
C985
NPT=597.65
C958
C957
C1027
5.00
C726
C697
C698
NPT=597.65
C695
NPT=597.65
C959
2.70
C727
C920
C921
B-259 ² 10.16m
5.00
2.70
C696
C665 C681
C728
B-231 ² 20.37m
C984 2.70
5.00
B-230 ² 14.17m
C919
C882
C881
C880
B-260 ² 8.60m
5.00
5.00
C678
C679
C826
C827
C983
C960
C1154
B-261 ² 7.78m
2.70
NPT=597.65
C667
C666
C825
NPT=597.65
C784
C982
5.00
C786
C785
C961
C918
C883
C1156
C1029
C1028
2.70
C747
C748
C749
C729
B-233 ² 9.43m
C824
C981
5.00
C730
B-234 ² 10.89m
B-232 ² 11.15m
C917
C884
C1157
C1030
C1155
2.70
C787
C962
C1094
C1159
C1031
5.00
2.70
2.70
C674 C675
C676
C677
C823
C979
C980 2.70
5.00
C746
2.70
ACCESO SOTANO 3
N=594.73
5.00
C670
C669
5.00
N=594.81
2.70
C673
C668
C664
N=594.86
C788
NPT=597.65
C1128
C1158
C978
NPT=597.65
C963
C916
C885
NPT=597.65
C977
C966
C915
C886
C822
2.70
C672
C671 5.00
C663
N=595.05
5.00
KG
3.80
C680
B-223 ² 19.71m
B-222 ² 20.41m
N=594.33
5.00
C745
1000
E3
PUERTAENCIA
EMERG
KG
B-225 ² 19.01m
B-224 ² 20.08m
C789
C967
C965
C964
C913
C914
5.00
C821 2.70
1500
E4
PUERTAENCIA
EMERG
C744
NPT=597.65
C911
C912
C888
C887
VYD
C1095
C1160
C976
1600 KG
CUARTO ELECTRICO
C1127
2.70
C790
C968
5.00
IDF
NPT=597.65
C890
C889
C819
C820
5.00
C817
C818
NPT=597.65
1600 KG
1097
C1096
2.70
C791
5.00
DE
CHUTE BASURA
RO
RES REGIST LICOS PARA MEDIDO HIDRAU
C792
C975
5.00
8.47
C743
5.00
C794
C793
C741
C742
C910
M3 M4
C1098
A 1 BE SU NO TA SO 5%
C1126
C1161
C969
2.70
C740
L-201 239.90M2
NPT=597.75
C1162
5.00
B
C891
C1100
C1099
NPT=597.60
C1125
2.70 2.70
C739
19
C970
C1163
2.70 2.70
18
C908
C1124
5.00
17
C816
C971
C909
C892
C1101
5.00
16
C795
C972
C907
5.00
15
C893
C1123
C1164
2.70
8.48
14
C815
C1102
C1122
5.00
.70
13
C906
C894
C1165
2.70
38
12
ICO ELECTR
RIO LICO
C814
C1103
C973
5.00
C796 C738
C905
5.00
2.70
800 KG
NPT=597.65 11
C797
C1104
C1121
C904
NPT=597.65
C896
C895
C813
C1105
5.00
5.00
5.00
E5
NPT=594.40
10
NPT=597.65 2.70
597.80
597.80
NSL=
5
M1 M2
C903
C897
C1106
2.70
C974
2.70
5.00
597.632
597.80
NSL=
NSL=
597.80
C737
C811
C1107
NPT=597.60
C1166
5.00
2.70
NPT=
SUBE S1 NPT=
11.4
NPT=597.75
C902
C898
C810
C812
C798
NPT=597.60
2.70
C799
C736
C1108
5.00
C1167
C899
2.70
2.70
5.00
0
9 8 7 6 5 4 3 2 1
C1109
C1120
2.70
5.00
C800 2.70
S HUECO DE ESCALERA AS ELECTRIC
NPT=597.75
5.00
C735
C900
2.70
NPT=597.65
(601.00)
C1110
C1119
C1168
C809
2.70
A "S1"
C802
5.00
2.70
597.80
(597.80)
C808
C801
C734
5.00
C807
2.70
NPT= 597.632
C731
C1111
C1118
5.00
5.00
NSL=
DE "S2"
C1113
C1112
2.70 5.00
5.00
C803 2.70
5.00
5.00
2.70
10.3 BAJA
5.00
4.50
4.50
2.50
2.50
C804
5.00
C732 2.70
597.80
597.80
NSL=
NPT=
5.00
2.70
ELECTRICA
10 11 12 13 14 15 16 17 18 BAJA S3
SUBE
B-227 ² 20.22m
4.50
4.50
4.50
4.50
4.50
C806
NPT=597.65 2.70
5.00
5.00
2.70
5.00
5.00
N=593.68
4.50
5.00
C733 2.70
5.00
2.70
5.00
B-235 ² 13.99m
B-226 ² 20.61m
9
C805 2.70
CHUTE BASURA
5.00
CHUTE BASURA
5.00
ESCALERA
2.70
8
5.00
5.00
2.70
C1221
5.00
B-228 ² 19.51m
7
5.00
2.70
2.70
5.00
B-229 ² 18.44m
6
5.00
2.70
5.00
5.00
O CUART RICO ELECT
C1114
C1117
C1169
C1223
5.00
C1218
SANITA HIDRAU
C1115
C1116
5.00
C1217
Y DATOS
5
C1274
2.70
C1219
VOZ
CUARTO ELECTRICO SERVICIOS
MAQ EST.
NPT=597.75
C1170
C901
2.70
NPT=594.40
SERVICIOS
5.00
C1273
NPT=597.65
2.70
2.70 2.70
C1171
5.00
C1272
C1258
NPT=597.65
2.70
C1271
C1270
NPT=597.65
C1220
2.70
C1269
C1260
2.70
C1215
C1268
C1172
2.70
2.70
C1212
C1214
C1267
C1173
2.70
4.50
C1262
C1261 5.00
C1253
C1216
C1174
C1224
C1259
2.70
C1213
C1266
C1265
C1264
C1263
C1222
C1254
C1175
4
2.70
C1256
5.00
5.00
4.50
5.00
5.00
5.00
5.00
C1257
C1255
C1176
C1225
2.50
5.00
5.00
5.00
5.00
5.00
5.00
C1226
2.50
2.70
2.70
5.00 2.70
5.00
5.00
2.70
C1211
N=593.52
C1177
NPT=597.65
2.70
3
2.70
2.70
5.00
2.70
2.70
N=593.74
C1178
C1227
2
4 24 m² B- .03 13
2.70
5.00
C1252
B-B'
C1179
C1228
1
5.00
C1251
C1210
AB-3-01
C1180
S
2 24 m² 0 B- .22 25 m² B- .67 13 1 12 24 m² 9 B- .89 23 m² 10 2.70 B- .08 0 10 24 m² B- .03 2.70 17
2.70
C1250
3 24 m² B- .93 10
5 24 m² B- .36 12
2.70
1110
9 24 m² B- .08 13
1 25 m² B- .12 13
8 23 m² B- .81 11
C1207
C1249
6 24 m² B- .39 13
2.70
2.70
2.70
2.70
12
C1206
C1239
C1240
13
8 24 m² B- .38 13
NPT=597.75
C1241
C1229
14
C1248
C1209
C1181
C1230
15
C1247
C1205
C1208
C1182
C1231
B
C1204
7 24 m² B- .62 14
C1232
16
C1203
C1237
C1238
C1233
C1234
C1235
C1236
C1242
17
C1244 C1245
18
NPT=597.65 C1246
B-237 ² 13.91m
C1183
NPT=597.65
C1243
C1201 C1202
B-236 ² 16.84m
C1184
C1185
C1186
C1187
C1188
C1189
C1190
C1191
C1192
C1193
4.50
C1198 C1199
C1200
4.50
C1197
4.50
E.P.
SALIDA DE SOTANO 3
N=593.03
C144
2.70
KG
C046B
C047B
5.00
C044
1000
C045B
5.00
E3
C117
C237
C239
C240
C211 2.70
KG
N=592.04
N=590.99
NPT=594.45
5.00
C143
2.70
1500
N=592.14
C118
E4
2.70
5.00
5.00
C042 C043
C302
C312
C301
C238
C214
C142
C303
C475
2.70
C117
5.00 5.00
C215
C213
NPT=594.45
NPT=594.45
C311
5.00
C040
C235
C236
C216
C139
C140
C473
2.70
5.00
C041
3.80
2.70
C138
C141
C526
C310
5.00
C118
5.00
C218
C527
C474
C304
C234
C217
C119
2.70 2.70
C305
C232
C233
C219
C528
5.00
C306
NPT=594.45
2.70
C120
NPT=594.55
2.70
C221
C231
C529
C309
5.00
C121
19
B-324 ² 15.01m
C222
C530
2.70
C307
5.00
C137 C122
C531
C658
2.70
18
C230
NPT=594.45
2.70
5.00
17
IDF
NPT=593.20 NPT=593.63
9
16
SITE IDFS
B-322 ² 16.96m
RIO LICO SANITA RO HIDRAU RES REGIST LICOS PARA MEDIDO HIDRAU
Y DATOS
8
8.47
VOZ
7
15
14
2.70
NPT=594.40
6
2.70
13
5.00
8.48
12
B-323 ² 67.73m
NPT=594.91
NPT=592.48
5
2.70
.70
38 N=590.99
11
ICO ELECTR
NPT=594.45
C136
800 KG
NPT=594.45
NPT=591.40
4
5.00
5 11.4
E5
M1 M2
B-325 ² 15.32m
10
S
N=590.91
3
2.70
C123 MAQ EST.
C532
C596
2.70
5.00
C657 C308
C229
C220
C135
9
8
7
6
5
4
3
2
1
C134
C124
S2
SUBE
5.00
Fosa ras escale
9 8 7 6 5 4 3 2 1
10 11 12 13 14 15 16 17 18
C133 2.70
B-327 ² 15.28m
5.00
NPT=594.55
NPT=591.29
N=591.17
C125
C224
C228
C223
2.70
0
10.3
B-328 ² 15.30m
NPT=594.40
C533
C597
C656 5.00
C132
C126
NPT=594.45
C595
NPT=590.75
C534
C598
5.00
C655
2.70
5.00
5.00
N=589.97
C536
C535
2.70
5.00
C225
C131 2.70
2.70
5.00
2.70
5.00
2.70
NPT=591.06 NPT=592.01
C537
C600
5.00
5.00
5.00
2.70
5.00
B-329 ² 15.75m
N=590.45
2
2.70
2.70
C594
5.00
SUBE
N=589.972
N=590.339
NPT=590.291
1
5.00
5.00
B-330 ² 15.71m
C585
NPT=594.45
C130
2.70
2.70
5.00
C593
5.00
C586
C226
C129 2.70
2.70
5.00
C592
5.00
B-326 ² 15.29m
N=590.05
N=590.29 N=590.15
S
5.00
5.00
C588
2.70
BAJA
N=589.25
C128 2.70
CHUTE BASURA
C589
2.70
5.00
CHUTE BASURA
C633
C584
C538
NPT=594.60
2.70
5.00
5.00
DROP OFF
C601
2.70
C590
B-331 ² 14.04m
N=589.41
CUARTO ELECTRICO
SERVICIOS
MAQ EST.
C653
5.00
C591
5.00
N=589.10
SERVICIOS
5.00
C652
C599
2.70
C583
C651
C649
NPT=594.45
2.70
2.70
N=589.16
C648
C227
C587
C582
C539
2.70
2.70
NPT=594.45
C634
2.70
C540
2.70
5.00
C127
2.70
C580
C581
C541
C602
4.50
C636
C632
N=588.18
5.00
5.00
2.70
N=588.16
5.00
C647
5.00
5.00
2.70
N=587.43
C542
10
5.00
5.00
C543
C603
C654
C638
C635 5.00
C579
C544
11
5.00
2.70
N=587.82
N=587.58
N=587.56
C545
C604
C639
5.00
5.00
5.00
C605
2.50
C641
C637
2.70
2.70
2.70
5.00
2.70
C631
C644
C643
C646
C645
5.00 2.70
2.70
4.50
C642
5.00
C640
2.70
5.00
C578
5.00
5.00
5.00
5.00
5.00 5.00
5.00
C546
NPT=594.45
2.70
5.00
2.70
2.70
C547
C607
2.50
2.70
5.00 2.70
5.00
2.70
2.70
2.70
2.70
5.00 2.70
2.70
N=586.92 N=587.22
2.70
2.70
C630
C577
C548
C608
3.80
5.00
2.70
C629
N=587.59
2.70
2.70
2.70
C628 C576
C549
C609
12
5.00
N=586.54
2.70
N=586.21
C575
C550
C610
2.70
5.00
NPT=594.55
N=586.65
C618 C619
C574
B-332 ² 16.83m
N=586.31
C551
C611
5.00
N=586.11
C627
C612
13
C626
C573
B-333 ² 13.95m
C613
14
N=585.59
C616
C617
C620
15
C572
C614
C615
C621
B
C625
N=585.65 N=585.62
C552
C553
C554
C555
NPT=594.45
C622
16 17
C623 C624
18
NPT=594.55 NPT=594.45
C556
C557
C558
C559
C560
C561
C568
C569 C570
C571
4.50
C565
C566 C567
N=585.75
A-A'
Basement floor plan S2
65
South View
North View
66
AB-3-01
Floor plans A-A'
7.64
7.61
U. M. PASEO CUMBRES, AV. LEONES, MONTERREY, NUEVO LEON.
3
10.5
.45
59
AV. ALEJANDRO
.51
10
DE RODAS
4
10.5 1
12.6
5 15 B- .68m² 16
NOTAS GENERALES
SUBE
5.00 BAJA
5.00
C1867
2.70
ACOTACIONES Y NIVELES EN METROS ESTE PLANO DEBERÁ VERIFICARSE CON LOS CONSULTORES ESTRUCTURALES Y DE INSTALACIONES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
5.00
C1868
2.70
5.00
C1869
4.50
C1848
5 KG
E1
1000
4
E9
4.50
4.50
2.50
4.50
2.50
4.50
2.50
4.50
2.50
5.00 2.70
4.50
2.50
2.50
4.50
2.50
2.50
4.50
2.50
4.50 2.50
4.50 2.50 2.50
4.50
2.50 2.50
4.50 4.50
2.50 2.50
4.50 4.50 2.50 2.50 2.50 2.50
4.50 4.50 2.502.50
4.50 4.50
4.50 4.50
5.00
2.50 2.50
5.00
4.50
4.50
2.50 2.50
2.50
2.70
4.50
4.50
2.70 2.70
4.50
2.50
5.00 5.00 2.70 2.70
5.00 5.00
2.50
2.70
5.00
4.50 4.50
4.50 4.50
2.50
4.50
5.00 5.00
2.50
5.00
2.50
5.00
4.50
2.70
5.00
2.50
5.00
2.70 2.70
2.50
5.00
2.50
2.702.70
5.00 5.00 2.70 2.70
4.50
2.50
5.00 5.00
C-X
4.50
2.70 2.70 2.70 2.70
NSL 0.00
5.00
2.70
5.00
5.00
5.00
2.70 5.00
2.70
5.00
2.50
C1784
2.50
C1783
B-162 ² 9.51m
B-166 ² 25.40m
B-165 ² 23.90m
2.70
2.70
5.00
2.70
C1779
5.00
5.00
RX
B-164 ² 17.08m
B-171 ² 17.54m
C1719
2.70
4.50
5.00
2.70
2.70
2.50
3.80
2.70
2.50
4.50
2.50
XX-XX-XX
4.50
B 10 7
9
8
6
S 12
5.00
5
4.50 4.50
2.50 2.50 2.50 2.50
5.00
2.70
2.70
5.00
2.50
5.00
5.00
5.00 5.00 5.00
5.00
5.00 5.00 5.00
3.80
5.00 KG
1000
1000
KG
E11 4
5.00
3
5.00
E10
2.70 2.70 2.70
E-X
XX-XX-XX
B-163 ² 10.15m
C1720
5.00
2.70
C1721
2.70
5.00
5.00
5.00
2.70
2.70
5.00
5.00
C1696
C1697
C1698
2.70 5.00
2.70
5.00 2.70
2.70
2.70 2.70 2.70
2.70
2.70 2.70
2.70 2.70
5.00
2.70
2.70 2.70 2.70 2.70
5.00
5.00
2.70
2.70
2.70 2.70 2.70 5.00
4.50 4.50
2.50
2.50 2.70
5.00
2.70
5.00 2.70
2.70 2.70
2.70 2.70
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70
5.00
5.00
2.70
2.70 5.00
5.00
2.70 2.70
2.70
2.70 2.70
2.70
5.00
5.00
5.00
5.00
2.70 5.00 5.00 5.00
2.70
4.50 4.50
2.50
2.70
2.70 2.70 2.70 2.70
2.70 2.70 2.70 2.70
2.70
5.00
5.00
2.70
5.00
5.00
2.70 2.70 2.70
5.00 5.00 5.00
2.70
2.70
2.70
2.70
5.00
2.70
2.70
5.00 5.00
2.70
2.70
2.70
5.00
NPT=600.85
5.00
2.70
2.70
5.00
2.70
2.70
5.00 5.00
2.70
5.00
2.70 2.70 2.70
C1786
C1785
4.50
B-175 ² 18.31m
B-172 ² 14.96m
B-176 ² 16.68m
B-173 ² 15.01m
5.00
5.00
4.50
2.50
2.70
2.70 2.70 2.70 2.70
5.00
5.00
5.00
2.70
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00 2.70
5.00
5.00
2.70
2.70 5.00 5.00
2.70 5.00
2.70 5.00
2.70 5.00
2.70
5.00
2.70
5.00 5.00
5.00
2.70 2.70 2.70 5.00
5.00
5.00
5.00
2.70
5.00
2.70 2.70
5.00
2.70
5.00 5.00 5.00
2.70 2.70
2.70
5.00 2.70
2.70 2.70
2.70
5.00
2.70
2.70
5.00
5.00
5.00 5.00
2.70
2.70
5.00
2.70
5.00
2.70
5.00
2.70
2.70
5.00
2.70
2.70
5.00 5.00
2.70
2.70
2.70
2.70
2.70
5.00
2.70
5.00
2.70
2.70
2.70 2.70
2.70
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
2.70 5.00
5.00
5.00 2.70
2.70 5.00
2.70
2.70 2.70
2.70
5.00
5.00
2.70 5.00
2.70 5.00
5.00
2.70 MAQ EST.
800 KG
C1077
BAJA A SOTANO 2 C1787 5%
4.50
B-168 ² 13.01m B-167 ² 21.66m
2.70
5.00
5.00
5.00
2.70 5.00
5.00
2.70
E6
5.00
5.00 5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
2.70
5.00 2.70
800 KG
D-X
XX-XX-XX AB-3-01
B-B'
4.50
2.70
5.00 2.70
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70
2.70 2.70
5.00
5.00
2.70
5.00
2.70
5.00
5.00
5.00
5.00
5.00
5.00
2.70 5.00
5.00
5.00 2.70 5.00 2.70
2.70
4.50
2.70
5.00
2.70
2.50
5.00
4.50
2.70
2.50
4.50
5.00
2.70
2.70 5.00
5.00
2.70
2.70
5.00
2.70
2.70
2.70
2.70
5.00
5.00 5.00
2.70
2.70 5.00
5.00
2.70
2.70
2.70
2.70 2.70
2.70
5.00
2.70
5.00
2.70
2.70
5.00
2.70
5.00 2.70
5.00
2.70
5.00 2.70
5.00
5.00
5.00
2.70
2.70
MAQ EST.
5.00
2.70
5.00
5.00 2.70
2.70
5.00
2.70
E12
C1142
2.70
C1643
C1642
5.00
5.00 2.70
2.70
CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
C1082
C1081
2.70
5.00 2.70
5.00 2.70
2.70
CAMBIO DE NIVEL EN PISO CAMBIO DE MATERIAL EN PISO
REVISIONES
5.00
C1778
5.00
2.50
2.70
4.50 4.50
FECHA
2.50
2.70
2.70 2.70
2.70
2.70
5.00
5.00
5.00 5.00
2.70
2.70
5.00
5.00
5.00
2.70
2.70
2.70
5.00
5.00
2.70
2.70
5.00
5.00
5.00 5.00
2.70
5.00
2.70
2.70 5.00
2.70 2.70
5.00 5.00
2.70
2.70
2.70
2.70 2.70 5.00
2.70 5.00
2.70
5.00
5.00 5.00 5.00
2.70 2.70
5.00 5.00
2.70
5.00
5.00
5.00
2.70 5.00
5.00 2.70 2.70 2.70
2.70
2.70
5.00
5.00
2.70
2.70
2.70
2.70
5.00
5.00
2.70
2.70 5.00
5.00
2.70
2.70 5.00
5.00
5.00
5.00
5.00
2.70
2.70
2.70
2.70 2.70
2.70
2.70
5.00
5.00
5.00
5.00
2.70
2.70 5.00
5.00
5.00
5.00
5.00
5.00
2.70
2.70
2.70
5.00
2.70 2.70 2.70 5.00
5.00
2.70
2.70
2.70
2.70
5.00
2.70
5.00 5.00 5.00
2.70 2.70 5.00 5.00 5.00 5.00
2.70
2.70
2.70
2.70 2.70
2.70
2.70
2.70
2.70
5.00 5.00
5.00
5.00
5.00
5.00 5.00
2.70
5.00
5.00
2.70 2.70 2.70
C1741 2.70
5.00
2.70
2.70
5.00 2.70
2.70
5.00
2.70
2.70
5.00
2.70
2.70
2.70
2.70
2.70
2.70
2.70
5.00
5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70
2.70 2.70
2.70
5.00
2.70
2.70 5.00
5.00
2.70 5.00
5.00
5.00
5.00
2.70
5.00
5.00
2.70
5.00
5.00
5.00
5.00
2.70 5.00
5.00 5.00
5.00
5.00
5.00
5.00
5.00
2.70
2.70
2.70 2.70 2.70 2.70 2.70 2.70 2.70
2.70
C1742
C1764
5.00
5.00
2.70
5.00
2.70
C1743
5.00
2.70
2.70
C1744 2.70
2.70
NPT=600.85
C1761
C1762
5.00
2.70
C1746
C1745
C1763
5.00
2.50
4.50 2.50
4.50
2.50
4.50
2.50
4.50 2.50
4.50
2.70
2.50
2.70
4.50
2.70
C1747 5.00
2.70
2.50
18/12/21 Rev. D
5.00
4.50
2.70
2.70
TE
5.00
DIEN PEN 8% DE
2.70
C1767
C1766
C1765
5.00
C1740 2.70
NPT=600.85
5.00
NPT=600.85
N=598.80
C1768
C1711
2.70
C1710
C1709
C1706
5.00
C1712
C1707
C1708
03/11/21 Rev. C
C1749
C1748
C1758
C1759
2.70
SALIDA DE SOTANO 1
C1705
C1633
C1629
C1630
05/10/21 Rev. B
C1757
5.00
C1634
C1632
C1631
C1628
FIRMA
25/08/21 Rev. A
C1751
C1750
C1760
5.00
C1627
C1547
C1772
C1771
C1770
C1769
2.70
C1545
C1542
NPT=600.85
C1716
C1715
C1714
C1713
5.00
C1546
C1544
C1704
5.00
C1548
C1543
C1701
C1702
C1703
NPT=600.85
2.70
C1541
C1459
C1458
C1638
C1637
C1636
C1635
C1752
NPT=600.85
C1756
5.00
C1460
C1457
C1626
5.00
C1455
C1456
C1623
C1624
C1625
C1549
2.70
C1453
C1454
NPT=600.80
C1552
C1551
C1550
C1540
5.00
2.50
C1391
C1538
5.00
C1394
C1393
C1392
C1537
C1539
NPT=600.85
C1773
2.70
C1462
C1461
C1717
5.00
C1387
C1389
C1390
C1464
C1463
C1700
5.00
4.50
ADMINISTRACION
C1452
C1639
C1622
2.70
2.70
SEGURIDAD
C1449
C1450
C1451
C1553
5.00
5.00
WC
NPT=600.85
C1397
C1396
C1395
C1536
C1774
5.00
2.70
C1352
B-102 ² 42.40m WC WC
N=599.032
C1398
C1465
C1718
C1699
2.70
C1385
C1386
NPT=600.85
C1448
C1640
5.00
5.00
C1354
C1353
C1754
C1755
2.70
C1383
C1384
C1355 2.70
B-103 ² 11.23m
C1388
N=599.011
5.00
5.00
NPT=600.85
C1356 2.70
S
GUA
TEA
PAR
C1753
2.70
5.00
B-104 ² 18.88m
C1304
NCIA VIGILA ² 16.00m
N=598.881
5.00
2.70
B-105 ² 19.40m
C1305
C1399
NIVEL SUPERIOR DE LOSA DE AZOTEA
NIVEL INDICADO EN CORTE/ALZADO
2.50
5.00
C1722
C1695
C1641
C1621
NIVEL SUPERIOR DE LOSA
C1143
2.70
C1382
C1554
C1535
NIVEL DE FIRME TERMINADO
C1080
C1078
C1782
NPT=600.85
C1466
NIVEL DE PISO TERMINADO NIVEL SUPERIOR DE LOSA ENTREPISO
N.F.T:
NIVEL INDICADO EN PLANTA
C1083
C1079
MAQ EST.
5.00
2.70 5.00
2.70
5.00
5.00
2.70
2.70
2.70 5.00
5.00
2.70
2.70
2.70
2.70
2.70
5.00
2.70
2.70
5.00
5.00 2.70
5.00
2.70
2.70
4.50
2.70
5.00
4.50
5.00
2.70
5.00
2.70
2.70
2.70
5.00
2.70
5.00
2.70
5.00
5.00
B-106 ² 21.64m C1306
ADMIN ² 24.00m
C1357
C1307
C1447
NIVEL DE BANQUETA
N.P.T: N.S.L.E:
C1086
C1139
C1140
C1141
2.70
2.70
4.50
2.70
MAQ EST.
2.50
2.70
2.70
5.00
C1308
B-107 ² 23.80m
C1400
NIVEL DE ARROYO VEHICULAR
N.BQ:
SIMBOLOGIA
BAJA A C1085 SOTANO 2 5%
C1137
C1138
5.00
5.00
C1136
2.70
5.00
2.70
C1381
NIVEL SUPERIOR DE CALLE
N.A.V:
N.S.L.A:
SUBE A C1088 SOTANO 1 5% C1087
2.70
5.00
2.70
2.70
5.00
5.00
C1134
5.00
2.70
C1089
5.00
5.00
5.00
2.70 2.70
ELECTRICO
5.00
REGISTRO PARA MEDIDORES HIDRAULICOS
C1133
5.00
2.70 2.70
SANITARIO HIDRAULICO
NITARIO
KG
E1
1000
KG
E7
3 E1
2.70
2.70
2.70
2.70 5.00
5.00 5.00
5.00 2.70
2.70
2.70
2.70
2.70
5.00
2.70 5.00
2.70
5.00
2.70
5.00 5.00
2.70
5.00
2.70
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00 5.00
5.00
IDF
5.00
2.702.70
VOZ Y DATOS
2.50
5.00
2.70
2.50 2.70
1000
2.50
5.00
5.00
5.00
KG
4.50
2.70
2.50
2.70
2.50
2.50
5.00
1000
5.00
4.50
2.50
5.00
HIDROSA
2.50
1000
KG
2.50
2.50
2.50
E8
2.50
4.50
2.70
KG
2.50
5.00
2.70 4.50
2.50
1000
2.50
5.00
5.00
3.80
5.00
2.70
C1090
BANCO DE NIVEL NIVEL DE JARDINERA
N.S.C:
N.S.L:
C1135
C1781
2.50
5.00
5.00
2.70
ES
4.50 4.50
4.50
2.70
2.50
4.50
2.50
2.50
2.50
2.70
2.50
2.50 5.00
C1694
C1780
C1723
C1776
N=598.57
N=598.80
C1132
NPT=600.80
NPT=600.80
4.50
5.00
C1619
C1091
C1131
C1724
C1693
NPT=600.85
C1358 2.70
N=597.02
N=598.68
2.70
C1692
C1644
C1620
NPT=600.85
C1817
C1775
N=598.52
N=598.55
5.00
C1646
C1645
C1092
20
C1615
C1617
C1555
19
5.00
2.70
C1556
C1534
18
5.00
C1533
C1647
C1616
C1618
17
5.00
C1557
16
C1558
C1532
15
2.70
NPT=600.85
C1468
C1467
NPT=600.80
14
C1559
C1818
NPT=601.00
13
C1691
12
C1560
C1530
C1531
C1469
NPT=600.85 5.00
B-108 ² 23.21m
N=598.35
2.70 2.70
5.00
C1690
NPT=600.80
11
5.00
2.70
2.70
C1310
C1309
ACCESO SOTANO 2
5.00
2.70
C1649
VOZ Y DATOS
5.00
C1470
C1446
C1529
C1820
C1819
NPT=600.85
C1777
C1311
B-109 ² 22.91m
N=597.84
5.00
2.70
C1689
ELECTRICO
C1471
C1821
C1728
C1727
C1725
2.70
5.00
5.00
2.70
2.70
B-110 ² 21.06m
5.00
C1688
C1648
C1614
C1561
C1823
C1822
C1312
N=597.74
2.70
5.00
5.00
C1442
C1528
C1130
C1730
C1726
2.70
C1613
5.00
2.70
2.70
5.00
5.00
2.70
AV. HACIENDA DE LAS CUMBR
4.50
5.00
2.70
C1651
C1093
B.D.N: N.D.J:
C1084
5.00
C1686
C1687
C1650
C1612
C1562
C1685 2.70
5.00
C1472
C1445
C1611
C1563
B-156 ² 42.66m
5.00
5.00
2.70
C1473
NPT=600.85
C1610
C1824
NPT=600.85
C1731
C1729
C1684
NPT=600.85
C1825 C1732
B-158 ² 10.24m
2.70
5.00
2.70
2.70
C1402
C1401
C1565
C1564
C1526
C1527
C1655
C1654
C1653
C1652
C1733
5.00
5.00
C1525
C1474
C1440
C1444
C1607
C1608
C1609
NPT=600.85
B-159 ² 10.16m
B-157 ² 10.60m
C1683 2.70
5.00
2.70
2.70
5.00
2.70
C1379
C1380
C1524
NPT=600.85
C1606
C1568
C1566
C1681
C1682
C1656
5.00
5.00
2.70
5.00
2.70
NPT=600.85
C1360
C1477
C1441
C1443
C1403
C1569
C1567
C1523
C1680
C1658
C1657
2.70
5.00
C1404
2.70
2.50
C1378
C1359
NPT=600.85
C1522
C1475
C1604
C1605
B-160 ² 8.60m
C1826
C1734
5.00
5.00
2.70
2.70
4.50
5.00
2.70
B-114 ² 11.43m
B-113 ² 10.50m
C1439
C1405
C1521
C1476
C1438
C1408
2.70
2.70
5.00
2.70
5.00
5.00
2.70
2.70
5.00
C1377
C1362
C1361
C1437
2.70
2.70
2.70
5.00
5.00
S 1 2 3 4 5 6 7 8 9 10
B-115 ² 16.65m
5.00
C1350
C1351
18 B 17 16 15 14 13 12 11 10
5.00
2.70
2.70
5.00
2.70
C1376
2.70
C1349
C1314
C1313
5.00
5.00
5.00
2.70
1000 KG
C1410
C1409
C1407
C1406
C1520
NPT=600.85
C1480
C1478
C1659
C1603
NPT=600.85
C1570
C1679
2.70
2.70
5.00
NPT=601.00
C1348
B-112 ² 21.23m
C1375
C1363
C1436
C1571
B-161 ² 7.78m
5.00
2.70
2.70
5.00
E1
B-111 ² 21.04m
C1372
C1373
C1374
C1364
B-116 ² 8.49m
C1411
C1602
C1572
C1518
C1678
2.70
5.00
2.70
2.70
5.00
3.80
NPT=600.85
C1366
C1365
B-118 ² 19.54m
C1481
C1479
C1435
NPT=600.85
C1573
C1517
C1519
C1660
NPT=600.85
5.00
2.70
5.00
C1315
1150 KG
C1371
C1367
B-120 ² 18.92m
B-119 ² 7.80m
B-117 ² 11.41m
C1434
C1412
C1601
C1661
2.70
5.00
2.70
C1347
NPT=600.85
C1370
C1368
2.70
5.00
C1345
C1574
C1600
5.00
5.00
5.00
C1344
E2
C1433
C1414
B-131 ² 20.68m
5.00
C1343 C1318
CHUTE DE BASURA
C1484
C1483
C1482
C1432
C1415
2.70
B-130 ² 14.17m
C1369
C1341
C1342
C1346
C1515
C1575
C1827
C1735
2.70
5.00
C1337
C1338
C1339
C1317
C1514
C1516
C1485
C1430
C1431
C1416
B-133 ² 9.36m
C1413
C1316
WC
2.70
C1417
B-134 ² 10.89m
B-132 ² 11.10m
C1323
NPT=600.85
C1319
B-121 ² 20.32m
SITE ONIA TELEF ² 27.35m
5.00
KG
C1428
C1429 C1334 C1335
C1336
C1340
B-122 ² 20.03m
C1486
2.70
1000
E3 C1332 C1333
NPT=600.85
C1321
C1320
5.00
KG
C1427
C1325
C1736 C1828
C1677
5.00
2.70
1500
E4 5.00
C1322
B-124 ² 20.06m
B-123 ² 19.69m
NPT=600.85
C1487
C1662
C1599
2.70
5.00
C1328
C1576
5.00
2.70
5.00
C1513
C1488
C1327
C1324
B-125 ² 19.01m
AB-3-01
C1829
2.70
C1330
C1329
C1327
C1326
5.00
5.00
C1129
C1737
2.70
C1676
5.00
NPT=600.95
5.00
5.00
5.00
5.00
C1331
3.80
2.70
C1738
DE
CHUTE BASURA
B-129 ² 24.59m B-128 ² 19.55m
B-127 ² 20.22m
C1830
2.70
5.00
2.70
RES REGIST LICOS PARA MEDIDO HIDRAU
3.80
B-126 ² 20.62m
5.00
8.47 RIO LICO SANITA HIDRAU RO
IDF
N=598.771 2.70
C1294
C1295
5.00
5.00
2.70
2.70
C1293
2.70
C1292
C1296
5.00
5.00
5.00
2.70
C1291
2.70
5.00
2.70
2.70
C1290
C1297
5.00
C1289
2.70
5.00
5.00
2.70
C1288
C1298
5.00
5.00
2.70
2.70
C1287
2.70
C1286
C1299
5.00
5.00
5.00
2.70
C1285
2.70
5.00
2.70
2.70
C1284
C1300
5.00
C1283
2.70
5.00
5.00
2.70
C1282
C1301
C1302
C1303
B-174 ² 13.88m 5.00
2.70
2.70
C1281
2.70
C1280
5.00
5.00
5.00
2.70
C1279
2.70
5.00
5.00
2.70
2.70
C1278
5.00
C1277
2.70
5.00
5.00
2.70
2.70
C1276
5.00
2.70
C1739
C1275
B-101 13.85m²
5.00
N=598.91
5.00
B-175 ² 14.68m
N=599.15 NPT=600.94
N=598.98 N=599.07
NPT=601.03
ACCESO A SOTANO 1
NPT=601.16
N=598.08
N=599.19
AV. LEONES
N=599.31
N=599.34
AB-3-01
B-B'
C1674
C1675
ICO
C1094
C1831
2.70
VOZ Y DATOS
C1095
C1128
C1832
C1673
ELECTR
O CUART RICO ELECT
5.00
C1672
2.70
2.70
1600 KG
CUARTO ELECTRICO
C1127
C1833
C1671
2.70
B-136 ² 39.87m
Y DATOS
5.00
C1663
1600 KG
1097
C1096 2.70
C1598
2.70 2.70
NPT=600.85
2.70 2.70
C1577
C1664
5.00
C1512
C1665
C1597
NOMENCLATURA
M3 M4
C1788
C1816
C1834
2.70
8.48
C1426
B-137 ² 40.36m
C1489
C1596
C1578
MONTACARGAS
C1790
A 1 BE SU NO TA SO 5%
C1815
C1835
5.00
.70
C1425
C1579
C1511
C1791
C1789
C1836
2.70
38 NPT=600.85
C1490
C1667
C1666
C1814
5.00
C1510
C1491 C1424
C1594
C1595
C1813
C1837
NPT=600.85
5.00
M1 M2
800 KG
C1581
C1580
C1792
5.00
2.70
601.00
601.00
NSL=
NPT=
600.836
C1509
C1838
C1668
C1593
C1508
NPT=600.85
C1492
C1793
C1669
5.00
NSL=
5 11.4
NPT=601.00 E5
C1592
C1812
5.00
5.00
601.00
C1423
C1794
C1591
2.70
(597.80)
C1583
C1582
C1795
C1811
5.00
A "S2"
2.70
(601.00)
NPT=600.85
C1796
5.00
2.70
5.00
C1493
C1422
DE "S1"
SUBE PB
C1584
C1507 2.70
ELECTRICA
NPT=
ESCALERA
5.00
S HUECO S DE ESCALERA ELECTRICA
S1
BAJA
C1494
C1590
2.70
2.70
0
10 11 12 13 14 15 16 17 18
C1506
C1797
2.70
C1670
5.00
5.00
2.70
5.00
10.3
10 9 8 7 6 5 4 3 2 1
C1798
2.70
C1839
C1589
C1585
C1505
C1495
C1799
NPT=600.85
C1810
2.70
5.00
C1840
2.70
C1496
C1420
C1421
2.70
5.00
NPT=600.85
(604.50)
2.70
A "PB"
C1587
C1586
C1800
C1809
C1841
5.00
5.00
(601.00)
B-138 ² 14.06m
VOZ
4.50
2.70
4.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
4.50
2.70
601.00
601.00
DE "S1"
C1842
C1504
600.844
NSL=
NPT=
ELECTRICA
5.00
BAJA
C1801
C1808
5.00
5.00
C1503
NPT=600.85
C1497
NSL=
ESCALERA
5.00 5.00
SUBE
10
9
5.00
8
2.70
7
5.00
6
5.00
5
2.70
4
5.00
3
C1498
601.00
2.70
5.00
5.00
C1889
2
5.00
NPT=
5.00
C1890
2.70
2.70
5.00
C1502 2.70
C1418 2.70
2.70
C1888
1
5.00
C1419
5.00
5.00
2.70
5.00
5.00
C1891
C1499
2.70
5.00
2.70
C1892
2.70
S
2.70
CHUTE BASURA
5.00
CHUTE BASURA
5.00
C1893
2.70
C1887
5.00
5.00
2.70
5.00
C1894
C1501
C1500
C1896
2.70
2.70
1110
5.00
2.70
2.70
2.70
C1803
C1802
2.70
2.70
NPT=600.85
C1804
C1806
C1588
C1895
C1886
C1805
NPT=600.95
5.00
C1932
C1926
CUARTO ELECTRICO
SERVICIOS
MAQ EST.
C1843
C1948
5.00
C1885
SERVICIOS
C1807
2.70
C1884
C1844
C1897
2.70
5.00
C1947
NPT=600.85
C1930
C1928
C1845
C1898
2.70
5.00
C1946
C1931
5.00
C1927
C1899
2.50
4.50
C1945
C1933
2.70
5.00
C1900
4.50
C1944
C1934
5.00
5.00
5.00
C1901
2.70
5.00
C1943
NPT=600.85
2.70
2.70
2.70
C1902
2.70
5.00
C1942
C1936
C1935 5.00
2.70
2.70
C1925
5.00
2.70
5.00
C1883
C1903
2.70
5.00
C1941
12
C1924
C1882
4 14 m² B- .89 10
3 14 m² B- .03 17
C1904
2.50
C1940
C1939
C1938
C1937
13
2 14 m² B- .09 10
6 14 m² B- .93 10
5 14 m² B- .22 13
C1905
2.70
5.00
5.00
5.00
5.00 5.00
5.00
14
5.00
C1923
3 15 m² B- .67 12
C1906
2.70
2.70
2.70 2.70
2.70
2.70
2.70
15
2.70
C1881
4 15 m² B- .12 13
1 14 m² B- .82 11
8 14 m² B- .35 12
3.80
C1922
C1912 C1913
7 14 m² B- .03 13
B
5.00
2.70
C1880
C1910
C1911 C1914
C1907
C1908
C1909
C1915
9 14 m² B- .39 13
2 15 m² B- .08 13
C1846
5.00
B-139 ² 16.83m
0 15 m² B- .62 14
1 15 m² B- .38 13
16
C1917 C1918
C1919
C1920
17
NPT=600.85
C1921
18
C1874 C1875
C1876
C1877 C1878
C1879
B-140 ² 13.92m
C1847
4.50
C1849
4.50
C1850
4.50
C1851
4.50
C1852
C1916
4.50
C1853
4.50
C1854
4.50
C1855
NPT=600.85
4.50
4.50
4.50
4.50
4.50
C1856
4.50
C1857
C1858
C1859
C1860
C1861
C1862
C1863
C1864
C1865
C1866
4.50
C1871 C1872
C1873
4.50
C1870
N
AA-1-05 ARQUITECTONICO ESCALA: 1:500 FECHA: 08.06.2022
PLANTA ARQUITECTÓNICA S1
A-A'
Basement floor plan S1
Plaza View
67
AB-3-01
E.N.
A-A'
7.64 7.61 3
10.5
.45
59
AV. ALEJANDRO
1
10.5
DE RODAS
4
10.5
.61
12
DE RA LE NCIA TANO CA ES ERGE A SO EM LIDA SA 5 SUBE
BAJA
NPT=604.50
20 18
B
19
L-112,L-113,L-114 300.53M2
17 14 12
S
13
1 2 3
4 5 6 8 13
12
11
HIDROSA
10
9
KG
1000
E1 5
SERVICIOS
KG 1000
KG
E7
KG 1000
KG
E8 KG 1000
WC-M
L-117 74.05M2
NPT=604.58
Q10 11.75M2
NPT=604.56
INS
SERVICIOS
NPT=604.59
Q11 NPT=604.47 11.75M2
NPT=604.47
WC-H
TAL
NPT=604.55 NPT=604.55
AC
E9
1000
E1
3
1000
E1
4
SERVICIOS
ION ES
L-116 141.42M2
NITARIO
7
NPT=604.55
10
11
NPT=604.52
CINEMEX 2,919.01 m2 L-112 TRIPLE ALTURA
15
16
L-115 84.64M2
ACCESO CINE
L-118 149.38M2
NPT=604.58
NPT=604.47
Q9 NPT=604.57 11.75M2 NPT=604.50 ESCALERA
10.3
DE "PB"
(604.50)
A "N2"
NPT=604.64
Q13 11.75M2
L-119,L-120 346.76M2
Q8 11.75M2NPT=604.57
NPT=604.44
(609.10)
S HUECO DE ESCALERA AS ELECTRIC
0
DE RA IA NO LE NC TA CA GE A SO ES ER EM LIDA SA 5
ELECTRICA
NPT=604.50
Q12 11.75M2
ESCALERA
ELECTRICA
DE "PB"
(604.50)
A "S2"
Q15 Q14 11.75 M2 11.75M2
(601.00)
NPT=604.57
604.45
604.50
NPT=604.524 E5
M1 M2
NPT=604.64
38
Q6 11.75M2
800 KG
.70
NPT=604.50
L-111 53.44M2
8.48 8.47 RO
RES REGIST LICOS PARA MEDIDO HIDRAU
NPT=604.44
L-124 100.35M2
Q5 11.75M2
NPT=604.57
NPT=604.62
L-125 204.98M2
B
Q4 11.75M2
NPT=604.62
1500
E4 KG
NPT=604.62 E3
L-126 100.26M2
1000
KG
NPT=604.62 NPT=604.54
L-141 81.78M2
NSL=604.25
T-140 35.40M2
NPT=604.57
L-142 104.04M2
L-139 51.39M2
NSL=604.25
B-B'
T-141 36.33M2
17 T-14 .72M
KG
ELECTRICO
1000
KG
VOZ Y DATOS
E11
1000
7
14
13
12
11
10
89
B
L-129,L-130 717.85M2
S
6
5
4
3
NSL=604.25
NSL=604.25
NPT=604.50 E6
E1
1150 KG
800 KG
PTA EMERGENCIA
E2
E12
PTA EMERGENCIA
800 KG
ELECTRICO
SANITARIO HIDRAULICO
REGISTRO PARA MEDIDORES HIDRAULICOS
IDF
20
19
18
17
16
15
14
13
11
NSL=604.00
NPT=604.50
CHUTE DE BASURA
NPT=604.56
VOZ Y DATOS
E10
NPT=604.58
L-145 148.66M2
T-145 65.37M2
2
ES
3 2
NPT=604.47
NSL=604.25
NPT=604.58
L-137 139.17M2
E.O.
Q1 11.75M2
NSL=604.25
T-144 50.13M2
L-138 96.33M2
AB-3-01
B-B'
NPT=604.57
L-144 124.98M2
12
AV. HACIENDA DE LAS CUMBR
L-103,L-104 1,147.55M2
L-128 197.17m2
Q2 11.75M2
T-142 45.77M2
NPT=604.58
L-127 100.52M2
Q3 11.75M2
NPT=604.44
L-140 79.77M2
L-105 35.56M2
AB-3-01
NPT=604.57
B
NPT=604.54
1
NPT=604.58
30 L-14 .60M 3 2
L-106 122.70M2
20 B 19 18 17 16 15 14 13 12 11
S 1 2 3 4 5 6 7 8 9 10 11 12 13
1000 KG
T-137 90.21M2
NPT=604.56
NPT=604.50
L-132 44.05M2
17
NSL=604.25
16
B
15 14
L-133 46.15M2
13
18
12
NSL=604.41
19
NSL=604.41 20
L-136 44.40M2
21
L-134 51.26M2
L-135 50.37M2
COMERCIO
COMERCIO
22 23
NSL=604.25
L-101,L-102 1,353.98M2
NPT=604.46
NSL=604.42
NSL=604.42
11
26
NSL=604.43 10
27
NSL=604.43
NSL=604.42
28
9.00
24 25
7
8
L-131 820.55M2
9.00
9
29
NPT=604.50
NSL=604.50
NSL=604.49
4
31
NSLA=PENDIENTE
NSL=604.50
2 35
1
34
NSL=604.55
NSL=604.51
36
37
B
38
NC=604.00
NSL=604.00
NSL=604.47
PENDIENTE DE 10.9%
33
3
NSL=604.45 32
9.00
5
6
30
NSL=603.45
NSL=604.52
NSL=603.14
9.00
AV. LEONES
TE IEN % ND 6.3 PE DE
9.00
PEN
PE DE ND 3.7 IEN % TE
DIE NTE 2.5 %
TALUD
9.00
9.00
DE
ACCESO A SOTANO 1
X= 5236.2542 Y= 5984.2740
TE
B
PE DE ND 17% IEN
SALIDA DE SOTANO 1
AB-3-01
E.P.
VOZ Y DATOS
L-123 108.10M2
NPT=604.62
LOBBY
IDF
1600 KG
CUARTO ELECTRICO
DE
Y DATOS
CHUTE BASURA
SANITA HIDRAU
VOZ
1600 KG
NPT=604.57
42.95M2
40.11M2
L-108 118.73M2
M3 M4
B
L-110
L-109
L-107 101.28M2
ICO ELECTR
RIO LICO
MONTACARGAS
L-122 104.70M2
NPT=604.44
604.50
NSL=
NPT=
NPT=
5
11.4
SUBE N2
DE LOSA PB
13 12 11 10 9 8 7 6 5 4 3 2 1
604.404
S1
NSL=
BAJA
L-121 106.43M2
Q7 11.75M2
B
14 15 16 17 18 19 20
BAJA
SUBE
N
A-A'
Ground floor
Plaza View
68
AB-3-01
Floor plans
E.N.
A-A'
AV. ALEJANDRO
U. M. PASEO CUMBRES, AV. LEONES, MONTERREY, NUEVO LEON.
DE RODAS
NOTAS GENERALES ACOTACIONES Y NIVELES EN METROS ESTE PLANO DEBERÁ VERIFICARSE CON LOS CONSULTORES ESTRUCTURALES Y DE INSTALACIONES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
NPT=604.23
21
22
23
B
24
25
26
14
15
16
S
17
18
19
20
1
L-210 526.57M2
2 3 4
5 6 8
NITARIO
7 13
12
11
HIDROSA
10
9
SERVICIOS
KG 1000
KG
E7
KG 1000
KG
E8 1000
NPT=609.23
KG
E9
1000
E1
3
1000
E1
4
E1
1000
KG
5
SERVICIOS
NSL=609.18
NPT=609.23
SERVICIOS
WC-H
WC-M
NPT=609.23
NPT=609.15
L-211,L-212, L-213,L-214
NPT=609.10 ESCALERA
ELECTRICA
DE "N2"
(609.10)
A "N3"
(613.70)
902.19M2
NPT=609.15
NOMENCLATURA NPT=609.23
S HUECO DE ESCALERA AS ELECTRIC
M3 M4 1600 KG
1600 KG
ELECTRICA
DE "N2"
(609.10)
A "PB"
(604.50)
N3
NPT=609.15
800 KG
NPT=609.23
NPT=609.22
L-215 126.05M2
L-209 150.24M2
L-208 119.22M2 O
ACCSES
NIVEL DE JARDINERA NIVEL SUPERIOR DE CALLE
N.A.V:
NIVEL DE ARROYO VEHICULAR
N.BQ:
NIVEL DE BANQUETA
N.P.T:
NIVEL DE PISO TERMINADO
N.S.L.E:
NIVEL SUPERIOR DE LOSA ENTREPISO
N.F.T:
NIVEL DE FIRME TERMINADO
N.S.L:
L-216 204.88M2
NPT=609.27
S
AMENTO
DE
DEPART
RO
RES REGIST LICOS PARA MEDIDO HIDRAU
CHUTE BASURA
RIO LICO
SANITA HIDRAU Y VOZ DATOS
NSL=609.18
L-207B 126.04M2
BANCO DE NIVEL
N.D.J: N.S.C:
NIVEL SUPERIOR DE LOSA
N.S.L.A:
ICO ELECTR
VOZ Y DATOS
NPT=609.15 ESCALERA
NPT=609.10 NPT=609.40 E5 NPT=609.22 M1 M2 SUBE
BAJA PB
B.D.N:
MONTACARGAS
CUARTO ELECTRICO
13 12 11 10 9 8 7 6 5 4 3 2 1
14 15 16 17 18 19 20
NIVEL SUPERIOR DE LOSA DE AZOTEA
NIVEL INDICADO EN PLANTA
NSL=609.18
NPT=609.23
IDF
SIMBOLOGIA
NIVEL INDICADO EN CORTE/ALZADO
1500
E4 KG
CAMBIO DE NIVEL EN PISO
E3
1000
NPT=609.27
KG
L-217 200.31M2 NPT=609.23
L-205 166.02M2
AB-3-01
KG 1000
ELECTRICO
E10 KG
VOZ Y DATOS
E11
1000
8
67
5
4
3
S 1
2
15
14
13
12
11
10
NSL 0.00
L-220 191.98M2
B
27
26
25
9
C-X
NPT=609.23
NSL=609.18
NPT=609.27 ELECTRICO
NPT=609.18 CHUTE DE BASURA
E2 1150 KG
26 B 25 24 23 22 21 20 19 18 17 16 15 14
S 1 2 3 4 5 6 7 8 9 10 11 12 13
800 KG
E6 800 KG
E12
REGISTRO PARA MEDIDORES HIDRAULICOS
LOBBY SANITARIO HIDRAULICO
E-X
XX-XX-XX
XX-XX-XX 24
23
22
21
20
19
18
17
16
NPT=609.23
IDF
E.O.
L-219 194.64M2
L-203 456.23M2
VOZ Y DATOS
D-X
XX-XX-XX AB-3-01
B-B'
L-204 161.62M2
ES
CAMBIO DE MATERIAL EN MURO
L-218 197.17M2
NPT=609.23
15
AV. HACIENDA DE LAS CUMBR
B-B'
CAMBIO DE MATERIAL EN PLAFON
NPT=609.23
NPT=609.27
NSL=609.18
E.P.
CAMBIO DE MATERIAL EN PISO
NPT=609.23
L-207A 163.05M2 L-206 389.71M2
L-221 388.05M2
E1
RX
1000 KG
REVISIONES
NPT=604.23
FECHA NSL=609.18
FIRMA
25/08/21 Rev. A 05/10/21 Rev. B
L-201,L-202 1,347.43M2
03/11/21 Rev. C 9.00
18/12/21 Rev. D
9.00
L-131 820.55M2 NPT=604.23
9.00
NSL=609.05
9.00
9.00
9.00
N
9.00
AB-3-01
AV. LEONES
A-A'
AA-1-07 ARQUITECTONICO ESCALA: 1:500 FECHA: 08.06.2022
PLANTA ARQUITECTÓNICA N2
E.S.
AB-3-01
Floor plan L2
E.N.
A-A'
AV. ALEJANDRO
U. M. PASEO CUMBRES, AV. LEONES, MONTERREY, NUEVO LEON.
DE RODAS
NOTAS GENERALES ACOTACIONES Y NIVELES EN METROS ESTE PLANO DEBERÁ VERIFICARSE CON LOS CONSULTORES ESTRUCTURALES Y DE INSTALACIONES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
NPT=604.75
20
21
22
23
B
24
25
26
14
15
16 17
S
18
19
1 2 3 4
5 6 7
KG 1000
SERVICIOS
KG
E1
1000
KG
E7
1000
3 E1
KG
KG
1000
E9
1000
KG
1000
L-311 143.14M2
E8
NSL=613.71
4
E1
5
14
13
1112
SERVICIOS
HIDROSA
10
9
L-310 165.79M2
NITARIO
8
L-309 260.50M2
WC-M
NSL=613.71
T-310 82.99M2
T-311 69.46M2
L-312 422.87M2
NPT=613.88
NSL=613.71
OL LO PEN PRO DIE ME NTE
NPT=613.80
S
WC-H
T-309 105.18M2
DIO 0.7 : 14 5% MT
L-308 89.31M2
2
3
4
5
6
S
7
8
9
10
11
12
13
14
DES
15
16
17
18
19
20
21
22
23
24
25
26
27
28
ARR
NPT=613.75
1
NPT=613.75
NPT=613.75
T-312 222.73M2
L-313 213.98M2
NOMENCLATURA NPT=613.75 S HUECO S DE ESCALERA ELECTRICA 13 14 15 16 17 18 19 20 21 22 23 24 25 26 BAJA
13 12 11 10
L-314 210.93M2
NPT=613.88 DE "N2"
(609.10)
A "PB"
ELECTRICA
M1 M2
NPT=613.75 NPT=613.75
MTS M: 13%
E5
VOZ Y DATOS
L-315 208.47M2 L-307 340.16M2
B.D.N:
BANCO DE NIVEL
N.D.J:
NIVEL DE JARDINERA
1600 KG
CUARTO ELECTRICO
T-314 106.96M2
PRO 0.75 NPT=613.80 LLO RRO IENTE NPT=613.87 DESA PEND 800 KG
1600 KG
NSL=613.71
(604.50)
NPT=613.70 NPT=613.98 ESCALERA
N2
MONTACARGAS
M3 M4
T-313 108.02M2
T-315 104.67M2
N.S.C:
NIVEL SUPERIOR DE CALLE
N.A.V:
NIVEL DE ARROYO VEHICULAR
N.BQ:
NIVEL DE BANQUETA
N.P.T:
NIVEL DE PISO TERMINADO
N.S.L.E:
NIVEL SUPERIOR DE LOSA ENTREPISO
N.F.T:
NIVEL DE FIRME TERMINADO
N.S.L:
NIVEL SUPERIOR DE LOSA
N.S.L.A:
NIVEL SUPERIOR DE LOSA DE AZOTEA
ICO ELECTR
Y DATOS
RO
RES REGIST LICOS PARA MEDIDO HIDRAU
NSL=613.71
IDF
1500
E4
PUERTAENCIA
EMERG 1000
E3 KG
NSL=613.71
B-B'
L-304 388.55M2
NPT=613.75
CAMBIO DE MATERIAL EN PISO
NPT=613.80
NPT=613.75
T-319 95.42M2
1000
KG
E10
ELECTRICO
C-X
XX-XX-XX
KG
VOZ Y DATOS
B-B' L-319 272.64M2
1000
E11
E-X
XX-XX-XX
NSL 0.00
13
12
11
10
9
78
S 5
4
3
2
6
B
NPT=613.75
1 2 3 4 5 6 7 8 9 10 11 12 13
1
14
26 B 25 24 23 22 21 20 19 18 17 16 15 14
800 KG
E6 E12
153.70M2
800 KG
ELECTRICO
T-320 156.65M2
NPT=613.88
L-320 335.53M2
RX
1000 KG
REVISIONES
NPT=604.75
L-301
FECHA
534.50M2
FIRMA
25/08/21 Rev. A 05/10/21 Rev. B 03/11/21 Rev. C 18/12/21 Rev. D
L-300 651.51M2 NSL=613.71
AZOTEA NPT=604.75
AV. LEONES
AB-3-01
SANITARIO HIDRAULICO
E.O.
28
27
26
25
IDF
XX-XX-XX AB-3-01
NSL=613.71
24
23
22
21
20
19
18
17
16
L-302 VOZ Y DATOS
D-X
L-318 197.22M2
T-318 97.63M2
15
AV. HACIENDA DE LAS CUMBR
CAMBIO DE MATERIAL EN MURO
NPT=613.88
NPT=613.75
NPT=613.71
E1
CAMBIO DE MATERIAL EN PLAFON
L-317 200.26M2
T-317 100.29M2
CHUTE DE BASURA
1150 KG
NIVEL INDICADO EN CORTE/ALZADO CAMBIO DE NIVEL EN PISO
NPT=613.80
L-3032 395.46 m
E2
NIVEL INDICADO EN PLANTA
T-316 102.41M2
ES
AB-3-01
ENCIA PUERTA
EMERG
KG
L-305 390.30M2
E.P.
L-306 330.50M2
SIMBOLOGIA
L-316 204.73M2
NPT=613.80
DE
VOZ
CHUTE BASURA
RIO LICO
SANITA HIDRAU
A-A'
N
AA-1-08 ARQUITECTONICO ESCALA: 1:500 FECHA: 08.06.2022
PLANTA ARQUITECTÓNICA N3
E.S.
Floor plan L3
69
Plaza View
Plaza View
70
AB-3-01
Floor plans
A-A'
E.N.
7.64
7.61
U. M. PASEO CUMBRES, AV. LEONES, MONTERREY, NUEVO LEON.
3
10.5
.45
59
AV. ALEJANDRO
1
10.5
DE RODAS
4
10.5
NOTAS GENERALES
1
12.6
11
5% . ND PE
KG
5
B
1000
E1
. ND PE
KG 1000
KG
E7
KG 1000
KG
E8
1000
E1
3
1000
E1
4
SERVICIOS
E9
NPT=618.79
KG
5% . ND PE
O-444 O-443 O-442 O-441 51.85m2 44.49m261.14m2 45.89m2 O-440 51.66m2 O-439 79.59m2
WC-M
1000
22 21 20 19 18 17 16 15 14 13 12
.5
10
9
NITARIO
8
HIDROSA
% .5
7
ND PE
6
%
5
ND PE
4
5%
3
. ND
2
PE
1
SERVICIOS
O-446 0-447 O-445 0-448 70.57m2 46.02m2 47.74m2 47.95m2 O-449 47.95m2 O-450 47.85m2 O-451 49.59m2
5%
15
S
SERVICIOS
16 17
18
19
WC-H
LOBBY
O-437 63.02m2 O-436 62.78m2 O-435 77.94m2
O-451 60.75m2
O-438 79.59m2
15
16
17
18
19
20
21
22
23
24
25
26
28
27
10
11
12
14
13
9
2
3
4
5
6
7
8
ACOTACIONES Y NIVELES EN METROS ESTE PLANO DEBERÁ VERIFICARSE CON LOS CONSULTORES ESTRUCTURALES Y DE INSTALACIONES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
20
21
22
23
24
25
B
O-45 110.857 m2
26
O-456 78.96m2
27
AZOTEA
O-453 O-454 O-455 74.73m2 77.91m2 77.77m 2
28
O-452 119.19m2 11 10 9 8 7 6 5 4 3 2 1 S
O-452 39.61m2
O-434 78.21m2
O-453 47.63m2
1
O-437 49.27m2
O-433 76.96m2
O-454 47.80m2
O-436 46.49m2 O-435 46.07m2
NSL=618.74
10.3 0
AZOTEA
O-432 63.32m2
O-455 47.26m2
O-434 46.44m2
NOMENCLATURA
MONTACARGAS
B.D.N:
M3 M4 1600 KG
O-430 65.11m2
1600 KG
CUARTO ELECTRICO
VOZ Y DATOS
11.4
IMPER BAJOTE 1%
ADO PENDIEN EMPAST 4 MTS:
O-457 46.71m2
O-432 45.98m2
NPT=618.74
O-431 58.99m2
O-456 47.67m2
O-433 45.61m2
O-458 51.90 M2
5
O-431 44.93m2
WC-H WC-M
.70
38
8.48
O-430 74.07m2
O-412 78.28m2
8.47
92.27m2
SALA 8B
B-B'
O-406 72.92m2
O-416 42.57m2
O-405 71.50m2
XX-XX-XX E.O.
E-X
XX-XX-XX
O-404 72.08m2
KG
C-X
XX-XX-XX
1000
ELECTRICO
E10 1000
KG
E11
VOZ Y DATOS 11
10
9
8
7
AB-3-01
B-B'
O-403 70.80m2
S 2
5
CAMBIO DE MATERIAL EN MURO
NSL 0.00
1
6
O-417 42.70m2 O-418 64.51m2
NPT=618.79
B
28
27
26
25
24
23
22
4
CAMBIO DE MATERIAL EN PLAFON
D-X
O-415 43.56m2
LOBBY
21
20
19
18
17
16
15
3
CAMBIO DE NIVEL EN PISO CAMBIO DE MATERIAL EN PISO
O-407 72.22m2
O-423 41.99m2
O-421 42.70m2
NIVEL SUPERIOR DE LOSA DE AZOTEA
O-408 73.88m2
O-422 40.88m2
AB-3-01
NIVEL SUPERIOR DE LOSA
NIVEL INDICADO EN PLANTA
O-409 73.25m2
O-414 43.44m2
O-424 41.33m2 E.P.
NIVEL SUPERIOR DE LOSA ENTREPISO NIVEL DE FIRME TERMINADO
SALA 6B
O-413 44.31m2
O-425 41.93m2
NIVEL DE PISO TERMINADO
N.S.L.E: N.F.T:
NIVEL INDICADO EN CORTE/ALZADO
89.95m2
O-426 41.93m2
NIVEL DE BANQUETA
N.P.T:
SIMBOLOGIA
O-410 75.32m2
SALA 10A SALA 8A BUSINESS SALA CENTER 6A
O-427 44.09m2
NIVEL DE ARROYO VEHICULAR
N.BQ:
N.S.L.A:
O-411 74.73m2
BUSINESS CENTER
O-428 43.63m2
NIVEL DE JARDINERA NIVEL SUPERIOR DE CALLE
N.A.V:
N.S.L:
SALA DE CAPACITACION
O-429 60.79m2
BANCO DE NIVEL
N.D.J: N.S.C:
O-402 77.33m2
O-420 110.38m2 O-419 107.39
RX
O-401 149.06m2
REVISIONES FECHA
FIRMA
25/08/21 Rev. A 05/10/21 Rev. B 03/11/21 Rev. C 18/12/21 Rev. D
N
AB-3-01
AV. LEONES
A-A'
AA-1-09 ARQUITECTONICO ESCALA: 1:500 FECHA: 08.06.2022
PLANTA ARQUITECTÓNICA N4
E.S.
AB-3-01
Floor plan L6
A-A'
E.N.
AV. ALEJANDRO
U. M. PASEO CUMBRES, AV. LEONES, MONTERREY, NUEVO LEON.
DE RODAS
NOTAS GENERALES
B
17
18
19
16
12
13
S 1 2
SERVICIOS
3 4
5 7 8
12
11
KG 1000
SERVICIOS
KG 1000
KG
E7
1000
KG
E1 3
1000
LOBBY O-538 O-537 O-536 81.04m2 83.45m2 77.92m2 O-535 78.03m2O-534 78.81m2 O-533 78.71m2
1000
E9
NPT=622.47
KG
1000
KG
E8
WC-M
E1
4
E1
5
HIDROSA
10
9
SERVICIOS
WC-H
NITARIO
6
PROYECCION: FOSA ELEVADORES
14
15
O-544 148.61m2
ACOTACIONES Y NIVELES EN METROS ESTE PLANO DEBERÁ VERIFICARSE CON LOS CONSULTORES ESTRUCTURALES Y DE INSTALACIONES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
20
12 11 10 9 8 7 6 5 4 3 2 1 S
SERVICIOS
21
12 13 14 15 16 17 18 19 20 21 22 B
O-540 O-541 O-542 100.36m2 104.62m2 104.41m2 O-543 105.81m2
22
O-539 146.47m2
O-545 88.48m2 O-546 84.90m2
O-547 105.71m2
O-532 80.72m2
O-548 106.07m2
O-531 77.84m2 O-530 78.96m2 O-529 79.55m2 O-528 78.25m2
O-549 104.10m2
O-550 93.53m2
O-527 77.66m2
O-551 83.77m2
O-526 76.04m2
NPT=622.42
NOMENCLATURA MONTACARGAS
M3 M4 1600 KG
O-552 92.83m2
1600 KG
CUARTO ELECTRICO
VOZ Y DATOS
IMPER BAJOTE 1% ADO PENDIEN EMPAST 4 MTS:
O-525 76.83m2
WC-H
O-524 75.65m2
WC-M
O-523 84.44m2 O-522 66.16m2
O-512 103.91m2
O-511 99.35m2
O-521 75.65m2
O-506 96.53m2
O-514 68.46m2
O-505 94.70m2
13
12
11
10
9
78
CAMBIO DE NIVEL EN PISO CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
D-X
XX-XX-XX AB-3-01
E.O.
B-B'
E-X
XX-XX-XX
KG
C-X
XX-XX-XX
1000
KG 6
NIVEL SUPERIOR DE LOSA DE AZOTEA
NSL 0.00
1
5
NIVEL DE FIRME TERMINADO NIVEL SUPERIOR DE LOSA
O-503 93.66m2
NPT=622.47
B
22
21
20
19
18
17
16
15
14
13
12
4
NIVEL SUPERIOR DE LOSA ENTREPISO
N.F.T: N.S.L:
NIVEL INDICADO EN PLANTA
O-504 95.19m2
LOBBY
1000
VOZ DATOSY
E11
ELECTRICO
E10
O-513 74.18m2
3
NIVEL DE PISO TERMINADO
N.S.L.E:
SIMBOLOGIA
O-507 95.83m2
O-516 69.86m2 O-515 70.16m2
2
NIVEL DE BANQUETA
N.P.T:
O-508 97.90m2
O-517 71.46m2
B-B'
NIVEL SUPERIOR DE CALLE NIVEL DE ARROYO VEHICULAR
N.BQ:
O-509 97.22m2
O-518 71.02m2
AB-3-01
NIVEL DE JARDINERA
N.S.C: N.A.V:
NIVEL INDICADO EN CORTE/ALZADO
O-519 73.51m2
O-522 147.38m2
O-502 88.61m2
O-501 221.20m2
RX
REVISIONES FECHA
FIRMA
25/08/21 Rev. A 05/10/21 Rev. B 03/11/21 Rev. C 18/12/21 Rev. D
AV. LEONES
AB-3-01
E.P.
BANCO DE NIVEL
N.D.J:
N.S.L.A:
O-510 99.96m2
O-520 72.56m2
B.D.N:
A-A'
N
AA-1-10 ARQUITECTONICO ESCALA: 1:500 FECHA: 08.06.2022
PLANTA ARQUITECTÓNICA N5
E.S.
Floor plan L7
71
AB-3-01
A-A'
E.N.
AV. ALEJANDRO
U. M. PASEO CUMBRES, AV. LEONES, MONTERREY, NUEVO LEON.
DE RODAS
NOTAS GENERALES
13
14
15
16 17
18
19
20
21
B
22
23
24
S
NPT=626.70
1
12 11 10 9 8 7 6 5 4 3 2 1
2 4
5 6 8
9
HIDROSA
7
NITARIO
3
KG 1000
E1
5
SERVICIOS
KG 1000
E7
KG 1000
KG
1000
E9
LOBBY
KG
1000
E1
3
1000
E1
4
SERVICIOS
KG
NSL=626.65
E8
13 14 15 16 17 18 19 20 21 22 23 24 B
ACOTACIONES Y NIVELES EN METROS ESTE PLANO DEBERÁ VERIFICARSE CON LOS CONSULTORES ESTRUCTURALES Y DE INSTALACIONES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
NPT=626.70
O-603 251.30m2
NPT=626.70
IMPER 1%
BAJO IENTE
O STAD PEND
MTS: EMPA 5
O-601 218.33m2
SERVICIOS SALON DE EVENTOS
NOMENCLATURA NPT=626.65
MONTACARGAS
M3 M4 1600 KG
B.D.N:
BANCO DE NIVEL
N.D.J:
NIVEL DE JARDINERA
1600 KG
VOZ Y CUARTO DATOS ELECTRICO
L-602 2,274.85M2
N.S.C:
NIVEL SUPERIOR DE CALLE
N.A.V:
NIVEL DE ARROYO VEHICULAR
N.BQ:
NIVEL DE BANQUETA
N.P.T:
NIVEL DE PISO TERMINADO
N.S.L.E:
NIVEL SUPERIOR DE LOSA ENTREPISO
N.F.T:
NIVEL DE FIRME TERMINADO
N.S.L:
NIVEL SUPERIOR DE LOSA
N.S.L.A:
NIVEL SUPERIOR DE LOSA DE AZOTEA
SIMBOLOGIA
NSL=626.65
NIVEL INDICADO EN PLANTA NIVEL INDICADO EN CORTE/ALZADO CAMBIO DE NIVEL EN PISO CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
D-X
XX-XX-XX AB-3-01
AB-3-01 HIDROSANITARIO DRENAJE
B-B'
E.O.
E-X
B-B'
XX-XX-XX
KG
1000
KG
XX-XX-XX
1000
VOZ Y DATOS
E11
ELECTRICO
E10
C-X
13
12
11
10
9
78
6
5
4
23
1
B
26
25
24
23
22
21
20
19
18
17
16
15
14
NSL 0.00
NSL=626.65 TERRAZA 672.98M2
RX
REVISIONES FECHA
FIRMA
25/08/21 Rev. A 05/10/21 Rev. B 03/11/21 Rev. C 18/12/21 Rev. D
AV. LEONES
AB-3-01
E.P.
A-A'
E.S.
N
AA-1-11 ARQUITECTONICO ESCALA: 1:500 FECHA: 08.06.2022
PLANTA ARQUITECTÓNICA N6
Floor plan L9
Lobby view
72
Construction Process
Commerce and apartments view
Commerce and office view
73
Apartment building view
Office view
74
South view
75
10 Showroom Colonia Monterrey, Nuevo León.
Constructor: Plate,Monterrey, Nuevo León. Design: Parametrico, Monterrey, Nuevo León. Work: As a project leader, Conceptual design, construction design,engineering coordination, dealing with supliers, all drawings and photos. Status: Built
Project generated through containers for the exhibition of the colonia project. The project has a double height that connects all the areas through a common one.
76
Floor plans
1
2
3
4
9.60 2.39
2.39
A
BODEGA
A
4.83
BOOTH
3.84
3.84
SINK
B
B 2.39
4.83
2.39
9.60
1
2
3
4 Ground floor
1
2
3
4
9.60 2.39
4.83
2.39
A 3.84
3.84
A
B
B 2.39
4.83
2.39
9.60
1
2
3
4 Floor plan L1
77
South view
South view
78
Sections
COLONIA.
A
USOS MIXTOS AV. COLON PLATE DESARROLLOS MONTERREY, NUEVO LEON.
B
N
NOTAS GENERALES
3.84
ACOTACIONES EN METROS NIVELES EN METROS ESTE PLANO DEBERÁ VERIFICARSE CON LOS CORRESPONDIENTES DE INSTALACIONES Y ESTRUCTURALES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
NOMENCLATURA B.D.N
BANCO DE NIVEL
N.B.Q
NIVEL DE BANQUETA
N.F.T
NIVEL DE FIRME TERMINADO
N.N.T
NIVEL NATURAL DE TERRENO
N.P.T
NIVEL DE PISO TERMINADO
N.C
NIVEL CERRAMIENTO
N.S.L
NIVEL SUPERIOR DE LOSA
N.I.L
NIVEL INFERIOR DE LOSA
SIMBOLOGIA NIVEL INDICADO EN PLANTA NIVEL INDICADO EN CORTE/ALZADO CAMBIO DE NIVEL EN PISO CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
REVISIONES FECHA
FIRMA
11-02-2020 06-03-2020 10-03-2020
AR-8.0 ARQUITECTONICO ESCALA: 1:20 FECHA: 17.03.2020
SECCIÓN LONGITUDINAL
Ground floor
COLONIA. USOS MIXTOS AV. COLON PLATE DESARROLLOS MONTERREY, NUEVO LEON.
1
2
3
4
NOTAS GENERALES
9.60 2.39
4.83
N
2.39
ACOTACIONES EN METROS NIVELES EN METROS ESTE PLANO DEBERÁ VERIFICARSE CON LOS CORRESPONDIENTES DE INSTALACIONES Y ESTRUCTURALES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
NOMENCLATURA B.D.N
BANCO DE NIVEL
N.B.Q
NIVEL DE BANQUETA
N.F.T
NIVEL DE FIRME TERMINADO
N.N.T
NIVEL NATURAL DE TERRENO
N.P.T
NIVEL DE PISO TERMINADO
N.C
NIVEL CERRAMIENTO
N.S.L
NIVEL SUPERIOR DE LOSA
N.I.L
NIVEL INFERIOR DE LOSA
SIMBOLOGIA NIVEL INDICADO EN PLANTA NIVEL INDICADO EN CORTE/ALZADO CAMBIO DE NIVEL EN PISO CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
REVISIONES FECHA
FIRMA
11-02-2020 06-03-2020 10-03-2020
AR-7.0 ARQUITECTONICO ESCALA: 1:20 FECHA: 17.03.2020
SECCIÓN TRANSVERSAL
Floor plan L1
79
interior view
Interior view
80
Facades
C
COLONIA.
A
B
USOS PLAT MON
USOS MIXTOS AV. COLON PLATE DESARROLLOS MONTERREY, NUEVO LEON.
A
B
3.84
N
N
NOTAS GENERALES
3.84
N3 5.80
N2
ACOTACIONES EN METROS
ACO
NIVELES EN METROS
NIV
ESTE PLANO DEBERÁ VERIFICARSE CON LOS CORRESPONDIENTES DE INSTALACIONES Y ESTRUCTURALES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
EST LOS DE I CUA CON EL C LUG EJEC IND DEB OBR HUB QUE PLA TOD EST EJEC ESP COR
NOMENCLATURA
NO
B.D.N
BANCO DE NIVEL
B.D.
N.B.Q
NIVEL DE BANQUETA
N.B
N.F.T
NIVEL DE FIRME TERMINADO
N.F.
N.N.T
NIVEL NATURAL DE TERRENO
N.N
N.P.T
NIVEL DE PISO TERMINADO
N.P.
N.C
NIVEL CERRAMIENTO
N.C
N.S.L
NIVEL SUPERIOR DE LOSA
N.S.
N.I.L
NIVEL INFERIOR DE LOSA
N.I.L
SIM
SIMBOLOGIA
2.90
NIVEL INDICADO EN PLANTA NIVEL INDICADO EN CORTE/ALZADO CAMBIO DE NIVEL EN PISO CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
REVISIONES FECHA
F
FIRMA
11-02-2020
11-
06-03-2020
06-
10-03-2020
10-
N1 0.00
AR-3.0 West view
ARQUITECTONICO
ARQU
ESCALA: 1:20
ESCAL
FECHA: 17.03.2020
FECHA
East view FACHADA OESTE
COLONIA. USOS MIXTOS AV. COLON PLATE DESARROLLOS MONTERREY, NUEVO LEON.
1
2
3
4
NOTAS GENERALES
9.60 2.39
4.83
N
2.39
ACOTACIONES EN METROS NIVELES EN METROS ESTE PLANO DEBERÁ VERIFICARSE CON LOS CORRESPONDIENTES DE INSTALACIONES Y ESTRUCTURALES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
NOMENCLATURA B.D.N
BANCO DE NIVEL
N.B.Q
NIVEL DE BANQUETA
N.F.T
NIVEL DE FIRME TERMINADO
N.N.T
NIVEL NATURAL DE TERRENO
N.P.T
NIVEL DE PISO TERMINADO
N.C
NIVEL CERRAMIENTO
N.S.L
NIVEL SUPERIOR DE LOSA
N.I.L
NIVEL INFERIOR DE LOSA
SIMBOLOGIA NIVEL INDICADO EN PLANTA NIVEL INDICADO EN CORTE/ALZADO CAMBIO DE NIVEL EN PISO CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
REVISIONES FECHA
FIRMA
11-02-2020 06-03-2020 10-03-2020
AR-5.0 ARQUITECTONICO ESCALA: 1:20 FECHA: 17.03.2020
FACHADA NORTE
North view
81
COLONIA.
1
2
3
USOS MIXTOS AV. COLON PLATE DESARROLLOS MONTERREY, NUEVO LEON.
4
N
NOTAS GENERALES ACOTACIONES EN METROS NIVELES EN METROS
N3 5.80
ESTE PLANO DEBERÁ VERIFICARSE CON LOS CORRESPONDIENTES DE INSTALACIONES Y ESTRUCTURALES, CUALQUIER DISCREPANCIA CONSULTARSE CON DIRECCION DE OBRA. EL CONTRATISTA RECTIFICARA EN EL LUGAR DE LA OBRA, ANTES DE EJECUTAR, LAS DIMENSIONES Y NIVELES INDICADOS EN ESTE PLANO DEBIENDO SOMETER A DIRECCION DE OBRA CUALQUIER DIFERENCIA QUE HUBIERE, ASI COMO LA INTERPRETACION QUE DE EL PROPIO CONTRATISTA A ESTE PLANO. TODOS LOS ACABADOS SEÑALADOS EN ESTE PLANO DEBERAN EJECUTARSE DE ACUERDO A LAS ESPECIFICACIONES CORRESPONDIENTES.
NOMENCLATURA
N2 2.90
B.D.N
BANCO DE NIVEL
N.B.Q
NIVEL DE BANQUETA
N.F.T
NIVEL DE FIRME TERMINADO
N.N.T
NIVEL NATURAL DE TERRENO
N.P.T
NIVEL DE PISO TERMINADO
N.C
NIVEL CERRAMIENTO
N.S.L
NIVEL SUPERIOR DE LOSA
N.I.L
NIVEL INFERIOR DE LOSA
SIMBOLOGIA NIVEL INDICADO EN PLANTA NIVEL INDICADO EN CORTE/ALZADO CAMBIO DE NIVEL EN PISO CAMBIO DE MATERIAL EN PISO CAMBIO DE MATERIAL EN PLAFON CAMBIO DE MATERIAL EN MURO
REVISIONES FECHA
FIRMA
11-02-2020 06-03-2020 10-03-2020
N1 0.00
AR-4.0 ARQUITECTONICO ESCALA: 1:20 FECHA: 17.03.2020
FACHADA SUR
South view
Interior view
82