Sean Devlin, Graduate Studio III - COTE Competition Submission

Page 1

REFILL

PHOTOVLTAIC ROOF ARRAY

THE EXISTING NATURE CENTER’S CONSERVATION EFFORTS ARE EXPANDED WITH MORE SPACE FOR WILDLIFE RESEARCH ROOF STRUCTURE CLASSROOM/MEETING ROOM WILDLIFE RESCUE & TRIAGE

Hunting Island, South Carolina is the location of the state’s most popular state park. Over the past decade, Hunting Island has been subjected to intense coastal change and erosion due to rising sea levels and increasingly severe hurricanes.

AVIAN AND SMALL MAMMAL LAB CEILING

HVAC

RESTROOM

RESTROOM

REFILL aims to replenish its own resources, specifically water. Water is precious and it is imperative that the way water is used be more thoughtfully considered. This project collects, treats, filters, and produces its own water. This way, REFILL is not consuming water from local aquifers, and any excess water that is collected can be used to replenish those aquifers.

MARINE & REPTILE LAB

THE USE OF LIGHT FRAME CONSTRUCTION ALLOWS FOR A 67% REDUCTION OF EMBODIED ENERGY FROM THE BENCHMARKS FOR BUILDINGS OF SIMILAR USE AND SIZE

WILDLIFE EXHIBIT

BUIDING COLUMNS

CLAY STUDY By pushing clay onto a physical topography model, a very tacticle experience provided clearer understanding of the high and low points of the site.

WALLS

EFFICIENT USE OF SITE AND PROGRAM ALLOWS FOR LESS WASTE DURING CONSTRUCTION AND GREATER RETURN ON INVESTMENT

BUILDING A: WILDLIFE CENTER MAINTAINING CLOSE PROXIMITY TO THE EXISTING PARKING LOT ALLOWS FOR GREATER ACCESSIBILITY TO THE SITE

SOUTHERN ORIENTATION OF BUILDINGS IS THE OPTIMAL ORIENTATION FOR GENERATING SOLAR POWER AS WELL AS MITIGATING SOLAR HEAT GAIN

WATER DROP STUDY

BOARDWALK

WATER NEEDS FOR THE ENTIRE PROJECT ARE OFFSET IN THE WATER TREATMENT CENTER

Early site development was informed by drainage paths and pools created by releasing water drops onto a physical topography model

A

RESTROOOM BOARDWALK STRUCTURE

RESTROOOM

C

CONTAMINANT LAB

B

INTERACTIVE EXHIBIT

LAB STORAGE

TEACHING LAB

OFFICE EXHIBITION SPACE VIDEO EXHIBIT PIER FOUNDATIONS

CONCEPTUAL SITE PLAN Buildings were located at spots where water drops pooled in the previous study while pathways folowed drainage paths.

D

BUILDING B: WATER TREATMENT CENTER EXPLODED AXONOMETRIC OF TYPICAL STRUCTURAL CONFIGURATION

N

TEMPORARY DORMS FOR A MAXIMUM OF 20 RESEARCHERS ALLOW THEM TO LIVE ON-SITE, REDUCING THE AMOUNT OF DAILY COMMUTERS TO THE SITE

FINALIZED SITE PLAN THROUGH A SERIES OF ITERATIONS, REFILL TAKES ITS FINAL FORM AS FIVE PAVILIONS COMPRISED OF A WILDLIFE CENTER, A WATER TREATMENT CENTER, AN EROSION RESEARCH CENTER, AND TWO RESEARCHER DORMITORIES

REFILL IS AN EXPANSION OF HUNTING ISLAND’S EXISTING NATURE CENTER AND PARK RANGER LIVING QUARTERS

PHOTOVOLTAIC PANEL 3” RIGID INSULATION 2X8 RAFTERS WOOD SOFFIT

ON-SITE DORMITORIES ALLOW RESEARCHERS TO STAY NEARBY, ELIMINATING AN AVERAGE 30 MILE ROUND-TRIP COMMUTE FOR DORM OCCUPANTS

AN ELEVATED BOARDWALK RAISES THE BUILDINGS ABOVE PREDICTED FLOOD LEVELS

8” ROCK WOOL INSULATION 6X12 WOOD BEAM OPERABLE JALOUSIE WINDOW

COMMUNAL SPACE QUAD

COMMUNAL SPACE

2X12 WOOD BLOCK GYPSUM WALL BOARD FINISH 8” ROCK WOOL INSULATION 6” RIGID INSULATION WOOD PANEL SIDING 1X4 WOOD DECKING 2X8 JOISTS 6X12 WOOD BEAM

8X8 WOOD COLUMN

BUILDING C: RESEARCHER DORMITORIES

A PAIRED MARSH LAB AND COAST LAB OBSERVE AND STUDY THE DELICATE RELATIONSHIP BETWEEN THE RISING SEA LEVELS AND THE WETLANDS MARSH LAB

12” DIAMETER SONOTUBE

COAST LAB

CONCRETE FOOTING

TYPICAL WALL SECTION

AERIAL PERSPECTIVE OF SITE

EROSION RESEARCH CENTER FLOOR PLAN

HVAC